[go: up one dir, main page]

KR200193629Y1 - Tube supply device for filing machine - Google Patents

Tube supply device for filing machine Download PDF

Info

Publication number
KR200193629Y1
KR200193629Y1 KR2020000004010U KR20000004010U KR200193629Y1 KR 200193629 Y1 KR200193629 Y1 KR 200193629Y1 KR 2020000004010 U KR2020000004010 U KR 2020000004010U KR 20000004010 U KR20000004010 U KR 20000004010U KR 200193629 Y1 KR200193629 Y1 KR 200193629Y1
Authority
KR
South Korea
Prior art keywords
molding tube
molding
tube
length
pressing arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR2020000004010U
Other languages
Korean (ko)
Inventor
노희옥
Original Assignee
노희옥
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노희옥 filed Critical 노희옥
Priority to KR2020000004010U priority Critical patent/KR200193629Y1/en
Application granted granted Critical
Publication of KR200193629Y1 publication Critical patent/KR200193629Y1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42CBOOKBINDING
    • B42C1/00Collating or gathering sheets combined with processes for permanently attaching together sheets or signatures or for interposing inserts
    • B42C1/10Machines for both collating or gathering and interposing inserts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B42BOOKBINDING; ALBUMS; FILES; SPECIAL PRINTED MATTER
    • B42FSHEETS TEMPORARILY ATTACHED TOGETHER; FILING APPLIANCES; FILE CARDS; INDEXING
    • B42F13/00Filing appliances with means for engaging perforations or slots
    • B42F13/12Filing appliances with means for engaging perforations or slots with pillars, posts, rods, or tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

본 고안은 적층된 다수의 인쇄물 또는 서류 등과 같은 지편을 하나로 묶어 제본하는 제본기의 몰딩튜브 공급장치에 관한 것이다.The present invention relates to a molding tube supply apparatus of a bookbinding machine for binding a plurality of stacked pieces such as a plurality of printed matter or documents into one.

본 고안의 목적은 적층된 다수의 지편 두께에 따른 적정 길이의 몰딩튜브를 자동으로 절단하여 공급하도록 하고, 또한, 상기한 몰딩튜브의 절단, 공급과정이 상기 지편의 천공작업과 동시적으로 작동되므로 작업성 및 생산성을 향상시키는데있다.An object of the present invention is to automatically cut and supply a molding tube of a suitable length according to the thickness of a plurality of stacked pieces, and also, because the cutting, supply process of the molding tube is operated simultaneously with the punching operation of the paper piece. To improve workability and productivity.

이러한 본 고안은 이송모터(M3)에 의해 몰딩튜브(5)를 이송안내하는 안내롤(32)과, 그 하부로 상기 몰딩튜브(5)를 삽입,지지하는 튜브가이드핀(35)과, 상기 몰딩튜브(5)를 커팅하는 커터(40) 및 상기 튜브가이드핀(35)의 일측으로 이에 삽입되는 몰딩튜브(5)를 지지하는 길이조절플레이트(36)로 구성하되, 상기 길이조절플레이트(36)는 천공수단(10)의 프레싱암(12)과 와이어(W)로 연결되어 상기 프레싱암(12)이 적층된 지편(2)의 두께에 따라 승하강함과 동시에 상기 길이조절플레이트(36)가 대응되게 승하강작동하면서 몰딩튜브(5)의 절단길이를 자동 조절하도록 이루어지므로 상기 천공작업과 동시에 몰딩튜브의 절단, 공급이 이루어지고, 상기 몰딩튜브는 상기 적층된 지편의 두께에 몰딩여유를 더한 길이로 작동설정되어 공급되기 때문에 그 작업성 및 생산성 향상의 효과를 갖게 되는 것이다.The present invention is a guide roll 32 for guiding the molding tube (5) by the transfer motor (M3), tube guide pins (35) for inserting and supporting the molding tube (5) below, and the Composed of a cutter 40 for cutting the molding tube (5) and the length adjustment plate 36 for supporting the molding tube (5) inserted into it to one side of the tube guide pin (35), the length adjustment plate 36 ) Is connected to the pressing arm 12 and the wire (W) of the punching means 10 so that the length adjusting plate 36 ascends and descends according to the thickness of the paper piece 2 in which the pressing arm 12 is stacked. Correspondingly raising and lowering operation is made to automatically adjust the cutting length of the molding tube (5), so that the cutting and supply of the molding tube at the same time as the punching operation is made, the molding tube is added to the thickness of the laminated piece plus molding margin Increased workability and productivity because it is supplied and operated in length Will have the effect.

Description

제본기의 몰딩튜브 공급장치{TUBE SUPPLY DEVICE FOR FILING MACHINE}Molding tube feeding device of bookbinding machine {TUBE SUPPLY DEVICE FOR FILING MACHINE}

본 고안은 적층된 다수의 인쇄물 또는 서류 등과 같은 지편을 하나로 묶어 제본하는 제본기에 관한 것으로서, 좀더 상세하게는 다수의 지편에 구멍을 뚫는 천공과정과, 몰딩튜브의 절단과정, 상기 절단된 몰딩튜브를 적층된 지편의 구멍에 삽입시켜 몰딩성형하여 하나로 묶는 과정을 효과적으로 수행하는 제본기의 몰딩튜브공급장치에 관한 것이다.The present invention relates to a bookbinding machine for binding a plurality of pieces such as stacked printed matter or documents into one, more specifically, a punching process of punching holes in a plurality of pieces, a cutting process of the molding tube, the cut molding tube The present invention relates to a molding tube supplying apparatus for a bookbinding machine, which inserts into a hole of a laminated sheet and performs molding molding to effectively bind the bundles together.

일반적으로 다수의 인쇄물이나 서류 등과 같은 지편을 제본하는 방법으로 일측면에 접착제를 도포하여 하나로 묶는 방법과 적층된 지편에 구멍을 뚫고 링을 연결하여 하나로 묶는 방법이 주로 사용되고 있다.In general, a method of binding multiple pieces of printed matter or documents, etc., is mainly used by applying an adhesive on one side and binding them together, and a method of tying one piece by punching holes and connecting rings in the stacked pieces.

