KR20090010002A - Guide rail construction method and anchor unit for mechanical concrete using anchor unit - Google Patents

Guide rail construction method and anchor unit for mechanical concrete using anchor unit Download PDF

Info

Publication number
KR20090010002A
KR20090010002A KR1020070073170A KR20070073170A KR20090010002A KR 20090010002 A KR20090010002 A KR 20090010002A KR 1020070073170 A KR1020070073170 A KR 1020070073170A KR 20070073170 A KR20070073170 A KR 20070073170A KR 20090010002 A KR20090010002 A KR 20090010002A
Authority
KR
South Korea
Prior art keywords
guide rail
concrete
anchor unit
anchor
connecting shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
KR1020070073170A
Other languages
Korean (ko)
Inventor
김영일
Original Assignee
(주)대원시스템
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)대원시스템 filed Critical (주)대원시스템
Priority to KR1020070073170A priority Critical patent/KR20090010002A/en
Publication of KR20090010002A publication Critical patent/KR20090010002A/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/20Posts therefor
    • E04H17/22Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 앵커유닛을 이용한 가이드레일 시공방법 및 기계식 콘크리트 타설용 앵커유닛에 관한 것으로서, 도로 주변에 안전을 위해 가이드레일을 시공하는 과정에서, 기계식 콘크리트 타설기에 의해 콘크리트 블럭이 시공되고, 콘크리트 블럭에 금속재로 이루어진 가이드레일의 시공을 간편, 용이하고 효율적인 시공이 이루어지도록 함은 물론, 가이드레일을 시공하기 위해 타설된 블럭에 별도로 구멍을 뚫지 않고서도 지주 및 레일 본체를 설치할 수 있도록 한 것이다.The present invention relates to a guide rail construction method and a mechanical concrete anchoring unit using an anchor unit, in the process of constructing a guide rail for safety around the road, a concrete block is constructed by a mechanical concrete pourer, the concrete block The construction of the guide rail made of metal is made to be simple, easy and efficient construction, as well as to install the support and the rail body without drilling a separate hole in the pour block for the construction of the guide rail.

본 발명은 기계식 콘크리트 타설기를 이용하여 콘크리트 블럭을 시공함과 동시에, 가이드레일을 설치하기 위한 앵커유닛을 매설된 상태로 설치되도록 하여, 콘크리트 블럭 시공 후, 가이드레일을 설치하는 과정에서 매설된 앵커유닛을 이용하여 가이드레일을 간편, 용이하고 효율적이며, 가이드레일의 설치 및 유지 보수가 용이하고, 가이드레일 뿐만 아니라, 방호책, 차량용 방호울타리, 보도용 난간 등의 도로변에 설치되는 안전장치에 대한 시공이 효율적이며 작업공기 및 인력을 감축할 수 있어 경제적인 효과를 얻을 수 있는 것이다.The present invention by constructing a concrete block using a mechanical concrete placing machine, at the same time to install the anchor unit for installing the guide rail, the anchor unit embedded in the process of installing the guide rail after the construction of the concrete block Simple, easy and efficient guide rail installation, easy installation and maintenance of the guide rail, as well as the construction of safety devices installed on the side of the road, such as protective fences, vehicle fences, sidewalk railings. It is efficient and can reduce working air and manpower, and can achieve economic effect.

Description

앵커유닛을 이용한 가이드레일 시공방법 및 기계식 콘크리트 타설용 앵커유닛{The guide rail engineering method which uses an anchor unit and machine ground concrete work use anchor unit}The guide rail engineering method which uses an anchor unit and machine ground concrete work use anchor unit}

본 발명은 앵커유닛을 이용한 난간, 방호벽, 울타리, 가이드레일 등의 시공방법 및 기계식 콘크리트 타설용 앵커유닛에 관한 것으로서, 보다 상세하게는 도로 주변에 안전을 위해 난간, 방호벽, 울타리, 가이드래일을 시공하는 과정에서, 기계식 콘크리트 타설기에 의해 콘크리트 블럭이 시공되고, 콘크리트 블럭에 금속재로 이루어진 가이드레일의 시공을 간편, 용이하고 효율적인 시공이 이루어지도록 함은 물론, 가이드레일을 시공하기 위해 타설된 블럭에 별도로 구멍을 뚫지 않고서도 지주 및 레일 본체를 설치할 수 있도록 한 것이다.The present invention relates to a method for constructing a railing, a barrier, a fence, a guide rail, and the like using an anchor unit and a mechanical concrete placing anchor unit, and more particularly, to construct a railing, a barrier, a fence, and a guide rail for safety around a road. In the process, the concrete block is constructed by a mechanical concrete pourer, and the construction of the guide rail made of metal material on the concrete block is made simple, easy and efficient, as well as separately placed on the poured block for the construction of the guide rail. It is to be able to install the strut and rail body without drilling a hole.

일반적으로, 각종 도로 주변에는 주행중인 차량의 안전을 도모하기 위한 수단으로 이탈 방지턱, 경계휀스, 가이드레일 등이 설치된다.In general, a separation prevention jaw, a boundary fence, a guide rail, and the like are installed around the various roads as a means for promoting safety of a running vehicle.

특히, 난간, 방호벽, 가이드레일은 도로의 급커브길이나 주행중인 차량의 도로이탈이 주의되는 장소에 설치되어 차량 이탈에 따른 대형사고를 예방하기 위해 사용되고 있다.In particular, railings, barriers, and guide rails are used to prevent road accidents caused by vehicle departures because they are installed at places where a sharp curve of roads or road departures of running vehicles are noted.

