[go: up one dir, main page]

KR20020081507A - Paper drain board building method and stitcher for more double hole - Google Patents

Paper drain board building method and stitcher for more double hole Download PDF

Info

Publication number
KR20020081507A
KR20020081507A KR1020010020842A KR20010020842A KR20020081507A KR 20020081507 A KR20020081507 A KR 20020081507A KR 1020010020842 A KR1020010020842 A KR 1020010020842A KR 20010020842 A KR20010020842 A KR 20010020842A KR 20020081507 A KR20020081507 A KR 20020081507A
Authority
KR
South Korea
Prior art keywords
paper
drainboard
soft ground
casing
drain board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
KR1020010020842A
Other languages
Korean (ko)
Other versions
KR100417217B1 (en
Inventor
최귀봉
Original Assignee
최귀봉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최귀봉 filed Critical 최귀봉
Priority to KR10-2001-0020842A priority Critical patent/KR100417217B1/en
Publication of KR20020081507A publication Critical patent/KR20020081507A/en
Application granted granted Critical
Publication of KR100417217B1 publication Critical patent/KR100417217B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

본 발명은 연약지반 처리를 위한 중장비의 진입이 가능하도록 인위적으로 조성한 단단한 지반에 케이싱이 용이하게 관입될 수 있도록 일정한 토층까지 사전 천공후 관입하는 페이퍼 드레인보드 시공방법과 타입장비를 제공한다. 이와 같은 페이퍼 드레인보드 시공방법 및 타입장비는 일반적으로 연약지반 위에 중장비의 진입을 위한 토사층을 형성하고, 상기 토사층 위에 배수층을 형성시켜서 연약지반을 개량하는 작업을 진행한다. 페이퍼 드레인보드 시공방법은 배수층 및 토사층을 천공하는 제 1 단계와 제 1 단계에서 천공된 배수층 및 토사층을 통하여 연약지반내에 페이퍼 드레인보드를 타입하는 제 2 단계로 이루어진다. 페이퍼 드레인보드 타입장치는 연약지반내로 타입되는 페이퍼 드레인보드와, 페이퍼 드레인보드를 연약지반내로 타입하기 위한 중공의 케이싱과, 케이싱을 지지하기 위한 리이더 및 페이퍼 드레인보드가 타입되는 위치에 배수층 및 토사층을 먼저 천공하기 위한 부재를 포함한다.The present invention provides a paper drainboard construction method and type equipment for intruding after pre-punching to a certain soil layer so that casing can be easily intruded into a hard ground artificially formed to enable the entry of heavy equipment for soft ground treatment. Such a paper drainboard construction method and type equipment generally form a soil layer for entry of heavy equipment on the soft ground, and proceed to improve the soft ground by forming a drainage layer on the soil layer. The paper drainboard construction method includes a first step of drilling the drainage layer and the soil layer and a second step of forming the paper drainboard in the soft ground through the drainage layer and the soil layer drilled in the first step. The paper drainboard type device includes a drainage layer and a soil layer at a position where a paper drainboard typed into a soft ground, a hollow casing to type the paper drainboard into a soft ground, a reader and a paper drainboard to support the casing are typed. It first includes a member for drilling.

Description

복수공 이상의 페이퍼 드레인보드 시공방법 및 타입장치{PAPER DRAIN BOARD BUILDING METHOD AND STITCHER FOR MORE DOUBLE HOLE}Paper drain board construction method and type device more than two holes {PAPER DRAIN BOARD BUILDING METHOD AND STITCHER FOR MORE DOUBLE HOLE}

본 발명은 페이퍼 드레인보드 시공방법 및 타입장치에 관한 것으로, 좀 더 상세하게는 연약지반을 개량하기 위한 페이퍼 드레인보드 시공방법 및 타입장치에 관한 것이다.The present invention relates to a paper drainboard construction method and type apparatus, and more particularly, to a paper drainboard construction method and type apparatus for improving the soft ground.

일반적으로 시행되고 있는 연약지반 강화용 드레인 형성공법은 연약층 위에서 중장비를 이용하여 드레인 보드를 관입하여 지반을 개량하는 공법이다. 이와 같은 공법은 연약지반 위에 중장비를 이용하여 시공함에 따라 중장비 진입에 필요한 최소한의 지지력이 필요하다. 따라서 해당지반이 연약지반인 경우에는 소요 지지력이 부족하므로서 인위적으로 토사를 포설하여 소요지지력을 확보하게 된다. 그런데 단순히 중장비의 진입내지는 시공중의 안정성만을 위하여 토사 포설층을 두껍게 하는 것이 유리하지만 토사층을 드레인할 경우에는 타입이 어려워지는 문제점이 발생된다.In general, the soft ground reinforcement drain formation method is a method of improving the ground by injecting the drain board using heavy equipment on the soft layer. Such a construction requires a minimum amount of support necessary for entering heavy equipment as it is constructed using heavy equipment on soft ground. Therefore, if the relevant ground is soft ground, the required supporting power is insufficient, so that the required supporting power is secured by artificially laying soil. By the way, it is advantageous to thicken the soil laying layer only for the stability of the construction or the construction of heavy equipment, but the type becomes difficult when draining the soil layer.

