KR20200002362U - Concrete penetration membrane structure - Google Patents
Concrete penetration membrane structure Download PDFInfo
- Publication number
- KR20200002362U KR20200002362U KR2020190001590U KR20190001590U KR20200002362U KR 20200002362 U KR20200002362 U KR 20200002362U KR 2020190001590 U KR2020190001590 U KR 2020190001590U KR 20190001590 U KR20190001590 U KR 20190001590U KR 20200002362 U KR20200002362 U KR 20200002362U
- Authority
- KR
- South Korea
- Prior art keywords
- fixing
- pouring
- casting
- concrete
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/365—Stop-end shutterings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
콘크리트 타설막이 구조체에 관한 것으로, 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체가 형성되며, 강성을 갖는 수직프레임이 끼워지도록 중앙에 결합구멍이 형성되고, 상기 결합구멍과 인접하게 고정구멍(13)이 형성된 타설막이부재; 상기 타설막이부재의 고정구멍에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부와 상기 제1 수직고정부로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부가 일체로 형성되는 고정부재; 상기 타설막이부재에 고정된 상기 고정부재를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드;를 마련하여 신축고정밴드에 의해 결속된 2개 또는 3개로 이루어진 타설막이부재를 설치할 수 있게 되어 타설막이부재의 설치 작업 시간을 대폭 줄일 수 있고, 타설막이부재의 중앙에 수직프레임이 결합되어 있어 콘크리트의 양생 시 다수의 타설막이부재가 견고하게 설치된 상태를 유지시킬 수 있으며, 이로 인해 타설막이 구조체의 설치를 간편하고 신속하게 설치할 수 있다는 효과가 얻어진다.Regarding the concrete pouring membrane structure, it is a concrete pouring membrane structure that is installed so that concrete is poured in a set area, and the casting membrane body is formed in a cylindrical shape with a certain diameter, and a coupling hole is formed in the center so that a rigid vertical frame is inserted. It is, a casting film member having a fixing hole 13 adjacent to the coupling hole; A fixing member integrally formed with a first vertical fixing part formed to have a predetermined length so as to be fitted into the fixing hole of the pouring film member and a second vertical fixing part formed to be spaced apart from the first vertical fixing part by a predetermined distance; An expansion and contraction band provided so as to bind a plurality of the fixing members fixed to the cast member, and two or three cast members bound by the expansion and contraction bands can be installed, so that the cast member The installation work time of the installation can be significantly reduced, and the vertical frame is coupled to the center of the pouring barrier member, so that a number of pouring barrier members can be kept firmly installed during curing of concrete, thereby preventing the installation of the pouring barrier structure. The effect of being able to install simply and quickly is obtained.
Description
본 고안은 콘크리트 타설막이 구조체에 관한 것으로, 더욱 상세하게는 콘크리트를 타설하기 위하여 설치되는 타설막이 구조체를 신축밴드로 결속시켜 타설막이 구조체의 설치를 보다 신속하게 할 수 있을 뿐만 아니라 타설막이 구조체의 설치 간격을 자유로이 조절할 수 있도록 하는 콘크리트 타설막이 구조체에 관한 것이다.The present design relates to a concrete pouring membrane structure, and more specifically, by binding the pouring membrane structure installed for pouring concrete with an extension band, the installation of the pouring membrane structure can be faster as well as the installation of the pouring membrane structure. It relates to a concrete pouring membrane structure that allows the gap to be freely adjusted.
일반적으로 건축물의 슬라브 등 기초구조물을 구축할 시에는 철근이 배근된 거푸집에 일정 두께로 콘크리트를 타설하게 된다.In general, when constructing a foundation structure such as a slab of a building, concrete is poured in a certain thickness in a form with reinforced bars.
즉, 거푸집 바닥면과 하부철근, 하부철근과 상부철근을 각각 일정 간격으로 배근한 후 상부철근에서 일정 높이까지 콘크리트를 타설하는 것이다.In other words, the bottom and lower reinforcing bars of the formwork, the lower reinforcing bars and the upper reinforcing bars are placed at regular intervals, and concrete is poured from the upper reinforcing bars to a predetermined height.
상기 슬라브 등 기초구조물을 구축할 시 콘크리트의 타설 면적이 넓어서 하루 작업시간 내에 모두 타설할 수 없거나 콘크리트의 생산현장에서 타설현장까지의 운송지연이나 타설장비의 고장 등으로 인해 콘크리트의 공급이 갑자기 중단될 시에는 타설 가능한 면적을 구획하여 이어치기를 위한 마감부재를 설치한다.When constructing a foundation structure such as the slab, the concrete is not able to be poured within a day due to the large pouring area, or the supply of concrete is suddenly stopped due to a delay in transportation from the production site to the pouring site or failure of the pouring equipment. In the case of the city, the area that can be poured is divided and a finishing member is installed for joining.
그리고 평면 슬라브를 수직으로 관통하여 후공정으로 구축되는 기둥이 접하는 부위, 구조물의 설계변경으로 인한 후타설 부위, 자재인양구 또는 토사반출구 등 평면 슬라브와 일체로 시공되지 않는 부분의 끊어치기를 위한 마감부재를 설치하게 된다.In addition, it is intended to cut parts that are not integrally constructed with the flat slab, such as the part that the flat slab is vertically penetrated and the pillars built in the post process contact, the post-placement part due to the design change of the structure, the material lifting port or the soil discharge port. Finishing members are installed.
상기 콘크리트의 이어치기 또는 끊어치기를 위한 마감부재 설치방법에는 합판, 각목재, 철판 등을 일정 크기로 절단하여 배근된 철근들의 사이를 막고 상부근과 타설면 사이를 길게 막아주어 콘크리트의 조인트부위를 형성하였으나, 설치작업의 번거로움과 먼저 타설되는 선구간의 콘크리트와 나중에 타설되는 후구간의 콘크리트 간에 이어지는 시공 조인트 부분의 부착강도 저하 등의 문제점을 개선하기 위해 다양한 마감부재를 이용한 설치방법이 안출되고 있다.The method of installing a finishing member for splicing or breaking concrete includes cutting plywood, timber, and steel plates to a certain size to block the space between the reinforced reinforcing bars, and to prevent the length between the upper bars and the pouring surface. However, in order to improve the hassle of installation work and problems such as a decrease in the adhesive strength of the construction joint between the concrete in the first section to be poured first and the concrete in the later section to be poured later, an installation method using various finishing members has been devised. have.
건축물의 슬라브 등을 구축하는 작업에 있어서 한 번에 모든 면적의 구역에 콘크리트를 타설할 수 없는 경우에는 타설 면적을 일정 구역으로 나누어 콘크리트 작업을 하게 된다.In the case of constructing the slabs of a building, if it is not possible to pour concrete in all areas at once, concrete work is performed by dividing the pouring area into certain areas.
상기와 같이 일정 구역으로 면적을 나누어 콘크리트를 타설하는 경우에는 한 번에 타설할 수 있는 구역을 다음 작업을 실시할 구역과 나누어 구획시키게 되는데, 이때 콘크리트의 누출을 방지하는 콘크리트 타설막이를 설치하게 된다.In the case of pouring concrete by dividing the area into a certain area as described above, the area that can be poured at a time is divided into the area where the next work is to be performed, and a concrete pouring barrier is installed to prevent leakage of concrete. .
