KR200306744Y1 - Concrete form fixing tool for underground breast wall - Google Patents

Concrete form fixing tool for underground breast wall Download PDF

Info

Publication number
KR200306744Y1
KR200306744Y1 KR20-2002-0036318U KR20020036318U KR200306744Y1 KR 200306744 Y1 KR200306744 Y1 KR 200306744Y1 KR 20020036318 U KR20020036318 U KR 20020036318U KR 200306744 Y1 KR200306744 Y1 KR 200306744Y1
Authority
KR
South Korea
Prior art keywords
formwork
wall
retaining wall
coupling
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR20-2002-0036318U
Other languages
Korean (ko)
Inventor
배용웅
Original Assignee
배용웅
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배용웅 filed Critical 배용웅
Priority to KR20-2002-0036318U priority Critical patent/KR200306744Y1/en
Application granted granted Critical
Publication of KR200306744Y1 publication Critical patent/KR200306744Y1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/07Tying means, the tensional elements of which are fastened or tensioned by means of wedge-shaped members
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은, 토류벽과 거푸집을 연결고정하는 고정구를 토류벽에 고정함에 있어서, 고정구를 손으로 파지하지 않고도 고정구와 토류벽과의 견고한 결합이 가능하도록 함은 물론, 시공이 간단할 뿐만 아니라, 작업성이 용이하고, 하나의 고정구를 이용하여 다양하게 거푸집을 고정할 수 있는 지하옹벽용 거푸집 고정구를 제공함에 그 목적이 있다.The present invention, in fixing the fasteners connecting the earth wall and the formwork to the earth wall, enables a firm coupling between the fastener and the earth wall without gripping the fasteners by hand, as well as simple construction and workability. An object of the present invention is to provide a formwork for underground retaining wall that is easy and can form formwork using a single fixture.

상기 목적을 이루기 위한 수단으로 본 고안인 지하옹벽용 거푸집 고정구는,Formwork fixture for underground retaining wall of the present invention as a means for achieving the above object,

일정한 각도로 경사지게 형성된 걸림편과 이 걸림편이 연장된 끼움부를 갖는 몸체로 이루어진 거푸집 고정구에 있어서, 내부에 적어도 하나이상의 결합공과, 이 결합공이 일측에 예비결합공이 각각 통공된 결합편이 상기 몸체의 일측단에 양측방향으로 절곡 형성되어 이루어진 것을 특징으로 한다.In the formwork fixture consisting of a body having a locking piece formed to be inclined at a predetermined angle and the engaging piece is extended, the at least one coupling hole therein, and the coupling piece through which the pre-combination hole through each side of the coupling hole is one side end of the body It is characterized in that formed on both sides bent.

Description

지하옹벽용 거푸집 고정구{CONCRETE FORM FIXING TOOL FOR UNDERGROUND BREAST WALL}Formwork for Underground Retaining Walls {CONCRETE FORM FIXING TOOL FOR UNDERGROUND BREAST WALL}

본 고안은 콘크리트 구조물 건축시에 지하 옹벽을 구축하기 위해 거푸집을 고정하는 고정구에 관한 것으로, 더욱 상세하게는, 하나의 고정구에 의해 다양한 거푸집을 고정할 수 있도록 하여, 거푸집의 견고한 고정에 의해 콘크리트 압력에 의한 변형을 방지하고 공수를 감소시켜 설치비를 절감할 수 있도록 함은 물론, 볼트체결공을 양측에 대응지게 형성하고 이 볼트체결공의 일측에 각각 에비체결공을 형성하여 작업이 용이하도록 한 지하옹벽용 거푸집 고정구에 관한 것이다.The present invention relates to a fixture for fixing the formwork to build a retaining wall in the construction of a concrete structure, more specifically, it is possible to fix a variety of formwork by a single fixture, the concrete pressure by the rigid fixing of the formwork To prevent the deformation and reduce the number of installations, and to reduce the installation cost, as well as to form the bolt fastening holes corresponding to both sides, and to form the Ebi fastening holes on one side of each of the bolt fastening holes for easy operation It relates to a formwork for retaining wall.

일반적으로 콘크리트 구조물을 지상에 건설하기 위해서는 구조물의 기초가 되는 지하층을 건설하여야 하는 바, 이 지하층을 건설하기 위해서는 먼저 지하에 옹벽을 구축하여 지하층의 외벽을 형성한다.In general, in order to build a concrete structure on the ground, it is necessary to construct a basement layer that is the basis of the structure. To construct the basement layer, a retaining wall is first constructed in the basement to form an outer wall of the basement layer.