이러한, 난간, 방호벽, 가이드레일은 도로의 가장자리부위에 설치되는 바, 통상적으로 사용되고 있는 기계식 콘크리트 타설기에 의해 콘크리트 블럭이 타설된 상태에서, 블럭에 타공기를 이용하여 구멍을 뚫어 설치공을 형성한 후, 앵커 보울트나 고정봉 및 브라켓을 이용하여 지주 및 레일 본체를 연결하여 난간, 방호벽, 가이드레일 등을 시공하고 시공시 높이를 조절할 수 있도록 한 것이다.These, railings, barriers, guide rails are installed on the edge of the road bar, in the state that the concrete block is cast by a mechanical concrete pourer, which is commonly used, using a perforator in the block to form an installation hole After that, by using anchor bolts or fixing rods and brackets to connect the pillar and the rail body to construct a railing, a protective wall, a guide rail and the like to adjust the height during construction.

상기와 같은 종래의 가이드레일은 도로 주변에 기계식 콘크리트 타설기를 이용하여 블럭을 시공한 상태에서, 레일 본체를 고정하기 위한 지주를 설치하기 위해서는 별도의 타공기를 이용하여 기시공된 블럭의 소정위치에 설치공을 타공한 후, 앵커 보울트나 고정봉을 이용하여 지주를 고정하여 가이드레일을 시공하게 된다.In the conventional guide rail as described above, the block is constructed using a mechanical concrete placing machine around the road, and in order to install a prop for fixing the rail main body, a separate perforator is installed at a predetermined position of the block. After perforating the installation hole, the guide rail is constructed by fixing the strut using an anchor bolt or a fixed rod.

그러나, 상기와 같은 종래의 가이드레일을 시공하기 위해서는 타설기에 의해 기시공된 콘크리트 블럭에 구멍을 타공해야 함으로, 구멍 타공에 의해 번거로움과 작업성이 떨어지는 불편함을 안고 있으며, 또한, 타공기에 의해 구멍을 타공하는 과정에서 콘크리트 블럭에 타격이 가해지게 되어 블럭 일부위가 파손되거나 균열이 발생되는 등의 많은 문제점이 발생하였다.However, in order to construct the conventional guide rail as described above, since the hole must be drilled in the concrete block constructed by the pourer, it is inconvenient to suffer from the inconvenience and workability due to the hole drilling. As a result of the perforation of the concrete block in the process of punching the hole, a portion of the block is broken or cracks are generated.

본 발명은 상기와 같은 종래의 문제점을 해결하기 위한 것으로서, 그 목적은 도로변에 난간, 방호벽, 울타리, 가이드레일 등을 시공함에 있어, 기계식 콘크리트 타설기를 이용하여 콘크리트 블럭을 시공함과 동시에, 가이드레일을 설치하기 위한 앵커유닛을 매설된 상태로 설치되도록 하여, 콘크리트 블럭 시공 후, 난간, 방호벽, 울타리, 가이드레일등을 설치하는 과정에서 매설된 앵커유닛을 이용하여 현장의 여건에 따라서 높이를 자유롭게 조절하여 가이드레일 등을 간편, 용이하고 효율적이며 경제적인 가이드레일 시공이 가능하도록 된 새로운 형태의 앵커유닛을 이용한 가이드레일 시공방법 및 기계식 콘크리트 타설용 앵커유닛을 제공하고자 하는 것이다.The present invention is to solve the conventional problems as described above, the purpose of the construction of the railings, barriers, fences, guide rails, etc. on the side of the road, while constructing the concrete block using a mechanical concrete pourer, at the same time, the guide rail By installing the anchor unit to be installed in the buried state, after the construction of the concrete block, using the anchor unit buried in the process of installing railings, barriers, fences, guide rails, etc., freely adjust the height according to the conditions of the site The purpose of the present invention is to provide a guide rail construction method and a mechanical concrete anchoring unit using a new type of anchor unit, which enables simple, easy, efficient and economical guide rail construction.

본 발명의 다른 목적은 가이드레일을 시공하기 위한 앵커유닛이 콘크리트 블럭에 매설된 상태로 기계식 콘크리트 타설기에 의해 시공되므로, 가이드레일의 설치 및 유지 보수가 용이하고, 가이드레일 뿐만 아니라, 방호책, 차량용 방호울타리, 보도용 난간 등의 도로변에 설치되는 안전장치에 대한 시공이 효율적이며, 콘크리트 타설시 앵커유닛을 통하여 내부의 기포가 외부로 방출되어 지지력을 높이는 효과와 작업공기 및 인력을 감축할 수 있는 것이다.Another object of the present invention is because the anchor unit for constructing the guide rail is constructed by a mechanical concrete pouring machine in a state buried in the concrete block, the installation and maintenance of the guide rail is easy, as well as the guide rail, protective measures, vehicle protection It is efficient to install safety devices installed on the side of roads such as fences and sidewalk railings, and when the concrete is placed, bubbles are released to the outside through anchor units to increase bearing capacity and reduce work air and manpower. .

이와 같은 목적을 달성하기 위하여, 본 발명은 도로변에 차량의 안전주행을 위해 난간, 방호벽, 울타리, 가이드레일을 설치함에 있어서, 기계식 콘크리트 타설 기를 이용하여 콘크리트 블럭을 시공하는 과정에서 앵커유닛을 매설되도록 시공하고, 콘크리트 블럭에 매설된 앵커유닛을 이용하여 지주를 고정하고 레일 본체를 설치하여 가이드레일을 시공하도록 이루어진 특징을 갖는다.In order to achieve the above object, the present invention is to install the anchor unit in the process of constructing a concrete block using a mechanical concrete pouring machine in installing a railing, a barrier, a fence, a guide rail for the safe driving of the vehicle on the roadside. Construction, using the anchor unit embedded in the concrete block has a feature made to fix the support and to install the guide rail by installing the rail body.