종래의 콘크리트 타설막이(10)는 도 1에서 보는 바와 같이 차단프레임(20)에 일정 간격으로 체결공(21)을 다수 형성하고 각 체결공(21)에 머리부(31)를 가진 차단봉(30)이 삽입되어 있는 구조로 이루어진다.As shown in FIG. 1, the conventional
차단프레임(20)은 콘크리트 타설 구역의 상부 타설면을 막아주고, 차단봉(30)은 상부 철근과 하부 철근 및 기타 구조물 등이 설치된 하부 타설면을 차단시키게 되며, 한번 작업 시 정해진 구역에서 콘크리트 타설이 종료되도록 일정 구역을 막고 콘크리트 타설물이 일정 구역 안에만 머물면서 양생되도록 하는 것이다.The blocking
그러나 종래의 콘크리트 타설막이는 차단봉이 플라스틱으로 길이방향으로 중공 홀을 가지는 원기둥 형상의 관체로 만들어져 콘크리트 타설물이 차단봉에 미치는 횡압력에 약하여 쉽게 파손되는 문제가 있다.However, the conventional concrete pouring barrier has a problem that the barrier bar is made of a cylindrical tube body having a hollow hole in the longitudinal direction of plastic, and thus the concrete pouring material is weak against the lateral pressure applied to the barrier bar and is easily damaged.
또 차단봉 사이사이에 틈이 생기고 특히 고강도 콘크리트와 같은 묽은 콘크리트가 타설될 경우에는 차단봉 사이의 틈으로 타설된 콘크리트의 상당량이 흘러나오게 되어, 콘크리트 타설막이 부근에서 콘크리트의 누출을 초래함으로써 양생되는 콘크리트 밀도의 불균형이나 공극이 발생되는 불량을 발생시킬 수 있으며, 누출된 콘크리트가 차단봉을 둘러싸면서 굳어져 콘크리트 양생 후 차단봉을 떼어내기가 매우 어렵게 되거나 차단봉을 떼어내는 과정에서 차단봉이 파손되는 문제가 있다.In addition, when there is a gap between the barrier bars, and especially when thin concrete such as high-strength concrete is poured, a significant amount of concrete poured through the gap between the barrier bars flows out, causing the concrete to leak in the vicinity of the concrete casting membrane, resulting in concrete density cured. There is a problem in that it is very difficult to remove the barrier bar after curing the concrete, or the barrier bar is damaged in the process of removing the barrier bar as the leaked concrete is hardened while surrounding the barrier bar.
또한 낱개로 이루어진 콘크리트 타설막이를 하나씩 설치하게 됨에 따라 콘크리트 타설막이의 설치에 따라 작업 시간이 길어지게 되고, 이로 인해 콘크리트 타설막이 설치 시 작업자의 피로도가 증가되는 문제점이 있었다.In addition, as the individual concrete pouring barriers are installed one by one, the working time is lengthened according to the installation of the concrete pouring barriers, and there is a problem in that the fatigue of the worker increases when the concrete pouring barriers are installed.
예를 들어, 하기 특허문헌 1에는 '차단봉이 삽입되는 차단부재를 가진 콘크리트 타설막이'가 개시되어 있다.For example, in Patent Document 1 below, a'concrete pouring membrane having a blocking member into which a blocking rod is inserted' is disclosed.
하기 특허문헌 1에 따른 차단봉이 삽입되는 차단부재를 가진 콘크리트 타설막이는 다수개의 소정 형상의 상부 체결공이 일정 간격으로 길이방향으로 뚫린 평면부와, 상기 평면부에 뚫린 다수개의 상부 체결공과 대향하는 다수개의 소정 형상의 하부 체결공이 길이방향으로 뚫린 저면부와, 상기 평면부 및 저면부의 일측 단부와 직각을 이루는 정면부로 형성되는 차단프레, 머리부와 몸체부를 가지고 다수개가 형성되고, 상기 머리부는 상부 체결공으로 빠지지 않도록 상부 체결공보다 크게 형성되며, 상기 몸체부는 길이방향으로 중공 홀을 가지는 원기둥 형상의 관체로 형성되고, 상기 몸체부의 중공 홀의 내주면에 일정 간격의 요철 형상으로 형성되는 지지구조를 가지는 차단봉, 신축성 있는 소재로 형성되며, 중앙에 상기 차단봉의 외주면이 삽입될 수 있는 삽입홈이 길이방향으로 형성되어 상기 차단프레임의 저면부 하방에 위치하는 차단부재를 포함한다.The concrete pouring membrane having a blocking member into which a blocking rod is inserted according to the following Patent Document 1 has a flat portion in which a plurality of predetermined shape upper fastening holes are drilled in the longitudinal direction at regular intervals, and a plurality of facing the plurality of upper fastening holes drilled in the flat portion. A plurality of blocks are formed with a bottom portion having a predetermined shape of the lower fastening hole drilled in the longitudinal direction, a front portion forming a right angle with one end of the flat portion and the bottom portion, a head portion and a body portion, and the head portion is fastened to the top. A blocking rod having a support structure that is formed larger than the upper fastening hole so as not to fall into a ball, the body portion is formed as a cylindrical tube body having a hollow hole in the longitudinal direction, and is formed in an uneven shape at regular intervals on the inner peripheral surface of the hollow hole of the body portion, It is formed of an elastic material and includes a blocking member positioned below the bottom of the blocking frame by having an insertion groove formed in the center in the longitudinal direction into which the outer peripheral surface of the blocking rod can be inserted.
상기 차단프레임은 콘크리트의 상부 타설 구역을 차단하고, 상기 차단봉은 상기 차단프레임의 평면부와 저면부에 서로 마주 보며 뚫린 다수개의 상부 체결공, 하부 체결공과 차단부재의 삽입홈에 차례로 각각 상하 유동 가능하게 삽입되어 콘크리트의 하부 타설 구역을 차단한다.The blocking frame blocks the upper pouring area of the concrete, and the blocking rod is able to flow up and down in sequence through a plurality of upper fastening holes, lower fastening holes and insertion grooves of the blocking member, which are drilled facing each other on the flat and bottom parts of the blocking frame. It is inserted so that it blocks the lower pouring area of concrete.
하기 특허문헌 2에는 '차단프레임이 없는 가변형 콘크리트 타설막이'가 개시되어 있다.Patent Document 2 below discloses a'variable concrete pouring membrane without a blocking frame'.