이런, 옹벽은 토압에 저항하여 흙이 무너지지 않도록 예방하는 벽체 구조물로써 벽 자체의 무게와 바닥면의 마찰력 등을 이용하여 안정을 유지하는 항토압 구조물이며, 벽에 작용하는 토압과 그 흙 위에 실린 하중, 지지력, 지반의 지지력 등을 조겅으로 하여 구조부재의 안정성과 벽 전체가 쓰러지거나 미끄러지는데에 대한 안정성이 확보되도록 설계된다.This retaining wall is a wall structure that resists earth pressure and prevents soil from collapsing. It is an anti-earth pressure structure that maintains stability by using the weight of the wall itself and the frictional force of the bottom surface, and the earth pressure acting on the wall and the load on the soil. It is designed to secure the stability of the structural member and the whole wall to fall or slip by using the support force, support force of the ground, etc.

따라서, 지하에 옹벽을 설치하기 위해서는 지반을 파서 H형빔을 옹벽이 형성되는 지주부분에 타설하고, 지하층의 확보된 넓이의 지반을 파내려 가면서 각목을 수평으로 끼워 조립함으로써, 토사의 붕괴를 막아주는 토류벽을 형성한 다음, 상기 거푸집과 일정한 각격이 유지되도록 하여 거푸집을 고정구로 고정한 후, 토류벽과 거푸집 사이에 콘크리트를 타설하여 옹벽을 형성한다.Therefore, in order to install the retaining wall in the basement, digging the ground and placing the H-beam on the supporting part where the retaining wall is formed, and digging each ground horizontally while digging the ground of the secured area of the basement layer, prevents the collapse of the soil. After the earth wall is formed, the mold is fixed to the mold to maintain a constant angle with the formwork, and then the concrete is poured between the earth wall and the formwork to form the retaining wall.

상기 거푸집과 토류벽과를 고정하는 수단으로 각목 등을 거푸집과 토류벽사이에 끼워 넣거나 한다.As a means for fixing the formwork and the earth wall, the wood or the like is sandwiched between the formwork and the earth wall.

그러나, 상기와 같은 고정수단에 의해 고정된 거푸집과 토류벽 사이에 콘크리트를 타설한 경우, 타설되는 콘크리트의 압력에 의해 상기 거푸집과 토류벽 사이에 장입한, 각목이 빠져 나가거나 하여 거푸집이 외측으로 밀려나게 되어 구축된 옹벽의 두께가 일정하지 못하고 배부름 현상이 발생됨에 따라 옹벽의 외부면이 일정면을 유지하지 못하게 된다.However, when concrete is poured between the formwork and the earth wall fixed by the fixing means as described above, the wood is charged between the formwork and the earth wall by the pressure of the concrete to be poured out, or the formwork is pushed outward. As a result, the thickness of the retaining wall is not constant and a full load occurs, so that the outer surface of the retaining wall cannot maintain a constant surface.

한편, 상기와 같은 고정수단의 문제점을 해결하기 위해 안출된 실용신안등록 249941호인, 지하옹벽 구축용 거푸집 고정장치가 있으며, 이는, 일측부에 나사부를 형성하여 토류벽과 고정될 수 있도록 하고, 타측부에는 볼트머리를 형성하되 볼트머리에서부터 내부에 나사산이 형성된 홈인 중공부를 형성하는 고정볼트와, 상기 고정볼트의 중공부에 일단부가 고정되고 콘크리트의 두께로 토류벽과 간격을 유지하는 간격유지너트를 형성하고, 타단부에는 와샤와 윙너트를 체결하여 거푸집을 가로목과 세로목으로 지지하면서 간격유지너트와 윙너트로 거푸집을 조입 결합하도록 나나산이 형성된 조임나사부가 포함되어 구성된다.On the other hand, Utility Model Registration No. 249941, which was devised to solve the problems of the fixing means as described above, there is a formwork fixing device for building a base retaining wall, which forms a screw on one side to be fixed with the earth wall, the other side The bolt head is formed, but a fixing bolt for forming a hollow portion that is a groove formed with a screw thread from the inside of the bolt head, and one end portion is fixed to the hollow portion of the fixing bolt and a gap maintaining nut for maintaining a gap with the earth wall in the thickness of concrete. The other end includes fastening screw part formed with Nanasan to join the formwork with the spacing nut and the wing nut while supporting the formwork with the horizontal and vertical necks by fastening the washer and the wing nut.

