KR20090007826A - Plain wall-mounted wall blocking method - Google Patents
Plain wall-mounted wall blocking method Download PDFInfo
- Publication number
- KR20090007826A KR20090007826A KR1020070070969A KR20070070969A KR20090007826A KR 20090007826 A KR20090007826 A KR 20090007826A KR 1020070070969 A KR1020070070969 A KR 1020070070969A KR 20070070969 A KR20070070969 A KR 20070070969A KR 20090007826 A KR20090007826 A KR 20090007826A
- Authority
- KR
- South Korea
- Prior art keywords
- casing
- grout
- wall
- reinforcing
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000000903 blocking effect Effects 0.000 title abstract description 3
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 36
- 239000011440 grout Substances 0.000 claims abstract description 35
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 14
- 239000007787 solid Substances 0.000 claims abstract description 5
- 230000004888 barrier function Effects 0.000 claims description 9
- 238000009412 basement excavation Methods 0.000 claims description 9
- 238000010276 construction Methods 0.000 claims description 8
- 238000004873 anchoring Methods 0.000 claims 1
- 230000002787 reinforcement Effects 0.000 abstract description 12
- 238000007711 solidification Methods 0.000 abstract 1
- 230000008023 solidification Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000010586 diagram Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000010526 radical polymerization reaction Methods 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
본 발명은 다수의 케이싱을 소정의 지반에 설치하고 이 케이싱 내부공간에 다수의 묶음으로 엮은 철근을 삽입하며, 이 케이싱내에 삽입된 철근과 케이싱 내부공간에 몰탈 그라우트를 주입하여 그라우팅한 후, 이 그라우트가 경화또는 고화되기 전에 상기 케이싱을 지면위로 인발하도록 한 차수벽 흙막이 공법에 있어서, 상기 그라우트가 경화되어 다수의 원기둥형태 또는 사각기둥 등의 기둥형태를 횡으로 연속설치한 후, 첨부도면 도 5A~도 5D에서와 같이 이들 그라우트 경화되어 형성된 기둥들에 항타된 보강케이싱이 연결되어 주변과 차폐되도록 설치되고, 이 보강케이싱 내부에도 몰탈 그라우트를 충전시켜 상기 케이싱 내의 그라우트와 같이 연속적으로 연결되어 견고하고도 완전한 지지체로서의 차수벽을 형성하여서 되는 것을 특징으로 하는 무지보형의 차수벽 흙막이공법. The present invention installs a plurality of casings in a predetermined ground and inserts a plurality of bundles of reinforcing bars into the inner space of the casing, and after grouting by injecting mortar grout into the reinforcing bars and the inner space of the casing, the grout In the order wall retaining method which draws the casing to the ground before hardening or solidification, after the grout is hardened and continuously installed a plurality of columnar shapes or columnar shapes such as square columns, the accompanying drawings are shown. As in 5D, these grout-cured pillars are fitted with a reinforced reinforcement casing connected to shield the periphery, and inside the reinforcement casing is filled with a mortar grout, which is connected continuously like a grout in the casing for a solid and complete Plain paper characterized by forming an order wall as a support Prosthesis wall blocking method.
Description
도 1은 지중에 케이싱(casing)을 삽입하기 위하여 지중에 굴착공을 형성하고 여기에 케이싱을 삽입하는 과정을 나타낸 각각의 단면도 및 평면도. 1 is a cross-sectional view and a plan view, respectively, illustrating a process of forming an excavation hole in the ground and inserting a casing therein to insert a casing in the ground;
도 2는 위 도 1의 케이싱 내에 철근을 삽입 설치하는 것을 나타낸 설명도. Figure 2 is an explanatory view showing the installation of reinforcing bars in the casing of Figure 1 above.
도 3은 위 도2의 케이싱 내의 공간부를 그라우트(grout)로 채워 그라우팅한 것을 나타낸 설명도.FIG. 3 is an explanatory view showing grouting by filling a grout with a space in the casing of FIG.
도 4는 상기 도 1~도 3에 도시된 케이싱의 상향인발 및 인발 후의 케이싱 내 상태를 나타낸 설명도.4 is an explanatory view showing the state of the casing after the up-draw and the draw of the casing shown in FIGS.
도 5A~도 5D는 도 3 및 도 4의 그라우트를 횡렬로 연속시켜 형성한 상태를 나타내는 것으로 5A to 5D show a state in which the grouts of FIGS. 3 and 4 are continuously formed in a row.
