KR20040037310A - Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket - Google Patents
Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket Download PDFInfo
- Publication number
- KR20040037310A KR20040037310A KR1020020065759A KR20020065759A KR20040037310A KR 20040037310 A KR20040037310 A KR 20040037310A KR 1020020065759 A KR1020020065759 A KR 1020020065759A KR 20020065759 A KR20020065759 A KR 20020065759A KR 20040037310 A KR20040037310 A KR 20040037310A
- Authority
- KR
- South Korea
- Prior art keywords
- bridge
- bracket
- support
- plate
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 교량의 통수단면 또는 형고를 높이기 위하여 강판을 이용한 단위 교량승상 브라켓 및 이를 이용한 교량승상 시공방법에 관한 것으로서, 지지강판에 형성된 앵커홈 위치와 같은 위치에 앵커홈이 형성된 교각 또는 교대 상부에 얹혀 설치될 "ㄱ"자 형상의 지지대와 지지대와 일체로 겹쳐져 연결되되 상부에 브라켓 연결지지 강봉 또는 교대 연결지지 강봉이 삽입될 연결구멍과 교각 또는 교대에 고정될 앵커를 삽입할 앵커홈이 중앙에 형성된 복수의 지지강판과 지지강판 전면에 직각으로 연결되되 상부에 잭받침판이 얹혀져 고정볼트로 연결될 고정볼트 홈이 중앙에 형성된 연결판과 연결판 하부에 단위 교량승상 브라켓을 상호 연결시켜줄 단위 교량승상 브라켓 연결봉이 삽입될 연결구멍이 중앙에 형성된 일정한 간격으로 3개의 하부 수직판이 설치된 단위 교량승상 브라켓과The present invention relates to a unit bridge lift bracket using a steel plate and a bridge lifting method using the same in order to increase the passage surface or the height of the bridge, the anchor groove formed in the same position as the anchor groove formed on the support steel plate An anchor groove for inserting an anchor to be piercing or alternating with a connection hole into which a bracket-supporting rod or an alternating-connecting rod is inserted at the upper part is integrally overlapped and connected with the "-" shaped support and the support to be installed. A plurality of supporting steel plates formed at right angles are connected to the front of the supporting steel plate, and a jack support plate is mounted on the upper part to connect the fixing bolt grooves to be connected to the fixing bolts. Three lower vertical plates at regular intervals with a connecting hole in the center for insertion of the connecting rod Installed units bridges seungsang bracket
상기 단위 교량승상 브라켓을 교각의 양측면에 다수개 설치하여 각각의 상기 지지대와 지지강판의 중앙에 형성된 앵커홈을 통하여 교각에 앵커볼트로 고정시킨 후에 상기 하부 수직판 중앙에 형성된 연결구멍을 통하여 상기 단위 교량승상 브라켓 연결봉을 교량승상 브라켓의 하부 수직판 중앙에 형성된 연결구멍에 삽입관통시켜 너트로 단위 교량승상 브라켓을 일체화시킨 교량승상 브라켓을 형성한 후에 교각 상부에는 상기 지지강판 상부에 형성된 연결구멍과 반대측에 설치된 교량승상 브라켓의 지지강판의 연결구멍에 브라켓 연결지지 강봉으로 상호 연결하고 상기 연결판 상부에 잭받침판을 설치하고 고정볼트 홈을 이용하여 고정볼트로 고정연결하여 교각에 교량승상 브라켓의 설치를 완료하고,The unit bridge lifting brackets are installed on both sides of the pier to fix the anchor bolt to the pier through the anchor groove formed in the center of each of the support and the support steel plate, and then through the connection hole formed in the center of the lower vertical plate. Insert the bridge-raising bracket connecting rod into the connection hole formed in the center of the lower vertical plate of the bridge-raising bracket to form a bridge-raising bracket integrating the unit bridge-raising bracket with a nut, and then the upper part of the bridge on the side opposite to the connection hole formed on the upper support steel plate. Connect the bracket to the connection hole of the support steel plate of the bridge climbing bracket installed in the bridge, and install the jack support plate on the upper part of the connecting plate and fix it with the fixing bolt using the fixing bolt groove. Done,
상기 단위 교량승상 브라켓이 교대에 다수개 설치되되 "ㄱ"자 형상의 지지대를 교대 상부에 얹혀 설치하고 상기 지지대와 지지강판의 중앙에 형성된 앵커홈을 통하여 교대에 앵커볼트로 고정시킨 후에 상기 하부 수직판 중앙에 형성된 연결구멍을 통하여 상기 단위 교량승상 브라켓 연결봉을 삽입관통시켜 너트로 각각의 단위 교량승상 브라켓을 일체화시켜 교량승상 브라켓을 형성한 후에 교대 상부에는 상기 지지강판 상부에 형성된 연결구멍과 반대측에 교대의 수직부에 삽입홈을 천공한 후에 상기 교량승상 브라켓의 지지강판의 연결구멍에 삽입된 교대 연결지지 강봉을 교대 수직부에 형성된 삽입홈에 삽입시키고 지지강판과 교대 연결지지 강봉을 너트로 고정시킨 후에 상기 연결판 상부에 잭받침판을 설치하고 고정볼트 홈을 이용하여 고정볼트로 고정연결하여 교대에 교량승상 브라켓의 설치를 완료한다.The unit bridge climbing brackets are installed in a plurality of shifts, and the "a" shaped support is installed on the upper part of the shift, and fixed to the shift through the anchor groove formed in the center of the support and the support steel plate with the anchor bolt to the lower number. After inserting the unit bridge lift bracket connecting rod through the connection hole formed in the center of the direct plate, each unit bridge lift bracket is integrated with a nut to form a bridge lift bracket, and then the upper part of the shift is opposite to the connection hole formed in the upper portion of the supporting steel plate. After drilling the insertion groove in the alternating vertical part, insert the alternating connecting support bar inserted in the connecting hole of the supporting steel plate of the bridge lift bracket into the insertion groove formed in the alternating vertical part, and fixing the supporting steel plate and the alternating connecting supporting bar with a nut. After installing the jack support plate on the top of the connecting plate and fixed ball using the fixing bolt groove Fixedly connected to complete the installation of the bridge seungsang bracket to shift.
상기의 교대 및 교각에 교량승상 브라켓의 설치가 완료되면 잭 받침판에 설치된 잭 이동방지대 위에 잭을 설치하고 유압을 이용하여 계획된 높이만큼 교량 상부빔을 들어올려 고정시킨 후에 교량빔의 고정설치 작업을 완료하여 교량의 승상작업을 완료하는 것이다.After the installation of the bridge ascending bracket on the shift and the pier is completed, install the jack on the jack movement prevention bar installed on the jack support plate, lift the bridge upper beam by the planned height by using hydraulic pressure, and then install the bridge beam. This is to complete the lifting of the bridge.