상기와 같은 구성의 종래의 지하옹벽 구축용 거푸집 고정장치는, 종래 각목을 이용하여 토류벽과 거푸집을 연결하여 거푸집을 고정함에 따라 제기된 문제점을 어느정도 해결하고는 있으나, 타설되는 콘크리트의 압력이 클 경우, 상기 고정장치가 거푸집을 견고하게 지지하지 못하게 되어 구축된 옹벽의 외벽면이 일정하게 유지하는데에 다소 무리가 따른다.Conventional underground retaining wall construction formwork fixing device of the above configuration, to solve some of the problems caused by fixing the formwork by connecting the earth wall and the formwork using conventional wood, to some extent, when the pressure of the concrete to be poured is large However, the fixing device does not firmly support the formwork, and it is somewhat difficult to keep the outer wall surface of the retaining wall constructed constant.

한편 본 출원인은, 상기와 같은 문제점을 해결하기 위해 실용신안등록 제277912호인 지하옹벽용 거푸집 고정구를 제안한 바 있다.Meanwhile, the present applicant has proposed a formwork for underground retaining wall, which is Utility Model Registration No. 277912, in order to solve the above problems.

이는 도 5에 도시된 바와 같이 몸체(1)와; 볼트체결공(2)이 적어도 하나 이상으로 형성된 결합편(3)이 상기 몸체의 일측에 하향지게 절곡형성되고, 일정한 각도로 경사지게 형성된 걸림편(4)과, 이 걸림편이 연장된 끼움부(5)가 상기 몸체의 타측에 형성되어 이루어진 것을 특징으로 하는 것으로, 하나의 고정구를 이용하여 다양하게 거푸집과 토류벽을 연결 거푸집을 고정할 수 있을 뿐만 아니라, 견고하게 고정된 거푸집에 의해 콘크리트 타설 후, 옹벽의 외벽면이 배부름현상이 나타나지 않아 외벽면이 일정면을 유지할 수 있으며, 간단한 연결작업에 의해 시공시간의 단축은 물론 작업능률의 향상을 가져오는 효과가 있다.It is a body (1) as shown in Figure 5; Coupling piece (3) formed of at least one bolt fastening hole (2) is bent downward to one side of the body, the engaging piece (4) formed to be inclined at a predetermined angle, and the fitting portion (5) is extended ) Is formed on the other side of the body, using a single fastener can not only secure the formwork connecting the formwork and the earth wall in various ways, but also after the concrete is poured by a rigidly fixed formwork, retaining wall As the outer wall surface does not appear to be full, the outer wall surface can maintain a constant surface, and the simple connection work reduces the construction time and improves work efficiency.

그러나, 상기 고정구를 거푸집에 결합하는 수단인 결합편이 몸체의 일측으로부터 절곡형성되어 있음에 따라 거푸집과의 결합력이 강화되지 못하게 되고, 또한, 고정구와 이 고정구를 거푸집에 볼트결합하기 위해서는 작업자가 몸체를 한손으로 파지하고 결합하여야 하기 때문에, 작업능률이 저하되는 문제점이 있다.However, as the coupling piece, which is a means for coupling the fixture to the formwork, is bent from one side of the body, the bonding force with the formwork cannot be strengthened, and in order to bolt the fixture to the formwork, the operator attaches the body to the formwork. Since holding and bonding with one hand, there is a problem that the work efficiency is reduced.

본 고안은 상기와 같은 종래 거푸집과 토류벽을 연결하여 거푸집을 고정하는 고정장치들이 지닌 문제점을 해결하기 위해 안출된 것으로, 거푸집을 견고하게 고정함은 물론, 시공이 간단할 뿐만 아니라, 작업성이 용이하고, 하나의 고정구를 이용하여 다양하게 거푸집을 고정할 수 있는 지하옹벽용 거푸집 고정구를 제공함에 그 목적이 있다.The present invention was devised to solve the problems of the fixing device for fixing the formwork by connecting the formwork and the earth wall as described above, not only secure the formwork firmly, but also easy construction, easy workability And, its purpose is to provide a formwork for underground retaining wall that can fix the formwork using a single fixture.

도 1은 본 고안인 지하옹벽용 거푸집 고정구를 나타낸 사시도이다.1 is a perspective view showing the formwork for underground retaining wall of the present invention.

도 2는 본 고안에 따른 지하옹벽용 거푸집 고정구에 의해 토류벽과 거푸집이 연결된 상태를 나타낸 설치상태도이다.Figure 2 is an installation state diagram showing a state connected to the earth wall and the formwork by the formwork for underground retaining wall according to the present invention.

도 3은 본 고안에 따른 지하옹벽용 거푸집 고정구에 연결구와 보조연결구가 각각 연결되는 것을 나타낸 분해사시도이다.Figure 3 is an exploded perspective view showing that the connector and the auxiliary connector is connected to the formwork for underground retaining wall according to the present invention, respectively.

도 4는 본 고안에 따른 지하옹벽용 거푸집 고정구의 다른 실시예에 의해 토류벽과 거푸집이 연결된 상태를 나타낸 설치상태도이다.Figure 4 is an installation state diagram showing a state connected to the earth wall and the formwork by another embodiment of the formwork for underground retaining wall according to the present invention.

도 5는 본 출원인에 의해 제안된 실용신안등록 제277912호인 지하옹벽용 고푸집 고정구를 나타낸 사시도이다.FIG. 5 is a perspective view illustrating the formwork for the base retaining wall of Utility Model Registration No. 277912 proposed by the present applicant.

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

10 : 몸체 11, 12 : 결합편10: body 11, 12: coupling piece

13 : 결합공 14 : 예비결합공13: coupling hole 14: pre-combination hole

15 : 걸림편 16 : 끼움부15: engaging piece 16: fitting part

17 : 연결공 20 : 토류벽17: connecting hole 20: earth wall

21 : 각목 30 : H형빔21: wood 30: H-beam

40 : 거푸집 50 : 볼트40: formwork 50: bolt

60 : 보조연결구 70 : 연결구60: auxiliary connector 70: connector

80,80' : 끼움편80,80 ': Fitting

상기 목적을 이루기 위한 수단으로 본 고안인 지하옹벽용 거푸집 고정구는,Formwork fixture for underground retaining wall of the present invention as a means for achieving the above object,

일정한 각도로 경사지게 형성된 걸림편과 이 걸림편이 연장된 끼움부를 갖는 몸체로 이루어진 거푸집 고정구에 있어서,In the formwork fixture consisting of a body having a locking piece formed to be inclined at a predetermined angle and the locking piece is extended,

내부에 적어도 하나이상의 결합공과, 이 결합공이 일측에 예비결합공이 각각 통공된 결합편이 상기 몸체의 일측단에 양측방향으로 절곡 형성되어 이루어진 것을 특징으로 한다.At least one coupling hole therein, and a coupling piece through which each coupling hole has a preliminary coupling hole on one side, is formed by bending in both directions at one end of the body.

상기와 같은 특징으로 지닌 본 고안에 따른 지하옹벽용 거푸집 고정구는, 결합편에 통공된 결합공에 볼트를 장입하여 토류벽을 이루는 각목과 각목 사이에 고정구를 결합하기 전, 이 결합공의 일측에 형성된 예비결합공에 적은 못 등을 이용하여 고정구를 토류벽의 일측부에 거치한 후, 상기 결합공을 이용하여 고정구를 완전하게 토류벽에 고정한 다음, 별도의 보조연결구와 연결구 등을 이용하여 토류벽과 거푸집을 일정한 간격을 유지한 상태에서 상기 거푸집을 견고하게 고정할 수 있으며, 또한, 거푸집을 고정하는 시공이 간단하게 이루어짐에 따라 작업의 효율성을 높이고, 하나의 고정구를 이용하여 필요에 따라 다양하게 거푸집을 고정할 수 있다.Formwork for underground retaining wall according to the present invention with the features as described above, by inserting a bolt into the coupling hole through the coupling piece, before joining the fixture between the wood and lumber to form the earth wall, formed on one side of the coupling hole After fixing the fixture to one side of the earth wall using a nail or the like in the preliminary coupling hole, the fastener is completely fixed to the earth wall using the coupling hole, and then the earth wall and the formwork are made by using a separate auxiliary connector and a connector. The formwork can be fixed firmly at a constant interval, and the construction can be easily fixed to increase the efficiency of the work, and fix the formwork as needed using a single fixture. can do.

이하, 본 고안인 지하옹벽용 거푸집 고정구를 첨부된 도면에 의거하여 좀 더 구체적으로 설명한다.Hereinafter, the formwork for underground retaining wall of the present invention will be described in more detail based on the accompanying drawings.

도 1은, 본 고안에 따른 지하옹벽용 거푸집 고정구를 나타낸 사시도이다.1 is a perspective view showing a formwork for underground retaining wall according to the present invention.

도시된 바와 같이 본 고안인 지하옹벽용 거푸집 고정구는, 몸체(10)와, 상기 상기 몸체(10)의 일측단에 양측방향으로 서로 대응지게 형성된 2개의 결합편 (11)(12)들과, 상기 결합편(11)(12)들에 적어도 하나이상으로 관통된 결합공(13) 및 이 결합공의 일측에 형성된 예비결합공(14)으로 이루어지며, 상기 몸체(10)의 타측에는 걸림편(15)이 연장형성된 끼움부(16)가 더 형성된다.As shown, the formwork for underground retaining wall according to the present invention, the body 10, and two coupling pieces (11, 12) formed to correspond to each other in both directions at one side end of the body (10), It consists of a coupling hole 13 penetrating at least one or more of the coupling pieces 11 and 12 and a preliminary coupling hole 14 formed on one side of the coupling hole, and the locking piece on the other side of the body 10. The fitting portion 16 from which the 15 is extended is further formed.

또한, 상기 끼움부(16)의 타측단부에는 별도의 연결공(17)이 더 통공됨에 따라 철사 등과 같은 것을 이용하여 연결할 때에 이용된다.In addition, the other end of the fitting portion 16 is used when connecting by using a wire or the like as the additional connection hole 17 is further through.

뿐만 아니라, 상기 끼움부(16)에 연장되어 형성된 걸림편(16)은 일정각도로 경사지게 형성됨에 따라 연결구나 별도의 보조연결구의 연결을 용이하게 한다.In addition, the engaging piece 16 is formed to extend to the fitting portion 16 is formed to be inclined at an angle to facilitate the connection of the connector or separate auxiliary connector.

상기와 같은 구성으로 이루어진 본 고안은 지하옹벽용 거푸집 고정구는, 도 2에 도시된 바와 같이 H형빔(30)과 H형빔(30) 사이에 적층된 각목(21)에 의해 형성된 토류벽(20)과 일정한 각격을 유지한 상태에서 거푸집(40)을 입설하고, 이 입설된 거푸집을 견고하게 고정한다.The present invention made of a configuration as described above, the formwork for the underground retaining wall is, as shown in Figure 2, the earth wall 20 formed by the lumber 21 laminated between the H-beam 30 and the H-beam 30 and The formwork 40 is placed in a state of maintaining a constant angle, and the formwork is firmly fixed.

상기 토류벽(20)과 거푸집(40)을 연결 고정하는 방법은, 먼저, 본 고안의 몸체(10)의 일측단에 양측방향으로 절곡형성된 형성된 결합편(11)(12)들에 적어도 하나 이상으로 관통된 예비결합공(14)에 적은 못을 박아 상기 토류벽(20)의 일측에몸체(10)가 어느정도 고정되도록 한 다음, 상기 예비결합공(14)의 일측에 각각 통광된 결합공(13)들에 볼트(50)를 인입하고, 인입된 볼트(50)를 상기 토류벽(20)을 이루는 각목(21)과 각목(21) 사이에 끼움 고정한 다음, 도 3에 도시된 바와 같이 상기 몸체(10)의 타측에 형성된 장형의 끼움부(16)에 별도의 보조연결구(60)에 형성된 관통홈(61)을 서로 끼움 고정한다.The method of fixing the earth wall 20 and the formwork 40 is connected to at least one of the coupling pieces 11 and 12 formed by bending in both directions at one end of the body 10 of the present invention. Small nails are inserted into the preliminary coupling holes 14 so that the body 10 is fixed to one side of the earth wall 20 to some extent, and then coupling holes 13 respectively transmitted to one side of the preliminary coupling holes 14. The bolt 50 is introduced into the field, and the inserted bolt 50 is fixed between the lumber 21 and the lumber 21 constituting the earth wall 20, and then the body 10 as shown in FIG. 3. The through groove 61 formed in the separate auxiliary connector 60 is fitted to each other in the long fitting portion 16 formed on the other side of the).

또한, 상기 끼움부(61)에 관통홈(61)이 끼워진 보조연결구(60)에 다수개 형성된 연결구결합홈(61') 중 하나의 연결구결합홈(61')과 장방형으로 이루어진 연결구(70)의 일측단에 형성된 연결홈(71)을 동일선상에 오도록 하고, 중앙부에 걸이홈(81)이 형성된 끼움편(80)을 상기 관통홈(61)과 연결홈(71)을 지나도록 하여 장입한 후, 장입된 끼움편(80)의 중앙에 형성된 걸이홈(81)에 또 다른 끼움편(80')을 세워 끼움으로써, 본 고안인 고정구의 몸체(10)에 보조연결구(60)와 연결구(70)를 연결한다.In addition, the connector 70 made of one of the connector coupling groove (61 ') of the plurality of connector coupling groove (61') formed in the auxiliary connector 60, the through-hole 61 is inserted into the fitting portion (61) and rectangular (70). The connecting groove 71 formed at one side end of the same line, and the fitting piece 80 formed with a hook groove 81 in the center to pass through the through groove 61 and the connecting groove 71 Then, by fitting another fitting piece (80 ') upright in the hook groove 81 formed in the center of the inserted fitting piece 80, the auxiliary connector 60 and the connector (60) to the body 10 of the fixture of the present invention ( 70).

또한, 상기 장방형의 연결구(70)의 타측단을 거푸집(40)에 관통시켜 끝단이 거푸집의 외부로 돌출되도록 한 다음, 이 타측단에 형성된 또 다른 연결홈(미도시)에 상기와 같은 방법으로 끼움편(80(80')을 끼운다.In addition, the other end of the rectangular connector 70 to penetrate the formwork 40 so that the end protrudes to the outside of the formwork, and then in another connection groove (not shown) formed in the other end in the same manner as described above Insert the fitting piece (80 (80 ')).

상기 몸체(10)를 토류벽(20)의 일측에 고정함에 있어서, 볼트(50)를 장입하여 고정하기 전, 먼저 상기 몸체(10)의 일측단에 양측방향으로 절곡된 결합편(11)(12)들의 예비결합공(14)을 이용하여 적은 못을 미리 박아 몸체(10)를 고정시킴으로써, 작업자는 상기 몸체(10)를 손으로 파지하거나 또는 볼트(50)를 파지하거나 하여 본 고안인 고정구의 몸체(10)를 토류벽(20)에 견고하게 결합할 수있기 때문에, 작업자의 작업능률이 향상될 뿐만 아니라, 작업효율성 또한 향상된다.In fixing the body 10 to one side of the earth wall 20, before the bolt 50 is charged and fixed, the coupling pieces 11 and 12 that are bent in both directions at one end of the body 10 first. By fastening a small nail in advance by using a pre-combination hole 14 of the) to fix the body 10, the operator grips the body 10 by hand or by holding the bolt 50 to the Since the body 10 can be firmly coupled to the earth wall 20, not only the work efficiency of the worker is improved, but the work efficiency is also improved.

상기와 같은 방법으로 연결구(70)와 이 연결구(70)를 본 고안인 고정구를 연결하는 보조연결구(60)와, 본 고안인 고정구가 각각 연결되면, 상기 거푸집(40)은, 견고한 지지력을 갖게되어 콘크리트를 상기 토류벽(20)과 거푸집(40) 사이에 형성된 공간부에 타설하여도 콘크리트의 압력에 의해 상기 거푸집이 유동되지 않아, 응벽의 두께가 일정하게 유지됨은 물론, 옹벽의 외벽면에 배부름 현상이 발생되지 않고 일정한 벽면을 유지할 수 있게된다.When the connector 70 and the auxiliary connector 60 for connecting the connector 70 and the fixture according to the present invention and the fixture according to the present invention are respectively connected in the above manner, the formwork 40 has a solid supporting force. Even if the concrete is placed in the space formed between the earth wall 20 and the formwork 40, the formwork does not flow due to the pressure of the concrete, the thickness of the solid wall is kept constant, as well as arranged on the outer wall surface of the retaining wall Calling does not occur and it is possible to maintain a constant wall.

또한, 거푸집과 토류벽을 연결하여 거푸집을 고정하는 방법이 종래의 나사를 돌리거나 하지 않고, 끼움편에 의한 간단한 끼움 동작에 의해 이루어짐에 따라 시공시간의 단축은 물론 용이한 작업에 의해 작업능률이 향상된다.In addition, the method of fixing the formwork by connecting the formwork and the earth wall is made by a simple fitting operation by the fitting piece, without turning the conventional screw, thereby reducing the construction time and improving work efficiency by easy operation. do.

또한 상기 보조연결구(60) 없이도 연결구(70)와 본 고안인 고정구 만을 이용하여도 토류벽과 거푸집을 연결하여 거푸집을 견고하게 고정할 수도 있음은 물론이며, 상기 거푸집과 토류벽의 간격이 좁거나 넓을 경우에도, 상기 보조연결구에 다수개 형성된 관통홈(61)을 이용하여 필요한 만큼 거푸집의 간격을 조정하여 고정할 수 있다.In addition, even without the auxiliary connector 60, even if only using the connector 70 and the fixture of the present invention can connect the earth wall and the formwork can be fixed firmly, if the gap between the formwork and the earth wall is narrow or wide Even, by using a plurality of through grooves 61 formed in the auxiliary connector can be fixed by adjusting the spacing of the form as necessary.

상기 몸체(10)의 타측단부에 형성된 연결공(17)은, 연결구(70)나 또는 보조연결구(60)를 이용하지 않고, 철사를 이용하여 거푸집과 토류벽을 연결할 때, 철사가 끼워지는 것이고, 상기 끼움부(16)와 연장 형성된 걸림편(15)이 일정각도로 경사지게 형성되어 있음에 따라 보조연결구나 연결구 및 끼워진 철사가 상기끼움부(16)로부터 이탈되는 것이 방지되는 것으로, 종래의 기술사상과 동일한다.The connection hole 17 formed at the other end of the body 10 is a wire is inserted when connecting the formwork and the earth wall using a wire, without using the connector 70 or the auxiliary connector 60, As the fitting portion 16 and the extended engaging piece 15 are formed to be inclined at a predetermined angle, the auxiliary connector, the connector, and the inserted wire are prevented from being separated from the fitting portion 16. Is the same as

도 4는 본 고안에 따른 지하옹벽용 거푸집 고정구의 다른 실시예를 나타낸 것으로, 연결구와 보조연결구를 이용하지 않고, 일측에 나사산(91)을 갖고 타측에는 연결구멍(92)이 관통된 또 다른 보조연결구(90)를 이용하여 거푸집과 토류벽을 연결하여 상기 거푸집을 견고하게 고정할 수도 있는 것으로, 이와 같이 본 고안인 지하옹벽용 거푸집 고정구는, 하나의 고정구에 따라 종류의 연결구 및 보조연결구를 연결하여 거푸집을 고정할 수 있기 때문에, 작업환경이나 또는 기타 여건에 따라, 각각 다르게 구성하여 거푸집과 토류벽을 연결하여 거푸집을 고정할 수 있는 것으로, 본 고안의 목적범위를 일탈하지 않는 한, 본 고안인 지하옹벽용 거푸집 고정구를 이용하여 거푸집과 토류벽을 연결하는 방법은 다양하게 변형실시가 가능하다.Figure 4 shows another embodiment of the formwork for the underground retaining wall according to the present invention, without using a connector and an auxiliary connector, there is another auxiliary thread that has a thread 91 on one side and a connection hole 92 through the other side By connecting the formwork and the earth wall using the connector (90), it is also possible to firmly fix the formwork, as the present invention the base retaining wall formwork fixtures, by connecting a connector and an auxiliary connector of the type according to one fixture Since the formwork can be fixed, it is possible to fix the formwork by connecting the formwork and the earth wall by configuring differently according to the working environment or other conditions, so long as it does not deviate from the object scope of the present invention, The method of connecting the formwork and the earth wall using the formwork for retaining wall can be variously modified.

상술한 바와 같이 본 고안은 지하옹벽용 거푸집 고정구에 의하면, 고정구를 토류벽에 고정할 때, 작업자가 고정구를 먼저 못 등을 이용하여 어느정도 고정한 다음, 볼트를 이용하여 견고하게 고정함으로써, 작업자가 고정구를 토류벽에 고정하기 위해 손으로 고정구를 잡는 불편함을 해결할 뿐만 아니라, 이로인해 작업효율성이 향상되는 효과는 물론, 시공시간의 단축과 함께 작업능률의 향상을 가져오는 효과가 기대된다.As described above, according to the present invention, according to the formwork for the underground retaining wall, when fixing the fixture to the earth wall, the worker first fixes the fixture to some extent by using a nail or the like, and then firmly secures it by using a bolt. Not only solves the inconvenience of holding the fixture by hand to fix it on the earth wall, but also the effect of improving the work efficiency, as well as the reduction of the construction time is expected to bring the effect of improving the work efficiency.

Claims (1)

일정한 각도로 경사지게 형성된 걸림편과 이 걸림편이 연장된 끼움부를 갖는 몸체로 이루어진 거푸집 고정구에 있어서,In the formwork fixture consisting of a body having a locking piece formed to be inclined at a predetermined angle and the locking piece is extended, 내부에 적어도 하나이상의 결합공(13)과, 이 결합공이 일측에 예비결합공(14)이 각각 통공된 결합편(11)(12)들이 상기 몸체(10)의 일측단에 양측방향으로 절곡 형성되어 이루어진 것을 특징으로 하는 지하옹벽용 거푸집 고정구.At least one coupling hole 13 therein, and coupling pieces 11 and 12 through which the coupling hole 14 is preliminarily coupled to one side, respectively, are bent in both directions at one end of the body 10. Formwork for underground retaining wall, characterized in that made.
KR20-2002-0036318U 2002-12-04 2002-12-04 Concrete form fixing tool for underground breast wall Expired - Fee Related KR200306744Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2002-0036318U KR200306744Y1 (en) 2002-12-04 2002-12-04 Concrete form fixing tool for underground breast wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2002-0036318U KR200306744Y1 (en) 2002-12-04 2002-12-04 Concrete form fixing tool for underground breast wall

Publications (1)

Publication Number Publication Date
KR200306744Y1 true KR200306744Y1 (en) 2003-03-11

Family

ID=49402480

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0036318U Expired - Fee Related KR200306744Y1 (en) 2002-12-04 2002-12-04 Concrete form fixing tool for underground breast wall

Country Status (1)

Country Link
KR (1) KR200306744Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101261233B1 (en) * 2012-02-21 2013-05-07 배용웅 Link type tie for space sustenance of concrete form
KR200470376Y1 (en) * 2013-05-13 2013-12-11 이성무 Side tie for use of interval maintenance device of mold
KR200472031Y1 (en) * 2013-04-23 2014-04-01 이재혁 Space keep goods for bean mold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101261233B1 (en) * 2012-02-21 2013-05-07 배용웅 Link type tie for space sustenance of concrete form
KR200472031Y1 (en) * 2013-04-23 2014-04-01 이재혁 Space keep goods for bean mold
KR200470376Y1 (en) * 2013-05-13 2013-12-11 이성무 Side tie for use of interval maintenance device of mold

Similar Documents

Publication Publication Date Title
KR200306744Y1 (en) Concrete form fixing tool for underground breast wall
KR200249941Y1 (en) fixing device of form with built for under ground retaining wall
JPH04315645A (en) Connecting device for stone structure
JP2007218043A (en) Joint securing structure of wooden building, fitting for joint securing structure, column base structure, fitting for column base structure, column-beam joint structure, and fitting for column-beam joint structure
KR200277912Y1 (en) Concrete form fixing tool for underground breast wall
KR200320198Y1 (en) Concrete form fixing tool for underground breast wall
KR101052830B1 (en) Stone Panel Fixture
KR200362839Y1 (en) Fixing structure for big-size concrete form
KR200277911Y1 (en) Concrete form connect tool for underground breast wall
KR100279192B1 (en) Masonry and Assembly Method for Concrete Block Assembly
JP2002227301A (en) Framework structure for wooden building
KR102307075B1 (en) Precast-concrete structure fixed full thread bolt and it&#39;s anchor construction method
KR100686385B1 (en) Formwork Supports
CN215888969U (en) Stand structure for building
JP4654674B2 (en) How to install seismic reinforcement brackets for wooden buildings
JPH031530Y2 (en)
KR200192133Y1 (en) Insert anchor for construction
KR200362865Y1 (en) Fixing tool for concrete form
KR200362840Y1 (en) Connection tool for concrete form
KR200393432Y1 (en) A support for mold
KR200321417Y1 (en) Flash board of fixing unit
KR20000074520A (en) connecting device for stone plate
JP3019014U (en) Bundle stone for construction
JP3134503U (en) Prefabricated seismic tombstone
JPH0211553Y2 (en)

Legal Events

Date Code Title Description
UA0108 Application for utility model registration

Comment text: Application for Utility Model Registration

Patent event code: UA01011R08D

Patent event date: 20021204

REGI Registration of establishment
UR0701 Registration of establishment

Patent event date: 20030226

Patent event code: UR07011E01D

Comment text: Registration of Establishment

UR1002 Payment of registration fee

Start annual number: 1

End annual number: 1

Payment date: 20021205

UG1601 Publication of registration
T201 Request for technology evaluation of utility model
UT0201 Request for technical evaluation

Patent event date: 20030408

Comment text: Request for Technology Evaluation of Utility Model

Patent event code: UT02011R01D

T701 Written decision to grant on technology evaluation
UT0701 Decision on maintenance of utility model

Patent event date: 20031229

Comment text: Written Decision on Result of Technology Evaluation

Patent event code: UT07011S01D

FPAY Annual fee payment

Payment date: 20040308

Year of fee payment: 3

UR1001 Payment of annual fee

Payment date: 20040308

Start annual number: 2

End annual number: 3

LAPS Lapse due to unpaid annual fee
UC1903 Unpaid annual fee

Termination date: 20070110

Termination category: Default of registration fee