[go: up one dir, main page]

KR200322867Y1 - LFG Drainage installation structure - Google Patents

LFG Drainage installation structure Download PDF

Info

Publication number
KR200322867Y1
KR200322867Y1 KR20-2003-0015234U KR20030015234U KR200322867Y1 KR 200322867 Y1 KR200322867 Y1 KR 200322867Y1 KR 20030015234 U KR20030015234 U KR 20030015234U KR 200322867 Y1 KR200322867 Y1 KR 200322867Y1
Authority
KR
South Korea
Prior art keywords
landfill
pipe
landfill gas
porous medium
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR20-2003-0015234U
Other languages
Korean (ko)
Inventor
유호원
Original Assignee
주식회사 유원기술단
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 유원기술단 filed Critical 주식회사 유원기술단
Priority to KR20-2003-0015234U priority Critical patent/KR200322867Y1/en
Application granted granted Critical
Publication of KR200322867Y1 publication Critical patent/KR200322867Y1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

본 고안은 매립지 매립가스배제시스템에 적용되는 매립가스 배제관 설치구조에 관한 것이다.The present invention relates to a landfill gas exclusion pipe installation structure applied to a landfill gas removal system.

이같은 본 고안은, 주변 쓰레기의 침하된 깊이와 동일한 높이만큼 하강하도록 매립가스 배제관을 이루는 다수의 파이프부재 표면에 공극율과 개공율을 극대화시킨 다단의 다공질 매체를 부착하므로서, 파이프부재에 형성된 관통공이 쓰레기에 의해 막히는 현상을 방지하면서 그 관통공을 통한 매립가스의 배출을 지속적으로 유지시켜 매립지의 조속한 안정화를 도모함은 물론, 매립지의 전반적인 다짐 강도를 일정하게 유지시켜 침하의 상태가 보다 균일하게 유지될수 있도록 하는 다공질 매체가 부착된 매립가스 배제관 설치구조를 제공한다.The present invention provides a through hole formed in the pipe member by attaching a multi-stage porous medium maximizing porosity and porosity to the surface of a plurality of pipe members constituting the landfill gas exclusion pipe to descend by the same height as the settled depth of the surrounding waste. While preventing the phenomenon of clogging by trash, the landfill gas discharged through the through hole is continuously maintained to promote rapid stabilization of the landfill, and the overall compaction strength of the landfill can be kept constant so that the state of settlement can be maintained more uniformly. A buried gas exclusion pipe installation structure with a porous medium is provided.

Description

다공질 매체가 부착된 매립가스 배제관 설치구조{LFG Drainage installation structure}Landfill gas exclusion pipe installation structure with porous media {LFG Drainage installation structure}

본 고안은 매립지 매립가스배제시스템에 적용되는 매립가스 배제관 설치구조에 관한 것으로서, 특히 주변 쓰레기의 침하된 깊이와 동일한 높이만큼 하강하도록 매립가스 배제관을 이루는 다수의 파이프부재 표면에 공극율과 개공율을 극대화시킨 다단의 다공질 매체를 부착하여 파이프부재의 관통공이 쓰레기에 의해 막히는 현상을 방지하면서 그 관통공을 통한 매립가스의 배출을 지속적으로 유지시켜 매립지의 조속한 안정화를 도모할 수 있도록 하는 다공질 매체가 부착된 매립가스 배제관 설치구조에 관한 것이다.The present invention relates to a landfill gas exclusion pipe installation structure applied to a landfill gas removal system, and in particular, porosity and porosity on a plurality of pipe member surfaces forming a landfill gas exclusion pipe to descend by the same height as the settled depth of surrounding waste. The porous media that attaches the multi-stage porous media to maximize the efficiency of the pipe member prevents the clogging of the through-holes of the pipe member by the waste while maintaining the discharge of the landfill gas through the through-holes, so that the landfill can be stabilized quickly. It relates to the installation structure of the landfill gas exclusion pipe attached.

일반적으로, 쓰레기 매립지는 매립된 쓰레기로 부터 발생된 매립가스를 외부로 배출시키고, 매립지 내부로 공기를 유입시키기 위한 매립가스 배제관(10)을 설치하는 한편, 그 쓰레기의 매립이 완료된 후에는 매립쓰레기층(1)의 상부에 가스배제층(2)과 우수차단층(3) 및 우수배수층(4)으로 이루어진 최종복토층을 덮는 구조를 갖도록 하였다.In general, the waste landfill site is provided with a landfill gas exclusion pipe 10 for discharging the landfill gas generated from the landfill waste to the outside and for introducing air into the landfill land, and after the landfill is completed, On top of the waste layer (1) was to have a structure covering the final cover layer consisting of the gas exhaust layer (2), storm water barrier layer (3) and rainwater drainage layer (4).

한편, 본원출원인은 상기와 같은 쓰레기 매립지에 적합하도록 매립지 침하를 고려한 상하이동식 매립가스 배제관을 갖는 매립지 최종복토시스템을 특허출원제10-2001-32583호(이하 '선행기술'이라 함)로 제안한 바 있다.On the other hand, the applicant of the present application proposed a landfill final cover system having a Shanghai-type landfill gas exclusion pipe in consideration of the settlement of landfill in order to be suitable for such landfills as patent application No. 10-2001-32583 (hereinafter referred to as 'prior art') There is a bar.

즉, 상기의 선행기술에서는 도 1 내지 도 3에 도시된 바와같이, 매립지의 바닥면으로 부터 가스배제층(2)까지 연결되도록 매립가스 배제관(10)을 다수의 파이프부재(11)를 분할시켜 구성하였다.That is, in the above prior art, as shown in FIGS. 1 to 3, the landfill gas exclusion pipe 10 is divided into a plurality of pipe members 11 so as to be connected to the gas exhaust layer 2 from the bottom surface of the landfill. It was configured to.

그리고, 상기 파이프부재(11)의 측벽면에는 다수의 관통공(12)을 형성하고, 상기 파이프부재(11)의 외벽면에는 분리 가능한 클램프부재(13)를 결합하였으며, 상기 클램프부재(13)의 외면으로 부터 외측 하방향으로는 적어도 한쌍의 지지다리(14)가 경사지게 연장되도록 결합 구성하였다. 또한, 상기 가스배제층(2)에는 외부까지 연장되는 가스배출관(5)을 설치하도록 하였다.In addition, a plurality of through holes 12 are formed in the side wall surface of the pipe member 11, and a detachable clamp member 13 is coupled to the outer wall surface of the pipe member 11, and the clamp member 13 is disposed. From the outer surface of the outer downward direction, at least one pair of support legs 14 were configured to be inclined to extend. In addition, the gas exhaust layer 2 is provided with a gas discharge pipe 5 extending to the outside.

그러나, 상기의 선행기술은 매립쓰레기의 침하가 이루어질 때 그 침하되는 매립쓰레기가 파이프부재(11)의 관통공(12)에 직접 맞닿으면서 상기 관통공(12)의 막힘현상을 초래하였는 바, 이로인하여 쓰레기의 매립으로 부터 발생하는 매립지내의 가스가 관통공(12)을 통해 외부로 배출되지 못하는 문제점을 가지게 되었다.However, in the prior art, when the landfill waste is settled, the landfill waste that is settled directly comes into contact with the through hole 12 of the pipe member 11, causing the blockage of the through hole 12. As a result, the gas in the landfill generated from the landfill of garbage cannot be discharged to the outside through the through hole 12.

이에 종래에는 상기와 같은 문제점을 개선하도록 다수의 파이프부재(11)가 분할 구성되는 매립가스 배제관(10)의 주변에 도 4 및 도 5에서와 같이 자갈(6)을 쌓아 통기영역이 확보되도록 하였다. 하지만, 상기와 같은 자갈시공은 여러가지의 구조적인 문제점을 가질수 밖에 없었다.Thus, in order to improve the above problems, a plurality of pipe members 11 are divided so as to secure a ventilation area by stacking gravel 6 as shown in FIGS. 4 and 5 around the landfill gas exclusion pipe 10. It was. However, such gravel construction had to have a variety of structural problems.

즉, 상기 다수의 파이프부재(11)로 분할 구성되는 매립가스 배제관(10)의 주변에 자갈을 쌓을 경우 시공의 어려움이 따를 수 밖에 없었으며, 이러한 시공의 어려움은 곧 자갈과 자갈 사이의 공극율 증가를 초래하는 문제점을 가지게 되었다.That is, when the gravel is piled around the landfill gas exclusion pipe 10 that is divided into the plurality of pipe members 11, the construction is inevitable, and such a construction difficulty is soon due to the porosity between the gravel and the gravel There is a problem that causes an increase.