Description
본 발명은 강판을 이용한 단위 교량승상 브라켓 및 이를 이용한 교량승상 시공방법에 관한 것으로서, 지지강판에 형성된 앵커홈 위치와 같은 위치에 앵커홈이 형성된 교각 또는 교대 상부에 얹혀 설치될 "ㄱ"자 형상의 지지대와 지지대와 일체로 겹쳐져 연결되되 상부에 브라켓 연결지지 강봉 또는 교대 연결지지 강봉이 삽입될 연결구멍과 교각 또는 교대에 고정될 앵커를 삽입할 앵커홈이 중앙에 형성된 복수의 지지강판과 지지강판 전면에 직각으로 연결되되 상부에 잭 받침판이 얹혀져 고정볼트로 연결될 고정볼트 홈이 중앙에 형성된 연결판과 연결판 하부에 단위 교량승상 브라켓을 상호 연결시켜줄 단위 교량승상 브라켓 연결봉이 삽입될 연결구멍이 중앙에 형성된 일정한 간격으로 3개의 하부 수직판이 설치된 단위 교량승상 브라켓과The present invention relates to a unit bridge lift bracket using a steel plate and a bridge lift construction method using the same, having a "b" shape to be installed on the pier or alternately formed on the top of the bridge grooves and the anchor groove formed at the same position as the anchor groove position formed on the support steel sheet. A plurality of supporting steel plates and supporting steel plates which are integrally stacked and connected to the supporting body and the supporting body, have a connecting hole into which a bracket connecting supporting rod or an alternating connecting supporting rod is inserted, and an anchor groove into which an anchor to be fixed to a pier or alternating part is inserted. It is connected at right angles, but the jack support plate is mounted on the upper part, and the fixing plate groove formed at the center to be connected with the fixing bolt is formed at the center and the connecting hole for inserting the unit bridge lifting bracket connecting rod to the unit bridge lifting bracket at the lower part of the connecting plate. Unit bridge lift brackets with three lower vertical plates installed at regular intervals
상기 단위 교량승상 브라켓을 교각의 양측면에 다수개 설치하되 각각의 상기 지지대와 지지강판의 중앙에 형성된 앵커홈을 통하여 교각에 앵커볼트로 고정시킨 후에 상기 하부 수직판 중앙에 형성된 연결구멍을 통하여 상기 단위 교량승상 브라켓 연결봉을 삽입관통시켜 너트로 단위 교량승상 브라켓을 일체화시킨 교량승상 브라켓을 형성한 후에 교각 상부에는 상기 지지강판 상부에 형성된 연결구멍과 반대측에 설치된 교량승상 브라켓의 지지강판의 연결구멍에 브라켓 연결지지 강봉으로 상호 연결하고 상기 연결판 상부에 잭 받침판을 설치하고 고정볼트 홈을 이용하여고정볼트로 고정연결하여 교각에 교량승상 브라켓의 설치를 완료하고,The unit bridge lifting brackets are installed on both sides of the pier, the anchor bolt is fixed to the pier through the anchor groove formed in the center of each of the support and the support steel plate and then the unit through the connection hole formed in the center of the lower vertical plate Insert the bridge-raising bracket connecting rod to form a bridge-raising bracket integrating the unit bridge-raising bracket with nuts, and then attach the bracket to the connection hole of the supporting steel plate of the bridge-raising bracket installed on the side opposite to the connection hole formed on the upper side of the supporting steel plate. Interconnect with the connecting rods and install the jack support plate on the upper part of the connecting plate, and use the fixing bolt groove to fix the fixing bolts to complete the installation of the bridge lift bracket on the piers.
상기 단위 교량승상 브라켓이 교대에 다수개 설치되되 "ㄱ"자 형상의 지지대를 교대 상부에 얹혀 설치하고 상기 지지대와 지지강판의 중앙에 형성된 앵커홈을 통하여 교대에 앵커볼트로 고정시킨 후에 상기 하부 수직판 중앙에 형성된 연결구멍을 통하여 상기 단위 교량승상 브라켓 연결봉을 삽입관통시켜 너트로 각각의 단위 교량승상 브라켓을 일체화시킨 교량승상 브라켓을 형성한 후에 교대 상단에는 상기 지지강판 상부에 형성된 연결구멍과 반대측에 교대의 수직부에 삽입홈을 천공한 후에 상기 교량승상 브라켓의 지지강판의 연결구멍에 삽입된 교대 연결지지 강봉을 교대 수직부에 형성된 삽입홈에 삽입시키고 지지강판과 교대 연결지지 강봉을 너트로 고정시킨 후에 상기 연결판 상부에 잭 받침판을 설치하고 고정볼트 홈을 이용하여 고정볼트로 고정연결하여 교대에 교량승상 브라켓의 설치를 완료한다.The unit bridge climbing brackets are installed in a plurality of shifts, and the "a" shaped support is installed on the upper part of the shift, and fixed to the shift through the anchor groove formed in the center of the support and the support steel plate with the anchor bolt to the lower number. Through the connecting hole formed in the center of the direct plate, the bridge rod bracket connecting rod is inserted to form a bridge bracket in which each unit bridge bracket is integrated with a nut, and then the upper end of the unit bridge is opposite to the connection hole formed in the upper portion of the supporting steel plate. After drilling the insertion groove in the alternating vertical part, insert the alternating connecting support bar inserted in the connecting hole of the supporting steel plate of the bridge lift bracket into the insertion groove formed in the alternating vertical part, and fixing the supporting steel plate and the alternating connecting supporting bar with a nut. After installing the jack support plate on the top of the connecting plate and using a fixed bolt groove fixed ball Fixedly connected to complete the installation of the bridge seungsang bracket to shift.
상기의 교대 및 교각에 교량승상 브라켓의 설치가 완료되면 잭 받침판에 설치된 잭 이동방지대 위에 잭을 설치하고 유압을 이용하여 계획된 높이만큼 교량 상부빔을 들어올려 고정시킨 후에 교량빔의 고정설치 작업을 완료하여 교량의 승상작업을 완료하는 것이다.After the installation of the bridge ascending bracket on the shift and the pier is completed, install the jack on the jack movement prevention bar installed on the jack support plate, lift the bridge upper beam by the planned height by using hydraulic pressure, and then install the bridge beam. This is to complete the lifting of the bridge.
본 발명의 목적은 교량의 통수단면 또는 형고를 높이기 위하여 단위 교량승상 브라켓을 교각 및 교대의 교좌설치면에 거치하고 단위 교량승상 브라켓을 브라켓 연결지지 강봉을 이용하여 교각 및 교대의 양측면에 설치된 단위 교량승상 브라켓을 연결고정하고 교대 및 교각의 일측면에 다수개 설치된 단위 교량승상 브라켓을 단위 교량승상 브라켓 연결봉을 이용하여 연결고정한 후에 잭 받침판에 설치된유압잭을 이용하여 교량의 상부빔을 인상하여 교량을 증축 및 보수보강하는 것으로서 소형의 브라켓을 다수개 설치하여 시공하는 것으로서 작업의 편리성과 기존의 교대 또는 교각에 영향을 미치지 않게 시공하므로서 시공기간의 단축과 시공의 편리성을 향상시키는데 있다.An object of the present invention is to mount the unit bridge lift bracket to the bridge and the bridge installation surface in order to increase the communication surface or the height of the bridge and the unit bridge installed on both sides of the bridge and the bridge by using the bracket connecting support rod After fixing the ascending bracket and connecting the multiple unit bridge brackets installed on one side of the bridge and the pier using the unit bridge ascending bracket connecting rod, the bridge is extended by raising the upper beam of the bridge by using the hydraulic jack installed on the jack support plate. And by reinforcing and installing a large number of small brackets to install the construction without affecting the convenience of work and existing shifts or piers to shorten the construction period and improve the convenience of construction.