하기 특허문헌 2에 따른 차단프레임이 없는 가변형 콘크리트 타설막이는 굵기가 다양한 상하부 철근, 수직철근이 밀집하게 배근되며, 현장 여건에 따라 불규칙하게 철근이 배근되기도 하는 건축물 벽체의 철근밀집구간에 용이하게 설치하여 콘크리트의 누출을 방지할 수 있는 차단프레임이 없는 가변형 콘크리트 타설막이로서, 길이방향으로 중공 홀을 가지는 원기둥 형상의 관체로 형성되는 차단봉, 중앙에 상기 차단봉의 외주면이 삽입될 수 있는 삽입홈이 길이방향으로 형성되는 차단부재, 상기 차단봉이 삽입되거나 삽입되지 않은 다수개의 상기 차단부재들이 각각 폭 방향으로 압착되면서 배근된 철근과 철근 사이 또는 철근과 거푸집 벽면 사이에 콘크리트 타설면 안쪽으로 콘크리트 타설 바닥면에 수직하게 배치되어 철근과 인접하는 차단부재 및 서로 인접하는 차단부재들이 측면에서 밀착되어 형성되는 가변형 타설막이 본체를 포함한다.The variable concrete pouring barrier without blocking frame according to the following Patent Document 2 is easily installed in the reinforced section of the wall of the building where the upper and lower reinforcing bars and vertical reinforcing bars of various thicknesses are densely arranged, and rebars are irregularly reinforced depending on the site conditions. As a variable concrete pouring membrane without a blocking frame that can prevent concrete leakage, a blocking rod formed of a cylindrical tube having a hollow hole in the longitudinal direction, and an insertion groove in the center into which the outer peripheral surface of the blocking rod can be inserted A blocking member formed in a direction, a plurality of blocking members with or without the blocking rod inserted are compressed in the width direction, respectively, between the reinforced reinforcing bar and the reinforcing bar, or between the reinforcing bar and the wall surface of the formwork, on the concrete floor surface It is disposed vertically and includes a block member adjacent to the reinforcing bar and a variable casting membrane body formed by contacting blocking members adjacent to each other from the side.
상기 차단봉은 차단부재의 삽입홈에 삽입되어 콘크리트의 타설압력을 견딜 수 있도록 금속 재질로 형성되며, 차단봉의 상단에는 머리부가 형성되고, 상기 차단봉의 하단이 콘크리트 타설 바닥면에 닿으면 쉽게 움직이지 않도록 하단에는 돌부가 형성되며, 상기 차단부재는 건축용 백업재로 외경의 크기가 같은 다수개의 원기둥 형상으로 형성되거나 외경의 크기가 다른 다수개의 원기둥 형상으로 형성된다.The blocking rod is inserted into the insertion groove of the blocking member and formed of a metal material to withstand the pouring pressure of concrete, and a head is formed at the top of the blocking rod, so that it does not move easily when the bottom of the blocking rod touches the concrete pouring floor. A protrusion is formed at the lower end, and the blocking member is formed in a plurality of cylindrical shapes having the same outer diameter as a backup material for construction, or a plurality of cylindrical shapes having different outer diameters.
상기 타설막이 본체는 1열로 형성되거나 2열 이상으로 설치되며, 상기 타설막이 본체의 차단부재들을 가로 지르는 수평지지부재가 설치되고, 상기 수평지지부재는 콘크리트 타설압력이 상기 타설막이 본체를 밀어내지 않도록 콘크리트 타설면 반대측에 설치하며, 상기 타설막이 본체가 2열 이상인 경우에는 콘크리트 타설면 반대측 가장 외측에 있는 타설막이 본체에 설치된다. The pouring membrane body is formed in one row or in two or more rows, and a horizontal support member is installed in which the pouring membrane crosses the blocking members of the main body, and the horizontal support member prevents the concrete pouring pressure from pushing the pouring membrane to the main body. It is installed on the opposite side of the concrete placement surface, and when the main body is in two or more rows, the outermost casting membrane on the opposite side of the concrete placement surface is installed on the body.
본 고안의 목적은 상기한 바와 같은 문제점을 해결하기 위한 것으로, 타설막이 구조체의 설치 시 다수개로 이루어진 타설막이 구조체를 신속하게 설치할 수 있도록 하는 콘크리트 타설막이 구조체를 제공하는 것이다.It is an object of the present invention to solve the above-described problems, and to provide a concrete pouring membrane structure that allows a plurality of pouring membrane structures to be quickly installed during installation of the pouring membrane structure.
본 고안의 다른 목적은 콘크리트의 양생 후 타설막이 구조체를 파손되지 않게 분리시켜 재사용할 수 있도록 함은 물론 원활하게 분리시킬 수 있도록 하는 콘크리트 타설막이 구조체를 제공하는 것이다.Another object of the present invention is to provide a concrete pouring membrane structure that can be reused by separating the pouring membrane structure without damage after curing of concrete, as well as allowing smooth separation.
본 고안의 또 다른 목적은 타설막이부재의 간격을 필요에 따라 자유로이 조절할 수 있도록 하는 콘크리트 타설막이 구조체를 제공하는 것이다.Another object of the present invention is to provide a concrete pouring membrane structure that allows the spacing of the pouring barrier members to be freely adjusted as necessary.
상기한 바와 같은 목적을 달성하기 위하여, 본 고안에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체가 형성되며, 상기 타설막이본체의 중앙에 결합구멍이 형성된 타설막이부재; 상기 타설막이부재의 결합구멍에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부와 상기 제1 수직고정부로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부가 일체로 형성되는 고정부재; 상기 타설막이부재에 고정된 상기 고정부재를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드;를 포함하는 것을 특징으로 한다. In order to achieve the above object, the concrete pouring membrane structure according to the present invention is a concrete pouring membrane structure that is installed so that concrete is poured in a set area, and the casting membrane body is formed in a cylindrical shape having a predetermined diameter, and the pouring membrane is A casting barrier member having a coupling hole formed in the center of the body; A fixing member integrally formed with a first vertical fixing part formed to have a predetermined length so as to be fitted into the coupling hole of the pouring film member and a second vertical fixing part formed to be spaced apart from the first vertical fixing part by a predetermined distance; It characterized in that it comprises a; a telescopic fixing band provided to bind the fixing member fixed to the casting member in a plurality.
또 본 고안에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체가 형성되며, 강성을 갖는 수직프레임이 끼워지도록 중앙에 결합구멍이 형성되고, 상기 결합구멍과 인접하게 고정구멍(13)이 형성된 타설막이부재; 상기 타설막이부재의 고정구멍에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부와 상기 제1 수직고정부로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부가 일체로 형성되는 고정부재; 상기 타설막이부재에 고정된 상기 고정부재를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드;를 포함하는 것을 특징으로 한다.In addition, the concrete pouring membrane structure according to the present invention is a concrete pouring membrane structure that is installed so that concrete is poured in a set area, and the casting membrane body is formed in a cylindrical shape with a certain diameter, and a coupling hole in the center so that a rigid vertical frame is inserted. Is formed, and a casting film member having a
상기 신축고정밴드는 다수의 타설막이부재가 결속되도록 제1 타설막이본체에 고정된 제1 고정부재 및 제2 타설막이본체에 고정된 제2 고정부재가 일체로 결속되도록 상기 제1 고정부재와 상기 제2 고정부재의 외면에 설치되는 것을 특징으로 한다.The telescopic fixing band includes the first fixing member and the first fixing member fixed to the first casting film body and the second fixing member fixed to the second casting film body so that the plurality of pouring film members are bound together. It characterized in that it is installed on the outer surface of the second fixing member.
상기 고정부재는 상기 타설막이부재의 고정구멍에 끼워지도록 상기 타설막이부재의 길이와 동일한 길이로 형성되는 제1 수직고정부; 상기 제1 수직고정부의 상단에 수평 방향으로 소정의 길이만큼 연장 형성되는 수평연결부; 상기 수평연결부의 선단에서 상기 제1 수직고정부의 길이보다 짧은 길이로 형성되는 제2 수직고정부;를 포함하는 것을 특징으로 한다.The fixing member may include a first vertical fixing portion formed to have a length equal to the length of the casting barrier member so as to be fitted into the fixing hole of the pouring barrier member; A horizontal connection part extending horizontally by a predetermined length on an upper end of the first vertical fixing part; And a second vertical fixing part formed at a front end of the horizontal connection part to have a length shorter than that of the first vertical fixing part.