도 5A는 보강케이스 설치 전 상태도, Figure 5A is a state diagram before the reinforcement case installation,
도 5B는 보강케이스 설치 후 상태도, Figure 5B is a state diagram after installing the reinforcement case,
도 5C는 보강케이스 내에서 그라우팅을 실시한 상태도, 5C is a state in which grouting is performed in a reinforcement case;
도 5D는 도 5C에서 보강케이스를 인발 제거한 후의 상태도를 각각 나타낸다.Figure 5D shows a state diagram after removing the reinforcement case in Figure 5C, respectively.
도 6은 도 5C를 화살표 방향으로 보았을 때의 배면도.Fig. 6 is a rear view of Fig. 5C as viewed in the direction of the arrow.
도 7(A~E)은 도 5A~도 5D에 의해 생성된 차수벽(WL)을 보다 강력히 지지하고 안전보증을 위해 차수벽을 관통하여 앙카체를 설치할 때의 공정순서를 나타낸 설명도.7 (A) to (E) are explanatory diagrams showing the process sequence when installing the anchor through the order wall for stronger support and safety of the order wall WL generated by FIGS. 5A to 5D.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
1. 케이싱 2, 2`. 보강케이싱1.
3. 철근 4, 4`. 그라우트3. Rebar 4, 4`. grout
11. 앙카홈 12. 앙카홈 내의 그라우트11. Anchor Home 12. Grout in Anchor Home
H. 굴착공 G. 지반 H. Excavator G. Soil
WL. 차수벽 P. 굴착공간WL. Order wall P. Excavation space
본 발명은 각종 건축공사 현장에서 지중의 차수와 지반지지를 위한 무지보형의 차수벽 흙막이공법 및 그 장치에 관한 것이다. 더욱 상세하게는 별도로 구비된 특수형상의 보강 케이싱을 설치하고, 또한 철근을 심어넣은 그라우트가 형성된 차수벽과 그 보강체의 2중 시스템에 의해 완벽하게 누수를 방지하고, 차수벽의 지지력을 더욱 더 향상시킨 공법에 관한 것이다. BACKGROUND OF THE
종래에는 지중 차수를 위한 흙막이 공사시 지지체 형태(STRUT)로 되는 지보형의 H-빔(H-BEAM)을 설치하여야 하고, 차후 건축구조물 설치시 기존 공법에서의 지지체(STRUT) 해체에 따른 부대공사를 행하여야 하고 이에 따른 공기 문제, 철조 접합(JOINT) 문제, 벽체 크랙(CRACK) 발생문제 등의 제 문제가 계속 발생되었다. 따라서 본 발명은 이들 문제점들을 해결하기 위한 무지보형의 차수벽 흙막이공법 및 관련장치에 관한 것이다.Conventionally, H-Beam, which is a support type (STRUT), should be installed when constructing the earth block for underground order, and additional work by dismantling the support (STRUT) in the existing construction method when installing the building structure later There were many problems such as air problem, JOINT problem, and wall crack problem. Accordingly, the present invention relates to an unsupported order wall retaining method and related apparatus for solving these problems.
종래 이 분야의 기술로는 본 발명자의 선행기술인 대한민국 공개특허공보 10-2005-39549 '앵커체를 이용한 자립식 차수벽 흙막이 공법과 이를 위한 연결소켓'이 있다. 이 공법은 지반천공 후, 강관을 삽입하고, 강선이 부착된 앵커체 삽입 후, 앵커체에 콘크리트를 타설하여 정착체를 형성시키고, 상기 강선에 강성을 부여하고, 상기 강선 상단부에는 하중계를 설치하고, 강관내부에 크라우팅을 실시한 후, 앵커체의 두부에 캡콘크리트를 타설하는 차수벽 설치단계(10)와, 상기 설치된 차수벽내측에 앵커체를 부착하고, 상기 앵커체의 강선이 교차되는 곳에 고정용 연결소켓(50)을 부착한 후, 강선에 강성을 부여하여, 연결소켓 내부에서 교차된 강선을 고정한 후, 차수벽 외측에 강봉(55)을 항타한 후 강관(P)과 연결하는 차수벽 보강단계(20)와, 상기 차수벽 외측부에 보강용 PE(60)을 주입하여서 차수벽를 형성하는 앵커체를 이용한 자립식 차수벽 흙막이 공법이다. Conventionally, the prior art of the present invention is the Republic of Korea Patent Publication No. 10-2005-39549 of the present inventors 'self-supporting order wall barrier using an anchor body and a connection socket for the same'. In this method, after the ground drilling, the steel pipe is inserted, the anchor body with the steel wire is inserted, the concrete is placed on the anchor body to form a fixing body, the rigidity is given to the steel wire, and the load gauge is installed at the upper end of the steel wire. After the crowning in the steel pipe, the order wall installation step 10 for placing cap concrete on the head of the anchor body, and the anchor body is attached to the inside of the installed order wall, and fixed to the intersection of the steel wire of the anchor body After attaching the connection socket 50, by giving rigidity to the steel wire, fixed the steel wire intersected inside the connection socket, after driving the steel bar 55 on the outer wall of the order wall reinforcement step of connecting the steel pipe (P) ( 20) and a self-supporting barrier wall mudwork using an anchor to form a barrier wall by injecting a reinforcement PE 60 to the outer side of the barrier wall.