전자의 경우는 상기 다수의 지편을 단순히 접착제에 의해 묶게 되기 때문에 낱장의 지편이 분리되는 문제가 있고,In the former case, since the plurality of pieces of paper are simply bundled by an adhesive, there is a problem that the pieces of paper are separated.

후자의 경우는 상기 지편이 링에 끼워지는 형태로 지편의 유동이 많게 되어 견고한 상태로 묶는 것이 곤란하고, 이로 인해 상기 낱장의 지편이 그 구멍부위가 찢어지면서 분리되는 문제가 있게 된다.In the latter case, it is difficult to bundle the paper pieces in a state in which the paper pieces are inserted into the ring, so that the paper pieces are rigid, and this causes the paper pieces of the sheet to be separated while the hole parts thereof are torn.

이러한 문제를 해결하고자 실용신안공보 제84-2041호에서는 상기 다수의 지편에 구멍을 뚫고, 이에 수지재의 철심을 삽입하여 그 상하부를 열변형으로 확대시켜 다수의 지편을 하나로 묶도록 하므로 다수의 지편을 견고하게 제본하도록 하였다.In order to solve such a problem, Utility Model Publication No. 84-2041 drills holes in the plurality of pieces, inserts iron cores of resin material, expands the upper and lower parts thereof by thermal deformation, and binds the plurality of pieces together. Firmly binding.

그러나 이러한 장치는 상기 지편에 구멍을 뚫는 과정에서 적층된 다수의 지편의 두께에 따라 드릴의 승하강작동을 적절히 조절하는 것이 곤란하여 하부에 위치하는 지편에 천공이 이루어지지 않거나 필요이상으로 드릴이 하강하면서 지편의 천공작업을 수행하므로 작업상의 큰 불편함을 갖고 있었다.However, such a device is difficult to properly adjust the operation of raising and lowering the drill according to the thickness of a plurality of laminated paper stacks in the process of drilling holes in the paper, so that the lower paper is not drilled or drilled more than necessary While carrying out the drilling work of the paper had a great inconvenience in the work.

또한, 상기 드릴의 천공작업을 위해서는 다수의 지편을 별도의 조임수단에 의한 지지하는 작동이 요구되어 작업성이 떨어지는 문제를 갖고 있었다.In addition, in order to drill the drill, an operation of supporting a plurality of pieces by a separate fastening means is required, which has a problem of poor workability.

또한, 상기한 장치는 상기 적층된 지편에 천공된 구멍으로 수지재의 철심을 삽입하기 위한 과정과 이 철심의 몰딩위치로의 이동을 수작업으로 별도로 수행하게 되고, 상기 지편의 구멍으로 삽입된 철심은 그 삽입 후, 이를 별도의 과정으로 지편의 두께에 따라 필요한 길이로 절단하여주는 과정이 요구되는 등의 작업상의 불편한 문제점을 갖고 있었다.In addition, the apparatus is to perform a process for manually inserting the iron core of the resin material into a hole punched in the laminated piece and the movement of the iron core to the molding position manually by hand, the iron core inserted into the hole of the piece After the insertion, it had a problem inconvenient, such as the process of cutting it to the required length according to the thickness of the paper pieces as a separate process.

또한, 상기한 철심의 길이를 적정길이로 제공하지 못함과, 철심의 상하부에서 성형하는 위치가 일정하지 못하므로 인해 제품의 불량율이 높아 그 경제적 손실이 큰 문제점을 갖고 있었다.In addition, the length of the iron core does not provide the proper length, and because the position of the molding in the upper and lower parts of the iron core is not fixed, the defect rate of the product is high, the economic loss has a big problem.

본 고안은 상기한 종래기술이 갖는 제반 문제점을 해결하고자 안출된 것으로서, 적층된 다수의 지편에 구멍을 천공하고, 상기 적층된 지편의 두께에 따라 자동으로 몰딩 튜브를 적정길이로 절단한 후, 상기 절단된 몰딩튜브를 지편의 구멍에 삽입하여 몰딩성형하므로 하나로 묶는 제본기를 제공하고자 한다.The present invention has been made to solve the above-mentioned problems of the prior art, the perforated holes in a plurality of laminated pieces, and automatically cut the molding tube to the appropriate length according to the thickness of the laminated pieces, the Since the molded molding tube is inserted into the hole of the sheet and molded to provide a binding device to bind together.

본 고안은 상기 제본기에 있어 적층된 다수의 지편 두께에 따른 적정 길이의 몰딩튜브를 자동으로 절단하여 공급하도록 하는데 그 목적이 있다.An object of the present invention is to automatically cut and supply a molding tube of a suitable length according to the thickness of a plurality of pieces laminated in the bookbinding machine.

또한, 상기한 몰딩튜브의 절단, 공급과정이 상기한 천공작업과 동시적으로 작동되므로 작업성 및 생산성을 향상시키도록 하는데 그 목적이 있다.In addition, the cutting and supplying process of the molding tube is operated at the same time as the above drilling operation is to improve the workability and productivity.

도 1은 본 고안의 제본기를 보여주는 외관도,1 is an external view showing a bookbinding machine of the present invention,

도 2는 본 고안의 장치에 따른 제본 과정을 보여주는 공정도,2 is a process chart showing a bookbinding process according to the device of the present invention,

도 3은 본 고안의 천공수단 및 몰딩튜브 절단수단을 보여주는 구성도,Figure 3 is a block diagram showing the drilling means and molding tube cutting means of the present invention,

도 4는 도 3의 작동상태도,4 is an operating state of FIG.

도 5 및 도 6은 본 고안의 프레싱암의 조작관계를 보여주는 측면도로서,5 and 6 are side views showing the operating relationship of the pressing arm of the present invention,

도 5는 프레싱암 지지상태이고,5 is a pressing arm supported state,

도 6은 프레싱암 해제상태이다.6 is a pressing arm released state.

도 7은 본 고안의 드럼캠과 중심캠의 작동을 보여주는 개념도,7 is a conceptual diagram showing the operation of the drum cam and the center cam of the present invention,

도 8은 본 고안의 몰딩성형수단을 보여주는 평면상태의 구성도,8 is a configuration of a planar state showing the molding means of the present invention,

도 9는 도 8의 작동상태도,9 is an operating state of Figure 8,

도 10은 본 고안의 몰딩성형수단을 보여주는 측면상태의 구성도,10 is a configuration of the side view showing the molding means of the present invention,

도 11은 도 10의 작동상태도.11 is an operating state of FIG.