일반적으로 기존의 교량을 증축 또는 보수시공하기 위하여 도 1과 같이 교각 및 교대(A)에 앵커(B)를 이용하여 지지대(C)를 고정설치한 후에 잭을 이용하여 교량 상부빔을 인상하여 교량을 보수보강하여 왔다. 그러나 이러한 방법은 교량이 중량물인 관계로 지지대가 장대하여 거치하는데에도 많은 장비가 소요되며 또한 인력도 많이 동원되어 시공비용의 과다와 시공기간이 길어지는 문제점이 있으며, 또다른 방법으로는 교량의 상부빔을 완전히 철거한 후에 교량의 인상에 필요한 시공을 한 후에 다시 설치하는 방법을 이용하여 왔으나 이또한 시공의 번거로움과 시공비가 과다하게 소요되는 문제점이 상존하여 왔다.In general, in order to expand or repair an existing bridge, as shown in FIG. 1, the support C is fixed to the pier and the bridge A using the anchor B, and then the bridge upper beam is raised using the jack to raise the bridge. Has been reinforcement. However, this method requires a lot of equipment to mount the support pole, because the bridge is heavy, and also requires a lot of manpower, so there is a problem of excessive construction cost and long construction period, another method is the upper part of the bridge Although the beam has been completely removed and then re-installed after the construction necessary for the raising of the bridge, this has also been a problem that the cumbersome construction cost and excessive construction cost are required.
본 발명은 이상과 같은 사항을 감안하여 제안된 것으로서, 단위 교량승상 브라켓을 여러개 설치하여 강봉을 이용하여 각각의 단위 교량승상 브라켓을 연결하고 유압잭을 이용하여 교량을 승상하거나 보수보강하는 방법을 사용하므로서 개개의 단위 교량승상 브라켓이 소형인 관계로 경량이어서 설치에도 용이하며 각각을 연결할때에도 별도의 중장비의 동원이 필요없는 아주 간편하면서도 설치 및 해체에 소요되는 시간이 절약되는 유용한 공법을 제공하는데 목적이 있다.The present invention has been proposed in view of the above, by installing a plurality of unit bridge lift brackets, connecting each unit bridge lift bracket using a steel rod, and using a method of lifting or repairing a bridge using a hydraulic jack. Since each unit bridge climbing bracket is small, it is lightweight and easy to install.It is very easy to install and does not require the use of separate heavy equipment even when connecting each other.It aims to provide a useful method that saves time for installation and dismantling. .
도 1은 종래의 교량승상시공을 위해 교량승상장치를 교량에 설치한 것을 보여주는 도면.1 is a view showing that the bridge lifting device is installed on the bridge for the conventional bridge lifting construction.
도 2는 본 발명의 교량승상을 위한 교량승상 브라켓 설치도면.Figure 2 is a bridge elevation bracket installation drawing for the bridge lift of the present invention.
도 3은 본 발명의 교량승상 브라켓을 교각에 설치한 정면도.Figure 3 is a front view of the bridge climbing bracket of the present invention installed on the piers.
도 4는 본 발명의 단위 교량승상 브라켓 상세도.Figure 4 is a detailed view of the unit bridge lift bracket of the present invention.
도 5는 본 발명의 잭 받침판 상세도.5 is a detailed view of the jack base plate of the present invention.
도 6은 본 발명의 교량승상 브라켓을 교각에 설치한 측면도.Figure 6 is a side view of the bridge climbing bracket of the present invention installed on the piers.
도 7은 본 발명의 브라켓 연결지지 강봉 및 체결구 상세도.Figure 7 is a detailed view of the bracket connection support steel rod and fastener of the present invention.
도 8은 본 발명의 단위 교량승상 브라켓 연결봉 상세도.Figure 8 is a detailed view of the unit bridge lift bracket connecting rod of the present invention.
도 9는 본 발명의 교량승상 브라켓을 교대에 설치한 도면.Fig. 9 is a diagram in which bridge climbing brackets of the present invention are installed on a shift;
도 10은 본 발명의 교량승상 브라켓을 교대에 설치한 측면도.Figure 10 is a side view of the bridge climbing bracket of the present invention installed on the shift.
도 11은 본 발명의 교대 연결지지 강봉 상세도.Figure 11 is a detailed view of the alternate connecting supporting rod of the present invention.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
A.... 교각 및 교대 B... 앵커A .... pier and shift B ... anchor
C... 지지대C ... support
1... 교각 2... 교각 상부1 ... piers 2 ... top of piers
10... 교량승상 브라켓10 ... Bridge Lift Bracket
20... 단위 교량승상 브라켓 21... 하부 수직판20 ... Unit lift bracket 21 ... Lower vertical plate
22... 연결판 23... 단위 교량승상 브라켓 연결봉22 ... Connecting plate 23 ... Unit bridge mounting bracket Connecting rod
24... 나사홈 25... 지지강판24 ... thread groove 25 ... support plate
26... 브라켓 연결지지 강봉 27... 지지대26 ... Bracket connection steel rod 27 ... Support
28... 앵커홈 29... 고정볼트 홈28. Anchor groove 29 ... Fixing bolt groove
30... 너트 31... 고정볼트30 ... Nuts 31 ... Screws
33... 연결구멍33. Connection hole
40... 잭 받침판 42... 잭이동방지대40. Jack base 42. Jack movement guard
50... 폴리에스테르 관 51... 지지봉50 ... Polyester tube 51 ... Support rod
52... 너트 체결구 53... 너트 체결구 손잡이52 ... nut fasteners 53 ... nut fastener handles
54... 너트54 ... Nut
100... 교대 101... 교대 수직부100 ... shift 101 ... shift vertical
102... 교대 상부 110... 교대 연결지지 강봉102 ... alternate upper 110 ... alternately supported supporting rod
111... 삽입홈111 ... Insertion groove
상기의 목적을 달성하기 위하여 본 발명은 교량의 통수단면 또는 형고를 높이기 위하여 강판을 이용한 단위 교량승상 브라켓 및 이를 이용한 교량승상 시공방법에 관한 것으로서, 지지강판(25)에 형성된 앵커홈(28) 위치와 같은 위치에 앵커홈(28)이 형성된 교각 또는 교대 상부(2, 100) 에 얹혀 설치될 "ㄱ"자 형상의 지지대(27)와 지지대(27)와 일체로 겹쳐져 연결되되 상부에 브라켓 연결지지 강봉 또는 교대 연결지지 강봉(26, 110)이 삽입될 연결구멍(33)과 교각 또는 교대(1,100)에 고정될 앵커를 삽입할 앵커홈(28)이 중앙에 형성된 복수의 지지강판(25)과 지지강판(25) 전면에 직각으로 연결되되 상부에 잭 받침판(40)이 얹혀져 고정볼트(31)로 연결될 고정볼트 홈(29)이 중앙에 형성된 연결판(22)과 연결판(22) 하부에 단위 교량승상 브라켓(20)을 상호 연결시켜줄 단위 교량승상 브라켓 연결봉(23)이 삽입될 연결구멍(33)이 중앙에 형성된 일정한 간격으로 3개의 하부 수직판(21)이 설치된 단위 교량승상 브라켓(20)과In order to achieve the above object, the present invention relates to a unit bridge lift bracket using a steel plate and a bridge lift construction method using the same in order to increase the passage surface or the height of the bridge, the anchor groove 28 position formed on the support steel plate 25 Anchor groove 28 is formed at the same position as the pier or alternate upper portion (2, 100) formed on top of the "b" shaped to be installed on the support 27 and the support 27 is integrally overlapped and connected to the upper bracket connection support A plurality of supporting steel plates 25 formed at the center of the connecting holes 33 into which the steel bars or the alternating connecting supporting rods 26 and 110 are to be inserted, and the anchor grooves 28 to insert the anchors to be fixed to the pier or the alternating plates 1 and 100. It is connected to the front of the support steel plate 25 at a right angle, but the jack support plate 40 is placed on the upper part, and the fixing bolt groove 29 to be connected to the fixing bolt 31 is formed at the bottom of the connecting plate 22 and the connecting plate 22. Unit to interconnect the unit bridge climbing brackets 20 Amount seungsang bracket connecting rods 23 are inserted into connection holes 33 are formed at regular intervals in the middle three bottom vertical plate 21 is provided a bridge unit seungsang bracket 20 and
상기 단위 교량승상 브라켓(20)을 교각(1)의 양측면에 다수개 설치하되 각각의 상기 지지대(27)와 지지강판(25)의 중앙에 형성된 앵커홈(28)을 통하여 교각(1)에 앵커볼트로 고정시킨 후에 상기 하부 수직판(21) 중앙에 형성된 연결구멍(33)을 통하여 상기 단위 교량승상 브라켓 연결봉(23)을 삽입관통시켜 너트(54)로 단위 교량승상 브라켓(20)을 일체화시킨 교량승상 브라켓(10)을 형성한 후에 교각 상부(2)에는 상기 지지강판(25) 상부에 형성된 연결구멍(33)과 반대측에 설치된 교량승상 브라켓(10)의 지지강판(25)의 연결구멍(33)에 브라켓 연결지지 강봉(26)으로 상호연결하고 상기 연결판(22) 상부에 잭 받침판(40)을 설치하고 고정볼트 홈(29)을 이용하여 고정볼트(31)로 고정연결하여 교각(1)에 교량승상 브라켓(10)의 설치를 완료하고,The unit bridge lifting brackets 20 are installed on both sides of the pier (1) a plurality of anchors in the pier (1) through the anchor groove 28 formed in the center of each of the support 27 and the support steel plate (25) After fixing with bolts, the unit bridge lift bracket connecting rod 23 is inserted through the connection hole 33 formed in the center of the lower vertical plate 21 to integrate the unit bridge lift bracket 20 with the nut 54. After the bridge elevating bracket 10 is formed, a connection hole of the supporting steel plate 25 of the bridge elevating bracket 10 installed on the side opposite to the connection hole 33 formed in the upper portion of the supporting steel plate 25 is formed in the bridge upper portion 2 ( 33) to the bracket connection supporting rods (26) and the jack support plate 40 is installed on the connecting plate 22 and the fixed bolt 31 by using the fixing bolt groove (29) to securely connect the pier ( 1) to complete the installation of the bridge climbing bracket (10),
상기 단위 교량승상 브라켓(20)이 교대(100)에 다수개 설치되되 "ㄱ"자 형상의 지지대(27)를 교대 상부(102)에 얹혀 설치하고 상기 지지대(27)와 지지강판(25)의 중앙에 형성된 앵커홈(28)을 통하여 교대(100)에 앵커볼트로 고정시킨 후에 상기 하부 수직판(21) 중앙에 형성된 연결구멍(33)을 통하여 상기 단위 교량승상 브라켓 연결봉(23)을 삽입관통시켜 너트(54)로 각각의 단위 교량승상 브라켓(20)을 일체화시킨 교량승상 브라켓(10)을 형성한 후에 교대 상부(102)에는 상기 지지강판(25) 상부에 형성된 연결구멍(33)과 반대측에 교대 수직부(101)에 삽입홈(111)을 천공한 후에 상기 교량승상 브라켓(10)의 지지강판(25)의 연결구멍(33)에 삽입된 교대 연결지지 강봉(110)을 교대 수직부(101)에 형성된 삽입홈(111)에 삽입시키고 지지강판(25)과 교대 연결지지 강봉(110)을 너트(54)로 고정시킨 후에 상기 연결판(22) 상부에 잭 받침판(40)을 설치하고 고정볼트 홈(29)을 이용하여 고정볼트(31)로 고정연결하여 교대(100)에 교량승상 브라켓(10)의 설치를 완료한다.The unit bridge climbing brackets 20 are installed in a plurality of shift 100, the "a" shaped support 27 is installed on the upper portion of the shift 102 and the support 27 and the support steel plate 25 After fixing the anchor bolt to the shift 100 through the anchor groove 28 formed in the center through the connecting hole 33 formed in the center of the lower vertical plate 21 through the unit bridge lifting bracket connecting rod 23 is inserted through After the bridge climbing bracket 10 is formed by integrating each of the unit bridge climbing brackets 20 with the nut 54, the alternating upper portion 102 is opposite to the connection hole 33 formed on the supporting steel plate 25. After alternately drilling the insertion groove 111 in the alternating vertical portion 101 to the alternating vertical supporting portion steel rod 110 inserted into the connecting hole 33 of the support steel plate 25 of the bridge lifting bracket 10 Inserted into the insertion groove 111 formed in the 101 and the support steel plate 25 and the alternately connected support steel rod 110 with the nut 54 After the fixing, the jack support plate 40 is installed on the connecting plate 22 and the fixed bolt groove 29 is fixedly connected to the fixing bolt 31 to install the bridge climbing bracket 10 on the shift 100. To complete.
상기의 교대(100) 및 교각(1)에 교량승상 브라켓(10)의 설치가 완료되면 잭 받침판(40)에 설치된 잭 이동방지대(42) 위에 잭을 설치하고 유압을 이용하여 계획된 높이만큼 교량 상부빔을 들어올려 고정시킨 후에 교량빔의 고정설치 작업을 완료하여 교량의 승상작업을 완료하는 것에 특징이 있다.When the installation of the bridge climbing bracket 10 on the shift 100 and the pier 1 is completed, the jack is installed on the jack movement preventing member 42 installed on the jack support plate 40 and the bridge is installed by the hydraulic pressure. After lifting and fixing the upper beam, it is characterized in that the lifting work of the bridge is completed by completing the fixed installation work of the bridge beam.
이하 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 발명의 교량승상을 위한 교량승상 브라켓 설치도와 도 3은 본 발명의 교량승상 브라켓을 교각에 설치한 정면도이다.Figure 2 is a bridge elevation bracket installation diagram for the bridge elevation of the present invention Figure 3 is a front view of the bridge elevation bracket of the present invention installed on the piers.