연약지반 강화용 드레인 공법중 페이퍼 드레인 공법은 배수를 위하여 연약지반 내에 페이퍼 드레인보드('플라스틱보드'라고도 칭함)을 타입하여 지반을 개량하는 공법이다. 이 공법은 유압식 타입방법과 진동식 타입방법이 있다. 진동식 타입방법은 장비의 대형화와 케이싱의 단면이 커지게 되므로서 지반내의 교란이 크게 일어나는 반면 유압식 타입방법은 장비가 소형화되고 지반의 교란이 최소화되는 장점이 있으나 단단한 토층에서는 드레인을 타입하는데 장시간 소요되는 문제점이 있다.The paper drain method among the soft ground reinforcement drain methods is a method of improving the ground by type paper drain boards (also called 'plastic boards') in the soft ground for drainage. This method has a hydraulic type method and a vibration type method. The vibrating type method has the advantage that the disturbance in the ground is large due to the large size of the equipment and the large cross section of the casing, while the hydraulic type method has the advantage of miniaturizing the equipment and minimizing the disturbance of the ground. There is a problem.

도 1은 일반적인 페이퍼 드레인보드 시공방법에 사용되는 타입장비를 보여주는 도면이고, 도 2는 도 1의 페이퍼 드레인보드 타입장비에 사용되는 케이싱 단면을 보여주는 도면이다.1 is a view showing the type equipment used in the general paper drain board construction method, Figure 2 is a view showing a cross-section of the casing used in the paper drain board type equipment of FIG.

도 1 및 도 2를 참조하면, 일반적으로 사용되는 페이퍼 드레인보드 타입장비는 페이퍼 드레인보드(110)를 타입할 수 있는 중장비(포크레인)(100)가 주로 사용된다. 연약지반(A') 위에 페이퍼 드레인보드(110)를 타입할 때 중장비(100)는 연약지반(A')상에 직접 진입하기 곤란하여 저면에 토목섬유(B'), 하중 분산층(주로 토사)(C') 및 배수층(D')을 포설한 후 그 상면에서 도 2와 같은 단면을 갖는 케이싱(130) 내부에 페이퍼 드레인보드(110)를 삽입한 후 타입공정을 진행한다.1 and 2, the paper drainboard type equipment generally used is a heavy equipment (fork crane) 100 that can type the paper drainboard 110 is mainly used. When the paper drain board 110 is typed on the soft ground A ', the heavy equipment 100 is difficult to enter directly on the soft ground A', so that the ground fiber (B '), load distribution layer (mainly earth and sand) ) C 'and the drainage layer D' are installed, and the paper drain board 110 is inserted into the casing 130 having the cross section as shown in FIG.

이때 케이싱(130)은 관입저항이 큰 배수층(D')과 토사층(C')의 두께가 현장여건상 일정하게 포설되지 않을뿐만아니라 토질이 균질하지 않으므로 인하여 관입이 순조롭지 않아 무리한 힘이 필요하게 되며, 이로 인한 중장비의 앞부분이 들어올려지도록 무리하게 관입하거나 위치를 조정하여 재타입하게 된다.In this case, the casing 130 has a large penetration resistance, so that the thicknesses of the drainage layer D 'and the soil layer C' are not uniformly laid in the field conditions, and the soil is not homogeneous. As a result, the front part of the heavy equipment is forced to be lifted or retyped by adjusting the position by force.

이와 같이 무리하게 타입할 경우 타입장치의 편중하중으로 지반이 부분침하하는 등의 변형이 일어나며, 이로 인하여 중장비 전도의 위험, 장비의 편중으로 페이퍼 드레인보드의 직진성을 유지하기 어렵다. 또, 재차 타입하는 경우 적정간격의 유지가 불가능하고 타입시간 지연으로 작업효율이 저하되는 문제점이 있다.In such a case, if the type is excessively deformed such as partial settlement of the ground due to the partial load of the type device, it is difficult to maintain the straightness of the paper drain board due to the danger of conduction of heavy equipment and the bias of the equipment. In addition, in case of re-type, there is a problem in that it is impossible to maintain an appropriate interval and work efficiency is lowered due to a delay in type time.