〈도면의 주요 부분에 대한 부호의 설명〉<Explanation of symbols for main parts of drawing>

5: 몰딩튜브 7: 베이스판 10: 천공수단5: molding tube 7: base plate 10: drilling means

11,11': 샤프트 12: 프레싱암 15,15': 압축스프링11,11 ': Shaft 12: Pressing arm 15,15': Compression spring

18: 지지부 20: 플레이트 22: 작동바 23: 탄발스프링18: support 20: plate 22: operating bar 23: ball spring

25: 지지바 30: 몰딩튜브절단수단 32: 안내롤25: support bar 30: molding tube cutting means 32: guide roll

35: 튜브가이드핀 36: 길이조절플레이트35: tube guide pin 36: length adjustment plate

50: 몰딩성형수단 51: 캠축 52: 중심캠50: molding molding means 51: camshaft 52: center cam

54: 드럼캠 54a: 승하강안내로 55: 작동자54: drum cam 54a: descent guide 55: operator

58: 작동샤프트 60: 하부 히터부 62: 가이드풀리58: operation shaft 60: lower heater 62: guide pulley

63: 작동롤 65: 가이드롤 66: 가이드플레이트63: operating roll 65: guide roll 66: guide plate

70: 상부히터부70: upper heater

이하, 상기한 본 고안을 이루기 위한 바람직한 실시예를 첨부도면을 참조하여 구체적으로 살펴보기로 한다.Hereinafter, with reference to the accompanying drawings a preferred embodiment for achieving the present invention will be described in detail.

즉, 본 고안의 제본기는 적층된 다수의 지편(2)에 구멍(2')을 천공하는 천공수단(10)과, 상기 적층된 다수의 지편(2) 두께에 따라 몰딩튜브(5)를 적정 길이로 자동 절단하는 몰딩튜브 절단수단(30) 및 상기 몰딩튜브 절단수단(30)에 의해 절단된 몰딩튜브(5)를 지편(2)의 구멍(2')에 삽입하여 몰딩성형하므로 다수의 지편(2)을 하나로 묶는 몰딩성형수단(50)으로 이루어진다.That is, the bookbinding machine of the present invention titrates the molding tube 5 according to the punching means 10 for drilling the holes 2 'in the plurality of stacked pieces 2 and the thickness of the stacked pieces 2. Molding tube cutting means 30 for automatic cutting to length and the molding tube 5 cut by the molding tube cutting means 30 is inserted into the hole (2 ') of the paper piece (2) molding molding, so many pieces It consists of molding means 50 for tying (2) into one.

상기 천공수단(10)은 도 3 및 도 4에 도시된 바와 같이, 베이스판(7)의 상부로 하부에 드릴(M1-1)을 구비한 천공모터(M1)와 프레싱암(12)이 샤프트(11)(11)상에 설치되고, 상기 천공모터(M1)는 일측에 설치된 레크기어(13)가 승하강모터(M2)의 축상에 설치된 피치언기어(M2-1)와 치합되어 승하강작동하되, 상기 샤프트(11)(11)상에는 천공모터(M1)와 프레싱암(12), 프레싱암(12)의 하부로 각각 압축스프링(15)(15')을 구비하여서 천공모터(M)의 승하강시 프레싱암(12)이 탄발적으로 승하강작동하면서 적층된 다수의 지편(2)을 가압 지지하도록 이루어진다.As shown in FIGS. 3 and 4, the drilling means 10 includes a drilling motor M1 and a pressing arm 12 having a drill M1-1 at a lower portion of the base plate 7. (11) (11), the perforated motor (M1) is raised and lowered by meshing with the pitch gear (M2-1) installed on the shaft of the lifting motor (M2), the rack gear 13 installed on one side It operates, but the drilling motor (M) is provided with a compression spring (15, 15 ') in the lower portion of the punching motor (M1), the pressing arm 12, the pressing arm (12) on the shaft (11) (11), respectively. During the lifting of the pressing arm 12 is made to press and support a plurality of stacked pieces (2) while operating the elevating operation.

이때, 상기 베이스판(7)상에는 천공모터(M1)의 드릴(M1-1) 하부 위치로 고무판(18a)을 갖는 지지부(18)를 설치하되, 상기 고무판(18a)에는 검출부(미도시)를 연결하여 상기 드릴(M1-1)의 접촉을 검출하여 승하강모터(M2)의 승하강작동을 제어하게 된다.At this time, a support portion 18 having a rubber plate 18a is installed on the base plate 7 at a lower position of the drill M1-1 of the drilling motor M1, and a detection unit (not shown) is provided on the rubber plate 18a. By connecting to detect the contact of the drill (M1-1) to control the lifting operation of the lifting motor (M2).

상기 몰딩튜브 절단수단(30)은 도 3 내지 도 4에 도시된 바와 같이, 이송모터(M3)의 축상에 설치되어 몰딩튜브(5)를 이송안내하는 안내롤(32)과, 그 하부로 상기 이송안내되는 몰딩튜브(5)를 삽입하여 지지하는 하부 히터부(60)상의 튜브가이드핀(35)과, 상기 몰딩튜브(5)를 커팅하는 커터(40) 및 상기 튜브가이드핀(35)의 일측으로 이에 삽입되는 몰딩튜브(5)를 지지하는 길이조절플레이트(36)로 구성하되, 상기 길이조절플레이트(36)는 그 일측 하단이 탄발스트링(37)에 탄발지지되고, 상단은 천공수단(10)의 프레싱암(12)과 와이어(W)로 연결되어 상기 프레싱암(12)이 적층된 지편(2)의 두께에 따라 승하강함과 동시에 상기 길이조절플레이트(36)가 대응되게 승하강작동하면서 몰딩튜브(5)의 절단길이를 자동 조절하도록 이루어진다.The molding tube cutting means 30 is installed on the shaft of the transfer motor M3, as shown in Figure 3 to 4, a guide roll 32 for guiding the molding tube (5) and the lower portion thereof The tube guide pin 35 on the lower heater unit 60 inserting and supporting the molding tube 5 to be transported, and the cutter 40 and the tube guide pin 35 cutting the molding tube 5. It consists of a length adjustment plate 36 for supporting the molding tube (5) is inserted into it on one side, the length adjustment plate 36 is one side of the lower end is supported on the ball shot string 37, the upper end is punched means ( It is connected by the pressing arm 12 and the wire (W) of 10) and ascend and descend according to the thickness of the paper piece 2 on which the pressing arm 12 is stacked, and at the same time, the length adjusting plate 36 is moved up and down correspondingly. While being made to automatically adjust the cutting length of the molding tube (5).