지지강판(25)에 형성된 앵커홈(28) 위치와 같은 위치에 앵커홈(28)이 형성된 교각 상부(2)에 얹혀 설치될 "ㄱ"자 형상의 지지대(27)와 지지대(27)와 일체로 겹쳐져 연결되되 상부에 브라켓 연결지지 강봉(26)이 삽입될 연결구멍(33)과 교각(1)에 고정될 앵커를 삽입할 앵커홈(28)이 중앙에 형성된 복수의 지지강판(25)과 지지강판(25) 전면에 직각으로 연결되되 상부에 잭받침판(40)이 얹혀져 고정볼트(31)로 연결될 고정볼트 홈(29)이 중앙에 형성된 연결판(22)과 연결판(22) 하부에 단위 교량승상 브라켓(20)을 상호 연결시켜줄 단위 교량승상 브라켓 연결봉(23)이 삽입될 연결구멍(33)이 중앙에 형성된 일정한 간격으로 3개의 하부 수직판(21)이 설치된 단위 교량승상 브라켓(20)을 교각(1)의 양측면에 다수개 설치하되 각각의 상기 지지대(27)와 지지강판(25)의 중앙에 형성된 앵커홈(28)을 통하여 교각(1)에 앵커볼트로 고정시킨 후에 상기 하부 수직판(21) 중앙에 형성된 연결구멍(33)을 통하여 상기 단위 교량승상 브라켓 연결봉(23)을 삽입관통시켜 너트(54)로 단위 교량승상 브라켓(20)을 일체화시킨 교량승상 브라켓(20)을 형성한 후에 교각 상부(2)에는 상기 지지강판(25) 상부에 형성된 연결구멍(33)과 반대측에 설치된 교량승상 브라켓(10)의 지지강판(25)의 연결구멍(33)에 브라켓 연결지지 강봉(26)으로 상호 연결하고 상기 연결판(22) 상부에 잭받침판(40)을 설치하고 고정볼트 홈(29)을 이용하여 고정볼트(31)로 고정연결하여 교각(1)에 교량승상 브라켓(10)의 설치를 한다.Integrated with the "a" shaped support 27 and the support 27 to be mounted on the upper part of the pier where the anchor groove 28 is formed at the same position as the anchor groove 28 formed on the support steel plate 25. And a plurality of supporting steel plates 25 formed at the center thereof to be connected to each other, and having a connection hole 33 into which a bracket connection supporting rod 26 is inserted and an anchor groove 28 into which an anchor to be fixed to the piers 1 is inserted. It is connected to the front of the support steel plate 25 at a right angle, but the jack support plate 40 is mounted on the upper part, and the fixing bolt groove 29 to be connected to the fixing bolt 31 is formed at the bottom of the connecting plate 22 and the connecting plate 22. Unit bridge lift brackets 20 to which the unit bridge lift brackets 20 to connect the unit bridge lift brackets 20 are provided with three lower vertical plates 21 at regular intervals in which a connection hole 33 into which a connection rod 23 is inserted is formed at the center. A plurality of) is installed on both sides of the pier (1) formed in the center of each of the support (27) and the support steel plate (25) After fixing the anchor bolt to the piers 1 through the grooves 28, the unit bridge lift bracket connecting rods 23 are inserted through the connecting holes 33 formed in the center of the lower vertical plate 21, and the nut 54 After the bridge climbing bracket 20 is formed by integrating the unit climbing bracket 20 into the bridge upper bracket 2, the bridge upper bracket 2 is provided on the side opposite to the connection hole 33 formed on the support steel plate 25. 10) to the connection hole 33 of the support steel plate 25 of the support plate connecting steel rods 26 to each other, and to install the jack support plate 40 on the connecting plate 22, using a fixing bolt groove 29 The fixed bolt 31 is fixedly connected to the bridge (1) to install the bridge climbing bracket (10).
이때 단위 교량승상 브라켓(20)의 설치개수는 승상을 하여야할 교량의 중량에 따라 설치개수를 가감할 수 있다. 단위 교량승상 브라켓(20)을 측면에서 연결할때에는 단위 교량승상 브라켓 연결봉(23)을 이용하여 설치하는데 이때에는 너트(54)를 이용하여 연결고정시킨다.At this time, the installation number of the unit bridge climbing bracket 20 can be added or subtracted according to the weight of the bridge to be lifted. When the unit bridge lift bracket 20 is connected from the side, the unit bridge lift bracket connecting rod 23 is installed. In this case, the connection is fixed using the nut 54.
또한, 교각 상부(2)에 지지대(27)를 거치하고 브라켓 연결지지 강봉(26)을 이용하여 양측의 단위 교량승상 브라켓(20)을 연결하는데 브라켓 연결지지 강봉(26)이 교각 상부(2)의 일정간격을 두고 설치되도록 하며 너트(54)를 상기 브라켓 연결지지 강봉(26)의 양측에 설치하여 체결고정한다.In addition, the support 27 is mounted on the upper portion of the pier 2 and the bracket connection supporting rods 26 are used to connect the unit bridge lift brackets 20 on both sides. The nut 54 is installed at both sides of the bracket connection supporting steel bar 26 and fixed at a predetermined interval.
도 4는 본 발명의 단위 교량승상 브라켓 상세도를 나타내는 것으로서4 is a detailed view showing the unit bridge lift bracket of the present invention.
지지강판(25)에 형성된 앵커홈(28) 위치와 같은 위치에 앵커홈(28)이 형성된 교각 상부(2)에 얹혀 설치될 "ㄱ"자 형상의 지지대(27)와 지지대(27)와 일체로 겹쳐져 연결되되 상부에 브라켓 연결지지 강봉(26)이 삽입될 연결구멍(33)과 교각(1)에 고정될 앵커를 삽입할 앵커홈(28)이 중앙에 형성된 복수의 지지강판(25)과 지지강판(25) 전면에 직각으로 연결되되 상부에 잭받침판(40)이 얹혀져 고정볼트(31)로 연결될 고정볼트 홈(29)이 중앙에 형성된 연결판(22)과 연결판(22) 하부에 단위 교량승상 브라켓(20)을 상호 연결시켜줄 단위 교량승상 브라켓 연결봉(23)이 삽입될 연결구멍(33)이 중앙에 형성된 일정한 간격으로 3개의 하부 수직판(21)이 설치된 단위 교량승상 브라켓(20)이다. 지지강판(25)은 한 개를 사용할 수도 있으나 잭과 교량의 하중을 고려하여 지지강판(25)을 이중으로 붙여서 사용한다. 지지대(27)의 "ㄱ"자형의 상부 부분은 교각 상부(2)에 얹혀져 설치되도록 하기 위한 것이다.Integrated with the "a" shaped support 27 and the support 27 to be mounted on the upper part of the pier where the anchor groove 28 is formed at the same position as the anchor groove 28 formed on the support steel plate 25. And a plurality of supporting steel plates 25 formed at the center thereof to be connected to each other, and having a connection hole 33 into which a bracket connection supporting rod 26 is inserted and an anchor groove 28 into which an anchor to be fixed to the piers 1 is inserted. It is connected to the front of the support steel plate 25 at a right angle, but the jack support plate 40 is mounted on the upper part, and the fixing bolt groove 29 to be connected to the fixing bolt 31 is formed at the bottom of the connecting plate 22 and the connecting plate 22. Unit bridge lift brackets 20 to which the unit bridge lift brackets 20 to connect the unit bridge lift brackets 20 are provided with three lower vertical plates 21 at regular intervals in which a connection hole 33 into which a connection rod 23 is inserted is formed at the center. )to be. One support steel plate 25 may be used, but in consideration of the load of the jack and the bridge, the support steel plate 25 is used to attach a double. The upper portion of the "a" shape of the support 27 is to be installed on the pier top (2).