이와 같은 본 발명에서, 기계식 콘크리트 타설기에 의해 타설되는 콘크리트 블럭에 매설되어 가이드레일이 설치되는 앵커유닛은 가이드레일을 설치하기 위한 도로변에 지지용 앵커를 시공하는 단계: 지지용 앵커에 상판, 하판, 연결축이 구비된 앵커유닛을 고정하는 단계; 고정된 앵커유닛의 연결축 상단부에 마감용 보울트와 테이프를 부착하는 단계; 기계식 콘크리트 타설기를 이용하여 앵커유닛이 설치된 상태에서 콘크리트를 타설하여 블럭을 시공하는 단계; 콘크리트 블럭에 매립된 앵커유닛의 연결축 상단부에 부착된 마감용 보울트와 테이프를 제거하는 단계; 연결축 상단부에 지주를 결합하는 단계; 지주에 레일본체를 연결하는 단계에 의해 가이드레일이 시공되는 특징을 갖는다. In the present invention as described above, the anchor unit embedded in the concrete block to be poured by the mechanical concrete placing machine is installed in the guide rail is a step of constructing a support anchor on the roadside for installing the guide rail: the top plate, the bottom plate, the support anchor Fixing an anchor unit having a connecting shaft; Attaching a closing bolt and a tape to an upper end of a connecting shaft of the fixed anchor unit; Constructing blocks by pouring concrete in the state where the anchor unit is installed by using a mechanical concrete pouring machine; Removing the finishing bolt and tape attached to the upper end of the connecting shaft of the anchor unit embedded in the concrete block; Coupling the strut to the upper end of the connecting shaft; The guide rail is constructed by the step of connecting the leg body to the support.

본 발명은 기계식 콘크리트 타설기를 이용하여 도로변에 가이드레일을 시공함에 있어서, 콘크리트 블럭을 설치함에 있어, 다수개의 설치공과 고정공이 형성되고 중앙에는 개구부가 형성된 상·하판과; 소정 높이를 가지며 상단부에는 내면에 나사부가 형성되고, 상·하판을 이격시키도록 사이에 설치되는 연결축과; 하단 일부위는 가이드레일을 설치하기 위한 도로변에 고정되어 설치되고 상단 일부는 하판에 형성된 고정공을 관통하여 너트에 의해 고정되는 지지용 앵커로 구성된 특징을 갖는다.The present invention in the construction of the guide rail on the side of the road by using a mechanical concrete placing machine, in installing the concrete block, a plurality of installation holes and fixing holes are formed in the center, the upper and lower plates formed with openings; A connecting shaft having a predetermined height and a screw portion formed on an inner surface of the upper end, and disposed between the upper and lower plates so as to separate the upper and lower plates; The upper part of the lower part is fixedly installed on the roadside for installing the guide rail and the upper part has a feature consisting of a support anchor which is fixed by a nut through a fixing hole formed in the lower plate.

이와 같은 본 발명에서, 상기 연결축 상단부에 형성된 나사부에는 마감 보울 트가 나사방식에 의해 분해 결합이 용이하도록 이루어지고, 마감 보울트는 콘크리트 타설에 의한 블럭 시공시 연결축의 나사부가 형성된 상단부 내면으로 콘크리트가 유입되는 것을 차단하게 되며, 콘크리트 블럭 시공이 완료되면, 마감 보울트는 제거되고 고정 보울트가 결합되어 상판과 연결축이 고정되도록 이루어진 특징을 갖는다.In the present invention as described above, the screw formed on the upper end of the connecting shaft is made to facilitate the disassembly and coupling of the closing bolt by the screw method, the closing bolt is concrete to the inner surface of the upper end formed with the screw of the connecting shaft when the block construction by concrete casting Blocking the inflow, and when the concrete block construction is completed, the finishing bolt is removed and the fixing bolt is coupled to have a top plate and the connecting shaft is fixed.

이와 같이 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛 시공방법 및 앵커유닛을 이용함에 따라, 기계식 콘크리트 타설기를 이용하여 콘크리트 블럭을 시공함과 동시에, 가이드레일을 설치하기 위한 앵커유닛을 매설된 상태로 설치되도록 하여, 콘크리트 블럭 시공 후, 가이드레일을 설치하는 과정에서 매설된 앵커유닛을 이용하여 가이드레일을 간편, 용이하고 효율적이며, 가이드레일의 설치 및 유지 보수가 용이하고, 가이드레일 뿐만 아니라, 방호책, 차량용 방호울타리, 보도용 난간 등의 도로변에 설치되는 안전장치에 대한 시공이 효율적이며 작업공기 및 인력을 감축할 수 있어 경제적인 효과를 얻을 수 있는 것이다.As described above, by using the method and the anchor unit of the mechanical concrete placing anchor unit construction according to the present invention, while constructing the concrete block using the mechanical concrete placing machine, while installing the anchor unit for installing the guide rails in the buried state After the construction of the concrete block, using the anchor unit embedded in the process of installing the guide rail, the guide rail is simple, easy and efficient, easy to install and maintain the guide rail, as well as the guide rail, protective measures, Construction of safety devices installed on roadsides, such as vehicle fences and sidewalk railings, is efficient and economical effects can be obtained by reducing work air and manpower.

이하, 본 발명을 첨부된 도면에 의해 보다 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

도 1에 도시된 바와 같이, 본 발명에 따른 앵커유닛을 이용한 가이드레일 시공방법은 기계식 콘크리트 타설기를 이용하여 콘크리트 블럭을 시공하는 과정에서 앵커유닛을 매설되도록 시공하고, 콘크리트 블럭에 매설된 앵커유닛을 이용하여 지주를 고정하고 레일 본체를 설치하여 가이드레일을 시공하도록 이루어는 것으로서, 기계식 콘크리트 타설기에 의해 타설되는 콘크리트 블럭에 매설되어 가이드레일이 설치되는 앵커유닛은 가이드레일을 설치하기 위한 도로변에 지지용 앵커를 시공하는 단계(S10): 지지용 앵커에 상판, 하판, 연결축이 구비된 앵커유닛을 고정하는 단계(S20); 고정된 앵커유닛의 연결축 상단부에 마감용 보울트와 테이프를 부착하는 단계(S30); 기계식 콘크리트 타설기를 이용하여 앵커유닛이 설치된 상태에서 콘크리트를 타설하여 블럭을 시공하는 단계(S40); 콘크리트 블럭에 매립된 앵커유닛의 연결축 상단부에 부착된 마감용 보울트와 테이프를 제거하는 단계(S50); 연결축 상단부에 지주를 결합하는 단계(S60); 지주에 레일본체를 연결하는 단계(S70)에 의해 가이드레일이 시공되는 것이다.As shown in Figure 1, the guide rail construction method using the anchor unit in accordance with the present invention constructs the anchor unit embedded in the process of constructing the concrete block using a mechanical concrete placing machine, and the anchor unit embedded in the concrete block It is made to install the guide rail by fixing the strut and installing the rail body, and the anchor unit embedded in the concrete block that is placed by the mechanical concrete placing machine is installed on the roadside for installing the guide rail. Step of constructing the anchor (S10): fixing the anchor unit having a top plate, a bottom plate, a connecting shaft to the support anchor (S20); Attaching a closing bolt and a tape to an upper end of a connection shaft of the fixed anchor unit (S30); Constructing a block by pouring concrete in a state in which an anchor unit is installed using a mechanical concrete pouring machine (S40); Removing the finishing bolt and the tape attached to the upper end of the connecting shaft of the anchor unit embedded in the concrete block (S50); Coupling the strut to the upper end of the connecting shaft (S60); Guide rail is constructed by the step (S70) of connecting the leg of the body to the support.

본 발명의 도로변에 지지용 앵커를 시공하는 단계(S10)에서는 도로변의 기초기반에 지정된 지주간의 거리와 앵커 피치 확인 후, 앵커를 고정하게 되며, 철근거치식의 경우에는 지주간의 거리를 확인한 후, 기존 배근된 철근에 고정하게 되는 것이다.In the step (S10) of constructing a support anchor on the roadside of the present invention, after confirming the distance between anchors and anchor pitches specified on the foundation of the roadside, the anchors are fixed, and in the case of the rebar mounting type, after confirming the distance between the posts, It will be fixed to the rebar.

지지용 앵커에 상판, 하판, 연결축이 구비된 앵커유닛을 고정하는 단계(S20)에서는 기초기반에 고정된 앵커에 앵커유닛을 고정하여 설치하되, 시공되는 콘크리트 블럭의 높이에 따라 설치 높이를 조절하여 앵커유닛의 상판이 콘크리트 블럭의 상면에 드러나도록 위치를 설정한 상태로 고정하게 되는 것이다.In fixing the anchor unit provided with the upper plate, the lower plate, the connecting shaft to the support anchor (S20), the anchor unit is fixed to the anchor fixed to the foundation base, but is installed, and adjusts the installation height according to the height of the concrete block to be constructed The anchor plate is to be fixed in a set position so that the top plate of the concrete block is exposed.

고정된 앵커유닛의 연결축 상단부에 마감용 보울트와 테이프를 부착하는 단계(S30)에서는 앵커유닛의 연결축의 상단부 내면에 형성된 나사부에 콘크리트 등의 이물질이 유입되어 막히는 것을 차단하기 위해 마감 보울트와 테이프가 결합 및 부 착된다.In the step (S30) of attaching the closing bolt and the tape to the upper end of the connecting shaft of the fixed anchor unit in the threaded portion formed on the inner surface of the upper end of the connecting shaft of the anchor unit in order to block the foreign matter, such as concrete, blocking the closing bolt and tape Combined and attached.

단계(S40)에서는 기계식 콘크리트 타설기를 이용하여 앵커유닛이 설치된 상태에서 콘크리트를 타설하여 설정된 높이의 콘크리트 블럭이 시공되고, 단계(S50)에서 콘크리트 블럭에 매립된 앵커유닛의 연결축 상단부에 부착된 마감용 보울트와 테이프를 제거하게 되며, 단계(S60)에서 연결축 상단부에 지주를 결합하고, 지주에 레일본체를 연결하는 단계(S70)를 거쳐 가이드 레일의 시공이 완료되는 것이다.In step S40, the concrete block of the set height is constructed by pouring concrete in the state in which the anchor unit is installed by using a mechanical concrete pouring machine, and in step S50, a finish attached to the upper end of the connecting shaft of the anchor unit embedded in the concrete block After removing the bolt and the tape for the coupling, in step (S60) is coupled to the strut on the upper end of the connecting shaft, and the construction of the guide rail is completed through the step (S70) of connecting the legature body to the strut.