또한, 자갈을 다수의 파이프부재(11)로 분할 구성된 매립가스 배제관(10)의 주변에 시공할 때 그 자갈이 시공된 매립지 부위와 자갈이 시공되지 않은 매립지 부위의 다짐 강도가 서로 다르게 나타나면서 그 침하상태가 불균일해지고, 이러한 침하의 불균일은 곧 최종복토층의 파괴를 유발하는 폐단이 따랐다.In addition, when the gravel is installed around the landfill gas exclusion pipe 10 which is divided into a plurality of pipe members 11, the compaction strength of the landfill site where the gravel is constructed and the landfill site where the gravel is not constructed appear different from each other. The sinking condition became uneven, and the unevenness of the sinking soon followed the closure causing the destruction of the final cover layer.

또한, 자갈과 인접되는 파이프부재(11)의 경우에는 매립쓰레기의 침하가 이루어질 때 자갈로 인해 그 하강이 제대로 이루어지지 못하였으며, 이는 곧 매립가스 배제관(10)이 정상적인 기능을 수행하지 못하면서 매립지 내부의 가스에 대한 정상적인 포집 및 배제가 불가능해지는 폐단이 따를 수 밖에 없었다.In addition, in the case of the pipe member 11 adjacent to the gravel, the fall of the landfill waste was not properly made due to the gravel, which means that the landfill gas exclusion pipe 10 does not perform a normal function, but the landfill There was no choice but to follow the closure of normal collection and exclusion of internal gases.

본 고안은 상기와 같은 종래의 문제점을 해결하기 위해 안출된 것으로서, 본 고안의 목적은, 매립 쓰레기의 침하된 깊이만큼 단계적으로 하강하도록 설치되는 매립가스 배제관의 파이프부재 표면에 공극율과 개공율을 극대화시킨 다공질 매체를 부착하므로서, 파이프부재에 형성된 관통공이 쓰레기에 의해 막히는 현상을 효과적으로 방지하고, 그 관통공을 통한 매립가스의 배출을 지속적으로 유지시켜 매립지의 조속한 안정화를 도모할 수 있도록 하며, 나아가 매립지의 전반적인 다짐 강도를 일정하게 유지시켜 침하의 상태가 보다 균일하게 유지될 수 있도록 하는 다공질 매체가 부착된 매립가스 배제관 구조를 제공하려는 것이다.The present invention has been made to solve the above-mentioned conventional problems, the object of the present invention, the porosity and porosity on the surface of the pipe member of the landfill gas exclusion pipe is installed to be lowered step by step by the depth of landfill waste By attaching the maximized porous media, the through-holes formed in the pipe member can be effectively prevented from being clogged by garbage, and the discharge of the landfill gas through the through-holes is continuously maintained, so that the landfill can be stabilized quickly. It is an object of the present invention to provide a landfill gas rejection tube structure in which a porous medium is attached so that the overall compaction strength of the landfill is kept constant so that the state of settlement can be maintained more uniformly.

도 1은 선행기술에 적용된 최종복토시스템의 측단면도.Figure 1 is a side cross-sectional view of the final cover system applied to the prior art.

도 2는 선행기술의 최종복토시스템에 적용된 매립가스 배제관의 사시도.Figure 2 is a perspective view of the landfill gas exclusion pipe applied to the final cover system of the prior art.

도 3은 선행기술의 최종복토시스템에 적용된 매립가스 배제관의 측단면도Figure 3 is a side cross-sectional view of the landfill gas exclusion pipe applied to the final cover system of the prior art

도 4는 종래 매립가스 배제관의 주변에 자갈을 설치한 상태의 측단면도.Figure 4 is a side sectional view of a state in which gravel is installed around the conventional landfill gas exclusion pipe.

도 5는 종래 도 4의 A-A선 단면도.5 is a cross-sectional view taken along the line A-A of FIG.

도 6은 본 고안의 일실시예로 매립가스 배제관의 표면에 부직포를 다단으로 부착시킨 상태의 측단면도.Figure 6 is a side cross-sectional view of the non-woven fabric attached to the surface of the landfill gas exclusion pipe in one embodiment of the present invention in multiple stages.

도 7은 본 고안의 일실시예로 도 6의 B-B선 단면도.7 is a cross-sectional view taken along the line B-B of Figure 6 as an embodiment of the present invention.

도 8은 본 고안의 일실시예로 매립가스 배제관의 표면에 그물망네트를 다단으로 부착시킨 상태의 측단면도.Figure 8 is a side cross-sectional view of a state in which the mesh net is attached to the surface of the landfill gas exclusion pipe in one embodiment of the present invention in multiple stages.

도 9는 본 고안의 일실시예로 도 8의 C-C선 단면도.9 is a cross-sectional view taken along the line C-C of Figure 8 as an embodiment of the present invention.