도 5는 본 발명의 잭받침판 상세도로서 상기 도 4의 연결판(22) 위에 설치되면서 연결판(22) 중앙에 형성된 고정볼트 홈(29)과 잭 받침판(40)에 형성된 고정볼트 홈(29)의 위치를 같게하여 연결판(22)과 잭 받침판(40)을 고정볼트(31)로 고정하여 일체화시키키 위한 것이다. 잭 이동방지대(42)는 잭을 거치하기 위하여 설치한 것으로서 잭에 유압이 작용할 때 잭이 옆으로 튕겨져 나오는 것을 방지하기 위하여 홈을 설치하여 홈내에 잭을 설치하기 위한 것으로서 잭 받침판(40)에 복수개이상 설치한다.5 is a detailed view of the jack support plate of the present invention, while being installed on the connection plate 22 of FIG. 4, the fixing bolt groove 29 formed in the center of the connection plate 22 and the fixing bolt groove 29 formed in the jack support plate 40 are shown. ) To equalize the position of the connecting plate 22 and the jack support plate 40 is fixed to the fixing bolt 31 to integrate. The jack movement preventing device 42 is installed to mount the jack, and is installed to install the jack in the groove to prevent the jack from being thrown to the side when the hydraulic pressure acts on the jack. Install more than one.
도 6은 본 발명의 교량승상 브라켓을 교각에 설치한 측면도이며, 도 7은 본 발명의 브라켓 연결지지강봉 및 체결구 상세도이고, 도 8은 본 발명의 단위 교량승상 브라켓 연결봉 상세도를 보여주는 것으로서 도 2내지 도 5의 장치를 교각(1)의 양측에 설치한 것으로서 교각(1) 양측에 설치된 단위 교량승상 브라켓(20)을 브라켓 연결지지 강봉(26)을 이용하여 상호 연결하며 다수개의 단위 교량상승 브라켓(20)을 일렬로 설치한 후에 단위 교량승상 브라켓 연결봉(23)을 이용하여 연결한다.Figure 6 is a side view of the bridge elevation bracket of the present invention installed on the piers, Figure 7 is a detailed view of the bracket connection supporting rods and fasteners of the present invention, Figure 8 shows a detailed view of the unit bridge lift bracket connecting rod of the present invention 2 to 5 are installed on both sides of the bridge (1), and the unit bridge lift brackets (20) installed on both sides of the bridge (1) are interconnected by using a bracket connection supporting rod 26 and a plurality of unit bridges After installing the ascending brackets 20 in a row, the bridges are connected using the ascending bracket connecting rods 23.
상기 브라켓 연결지지 강봉(26)은 좌우측의 일정길이에 나사홈(24)을 형성하고 나사홈(24)이 형성되지 않은 중앙부분은 폴리에스테르 관(50)으로 피복하되 폴리에스테르 관내부에 구리스를 충전하고 상기 브라켓 연결지지 강봉(26)을 삽입한다. 또한, 브라켓 연결지지강봉(26)의 일측부에 나사홈(24)이 형성된 부분에 너트 체결구 지지봉 삽입홈(55)을 형성하여 지지봉(51)과 너트 체결구 손잡이(53)가 각각 형성된 너트 체결구(52)의 지지봉(51)을 상기 너트 체결구 지지봉 삽입홈(55)에 삽입한 후에 너트 체결구 손잡이(53)를 돌려서 양측의 단위 교량승상 브라켓(20)에 연결된 브라켓 연결지지 강봉(26)의 양측에 너트(54)를 끼워서 지지강판(25)의 양측에 체결고정하며, 교각(1)의 일측에 일렬로 다수개 설치된 단위 교량승상 브라켓(20)을 상호 연결하기 위한 단위 교량승상 브라켓 연결봉(23)에는 전길이에 걸쳐 나사홈(24)이 설치되어 일측에 설치된 너트 체결구 지지봉 삽입홈(55)에 도 7의 너트 체결구(52)의 지지봉(51)을 삽입하고 너트 체결구 손잡이(53)를 돌려서 하부 수직판(21)을 관통하도록하며 단위 교량승상 브라켓 연결봉(23)의 양측에 너트(30)를 설치하여 너트(30)가 하부수직판(21)에 체결고정되도록 한다.The bracket connection supporting steel bar 26 forms a screw groove 24 at a predetermined length on the left and right sides, and the center portion where the screw groove 24 is not formed is coated with a polyester tube 50, but grease is formed inside the polyester tube. After charging, insert the bracket connection support rod 26. In addition, a nut fastener support rod insertion groove 55 is formed in a portion where the screw groove 24 is formed at one side of the bracket connection support steel bar 26 so that the support rod 51 and the nut fastener handle 53 are formed, respectively. After inserting the support rod 51 of the fastener 52 into the nut fastener support rod insertion groove 55, the bracket connection supporting steel rods connected to the unit bridge lift brackets 20 on both sides by turning the nut fastener handle 53 ( 26, a unit bridge lift for fastening and fastening to both sides of the support steel plate 25 by inserting the nut 54 on both sides, and interconnecting a plurality of unit bridge lift brackets 20 installed in a row on one side of the piers 1; The bracket connecting rod 23 is provided with a screw groove 24 over the entire length, and inserts the support rod 51 of the nut fastener 52 of FIG. 7 into the nut fastener support rod insertion groove 55 installed on one side, and tightens the nut. Turn the old handle (53) to penetrate the lower vertical plate (21). The nut 30 is installed on both sides of the upper bracket connecting rod 23 so that the nut 30 is fastened to the lower vertical plate 21.
상기 브라켓 연결지지 강봉의 중앙에 구리스를 관내부에 충전한 폴리에스테르 관을 삽입하는데 그것은 교각상부에 브라켓 연결지지 강봉을 설치하고 교량빔을 인상 증축한 후에 브라켓과 브라켓 연결지지 강봉을 제거할 때 강봉을 손쉽게 관내부에서 제거하기 위하여 윤활유 역할을 하도록 구리스를 충전하였으며, 교량빔을 인상 증축한 공간에 콘크리트를 타설하면서 폴리에스테르 관내부에도 콘크리트로 관내부를 충전하는 것이다.Insert the polyester tube filled with grease inside the pipe at the center of the bracket connection supporting rod, which is installed when the bracket and the bracket connection supporting rod are removed after the bracket connection supporting rod is installed on the top of the bridge and the bridge beam is stretched and extended. The grease was filled to act as a lubricant to easily remove the inside of the pipe, and the concrete inside the polyester pipe was filled with concrete while placing concrete in the space where the bridge beam was extended.