이때, 상기 커터(40)와 길이조절플레이트(36)사이의 몰딩튜브(5) 길이는 적층된 지편의 두께(T)에 몰딩을 위한 여유길이(a)(보통은 11mm-12mm정도)를 더한 길이로 형성하게 된다.At this time, the length of the molding tube (5) between the cutter 40 and the length adjustment plate 36 is added to the thickness (T) of the laminated paper pieces plus an extra length (a) (usually about 11mm-12mm) for molding. It will be formed in length.

상기 몰딩성형수단(50)은 도 7 내지 도 11에 도시된 바와 같이, 감속모터(M4)에 의해 회전작동하는 캠축(51)상에 일측 외주연으로 요홈(52a)을 형성한 중심캠(52)과 외주면을 따라 승하강안내로(54a)를 형성하는 드럼캠(54)을 설치하고,As shown in FIGS. 7 to 11, the molding shaping means 50 has a center cam 52 having a groove 52a formed at one outer circumference on a cam shaft 51 that is rotated by the reduction motor M4. ) And the drum cam 54 to form the elevating guide path (54a) along the outer circumferential surface,

상기 중심캠(52)의 일측에 그 외주연을 따라 안내되는 작동자(55)와, 상기 작동자(55)가 캠작동함에 따라 전후 회동작동하는 링크(56)(56')와, 상기 링크(56)(56')와 로드(57)로 일측이 연결되어 회전작동하는 작동샤프트(58)와, 상기 작동샤프트(58)의 타측과 완충스프링(S)에 의해 탄발적으로 회동작동하는 가이드풀리(62)에 와이어(W2)로 연결하여 상기 가이드풀리(62)에 의해 일정 각도 회동작동하고, 일측에 작동롤(63)을 갖는 하부 히터부(60)를 연계작동하도록 구성하되,An operator 55 guided along one of the center cams 52 along its outer circumference, and links 56 and 56 'that are rotated back and forth as the operator 55 cams, and the link (56) (56 ') and the rod (57) is connected to one side of the operation shaft 58 and the rotational operation, and the other side of the operation shaft 58 and the guide that is elastically rotated by the buffer spring (S) Is connected to the pulley 62 by a wire (W2) by rotating the angle by the guide pulley 62, and configured to operate in conjunction with the lower heater unit 60 having an operation roll 63 on one side,

상기 하부 히터부(60)는 일측의 작동롤(63)이 드럼캠(54)의 승하강안내로(54a)를 따라 안내되면서 승하강작동하게 되고,The lower heater unit 60 is operated by the operation roll 63 of one side is guided along the elevating guide path (54a) of the drum cam 54, the elevating operation,

상기 작동샤프트(58)의 상단에는 지지부(18)와 그 상부에 프레싱암(12)에 의해 승하강작동하되 작동링크(68)로 연결된 상부 히터부(70)를 각각 구비하되, 상기 작동샤프트(58)의 회동작동에 따라 상기 지지부(18)와 상부 히터부(70)가 상호 역방향으로 전후진하도록 이루어진다.The upper end of the operation shaft 58 is provided with an upper heater unit 70 connected to the operation link 68 by lifting and lowering operation by the pressing arm 12 on the support 18 and the upper, respectively, the operation shaft ( According to the rotation operation of the 58, the support 18 and the upper heater 70 is made to move forward and backward in mutual directions.

이때, 상기 상,하부 히터부(60)(70)는 다수의 지편(2)에 천공되는 구멍(2')과 수직상하부에 위치하도록 작동된다.At this time, the upper and lower heaters 60 and 70 are operated to be positioned in the vertical portion and the hole (2 ') perforated in the plurality of pieces (2).

또한, 상기 하부 히터부(60)는 일측의 가이드롤(65)을 구비하여 승하강시 상기 가이드롤(65)이 가이드플레이트(66)를 따라 일정하게 승하강작동하게 된다.In addition, the lower heater unit 60 is provided with a guide roll 65 on one side, and the guide roll 65 moves up and down uniformly along the guide plate 66 during the ascending and descending.

한편, 도 5 및 도 6은 프레싱암(12)을 지지, 해지하는 구성을 보여주는 것으로서, 베이스판(7)의 브라켓(8)상에 힌지결합된 플레이트(20)의 걸림공(21)에 상기 프레싱암(12)의 하부로 돌출된 스톱바(12a)가 삽입되고, 상기 플레이트(20)의 전방측으로는 상단에 걸림돌기(22a)를 형성하고 플레이트(20)와 베이스판(7)의 사이로 플레이트(20)를 상부로 경사지게 미는 탄발스프링(23)을 갖는 작동바(22)가 삽입설치되며, 상기 작동바(22)의 하단은 드럼캠(54)의 돌기캠(54b)에 의해 회동작동하면서 상기 작동바(22)를 승하강조절하는 연결바(24)와 연결구성하여 상기 돌기캠(54b)의 캠작동에 의해 플레이트(20)를 수평이나 상방향으로 탄발적으로 조절하면서 프레싱암(12)을 지지,해제하게 된다.On the other hand, Figures 5 and 6 show the configuration to support and release the pressing arm 12, the hook hole 21 of the plate 20 hinged on the bracket (8) of the base plate (7) A stop bar 12a protruding into the lower portion of the pressing arm 12 is inserted, and a locking protrusion 22a is formed at an upper end of the plate 20 in front of the plate 20 and between the plate 20 and the base plate 7. An operation bar 22 having an elastic spring 23 for pushing the plate 20 upwardly is inserted and installed, and a lower end of the operation bar 22 is rotated by the projection cam 54b of the drum cam 54. While connecting to the connecting bar 24 for raising and lowering the operation bar (22) while adjusting the plate 20 by the cam operation of the projection cam (54b) while pressing the pressing arm (horizontally or upwardly) 12) to support and release.