도 10은 본 고안의 일실시예로 매립가스 배제관의 표면에 복층을 이루는 부직포와 그물망매트를 다단으로 부착시킨 상태의 측단면도.Figure 10 is a side cross-sectional view of a non-woven fabric and a mesh mat to form a multi-layer on the surface of the landfill gas exclusion pipe in one embodiment of the present invention in a multi-stage.

도 11은 본 고안의 일실시예로 도 10의 D-D선 단면도.11 is a cross-sectional view taken along the line D-D of FIG. 10 as an embodiment of the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1; 매립쓰레기층, 2; 가스배제층, 3; 우수차단층, 4; 우수배수층, 5; 가스배출관, 10; 매립가스 배제관, 11; 파이프부재, 12; 관통공, 20; 다공질 매체, 21; 부직포, 22; 그물망네트One; Landfill waste layer 2; Gas exhaust layer, 3; Storm barrier layer, 4; Storm drainage layer, 5; Gas discharge pipe, 10; Landfill gas exclusion pipe, 11; A pipe member, 12; Through hole, 20; Porous medium, 21; Nonwovens, 22; Net

이같은 본 고안은, 매립지에서 발생하는 매립가스의 배제를 위하여 다수의 파이프부재로 구성되는 매립가스 배제관을 설치하여, 매립된 쓰레기로부터 발생된매립가스를 외부로 배출하는 한편, 쓰레기의 매립이 완료된 후에는 매립쓰레기층의 상부에 가스배제층과 우수차단층 및 우수배수층을 포함하는 최종복토층을 설치하게 되는 매립지의 매립가스배제시스템에 있어서, 상기 매립가스 배제관을 구성하는 파이프부재의 외표면에, 통기성이 우수한 다공질 매체를 일체형으로 부착하여 공극율과 개공율의 극대화를 통해 매립쓰레기에 의한 관통공의 막힘현상을 방지하도록 구성함을 특징으로 한다.The present invention is to install a landfill gas exclusion pipe consisting of a plurality of pipe members for the exclusion of landfill gas generated in the landfill, discharge the landfill gas generated from the landfill waste to the outside, while the landfill of waste is completed In the landfill gas removal system of a landfill site in which a final cover layer including a gas exhaust layer, a rain barrier layer and a storm drain layer is disposed on an upper part of the landfill waste layer, the outer surface of the pipe member constituting the landfill gas exclusion pipe It is characterized in that it is configured to prevent the blockage of the through-holes by the landfill waste by maximizing the porosity and the porosity by integrally attaching a porous medium having excellent air permeability.

이하, 첨부된 도면에 의거하여 본 고안의 바람직한 일실시예를 설명하면 다음과 같다.Hereinafter, a preferred embodiment of the present invention based on the accompanying drawings.

참고로 이하에 참조되는 도면에 대하여는 설명의 편의상 종래와 동일한 부분에 대해서는 동일한 참조 번호를 부여하여 설명한다.For reference, the drawings referred to below will be described with the same reference numerals for the same parts as in the prior art for convenience of description.

도 6은 본 고안의 일실시예로 매립가스 배제관의 표면에 부직포를 다단으로 부착시킨 상태의 측단면도이고, 도 7은 도 6의 B-B선 단면도 이다.Figure 6 is a side cross-sectional view of a non-woven fabric attached to the surface of the landfill gas exclusion pipe in one embodiment according to an embodiment of the present invention, Figure 7 is a cross-sectional view taken along line B-B of FIG.

도 8은 본 고안의 다른 실시예로 매립가스 배제관의 표면에 그물망네트를 다단으로 부착시킨 상태의 측단면도이고, 도 9는 도 8의 C-C선 단면도 이다.FIG. 8 is a side cross-sectional view of a mesh net attached to the surface of a landfill gas exclusion pipe in another embodiment according to another embodiment of the present invention, and FIG. 9 is a cross-sectional view taken along line C-C of FIG. 8.

도 10은 본 고안의 또 다른 실시예로 매립가스 배제관의 표면에 복층을 이루는 부직포와 그물망네트를 다단으로 부착시킨 상태의 측단면도이고, 도 11은 도 10의 D-D선 단면도 이다.FIG. 10 is a cross-sectional side view illustrating a non-woven fabric and a mesh net formed in multiple layers on the surface of a landfill gas exclusion pipe as another embodiment of the present invention, and FIG. 11 is a cross-sectional view taken along the line D-D of FIG.