한편, 연약지반처리시 주요관건의 하나인 수평 배수층인 샌드매트가 타입장치의 트랙으로 인한 굴곡발생이 불가피한 실정인데 상부 정지작업을 하지 않은 채 그대로 상재하중을 포설하고 있는 관계로 인하여 배수층이 규정된 두께에 미달되어 압밀지연의 원인이 되고 있다.On the other hand, the sand mat, a horizontal drainage layer, which is one of the main factors in soft ground treatment, is inevitably caused by the track of the type device, and the drainage layer is defined due to the fact that the floor load is laid without the upper stop work. It is less than the thickness and causes consolidation delay.

본 발명은 이와 같은 문제점을 해결하기 위한 것으로, 그 목적은 유압식 타입방법의 단점을 해소할 수 있는 새로운 형태의 페이퍼 드레인보드 시공방법 및 타입장치를 제공하는데 있다.The present invention has been made to solve the above problems, and an object thereof is to provide a new type of paper drainboard construction method and type device that can solve the disadvantage of the hydraulic type method.

도 1은 일반적인 페이퍼 드레인보드 타입장비를 보여주는 도면;1 is a view showing a typical paper drain board type equipment;

도 2는 도 1의 페이퍼 드레인보드 타입장치에 사용되는 케이싱 단면을 보여주는 도면;Figure 2 shows a cross section of the casing used in the paper drainboard type device of Figure 1;

도 3은 본 발명의 바람직한 실시예에 따른 페이퍼 드레인보드 타입장치를 보여주는 도면;3 shows a paper drainboard type device according to a preferred embodiment of the present invention;

도 4a 및 도 4b는 도 3에서 리이더와 케이싱을 구체적으로 설명하기 위한 도면들;4A and 4B are views for explaining the reader and the casing in FIG. 3 in detail;

도 5는 본 발명의 바람직한 다른 실시예에 따른 케이싱 단면을 보여주는 도면;5 shows a casing cross section according to another preferred embodiment of the present invention;

도 6은 본 발명의 바람직한 실시예에 따른 페이퍼 앵커플레이트를 보여주는 도면;6 shows a paper anchor plate according to a preferred embodiment of the present invention;

도 7a 및 도 7b는 본 발명의 바람직한 실시예에 따른 페이퍼 드레인보드 타입장비를 보여주는 도면이다.7A and 7B illustrate a paper drainboard type device according to a preferred embodiment of the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

10 : 페이퍼 드레인보드 타입장치20 : 동력체10: paper drain board type device 20: power body

30 : 리이더40 : 케이싱30: reader 40: casing

50 : 페이퍼 드레인보드60 : 앵커플레이트50: paper drain board 60: anchor plate

70 : 유압식 천공기80 : 천공 로드70: hydraulic drilling machine 80: drilling rod

90 : 가이더90: guider

상술한 목적을 달성하기 위한 본 발명의 특징에 의하면, 본 발명은 단단한 지반을 용이하게 관입할 수 있도록 일정한 토층까지 사전 천공한 후 관입하는 페이퍼 드레인보드 시공방법과 드레인 타입장치를 제공한다. 이와 같은 페이퍼 드레인보드 시공방법은 연약지반 상에 토사층을 형성하고, 상기 토사층 상에 배수층을 형성하여 연약지반을 개량하는 작업을 진행한다. 이 페이퍼 드레인보드 시공방법은 상기 배수층 및 토사층을 천공하는 제 1 단계 및; 상기 제 1 단계에서 천공된 상기 배수층 및 토사층을 통하여 상기 연약지반 내에 페이퍼 드레인보드를 타입하는 제 2 단계를 포함한다.According to a feature of the present invention for achieving the above object, the present invention provides a paper drainboard construction method and a drain type device to pre-drill and then penetrate to a predetermined soil layer so as to easily penetrate the solid ground. In the paper drainboard construction method, a soil layer is formed on the soft ground, and a drainage layer is formed on the soil layer to improve the soft ground. The paper drainboard construction method includes a first step of drilling the drainage layer and the soil layer; And a second step of forming a paper drain board in the soft ground through the drainage layer and the soil layer perforated in the first step.

이와 같은 본 발명에서 상기 제 2 단계 후 다음 페이퍼 드레인보드를 타입하기 위한 위치에 상기 배수층 및 토사층을 천공하는 단계가 동시에 진행될 수 있다.In the present invention as described above, the step of drilling the drainage layer and the soil layer in the position for the type of the next paper drain board after the second step can be carried out at the same time.

상술한 목적을 달성하기 위한 본 발명의 다른 특징에 의하면, 본 발명은 연약지반 위에 토사층을 형성하고, 상기 토사층 위에 배수층을 형성시켜서 연약지반을 개량하는 작업을 진행하기 위한 페이퍼 드레인보드 타입장치를 제공한다. 이 페이퍼 드레인보드 타입장치는 상기 연약지반 내로 타입되는 페이퍼 드레인보드와; 상기 페이퍼 드레인보드를 상기 연약지반 내로 타입하기 위한 중공의 케이싱과; 상기 케이싱을 지지하기 위한 리이더 및; 상기 페이퍼 드레인보드가 타입되는 위치에 상기 배수층 및 토사층을 먼저 천공하기 위한 수단을 포함한다.According to another feature of the present invention for achieving the above object, the present invention provides a paper drainboard type device for proceeding to improve the soft ground by forming a soil layer on the soft ground, a drainage layer formed on the soil layer do. This paper drain board type device includes: a paper drain board typed into the soft ground; A hollow casing to type the paper drainboard into the soft ground; A reader for supporting the casing; And means for first drilling the drainage layer and the soil layer in a position where the paper drainboard is typed.

이와 같은 본 발명에서 상기 천공수단은 상기 케이싱이 지지되는 상기 리이더에 의해서 지지될 수 있으며, 상기 천공수단은 상기 케이싱이 지지되는 리이더에 결합된 가이더에 의해서 천공 위치로 유도될 수 있다. 또, 상기 천공수단은 유압식일 수 있다. 또, 상기 가이더는 상기 케이싱과의 간격을 조절할 수 있다.In the present invention as described above, the drilling means may be supported by the leader on which the casing is supported, and the drilling means may be guided to the drilling position by a guider coupled to the reader on which the casing is supported. In addition, the drilling means may be hydraulic. In addition, the guider can adjust the distance from the casing.

이와 같은 본 발명에서 상기 케이싱은 상기 리이더에 결합되고 상기 케이싱의 외주와 같은 단면형을 갖도록 형성된 가이더상에서 작동될 수 있다.In the present invention as described above, the casing may be operated on a guider that is coupled to the reader and is formed to have a cross-sectional shape such as an outer circumference of the casing.

이와 같은 본 발명에서 상기 페이퍼 드레인보드는 사면에 하향 경사면이 형성될 수 있으며, 상기 페이퍼 드레인보드에 의해서 상기 연약지반에 삽입되는 앵커플레이트는 V형으로 형성되고, 양측을 연결하는 고리를 포함할 수 있다.In the present invention as described above, the paper drainboard may have a downward inclined surface formed on a slope, and the anchor plate inserted into the soft ground by the paper drainboard may be formed in a V shape and may include a ring connecting both sides. have.

이와 같은 본 발명에서 상기 케이싱은 외부상에 일정한 간격으로 형성되는 띠를 더 포함할 수 있다.In the present invention as described above, the casing may further include a band formed on the outside at regular intervals.

이와 같은 본 발명에 따른 페이퍼 드레인보드 타입장치는 동력체의 앞부분에 설치되는 제 1 하중 지지판 및; 상기 제 1 하중 지지판과 반대되도록 뒷부분에 설치되는 제 2 하중 지지판을 더 포함할 수 있으며, 상기 제 2 하중 지지판은 지면과 닿는 면이 평평하게 형성될 수 있다.Such a paper drainboard type device according to the present invention includes a first load supporting plate which is installed in front of the power body; The second load supporting plate may further include a second load supporting plate installed at a rear portion thereof so as to be opposite to the first load supporting plate, and the second load supporting plate may have a flat contact surface with the ground.

본 발명의 실시예는 여러 가지 형태로 변형될 수 있으며, 본 발명의 범위가 아래에서 상술하는 실시예로 인해 한정되어 지는 것으로 해석되어져서는 안 된다. 본 실시예는 당업계에서 평균적인 지식을 가진 자에게 본 발명을 보다 명확하게 설명하기 위해서 제공되어지는 것이다. 따라서, 도면에서의 요소의 형상 등은 보다 명확한 설명을 강조하기 위해서 과장되어진 것이다.The embodiments of the present invention may be modified in various forms, and the scope of the present invention should not be construed as being limited by the embodiments described below. This embodiment is provided to explain more clearly the present invention to those skilled in the art. Accordingly, the shape of the elements in the drawings and the like are exaggerated to emphasize a clearer description.

(실시예)(Example)

이하, 본 발명의 바람직한 실시예를 도 3 내지 도 7를 참조하면서 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to FIGS. 3 to 7.