교량에는 지상의 도로와 교량이 만나는 지점에 교대를 설치하고 교량부분에는 교각을 설치하고 그 위에 교량빔을 설치하게되며 교대 및 교각과 교량빔사이에 교좌장치를 설치하게 된다. 본 발명은 이러한 교좌장치가 설치된 공간부에 설치하여 교량을 승상 또는 보수보강을 하기 위하여 상기의 단위 교량승상 브라켓을 설치하여 공사를 실시하게 된다. 따라서 상기의 도면설명에서는 교각에 설치하는 것을 설명하였는데, 본 도면에서는 교대에 단위 교량승상 브라켓을 설치하는 것을 설명하고자 한다. 교각과 교대에 본 브라켓을 설치하는 것은 별도의 공사가 아니고 항상 동일하게 일어나는 것으로서 본 발명의 명세서에서 함께 설명하기로 한다.In the bridge, the bridge is installed at the point where the road and the bridge meet, the bridge is installed at the bridge part, the bridge beam is installed on the bridge, and the bridge device is installed between the bridge and the bridge and the bridge beam. The present invention is installed in the space in which the bridge device is installed to perform the construction by installing the above unit bridge lifting bracket to raise or repair the bridge. Therefore, in the above description of the drawings, the installation on the pier has been described. In this drawing, the installation of the unit bridge lift bracket on the shift will be described. The installation of the bracket on the pier and the shift is not a separate construction and always happens to be the same and will be described together in the specification of the present invention.
도 9는 본 발명의 교량승상 브라켓을 교대에 설치한 도면이며, 도 10은 본 발명의 교량승상 브라켓을 교대에 설치한 측면도를 보여준다.9 is a view showing the bridge climbing bracket of the present invention in the shift, Figure 10 shows a side view of the bridge climbing bracket of the present invention in the shift.
상기의 도 2내지 도 6에서 설명한 방법대로 교대(100)에도 설치를 하되 교대 수직부(101)에 교대 연결지지 강봉(110)의 일측단부가 삽입고정될 삽입홈(111)을 천공하고 교대(100)의 일측에 설치된 일련의 단위 교량승상 브라켓(20)으로 이루어진 교량승상 브라켓(20)의 지지강판(25) 상부에 형성된 연결구멍(33)을 통하여 삽입된 교대 연결지지 강봉(110)의 일측이 상기 교대 수직부(101)에 설치된 삽입홈(111)에 삽입되도록 하고 일측에는 너트(30)를 체결하여 지지강판(25)에 체결고정되도록 한다.2 to 6 is installed in the shift 100 as described in the above method, but drills and inserts the insertion groove 111 to be fixed to one end of the alternating connection supporting steel rod 110 to the shift vertical portion 101 ( One side of the alternate connection supporting steel rod 110 inserted through the connection hole 33 formed in the upper portion of the support steel plate 25 of the bridge climbing bracket 20 formed of a series of bridge climbing brackets 20 installed on one side of the 100; The alternating vertical portion 101 is to be inserted into the insertion groove 111 is to be fastened to the support steel plate 25 by fastening the nut 30 on one side.
도 11은 본 발명의 교대 연결지지 강봉 상세도로서 일측의 일정길이에만 나사홈(24)을 형성하고 타측은 교대 수직부(101)에 삽입시키기 위해 나사홈(24)을 형성하지 않으며 상기 교대 연결지지 강봉(110) 중앙에는 구리스를 충전한 폴리에스테르 관(50)을 삽입하고 나사홈(24)이 형성된 부분에 상기 도 7에서 설명한 너트 체결구(52)의 지지봉(51)을 삽입한 후에 일측에 형성된 너트 체결구 손잡이(53)를 돌려서 너트(54)를 상기 지지강판(25)에 체결고정하도록 하고 상기 도 8에서 설명한 단위 교량승상 브라켓 연결봉(23)을 이용하여 교대(100)에 설치된 일련의 단위 교량승상 브라켓(20)으로 이루어진 교량승상 브라켓(10)의 하부 수직판(21)에 관통하여 너트(54)를 체결하여 상호 연결한다.11 is a detailed view of the alternate connection support steel bar of the present invention to form a screw groove 24 only on a certain length of one side and the other side does not form a screw groove 24 to insert into the alternating vertical portion 101, the alternating connection After inserting the grease-filled polyester tube 50 into the center of the supporting steel rod 110 and inserting the supporting rod 51 of the nut fastener 52 described in FIG. Turn the nut fastener handle 53 formed on the nut 54 to be fastened to the support steel plate 25, and a series installed on the shift 100 using the unit bridge lift bracket connecting rod 23 described in FIG. 8. Penetration through the lower vertical plate 21 of the bridge climbing bracket (10) consisting of the unit bridge lifting bracket 20 of the nut 54 is connected to each other.
상기 교대 연결지지 강봉의 중앙에 구리스를 관내부에 충전한 폴리에스테르 관을 삽입하는데 그것은 교대 상부에 교대 연결지지 강봉을 설치하고 교량빔을 인상 증축한 후에 브라켓과 교대 연결지지 강봉을 제거할 때 강봉을 손쉽게 관내부에서 제거하기 위하여 윤활유 역할을 하도록 구리스를 충전하였으며, 교량빔을 인상 증축한 공간에 콘크리트를 타설하면서 폴리에스테르 관내부에도 콘크리트로 관내부를 충전하는 것이다.Insert a polyester tube filled with grease into the tube at the center of the alternating connecting rod, which is installed when the bracket and the alternating supporting rod are removed after the alternating connecting supporting rod is installed on the upper part of the alternating rod and the extension of the bridge beam is performed. The grease was filled to act as a lubricant to easily remove the inside of the pipe, and the concrete inside the polyester pipe was filled with concrete while placing concrete in the space where the bridge beam was extended.