또한 본 고안에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체가 형성되며, 강성을 갖는 수직프레임이 끼워지도록 중앙에 결합구멍이 형성되고, 상기 결합구멍과 인접하게 고정구멍이 형성되는 제1 타설막이본체와 제2 타설막이본체 및 제3 타설막이본체로 이루어지는 타설막이부재; 상기 타설막이부재의 고정구멍에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부와 상기 제1 수직고정부로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부가 일체로 형성되어 상기 제1 타설막이본체에 설치되는 제1 고정부재와 상기 제2 타설막이본체에 설치되는 제2 고정부재 및 상기 제3 타설막이본체에 고정되는 제3 고정부재로 이루어지는 고정부재; 상기 제1 고정부재와 제2 고정부재를 결속시키는 제1 신축고정밴드, 상기 제1 고정부재와 제2 고정부재 및 제3 고정부재를 결속시키는 제2 신축고정밴드로 이루어지는 신축고정밴드; 상기 다수의 고정부재를 끼워 설치할 수 있도록 구비되는 고정프레임;을 포함하는 것을 특징으로 한다.In addition, the concrete pouring membrane structure according to the present invention is a concrete pouring membrane structure that is installed to pour concrete as much as a set area, and the casting membrane body is formed in a cylindrical shape with a certain diameter, and a coupling hole in the center so that a rigid vertical frame is inserted. A casting film member comprising a first casting film body, a second casting film body, and a third casting film body having a fixing hole adjacent to the coupling hole; A first vertical fixing part formed to have a predetermined length so as to be inserted into a fixing hole of the pouring membrane member and a second vertical fixing part formed to be spaced apart from the first vertical fixing part by a predetermined distance are integrally formed to form the first casting. A fixing member comprising a first fixing member installed on the membrane body, a second fixing member installed on the second pouring membrane body, and a third fixing member fixed to the third casting membrane body; A first elastic fixing band for binding the first fixing member and the second fixing member, and a second elastic fixing band for binding the first fixing member, the second fixing member, and the third fixing member; It characterized in that it comprises a; a fixing frame provided so as to install the plurality of fixing members.
상기 고정부재는 상기 타설막이부재의 고정구멍에 끼워지도록 상기 타설막이본체의 길이와 동일한 길이로 형성되는 제1 수직고정부; 상기 제1 수직고정부의 상단에 수평 방향으로 소정의 길이만큼 연장 형성되는 수평연결부; 상기 수평연결부의 선단에서 상기 제1 수직고정부의 길이보다 짧은 길이로 형성되는 제2 수직고정부;를 포함하는 것을 특징으로 한다.The fixing member includes a first vertical fixing portion formed to have a length equal to the length of the casting membrane body so as to be fitted into the fixing hole of the casting membrane member; A horizontal connection part extending horizontally by a predetermined length on an upper end of the first vertical fixing part; And a second vertical fixing part formed at a front end of the horizontal connection part to have a length shorter than that of the first vertical fixing part.
상술한 바와 같이, 본 고안에 따른 콘크리트 타설막이 구조체에 의하면, 신축고정밴드에 의해 결속된 2개 또는 3개로 이루어진 타설막이부재를 설치할 수 있게 되어 타설막이부재의 설치 작업 시간을 대폭 줄일 수 있고, 타설막이부재의 중앙에 수직프레임이 결합되어 있어 콘크리트의 양생 시 다수의 타설막이부재가 견고하게 설치된 상태를 유지시킬 수 있으며, 이로 인해 타설막이 구조체의 설치를 간편하고 신속하게 설치할 수 있다는 효과가 얻어진다.As described above, according to the concrete pouring membrane structure according to the present invention, it is possible to install two or three pouring barrier members bound by an extension and fixing band, so that the installation work time of the pouring barrier member can be greatly reduced, Since a vertical frame is attached to the center of the pouring barrier member, it is possible to maintain a firmly installed state of a number of pouring barriers during curing of concrete, resulting in the effect that the installation of the pouring barrier structure can be easily and quickly installed. Lose.
본 고안에 따른 콘크리트 타설막이 구조체에 의하면, 타설막이부재 사이를 관통하는 철근 등을 용이하게 끼울 수 있도록 하여 타설막이 구조체의 설치 작업을 보다 용이하게 할 뿐만 이나라 타설막이 구조체의 설치에 따른 작업시간을 줄일 수 있다는 효과가 얻어진다.According to the concrete pouring membrane structure according to the present invention, it is possible to easily insert the reinforcing bars penetrating between the pouring barrier members, thereby making the installation work of the pouring barrier structure easier, and reducing the working time according to the installation of the Inara casting barrier structure. The effect of being able to reduce is obtained.
도 1은 종래의 콘크리트 타설막이를 도시한 입체도,
도 2는 본 고안의 바람직한 제1 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 분해 입체도,
도 3은 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도,
도 4는 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체의 타설막이부재를 도시한 입체도,
도 5는 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체의 타설막이부재를 도시한 분해 입체도,
도 6은 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도,
도 7은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도,
도 8은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도,
도 9는 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도,
도 10은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도.1 is a three-dimensional view showing a conventional concrete pouring barrier,
Figure 2 is an exploded three-dimensional view showing the concrete pouring membrane structure according to the first embodiment of the present invention,
3 is a three-dimensional view showing a concrete pouring membrane structure according to a second embodiment of the present invention,
Figure 4 is a three-dimensional view showing the pouring barrier member of the concrete pouring barrier structure according to a second embodiment of the present invention,
5 is an exploded three-dimensional view showing a pouring barrier member of a concrete pouring barrier structure according to a second preferred embodiment of the present invention,
6 is a three-dimensional view showing a state in which the concrete pouring membrane structure is installed according to a second embodiment of the present invention,
7 is a three-dimensional view showing a concrete pouring membrane structure according to a third preferred embodiment of the present invention,
8 is a three-dimensional view showing a concrete pouring membrane structure according to a third preferred embodiment of the present invention,
9 is a three-dimensional view showing a state in which the concrete pouring membrane structure is installed according to a third preferred embodiment of the present invention,
Figure 10 is a three-dimensional view showing a state in which the concrete pouring membrane structure is installed according to a third embodiment of the present invention.
이하 본 고안의 바람직한 실시 예에 따른 콘크리트 타설막이 구조체를 첨부된 도면을 참조하여 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings, a concrete pouring membrane structure according to a preferred embodiment of the present invention will be described in detail.
<제1 실시 예><First embodiment>
본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체(10a, 10b)가 형성되며, 상기 타설막이본체(10a, 10b)의 중앙에 결합구멍(11)이 형성된 타설막이부재(10), 상기 타설막이부재(10)의 결합구멍(1)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되는 고정부재(20), 상기 타설막이부재(10)에 고정된 상기 고정부재(20)를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드(30a)를 포함한다.The concrete pouring membrane structure according to the second preferred embodiment of the present invention is a concrete pouring membrane structure that is installed so that concrete is poured in a predetermined area, and the pouring
도 2는 본 고안의 바람직한 제1 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 분해 입체도이다.Figure 2 is an exploded three-dimensional view showing the concrete pouring membrane structure according to the first embodiment of the present invention.
상기 타설막이부재(10)는 다수의 타설막이본체로 이루어질 수 있느데, 도 2에서와 같이, 상기 타설막이본체는 제1 타설막이본체(10a)와 제2 타설막이본체(10b)로 이루어지며, 이들 타설막이본체(10a, 10b)에는 고정부재20)가 결합되도록 결합구멍(11)이 형성된다.The pouring
또한 상기 고정부재(20)는 대략 '∩'자 형상으로 이루어지는데, 결합구멍(11)에 결합되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)의 상단에서 수평으로 연결되는 수평연결부(22) 및 수평연결부(22)의 선단에서 수직으로 절곡되는 제2 수직고정부(23)로 이루어진다.In addition, the fixing
상기 고정부재(20)는 타설막이본체(10a, 10b)에 각각 결합되는 제1 고정부재(20a)와 제2 고정부재(20b)로 이루어지며, 이들제1 고정부재(20a)와 제2 고정부재(20b)는 신축고정밴드(30)에 의해 하나로 결속된다.The fixing
<제2 실시 예><Second Example>
본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이본체(10a, 10b)가 형성되며, 강성을 갖는 수직프레임(12)이 끼워지도록 중앙에 결합구멍(11)이 형성되고, 상기 결합구멍(11)과 인접하게 고정구멍(13)이 형성된 타설막이부재(10), 상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되는 고정부재(20), 상기 타설막이부재(10)에 고정된 상기 고정부재(20)를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드(30a)를 포함한다.The concrete pouring membrane structure according to the second preferred embodiment of the present invention is a concrete pouring membrane structure installed to pour concrete as much as a set area, and the casting
도 3는 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도이고, 도 4은 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체의 타설막이부재를 도시한 입체도이며, 도 5는 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체의 타설막이부재를 도시한 분해 입체도이다.3 is a three-dimensional view showing a concrete pouring membrane structure according to a second preferred embodiment of the present invention, and FIG. 4 is a three-dimensional view showing a pouring barrier member of the concrete pouring membrane structure according to a second preferred embodiment of the present invention. And Figure 5 is an exploded three-dimensional view showing a pouring barrier member of the concrete pouring membrane structure according to a second preferred embodiment of the present invention.
도 3 내지 도 5에 도시된 바와 같이, 본 고안의 제2 실시 예에 따른 콘크리트 타설막이 구조체는 콘크리트가 타설되도록 설치되는 타설막이부재(10)와 상기 타설막이부배(10)를 설치되게끔 하는 고정부재(20) 및 상기 다수의 타설막이부재(10)를 하나로 묶어주는 신축고정밴드(30a)로 이루어진다.As shown in Figs. 3 to 5, the concrete pouring barrier structure according to the second embodiment of the present invention allows the pouring
상기 타설막이부재(10)인 타설막이본체(10a, 10b)는 소정의 길이를 갖는 원통체로 이루어지로, 타설막이본체(10a, 10b)의 중앙에는 수직프레임(12)을 끼워 결합할 수 있도록 결합구멍(11)이 형성된다.The pouring
이러한 결합구멍(11)은 육각형의 형상으로 이루어지고, 상기 결합구멍(11)에 끼워져 결합되는 수직프레임(12)은 결합구멍(11)과 동일한 육각형의 형상으로 형성된다.The
상기 결합구멍(11) 및 수직프레임(12)은 육각형 외에도 사각형, 원형, 타원형 등의 형상으로 다양하게 형성될 수 있음은 물론이다.It goes without saying that the
또한 상기 타설막이본체(10a, 10b)의 상면에는 결합구멍(11)과 인접하게 고정구멍(13)이 형성된다. 상기 고정구멍(13)은 타설막이본체(10a, 10b)의 상면에서 하면까지 형성될 수 있고, 상기 고정구멍(13)은 소정의 깊이로 형성될 수 있다.In addition, a fixing
즉, 상기 고정구멍(13)은 타설막이본체(10a, 10b)를 관통되게 형성되거나 고정부재(20)를 끼워 고정시키고자 하는 길이로 형성될 수 있다.That is, the fixing
상기 고정부재(20)는 상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 상기 타설막이본체(10a, 10b)의 길이와 동일한 길이로 형성되는 제1 수직고정부(21), 상기 제1 수직고정부(21)의 상단에 수평 방향으로 소정의 길이만큼 연장 형성되는 수평연결부(22), 상기 수평연결부(22)의 선단에서 상기 제1 수직고정부(21)의 길이보다 짧은 길이로 형성되는 제2 수직고정부(23)를 포함한다.The fixing
도 5에 도시된 바와 같이, 상기 고정부재(20)는 고정구멍(13)에 끼워져 결합되는 제1 수직고정부(21)와 상기 타설막이부재(10)를 고정프레임(40)에 끼워 설치할 수 있도록 상기 제1 수직고정부(21)와 이격되게 형성되는 제2 수직고정부(23)로 이루어진다.As shown in Figure 5, the fixing
상기 제1 수직고정부(21)는 타설막이본체(10a, 10b)와 동일한 길이로 형성되고, 상기 제1 수직고정부(21)의 상단에는 수평으로 연장 형성되는 수평연결부(22)가 일체로 형성되며, 상기 수평연결부(22)의 선단에는 제1 수직고정부(21)와 같이 수직으로 제2 수직고정부(23)가 일체로 형성된다.The first vertical fixing
상기 수평연결부(22)는 고정프레임(40)의 폭과 동일한 길이로 형성되어 상기 타설막이부재(10)를 간편하게 설치할 수 있도록 한다.The
상기 신축고정밴드(30a)는 다수의 타설막이부재가 결속되도록 제1 타설막이부재(10a)에 고정된 제1 고정부재(20a) 및 제2 타설막이부재(10b)에 고정된 제2 고정부재(20b)가 일체로 결속되도록 상기 제1 고정부재(20a)와 상기 제2 고정부재(20b)의 외면에 설치된다.The elastic fixing band (30a) is a first fixing member (20a) fixed to the first casting member (10a) and a second fixing member fixed to the second casting member (10b) so that the plurality of casting member (10b) is bound (20b) is installed on the outer surfaces of the first fixing
한편 상기 타설막이부재(10)는 제1 타설막이본체(10a)와 제2 타설막이본체(10b)로 이루어지며, 이들 제1 타설막이본체(10a)와 제2 타설막이본체(10b)는 제1 고정부재(20a)와 제2 고정부재(20b)에 의해 하나로 결속된다.On the other hand, the pouring
즉, 상기 제1 타설막이본체(10a)에는 제1 고정부재(20a)가 설치되고, 제2 타설막이본체(10b)에는 제2 고정부재(20b)가 설치되며, 이들 제1 고정부재(20a)와 제2 고정부재(20b)는 신축고정밴드(30a)에 의해 하나로 결속된다.That is, a first fixing
다음 본 고안의 바람직한 실시 예에 따른 콘크리트 타설막이 구조체의 결합관계를 설명한다.Next, the bonding relationship between the concrete pouring membrane structure according to a preferred embodiment of the present invention will be described.
도 6는 본 고안의 바람직한 제2 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도이다.6 is a three-dimensional view showing a state in which the concrete pouring membrane structure is installed according to a second embodiment of the present invention.
도 3 내지 도 6에 도시된 바와 같이, 본 고안의 제2 실시 예에 따른 콘크리트 타설막이 구조체는 2개의 타설막이본체(10a, 10b)에 각각 결합구멍(11) 및 고정구멍(13)을 형성하고, 상기 결합구멍(11)에 수직프레임(12)을 끼워 결합하게 된다.As shown in Figs. 3 to 6, the concrete pouring membrane structure according to the second embodiment of the present invention has a
이에 따라 상기 타설막이본체(10a, 10b)는 수직프레임(12)의 결합에 의해 콘크리트 타설 시 콘크리트의 압력에 견디는 강성을 갖게 된다.Accordingly, the pouring membrane body (10a, 10b) has the rigidity to withstand the pressure of the concrete during concrete placement by the combination of the vertical frame (12).
아울러 상기 제1 타설막이본체(10a)에는 제1 고정부재(20a)를 끼워 결합하고, 제2 타설막이본체(10b)에는 제2 고정부재(20b)를 끼워 결합한다.In addition, a first fixing
이러한 제1 고정부재(20a)와 제2 고정부재(20b)에는 신축고정밴드(30a)가 끼워지게 되고, 상기 신축고정밴드(30a)는 열에 의해 수축되어 제1 고정부재(20a)와 제2 고정부재(20b)를 하나로 결속하게 된다.The
이렇게 신축고정밴드(30a)에 의해 결속된 타설막이부재(10)는 고정프레임(40)에 끼워 설치하게 되며, 2개가 하나로 묶인 타설막이부재(10)를 설치하게 되어 타설막이부재(10)의 설치에 따른 작업시간을 대폭 줄일 수 있게 된다.In this way, the
<제3 실시 예><Third Example>
도 7은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도이고, 도 8은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체를 도시한 입체도이다.7 is a three-dimensional view showing a concrete pouring membrane structure according to a third preferred embodiment of the present invention, and FIG. 8 is a three-dimensional view showing a concrete pouring membrane structure according to a third preferred embodiment of the present invention.
본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체는 설정된 구역만큼 콘크리트가 타설되도록 설치되는 콘크리트 타설막이 구조체로서, 일정 직경을 갖는 원통형으로 타설막이부재(10a, 10b, 10c)가 형성되며, 강성을 갖는 수직프레임(12)이 끼워지도록 중앙에 결합구멍(11)이 형성되고, 상기 결합구멍(11)과 인접하게 고정구멍(13)이 형성되는 제1 타설막이본체(10a)와 제2 타설막이본체(10b) 및 제3 타설막이본체(10c)로 이루어지는 타설막이부재(10), 상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되어 상기 제1 타설막이본체(10a)에 설치되는 제1 고정부재(20a)와 상기 제2 타설막이본체(10ab)에 설치되는 제2 고정부재(20b) 및 상기 제3 타설막이본체(10c)에 고정되는 제3 고정부재(20c)로 이루어지는 고정부재(20), 상기 제1 고정부재(20a)와 제2 고정부재(20b)를 결속시키는 제1 신축고정밴드(30a), 상기 제1 고정부재(20a)와 제2 고정부재(20b) 및 제3 고정부재(20c)를 결속시키는 제2 신축고정밴드(30b)로 이루어지는 신축고정밴드, 상기 다수의 고정부재(20)를 끼워 설치할 수 있도록 구비되는 고정프레임(40)을 포함한다.The concrete pouring membrane structure according to the third preferred embodiment of the present invention is a concrete pouring membrane structure that is installed so that concrete is poured in a predetermined area, and the
도 7 및 도 8에 도시된 바와 같이, 본 고안의 제3 실시 예에 따른 콘크리트 타설막이 구조체는 제1 타설막이본체(10a), 제2 타설막이본체(10b), 제3 타설막이본체(10c)를 구비하고, 상기 제1 타설막이본체(10a)에 설치되는 제1 고정부재(20a), 제2 타설막이본체(10b)에 설치되는 제2 고정부재(20b) 및 제3 타설막이본체(10c)에 설치되는 제3 고정부재(20c)로 이루어진다.As shown in Figures 7 and 8, the concrete pouring membrane structure according to the third embodiment of the present invention includes a first casting membrane body (10a), a second casting membrane body (10b), a third casting membrane body (10c) ), and a first fixing
아울러 타설막이부재(10)에는 각각 제1 수직고정부(21)가 결합되는 결합구멍(11), 상기 결합구멍(11)에 설치되는 수직프레임(12) 및 제2 수직고정부(23)가 결합되는 고정구멍(13)이 형성된다.In addition, the pouring
상기 고정부재(20)는 결합구멍(11)에 결합되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)의 상단에서 고정프레임(40)의 두께로 연장되는 수평연결부(22)가 일체로 형성되며, 고정프레임(40)에 안정되게 걸리도록 소정의 길이로 제2 수직고정부(23)가 일체로 형성된다.The fixing
상기 고정부재(20)는 제1 타설막이본체(10a)에 설치되는 제1 고정부재(20a), 제2 타설막이본체(10b)에 설치되는 제2 고정부재(20b) 및 제3 타설막이본체(10c)에 설치되는 제3 고정부재(20c)로 이루어진다.The fixing
또한 상기 제1 고정부재(20a), 제2 고정부재(20b) 및 제3 고정부재(20c)를 하나로 결속시키는 제2 신축고정밴드(30b)가 구비된다.In addition, a second
도 9은 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도이고, 도 10는 본 고안의 바람직한 제3 실시 예에 따른 콘크리트 타설막이 구조체가 설치된 상태를 도시한 입체도이다.9 is a three-dimensional view showing a state in which a concrete pouring membrane structure according to a third preferred embodiment of the present invention is installed, and FIG. 10 is a diagram showing a state in which a concrete pouring membrane structure according to a third preferred embodiment of the present invention is installed It is a three-dimensional view.