그러나, 상기 종래 기술로도 매우 깊게 지반을 천공하고 굴토작업과 이러한 같은 지중에서의 차수벽 흙막이작업을 할 때에는 여전히 안전보증 문제가 심각히 대두 된다. 특히 그 지반이 연약지반인 경우 토압 및 지하수에 의한 지반붕괴 문제로 더욱 안전문제가 심각히 대두되고 있으나 매우 깊은 지반을 굴착하거나 연약지반일 경우 종래기술로는 안전보증이 거의 불가능에 가까운 문제점이 있었다. However, even when the above-mentioned conventional technology drills the ground very deeply and performs the excavation work and the order wall clogging work in the same ground, the safety guarantee problem still arises seriously. In particular, when the ground is soft ground, the safety problem is seriously raised due to the ground collapse problem due to earth pressure and groundwater. However, when the deep ground is excavated or the ground is soft ground, the safety guarantee is almost impossible with the prior art.
본 발명은 상기와 같은 종래기술의 문제점을 보완, 해결하기 위한것으로, 건설현장에서 H-빔과 같은 지보를 별도로 설치함이 없이 차수벽형성을 위해 타설되는 케이싱(casing)과 케이싱(casing) 사이의 공간에 보강케이싱을 설치함으로써 차수벽의 지지력을 향상시키고 특히 차수벽을 고정지지하는 앙카체와의 병행설치로 차수벽이 확실한 지지보의 역할도 겸하여 토립자 누수등의 유출을 방지하고, 아울러 지반의 보강 및 차수를 일층 강화시키도록 한 데에 본 발명의 목적이 있다. The present invention is to complement and solve the problems of the prior art as described above, between the casing (casing) and the casing (casting) that is cast for forming the order wall without separately installing the support such as H-beam at the construction site The reinforcement casing is installed in the space to improve the support of the order wall, and in parallel with the anchor body that supports the order wall, it also serves as a sure support wall and prevents leakage of the masonry. It is an object of the present invention to further enhance the.
상기 목적을 달성하기 위하여, 본 발명은 다수의 케이싱을 소정의 지반에 설치하고 이 케이싱 내부공간에 다수의 묶음으로 엮은 철근을 삽입하며, 이 케이싱내에 삽입된 철근과 케이싱 내부공간에 몰탈 그라우트를 주입하여 그라우팅한 후, 이 그라우트가 경화또는 고화되기 전에 상기 케이싱을 지면위로 인발한다.In order to achieve the above object, the present invention installs a plurality of casings in a predetermined ground and inserts a plurality of bundles of reinforcing bars into the casing inner space, and injects mortar grout into the reinforcing bars and the casing inner space inserted into the casing After grouting, the casing is drawn onto the ground before the grout is cured or solidified.
상기 그라우트가 경화되어 다수의 원기둥형태 또는 사각기둥 등의 기둥형태를 횡으로 연속설치한 후, 첨부도면 도 5A~도 5D에서와 같이 이들 그라우트 경화되어 형성된 기둥들에 항타된 보강케이싱이 연결되어 주변과 차폐되도록 설치되고, 이 보강케이싱 내부에도 몰탈 그라우트를 충전시켜 상기 케이싱 내의 그라우트와 같이 연속적으로 연결되어 견고하고도 완전한 지지체로서의 차수벽을 형성한다.After the grout is cured and continuously installed in a column shape such as a plurality of cylinders or square columns, the reinforcing casings connected to the pillars formed by curing these grouts are connected as shown in FIGS. 5A to 5D. And a mortar grout is also filled in the reinforcing casing to be continuously connected like the grout in the casing to form a barrier wall as a solid and complete support.