이상의 설명에서와 같이, 본 발명은 단위 교량승상 브라켓을 여러개 설치하여 강봉을 이용하여 각각의 단위 교량승상 브라켓을 연결하고 유압잭을 이용하여 교량을 승상하거나 보수보강하는 방법을 사용하므로서 개개의 단위 교량승상 브라켓이 소형인 관계로 경량이어서 설치에도 용이하며 각각의 단위 교량승상 브라켓을 연결할때에도 별도 중장비의 동원이 필요없는 아주 간편하면서도 설치 및 해체에 소요되는 시간이 절약되므로서 공사비의 절감 및 공사기간이 감축되는 매우 유용한 공법인 것이다.As described above, in the present invention, by installing a plurality of unit bridge lift brackets, each unit bridge lift bracket is connected by using a steel rod, and each unit bridge lift by using a method of lifting or repairing a bridge by using a hydraulic jack. Because of the small size of the bracket, it is light and easy to install, and it is very simple and does not require the mobilization of heavy equipment even when connecting the individual bridge lift brackets, and it saves time for installation and dismantling, thereby reducing construction cost and construction period. It is a very useful method.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0065759A KR100499978B1 (en) | 2002-10-28 | 2002-10-28 | Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2002-0065759A KR100499978B1 (en) | 2002-10-28 | 2002-10-28 | Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2002-0032115U Division KR200303279Y1 (en) | 2002-10-28 | 2002-10-28 | Bracket for holding up bridge manufactured with steel plate |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20040037310A true KR20040037310A (en) | 2004-05-07 |
KR100499978B1 KR100499978B1 (en) | 2005-07-07 |
Family
ID=37335634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2002-0065759A Expired - Fee Related KR100499978B1 (en) | 2002-10-28 | 2002-10-28 | Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100499978B1 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100646322B1 (en) * | 2006-06-15 | 2006-11-23 | (주)신광건설 | Apparatus and method for constructing the upper structure by using multifunctional force bracket |
KR100760833B1 (en) * | 2007-03-02 | 2007-09-21 | 인중건설 주식회사 | Individual assembly bracket and bridge superstructure support lifting method using same |
KR100904984B1 (en) * | 2008-10-10 | 2009-06-30 | 주식회사 아워브레인 | Clock Type Safety Diagnosis Device of Steel Bridge Box Slab Section of Bridge |
KR100977280B1 (en) * | 2008-03-25 | 2010-08-23 | 서울메트로 | Beam raise plate of piers |
KR101004795B1 (en) * | 2008-04-14 | 2011-01-04 | (주)안풍건설 | Raising method of superstructure of steel plate bridge and its structure |
CN103726449A (en) * | 2013-12-19 | 2014-04-16 | 柳州欧维姆机械股份有限公司 | Automatic beam placement platform device and construction method of replacing railway beams thereby |
CN104328743A (en) * | 2014-11-24 | 2015-02-04 | 上海天演建筑物移位工程股份有限公司 | Bridge jacking temporary counter-force support device and counter-force support method |
JP2019214919A (en) * | 2018-06-12 | 2019-12-19 | 株式会社アルプス・テクノズ | Concrete edge widening structure that makes it easy to recover girder of superstructure after earthquake |
CN112195783A (en) * | 2020-09-14 | 2021-01-08 | 中交路桥建设有限公司 | A prefabricated corbel installation structure and preloading method for cable tower beam construction |
CN114293483A (en) * | 2022-01-11 | 2022-04-08 | 浙江交工集团股份有限公司 | A kind of bridge bearing replacement jacking support platform and jacking support platform tooling |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100780888B1 (en) | 2006-11-15 | 2007-11-30 | 민경기술 주식회사 | Bracket structure for continuous work with improved safety and bridge lifting construction method using the same |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100214386B1 (en) * | 1997-06-18 | 1999-08-02 | 김정현 | Jack supproting apparatus in raising the bridge super structure |
-
2002
- 2002-10-28 KR KR10-2002-0065759A patent/KR100499978B1/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100646322B1 (en) * | 2006-06-15 | 2006-11-23 | (주)신광건설 | Apparatus and method for constructing the upper structure by using multifunctional force bracket |
KR100760833B1 (en) * | 2007-03-02 | 2007-09-21 | 인중건설 주식회사 | Individual assembly bracket and bridge superstructure support lifting method using same |
KR100977280B1 (en) * | 2008-03-25 | 2010-08-23 | 서울메트로 | Beam raise plate of piers |
KR101004795B1 (en) * | 2008-04-14 | 2011-01-04 | (주)안풍건설 | Raising method of superstructure of steel plate bridge and its structure |
KR100904984B1 (en) * | 2008-10-10 | 2009-06-30 | 주식회사 아워브레인 | Clock Type Safety Diagnosis Device of Steel Bridge Box Slab Section of Bridge |
CN103726449A (en) * | 2013-12-19 | 2014-04-16 | 柳州欧维姆机械股份有限公司 | Automatic beam placement platform device and construction method of replacing railway beams thereby |
CN104328743A (en) * | 2014-11-24 | 2015-02-04 | 上海天演建筑物移位工程股份有限公司 | Bridge jacking temporary counter-force support device and counter-force support method |
JP2019214919A (en) * | 2018-06-12 | 2019-12-19 | 株式会社アルプス・テクノズ | Concrete edge widening structure that makes it easy to recover girder of superstructure after earthquake |
CN112195783A (en) * | 2020-09-14 | 2021-01-08 | 中交路桥建设有限公司 | A prefabricated corbel installation structure and preloading method for cable tower beam construction |
CN114293483A (en) * | 2022-01-11 | 2022-04-08 | 浙江交工集团股份有限公司 | A kind of bridge bearing replacement jacking support platform and jacking support platform tooling |
Also Published As
Publication number | Publication date |
---|---|
KR100499978B1 (en) | 2005-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100499978B1 (en) | Bracket for holding up bridge manufactured with steel plate and constructing method of bridge hold-up system the bracket | |
US20100325997A1 (en) | Anchorage system of ventilated facades | |
US20060163001A1 (en) | Wall hanging scaffold | |
US10273129B2 (en) | Method and apparatus for raising a structure | |
US4869467A (en) | Internally supported retaining element and method of using | |
KR100683621B1 (en) | Upper structure impression bracket with adjustable angle and length | |
US20180058082A1 (en) | Ground anchor bracket for multiple wall braces | |
CN207597813U (en) | Install elevator shaft additional | |
KR100780888B1 (en) | Bracket structure for continuous work with improved safety and bridge lifting construction method using the same | |
KR200361531Y1 (en) | A checking stand for bridge maintenance care with three steps separation type | |
US10900193B2 (en) | Pumping unit bases with driven piles | |
KR200303279Y1 (en) | Bracket for holding up bridge manufactured with steel plate | |
CN114396176B (en) | Reinforcing device and reinforcing method for steel beam column connecting node | |
KR100977482B1 (en) | Pedestrian bridges where installation is easy for existence road slope | |
KR200433150Y1 (en) | Fixture for street lamp post | |
KR100526995B1 (en) | Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus | |
KR20070111435A (en) | Fish beam lifting device and method for bridge bridge device replacement and repair | |
KR100566721B1 (en) | Prefabricator | |
KR200414119Y1 (en) | Mounting structure of fence post | |
KR200437704Y1 (en) | Aisle Cradle for Bridge Inspection | |
KR100526996B1 (en) | Fabricated inspecting support of bridge using steel bar and installing method thereof | |
KR200300124Y1 (en) | Fortification part batter board using newly-established road | |
KR200314568Y1 (en) | A clamping device for safety porch of gang form of construct | |
CN221989312U (en) | Temporary scaffold device for large-size reinforcement cage | |
KR200322332Y1 (en) | Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
St.27 status event code: A-1-2-D10-D21-exm-PE0902 |
|
E13-X000 | Pre-grant limitation requested |
St.27 status event code: A-2-3-E10-E13-lim-X000 |
|
P11-X000 | Amendment of application requested |
St.27 status event code: A-2-2-P10-P11-nap-X000 |
|
P13-X000 | Application amended |
St.27 status event code: A-2-2-P10-P13-nap-X000 |
|
R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
PR1002 | Payment of registration fee |
Fee payment year number: 1 St.27 status event code: A-2-2-U10-U11-oth-PR1002 |
|
PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |
Not in force date: 20080630 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE St.27 status event code: A-4-4-U10-U13-oth-PC1903 |
|
PC1903 | Unpaid annual fee |
Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20080630 St.27 status event code: N-4-6-H10-H13-oth-PC1903 |
|
P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |