[go: up one dir, main page]

KR20110028147A - Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method - Google Patents

Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method Download PDF

Info

Publication number
KR20110028147A
KR20110028147A KR1020090086103A KR20090086103A KR20110028147A KR 20110028147 A KR20110028147 A KR 20110028147A KR 1020090086103 A KR1020090086103 A KR 1020090086103A KR 20090086103 A KR20090086103 A KR 20090086103A KR 20110028147 A KR20110028147 A KR 20110028147A
Authority
KR
South Korea
Prior art keywords
bit
compressed air
auger
underground
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
KR1020090086103A
Other languages
Korean (ko)
Inventor
위성배
위성길
Original Assignee
홍익컨스텍(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍익컨스텍(주) filed Critical 홍익컨스텍(주)
Priority to KR1020090086103A priority Critical patent/KR20110028147A/en
Publication of KR20110028147A publication Critical patent/KR20110028147A/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/08Roller bits
    • E21B10/16Roller bits characterised by tooth form or arrangement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/08Roller bits
    • E21B10/18Roller bits characterised by conduits or nozzles for drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/08Roller bits
    • E21B10/20Roller bits characterised by detachable or adjustable parts, e.g. legs or axles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

PURPOSE: A precision boring auger bit for drilling ground is provided to reduce an excavation process time and to improve the precision of construction by improving the directivity of excavation work. CONSTITUTION: A precision boring auger bit for drilling ground comprises an auger part(10), an air hammer part(20), and a drilling bit part(30). The auger part has a screw axis(12). A screw wind(13) is formed in the outside of the screw axis. The air hammer part progresses using the compressed air pressure flowing in a compressed air pressing part(21). The drilling bit part forms a pilot bit(32) on the center leading end of a bit body part(31).

Description

지하굴착용 정밀보링 오거비크 및 이를 이용한 지중 정밀보링 시공공법 {The Precision Boring Auger Bit for drilling in the earth and The Method thereof}Precision Boring Auger Bit for Underground Excavation and Underground Boring Construction Method

본 발명은 지반을 굴착하여 보링하는 지하굴착용 오거비트에 관한 것으로서, 좀 더 상세하게는, 지하 지반을 굴착하는 과정에서 굴착장비의 회전운동에 의한 원심력 등으로 인해 원하지 않는 방향으로 휘어져 지중 굴착 되는 것을 방지하고, 지하 지반의 굴착시에 직진성을 향상시켜 정밀한 굴착작업이 가능하도록 하는 지하굴착용 정밀보링 오거비트 및 이를 이용한 지중 정밀보링 시공공법에 관한 것이다.The present invention relates to an underground excavation auger bit boring by drilling the ground, more specifically, in the process of excavating the underground ground bent in an undesired direction due to the centrifugal force due to the rotational movement of the excavation equipment The present invention relates to a precision boring auger for underground excavation and to a precision boring construction method using the same, which prevents and improves the straightness during the excavation of the underground.

일반적으로 기반시설 구축 및 도시재개발 공사등으로 대규모 진행되고 있는 흙막이 공사나 터널 축조시 지반의 붕괴를 방지하기 위해 철제파일이나 콘크리트 파일을 지중에 설치하는 공법으로 상기 파일들을 충격 가압하여 지중에 상기 파일들을 압입하는 타격식 파일압입 공법이 행하여 졌으나, 상기 공법의 경우에는 파일 타격시에 발생되는 진동에 의하여 주변 건축물에 충격을 주는 단점으로 인해 제한적으로 사용되고 왔었다.In general, to protect the ground during the construction of large-scale earthquakes or tunnels, such as infrastructure construction and urban redevelopment construction, steel piles or concrete piles are installed in the ground to impact the piles. Although a blow-pile press-injection method for press-fitting has been performed, the method has been used in a limited way due to the disadvantage of impacting the surrounding buildings by the vibration generated when the pile hit.

종래에는 이를 보완하기 위한 방법으로, 지반 굴착기의 오거 스크류 구동축과 연동하여 감속회전 할 수 있는 원통형 스커트 관체를 별도로 추가 장착하여 원통형의 케이싱 오거를 회전시켜 지반을 굴착 천공하는 케이싱 오거 공법이 사용되고 있으며, 또한, 지하 구조물을 축조를 위하여 지지 기둥을 설치하는 경우에도, 먼저 지지기둥을 설치할 위치에 지반 굴착기의 오거 스크류로 천공 후, 상기 천공된 자리에 철근 콘크리트로 타설하여 지지 기둥을 시공하는 공법이 행해지고 있다.Conventionally, as a method for compensating for this, a casing auger method for drilling a ground by rotating a cylindrical casing auger by additionally installing a cylindrical skirt tube that can be decelerated and rotated in conjunction with an auger screw drive shaft of a ground excavator is used. In addition, even in the case of installing the support pillar for the construction of the underground structure, the first method of drilling the auger screw of the ground excavator at the position where the support pillar is to be installed, and then the method of constructing the support pillar by casting with reinforced concrete in the perforated place have.

상기 전술한 바와 같이, 파일을 설치하거나 지지 기둥을 시공하기 위해서는 먼저, 지반을 오거 스크류로 굴착하여 천공하는 작업이 필요하며, 종래 상기 오거 스크류로 지하 지반을 굴착하는 경우에 있어서, 특히, 장거리로 천공하는 경우, 상기 오거 스크류의 회전운동에 의한 원심력 등의 영향으로 인해 지중에 천공하고자 하는 위치에서 벗어나 보링 되는 문제점이 있었고, 다시 재굴착작업을 행하여야 함으로써, 시공기간과 비용이 증가되는 문제점이 있었다.As described above, in order to install a pile or construct a support column, first, the ground is required to be drilled by auger screw, and in the case of digging underground ground with the auger screw, in particular, a long distance In case of drilling, there was a problem of boring out of the position to be drilled in the ground due to the influence of centrifugal force due to the rotational motion of the auger screw, and re-excavation should be performed again, thereby increasing the construction period and cost. there was.

따라서, 본 발명은 상기한 문제점을 해결하기 위해 안출된 것으로, 지하 지반의 굴착시 굴착작업의 직진성을 향상시켜 원하는 위치에 정확하게 지하 지반을 천공할 수 있게 함으로써, 시공의 정밀성을 향상시키고, 지하 굴착 천공의 시공기간을 단축시켜 천공에 따른 시공비용을 절감시킬 수 있는 지하굴착용 정밀보링 오거비트 및 이를 이용한 지중 정밀보링 시공공법을 제공함에 있다.Accordingly, the present invention has been made to solve the above problems, by improving the straightness of the excavation work when excavation of the underground ground to be able to drill the underground ground precisely to the desired position, thereby improving the precision of construction, underground excavation The present invention provides a precision boring auger for underground excavation that can reduce the construction cost of drilling by shortening the construction period of drilling and underground precision boring construction method using the same.

상기 전술한 문제점을 해결하기 위한 본 발명의 일 형태에서는, 내부중심부에는 길이방향으로 압축공기 이동로(11)가 형성되는 스크류축(12)이 구비되고, 상기 스크류축(12)의 외주면에는 길이방향으로 스크류날개(13)가 형성되는 오거부(10); 상기 오거부(10)의 선단에 결합되는 에어햄머 몸체부(25)가 구비되고, 상기 압축공기 이동로(11)와 연통되게 상기 에어햄머 몸체부(25)의 내부중심부에 소정공간으로 압축공기 가압부(21)가 형성되며, 회전운동과 함께, 상기 압축공기 가압부(21)로 유입되는 압축공기의 순간 가압을 통해 충격전진 하는 에어 햄머부(20); 및 지반을 굴착하는 비트 몸체부(31)가 상기 에어 햄머부(20)의 선단에 결합되고, 상기 비트 몸체부(31)의 중심 선단에는 소정길이로 돌출되게 파일럿 비트(32)가 형성되는 굴착 비트부(30);로 구성되는 것을 특징으로 하는 지하굴착용 정밀보링 오거비트(100)를 제공한다.In one embodiment of the present invention for solving the above-described problems, the inner center portion is provided with a screw shaft 12 is formed with a compressed air movement path 11 in the longitudinal direction, the outer peripheral surface of the screw shaft 12 in length Auger 10 is formed with a screw blade 13 in the direction; An air hammer body portion 25 coupled to the distal end of the auger portion 10 is provided, and the compressed air is compressed into a predetermined space at an inner central portion of the air hammer body portion 25 so as to communicate with the compressed air movement path 11. The pressurizing unit 21 is formed, and with the rotational movement, the air hammer unit 20 to shock forward through the instantaneous pressurization of the compressed air flowing into the compressed air pressurizing unit 21; And a bit body part 31 for drilling the ground is coupled to the tip of the air hammer part 20, and a pilot bit 32 is formed to protrude to a predetermined length at the center tip of the bit body part 31. Bit portion 30; provides an underground drilling precision boring auger bit 100, characterized in that consisting of.

본 발명에 따른 지하굴착용 정밀보링 오거비트(100)는, 중공의 원통형의 하우징 몸체부(22)가 마련되고, 상기 하우징 몸체부(22)의 외주면에는 소정간격을 두고 길이 방향으로 다수의 이동 안내편(23)이 방사상으로 형성되며, 상기 중공의 하우징 몸체부(22)의 내부에는 상기 에어 햄머부(20)가 결합하여 구비되는 에어햄머 하우징부(24); 및 중공 원통형의 파이프로 형성되고, 선단부의 외주면으로는 선단슈(41)가 결합되며, 회전운동과 함께 전진이동하는 상기 오거부(10) 및 에어햄머 하우징부(24)가 내부 중공에 위치하는 안내 케이싱 파이프(40);를 더 포함하여 구성되며, 상기 비트 몸체부(31) 및 파일럿 비트(32)의 내부중심부에는 상기 압축공기 가압부(21)와 연통되어 상기 압축공기 가압부(21)로부터 소정량의 압축공기가 유입되어 이동배출되는 압축공기 배출로(33)가 형성될 수 있다.Underground drilling precision boring auger bit 100 according to the present invention, a hollow cylindrical housing body portion 22 is provided, a plurality of movement in the longitudinal direction at a predetermined interval on the outer peripheral surface of the housing body portion 22 An air hammer housing part 24 having a guide piece 23 formed in a radial shape, the air hammer part 20 being coupled to the inside of the hollow housing body part 22; And a hollow cylindrical pipe, wherein the tip shoe 41 is coupled to the outer circumferential surface of the tip portion, and the auger portion 10 and the air hammer housing portion 24, which move forward with the rotational movement, are located in the inner hollow. It further comprises a guide casing pipe (40), the inner portion of the bit body 31 and the pilot bit 32 is in communication with the compressed air pressurizing portion 21 is the compressed air pressurizing portion 21 A compressed air discharge path 33 through which a predetermined amount of compressed air is introduced therefrom and moved out may be formed.

또한, 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 이용한 지중 정밀보링 시공공법은, 원하는 위치의 지중의 지반을 천공하는 지중 정밀보링 시공공법에 있어서, 지중에 보링 하려는 위치를 따라 소구경의 파일럿 홀(50)을 형성시키는 단계; 상기 파일럿 홀(50)이 중공의 유도 케이싱 파이프(60)의 중심에 위치하도록 한 후, 상기 유도 케이싱 파이프(60)를 지중에 소정깊이로 압입하는 단계; 및In addition, the underground precision boring construction method using the underground drilling precision boring auger bit 100 according to the present invention, in the underground precision boring construction method for drilling the ground of the ground of the desired position, along the position to be bored in the ground Forming a pilot hole 50 of the aperture; Placing the pilot hole (50) at the center of the hollow induction casing pipe (60), and then pressing the induction casing pipe (60) to a predetermined depth in the ground; And

내부중심부에는 길이방향으로 압축공기 이동로(11)가 형성되는 스크류축(12)이 구비되고, 상기 스크류축(12)의 외주면에는 길이방향으로 스크류날개(13)가 형성되는 오거부(10)와, 상기 오거부(10)의 선단에 결합되는 에어햄머 몸체부(25)가 구비되고, 상기 압축공기 이동로(11)와 연통되게 상기 에어햄머 몸체부(25)의 내부 중심부에 소정공간으로 압축공기 가압부(21)가 형성되며, 회전운동과 함께, 상기 압축공기 가압부(21)로 유입되는 압축공기의 순간 가압을 통해 충격전진 하는 에어 햄머부(20)와, 지반을 굴착하는 비트 몸체부(31)가 상기 에어 햄머부(20)의 선단에 결합되고, 상기 비트 몸체부(31)의 중심 선단에는 소정길이로 돌출되게 파일럿 비트(32)가 형성되는 굴착 비트부(30)와, 중공의 원통형의 하우징 몸체부(22)가 마련되고, 상기 하우징 몸체부(22)의 외주면에는 소정간격을 두고 길이 방향으로 다수의 이동 안내편(23)이 방사상으로 형성되며, 상기 중공의 하우징 몸체부(22)의 내부에는 상기 에어 햄머부(20)가 결합하여 구비되는 에어햄머 하우징부(24) 및, 중공 원통형의 파이프로 형성되고, 선단부의 외주면으로는 선단슈(41)가 결합되며, 회전운동과 함께 전진이동하는 상기 오거부(10) 및 에어햄머 하우징부(24)가 내부 중공에 위치하는 안내 케이싱 파이프(40)로 구성되며, 상기 비트 몸체부(31) 및 파일럿 비트(32)의 내부중심부에는 상기 압축공기 가압부(21)와 연통되어 상기 압축공기 가압부(21)로부터 소정량의 압축공기가 유입되어 이동배출되는 압축공기 배출로(33)가 형성되는 지하굴착용 정밀보링 오거비트(100)의, 상기 파일럿 비트(32)를 상기 파일럿 홀(50)에 끼워 넣어 위치시킨 후, 상기 유도 케이싱 파이프(60) 내에 상기 안내 케이싱 파이프(40)가 위치되도록 하여 상기 굴착 비트부(30)를 작동시켜 상기 유도 케이싱 파이프(60)의 안내를 받으며 상기 안내 케이싱 파이프(40)를 전진 이동시키고, 상기 파일럿 홀(50)의 유도를 받으며 상기 파일럿 비트(32)을 전진 이동시켜 소정깊이로 지중을 굴착해 나가는 단계;를 포함하여 이루질 수 있다.The inner center portion is provided with a screw shaft 12, the compressed air movement path 11 is formed in the longitudinal direction, the auger portion 10 is formed on the outer peripheral surface of the screw shaft 12 in the longitudinal direction And, the air hammer body portion 25 which is coupled to the tip of the auger portion 10 is provided, and communicates with the compressed air movement path 11 to a predetermined space in the inner center of the air hammer body portion 25 Compressed air pressurization portion 21 is formed, with the rotational movement, the air hammer unit 20 and the air hammer to advance the impact through the instantaneous pressurization of the compressed air flowing into the compressed air pressurizing portion 21, the bit excavating the ground Body portion 31 is coupled to the front end of the air hammer 20, the drill bit 32 is formed with a pilot bit 32 to protrude a predetermined length at the center end of the bit body portion 31 and The hollow cylindrical housing body portion 22 is provided, the outside of the housing body portion 22 A plurality of movement guide pieces (23) are radially formed in the longitudinal direction at predetermined intervals on the surface, and the air hammer housing (20) is provided in combination with the hollow housing body portion (22). The auger 10 and the air hammer housing 24 which are formed of a portion 24 and a hollow cylindrical pipe, the front end shoe 41 is coupled to the outer circumferential surface of the front end, and move forward with rotational movement. It consists of a guide casing pipe (40) located in the inner hollow, the inner portion of the bit body 31 and the pilot bit 32 is in communication with the compressed air pressurizing portion 21 is the compressed air pressurizing portion 21 The pilot bit 32 of the underground boring precision boring auger bit 100 in which a compressed air discharge path 33 is formed, through which a predetermined amount of compressed air flows in and is discharged and inserted into the pilot hole 50. After positioning, the induction casing wave The guide casing pipe 40 is positioned in the pipe 60 to operate the excavation bit part 30 to move the guide casing pipe 40 forward while receiving the guide casing pipe 60. Under the guidance of the pilot hole 50, the pilot bit 32 to move forward to excavate the ground to a predetermined depth; can be made.

본 발명에 따른 지하굴착용 정밀보링 오거비트는, 지중의 천공시 굴착작업의 직진성을 향상시켜 원하는 위치에 정확하게 지하 지반을 천공할 수 있게 함으로써, 시공의 정밀성를 향상되고, 지하 굴착 천공의 시공기간을 단축 시키며, 잘못된 위치로 굴착 진행되어 재굴착하는 것을 사전에 방지하여 재굴착시의 추가비용을 절감시킬 수 있다.Precision boring auger bit for underground excavation according to the present invention, by improving the straightness of the excavation work during the drilling of the underground to be able to drill the underground ground precisely to the desired position, thereby improving the construction precision, the construction period of underground excavation drilling It can shorten and reduce the additional cost of re-excavation by preventing the re-excavation by proceeding to the wrong position.

이하 상기 목적이 구체적으로 실현될 수 있는 본 발명의 실시예들을 첨부된 도면을 참조하여 설명한다. 본 실시예들을 설명함에 있어서, 동일 구성에 대해서는 동일 명칭 및 부호가 사용되며, 이에 따른 부가적인 설명은 하기에서 생략된다.DETAILED DESCRIPTION Hereinafter, embodiments of the present invention in which the above object can be specifically realized are described with reference to the accompanying drawings. In describing the embodiments, the same names and symbols are used for the same components, and additional description thereof will be omitted below.

도 1은 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 분해하여 나타낸 분해 사시도이고, 도 2는 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)의 단면을 나타내는 단면도이며, 도 3은 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)의 정면을 나타내는 정면도이다.1 is an exploded perspective view illustrating an exploded view of the underground boring precision auger bit 100 according to the present invention, and FIG. 2 is a cross-sectional view showing a cross section of the underground boring precision boring auger bit 100 according to the present invention. 3 is a front view showing the front of the precision boring auger bit 100 for underground excavation according to the present invention.