또한, 지반굴착의 심도가 깊어지고 더욱 안전보증을 요하는 공사인 경우에는 상기 지지체구조에 앙카체를 별도로 설치하여 완벽한 차수와 더불어 차수벽 지지를 도모한다.In addition, in the case of deep construction of the ground excavation and requires more safety guarantee, the anchor structure is separately installed in the support structure to achieve a perfect order and support of the order wall.
본 발명을 첨부된 도면을 이용하여 이하에 일 실시예를 구체적으로 설명한다. 먼저, 도 1은 케이싱(1) 삽입을 위해 지반(G)을 굴착하여 형성한 굴착공(H)에 케이싱(1)를 삽입한 것을 나타낸 것이다.Hereinafter, an embodiment will be described in detail with reference to the accompanying drawings. First, Figure 1 shows that the casing (1) is inserted into the excavation hole (H) formed by excavating the ground (G) for inserting the casing (1).
상기 케이싱(1) 내에 도 2에서와 같이 철근(3)을 케이싱 안쪽 원주 주위로 일정간격 띄워서 삽입하고, 케이싱(1)과 철근(3)사이의 공극에 몰탈그라우트를 주입하여 케이싱(1)내에서 도 3에서와 같이 그라우팅(4)을 한다. 이때 상기 철근 삽입시, 후에 앙카체를 케이싱을 가로질러 설치할 수 있는 공간을 확보해야 한다. 상기 그라우팅 작업으로 도 4에서와 같이 케이싱(1)내에 충만된 그라우트(4)가 굳기전에 상기 케이싱(1)을 굴착공(H)로부터 상향 인발시킨다.As shown in FIG. 2, the
상기 그라우트(4)와 그라우트(4) 사이를 보강케이싱(2)(2`)으로 주변과 차단시키므로써 누수를 방지하고 차수벽의 지지력을 향상시킨다. By blocking the grout between the grout (4) and the grout (4) with the surrounding casing (2) (2`) to prevent leakage and improve the bearing wall support.
상기 보강케이싱(2)(2`)의 상·하 단부의 형상은 ㅡ, ∧, ∩, 사다리꼴 등의 여러가지 형태로 되어있다. 상기 보강케이싱(2)(2`)과 상기 경화된 그라우트(4)사이의 공간부를 도 5C에서와 같이 새로이 그라우팅하여 그라우트(4`)로 채우고 전술한 그라우트(4)와 같이 완벽한 차수벽(WL)을 형성한다.The upper and lower ends of the reinforcing
상기 보강케이싱(2)(2`)은 별도로 보강케이싱(2)(2`)의 차수측 케이싱(2`)의 면에 다수의 통공(21)을 천공하여 이 통공(21)을 통하여 보강케이싱 내에 주입한 몰탈그라우트(4`)가 흘러나와 이 보강케이싱(2`)의 면을 피복함으로써 지면과 차수 벽의 결합을 단단하게 만들어 줄수도 있다. 이 경우 흘러나온 몰탈 그라우트(4`)가 경화되어 완전히 주변과 밀폐되도록 하여준다. The reinforcing casing (2) (2`) separately drills a plurality of through holes (21) on the surface of the order-side casing (2`) of the reinforcing casing (2) (2`) and reinforces the casing through the through holes (21). The mortar grout 4 'injected into the inside flows out and covers the surface of the reinforcing casing 2', thereby making it possible to harden the bond between the ground and the order wall. In this case, the mortar grout (4`) flows out and is completely sealed to the surroundings.
한편, 굴착지반이 깊고 특히 연약지반인경우 보다 근본적인 차수벽지지와 안전보증공사를 위해 도 7(A)에서와 같이 차수벽(WL) 작업공간 내를 굴착하여 굴착공간(P)을 형성하고 앙카체를 전술한 차수벽(WL)에 부가시켜 보강 설치할 수 있다. 이 경우 도7(A)~(E)에서 도시한 설치순서대로 시공한다.On the other hand, when the excavation ground is deep and especially soft ground, the excavation space (P) is formed by excavating the inside of the working wall (WL) work space as shown in FIG. 7 (A) for more fundamental order wall support and safety assurance construction. In addition to the above-mentioned order wall WL, it can be reinforced. In this case, construct them in the installation order shown in Figs. 7A to 7E.