도 2 내지 도 4(b)에 도시된 바와 같이, 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛(1)의 상·하판(10, 20)은 다수개의 설치공(11)과 고정공(21)이 형성되고 중앙에는 개구부(12, 22)가 형성되며, 연결축(30)은 소정 높이를 가지며 상단부에는 내면에 나사부(31)가 형성되고 상·하판(10, 20)을 이격시키도록 사이에 설치되는 것이다.As shown in Figure 2 to 4 (b), the upper and lower plates (10, 20) of the mechanical concrete placing anchor unit 1 according to the present invention is a plurality of mounting holes 11 and fixing holes 21 And the openings 12 and 22 are formed at the center thereof, and the connecting shaft 30 has a predetermined height, and a screw part 31 is formed at an inner surface at an upper end thereof to space the upper and lower plates 10 and 20 therebetween. It is installed.

지지용 앵커(40)는 하단 일부위는 가이드레일을 설치하기 위한 도로변 기초기반에 고정되어 설치되고 상단 일부는 하판(20)에 형성된 고정공(21)을 관통하여 너트(41)에 의해 고정되는 것이다.The support anchor 40 is fixedly installed on the roadside foundation for installing the guide rail on the lower part of the lower part, and the upper part is fixed by the nut 41 through the fixing hole 21 formed in the lower plate 20. will be.

이때, 상기 연결축(30) 상단부에 형성된 나사부(31)에는 마감 보울트(32)가 나사방식에 의해 분해 결합이 용이하도록 구성되고, 마감 보울트(32)는 콘크리트 타설에 의한 블럭 시공시 연결축의 나사부(31)가 형성된 상단부 내면으로 콘크리트가 유입되는 것을 차단하게 되며, 콘크리트 블럭 시공이 완료되면, 마감 보울트(32)는 제거되고 고정 보울트가 결합되어 상판(10)과 연결축(30)이 고정되도록 이루어진다.At this time, the threaded portion 31 formed on the upper end of the connecting shaft 30 is configured so that the closing bolt 32 is easily disassembled by the screw method, the closing bolt 32 is the screw portion of the connecting shaft when the block construction by concrete casting (31) to prevent the concrete from flowing into the inner surface of the upper end, and when the concrete block construction is completed, the finishing bolt 32 is removed and the fixing bolt is coupled so that the top plate 10 and the connecting shaft 30 is fixed Is done.

도 2는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛을 나타내는 분해 사시도이고, 도 3은 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛을 나타내는 측단면도이며, 도 4(a), 4(b)는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛의 사용상태를 나타내는 측단면도 및 종단면도로서, 도로변의 가이드레일이 설치되는 기초 기반에 지지용 앵커(40)를 소정 위치에 박아 고정하고, 지지용 앵커(40)에 하판(20)을 결합하되, 지지용 앵커(40)의 상단 일부위가 하판(20)에 형성된 고정공(21)을 관통한 후, 너트(41)에 의해 결합되며, 하판(20)에는 다수개의 연결축(30)이 용접에 의해 결합되고, 연결축(30)의 상단부에는 상판(10)이 결합되어 구성되는 것이다.Figure 2 is an exploded perspective view showing a mechanical concrete placing anchor unit according to the present invention, Figure 3 is a side sectional view showing a mechanical concrete placing anchor unit according to the present invention, Figure 4 (a), 4 (b) is As a side cross-sectional view and a longitudinal cross-sectional view showing the state of use of the mechanical concrete anchoring unit according to the invention, the support anchor 40 is driven and fixed to a predetermined position on a foundation on which a roadside guide rail is installed, and the support anchor 40 The lower plate 20 is coupled to the lower plate 20, and a portion of the upper end of the support anchor 40 passes through the fixing hole 21 formed in the lower plate 20, and then is coupled by the nut 41, and the lower plate 20 There is a plurality of connecting shaft 30 is coupled by welding, the upper end of the connecting shaft 30 is configured to be coupled to the upper plate 10.

상기 상판(10)에는 다수개의 설치공(11)이 형성되어 연결축(30)이 끼워져 결합되고, 연결축(30)의 상단부에는 내면에 소정 깊이를 갖는 나사부(31)가 형성되며, 나사부(31)에는 마감 보울트(32)가 나사방식에 의해 결합되는 것이다.A plurality of installation holes 11 are formed in the upper plate 10 so that the connecting shaft 30 is fitted and coupled thereto, and an upper end portion of the connecting shaft 30 is formed with a screw portion 31 having a predetermined depth on the inner surface thereof. 31) the finishing bolt 32 is coupled by a screw method.

이때, 상기 마감 보울트(32)가 결합된 연결축(30)의 상면에는 마감 테이프가 부착되어 나사부(31) 내부로 이물질이 유입되는 것을 차단하게 된다.At this time, the finishing tape is attached to the upper surface of the connecting shaft 30 to which the closing bolt 32 is coupled to block foreign matter from flowing into the thread part 31.

본 발명의 앵커유닛(1)은 가이드레일이 시공되는 도로변에 설치된 상태에서, 기계식 콘크리트 타설기에 의해 콘크리트 블럭이 시공됨에 있어, 상판(10)의 상면을 기점으로 아랫부분은 타설되는 콘크리트에 의해 매설된 상태로 설치된다.In the anchor unit (1) of the present invention is installed on the side of the road on which the guide rail is constructed, the concrete block is constructed by a mechanical concrete placing machine, the lower part is buried by concrete poured from the upper surface of the upper plate (10) It is installed as it is.