본 고안은 도 6 내지 도 11에 도시된 바와같이, 매립 쓰레기의 침하된 깊이만큼 단계적으로 하강하도록 다수의 파이프부재(11)로 분할 구성되는 매립가스 배제관(10)을 구비하는 매립지의 매립가스배제시스템에 적용된다.6 to 11, the landfill gas of the landfill having a landfill gas exclusion pipe 10 is divided into a plurality of pipe members 11 so as to descend in stages by the settled depth of landfill waste, as shown in Figure 6 to 11 Applies to exclusion systems.

이러한 매립가스배제시스템에 의하면, 다수의 파이프부재(11)를 통해 매립된 쓰레기로부터 발생된 매립가스를 외부로 배출시키는 동시에 매립지 내부로 공기를 유입시키는 한편, 쓰레기의 매립이 완료된 후에는 매립 쓰레기층(1)의 상부에 가스배제층(2)과 우수차단층(3) 및 우수배수층(4)으로 이루어진 최종복토층을 덮는 구조로 시공된다.According to such a landfill gas removal system, while the landfill gas generated from the landfilled waste through the plurality of pipe members 11 is discharged to the outside and air is introduced into the landfill, while the landfill is completed, the landfill waste layer It is constructed in a structure covering the final cover layer composed of the gas exhaust layer 2, the rain barrier layer 3 and the rain drain layer 4 on the upper part of (1).

그리고, 상기 매립가스 배제관(10)을 구성하는 파이프부재(11)의 표면에는 공극율과 개공율의 극대화를 통해 매립쓰레기에 의한 관통공(12)의 막힘 현상을 방지하도록 통기성이 우수한 다공질 매체(20)를 일체로 부착 구성한다.In addition, a porous medium having excellent air permeability on the surface of the pipe member 11 constituting the buried gas exclusion pipe 10 to prevent clogging of the through hole 12 by landfill waste through maximization of porosity and porosity. 20) is integrally attached.

이때, 상기 다공질 매체(20)는, 토목섬유류인 부직포, 토목합성수지류인 그물망네트, 또는 이들의 복층구조가 선택적으로 사용될 수 있다.At this time, the porous medium 20, a non-woven fabric of geotextiles, a mesh net of geosynthetic resins, or a multilayer structure thereof may be selectively used.

상기 다공질 매체(20)는 또한, 판형 재질에 타공을 통하여 개공을 확보하는 또 다른 형태의 소재가 사용될 수 있음은 물론이다.The porous medium 20 is also, of course, another type of material to secure the opening through the perforated plate-shaped material may be used.

뿐만 아니라 상기 파이프부재(11)가, 횡방향으로 설치되어 배수기능을 수행하도록 반원형의 밀폐부를 갖는 반유공관의 경우에는, 상측 유공부분만 다공질 매체를 부착하여 반유공관의 상측 유공부위를 가리우도록 설치하는 것이 바람직하다. 이를 통해 횡방향으로 매립가스를 포집하여 이송하는 기능을 효과적으로 수행할 수 있게 된다.In addition, in the case of the semi-perforated pipe having the semi-circular closed portion so that the pipe member 11 is installed in the transverse direction to perform a drainage function, only the upper perforated portion attaches a porous medium to cover the upper perforated portion of the semi-perforated pipe. It is desirable to install. Through this, it is possible to effectively perform the function of collecting and transporting the landfill gas in the transverse direction.

이와같이 구성된 본 고안의 일실시예에 대한 작용을 첨부된 도 6 내지 도 11을 참조하여 설명하면 다음과 같다.Referring to Figures 6 to 11 attached to the operation of the embodiment of the present invention configured as described above are as follows.

먼저, 매립지의 내부로 쓰레기의 매립이 진행됨에 따라 매립지 바닥의 다수지점으로 부터 각각 파이프부재(11)을 다단 설치한다.First, as the landfill of the waste proceeds to the interior of the landfill, the pipe members 11 are installed in multiple stages from a plurality of points at the bottom of the landfill.

이때, 상기 파이프부재(11)의 표면에는 그 파이프부재(11)에 형성된 관통공(12)이 매립쓰레기에 의해 막히지 않도록 통기성이 우수한 다공질 매체(20)를 다단으로 부착하여 둔다.At this time, the porous medium 20 having excellent air permeability is attached to the surface of the pipe member 11 in multiple stages so that the through-hole 12 formed in the pipe member 11 is not blocked by landfill waste.

여기서, 상기 다공질 매체(20)는 도 6 및 도 7에서와 같이 토목섬유류인 부직포(21)를 다단으로 구성하거나, 또는 도 8 및 도 9에서와 같이 토목합성수지류인 그물망네트(22)를 다단으로 구성하거나, 또는 도 10 및 도 11에서와 같이 토목섬유류인 부직포(21)와 토목합성수지류인 그물망네트(22)를 복층 구조로 하여 다단으로 구성하여 둔다.Here, the porous medium 20 is composed of a multi-layer nonwoven fabric 21 of geo-fibers as shown in Figs. 6 and 7, or a multi-layered net net 22 of a geosynthetic resin stream as shown in Figs. Alternatively, as shown in FIGS. 10 and 11, a non-woven fabric 21, which is a geotextile, and a mesh net, 22, which is a civil synthetic resin, have a multi-layer structure.

더불어, 상기 다공질 매체(20)를 다단으로 구성하는 것은, 상기 파이프부재(11) 주변의 통기 면적을 배가시킴은 물론, 매립쓰레기의 침하가 발생할 때 상기 다공질매체(20)가 파이프부재(11)의 표면으로 부터 미끄러지는 것을 방지하기 위함이다.In addition, configuring the porous medium 20 in multiple stages not only doubles the ventilation area around the pipe member 11, but also when the landfill waste is settled, the porous medium 20 is connected to the pipe member 11. This is to prevent slipping from the surface of the machine.

이후, 하측 파이프부재(11)의 상부까지 쓰레기가 매립되면, 그 파이프부재(11)의 내측 상부에 다른 파이프부재(11)의 하부를 삽입시킨 상태로 설치하고, 상기 상측 파이프부재(11)의 양측 지지다리(14)는 매립된 쓰레기 위에 지지되도록 설치하여 둔다.Thereafter, when the garbage is embedded up to the upper portion of the lower pipe member 11, it is installed in a state where the lower portion of the other pipe member 11 is inserted into the upper portion of the inner pipe member 11, and the upper pipe member 11 is disposed. Both support legs 14 are installed to be supported on the landfilled garbage.

그러면, 상기 상측 파이프부재(11)는 하측 파이프부재(11)의 내측으로 하향 슬라이딩되지 않고 설치된 높이를 일정하게 유지할 수 있게 된다.Then, the upper pipe member 11 is able to maintain the height of the installed constant without sliding downward into the lower pipe member (11).

이와같은 상태에서 쓰레기 매립이 더 진행되어 상측 파이프부재(11)의 대략중간지점까지 쓰레기의 매립이 완료되면, 상기 상측 파이프부재(11)의 지지다리(14)를 그 파이프부재(11)로 부터 분리시킨다.In this state, when the landfill is further progressed and the landfill of the waste is completed to the approximately middle point of the upper pipe member 11, the support leg 14 of the upper pipe member 11 is removed from the pipe member 11. Isolate.

그러면, 상기 상측 파이프부재(11)는 그 주변에 매립된 쓰레기로 부터 가해지는 횡압력에 의해 하측 파이프부재(11)의 내측으로 하향 슬라이딩되지 않고 설치된 높이를 일정하게 유지하게 되는 것이다.Then, the upper pipe member 11 is to maintain a constant height without being slid downward into the lower pipe member 11 by the lateral pressure applied from the garbage embedded in the periphery.

이러한 방법으로 매립지의 다수 지점에 각각 파이프부재(11)를 설치하여 쓰레기 매립을 완료하면, 그 매립이 완료된 매립쓰레기층(1)의 상부에는 가스배제층(2) 및 우수차단층(3)과 우수배수층(4)으로 이루어진 최종복토층을 덮을수 있게 되는 것이다.In this way, when the pipe member 11 is installed at a plurality of points of the landfill, respectively, and the landfill is completed, the gas exhaust layer 2 and the rain barrier layer 3 and the upper portion of the landfill waste layer 1 after the landfill are completed. It will be able to cover the final cover layer consisting of rainwater drainage layer (4).

이때, 상기 파이프부재(11)의 표면에 부착된 다공질 매체(20)는, 상기 파이프부재(11)에 형성된 관통공(12)의 통기 면적을 확장시키면서 그 공극율과 개공율을 보다 극대화시키도록 하였는 바, 상기 관통공(12)은 매립쓰레기의 침하가 이루어지더라도 그 침하된 매립쓰레기에 의해 막힘현상이 발생하지 않으면서 매립가스의 외부 배출을 지속적으로 유지시킬 수 있게 되는 것이다.At this time, the porous medium 20 attached to the surface of the pipe member 11 is to maximize the porosity and porosity while expanding the ventilation area of the through hole 12 formed in the pipe member 11. The through hole 12 may continuously maintain the external discharge of landfill gas without clogging caused by the landfill waste, even if the landfill waste is settled.

뿐만 아니라, 상기 다공질 매체(20)는 쓰레기의 매립으로 부터 파이프부재(11)의 하강이 이루어질 때 그 파이프부재(11)와 함께 하강되도록 하였는 바, 쓰레기 매립지의 전반적인 다짐 강도는 물론, 매립지의 침하상태는 균일하게 유지될 수 있는 것이다.In addition, the porous medium 20 is to be lowered together with the pipe member 11 when the pipe member 11 is lowered from the landfill of waste, so that the overall compaction strength of the landfill, as well as settlement of the landfill The state can be kept uniform.

이상에서 설명한 바와같이 본 고안 다공질 매체가 부착된 매립가스 배제관구조는 주변 쓰레기의 침하된 깊이와 동일한 높이만큼 하강하도록 매립가스 배제관을 이루는 다수의 파이프부재 표면에 공극율과 개공율을 극대화시킨 다단의 다공질 매체를 부착하므로서, 파이프부재에 형성된 관통공이 쓰레기에 의해 막히는 현상을 방지하면서 그 관통공을 통한 매립가스의 배출을 지속적으로 유지시켜 매립지의 조속한 안정화를 도모함은 물론, 매립지의 전반적인 다짐 강도와 침하의 상태를 보다 균일하게 유지시키는 특징을 갖는다.As described above, the landfill gas rejection pipe structure with the porous media of the present invention is designed to maximize porosity and porosity on the surface of a plurality of pipe members forming the landfill gas rejection pipe so as to descend by the same height as the settled depth of the surrounding waste. By attaching the porous media of the pipe, the through-hole formed in the pipe member is prevented from being clogged by the waste while maintaining the discharge of the landfill gas through the through-hole to promote the stabilization of the landfill as well as the overall compaction strength of the landfill It has the characteristic to keep the state of settlement more uniform.

Claims (4)

매립지에서 발생하는 매립가스의 배제를 위하여 다수의 파이프부재로 구성되는 매립가스 배제관을 설치하여, 매립된 쓰레기로부터 발생된 매립가스를 외부로 배출하는 한편, 쓰레기의 매립이 완료된 후에는 매립쓰레기층의 상부에 가스배제층과 우수차단층 및 우수배수층을 포함하는 최종복토층을 설치하게 되는 매립지의 매립가스배제시스템에 있어서,A landfill gas exclusion pipe consisting of a plurality of pipe members is installed to exclude landfill gas from landfills, and the landfill gas generated from the landfill waste is discharged to the outside, and the landfill waste layer is completed after the landfill is completed. In the landfill gas removal system of a landfill, which is to install a final cover layer including a gas exhaust layer, rainwater barrier layer and rainwater drainage layer on top of 상기 매립가스 배제관을 구성하는 파이프부재의 외표면에, 통기성이 우수한 다공질 매체를 일체형으로 부착하여 공극율과 개공율의 극대화를 통해 매립쓰레기에 의한 관통공의 막힘현상을 방지하도록 구성함을 특징으로 하는 다공질 매체가 부착된 매립가스 배제관 구조.It is configured to prevent the blockage of the through-hole by the landfill waste by maximizing the porosity and the porosity by integrally attaching the porous medium having excellent air permeability to the outer surface of the pipe member constituting the landfill gas exclusion pipe. A landfill gas rejection pipe structure having a porous medium attached thereto. 제1항에 있어서,The method of claim 1, 상기 다공질 매체는, 토목섬유류인 부직포, 토목합성수지류인 그물망네트, 또는 이들의 복층구조 중 어느 하나로 구성함을 특징으로 하는 다공질 매체가 부착된 매립가스 배제관 구조.The porous medium is a buried gas exclusion pipe structure with a porous medium, characterized in that composed of any one of a non-woven fabric, geosynthetic resins, mesh nets, or a multilayer structure thereof. 제1항에 있어서,The method of claim 1, 상기 다공질 매체는, 판형재질에 타공을 통한 개공을 확보함을 특징으로 하는 다공질 매체가 부착된 매립가스 배제관 구조.The porous medium, the landfill gas exclusion pipe structure with a porous medium, characterized in that to ensure the opening through the perforated plate-like material. 제1항 내지 제3항 중 어느 한 항에 있어서,The method according to any one of claims 1 to 3, 상기 파이프부재가 횡방향으로 설치되어 배수기능을 수행하도록 반원형의 밀폐부를 갖는 반유공관의 경우에는, 상측 유공부분만 다공질 매체를 부착하여 반유공관의 상측 유공부위를 가리우도록 설치하는 것을 특징으로 하는 다공질 매체가 부착된 매립가스 배제관 구조.In the case of the semi-perforated pipe having a semicircular sealed portion to install the pipe member in the transverse direction to perform the drainage function, the porous member is attached to the upper perforated portion so as to cover the upper perforated portion of the semi-perforated pipe. Landfill gas exclusion pipe structure with a porous medium attached.
KR20-2003-0015234U 2003-05-16 2003-05-16 LFG Drainage installation structure Expired - Fee Related KR200322867Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0015234U KR200322867Y1 (en) 2003-05-16 2003-05-16 LFG Drainage installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0015234U KR200322867Y1 (en) 2003-05-16 2003-05-16 LFG Drainage installation structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020030036286A Division KR20040099073A (en) 2003-06-05 2003-06-05 LFG Drainage installation structure

Publications (1)

Publication Number Publication Date
KR200322867Y1 true KR200322867Y1 (en) 2003-08-14

Family

ID=49412677

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0015234U Expired - Fee Related KR200322867Y1 (en) 2003-05-16 2003-05-16 LFG Drainage installation structure

Country Status (1)

Country Link
KR (1) KR200322867Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100449585B1 (en) * 2002-03-25 2004-09-18 한남수 Vegetation revetment block and construction method using the same
KR200448961Y1 (en) 2008-07-29 2010-06-09 조승연 Landfill gas combustion combustor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100449585B1 (en) * 2002-03-25 2004-09-18 한남수 Vegetation revetment block and construction method using the same
KR200448961Y1 (en) 2008-07-29 2010-06-09 조승연 Landfill gas combustion combustor

Similar Documents

Publication Publication Date Title
US5316410A (en) Foundation drainage system
KR100607714B1 (en) Method of Forming Waste Landfill and Waste Landfill with Rainfall Exclusion Device
US7118308B2 (en) Multi-planar gas recovery bioreactor
KR200322867Y1 (en) LFG Drainage installation structure
CA2568491C (en) Landfill including highly permeable zones
JP4900972B2 (en) Ground drainage structure and its construction method
KR100964893B1 (en) Ultra-soft ground collecting and drainage system in which water channel and drain material are combined
KR20040099073A (en) LFG Drainage installation structure
KR20100079623A (en) Draining corrugated pipe
KR100658441B1 (en) Landfill Leachate Filtration Mat
KR20120139874A (en) Drainage system for soft ground using open channel and water-permeable drainage member
JPH09316874A (en) Liquefaction countermeasure support pile
JP2008285927A (en) Infiltration system
JP4953384B2 (en) Ground drainage structure and its construction method
EP0499442B1 (en) Underground drainage
KR100784174B1 (en) Collector and drainage system having both water permeability and drainage for super soft ground and super soft ground surface treatment
EP0933477B1 (en) Drainage method and strap draining materials therefor
KR100853495B1 (en) Soft ground improvement method using water
JP4084479B2 (en) Rainwater penetration structure
US6079903A (en) Drain channel system
KR0173306B1 (en) Waste landfill facility on soft ground and its construction method
KR200374602Y1 (en) Block for high density polyethylene sheet
CN213013707U (en) Underground drainage device and system for railway roadbed
JP3227025U (en) Rainwater storage infiltration tank
JP3713981B2 (en) Construction method for underwater foundation

Legal Events

Date Code Title Description
UA0108 Application for utility model registration

Comment text: Application for Utility Model Registration

Patent event code: UA01011R08D

Patent event date: 20030516

REGI Registration of establishment
UR0701 Registration of establishment

Patent event date: 20030731

Patent event code: UR07011E01D

Comment text: Registration of Establishment

UR1002 Payment of registration fee

Start annual number: 1

End annual number: 1

Payment date: 20030519

UG1601 Publication of registration
T201 Request for technology evaluation of utility model
UT0201 Request for technical evaluation

Patent event date: 20030908

Comment text: Request for Technology Evaluation of Utility Model

Patent event code: UT02011R01D

T601 Decision to invalidate utility model after technical evaluation
UT0601 Decision on revocation of utility model registration

Comment text: Notice of Reason for Refusal during Technology Evaluation

Patent event date: 20040228

Patent event code: UT06011S01I

LAPS Lapse due to unpaid annual fee
UC1903 Unpaid annual fee