상기 앙카체는 도 7(B)에서와 같이 차수벽(WL)을 관통하여 차수벽이 지지되고 있는 지반(G)에 앙카체 내장홈(11)을 형성하고, 다음 이 홈(11)에 그 후단부가 절곡된 철근(12)을 삽입하고 다음 도 7(E)에서와 같이 상기 앙카홈(11) 내부에 몰탈그라우트(13)를 채워 그라우팅 함으로써 상기 철근(12)을 심으로 한 상기 차수벽(WL) 지지 앙카체가 설치된다.As shown in Fig. 7 (B), the anchor body forms an anchor
그리고 지면에 삽입되는 케이싱 내의 철근과 차수벽의 작업면에 삽입되는 케이싱 내의 철근은 강관이나, pc 강연선 FRP, 토목섬유 등으로 사용하여도 좋다.The reinforcing bars in the casing inserted into the ground and the reinforcing bars in the casing inserted into the working surface of the order wall may be used as steel pipes, pc strands, FRPs, geotextiles, and the like.
본 발명은 각종 가시설 흙막이 공사 현장에서 지반 굴토시 차수 및 흙막이 공법을 별도를 하는 것을 동시에 작업하여 접촉부, 수직도 문제를 향상시키고 자립형 차수벽 흙막이 벽체로 지지력 및 차수성을 향상시키고 수동 토입에 대한 토압등을 막고 무지보형태로 지반굴토 작업이 진행되어 지지체로(strut 및 wale) 사용되는 H-beam이 사용을 하지 않아 공사 진행간 안전사고가 위험성이 제거되고, 지반굴 토 완료시 버팀목(strut) 간섭에 따른 철근 접합(joint) 문제 및 벽체 크랙(crack), 버팀목(strut) 해체에 따른 공기 지연 문제가 발생되지 않고 기존에 버팅용 제반등 복잡하고 번거로운 수단을 사용하지 않아 작업공간을 넓고 안전성을 향상시킬 수 있다.The present invention improves the contact portion, verticality problem and improves the bearing capacity and water repellency by the self-contained water barrier cladding wall at the same time to separate the ground piles and the earthquake method at various temporary construction site H-beam used as a support (strut and wale) is not used because the ground grotto works in the form of unsupported beams are prevented and safety accidents are eliminated during construction, and the strut interference is completed when the grotto is completed. The problem of reinforcing bars and air delay due to dismantling of wall cracks and struts does not occur, and it is not necessary to use complicated and cumbersome means such as buttings, thereby increasing the working space and improving safety. You can.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070070969A KR100914158B1 (en) | 2007-07-16 | 2007-07-16 | Plain wall-mounted wall blocking method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070070969A KR100914158B1 (en) | 2007-07-16 | 2007-07-16 | Plain wall-mounted wall blocking method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090007826A true KR20090007826A (en) | 2009-01-21 |
KR100914158B1 KR100914158B1 (en) | 2009-08-28 |
Family
ID=40488289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070070969A Expired - Fee Related KR100914158B1 (en) | 2007-07-16 | 2007-07-16 | Plain wall-mounted wall blocking method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100914158B1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938483B1 (en) * | 2009-04-20 | 2010-01-25 | 문동춘 | Continuous order wall grout method |
CN104314082A (en) * | 2014-11-12 | 2015-01-28 | 云南建工集团有限公司 | Deep function pit supporting structure in karst geology condition and construction method thereof |
CN106088086A (en) * | 2016-08-08 | 2016-11-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Pile body post-grouting process for deep foundation pit fender pile support in karst area |
KR101925598B1 (en) | 2018-02-06 | 2019-02-20 | 주식회사 유탑엔지니어링건축사사무소 | Underground continuous wall grouting waterproofing method |
KR101925597B1 (en) | 2018-02-06 | 2019-02-20 | 주식회사 유탑엔지니어링건축사사무소 | Underground continuous wall grouting waterproofing method |
KR20220030686A (en) | 2020-09-03 | 2022-03-11 | 오창균 | Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall |
CN116716894A (en) * | 2023-06-21 | 2023-09-08 | 中铁一局集团(广州)建设工程有限公司 | Anhydrous grouting construction method for assembled diaphragm wall post-pouring structure |
KR20240040874A (en) | 2022-09-22 | 2024-03-29 | 오창균 | Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102732812B1 (en) * | 2024-03-27 | 2024-11-25 | 김한슬 | CIP construction method without wale |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4268192A (en) | 1978-09-11 | 1981-05-19 | Raymond International Builders, Inc. | Concrete wall construction |
US4230425A (en) | 1979-03-19 | 1980-10-28 | Gusev Vladimir A | Method and installation for producing cast-in-situ piles |
KR200296444Y1 (en) | 2002-09-12 | 2002-11-23 | (주)한빛하이테크엔지니어링 | Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method |
KR100614602B1 (en) | 2006-05-09 | 2006-08-25 | (주)다이크 | Pile construction method to reduce side friction |
-
2007
- 2007-07-16 KR KR1020070070969A patent/KR100914158B1/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938483B1 (en) * | 2009-04-20 | 2010-01-25 | 문동춘 | Continuous order wall grout method |