또한, 도 4a는 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 이용한 지중 정밀보링 시공공법의 첫단계로서, 보링 위치에 파일럿 홀(50)을 형성시키는 단계를 나타내는 시공 상태도이고, 도 4b는 파일럿 홀(50)을 형성한 후 유도 케이싱 파이프(60)를 압입시키는 단계를 나타내는 시공 상태도이며, 도 4c는 파일럿 홀(50)에 파일럿 비트(32)를 위치시킨 후 굴착을 실시하는 것을 나타내는 시공 상태도이고, 도 3d는 본 발명에 따른 오거비트(100)가 유도 케이싱 파이프(60), 파일럿 홀(50) 및 안내 케이싱 파이프(40)의 안내를 받으며 지중 굴착하는 것을 나타내는 시공 상태도이다.In addition, Figure 4a is a construction state diagram showing the step of forming a pilot hole 50 in the boring position as the first step of the underground precision boring construction method using the underground boring precision auger bit 100 according to the present invention, 4B is a construction state diagram illustrating a step of press-fitting the induction casing pipe 60 after the pilot hole 50 is formed. FIG. 4C shows that the pilot bit 32 is placed in the pilot hole 50 and then excavated. 3D is a construction state diagram illustrating that the auger bit 100 according to the present invention is ground excavated while being guided by the induction casing pipe 60, the pilot hole 50, and the guide casing pipe 40.

본 발명에 따른 지하굴착용 정밀보링 오거비트(100)는, 도 1에 도시된 바와 같이, 크게 압축공기 이동로(11)와 스크류날개(13)가 형성되는 오거부(10)와, 상기 오거부(10)의 선단에 위치하여 압축공기에 의한 타격을 전방에 위치하는 굴착 비트부(30)로 전달하는 에어 햄머부(20) 및, 상기 에어 햄머부(20)의 전방에 위치하여 지중을 굴착하는 굴착 비트부(30)로 구성된다.Underground drilling precision boring auger bit 100 according to the present invention, as shown in Figure 1, the auger portion 10 is formed with a compressed air movement path 11 and screw blades 13, and the oh Located in the tip of the reject 10, the air hammer portion 20 for transmitting the impact by the compressed air to the drilling bit portion 30 located in front, and the ground in front of the air hammer portion 20 It is composed of an excavation bit part 30 to excavate.

상기 오거부(10)에는, 길이방향으로 내부중심부에는 외부로부터 유입되는 압축공기가 이동하는 압축공기 이동로(11)가 형성되는 스크류축(12)이 구비되고, 상기 스크류축(12)의 외주면으로는 상기 굴착 비트부(30)에서 굴착된 토사를 외부로 배출시키는 스크류날개(13)가 형성된다.The auger portion 10 has a screw shaft 12 formed with a compressed air movement path 11 through which compressed air flowing from the outside moves in the inner center portion in a longitudinal direction, and an outer peripheral surface of the screw shaft 12. As the screw blade 13 for discharging the excavated soil from the excavation bit portion 30 to the outside is formed.

상기 에어 햄머부(20)에는, 상기 오거부(10)의 전방에서 상기 스크류축(12)의 선단과 결합하고, 도 1과 도 2에 도시된 바와 같이, 상기 압축공기 이동로(11)와 연통되어 내부중심부에 소정공간으로 상기 압축공기 이동로(11)보다 확장되게 형성되는 압축공기 가압부(21)가 마련되는 에어햄머 몸체부(25)가 구비되며, 상기 에어 햄머부(20)는 상기 압축공기 이동로(11)를 통해 상기 압축공기 가압부(21)로 유입되는 압축공기의 순간 가압을 통해 충격 전진하게 된다.The air hammer portion 20, coupled to the front end of the screw shaft 12 in front of the auger portion 10, as shown in Figures 1 and 2, and the compressed air movement path (11) and The air hammer body portion 25 is provided with a compressed air pressurization portion 21 is formed in communication with the inner center portion to be expanded to the predetermined space than the compressed air movement path 11, the air hammer portion 20 is provided The impact air is advanced through the instantaneous pressurization of the compressed air flowing into the compressed air pressurization unit 21 through the compressed air moving path 11.

상기 굴착 비트부(30)는, 지반을 굴착하는 비트 몸체부(31)가 상기 에어 햄머부(20)의 선단에 결합되고, 상기 비트 몸체부(31)의 중심 선단에는 소정길이로 돌출되게 파일럿 비트(32)가 형성된다. 압축공기 가압부(21)로 유입된 압축공기의 순간적인 가압으로 상기 에어 햄머부(20)가 회전함과 동시에 충격 전진하게 되면, 상기 에어 햄머부(20)의 전방에 일체로 결합되어 형성된 상기 굴착 비트부(30)는, 에어 햄머부(20)와 함께 회전하면서 충격 전진하여 전면에 위치하는 지중에 타격을 가면서 회전 굴착하게 되고, 상기 비트 몸체부(31)와 파일럿 비트(32)의 외측면으로는 초경금속편이 용접 부착되어 지반과 접하여 지중을 굴착하게 된다.The drilling bit portion 30, the bit body portion 31 for excavating the ground is coupled to the front end of the air hammer portion 20, the pilot to project a predetermined length to the center end of the bit body portion 31 Bit 32 is formed. When the air hammer unit 20 is rotated and impacted by the instantaneous pressurization of the compressed air introduced into the compressed air pressurizing unit 21, the air hammer unit 20 is integrally coupled to the front of the air hammer unit 20. Excavation bit portion 30, while rotating with the air hammer 20, the impact advances to rotate the excavation while hitting the ground located in the front, the outside of the bit body portion 31 and the pilot bit 32 Carbide metal pieces are welded to the side to contact the ground to excavate the ground.

바람직하게는, 도 1과 도 2에 도시된 바와 같이, 상기 비트 몸체부(31)의 상측면에 일측이 회전가능하게 힌지결합 되는 다수개의 확장비트(34)를 마련하여 상기 오거비트(100)가 지반을 회전 굴착시 원심력에 의하여 다수의 상기 확장비트(34)가 힌지결합을 중심으로 비트 몸체부(31)의 외측으로 확장되어 나오면서 비트 몸체부(31)가 굴착한 범위 이상으로 확장 굴착할 수 있도록 하고, 확장 굴착 부위로 안내 케이싱 파이프(40)가 압입 될 수 있도록 한다.Preferably, as shown in FIGS. 1 and 2, the auger bit 100 is provided by providing a plurality of extension bits 34 on one side of which is rotatably hinged to an upper surface of the bit body part 31. When the ground is rotated and excavated by the centrifugal force, the plurality of extension bits 34 extend outwardly of the bit body portion 31 around the hinge coupling and extend and drill beyond the range in which the bit body portion 31 is excavated. To allow the guide casing pipe 40 to be press-fitted into the extended excavation site.

또한, 바람직하게는. 도 1과 도 3에 도시된 바와 같이, 상기 비트 몸체부의 외주면의 길이방향으로 다수의 홈을 형성시켜 상기 압축공기 배출로(33)를 통하여 배출된 압축공기가 굴착과정에서 발생되는 분진 등과 함께 상기 에어햄머 하우징부(24)의 다수의 이동 안내편(23)의 사이 공간으로 빠져나갈 수 있도록 한다.Also preferably. 1 and 3, by forming a plurality of grooves in the longitudinal direction of the outer circumferential surface of the bit body portion, the compressed air discharged through the compressed air discharge path 33 together with the dust generated during the excavation process, etc. It is possible to escape to the space between the plurality of movement guide pieces 23 of the air hammer housing part 24.

상기 굴착 비트부(30)가 전면의 지중을 타격하면서 회전 굴착하는 경우에, 상기 비트 몸체부(31)의 중심 선단에 상기 비트 몸체부(31)의 전방 외곽보다 작은 소구경으로 돌출되게 파일럿 비트(32)를 형성되고, 상기 파일럿 비트(32)가, 비트 몸체부(31)의 회전에 따른 원심력보다 작은 원심력을 받으려 지중을 타격 회전하면서 굴착하여, 초기 천공 안내홈을 형성시킴과 동시에 상기 천공 안내홈에 파일럿 비트(32)가 타격 전진하면서 끼워져 굴착하여 지중에 지속적으로 상기 파일럿 비트(32)가 천공 안내홈을 형성하면서 굴착 전진하고, 뒤이어, 상기 비트 몸체부(31)가 상기 파일럿 비트(32)의 형성시킨 천공 안내홈의 외측 지반을 굴착함으로써, 지하 지반 굴착의 직진성을 향상시킬 수 있게 된다.When the excavation bit portion 30 rotates and excavates while hitting the ground of the front surface, the pilot bit is projected to a small diameter smaller than the front outer periphery of the bit body portion 31 at the center tip of the bit body portion 31. And the pilot bit 32 is excavated while hitting the ground to receive centrifugal force smaller than the centrifugal force due to the rotation of the bit body portion 31 to form an initial drilling guide groove and at the same time The pilot bit 32 is inserted into the guide groove while striking forward and excavated, and the pilot bit 32 is excavated and advanced continuously while forming the perforated guide groove in the ground. Subsequently, the bit body 31 is connected to the pilot bit ( By excavating the outer ground of the drill guide groove formed in 32), it is possible to improve the straightness of the underground ground excavation.

바람직하게는, 지하 지반의 천공하려는 위치에 소구경의 파일럿 홀(50)을 먼저 시공하고, 상기 파일럿 홀(50)에 상기 파일럿 비트(32)를 위치시킨 후, 상기 전술한 바와 같이, 지하 지반을 굴착하며, 파일럿 비트(32)가 상기 파일럿 홀(50)의 안내를 받으려 굴착 전진이동 할 수 있도록 함으로써, 지하 지반 굴착의 직진성을 더욱 향상시킬 수 있게 된다.Preferably, a small diameter pilot hole 50 is first constructed at a position to be drilled in the underground ground, and the pilot bit 32 is positioned in the pilot hole 50, and then, as described above, the underground ground By excavating, by allowing the pilot bit 32 to move forward excavation under the guidance of the pilot hole 50, it is possible to further improve the straightness of the underground ground excavation.

또한, 바람직하게는, 도 1과 도 2에 도시된 바와 같이, 중공의 원통형의 하우징 몸체부(22)를 마련하고, 상기 하우징 몸체부(22)의 외주면에는 소정간격을 두고 길이방향으로 다수의 이동 안내편(23)을 방사상으로 형성시키며, 상기 중공의 하우징 몸체부(22)의 내부에는 상기 에어 햄머부(20)가 결합되는 에어 햄머 하우징부를 마련하고, 또한, 중공 원통형의 파이프로 형성되고, 선단부의 외주면으로는 지중압입을 용이하게 할 수 있도록 하는 선단슈(41)가 결합되며, 회전운동과 함께 전진이동하는 상기 오거부(10) 및 햄머 하우징부가 내부 중공에 위치하는 안내 케이싱 파이프(40)를 마련하여, 상기 안내 케이싱 파이프(40)의 내부면 상을 에어 햄머 하우징부의 다수의 상기 이동 안내편(23)의 외측면이 슬라이딩 이동하게 되어 상기 안내 케이싱 파이프(40)의 안내를 받으며 에어 햄머부(20)가 전진이동함으로써, 상기 에어 햄머부(20)의 전방에 일체로 구비되는 상기 굴착 비트부(30)의 지중 굴착시의 직진성을 향상시킬 수 있게 된다.In addition, preferably, as shown in Figures 1 and 2, to provide a hollow cylindrical housing body portion 22, the outer peripheral surface of the housing body portion 22 at a predetermined interval with a plurality of longitudinal direction The moving guide piece 23 is formed radially, and the inside of the hollow housing body portion 22 is provided with an air hammer housing portion to which the air hammer portion 20 is coupled, and is also formed of a hollow cylindrical pipe. To the outer circumferential surface of the tip portion, the tip shoe 41 is coupled to facilitate the underground press-in, and the guide casing pipe in which the auger portion 10 and the hammer housing portion move forward with the rotational movement are located in the inner hollow ( 40, the outer surface of the plurality of the movement guide piece 23 of the air hammer housing part is sliding on the inner surface of the guide casing pipe 40, the inner side of the guide casing pipe 40 An air hammer section 20 it is possible to improve the straightness of the ground during excavation of the excavation bit part 30 is provided integrally on the front side of and moves forward, the air hammer unit 20 receives.

또한, 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 이용한 지중 정밀보링 시공공법은, 도 4a 내지 도 4d에 도시된 바와 같이, 먼저, 지중에 보링 하려는 위치를 측정하여 정하고, 정하여진 보링 위치에 소구경의 파일럿 홀(50)을 천공한다.In addition, the underground precision boring construction method using the underground boring precision auger bit 100 according to the present invention, as shown in Figure 4a to 4d, first, by determining the position to be bored in the ground, The small diameter pilot hole 50 is drilled in the boring position.

상기 파일럿 홀(50)을 천공한 후, 중공의 유도 케이싱 파이프(60)의 중심에 상기 파일럿 홀(50)이 위치하도록 맞추고, 상기 유도 케이싱 파이프(60)를 토사가 위치하는 한 상기 유도 케이싱 파이프(60)의 소정길이만큼 지중에 압입 시킨다.After drilling the pilot hole 50, the pilot hole 50 is positioned at the center of the hollow induction casing pipe 60, and the induction casing pipe 60 is provided so that the induction casing pipe 60 is located in the soil. It is press-fitted into the ground by the predetermined length of (60).

상기 유도 케이싱 파이프(60)를 지중에 소정깊이로 압입 시킨 후에는, 상기 전술한 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 이용하여 굴착을 실시하게 된다. 상기 지하굴착용 정밀보링 오거비트(100)의 파일럿 비트(32)를 상기 파일럿 홀(50)에 정위치시킨 후, 상기 오거비트(100)를 작동시켜 굴착을 실시한다.After the induction casing pipe 60 is press-fitted to a predetermined depth in the ground, the excavation is carried out using the above-mentioned underground boring precision boring auger 100 according to the present invention. After positioning the pilot bit 32 of the underground boring precision auger bit 100 in the pilot hole 50, the auger bit 100 is operated to perform excavation.

이때 파일럿 홀(50)의 안내를 받으며 파일럿 비트(32)가 선굴착을 하고 뒤이어, 비트 몸체부(31)가 파일럿 비트(32)가 굴착한 굴착부위를 확공하며 굴착하게 된다. 이와 같이, 상기 오거비트(100)는 먼저, 상기 유도 케이싱 파이프(60)의 안내를 받으며 굴착하게 되고, 아울러 상기 파일럿 비트(32)는 상기 파일럿 홀(50)의 안내를 받으며 굴착하게 되며, 또한, 타격 전진이동하는 에어 햄머부(20)는 상기 안내 케이싱 파이프(40)의 안내를 받으면 굴착하게 되어 지중 굴착의 직진성을 향상시킬 수 있으며, 이로 인해 원하는 지중 위치에 정밀하게 보링할 수 있게 되는 것이다.At this time, the pilot bit 32 is guided by the pilot hole 50, and the bit body 31 expands and drills the excavated part of the pilot bit 32. As such, the auger bit 100 is first excavated under the guidance of the induction casing pipe 60, and the pilot bit 32 is excavated under the guidance of the pilot hole 50. , The air hammer unit 20 to move forward hitting is excavated when the guide casing pipe 40 is guided to improve the straightness of the underground excavation, thereby allowing precise boring at the desired underground position. .

위에서 몇몇의 실시예가 예시적으로 설명되었음에도 불구하고, 본 발명이 이의 취지 및 범주에서 벗어남 없이 다른 여러 형태로 구체화될 수 있다는 사실은 해당 기술에 통상의 지식을 가진 이들에게는 자명한 것이다.Although some embodiments have been described above by way of example, it will be apparent to those skilled in the art that the present invention may be embodied in many other forms without departing from the spirit and scope thereof.

따라서, 본 상술된 실시예는 제한적인 것이 아닌 예시적인 것으로 여겨져야 하며, 첨부된 청구항 및 이의 동등 범위 내의 모든 실시예는 본 발명의 범주 내에 포함된다.Accordingly, the above-described embodiments are to be considered as illustrative and not restrictive, and all embodiments within the scope of the appended claims and their equivalents are included within the scope of the present invention.

도 1은 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 분해하여 나타낸 분해 사시도;1 is an exploded perspective view showing an exploded view of the underground boring precision auger bit 100 according to the present invention;

도 2는 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)의 단면을 나타내는 단면도;2 is a cross-sectional view showing a cross-section of the underground boring precision boring auger bit 100 according to the present invention;

도 3은 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)의 정면을 나타내는 정면도;Figure 3 is a front view showing the front of the drilling boring auger 100 for underground excavation according to the present invention;

도 4a는 본 발명에 따른 지하굴착용 정밀보링 오거비트(100)를 이용한 지중 정밀보링 시공공법의 첫단계로서, 보링 위치에 파일럿 홀(50)을 형성시키는 단계를 나타내는 시공 상태도;Figure 4a is a first step of the underground precision boring construction method using the underground drilling precision boring auger bit 100 according to the present invention, the construction state showing the step of forming a pilot hole 50 in the boring position;

도 4b는 파일럿 홀(50)을 형성한 후 유도 케이싱 파이프(60)를 압입시키는 단계를 나타내는 시공 상태도;4B is a construction state diagram illustrating a step of pressing the induction casing pipe 60 after forming the pilot hole 50;

도 4c는 파일럿 홀(50)에 파일럿 비트(32)를 위치시킨 후 굴착을 실시하는 것을 나타내는 시공 상태도; 및4C is a construction state diagram showing that drilling is performed after positioning the pilot bit 32 in the pilot hole 50; And

도 4d는 본 발명에 따른 오거비트(100)가 유도 케이싱 파이프(60), 파일럿 홀(50) 및 안내 케이싱 파이프(40)의 안내를 받으며 지중 굴착하는 것을 나타내는 시공 상태도;이다.FIG. 4D is a construction state diagram illustrating that the auger bit 100 according to the present invention is ground excavated while being guided by the induction casing pipe 60, the pilot hole 50, and the guide casing pipe 40.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 오거부 11 : 압축공기 이동로10: rejection 11: compressed air movement path

12 : 스크류축 13 : 스크류날개12: screw shaft 13: screw blade

20 : 에어 햄머부 21 : 압축공기 가압부20: air hammer part 21: compressed air pressurizing part

22 : 하우징 몸체부 23 : 이동 안내편22: housing body portion 23: movement guide piece

24 : 에어햄머 하우징부 25 : 에어햄머 몸체부24: air hammer housing portion 25: air hammer body portion

30 : 굴착 비트부 31 : 비트 몸체부30: drilling bit portion 31: bit body portion

32 : 파일럿 비트 33 : 압축공기 배출로32: pilot bit 33: compressed air discharge

34 : 확장 비트34 extension bits

40 : 안내 케이싱 파이프 41 : 선단슈40: guide casing pipe 41: tip shoe

50 : 파일럿 홀 60 : 유도 케이싱 파이프50: pilot hole 60: induction casing pipe

100 : 지하굴착용 정밀보링 오거비트100: precision boring auger bit for underground excavation

Claims (3)

내부중심부에는 길이방향으로 압축공기 이동로(11)가 형성되는 스크류축(12)이 구비되고, 상기 스크류축(12)의 외주면에는 길이방향으로 스크류날개(13)가 형성되는 오거부(10);The inner center portion is provided with a screw shaft 12, the compressed air movement path 11 is formed in the longitudinal direction, the auger portion 10 is formed on the outer peripheral surface of the screw shaft 12 in the longitudinal direction ; 상기 오거부(10)의 선단에 결합되는 에어햄머 몸체부(25)가 구비되고, 상기 압축공기 이동로(11)와 연통되게 상기 에어햄머 몸체부(25)의 내부중심부에 소정공간으로 압축공기 가압부(21)가 형성되며, 회전운동과 함께, 상기 압축공기 가압부(21)로 유입되는 압축공기의 순간 가압을 통해 충격전진 하는 에어 햄머부(20); 및An air hammer body portion 25 coupled to the distal end of the auger portion 10 is provided, and the compressed air is compressed into a predetermined space at an inner central portion of the air hammer body portion 25 so as to communicate with the compressed air movement path 11. The pressurizing unit 21 is formed, and with the rotational movement, the air hammer unit 20 to shock forward through the instantaneous pressurization of the compressed air flowing into the compressed air pressurizing unit 21; And 지반을 굴착하는 비트 몸체부(31)가 상기 에어 햄머부(20)의 선단에 결합되고, 상기 비트 몸체부(31)의 중심 선단에는 소정길이로 돌출되게 파일럿 비트(32)가 형성되는 굴착 비트부(30);로 구성되는 것을 특징으로 하는 지하굴착용 정밀보링 오거비트(100).A bit body 31 for excavating the ground is coupled to the tip of the air hammer 20, the drilling bit 32 is formed in the center tip of the bit body 31 to protrude to a predetermined length Part 30; underground boring precision boring auger bit 100, characterized in that consisting of. 제 1항에 있어서,The method of claim 1, 중공의 원통형의 하우징 몸체부(22)가 마련되고, 상기 하우징 몸체부(22)의 외주면에는 소정간격을 두고 길이 방향으로 다수의 이동 안내편(23)이 방사상으로 형성되며, 상기 중공의 하우징 몸체부(22)의 내부에는 상기 에어 햄머부(20)가 결 합하여 구비되는 에어햄머 하우징부(24); 및The hollow cylindrical housing body portion 22 is provided, the outer circumferential surface of the housing body portion 22 is formed with a plurality of moving guide pieces radially in the longitudinal direction at a predetermined interval, the hollow housing body An air hammer housing part 24 provided with the air hammer part 20 in the interior of the part 22; And 중공 원통형의 파이프로 형성되고, 선단부의 외주면으로는 선단슈(41)가 결합되며, 회전운동과 함께 전진이동하는 상기 오거부(10) 및 에어햄머 하우징부(24)가 내부 중공에 위치하는 안내 케이싱 파이프(40);를 더 포함하여 구성되며,It is formed of a hollow cylindrical pipe, the tip shoe 41 is coupled to the outer circumferential surface of the tip portion, the auger portion 10 and the air hammer housing portion 24 that moves forward with the rotational movement is located in the inner hollow guide Casing pipe 40; is configured to further include, 상기 비트 몸체부(31) 및 파일럿 비트(32)의 내부중심부에는 상기 압축공기 가압부(21)와 연통되어 상기 압축공기 가압부(21)로부터 소정량의 압축공기가 유입되어 이동배출되는 압축공기 배출로(33)가 형성되는 것을 특징으로 하는 지하굴착용 정밀보링 오거비트(100).Compressed air is communicated with the compressed air pressurizing portion 21 to the inner center portion of the bit body 31 and the pilot bit 32 so that a predetermined amount of compressed air flows in and is discharged from the compressed air pressurizing portion 21. Underground drilling precision boring auger bit 100, characterized in that the discharge path 33 is formed. 원하는 위치의 지중의 지반을 천공하는 지중 정밀보링 시공공법에 있어서,In the underground precision boring construction method for drilling the ground of the ground of the desired position, 지중에 보링 하려는 위치를 따라 소구경의 파일럿 홀(50)을 형성시키는 단계;Forming a pilot hole 50 having a small diameter along a position to be bored in the ground; 상기 파일럿 홀(50)이 중공의 유도 케이싱 파이프(60)의 중심에 위치하도록 한 후, 상기 유도 케이싱 파이프(60)를 지중에 소정깊이로 압입하는 단계; 및Placing the pilot hole (50) at the center of the hollow induction casing pipe (60), and then pressing the induction casing pipe (60) to a predetermined depth in the ground; And 내부중심부에는 길이방향으로 압축공기 이동로(11)가 형성되는 스크류축(12)이 구비되고, 상기 스크류축(12)의 외주면에는 길이방향으로 스크류날개(13)가 형성되는 오거부(10)와, 상기 오거부(10)의 선단에 결합되는 에어햄머 몸체부(25)가 구비되고, 상기 압축공기 이동로(11)와 연통되게 상기 에어햄머 몸체부(25)의 내부중심부에 소정공간으로 압축공기 가압부(21)가 형성되며, 회전운동과 함께, 상기 압축공기 가압부(21)로 유입되는 압축공기의 순간 가압을 통해 충격전진 하는 에어 햄머부(20)와,The inner center portion is provided with a screw shaft 12, the compressed air movement path 11 is formed in the longitudinal direction, the auger portion 10 is formed on the outer peripheral surface of the screw shaft 12 in the longitudinal direction And, the air hammer body portion 25 which is coupled to the front end of the auger portion 10 is provided, in communication with the compressed air movement path 11 to the inner center of the air hammer body portion 25 to a predetermined space Compressed air pressurization portion 21 is formed, with the rotational movement, the air hammer unit 20 for shock advance through the instantaneous pressurization of the compressed air flowing into the compressed air pressurizing portion 21, 지반을 굴착하는 비트 몸체부(31)가 상기 에어 햄머부(20)의 선단에 결합되고, 상기 비트 몸체부(31)의 중심 선단에는 소정길이로 돌출되게 파일럿 비트(32)가 형성되는 굴착 비트부(30)와,A bit body 31 for excavating the ground is coupled to the tip of the air hammer 20, the drilling bit 32 is formed in the center tip of the bit body 31 to protrude to a predetermined length Section 30, 중공의 원통형의 하우징 몸체부(22)가 마련되고, 상기 하우징 몸체부(22)의 외주면에는 소정간격을 두고 길이 방향으로 다수의 이동 안내편(23)이 방사상으로 형성되며, 상기 중공의 하우징 몸체부(22)의 내부에는 상기 에어 햄머부(20)가 결합하여 구비되는 에어햄머 하우징부(24) 및,The hollow cylindrical housing body portion 22 is provided, the outer circumferential surface of the housing body portion 22 is formed with a plurality of moving guide pieces in the radial direction in the longitudinal direction at a predetermined interval radially, the hollow housing body An air hammer housing part 24 provided with the air hammer part 20 coupled to the inside of the part 22, 중공 원통형의 파이프로 형성되고, 선단부의 외주면으로는 선단슈(41)가 결합되며, 회전운동과 함께 전진이동하는 상기 오거부(10) 및 에어햄머 하우징부(24)가 내부 중공에 위치하는 안내 케이싱 파이프(40)로 구성되며,It is formed of a hollow cylindrical pipe, the tip shoe 41 is coupled to the outer circumferential surface of the tip portion, the auger portion 10 and the air hammer housing portion 24 that moves forward with the rotational movement is located in the inner hollow guide Casing pipe 40, 상기 비트 몸체부(31) 및 파일럿 비트(32)의 내부중심부에는 상기 압축공기 가압부(21)와 연통되어 상기 압축공기 가압부(21)로부터 소정량의 압축공기가 유입되어 이동배출되는 압축공기 배출로(33)가 형성되는 지하굴착용 정밀보링 오거비트(100)의,Compressed air is communicated with the compressed air pressurizing portion 21 to the inner center portion of the bit body 31 and the pilot bit 32 so that a predetermined amount of compressed air flows in and is discharged from the compressed air pressurizing portion 21. Of the underground boring precision boring auger bit 100, the discharge path 33 is formed, 상기 파일럿 비트(32)를 상기 파일럿 홀(50)에 끼워 넣어 위치시킨 후, 상기 유도 케이싱 파이프(60) 내에 상기 안내 케이싱 파이프(40)가 위치되도록 하여 상 기 굴착 비트부(30)를 작동시켜 상기 유도 케이싱 파이프(60)의 안내를 받으며 상기 안내 케이싱 파이프(40)를 전진 이동시키고, 상기 파일럿 홀(50)의 유도를 받으며 상기 파일럿 비트(32)을 전진 이동시켜 소정깊이로 지중을 굴착해 나가는 단계;를 포함하여 이루어지는 것을 특징으로 하는 지중 정밀보링 시공공법.After the pilot bit 32 is inserted into the pilot hole 50 and positioned, the guide casing pipe 40 is positioned in the induction casing pipe 60 to operate the excavation bit part 30. The guide casing pipe 40 is moved forward while being guided by the induction casing pipe 60, the pilot bit 32 is moved forward while being guided by the pilot hole 50, and the ground is excavated to a predetermined depth. Underground precision boring construction method characterized in that it comprises a; exiting.
KR1020090086103A 2009-09-11 2009-09-11 Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method Ceased KR20110028147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090086103A KR20110028147A (en) 2009-09-11 2009-09-11 Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090086103A KR20110028147A (en) 2009-09-11 2009-09-11 Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method

Publications (1)

Publication Number Publication Date
KR20110028147A true KR20110028147A (en) 2011-03-17

Family

ID=43934640

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090086103A Ceased KR20110028147A (en) 2009-09-11 2009-09-11 Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method

Country Status (1)

Country Link
KR (1) KR20110028147A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561951A (en) * 2012-01-14 2012-07-11 中国石油天然气集团公司 Double-stage and double-speed well drilling tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561951A (en) * 2012-01-14 2012-07-11 中国石油天然气集团公司 Double-stage and double-speed well drilling tool

Similar Documents

Publication Publication Date Title
KR20100128581A (en) Large diameter rock drilling method and apparatus
KR20120108707A (en) Drill assembly and drilling machine with the same
JP2016098558A (en) Free surface forming method
KR101342134B1 (en) Excavating equipment for Front edge expanded bulb having internal excavation method used high strength steel pile
KR102186261B1 (en) Order wall installation device and order wall installation method for constructing ground drilling
KR101283494B1 (en) Assembly hammer with extendable bit and hammer bit
KR20140039409A (en) Machine boring rock large diameter rotation type
KR102314331B1 (en) A tunnel construction method using a steel chamber machine for FrontJacking construction method
KR20110028147A (en) Underground Excavation Precision Boring Auger Vig and Underground Precision Boring Construction Method
KR200384053Y1 (en) Casing structure of drilling equipment
KR101469155B1 (en) Assembly hammer with extendable bit and hammer bit
KR20140048721A (en) Drilling apparatus
JP2580947B2 (en) Drilling rig
CN214886838U (en) A drill pipe guide device for assisting an impact rotary rock drill to complete the grooving operation
FI89624B (en) Roterbart borrverktyg
KR101010207B1 (en) Hollow Rock Excavators
KR20180013029A (en) Method for enlarging holes and bit therefore
JPH04302693A (en) Excavating engineering method
KR200248161Y1 (en) Apparatus for drilling a hole in rock formation
KR101598198B1 (en) Reaming device of excavation hammer for core barrel work
KR102002525B1 (en) Vertical shaft ring cut excavating system
CN113513261B (en) Drill rod guiding device for assisting impact rotary rock drill to complete grooving operation
CN115059060B (en) Construction method for rotary digging grouting retaining wall of complex terrain
KR102275847B1 (en) Tunnel excavator
KR20130140983A (en) Composite hammer for extending hole

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20090911

PA0201 Request for examination
N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 20110118

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

PG1501 Laying open of application
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20110722

Patent event code: PE09021S01D

E601 Decision to refuse application
PE0601 Decision on rejection of patent

Patent event date: 20120119

Comment text: Decision to Refuse Application

Patent event code: PE06012S01D

Patent event date: 20110722

Comment text: Notification of reason for refusal

Patent event code: PE06011S01I