도 1을 참조하면, 본 발명은 연약지반(A)상에 토사층(C)을 형성하고, 상기 토사층(C)상에 배수층(D)을 형성시켜서 연약지반(A)을 개량하는 작업을 진행하는 페이퍼 드레인보드 시공방법을 제공한다. 이와 같은 페이퍼 드레인보드 시공방법은 상기 배수층(D) 및 토사층(C)을 천공하는 제 1 단계 및; 상기 제 1 단계에서 천공된 상기 배수층(D) 및 토사층(C)을 통하여 상기 연약지반(A)내에 페이퍼 드레인보드(50)를 타입하는 제 2 단계로 이루어진다. 또, 이 페이퍼 드레인보드 시공방법은 상기 제 2 단계 후 다음 페이퍼 드레인보드(50)를 타입하기 위한 위치에 상기 배수층(D) 및 토사층(C)을 천공하는 단계가 동시에 진행되도록 한다.1, the present invention is to form a soil layer (C) on the soft ground (A), to form a drainage layer (D) on the soil layer (C) to proceed to improve the soft ground (A) Provides paper drainboard construction method. Such a paper drainboard construction method includes a first step of drilling the drainage layer (D) and the soil layer (C); The second step is to form a paper drain board 50 in the soft ground A through the drainage layer D and the soil layer C perforated in the first step. In addition, the paper drainboard construction method allows the step of drilling the drainage layer (D) and the soil layer (C) at the position for the next paper drainboard (50) after the second step to proceed simultaneously.

다시, 도 1을 참조하면, 본 발명은 연약지반(A)상에 토사층(C)을 형성하고 상기 토사층(C)상에 배수층(D)을 형성한 후 상기 연약지반(A)을 개량하는 작업을 진행하기 위한 페이퍼 드레인보드 타입장치를 제공한다. 이 페이퍼 드레인보드 타입장치는 상기 연약지반(A)내로 타입되는 페이퍼 드레인보드(50)와; 상기 페이퍼 드레인보드(50)를 상기 연약지반(A)내로 타입하기 위한 중공의 케이싱(40)과; 상기 케이싱(40)을 지지하기 위한 리이더(30) 및; 상기 페이퍼 드레인보드(50)가 타입되는 위치에 상기 배수층(D) 및 토사층(C)을 먼저 천공하기 위한 수단(70,80,90)으로 이루어진다.Again, referring to Figure 1, the present invention is to form the soil layer (C) on the soft ground (A) and to form the drainage layer (D) on the soil layer (C) to improve the soft ground (A) Provides a paper drainboard type device for proceeding. This paper drain board type device includes: a paper drain board 50 which is typed into the soft ground A; A hollow casing 40 for typing the paper drain board 50 into the soft ground A; A reader (30) for supporting the casing (40); And a means (70, 80, 90) for first drilling the drainage layer (D) and the soil layer (C) at a position where the paper drainboard (50) is typed.

이때, 상기 천공수단(70,80,90)은 상기 케이싱(40)이 지지되는 상기 리이더(30)에 의해서 지지되고, 상기 천공수단(70,80)은 상기 케이싱(40)이 지지되는 리이더(30)에 결합된 가이더(90)에 의해서 천공 위치로 유도된다. 이와 같은 천공수단은 유압식천공기(70)를 사용하여 구성될 수 있다.In this case, the drilling means (70, 80, 90) is supported by the reader 30, the casing 40 is supported, the drilling means (70, 80) is a li Guided to the drill 30 is guided to the punctured position (90). Such a drilling means may be configured using a hydraulic drilling machine (70).

한편, 도 4a 및 도 4b에서 보인 바와 같이 상기 케이싱(40)은 원통형 또는 트러스식의 상기 리이더(30)에 결합되고 상기 단면이 보강된 케이싱(40)의 외주와 같은 단면형을 갖도록 형성된 가이더(36)상에서 작동되도록 하며 동 가이더는 드레인 보드를 다축으로 동시에 타입시 케이싱의 간격 조절이 용이하도록 조절장치를 첨부한다.On the other hand, as shown in Figures 4a and 4b is a guider formed to have a cross-sectional shape, such as the outer periphery of the casing 40, the cross section is coupled to the reader 30 of the cylindrical or truss type reinforced with a cross section It is operated on (36), and the guider attaches the adjusting device to facilitate the adjustment of the casing spacing when the drain board is multi-axis type at the same time.

그리고, 도 5에서 보인 바와 같이 상기 페이퍼 드레인보드(50)는 사면에 하향 경사면(44)이 형성되도록 하고, 외부상에 일정한 간격으로 형성되는 띠(42)를 갖도록 한다. 도 6에서 보인 바와 같이 상기 페이퍼 드레인보드(50)에 의해서 상기 연약지반에 삽입되는 앵커플레이트(60)는 V형으로 형성되고, 양측을 연결하는 고리(62)를 갖도록 구성된다.As shown in FIG. 5, the paper drain board 50 has a downwardly inclined surface 44 formed on a slope and has a band 42 formed at regular intervals on the outside. As shown in FIG. 6, the anchor plate 60 inserted into the soft ground by the paper drain board 50 is formed in a V shape and configured to have a ring 62 connecting both sides thereof.

도 7a 및 도 7b는 본 발명의 바람직한 실시예에 따른 페이퍼 드레인보드 타입장치의 동력체를 보여주는 도면이다.7A and 7B are views illustrating a power body of a paper drainboard type device according to a preferred embodiment of the present invention.

도 7a 및 도 7b를 참조하면, 동력체(20)의 앞부분에 설치되는 제 1 하중 지지판(22) 및; 상기 제 1 하중 지지판(22)과 반대되도록 뒷부분에 설치되는 제 2 하중 지지판(24)을 갖는다. 이때, 상기 제 2 하중 지지판(24)은 지면과 닿는 면이 평평하게 형성된다.7a and 7b, the first load supporting plate 22 is installed in the front of the power body 20; It has a 2nd load support plate 24 provided in the back part so that it may be opposite to the said 1st load support plate 22. As shown in FIG. At this time, the second load supporting plate 24 is formed in a flat contact with the ground.

상술한 바와 같은, 본 발명의 바람직한 실시예에 따른 페이퍼 드레인보드 시공방법 및 타입장치의 구성 및 동작을 상기한 설명 및 도면에 따라 도시하였지만, 이는 예를 들어 설명한 것에 불과하며 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경이 가능하다는 것을 이 분야의 통상적인 기술자들은 잘 이해할 수 있을 것이다.Although the configuration and operation of the paper drainboard construction method and type device according to the preferred embodiment of the present invention as described above are shown in accordance with the above description and drawings, this is merely an example and the technical spirit of the present invention is described. Those skilled in the art will appreciate that various changes and modifications can be made without departing.

이와 같은 본 발명에 의하면, 케이싱의 관입이 어려운 연약지반 상단부의 배수층 및 토사층을 사전에 천공하고, 케이싱의 저부단면을 조정하여 케이싱의 관입저항을 최소화함으써 스미어존(smear zone)을 최소화하고 케이싱의 직선도 유지 및 동일 관입에너지로 1공이상의 드레인을 동시에 타입하는 것이 가능하게 되어 경제적 시공과 압밀효과의 극대화를 기할 수 있다.According to the present invention, the drainage layer and the earth and sand layer of the upper soft ground difficult to penetrate the casing in advance, and by adjusting the bottom end surface of the casing to minimize the penetration resistance of the casing to minimize the smear zone (casme zone) and the casing It is possible to simultaneously maintain the straightness of and to drain more than one hole with the same intrusive energy at the same time to maximize the economic construction and consolidation effect.

Claims (10)