이와 같은 본 고안의 제3 실시 예에 따른 콘크리트 타설막이 구조체는 제2 신축고정밴드(30b)에 의해 결속된 타설막이부재(10)를 고정프레임(40)에 설치하게 된다.The concrete pouring barrier structure according to the third embodiment of the present invention is to install the pouring
즉, 상기 제2 신축고정밴드(30b)는 3개의 타설막이본체(10a, 10b, 10c) 및 3개의 고정부재(20a, 20b, 20c)를 하나로 결속시킨 것으로, 작업자는 타설막이부재(10)를 고정프레임(40)에 설치 시 3개의 타설막이본체(10a, 10b, 10c)를 일시에 설치할 수 있게 된다.That is, the second
한편 본 고안의 제2 실시 예에 따른 콘크리트 타설막이 구조체는 2개의 타설막이본체(10a, 10b)와 2개의 고정부재(20a, 20b)를 결속시킨 제1 신축고정밴드(30a)를 이용하여 고정프레임(40)의 길이에 맞게 설치할 수 있게 된다.On the other hand, the concrete pouring barrier structure according to the second embodiment of the present invention is fixed by using a first
이에 따라 작업자는 2개 또는 3개로 이루어진 타설막이부재(10)를 이용하여 설치하게 되는데, 고정프레임(40)의 길이, 즉 타설막이부재(10)의 설치가 많은 경우 3개로 이루어진 타설막이부재(10)를 이용하여 설치하게 됨에 따라 작업 시간을 대폭 줄일 수 있게 된다.Accordingly, the operator is to install using the two or three pouring
또한 2개로 이루어진 타설막이부재(10)와 3개로 이루어진 타설막이부재(10)를 이용하여 고정프레임(40)의 길이에 맞게 설치할 수 있게 되어 타설막이 구조체의 설치 길이에 관계없이 자유롭게 설치할 수 있게 된다.In addition, it is possible to install it according to the length of the fixed
이상 본 고안자에 의해서 이루어진 고안을 상기 실시 예에 따라 구체적으로 설명하였지만, 본 고안은 상기 실시 예에 한정되는 것은 아니고 그 요지를 이탈하지 않는 범위에서 여러 가지로 변경 가능한 것은 물론이다.Although the design made by the present inventor has been described in detail according to the above embodiment, the present invention is not limited to the above embodiment and can be changed in various ways without departing from the gist of the present invention.
10: 타설막이부재 10a: 제1 타설막이본체
10b: 제2 타설막이본체 11: 결합구멍
12: 수직프레임 13: 고정구멍
20: 고정부재 20a: 제1 고정부재
20b: 제2 고정부재 20c: 제3 고정부재
21: 제1 수직고정부 22: 수평연결부
23: 제2 수직고정부
30a: 제1 신축고정밴드 30b: 제2 신축고정밴드
40: 고정프레임10:
10b: second casting membrane body 11: coupling hole
12: vertical frame 13: fixing hole
20: fixing
20b: second fixing
21: first vertical fixing portion 22: horizontal connecting portion
23: second vertical fixation
30a: first
40: fixed frame
Claims (6)
일정 직경을 갖는 원통형으로 타설막이본체(10a, 10b)가 형성되며, 상기 타설막이본체(10a, 10b)의 중앙에 결합구멍(11)이 형성된 타설막이부재(10);
상기 타설막이부재(10)의 결합구멍(11)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되는 고정부재(20);
상기 타설막이부재(10)에 고정된 상기 고정부재(20)를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드(30);를 포함하는 것을 특징으로 하는 콘크리트 타설막이 구조체.As a concrete pouring membrane structure that is installed so that concrete is poured as much as a set area,
The casting membrane body (10a, 10b) is formed in a cylindrical shape having a predetermined diameter, the casting membrane member (10) having a coupling hole (11) formed in the center of the casting (10a, 10b);
A first vertical fixing part 21 formed to have a predetermined length so as to fit into the coupling hole 11 of the pouring film member 10 and a first vertical fixing part 21 formed to be spaced apart by a predetermined distance from the first vertical fixing part 21 2 a fixing member 20 in which the vertical fixing part 23 is integrally formed;
Concrete pouring membrane structure comprising: a telescopic fixing band 30 provided to bind the fixing member 20 fixed to the pouring barrier member 10 into a plurality.
일정 직경을 갖는 원통형으로 타설막이본체(10a, 10b)가 형성되며, 강성을 갖는 수직프레임(12)이 끼워지도록 중앙에 결합구멍(11)이 형성되고, 상기 결합구멍(11)과 인접하게 고정구멍(13)이 형성된 타설막이부재(10);
상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되는 고정부재(20);
상기 타설막이부재(10)에 고정된 상기 고정부재(20)를 다수개로 결속시킬 수 있도록 구비되는 신축고정밴드(30a);를 포함하는 것을 특징으로 하는 콘크리트 타설막이 구조체.As a concrete pouring membrane structure installed so that concrete is poured as much as a set area,
The casting film main body (10a, 10b) is formed in a cylindrical shape having a certain diameter, and a coupling hole (11) is formed in the center so that the vertical frame (12) having rigidity is fitted, and fixed adjacent to the coupling hole (11) A casting barrier member 10 having a hole 13 formed therein;
A first vertical fixing part 21 formed to have a predetermined length to fit into the fixing hole 13 of the pouring film member 10 and a first vertical fixing part 21 formed to be spaced apart by a predetermined distance from the first vertical fixing part 21. 2 a fixing member 20 in which the vertical fixing part 23 is integrally formed;
Concrete pouring membrane structure comprising: a telescopic fixing band (30a) provided to bind the fixing member 20 fixed to the pouring barrier member 10 into a plurality.
상기 신축고정밴드(30a)는 다수의 타설막이부재가 결속되도록 제1 타설막이본체(10a)에 고정된 제1 고정부재(20a) 및 제2 타설막이본체(10b)에 고정된 제2 고정부재(20b)가 일체로 결속되도록 상기 제1 고정부재(20a)와 상기 제2 고정부재(20b)의 외면에 설치되는 것을 특징으로 하는 콘크리트 타설막이 구조체.The method of claim 2,
The telescopic fixing band 30a is a first fixing member 20a fixed to the first casting film body 10a and a second fixing member fixed to the second casting film body 10b so that a plurality of casting film members are bound. (20b) Concrete pouring membrane structure, characterized in that it is installed on the outer surface of the first fixing member (20a) and the second fixing member (20b) so as to be integrally bound.
상기 고정부재(20)는 상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 상기 타설막이부재(10)의 길이와 동일한 길이로 형성되는 제1 수직고정부(21);
상기 제1 수직고정부(21)의 상단에 수평 방향으로 소정의 길이만큼 연장 형성되는 수평연결부(22);
상기 수평연결부(22)의 선단에서 상기 제1 수직고정부(21)의 길이보다 짧은 길이로 형성되는 제2 수직고정부(23);를 포함하는 것을 특징으로 하는 콘크리트 타설막이 구조체.The method of claim 2,
The fixing member 20 includes a first vertical fixing part 21 formed to have the same length as that of the pouring barrier member 10 so as to fit into the fixing hole 13 of the pouring barrier member 10;
A horizontal connection part 22 extending from an upper end of the first vertical fixing part 21 by a predetermined length in the horizontal direction;
And a second vertical fixing part 23 formed at a front end of the horizontal connection part 22 to a length shorter than the length of the first vertical fixing part 21.