이와 같이, 본 발명에 따른 앵커유닛을 이용하여 가이드레일을 설치하려면, 먼저, 가이드레일을 설치하고자 하는 도로변의 기초 기반에 지지용 앵커(40)를 상부 일부위가 드러나도록 고정한 다음, 상판(10)과 하판(20) 사이에 연결축(30)을 위치시켜 상호간에 이격된 상태로 연결축(30) 상,하단부에 고정시켜 앵커유닛(1)을 구성한다.As such, in order to install the guide rail using the anchor unit according to the present invention, first, the fixing anchor 40 is exposed to the upper part of the upper surface 10 to the foundation base of the roadside on which the guide rail is to be installed, and then the top plate 10 The connecting shaft 30 is positioned between the bottom plate 20 and the connecting plate 30 to be fixed to the upper and lower ends of the connecting shaft 30 so as to be spaced apart from each other.

이 상태에서, 앵커유닛(1)의 하판(20)을 기초 기반에 고정된 지지용 앵커(40)에 결합시켜 너트(41)로 고정하게 되면, 가이드레일 시공을 위한 앵커유닛의 설치가 완료되는 것으로서, 이때, 상기 상판(10)의 설치 높이는 기설정된 콘크리트 블럭의 높이에 따라, 설치 높이가 조절되는바, 콘크리트가 타설되어 블럭이 형성되는 과정에서, 상판(10)은 저면을 기점으로 아랫부분은 콘크리트에 매설되어 시공되고, 상면은 외부로 드러나게 된다.In this state, when the lower plate 20 of the anchor unit 1 is coupled to the support anchor 40 fixed to the foundation base and fixed with the nut 41, the installation of the anchor unit for the guide rail construction is completed. As, at this time, the installation height of the top plate 10 is adjusted according to the height of the predetermined concrete block, the installation height is adjusted, in the process of forming concrete block is formed, the top plate 10 is the bottom portion from the bottom surface Is embedded in concrete and the upper surface is exposed to the outside.

특히, 본 발명의 앵커유닛을 구성하는 연결축(30)의 상단부가 상판(10)에 형성된 설치공(11)에 끼워져 결합되고, 상단부 내면에 형성된 나사부(31)에는 마감 보울트(32)가 결합되며, 연결축(30)이 끼워져 결합된 부위의 설치공(11)에는 마감 테이프가 부착되어 연결축(30) 상면을 차폐하게 되는 것이다.In particular, the upper end of the connecting shaft 30 constituting the anchor unit of the present invention is fitted into the installation hole 11 formed in the upper plate 10, the closing bolt 32 is coupled to the threaded portion 31 formed on the inner surface of the upper end The connection tape 30 is fitted to the installation hole 11 of the combined portion is a closing tape is attached to shield the upper surface of the connection shaft (30).

이와 같이, 가이드레일을 설치하고자 하는 위치에 앵커유닛(1)의 설치가 완료되면, 기계식 콘크리트 타설기(도면에 도시되지 않음)를 이용하여 콘크리트 블럭을 설치하게 되면, 앵커유닛(1)의 상판(10)을 제외한 모든 부위가 콘크리트에 의해 매설되는 것이다.As such, when the installation of the anchor unit 1 is completed at the position where the guide rail is to be installed, when the concrete block is installed using a mechanical concrete placing machine (not shown), the upper plate of the anchor unit 1 All parts except (10) are buried by concrete.

본 발명은 앵커유닛(1)이 콘크리트 블럭에 매설된 상태로 설치가 완료되면, 앵커유닛을 이용하여 가이드레일을 시공하게 되는 것으로서, 상판(10)에 부착된 마감 테이프를 제거하고, 나사부(31)에 결합된 마감 보울트(32)를 분해한 다음, 별도의 체결수단 보울트를 이용하여 나사부(31)에 결합시키게 되면, 보울트에 의해 상 판(10)이 연결축(30)에 견고하게 고정되는 것이다, According to the present invention, when the installation is completed in the state in which the anchor unit 1 is embedded in the concrete block, the guide rail is constructed by using the anchor unit, and removes the finishing tape attached to the upper plate 10, and the thread part 31 After disassembling the finishing bolt (32) coupled to the screw 31 using a separate fastening means bolt, the upper plate 10 is firmly fixed to the connecting shaft 30 by the bolt will be,

따라서, 콘크리트 블럭에 매설된 앵커유닛(1)의 상판(10)에 형성된 개구부(12)에 지주를 연결하여 결합하고 지주에 레일 본체를 연결하여 난간, 방호벽, 울타리, 가이드레일 등을 완성하게 되는 것이다.Therefore, the pillars are connected to the openings 12 formed in the upper plate 10 of the anchor unit 1 embedded in the concrete block, and the rail body is connected to the pillars to complete railings, a barrier, a fence, a guide rail, and the like. will be.

본 발명의 앵커유닛을 구성하는 상판(10)과 하판(20)에 형성되는 설치공(11)과 고정공(21)은 여러 종류의 가이드레일 및 난간 등에 적용하여 사용할 수 있도록 등간격을 이루며 다수개로 이루어지고, 특히, 기계식 콘크리트 타설시 공기배출 유도를 통한 콘크리트의 원활한 섞임과 밀도증강을 도모하게 된다.The installation hole 11 and the fixing hole 21 formed in the upper plate 10 and the lower plate 20 constituting the anchor unit of the present invention are formed at equal intervals to be applied to various kinds of guide rails and handrails. It is made of dogs, and in particular, it promotes smooth mixing and density increase of concrete through induction of air discharge during mechanical concrete pouring.