연약지반(A)상에 토사층(C)을 형성하고, 상기 토사층(C)상에 배수층(D)을 형성시켜서 연약지반(A)을 개량하는 작업을 진행하는 페이퍼 드레인보드 시공방법에 있어서,In the paper drain board construction method of forming a soil layer (C) on the soft ground (A), the drainage layer (D) is formed on the soil layer (C) to improve the soft ground (A), 상기 배수층(D) 및 토사층(C)을 천공하는 제 1 단계 및;A first step of drilling the drainage layer (D) and the soil layer (C); 상기 제 1 단계에서 천공된 상기 배수층(D) 및 토사층(C)을 통하여 상기 연약지반(A)내에 페이퍼 드레인보드(50)를 타입하는 제 2 단계를 포함하는 일축이상 동시 타입이 가능한 것을 특징으로 하는 페이퍼 드레인보드 시공방법.Simultaneous type of at least one axis including a second step of forming a paper drain board 50 in the soft ground (A) through the drainage layer (D) and the soil layer (C) perforated in the first step is possible. Paper drain board construction method. 제 1 항에 있어서,The method of claim 1, 상기 제 2 단계 후 다음 페이퍼 드레인보드(50)를 타입하기 위한 위치에 상기 배수층(D) 및 토사층(C)을 천공하는 단계가 일축이상 동시타입이 가능한 것을 특징으로 하는 페이퍼 드레인보드 시공방법.And the step of drilling the drainage layer (D) and the soil layer (C) at a position for typing the next paper drainboard (50) after the second step is possible at least one simultaneous type. 연약지반(A)상에 토사층(C)을 형성하고 상기 토사층(C)상에 배수층(D)을 형성한 후 상기 연약지반(A)을 개량하는 작업을 진행하기 위한 페이퍼 드레인보드 타입장치에 있어서,In the paper drainboard type device for forming the soil layer (C) on the soft ground (A), and the drainage layer (D) on the soil layer (C) to improve the soft ground (A) in progress , 상기 연약지반(A)내로 타입되는 페이퍼 드레인보드(50)와;A paper drain board 50 which is typed into the soft ground A; 상기 페이퍼 드레인보드(50)를 상기 연약지반(A)내로 타입하기 위한 중공의 케이싱(40)과;A hollow casing 40 for typing the paper drain board 50 into the soft ground A; 상기 케이싱(40)을 지지하기 위한 리이더(30) 및;A reader (30) for supporting the casing (40); 상기 페이퍼 드레인보드(50)가 타입되는 위치에 상기 배수층(D) 및 토사층(C)을 먼저 천공하기 위한 수단을 포함하는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.And a means for first drilling the drainage layer (D) and the earth and sand layer (C) at a position where the paper drainboard (50) is typed. 제 3 항에 있어서,The method of claim 3, wherein 상기 천공수단은 상기 케이싱(40)이 지지되는 리이더(30)에 결합된 가이더(90)에 의해서 천공 위치로 유도되어 유압식으로 천공되는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The drilling means is a paper drainboard type device, characterized in that the guided by the guider (90) coupled to the reader (30) on which the casing (40) is supported to be drilled hydraulically. 제 3 항에 있어서,The method of claim 3, wherein 상기 케이싱(40)은 상기 리이더(30)에 결합되고 상기 케이싱(40)의 외주와 같은 단면형을 갖도록 형성된 가이더(36)상에 가이더는 한공 이상의 케이싱을 동시에 타입시 상기 각 케이싱과의 간격을 조절할 수 있는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The casing 40 is coupled to the reader 30 and formed on the guider 36 formed to have the same cross-sectional shape as the outer circumference of the casing 40. Paper drainboard type device, characterized in that the adjustable. 제 3 항에 있어서,The method of claim 3, wherein 상기 페이퍼 드레인보드(50)는 사면에 하향 경사면(44)이 형성되는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The paper drain board (50) is a paper drain board type device, characterized in that the downward inclined surface 44 is formed on the slope. 제 3 항 또는 제 6 항에 있어서,The method according to claim 3 or 6, wherein 상기 페이퍼 드레인보드(50)에 의해서 상기 연약지반에 삽입되는 앵커플레이트(60)는 V형으로 형성되고, 양측을 연결하는 고리(62)를 포함하는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The anchor plate (60) inserted into the soft ground by the paper drain board (50) is formed in a V-type, paper drainboard type device, characterized in that it comprises a ring (62) connecting both sides. 제 3 항에 있어서,The method of claim 3, wherein 상기 케이싱(40)은 외부상에 일정한 간격으로 형성되는 띠(42)를 더 포함하는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The casing 40 further comprises a strip 42 formed on the outside at regular intervals. 제 3 항에 있어서,The method of claim 3, wherein 앞부분에 설치되는 제 1 하중 지지판(22) 및;A first load supporting plate 22 installed at the front part; 상기 배수층 정지작업을 겸한 제 1 하중 지지판(22)과 반대되도록 뒷부분에 설치되는 제 2 하중 지지판(24)을 더 포함하는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.Paper drainboard type device, characterized in that further comprising a second load supporting plate (24) installed at the rear portion to be opposed to the first load supporting plate (22) serving as the drainage layer stop operation. 제 5 항에 있어서,The method of claim 5, 상기 가이더(36)는 한공 이상의 케이싱을 동시 관입시 상기 각 케이싱과의 간격을 조절할 수 있는 것을 특징으로 하는 페이퍼 드레인보드 타입장치.The guider (36) is a paper drainboard type device, characterized in that can be adjusted to the gap with each of the casing at the same time injecting more than one casing.
KR10-2001-0020842A 2001-04-18 2001-04-18 Paper drain board building method and stitcher for more double hole Expired - Fee Related KR100417217B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0020842A KR100417217B1 (en) 2001-04-18 2001-04-18 Paper drain board building method and stitcher for more double hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0020842A KR100417217B1 (en) 2001-04-18 2001-04-18 Paper drain board building method and stitcher for more double hole

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010011075U Division KR200240004Y1 (en) 2001-04-18 2001-04-18 Paper drain board building method and stitcher for more double hole

Publications (2)

Publication Number Publication Date
KR20020081507A true KR20020081507A (en) 2002-10-28
KR100417217B1 KR100417217B1 (en) 2004-02-05

Family

ID=27701593

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0020842A Expired - Fee Related KR100417217B1 (en) 2001-04-18 2001-04-18 Paper drain board building method and stitcher for more double hole

Country Status (1)

Country Link
KR (1) KR100417217B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542081A (en) * 2017-08-29 2018-01-05 中冶集团武汉勘察研究院有限公司 The installation method of a kind of deep yard drain plate that rockfills and for the hole-forming device in this method
CN109252433A (en) * 2018-08-16 2019-01-22 温州大学 Method soft soil foundation intensive treatment construction and reinforce soft soil foundation foundation pit

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100749119B1 (en) 2006-09-12 2007-08-13 주식회사 도담이앤씨 Paper Drain Board Fixing Device for Soft Ground Improvement
KR100950067B1 (en) * 2009-08-26 2010-03-26 주식회사 신아건설산업 The casing stroking device for drain board

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542081A (en) * 2017-08-29 2018-01-05 中冶集团武汉勘察研究院有限公司 The installation method of a kind of deep yard drain plate that rockfills and for the hole-forming device in this method
CN107542081B (en) * 2017-08-29 2020-01-31 中冶集团武汉勘察研究院有限公司 method for installing drainage plate of deep stone-filling site and hole-forming device used in the method
CN109252433A (en) * 2018-08-16 2019-01-22 温州大学 Method soft soil foundation intensive treatment construction and reinforce soft soil foundation foundation pit

Also Published As

Publication number Publication date
KR100417217B1 (en) 2004-02-05

Similar Documents

Publication Publication Date Title
EP2064392A1 (en) Soil guard structure and establishment method
KR20190052284A (en) Self reliance earth retaining construction method having prestress introduced of Double I Beam
JPH07217226A (en) Reinforcement method for reinforced concrete floor slabs
KR100417217B1 (en) Paper drain board building method and stitcher for more double hole
KR20110029454A (en) Reinforcement structure of the lower base of pillar used for reverse drilling method
CN1405409A (en) Foundation pit side-wall flexible support method
KR200240004Y1 (en) Paper drain board building method and stitcher for more double hole
EP0803613B1 (en) Method for placing a wall in the soil
KR200496837Y1 (en) Foundation structure for fixing wire mesh fence columns
KR101790249B1 (en) Stone net structure using stone net fixing member
CN204940303U (en) A kind of large rigidity foundation pit supporting pile
KR100467282B1 (en) Drainage structure for basic improvement of soil of construction using vertical drainage member
KR100568988B1 (en) Structure of retaining wall using slide panel and installation method
KR100503871B1 (en) Device for strengthening retaining board
KR20120049602A (en) Temporary retaining wall and constructing method thereof
KR100699726B1 (en) Core material of drain board
JP2007332589A (en) How to move the excavator on the frame
KR101300281B1 (en) Steel plate insertion device and method by using auger sticking vibro-hammer
CN103806443B (en) A kind of pile tube for ground minor installation and manufacture method thereof
KR100660482B1 (en) 케이 Casing type device for drain type
KR102743537B1 (en) Repair method for noise removal on the floor of the underground parking lot
KR102193932B1 (en) Vertical drainage penetration device equipped with air injection means and penetration method
JP3293796B2 (en) Pile driver
JP3648670B2 (en) Seismic isolation device installation method for existing foundation deep piles
KR200253343Y1 (en) Vertical drain construction apparatus

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20010418

PA0201 Request for examination
PG1501 Laying open of application
E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20031020

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20040119

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20040120

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
PR1001 Payment of annual fee

Payment date: 20061211

Start annual number: 4

End annual number: 4

PR1001 Payment of annual fee

Payment date: 20080114

Start annual number: 5

End annual number: 5

PR1001 Payment of annual fee

Payment date: 20090113

Start annual number: 6

End annual number: 6

PR1001 Payment of annual fee

Payment date: 20100112

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 20110110

Start annual number: 8

End annual number: 8

PR1001 Payment of annual fee

Payment date: 20120110

Start annual number: 9

End annual number: 9

FPAY Annual fee payment

Payment date: 20130111

Year of fee payment: 10

PR1001 Payment of annual fee

Payment date: 20130111

Start annual number: 10

End annual number: 10

FPAY Annual fee payment

Payment date: 20140120

Year of fee payment: 11

PR1001 Payment of annual fee

Payment date: 20140120

Start annual number: 11

End annual number: 11

FPAY Annual fee payment

Payment date: 20150119

Year of fee payment: 12

PR1001 Payment of annual fee

Payment date: 20150119

Start annual number: 12

End annual number: 12

FPAY Annual fee payment

Payment date: 20160219

Year of fee payment: 13

PR1001 Payment of annual fee

Payment date: 20160219

Start annual number: 13

End annual number: 13

FPAY Annual fee payment

Payment date: 20170217

Year of fee payment: 14

PR1001 Payment of annual fee

Payment date: 20170217

Start annual number: 14

End annual number: 14

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20181030