일정 직경을 갖는 원통형으로 타설막이본체(10a, 10b, 10c)가 형성되며, 강성을 갖는 수직프레임(12)이 끼워지도록 중앙에 결합구멍(11)이 형성되고, 상기 결합구멍(11)과 인접하게 고정구멍(13)이 형성되는 제1 타설막이본체(10a)와 제2 타설막이본체(10b) 및 제3 타설막이본체(10c)로 이루어지는 타설막이부재(10);
상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 소정의 길이로 형성되는 제1 수직고정부(21)와 상기 제1 수직고정부(21)로부터 소정의 거리만큼 이격되게 형성되는 제2 수직고정부(23)가 일체로 형성되어 상기 제1 타설막이본체(10a)에 설치되는 제1 고정부재(20a)와 상기 제2 타설막이본체(10ab)에 설치되는 제2 고정부재(20b) 및 상기 제3 타설막이본체(10c)에 고정되는 제3 고정부재(20c)로 이루어지는 고정부재(20);
상기 제1 고정부재(20a)와 제2 고정부재(20b)를 결속시키는 제1 신축고정밴드(30a), 상기 제1 고정부재(20a)와 제2 고정부재(20b) 및 제3 고정부재(20c)를 결속시키는 제2 신축고정밴드(30b)로 이루어지는 신축고정밴드;
상기 다수의 고정부재(20)를 끼워 설치할 수 있도록 구비되는 고정프레임(40);을 포함하는 것을 특징으로 하는 콘크리트 타설막이 구조체.As a concrete pouring membrane structure that is installed so that concrete is poured as much as a set area,
The casting film main body (10a, 10b, 10c) is formed in a cylindrical shape having a certain diameter, and a coupling hole (11) is formed in the center to fit the vertical frame (12) having rigidity, and adjacent to the coupling hole (11) A casting membrane member 10 comprising a first casting membrane body 10a, a second casting membrane body 10b, and a third casting membrane body 10c having the fixing holes 13 formed therein;
A first vertical fixing part 21 formed to have a predetermined length to fit into the fixing hole 13 of the pouring film member 10 and a first vertical fixing part 21 formed to be spaced apart by a predetermined distance from the first vertical fixing part 21. 2 The vertical fixing part 23 is integrally formed so that the first fixing member 20a installed on the first casting film body 10a and the second fixing member 20b installed on the second casting film body 10ab ) And a third fixing member (20c) fixed to the third casting film body (10c);
A first elastic fixing band (30a) for binding the first fixing member (20a) and the second fixing member (20b), the first fixing member (20a) and the second fixing member (20b) and the third fixing member ( A telescopic fixing band consisting of a second telescopic fixing band 30b for binding 20c);
A concrete pouring membrane structure comprising: a fixing frame 40 provided to insert and install the plurality of fixing members 20.
상기 고정부재(20)는 상기 타설막이부재(10)의 고정구멍(13)에 끼워지도록 상기 타설막이본체(10a, 10b, 10c)의 길이와 동일한 길이로 형성되는 제1 수직고정부(21);
상기 제1 수직고정부(21)의 상단에 수평 방향으로 소정의 길이만큼 연장 형성되는 수평연결부(22);
상기 수평연결부(22)의 선단에서 상기 제1 수직고정부(21)의 길이보다 짧은 길이로 형성되는 제2 수직고정부(23);를 포함하는 것을 특징으로 하는 콘크리트 타설막이 구조체.
The method of claim 5,
The fixing member 20 is a first vertical fixing part 21 formed to have the same length as that of the casting membrane body 10a, 10b, 10c so as to be fitted into the fixing hole 13 of the casting membrane member 10 ;
A horizontal connection part 22 extending from an upper end of the first vertical fixing part 21 by a predetermined length in a horizontal direction;
And a second vertical fixing part 23 formed at a front end of the horizontal connection part 22 to a length shorter than the length of the first vertical fixing part 21.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020190001590U KR20200002362U (en) | 2019-04-17 | 2019-04-17 | Concrete penetration membrane structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR2020190001590U KR20200002362U (en) | 2019-04-17 | 2019-04-17 | Concrete penetration membrane structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20200002362U true KR20200002362U (en) | 2020-10-27 |
Family
ID=73005963
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020190001590U Abandoned KR20200002362U (en) | 2019-04-17 | 2019-04-17 | Concrete penetration membrane structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20200002362U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115387614A (en) * | 2022-08-30 | 2022-11-25 | 上海建工四建集团有限公司 | Telescopic pneumatic vibrator, vibrating device and using method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101783167B1 (en) | 2017-01-02 | 2017-09-28 | 주식회사 다마가산업 | Concrete interception wall having blocking members into which blocking pipe inserted |
KR101868287B1 (en) | 2017-08-02 | 2018-06-15 | 주식회사 다마가산업 | Variable concrete interception wall without blocking frame |
KR101868288B1 (en) | 2017-07-12 | 2018-06-15 | 주식회사 다마가산업 | Concrete interception wall having blocking member and blocking board |
-
2019
- 2019-04-17 KR KR2020190001590U patent/KR20200002362U/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101783167B1 (en) | 2017-01-02 | 2017-09-28 | 주식회사 다마가산업 | Concrete interception wall having blocking members into which blocking pipe inserted |
KR101868288B1 (en) | 2017-07-12 | 2018-06-15 | 주식회사 다마가산업 | Concrete interception wall having blocking member and blocking board |
KR101868287B1 (en) | 2017-08-02 | 2018-06-15 | 주식회사 다마가산업 | Variable concrete interception wall without blocking frame |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115387614A (en) * | 2022-08-30 | 2022-11-25 | 上海建工四建集团有限公司 | Telescopic pneumatic vibrator, vibrating device and using method thereof |
CN115387614B (en) * | 2022-08-30 | 2023-08-08 | 上海建工四建集团有限公司 | Telescopic pneumatic vibrator, vibrating device and use method of vibrating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3327214B1 (en) | Framework structure and construction method for same | |
US9453350B2 (en) | Shuttering | |
US8827235B1 (en) | Concrete form for building foundation construction with form insert creating recessed sections | |
KR101663132B1 (en) | Self-supporting type column structure | |
KR100899779B1 (en) | Masonry brick | |
KR100949785B1 (en) | Mold for making PC beam | |
JP6151337B2 (en) | Construction method for block pile foundation and block pile foundation | |
KR102269141B1 (en) | Deck plate wall installation method using underground pavement | |
JP2010094914A (en) | Formwork for precast concrete member integrating beam and column-beam joint section and production process of precast concrete member integrating beam and column-beam joint section using the formwork | |
KR20200002362U (en) | Concrete penetration membrane structure | |
JP6253058B2 (en) | Reinforcing bar member and reinforced concrete structure using the reinforcing bar member | |
KR20090010281A (en) | Finishing member for cutting concrete | |
KR102358453B1 (en) | A Section Reducing Member and a Fixing Frame for Concrete Structure and a Construction Method thereof | |
KR20200001960U (en) | Concrete penetration membrane structure | |
KR20190131213A (en) | Bridge construction method using manufactured pc slab | |
KR20210000539U (en) | Concrete penetration membrane structure | |
JP4404263B2 (en) | Concrete jointing method | |
KR20190080461A (en) | Concrete slab and method for manufacturing concrete slab | |
KR20200001781U (en) | Concrete penetration membrane structure | |
KR101650856B1 (en) | Partial slab integrated I-shaped girder and bridge construction method using the same | |
KR20210002344U (en) | Concrete penetration membrane structure | |
JP7016106B2 (en) | Lightweight embankment structure and how to build a lightweight embankment | |
JP6576204B2 (en) | Slab construction method | |
AU2015410553B2 (en) | A formwork panel assembly | |
JP2017008563A (en) | Pc board formwork material and foundation construction method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
UA0108 | Application for utility model registration |
Comment text: Application for Utility Model Registration Patent event code: UA01011R08D Patent event date: 20190417 |
|
UA0201 | Request for examination | ||
UE0701 | Decision of registration |
Patent event date: 20200731 Comment text: Decision to Grant Registration Patent event code: UE07011S01D |
|
UG1501 | Laying open of application | ||
UC1904 | Unpaid initial registration fee |