도 5(a), 5(b), 5(c)는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛의 다른 실시예를 나타내는 종단면도로서, 본 발명의 앵커유닛을 이용하여 도로 등이나 안전 휀스 및 난간 등이 요구되는 경우에 도 5(a)에 따른 실시예와 같이, 콘크리트 블럭을 시공하는 과정에서, 앵커유닛을 매설되도록 하여 방호책을 시공하여 사용하게 되며, 도 5(b)에서와 같이, 차량용 방호 울타리를 시공하거나 또는, 도 5(c)에 따른 실시예와 같이, 도로 주변의 안전한 보행을 위한 보도용 난간을 시공하여 사용할 수 있는 것이다.5 (a), 5 (b), 5 (c) is a longitudinal sectional view showing another embodiment of the mechanical concrete placing anchor unit according to the present invention, by using the anchor unit of the present invention, such as road or safety fence and When a railing or the like is required, as in the embodiment according to FIG. 5 (a), in the process of constructing the concrete block, the anchor unit is embedded to be used to construct a protective measure, as shown in FIG. 5 (b), Construction of a vehicle protective fence or, as in the embodiment according to Figure 5 (c), can be used by constructing a sidewalk railing for safe walking around the road.

또한 본 발명은 앵커유닛을 설치시 지지용 앵커를 이용하여 높낮이를 자유롭게 조절할 수 있어 시공의 편리성을 가지며, 특히 콘크리트 타설시 양생과정에서 발생되는 기포를 외부로 방출시켜 지력과 견고성을 가질 수 있게 된다.In addition, the present invention has the convenience of construction because the height can be freely adjusted by using the support anchor when installing the anchor unit, in particular to release the bubbles generated during the curing process to the outside to have the intelligence and robustness do.

도 1은 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛 시공방법을 나타내는 공정도,1 is a process chart showing a method for constructing a mechanical concrete anchoring unit according to the present invention;

도 2는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛을 나타내는 분해 사시도,Figure 2 is an exploded perspective view showing an anchor unit for mechanical concrete pouring according to the present invention,

도 3은 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛을 나타내는 측단면도,3 is a side cross-sectional view showing an anchor unit for mechanical concrete pouring according to the present invention;

도 4(a), 4(b)는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛의 사용상태를 나타내는 측단면도 및 종단면도,4 (a), 4 (b) is a side cross-sectional view and a longitudinal sectional view showing a state of use of the mechanical concrete anchoring unit according to the present invention,

도 5(a), 5(b), 5(c)는 본 발명에 따른 기계식 콘크리트 타설용 앵커유닛의 다른 실시예를 나타내는 종단면도이다.5 (a), 5 (b), 5 (c) is a longitudinal cross-sectional view showing another embodiment of the mechanical concrete placing anchor unit according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:앵커유닛 10:상판1: anchor unit 10: top plate

11:설치공 12, 22:개구부11: installation worker 12, 22: opening

20:하판 21:고정공20: Lower plate 21: Fixed hole

30:연결축 31:나사부30: connecting shaft 31: screw part

40:지지용 앵카 41:너트40: support anchor 41: nut

Claims (4)

도로변에 차량의 안전주행을 위해 가이드레일을 설치함에 있어서,In installing the guide rail for the safe driving of the vehicle on the side of the road, 기계식 콘크리트 타설기를 이용하여 콘크리트 블럭을 시공하는 과정에서 앵커유닛을 매설되도록 시공하고, 콘크리트 블럭에 매설된 앵커유닛을 이용하여 지주를 고정하고 레일 본체를 설치하여 가이드레일을 시공하도록 이루어진 것을 특징으로 하는 앵커유닛을 이용한 가이드레일 시공방법.In the process of constructing a concrete block using a mechanical concrete pourer, the anchor unit is constructed to be embedded, and the guide rail is installed by fixing the props using the anchor unit embedded in the concrete block and installing the rail body. Guide rail construction method using anchor unit. 제 1항에 있어서,The method of claim 1, 기계식 콘크리트 타설기에 의해 타설되는 콘크리트 블럭에 매설되어 가이드레일이 설치되는 앵커유닛은 가이드레일을 설치하기 위한 도로변에 지지용 앵커를 시공하는 단계:Anchor unit embedded in the concrete block to be placed by a mechanical concrete pourer is installed guide rail is installed in the step of installing a support anchor on the roadside for installing the guide rail: 지지용 앵커에 상판, 하판, 연결축이 구비된 앵커유닛을 고정하는 단계;Fixing an anchor unit having an upper plate, a lower plate, and a connecting shaft to a support anchor; 고정된 앵커유닛의 연결축 상단부에 마감용 보울트와 테이프를 부착하는 단계;Attaching a closing bolt and a tape to an upper end of a connecting shaft of the fixed anchor unit; 기계식 콘크리트 타설기를 이용하여 앵커유닛이 설치된 상태에서 콘크리트를 타설하여 블럭을 시공하는 단계;Constructing blocks by pouring concrete in the state where the anchor unit is installed by using a mechanical concrete pouring machine; 콘크리트 블럭에 매립된 앵커유닛의 연결축 상단부에 부착된 마감용 보울트와 테이프를 제거하는 단계;Removing the finishing bolt and tape attached to the upper end of the connecting shaft of the anchor unit embedded in the concrete block; 연결축 상단부에 지주를 결합하는 단계; 지주에 레일본체를 연결하는 단계에 의해 가이드레일이 시공되는 것을 특징으로 하는 앵커유닛을 이용한 가이드레일 시공방법.Coupling the strut to the upper end of the connecting shaft; Guide rail construction method using an anchor unit, characterized in that the guide rail is constructed by the step of connecting the renal body to the support. 기계식 콘크리트 타설기를 이용하여 도로변에 가이드레일을 시공함에 있어서,In constructing the guide rail on the side of the road using a mechanical concrete pouring machine, 콘크리트 블럭을 설치함에 있어, 다수개의 설치공과 고정공이 형성되고 중앙에는 개구부가 형성된 상·하판과;In installing a concrete block, a plurality of installation holes and fixing holes are formed and the upper and lower plates formed with an opening in the center; 소정 높이를 가지며 상단부에는 내면에 나사부가 형성되고, 상·하판을 이격시키도록 사이에 설치되는 연결축과;A connecting shaft having a predetermined height and a screw portion formed on an inner surface of the upper end, and disposed between the upper and lower plates so as to separate the upper and lower plates; 하단 일부위는 가이드레일을 설치하기 위한 도로변에 고정되어 설치되고 상단 일부는 하판에 형성된 고정공을 관통하여 너트에 의해 고정되는 지지용 앵커가 구비된 것을 특징으로 하는 기계식 콘크리트 타설용 앵커유닛.The upper part of the lower portion is fixed to the roadside for installing the guide rail and the upper part of the mechanical concrete pour anchor unit, characterized in that the support anchor is fixed by a nut through the fixing hole formed in the lower plate. 제 3항에 있어서,The method of claim 3, wherein 상기 연결축 상단부에 형성된 나사부에는 마감 보울트가 나사방식에 의해 분해 결합이 용이하도록 이루어지고, 마감 보울트는 콘크리트 타설에 의한 블럭 시공시 연결축의 나사부가 형성된 상단부 내면으로 콘크리트가 유입되는 것을 차단하게 되며, 콘크리트 블럭 시공이 완료되면, 마감 보울트는 제거되고 고정보울트가 결합되어 상판과 연결축이 고정되도록 이루어진 것을 특징으로 하는 기계식 콘크리트 타설용 앵커유닛.The thread formed on the upper end of the connecting shaft is easy to disassemble and combine the closing bolt by the screw method, and the closing bolt prevents concrete from flowing into the inner surface of the upper end of the threaded part of the connecting shaft when the block is constructed by concrete placing. When the concrete block construction is completed, the finishing bolt is removed and the high information bolt is coupled to the anchoring unit for mechanical concrete placing, characterized in that the upper plate and the connecting shaft is fixed.
KR1020070073170A 2007-07-21 2007-07-21 Guide rail construction method and anchor unit for mechanical concrete using anchor unit Abandoned KR20090010002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070073170A KR20090010002A (en) 2007-07-21 2007-07-21 Guide rail construction method and anchor unit for mechanical concrete using anchor unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070073170A KR20090010002A (en) 2007-07-21 2007-07-21 Guide rail construction method and anchor unit for mechanical concrete using anchor unit

Publications (1)

Publication Number Publication Date
KR20090010002A true KR20090010002A (en) 2009-01-28

Family

ID=40489410

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070073170A Abandoned KR20090010002A (en) 2007-07-21 2007-07-21 Guide rail construction method and anchor unit for mechanical concrete using anchor unit

Country Status (1)

Country Link
KR (1) KR20090010002A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114919113A (en) * 2022-05-09 2022-08-19 岚图汽车科技有限公司 Soft mould forming method and plastic guide rail
KR20240175988A (en) * 2023-06-14 2024-12-23 젠코 주식회사 Prefabricated fences for facility protection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114919113A (en) * 2022-05-09 2022-08-19 岚图汽车科技有限公司 Soft mould forming method and plastic guide rail
CN114919113B (en) * 2022-05-09 2023-10-24 岚图汽车科技有限公司 Soft mold forming method and plastic guide rail
KR20240175988A (en) * 2023-06-14 2024-12-23 젠코 주식회사 Prefabricated fences for facility protection

Similar Documents

Publication Publication Date Title
KR101090400B1 (en) Construction method of extended footbridge installed on side of road
KR102017871B1 (en) Linear drain apparatus of bridge using cantilever deck and method for constructing this same
KR101633431B1 (en) Expandable bridge sidewalk and it&#39;s construction method
KR20110127629A (en) Hanger temporary installation material for cantilever construction and construction method of cantilever part using the same
KR101707170B1 (en) Structure for connecting support
EP4353909A2 (en) Apparatus and method for installation of support posts for a vehicle restraint system
US20230349117A1 (en) System, apparatus and method for installation of street furniture
KR100688149B1 (en) Supporting structure of safety railing for steel bridge
KR20090010002A (en) Guide rail construction method and anchor unit for mechanical concrete using anchor unit
KR101170327B1 (en) A sidewalk enlargement installation using slabe
KR20090070852A (en) Pedestrian road boundary stone construction method and device
CN110144818B (en) Construction method of cast-in-place concrete guardrail
KR101189041B1 (en) Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same
KR100473477B1 (en) Bridge guirail reinforcement method of non-dismantle for bridge curbstone
KR101799237B1 (en) Method of manufacturing grounding stone for pillar fixed and grounding stone for pillar fixed produced by the same
JP2017172144A (en) Junction structure and junction method between road floor slab and pca wall balustrade
KR101316719B1 (en) Structure for reinforcing sloping ground of roadside having guardrail
JP2013142266A (en) Concrete slab for sidewalk, installation method of the same, and temporary sidewalk structure using the same
KR101151831B1 (en) Construction method of filling-up girder for bridge footway
KR101202608B1 (en) Method for Installing Sidewalk Enlargement Installation for Slope Way
CN217581378U (en) Edge protection guardrail structure of externally-mounted clamping assembly type concrete stair
KR20100056086A (en) A block of a wing type
CN210288108U (en) Cast-in-place concrete guardrail
KR200414665Y1 (en) Bridge inspection formed integrally with the bridge
CN211645987U (en) Combined bridge guardrail

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20070721

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20080728

Patent event code: PE09021S01D

PG1501 Laying open of application
E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20090224

NORF Unpaid initial registration fee
PC1904 Unpaid initial registration fee