CN104314082A (en) * | 2014-11-12 | 2015-01-28 | 云南建工集团有限公司 | Deep function pit supporting structure in karst geology condition and construction method thereof |
CN106088086A (en) * | 2016-08-08 | 2016-11-09 | 中国电建集团贵阳勘测设计研究院有限公司 | Pile body post-grouting process for deep foundation pit fender pile support in karst area |
KR101925598B1 (en) | 2018-02-06 | 2019-02-20 | 주식회사 유탑엔지니어링건축사사무소 | Underground continuous wall grouting waterproofing method |
KR101925597B1 (en) | 2018-02-06 | 2019-02-20 | 주식회사 유탑엔지니어링건축사사무소 | Underground continuous wall grouting waterproofing method |
KR20220030686A (en) | 2020-09-03 | 2022-03-11 | 오창균 | Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall |
KR20240040874A (en) | 2022-09-22 | 2024-03-29 | 오창균 | Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall |
CN116716894A (en) * | 2023-06-21 | 2023-09-08 | 中铁一局集团(广州)建设工程有限公司 | Anhydrous grouting construction method for assembled diaphragm wall post-pouring structure |
CN116716894B (en) * | 2023-06-21 | 2024-02-27 | 中铁一局集团(广州)建设工程有限公司 | Anhydrous grouting construction method for assembled diaphragm wall post-pouring structure |
Also Published As
Publication number | Publication date |
---|---|
KR100914158B1 (en) | 2009-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100914158B1 (en) | Plain wall-mounted wall blocking method | |
KR101302743B1 (en) | Phc pile and its using the same soil cement wall construction methode | |
CN103898916B (en) | Mini stake Composite Braced Retaining Structure and construction method | |
KR101973565B1 (en) | Sheathing method for constructing both sheathing wall and cutoff collar by welding cutoff plate to phc pile with longitudinal plate | |
KR102113291B1 (en) | Soil retaining wall using phc pile and construction method thererof | |
JP2009084919A (en) | Ground excavation method | |
KR101018282B1 (en) | How to install the structure for underground tunnel formation | |
JP6189597B2 (en) | Columnar structure reinforcement structure and columnar structure reinforcement method | |
CN110130361A (en) | A foundation pit support structure and construction method for protecting subway tunnel structures | |
KR101078080B1 (en) | Earth retaining wall and it's construction method using the precast pile and ground reinforcement | |
CN106065628B (en) | Based on the major diameter running water pipe security protection construction method faced forever with reference to theory | |
KR100618597B1 (en) | Cast-in-place concrete pile using inner tube and concrete rise prevention device and construction method | |
KR101021915B1 (en) | Order temporary construction method for earthquake construction | |
KR100546998B1 (en) | Direct Excavation Tunnel Shaft Construction Method | |
KR101974826B1 (en) | The Precast Pile Having Interlocking Secant and The Earth Retaining Wall Method Constructed by It's Continuous Pile | |
JP5976373B2 (en) | Pile foundation reinforcement structure and reinforcement method | |
KR101210368B1 (en) | Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts. | |
KR20100124028A (en) | Construction method of lower end expanded type cast-in-place piles | |
KR101122330B1 (en) | Permanent usage of Temporary earth wall as the part of the basement exterior Wall method | |
JP2011157719A (en) | Earth retaining method | |
KR200296444Y1 (en) | Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method | |
KR101021913B1 (en) | Order temporary construction method for earthquake construction | |
KR101234270B1 (en) | Method for non excavated excavating construction using steel pipe and steel pipe with hole | |
KR20040023915A (en) | Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof | |
KR101069706B1 (en) | Method for constructing structure for forming underground tunnel on boundary of rock bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20070716 |
|
PA0201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20080926 Patent event code: PE09021S01D |
|
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20090317 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20090818 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20090820 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20090820 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |