KR200263810Y1 - Revetment for widening street - Google Patents

Revetment for widening street Download PDF

Info

Publication number
KR200263810Y1
KR200263810Y1 KR2020010034403U KR20010034403U KR200263810Y1 KR 200263810 Y1 KR200263810 Y1 KR 200263810Y1 KR 2020010034403 U KR2020010034403 U KR 2020010034403U KR 20010034403 U KR20010034403 U KR 20010034403U KR 200263810 Y1 KR200263810 Y1 KR 200263810Y1
Authority
KR
South Korea
Prior art keywords
retaining wall
type
road
bent
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
KR2020010034403U
Other languages
Korean (ko)
Inventor
신재호
Original Assignee
(주)동명기술공단종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동명기술공단종합건축사사무소 filed Critical (주)동명기술공단종합건축사사무소
Priority to KR2020010034403U priority Critical patent/KR200263810Y1/en
Application granted granted Critical
Publication of KR200263810Y1 publication Critical patent/KR200263810Y1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

본 고안은 성토층 상에 시공된 기존 포장도로의 노견측으로 차선을 증설할 경우 노폭을 최대화하여 도로확장을 효과적으로 취할 수 있도록 함과 동시에 시공을 비교적 신속 용이하게 취할 수 있어 시공기간과 비용을 최소화할 수 있도록 하고, 시공후 견고한 설치상태를 유지시켜 줄 수 있음에 따라 횡방향 변이를 미연에 방지할 수 있으며, 더불어 기존 포장도로 내에 위치한 성토층의 보강을 취해 성토층의 부등침하현상으로 인해 도로의 포장상태가 변형되는 문제현상 등을 최소화할 수 있도록 한 도로 확폭용 옹벽에 관한 것이다.The present invention can maximize the width of the road when the lanes are expanded to the side of the existing pavement constructed on the fill layer, so that the road can be effectively extended and the construction can be taken relatively quickly, minimizing the construction period and cost. It is possible to prevent lateral shifts in advance as it can maintain a solid installation state after construction, and also by reinforcing the fill layer located in the existing pavement, due to the uneven settlement of the fill layer. It relates to a widening retaining wall for minimizing problems such as pavement deformation.

특히, 수직 및 수평부가 형성되도록 "┖"형상으로 절곡 형성되어 있되, 수직부 상부에는 길이방향으로 지주 삽입홈이 등간격으로 형성되어 있고, 이 수직부 내측에는 중앙에 일정길이의 타이-망이 연결 설치된 톱니형 돌기가 형성되어 있는 노견돌기부가 일체로 형성되어 있으며, 수평부에는 체결공과 배수구가 수개 형성되어 있는 "┖"형 노출옹벽과; 상기 "┖"형 노출옹벽과 대응되는 형상을 취하도록 절곡 형성되어 있되, 수평부에는 연결시 상기 ┖"형 노출옹벽의 수평부에 형성되어 있는 체결공과 원심을 일치시킬 수 있는 나사공을 일체로 형성하고 있는 절곡부와, 수개의 배수구가 형성되어 있고, 수직부에는 앵커공이 수개 형성되어 있는 "┛"형 매설부재와; 시공시 상기 "┛"형 매설부재의 앵커공에 삽입을 취해 성토층으로 삽입 고정을 이루는 일정길이의 앵커막대 및 상기 절곡부에 형성되어 있는 나사공으로 부터 삽입을 취해 이 "┛"형 매설부재와 "┖"형 노출옹벽을 결착시키는 앵커볼트를일체로 포함하여 구성됨을 특징으로 한다.In particular, the vertical and horizontal portions are bent in a "┖" shape to be formed, but the vertical portion is formed in the longitudinal direction in the longitudinal insertion grooves are formed at equal intervals, the inside of the vertical portion of a certain length tie-net An exposed projection wall in which a toothed projection is formed, which is connected to each other, and is integrally formed, and the horizontal portion includes a "┖" -type exposed retaining wall in which a plurality of fastening holes and drains are formed; It is formed to be bent to take a shape corresponding to the "┖" -type exposed retaining wall, the horizontal portion is integrally provided with a screw hole that can match the centrifugal fastening hole formed in the horizontal portion of the "상기" -type exposed retaining wall when connected A "┛" buried member having a bent portion formed therein, a plurality of drainage holes, and a plurality of anchor holes formed in the vertical portion thereof; It consists of a fixed length of the anchor rod to form a fixed insertion and the anchoring bolt to take the insertion from the screw hole formed in the bent portion to bind the "┛" type buried member and "┖" type exposed retaining wall as a whole. It features.

Description

도로 확폭용 옹벽{REVETMENT FOR WIDENING STREET}Retaining wall for widening roads {REVETMENT FOR WIDENING STREET}

본 고안은 도로 확폭용 옹벽에 관한 것으로서, 더욱 상세하게는 성토층 상에 시공된 기존 포장도로의 노견측으로 차선을 증설할 경우 노폭을 최대화하여 도로확장을 효과적으로 취할 수 있도록 함과 동시에 시공을 비교적 신속 용이하게 취할 수 있어 시공기간과 비용을 최소화할 수 있도록 하고, 시공후 견고한 설치상태를 유지시켜 줄 수 있음에 따라 횡방향 변이를 미연에 방지할 수 있으며, 더불어 기존 포장도로 내에 위치한 성토층의 보강을 취해 성토층의 부등침하현상으로 인해 도로의 포장상태가 변형되는 문제현상 등을 최소화할 수 있도록 한 도로확폭용 옹벽에 관한 것이다.The present invention relates to a retaining wall for widening roads. More specifically, when the lanes are expanded to the side of the existing pavement constructed on the fill layer, the road width can be maximized and the road can be effectively expanded, and the construction can be performed relatively quickly. It can be easily taken to minimize the construction period and cost, and to maintain a solid installation state after construction to prevent lateral shifts in advance, and to reinforce the fill layer located in the existing pavement. It is related to the road widening retaining wall to minimize the problem of the road pavement deformation due to the uneven settlement of the fill layer.

일반적으로 차량보급의 급속한 증가추세에 의해 도로사정은 날로 악화되어 곳곳에서 심한 교통체증이 유발되고 있다.In general, due to the rapid increase in vehicle supply, road conditions have deteriorated day by day, causing severe traffic jams everywhere.

그러므로 차량통행이 많은 고속도로와 간선도로 등의 상습 정체지역에서는 도로 노폭의 확장과 같은 차도확장공사가 대부분 시행되고 있다.Therefore, most road extension works such as the expansion of road roadway are mostly carried out in areas with frequent traffic such as highways and main roads.

여기서 이와 같은 차도확장공사는 통상적으로 증차선에 상당하는 만큼 성토를 덧 취해 확장하는 방법이 보편적이다.In this case, it is common for such a road extension construction to expand and add fillet as much as it is equivalent to a distant lane.

이는 막대한 예산이 소요되는 새로운 도로 건설에 비해 시공비가 비교적 저렴하고 공기도 짧게 걸린다는 이점 때문에 선호되고 있으나, 용지부족, 지가상승에 따른 토지보상비 및 시공비의 양등, 공기지연, 난공사구간의 점증, 안전사고 위험 등과 같은 애로 사항이 다수 발생하는 문제점이 있었다.This is preferred because of the relatively low construction cost and short air cost compared to new road construction, which requires a huge budget.However, there is a lack of land, land compensation and construction cost due to land price increase, air delay, increase in construction period, and safety. There were a number of problems such as accident risks.

이에 따라 근래에는 기존의 문제점을 보완하기 위해 옹벽을 사용하여 도로의 노폭을 확장하는 방법이 널리 시행되고 있다.Therefore, in recent years, in order to compensate for the existing problems, a method of expanding road roadway using retaining walls has been widely implemented.

그러나, 위와 같은 종래의 옹벽구조물을 이용하여 도로를 확폭시킬 경우에는 대체로 다음과 같은 문제점이 발생하였다.However, when the road is widened by using the conventional retaining wall structure as described above, the following problems generally occur.

이를 순서에 의거하여 구체적으로 나열 설명하면 다음과 같다.This is described in detail based on the order as follows.

첫째, 일정기간이 경과하면 횡토압의 전가에 의해 옹벽 상부에 횡방향 변이가 발생하여 노견과 옹벽간에 틈이 발생하고 지표수의 유입으로 도로품질의 저하가 초래되는 문제점이 있었다.First, when a certain period elapses, a transverse change occurs in the retaining wall by the imputation of the transverse pressure, causing a gap between the road and the retaining wall, and deterioration of the road quality due to the inflow of surface water.

둘째, 작용하는 횡토압에 대하여는 옹벽 기판의 마찰력에 의하여 지지되므로 응력전도에 대하여 안전성을 확보하기 위해선 옹벽 기판의 폭을 부득이 넓혀야 하므로 옹벽구조물이 대형화되는 문제점이 있었다.Second, since the acting transverse earth pressure is supported by the frictional force of the retaining wall substrate, the retaining wall structure has to be enlarged because the width of the retaining wall substrate is inevitably wide in order to secure safety against stress conduction.

따라서, 콘크리트포장 고속도로의 확폭공사에 있어서는 기존의 법면을 최대한 유지하고, 노견과 옹벽사이로 지표수의 공급을 차단하여 옹벽에 작용하는 횡하중을 효율적으로 지지할 수 있는 구조로의 개선과 함께 용지를 최소화하여 시공비용의 절감을 꾀할 필요성이 절실히 요구되고 있었다.Therefore, in the expansion work of concrete pavement expressway, the existing surface is kept to the maximum, and the surface water is prevented between the road and the retaining wall to improve the lateral load acting on the retaining wall. There was an urgent need to reduce construction costs.

본 고안은 위와 같은 종래의 문제점들을 해결할 수 있도록 한 것으로, 그 목적은 성토층 상에 시공된 기존 포장도로의 노견측으로 차선을 증설할 경우 노폭을 최대화하여 도로확장을 효과적으로 취할 수 있도록 함과 동시에 시공을 비교적 신속 용이하게 취할 수 있어 시공기간과 비용을 최소화할 수 있도록 하고, 시공후 견고한 설치상태를 유지시켜 줄 수 있음에 따라 횡방향 변이를 미연에 방지할 수 있으며, 더불어 기존 포장도로 내에 위치한 성토층의 보강을 취해 성토층의 부등침하현상으로 인해 도로의 포장상태가 변형되는 문제현상 등을 최소화할 수 있도록 한 도로 확폭용 옹벽을 제공하는데 있다.The present invention is to solve the above problems, the purpose of which is to maximize the width of the road when the lanes to the side of the existing pavement constructed on the fill layer to maximize the road width and at the same time construction Can be taken relatively quickly and easily, minimizing construction period and cost, and maintaining a solid installation state after construction, thus preventing lateral variation in advance, and filling in existing pavement It is to provide a retaining wall for widening the road to minimize the problem that the pavement of the road is deformed due to the uneven settlement of the fill layer by reinforcing the layer.

이와 같은 목적을 달성시킬 수 있도록 하는 본 고안의 기술적 사상으로는,In the technical idea of the present invention to achieve the above object,

수직 및 수평부가 형성되도록 "┖"형상으로 절곡 형성되어 있되, 수직부 상부에는 길이방향으로 지주 삽입홈이 등간격으로 형성되어 있고, 이 수직부 내측에는 중앙에 일정길이의 타이-망이 연결 설치된 톱니형 돌기가 형성되어 있는 노견돌기부가 일체로 형성되어 있으며, 수평부에는 체결공과 배수구가 수개 형성되어 있는 "┖"형 노출옹벽과;The vertical and horizontal portions are bent in a "┖" shape to be formed, and the vertical portion is formed with equally spaced strut insertion grooves in the longitudinal direction, and inside the vertical portion, a tie-net having a predetermined length is connected to the center. An exposed projection wall, in which a tooth projection is formed integrally with a tooth projection, and a horizontal portion has a plurality of fastening holes and drains;

상기 "┖"형 노출옹벽과 대응되는 형상을 취하도록 절곡 형성되어 있되, 수평부에는 연결시 상기 ┖"형 노출옹벽의 수평부에 형성되어 있는 체결공과 원심을 일치시킬 수 있는 나사공을 일체로 형성하고 있는 절곡부와, 수개의 배수구가 형성되어 있고, 수직부에는 앵커공이 수개 형성되어 있는 "┛"형 매설부재와;It is formed to be bent to take a shape corresponding to the "┖" -type exposed retaining wall, the horizontal portion is integrally provided with a screw hole that can match the centrifugal fastening hole formed in the horizontal portion of the "상기" -type exposed retaining wall when connected A bent portion formed therein, several drain holes are formed, and the vertical portion has a "┛" -type buried member formed with several anchor holes;

시공시 상기 "┛"형 매설부재의 앵커공에 삽입을 취해 성토층으로 삽입 고정을 이루는 일정길이의 앵커막대 및 상기 절곡부에 형성되어 있는 나사공으로 부터 삽입을 취해 이 "┛"형 매설부재와 "┖"형 노출옹벽을 결착시키는 앵커볼트를 일체로 포함하여 구성된 것이 제시된다.When the construction is inserted into the anchor hole of the "┛" -type buried member and inserted into the anchor rod of a certain length to form a fixed insertion into the fill layer, and the "┛" -type buried member is inserted from the screw hole formed in the bent portion and It is proposed to include an anchor bolt that integrally binds the "┖" type exposed retaining wall.

도 1은 본 고안인 도로 확폭용 옹벽의 구성상태를 도시한 분해사시도,1 is an exploded perspective view showing a configuration state of the retaining wall for road widening according to the present invention,

도 2는 본 고안인 도로 확폭용 옹벽의 조립 연결된 상태를 도시한 측단면도,Figure 2 is a side cross-sectional view showing an assembled state of the retaining wall for road widening according to the present invention,

도 3은 본 고안인 도로 확폭용 옹벽의 시공된 상태를 개략적으로 도시한 측단면도.Figure 3 is a side cross-sectional view schematically showing the constructed state of the retaining wall for widening the road according to the present invention.

< 도면의 주요부분에 대한 부호의 간단한 설명 ><Brief description of symbols for the main parts of the drawings>

A : 기존 포장도로 B : 신설 포장도로A: Existing Pavement B: New Pavement

10 : "┖"형 노출옹벽 12a,12b : 수직부10: "┖" type exposed retaining wall 12a, 12b: vertical portion

14a,14b : 수평부 16 : 지주 삽입홈14a, 14b: Horizontal portion 16: Shoring insertion groove

18 : 타이(tie)-망 20 : 톱니형돌기18: tie-mesh 20: toothed projection

22 : 노견돌기부 24 : 체결공22: road projection 24: fastener

26a,26b : 배수구 30 : "┛"형 매설부재26a, 26b: Drainage 30: "┛" type buried member

32 : 나사공 34 : 절곡부32: screw hole 34: bend

36 : 앵커공 38 : 성토층36: anchor ball 38: fill layer

40 : 앵커막대 42 : 앵커볼트40: anchor bar 42: anchor bolt

44 : 지주44: prop

이하, 상기와 같이 구성된 본 고안의 구성을 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, with reference to the drawings in detail the configuration of the subject innovation configured as described above are as follows.

도 1은 본 고안인 도로 확폭용 옹벽의 구성상태를 도시한 분해사시도이고, 도 2는 본 고안인 도로 확폭용 옹벽의 조립 연결된 상태를 도시한 측단면도이다.1 is an exploded perspective view showing a configuration of the road widening retaining wall of the present invention, Figure 2 is a side cross-sectional view showing the assembled state of the road widening retaining wall of the present invention.

참고로 본 고안을 설명함에 있어 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 고안의 요지를 불필요하게 흐릴 수 있다고 판단될 경우에는 그 상세한 설명을 생략하였다.For reference, in describing the present invention, when it is determined that a detailed description of related known functions or configurations may unnecessarily obscure the subject matter of the present invention, the detailed description thereof is omitted.

또한, 후술되는 용어들은 본 고안에서의 기능을 고려하여 정의된 용어들로서 이는 사용자, 운영자의 의도 또는 관례 등에 따라 달라질 수 있다.In addition, terms to be described later are terms defined in consideration of functions in the present invention, which may vary according to the intention or custom of a user or an operator.

그러므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.Therefore, the definition should be made based on the contents throughout the specification.

도시된 바와 같이 수직 및 수평부(12a),(14a)가 형성되도록 "┖"형상으로 절곡 형성되어 있되, 수직부(12a) 상부에는 길이방향으로 지주 삽입홈(16)이 등간격으로 형성되어 있고, 이 수직부(12a) 내측에는 중앙에 일정길이의 타이-망(18)이 연결 설치된 톱니형 돌기(20)가 형성되어 있는 노견돌기부(22)가 일체로 형성되어 있으며, 수평부(14a)에는 체결공(24)과 배수구(26a)가 수개 형성되어 있는 "┖"형 노출옹벽(10)이 일측에 형성되어 있다.As shown in the figure, the vertical and horizontal portions 12a and 14a are formed to be bent in a "┖" shape to be formed, but the vertical insertion portions 16a are formed at equal intervals in the longitudinal insertion grooves 16. The inside of the vertical portion 12a is formed with the uneven projection 22 formed in the form of a toothed projection 20 in which a tie-net 18 having a predetermined length is connected at the center thereof. The horizontal portion 14a is integrally formed. ) Is formed on one side with a " 형 " type exposed retaining wall 10 in which a plurality of fastening holes 24 and drain holes 26a are formed.

또한, 상기 "┖"형 노출옹벽(10)의 타측에는 "┖"형 노출옹벽(10)과 대응되는 형상을 취하도록 절곡 형성되어 있되, 수평부(14b)에는 연결시 상기 ┖"형 노출옹벽(10)의 수평부(14a)에 형성되어 있는 체결공(24)과 원심을 일치시킬 수 있는 나사공(32)을 일체로 형성하고 있는 절곡부(34)와, 수개의 배수구(26b)가 형성되어있고, 수직부(12b)에는 앵커공(36)이 수개 형성되어 있는 "┛"형 매설부재(30)가 형성되어 있다.In addition, the other side of the "┖" -type exposed retaining wall 10 is bent to take a shape corresponding to the "┖" -type exposed retaining wall 10, the horizontal portion 14b when connected to the "┖" -type exposed retaining wall The bent portion 34 which integrally forms the fastening hole 24 formed in the horizontal part 14a of the 10, and the screw hole 32 which can match the centrifugal, and several drain holes 26b In the vertical portion 12b, a "┛" type embedding member 30 is formed in which several anchor holes 36 are formed.

그리고, 상기 "┛"형 매설부재(30)의 앵커공(36)에는 시공시 상기 "┛"형 매설부재(30)의 앵커공(36)에 삽입을 취해 성토층(38)으로 삽입 고정을 이루는 일정길이의 앵커막대(40) 및 상기 절곡부(34)에 형성되어 있는 나사공(32)으로 부터 삽입을 취해 이 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)을 결착시키는 앵커볼트(42)가 위치 구성되어 있다.In addition, the anchor hole 36 of the "┛" -type buried member 30 is inserted into the anchor hole 36 of the "┛" -type buried member 30 to be inserted and fixed into the fill layer 38. The "rod" type buried member 30 and the "┖" type exposed retaining wall 10 are inserted into the anchor rod 40 and the threaded holes 32 formed in the bent portion 34 to form a predetermined length. Anchor bolts 42 for binding the position is configured.

이와 같이 구성되어 있는 본 고안의 시공과정과 작용을 첨부된 도면을 참조하여 구체적으로 설명하면 다음과 같다.When described in detail with reference to the accompanying drawings the construction process and operation of the subject innovation is configured as follows.

도 3은 본 고안인 도로 확폭용 옹벽의 시공된 상태를 개략적으로 도시한 측단면도이다.Figure 3 is a side cross-sectional view schematically showing the construction of the retaining wall for road widening according to the present invention.

먼저, 본 고안을 이용하여 시공하는 과정을 구체적으로 설명하면 다음과 같다.First, the process of construction using the present invention in detail.

즉, 기존 포장도로(A) 변에 위치한 노견과 법면의 가장자리 일부를 절취하고, 바닥 다짐작업을 실시한 다음에 "┛"형 매설부재(30)를 내측에 위치시키면 된다.That is, a part of the edge of the road surface and the normal surface located on the side of the existing pavement (A) may be cut off, and after the floor compacting operation is performed, the "┛" type embedding member 30 may be positioned inside.

그리고 이 "┛"형 매설부재(30)의 앵커공(36)에 앵커막대(40)를 삽입하여 성토층(38)과 결착을 취한 후 이 "┛"형 매설부재(30)의 측방향으로 부터 "┖"형 노출옹벽(10)을 위치시켜 이 "┛"형 매설부재(30)의의 절곡부(34) 하단에 "┖"형 노출옹벽(10)의 수평부(14a) 끝단이 삽입 위치되게 하면 된다.Then, the anchor rod 40 is inserted into the anchor hole 36 of the " 형 " type buried member 30 to bind with the fill layer 38. Then, the " 의 " Position the end portion of the horizontal portion 14a of the "┛" type exposed retaining wall 10 at the lower end of the bent portion 34 of the "┛" type embedding member 30. You can do it.

그런 후 상기 절곡부(34) 상에 길이방향으로 형성되어 있는 나사공(32)에 앵커볼트(42)를 삽입하여 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)의 결착을 취하고, 이와 같이 결착된 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)의 내측에 상기 "┛"형 매설부재(30)의 상단부까지 위치되게 성토를 되메움하여 다짐한 후 이 상부에 기존 포장도로(A)와 연계하여 신설 포장도로(B)를 증설하면 시공이 완료되게 된다.Then, the anchor bolt 42 is inserted into the threaded hole 32 formed in the lengthwise direction on the bent portion 34 to form the "┛" -type buried member 30 and the "┖" -type exposed retaining wall 10. By binding, fill the fill back to be located to the upper end of the "매" -type buried member 30 inside the "┛" -type buried member 30 and the "┖" -type exposed retaining wall 10 thus bound. After the pledge, if the new pavement (B) is added in connection with the existing pavement (A), the construction is completed.

이때, 상기 "┖"형 노출옹벽(10)의 내측면에 일체로 형성되어 있는 노견돌기부(22)의 톱니형 돌기(20)에 일체로 연결 설치된 타이-망(18)을 증설되는 신설 포장도로(B)의 층내에 위치시킨 후 포장을 취하게 된다.At this time, the newly paved road to which the tie-net 18 is integrally connected to the sawtooth projection 20 of the dog projection 22 formed integrally with the inner surface of the "┖" type exposed retaining wall 10. After placing in layer (B), packaging is taken.

그러므로, 성토층(38) 상에 시공된 기존 포장도로(A)의 노견측으로 차선을 증설할 경우 노폭을 최대화하여 도로확장을 효과적으로 취할 수 있는 작용을 이룰 수 있게 됨과 동시에 시공을 비교적 신속 용이하게 취할 수 있어 시공기간과 비용을 최소화할 수 있는 작용을 이룰 수 있게 된다.Therefore, when the lane is extended to the side of the existing pavement (A) constructed on the fill layer 38, the road width can be maximized and the road can be effectively extended, and the construction can be taken relatively quickly. It can achieve the effect of minimizing the construction period and cost.

또한, 결착을 취하고 있는 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)이 횡토압을 분담함으로 전체 옹벽 구조의 응력전도 및 수평방향 활동에 대한 안전도를 향상시켜 줄 수 있도록 하여 횡방향 변이에 의해 옹벽이 전도되는 문제현상을 미연에 방지할 수 있도록 하는 작용을 이룰 수 있게 된다.In addition, the "┛" -type buried member 30 and the "┖" -type exposed retaining wall 10, which are binding, share the transverse earth pressure so that the safety of stress conduction and horizontal activity of the whole retaining wall structure can be improved. Therefore, it is possible to achieve the action to prevent the problem phenomenon that the retaining wall is conducted by the lateral shift in advance.

그리고, 기존 포장도로(A)와 연계되게 시공되는 신설 포장도로(B)가 상기 "┖"형 노출옹벽(10)의 내측면에 일체로 형성되어 있는 노견돌기부(22)의 톱니형 돌기(20)와 이에 일체로 연결 설치된 타이-망(18)을 통해 연결을 견고히 취하게 됨에따라 두 구조물의 상대적 변이에 의해 틈이 발생할 문제의 소지를 최소화하여 노견 하부로 지표수의 유입을 최소화 할 수 있는 작용을 이룰 수 있게 되고, 기존의 도로 확폭용 옹벽과는 달리 노견을 별도로 타설해 줄 필요가 없음에 따라 공기와 시공비용을 단축할 수 있는 작용을 이룰 수 있게 된다.And, the new pavement (B), which is constructed in connection with the existing pavement (A), the sawtooth projection 20 of the dog projection 22 is formed integrally with the inner surface of the "┖" type exposed retaining wall (10) ) And the tie-network (18) installed integrally therewith, the connection is firmly taken into account, thus minimizing the possibility of gaps caused by the relative variation of the two structures, thereby minimizing the inflow of surface water to the bottom of the head. Unlike existing retaining walls for road expansion, it is possible to achieve the effect of reducing air and construction costs, as it does not need to cast a separate road.

더욱이, "┛"형 매설부재(30)에 횡방향으로 삽입되어 성토층(38)과의 결착을 다지는 앵커막대(40)가 기존 포장도로(A)의 하부에 위치한 성토층(38)을 보강하고, 상기 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)의 수평부(14a),(14b)에 관통 형성되어 있는 배수구(26a),(26b)에 의해 유입된 지표수를 배수할 수 있도록 함에 따라 성토층(38)의 부등침하현상으로 인해 도로의 포장상태가 변형되는 문제현상을 최소화할 수 있는 작용을 이룰 수 있게 된다.Furthermore, an anchor rod 40 inserted laterally into the "형" type buried member 30 to compact with the fill layer 38 reinforces the fill layer 38 located below the existing pavement A. And the surface water introduced by the drain holes 26a and 26b penetrating through the horizontal portions 14a and 14b of the “┛” type buried member 30 and the “┖” type exposed retaining wall 10. As it is possible to drain the pavement layer 38 it is possible to achieve the effect of minimizing the problem phenomenon that the pavement of the road is deformed due to the unequal settlement phenomenon.

참고로, 본 고안은 다양하게 변형 실시될 수 있고, 여러 가지의 형태를 취할 수 있으나 상기 고안의 상세한 설명에서는 그에 따른 특별한 실시 예에 대해서만 기술하였다.For reference, the present invention may be variously modified and may take various forms, but the detailed description of the present invention has been described only with respect to specific embodiments thereof.

그러므로, 본 고안은 상세한 설명에서 언급되는 특별한 형태로 한정되는 것이 아닌 것으로 이해되어야 하며, 오히려 첨부된 청구범위에 의해 정의되는 본 고안의 정신과 범위 내에 있는 모든 변형물과 균등물 및 대체물을 포함하는 것으로 이해되어야 한다.Therefore, it is to be understood that the invention is not to be limited to the specific forms referred to in the description, but rather includes all modifications, equivalents, and substitutions within the spirit and scope of the invention as defined by the appended claims. It must be understood.

이상에서 살펴본 바와 같이 본 고안은 성토층 상에 시공된 기존 포장도로의 노견측으로 차선을 증설할 경우 노폭을 최대화하여 도로확장을 효과적으로 취할 수있도록 함과 동시에 시공을 비교적 신속 용이하게 취할 수 있어 시공기간과 비용을 최소화할 수 있도록 하고, 시공후 견고한 설치상태를 유지시켜 줄 수 있음에 따라 횡방향 변이를 미연에 방지할 수 있으며, 더불어 기존 성토층 내의 보강을 취해 성토층의 부등침하현상으로 인해 도로의 포장상태가 변형되는 문제현상 등을 최소화할 수 있도록 한 효과가 있다.As discussed above, the present invention maximizes the width of the road when the lane is extended to the side of the existing pavement constructed on the fill layer, so that the road can be effectively extended and the construction can be taken relatively quickly. As it can minimize the cost and cost, and can maintain the solid installation after construction, it is possible to prevent the lateral shift in advance, and also by reinforcing the existing fill layer, the road due to the uneven settlement of the fill layer There is an effect that can minimize the problem phenomenon such as deformation of the packaging state.

Claims (1)

수직 및 수평부(12a),(14a)가 형성되도록 "┖"형상으로 절곡 형성되어 있되, 수직부(12a) 상부에는 길이방향으로 지주 삽입홈(16)이 등간격으로 형성되어 있고, 이 수직부(12a) 내측에는 중앙에 일정길이의 타이-망(18)이 연결 설치된 톱니형 돌기(20)가 형성되어 있는 노견돌기부(22)가 일체로 형성되어 있으며, 수평부(14a)에는 체결공(24)과 배수구(26a)가 수개 형성되어 있는 "┖"형 노출옹벽(10)과;The vertical and horizontal portions 12a and 14a are bent in a "┖" shape so as to be formed, but the vertical insertion portions 16a are formed at equal intervals in the longitudinal insertion grooves 16 in the longitudinal direction. Inside the part 12a, a dog-protrusion 22 is formed integrally with a tooth-shaped protrusion 20 provided with a tie-net 18 having a predetermined length in the center thereof, and a fastening hole is provided in the horizontal portion 14a. &Quot; ┖ " -type exposed retaining wall 10 in which several 24 and drain holes 26a are formed; 상기 "┖"형 노출옹벽(10)과 대응되는 형상을 취하도록 절곡 형성되어 있되, 수평부(14b)에는 연결시 상기 ┖"형 노출옹벽(10)의 수평부(14a)에 형성되어 있는 체결공(24)과 원심을 일치시킬 수 있는 나사공(32)을 일체로 형성하고 있는 절곡부(34)와, 수개의 배수구(26b)가 형성되어 있고, 수직부(12b)에는 앵커공(36)이 수개 형성되어 있는 "┛"형 매설부재(30)와;Is formed to be bent to take a shape corresponding to the "┖" -type exposed retaining wall 10, the horizontal portion 14b is fastening formed in the horizontal portion (14a) of the "┖" -type exposed retaining wall 10 when connected A bent portion 34 which integrally forms the screw hole 32 which can coincide the ball 24 with the centrifuge, and several drain holes 26b are formed, and the anchor hole 36 is formed in the vertical portion 12b. A plurality of " ┛ &quot; type embedding members 30; 시공시 상기 "┛"형 매설부재(30)의 앵커공(36)에 삽입을 취해 성토층(38)으로 삽입 고정을 이루는 일정길이의 앵커막대(40) 및 상기 절곡부(34)에 형성되어 있는 나사공(32)으로 부터 삽입을 취해 이 "┛"형 매설부재(30)와 "┖"형 노출옹벽(10)을 결착시키는 앵커볼트(42)를 일체로 포함하여 구성됨을 특징으로 하는 도로 확폭용 옹벽.It is formed in the anchor rod 40 and the bent portion 34 having a predetermined length to be inserted into the anchor hole 36 of the "┛" -type buried member 30 to be inserted into the fill layer 38 during construction The road is characterized in that it comprises an anchor bolt 42 is integrally formed by inserting from the threaded hole 32 to bind the "┛" type buried member 30 and the "┖" type exposed retaining wall 10 integrally. Widening retaining wall.
KR2020010034403U 2001-11-09 2001-11-09 Revetment for widening street Expired - Lifetime KR200263810Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010034403U KR200263810Y1 (en) 2001-11-09 2001-11-09 Revetment for widening street

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010034403U KR200263810Y1 (en) 2001-11-09 2001-11-09 Revetment for widening street

Publications (1)

Publication Number Publication Date
KR200263810Y1 true KR200263810Y1 (en) 2002-02-09

Family

ID=73111827

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010034403U Expired - Lifetime KR200263810Y1 (en) 2001-11-09 2001-11-09 Revetment for widening street

Country Status (1)

Country Link
KR (1) KR200263810Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100441379B1 (en) * 2001-12-28 2004-07-23 김미경 Road extension method and precast concrete structure applied to it
KR101118611B1 (en) 2009-09-29 2012-02-27 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100441379B1 (en) * 2001-12-28 2004-07-23 김미경 Road extension method and precast concrete structure applied to it
KR101118611B1 (en) 2009-09-29 2012-02-27 동아에스텍 주식회사 Road for bicycle and walker constructing on the slope of road

Similar Documents

Publication Publication Date Title
KR100640716B1 (en) Inverted tee type precast concrete retaining wall block and construction method using the same
KR101590032B1 (en) Column wall using pile and structure construction method therewith
RU2413814C2 (en) Road guide structure
KR101206860B1 (en) Excavation tunnel constructing method using vertical side wall and arch ceiling
KR101005469B1 (en) Pedestrian Extension
KR200263810Y1 (en) Revetment for widening street
KR101976742B1 (en) Steel deck reinforce slab bridge and method for constructing this same
KR102057323B1 (en) Attached or mounted extended footbridge
KR101772940B1 (en) Precast concrete retaining wall
KR101193312B1 (en) Three-segment assembly retaining wall
KR100899680B1 (en) Drainage block with integral structure
KR20050021421A (en) Guard rail using road
JP4827203B2 (en) Road widening structure
JP3188328B2 (en) Structure of concrete precast guard fence
KR200420394Y1 (en) Inverse Tee Type Precast Concrete Retaining Wall Block
KR940009455B1 (en) Retaining wall for widening road side of concrete pavement and construction method
KR101153717B1 (en) Connecting Structure and Method of Concrete Slabs using Bottom Slab having Dowel bars and Drainage Channel
KR20000066218A (en) A mounting method and device consolidation expansion and contraction for onfood part of bridge
KR200292729Y1 (en) Breast wall construction practicable extension to step
JP4020918B2 (en) Bridge structure of girder bridge
KR200217006Y1 (en) A structure for connecting slab of a bridge
KR100450601B1 (en) Breast wall construction practicable extension to step
KR20150059918A (en) Box structure and construction method for underground structure using the same
KR20090109236A (en) Composite floor shift integral ramen bridge structure
KR200330844Y1 (en) A road construction for reinforcement a weakness ground

Legal Events

Date Code Title Description
UA0108 Application for utility model registration

Comment text: Application for Utility Model Registration

Patent event code: UA01011R08D

Patent event date: 20011109

REGI Registration of establishment
UR0701 Registration of establishment

Patent event date: 20020128

Patent event code: UR07011E01D

Comment text: Registration of Establishment

UR1002 Payment of registration fee

Start annual number: 1

End annual number: 1

Payment date: 20011109

UG1601 Publication of registration
T201 Request for technology evaluation of utility model
UT0201 Request for technical evaluation

Patent event date: 20020308

Comment text: Request for Technology Evaluation of Utility Model

Patent event code: UT02011R01D

T701 Written decision to grant on technology evaluation
UT0701 Decision on maintenance of utility model

Patent event date: 20021120

Comment text: Written Decision on Result of Technology Evaluation

Patent event code: UT07011S01D

UR1001 Payment of annual fee

Payment date: 20030107

Start annual number: 2

End annual number: 3

UR1001 Payment of annual fee

Payment date: 20041222

Start annual number: 4

End annual number: 4

UR1001 Payment of annual fee

Payment date: 20060110

Start annual number: 5

End annual number: 5

UR1001 Payment of annual fee

Payment date: 20070109

Start annual number: 6

End annual number: 6

UR1001 Payment of annual fee

Payment date: 20080108

Start annual number: 7

End annual number: 7

UR1001 Payment of annual fee

Payment date: 20090113

Start annual number: 8

End annual number: 8

UR1001 Payment of annual fee

Payment date: 20100106

Start annual number: 9

End annual number: 9

FPAY Annual fee payment

Payment date: 20110111

Year of fee payment: 10

UR1001 Payment of annual fee

Payment date: 20110111

Start annual number: 10

End annual number: 10

EXPY Expiration of term
UC1801 Expiration of term

Termination category: Expiration of duration

Termination date: 20121009