미설명부호로서, 19는 천공모터(M1)가 천공작업 후 상승시를 검출하여 천공모터(M1)의 작동은 정지시키고, 감속모터(M4)의 작동을 행하도록 전화시키는 검출자, 25는 플레이트(20)를 수평으로 지지하는 지지바, 26은 릴리이스 버튼, 11a는 프레싱암(12)의 승강을 제한하는 돌기를 나타내는 것이다.As an unexplained symbol, 19 denotes a detector which detects when the puncture motor M1 rises after the puncture operation, stops the operation of the puncture motor M1, and converts the deceleration motor M4 to perform the operation. A support bar for supporting 20) horizontally, 26 is a release button, and 11a represents a projection for limiting the lifting of the pressing arm 12.

다음은 상기와 같이 구성된 본 고안의 작동 및 작용에 대해 살펴보기로 한다.Next will be a look at the operation and action of the subject innovation configured as described above.

먼저, 본 고안은 도 3 및 도 4에 도시된 바와 같이, 제본할 인쇄물이나 서류등의 지편(2)을 적층한 상태로 베이스판(7)상에 위치시킨다.First, the present invention, as shown in Figures 3 and 4, is placed on the base plate 7 in a state in which the laminations (2), such as the printed matter or documents to be bound.

이때, 상기 적층된 지편(2)의 제본할 부위가 천공드릴(M1-1)의 하부 위치로 위치하도록 놓게 된다.At this time, the portion to be bound of the stacked pieces 2 is placed so as to be located in the lower position of the drill drill (M1-1).

이와 같은 상태에서 전원을 온작동하면, 상기 천공모터(M1)와 함께 승하강모터(M2)가 구동작동하여 그 축상의 피니언기어(M2-1)가 이에 치합된 천공모터(M1)의 레크기어(13)를 하강시키게 된다.When the power is turned on in such a state, the lifting and lowering motor M2 is driven together with the punching motor M1, and the rack gear of the punching motor M1 in which the pinion gear M2-1 on the shaft is engaged. (13) will be lowered.

결국, 상기 천공모터(M1)는 작동 상태로 샤프트(11)(11')를 따라 하강하게 된다.As a result, the perforation motor M1 is lowered along the shafts 11 and 11 'in an operating state.

이때, 상기 사프트(11)(11')상에는 천공모터(M1)와 그 하부의 프레싱암(12)사이, 또한 상기 프레싱암(12)하부로 압축스프링(15)(15')이 설치되어 있기 때문에 상기 천공모터(M1)의 하강으로 상기 압축스프링(15)이 압축되어 그 하부의 프레싱암(12)도 압축스프링(15')을 압축하며 하강작동하게 된다.At this time, the compression springs 15 and 15 'are provided on the shafts 11 and 11' between the punching motor M1 and the pressing arm 12 below it, and below the pressing arm 12. Therefore, the compression spring 15 is compressed by the lowering of the puncturing motor M1, and the pressing arm 12 at the lower portion thereof also compresses and compresses the compression spring 15 '.

이와 같이 하강작동하는 프레싱암(12)이 먼저 적층된 지편(2)에 탄발적으로 지지지되면서 상기 지편(2)상부를 가압하며 클램핑하게 된다.As such, the downwardly acting pressing arm 12 is elastically supported by the laminated stack 2 and presses and clamps the upper section 2.

이와 같은 상태에서 상기 천공모터(M1)는 계속적으로 압축스프링(15)을 압축하며 하강하면서 하부의 드릴(M1-1)에 의해 적층된 지편(2)에 구멍(2')을 천공하게 된다.In this state, the drilling motor M1 continuously compresses the compression spring 15 and drills the holes 2 'in the paper pieces 2 stacked by the lower drill M1-1.

결국, 상기 적층된 지편(2)은 별도의 클램핑작동이 배제되는 상태로 단순히 천공모터(M1)를 하강시킴에 의해 1차적으로 프레싱암(12)에 의해 클램핑작동되고, 2차적으로 천공작동을 행하게 되는 것이다.As a result, the stacked pieces 2 are first clamped by the pressing arm 12 by simply lowering the punching motor M1 in a state in which a separate clamping operation is excluded, and secondly, punching operation is performed. Will be done.

이와 같이하여 상기 천공모터(M1)의 드릴(M1-1)이 적층된 지편(2)의 하단까지 구멍(2')을 천공하는 작업이 완료하고, 그 하부의 지지부(18)의 고무판(18a)에 닿아 이를 천공하게 되면, 상기 고무판(18a)에 연결된 미도시된 검출부에 의해 검출되어 상기 승하강모터(M2)를 역회전시켜 천공모터(M1)와 드릴(M1-1)을 다시 상승시키게 된다.In this way, the operation of drilling the hole 2 'to the lower end of the paper piece 2 on which the drill M1-1 of the drilling motor M1 is stacked is completed, and the rubber plate 18a of the lower support 18 is completed. When touched to puncture it, it is detected by a detector (not shown) connected to the rubber plate (18a) to reversely rotate the lifting motor (M2) to raise the drilling motor (M1) and drill (M1-1) again. do.

이때, 상기 프레싱암(12)은 계속적으로 적층된 지편(2)을 가압지지하고 있는 상태를 유지하게 된다.At this time, the pressing arm 12 maintains a state in which the supporting pieces 2 continuously stacked are pressed and supported.

이는, 첨부도면 도 5에 도시된 바와 같이, 플레이트(20)가 작동바(22)의 탄발스프링(23)의 탄발력에 의해 힌지를 중심으로 상방으로 경사를 이루는 상태를 유지하므로 상기 프레싱암(12)이 천공모터(M1)의 하강력에 의해 하강하여 지편(2)을 클팸핑시 그 스톱바(12a)가 상기 경사를 이루는 플레이트(20)의 걸림공(21)의 상하단에 걸리므로 상기 천공모터(M1)와 함께 승강작동을 하지 못하고, 지편(2)을 클램핑하는 상태로 유지하게 되는 것이다.5, the pressing arm is inclined upwardly about the hinge by the elastic force of the elastic spring 23 of the operation bar 22, as shown in FIG. 5. 12) the stop bar 12a is caught by the lowering force of the punching motor M1, and the stop bar 12a is caught by the upper and lower ends of the engaging hole 21 of the inclined plate 20. Lifting operation with the perforation motor (M1) is not possible to maintain the state clamping the piece (2).

따라서, 상기 적층된 지편(2)은 드릴(M1-1)에 의해 하단부까지 정확히 천공작업이 이루어짐은 물론 상기 프레싱암(12)에 의해 계속 가압지지되는 상태를 유지하게 되는 것이다.Therefore, the stacked pieces 2 are to be drilled exactly to the lower end by the drill (M1-1) as well as to maintain a state of being continuously pressed by the pressing arm (12).

한편, 상기와 같이 천공모터(M1), 프레싱암(12)이 하강하면서의 천공작업이 이루어짐과 동시에 상기 이송모터(M3)에 의해 회전작동하는 안내롤(32)에 의해 몰딩튜브(5)를 하부 히터부(60)의 튜브가이드핀(35)에 삽입되게 이송하여 공급하게 된다.On the other hand, as described above, the drilling tube (M1), the pressing arm 12 while the drilling operation is made while the molding tube (5) by the guide roll 32 that is rotated by the transfer motor (M3) at the same time The feed is supplied to be inserted into the tube guide pin 35 of the lower heater unit 60.

이와 동시에 상기 프레싱암(12)의 일측에 연결된 와이어(W)에 의해 길이조절플레이트(36)가 탄발스프링(37)을 인장하며 탄발적으로 상승하게 되고, 상기 공급되는 몰딩튜브(5)의 선단을 지지하게 된다.At the same time, the length adjusting plate 36 is elastically raised while tensioning the carbon spring 37 by a wire W connected to one side of the pressing arm 12, and the tip of the molding tube 5 is supplied. Will be supported.

이때, 상기 프레싱암(12)이 적층된 지편(2)의 두께(T)만큼 하강작동함에 대응되게 상기 길이조절플레이트(36)는 커터(40)와의 사이 거리가 상기 적층된 지편(2)의 두께(T)에 몰딩여유(a)를 더한 길이(T+a)를 갖도록 자동으로 위치하게 된다.At this time, the length adjustment plate 36 has a distance between the cutter 40 and the length of the laminated sheet 2 so that the pressing arm 12 is lowered by the thickness T of the laminated sheet 2. The thickness T is automatically positioned to have a length T + a plus the molding margin a.

이때, 상기 몰딩여유는 보통 11-12mm정도를 준다.In this case, the molding margin is usually about 11-12mm.

결국, 상기 제본하는 지편(2)의 두께(T)에 따라 몰딩튜브(5)의 길이가 몰딩여유를 포함한 상태로 자동으로 설정되게 되는 것이다.As a result, the length of the molding tube 5 is automatically set in the state including the molding margin according to the thickness T of the bookbinding piece 2 to be bound.

이와 같이 상기 몰딩튜브(5)가 길이조절플레이트(36)에 지지되게 공급되면, 상기 이송모터(M3)에 의해 회전하는 안내롤(32)에서 몰딩튜브(5)는 걷돌면서 더이상 이송되지 못하는 상태를 유지하게 된다.As such, when the molding tube 5 is supplied to be supported by the length adjustment plate 36, the molding tube 5 is no longer transported while walking on the guide roll 32 that is rotated by the transfer motor M3. Will be maintained.

상기와 같이 하여 천공모터(M1)가 하강하면서 적층된 지편(2)의 천공작업을 완료하고, 상기 적층된 지편(2)의 두께에 따른 몰딩튜브(5)의 길이가 설정완료된 후, 상기 천공모터(M1)가 상승작동하면 이를 검출자(19)가 검출하게 된다.After the drilling motor M1 is lowered as described above to complete the drilling operation of the stacked pieces 2, the length of the molding tube 5 according to the thickness of the stacked pieces 2 is completed, the drilling When the motor M1 is operated up, the detector 19 detects this.

이러한 과정중 상기 커터(40)가 슬라이딩 작동하면서 설정된 길이의 몰딩튜브(5)를 절단하게 된다.During this process, the cutter 40 cuts the molding tube 5 having a predetermined length while sliding.

또한, 상기한 검출자(19)의 검출작동으로 상기 천공모터(M1), 승하강모터(M2)의 작동과, 이송모터(M3)의 작동은 정지되고, 감속모터(M4)를 작동시키게 된다.In addition, by the detection operation of the detector 19, the operation of the drilling motor (M1), the lifting motor (M2) and the operation of the transfer motor (M3) is stopped, the deceleration motor (M4) is operated. .

상기와 같이 감속모터(M4)가 작동하게 되면, 상기 감속모터(M4)에 의한 연계작동으로 캠축(51)을 회전작동시키게 된다.When the reduction motor (M4) is operated as described above, the cam shaft 51 is rotated by the linkage operation by the reduction motor (M4).

이와 같은 캠축(51)의 작동으로 중심캠(52)과 드럼캠(54)이 도 7 내지 도 11에 도시된 바와 같이 회전작동하게 된다.By the operation of the camshaft 51 as described above, the center cam 52 and the drum cam 54 are rotated as shown in FIGS. 7 to 11.

먼저, 상기 중심캠(52)을 중심으로 한 작동을 살펴보면, 상기 중심캠(52)의 1회전작동으로 중심캠(52)의 요홈(52a)에 삽입되어 있던 작동자(55)가 중심캠(52)의 외주연을 따라 안내되어 상기 요홈(52a)에서 이탈되면 상기 작동자(55)에 연결된 링크(56)(56')를 회동시키게 되고,First, referring to the operation centering on the center cam 52, the operator 55, which was inserted into the groove 52a of the center cam 52 by one rotation operation of the center cam 52, is the center cam ( When guided along the outer circumference of the 52 to move away from the groove (52a) is to rotate the link (56, 56 ') connected to the operator 55,

계속적으로 상기 링크(56')와 일측이 로드(57)로 연결된 작동샤프트(58)를 회동시킴과 동시에 상기 작동샤프트(58)의 타측에 연결된 와이어(W2)를 연계적으로 잡아당기게 된다.(도 9참조)The link 56 'and one side rotate the operating shaft 58 connected by the rod 57 and simultaneously pull the wire W2 connected to the other side of the operating shaft 58 in an associated manner. 9)

이와 같이 상기 와이어(W2)가 잡아당겨지면서 상기 와이어(W2)에 연결된 가이드풀리(62)가 일측의 완충스프링(S)에 의해 탄발적으로 회전하면서 하부 히터부(60)를 회전작동시키게 된다.As the wire (W2) is pulled as described above, the guide pulley (62) connected to the wire (W2) is rotated by the shock spring (S) on one side while rotating the lower heater unit (60).

이와 같이하여 상기 하부 히터부(60)는 일정각도(90도)로 회동하게 된다.In this way, the lower heater unit 60 is rotated at a predetermined angle (90 degrees).

상기와 같은 하부 히터부(60)의 회동작동으로 상기 히터부(60)의 작동롤(63)이 드럼캠(54)의 승하강안내로(54a)에 삽입안내됨과 동시에 상기 하부 히터부(60)의 튜브가이드핀(35)이 적층된 다수의 지편(2)의 구멍(2') 하부로 위치하게 되는 것이다.By operating the rotation of the lower heater unit 60 as described above, the operation roll 63 of the heater unit 60 is guided to the lifting guide path 54a of the drum cam 54 and the lower heater unit 60 at the same time. Tube guide pins 35) are positioned below the holes 2 'of the plurality of pieces 2 stacked.

또한, 상기와 같은 작동샤프트(58)의 회동작동으로 상부의 지지부(18)는 후퇴하여 지편(2)의 구멍(2')을 개방하게 되고, 상부 히터부(70)는 작동링크(68)에 의해 반대로 전진하여 상기 하부 히터부(60)와 동일하게 적층된 다수의 지편(2)의 구멍(2')상부로 위치하게 되는 것이다.In addition, the rotation of the operation shaft 58 as described above, the upper support portion 18 is retracted to open the hole (2 ') of the paper piece (2), the upper heater portion 70 is the operation link 68 By advancing in reverse by the above to be located above the hole (2 ') of the plurality of pieces (2) stacked in the same way as the lower heater unit (60).

이때, 상기 상부 히터부(70)는 프레싱암(12)에 의해 승하강 지지되므로 적층된 지편(2)에 따른 적정의 높이로 위치하게 된다.At this time, since the upper heater unit 70 is supported by the pressing arm 12 to move up and down, it is positioned at an appropriate height according to the stacked pieces (2).

결국, 상기 중심캠(52)의 캠작동으로는 상,하부 히터부(60)(70)가 적층된 지편(2)의 구멍(2') 상,하부에 위치함과 동시에 상기 하부 히터부(60)의 작동롤(63)은 드럼캠(54)의 승하강안내로(54a)에 위치하게 된다.As a result, in the cam operation of the center cam 52, upper and lower heater parts 60 and 70 are positioned above and below the holes 2 'of the stack 2, and the lower heater part ( The operation roll 63 of the 60 is located on the lifting guide path 54a of the drum cam 54.

다음, 상기 중심캠(52)과 함께 드럼캠(54)이 1회전작동하면서 상기 드럼캠(54)의 승하강안내로(54a)를 따라 하부 히터부(60)의 작동롤(63)이 안내된다.Next, the operation roll 63 of the lower heater unit 60 is guided along the elevating guide path 54a of the drum cam 54 while the drum cam 54 is rotated together with the center cam 52. do.

즉, 상기 하부 히터부(60)는 작동롤(63)이 승하강안내로(54a)에 안내되면서 1차적으로 수직상승하여 적층된 지편(2)의 하부로 위치하게 되어, 상기 하부 히터부(60)의 튜브가이드핀(35)에 삽입된 절단된 몰딩튜브(5)가 적층된 지편(2)의 구멍(2')에 삽입되게 된다.That is, the lower heater unit 60 is positioned in the lower portion of the paper piece (2) laminated primarily by vertically rising while the operation roll 63 is guided to the elevating guide path (54a), the lower heater unit ( The cut molding tube 5 inserted into the tube guide pin 35 of the 60 is inserted into the hole 2 ′ of the laminated sheet 2.

이때, 상기 하부 히터부(60)는 일측의 가이드롤(65)이 가이드플레이트(66)에 안내되어 일정한 위치로의 승하강 작동이 가능하게 된다.At this time, the lower heater unit 60 is guided to one side of the guide roll 65 is guide plate 66 is able to move up and down to a predetermined position.

이와 같은 상태에서 상기 드럼캠(54)에 의한 캠작동으로 하부 히터부(60)는 상부로 가압되면서 그 튜브가이드핀(35)에 삽입지지되어 있던 몰딩튜브(5)의 상하단이 상기 상,하부 히터부(60)(70)에 가압작동되면서 가열성형된다.In this state, the upper and lower ends of the molding tube 5, which is inserted and supported by the tube guide pin 35, are pressed into the lower heater part 60 by the cam operation by the drum cam 54. It is heated and molded while pressurizing the heaters 60 and 70.

이와 같이하여 도 2에 도시된 바와 같이, 상기 몰딩튜브(5)의 상하단이 적층된 지편(2)의 상하부에서 가열된 상태로 확장된 확관부(5')을 형성하도록 성형되면서 적층된 지편(2)을 하나로 묶게 되는 것이다.Thus, as shown in Figure 2, the upper and lower ends of the molding tube (5) laminated while being molded to form an expanded expansion portion (5 ') in the heated state in the upper and lower portions of the laminated sheet (2) 2) will be combined into one.

이와 같이하여 상기 몰딩튜브(5)의 상하단의 성형이 완료되는 시점이 되면 상기 드럼캠(54)의 승하강안내로(54a)에 안내되는 작동롤(63)은 다시 하강하여 하부 히터부(60)가 하강 복귀되게 된다.As such, when the molding of the upper and lower ends of the molding tube 5 is completed, the operation roll 63 guided to the lifting guide path 54a of the drum cam 54 is lowered again to lower the heater unit 60. ) Will return down.

또한, 상기 드럼캠(54)의 1회전이 완료되는 시점이 되면, 도 6에 도시된 바와 같이 상기 드럼캠(54)의 돌기캠(54b)에 의해 연결바(24)가 회동하면서 상기 작동바(22)가 탄발스프링(23)을 압축하면서 플레이트(20)와 함께 하강작동하게 된다.In addition, when the first rotation of the drum cam 54 is completed, as shown in Figure 6, the connecting bar 24 is rotated by the projection cam 54b of the drum cam 54, the operation bar While 22 compresses the bullet spring 23, the lowering operation is performed with the plate 20.

이때, 상기 플레이트(20)는 일측의 지지바(25)에 지지되어 수평이 유지지되는 지점까지 회동하게 되고, 이와 동시에 상기 플레이트(20)의 지지공(21)이 수직상태를 이루면서 이에 지지되어 있던 프레싱암(12)의 스톱바(12a)를 지지해제하게 된다.At this time, the plate 20 is supported by the support bar 25 on one side is rotated to the point where the horizontal is maintained, and at the same time the support hole 21 of the plate 20 is supported while making a vertical state The stop bar 12a of the pressing arm 12 was released.

이와 같이 상기 프레싱암(12)의 스톱바(12a)가 지지해제되면서 상기 프레싱암(12)은 샤트트(11)(11')의 압축스프링(15')의 탄발력에 의해 수직상승하여 원위치로 복귀하게 된다.As described above, the stop bar 12a of the pressing arm 12 is released, and the pressing arm 12 vertically rises due to the elastic force of the compression spring 15 'of the shafts 11 and 11'. Will return to.

이와 동시에 상기 프레싱암(12)에 지지되어 있는 상부 히터부(70)도 지편(2)의 상부에서 이격되게 상승하여 위치된다.At the same time, the upper heater unit 70 supported by the pressing arm 12 is also positioned to rise apart from the upper portion of the paper piece (2).

결국, 상기 드럼캠(54)의 1회전이 완료되는 시점에서는 상기 지편(2)의 구멍(2')에서 몰딩튜브(5)를 성형한 상,하부 히터부(60)(70)가 분리되게 된다.As a result, when one rotation of the drum cam 54 is completed, the upper and lower heater parts 60 and 70 formed by molding the molding tube 5 from the holes 2 ′ of the paper piece 2 are separated. do.

또한, 상기 중심캠(52)의 1회전이 완료되는 시점에서는 상기 중심캠(52)의 외주연을 따라 안내되던 작동자(55)가 다시 중심캠(52)의 요홈(52a)에 삽입되면서 상기 작동자(55)에 연결된 링크(56)(56')와, 상기 링크(56')와 로드(57)로 연결된 작동샤프트(58)를 원위치시킴과 동시에 상기 작동샤프트(58)의 타측에 와이어(W2)로 연결된 가이드풀리(62)를 원위치 회동시키게 된다.In addition, when one rotation of the center cam 52 is completed, the operator 55 guided along the outer circumference of the center cam 52 is inserted into the groove 52a of the center cam 52 again. A link 56, 56 'connected to the operator 55, and an operation shaft 58 connected to the link 56' and the rod 57, and at the same time a wire on the other side of the operation shaft 58 The guide pulley 62 connected by (W2) is rotated to its original position.

이는 상기 가이드풀리(62)의 회동으로 인장되어 있던 완충스프링(S)의 탄발력에 의해 가능하게 된다.This is made possible by the elasticity of the shock absorbing spring S which is tensioned by the rotation of the guide pulley 62.

이와 같은 작동으로 상기 하부 히터부(60)는 원위치로 회동작동하게 되고,By this operation, the lower heater unit 60 is rotated to the original position,

또한, 상기 작동샤프트(58) 상단에서는 지지부(18)가 전진하여 원위치로 복귀함과 동시에 상부 히터부(70)는 후퇴하여 원위치로 복귀하게 된다.In addition, at the upper end of the operation shaft 58, the support 18 is advanced and returned to the original position, and at the same time, the upper heater unit 70 is retracted and returned to the original position.

상기와 같은 상태에서 상기 드럼캠(54)의 1회전작동이 완료되면, 상기 감속모터(M4)의 작동이 정지되면서 제본작업을 완료하게 되는 것이다.When the one rotation operation of the drum cam 54 is completed in the above state, the operation of the reduction motor M4 is stopped to complete the bookbinding operation.

이상에서 상세히 살펴본 바와 같이 본 고안은 적층된 다수의 지편에 구멍을 천공하고, 상기 적층된 지편의 두께에 따라 자동으로 몰딩 튜브를 적정길이로 절단한 후, 상기 절단된 몰딩튜브를 지편의 구멍에 삽입하여 몰딩성형하므로 하나로 묶는 제본과정에서 상기 적층된 다수의 지편 두께에 따른 적정 길이, 즉 지편 두께에몰딩여유가 더해진 길이의 몰딩튜브를 프레싱암의 지편 클램핑작동에 의해 자동으로 설정하여 이를 절단, 공급하도록 하게 되고,As described in detail above, the present invention drills holes in a plurality of stacked pieces, automatically cuts the molding tube to a proper length according to the thickness of the stacked pieces, and cuts the cut molding tube into the holes of the pieces. Inserting and molding molding, so that in the binding process of binding together, the molding tube of the appropriate length according to the laminated thickness of the plurality of pieces, that is, the length of the sheet plus the molding margin is automatically set by the clamping operation of the pressing arm, and cut it. To supply,

또한, 상기한 몰딩튜브의 절단, 공급과정이 상기한 천공작업과 동시적으로 작동되므로 그 작업성 및 생산성을 향상시키는 효과를 갖게 되는 것이다.In addition, since the cutting and supplying process of the molding tube is operated simultaneously with the above drilling operation, the workability and productivity will be improved.

Claims (2)

적층된 다수의 지편(2)에 구멍을 천공하여 이에 몰딩튜브를 삽입하여 몰딩성형하므로 하나로 묶는 제본기에 있어서,In the bookbinding machine which drills a hole in a plurality of stacked pieces (2) and inserts a molding tube therein to mold molding, thereby binding them together. 베이스판(7)의 상부로 드릴을 구비한 천공모터(M1)와 적층된 지편(2)을 클램핑하는 프레싱암(12)이 샤프트(11)(11')를 따라 승하강작동함에 있어,In the elevating operation along the shafts 11 and 11 ', the punching motor M1 having a drill to the upper portion of the base plate 7 and the pressing arm 12 which clamps the stacked pieces 2 are provided. 이송모터(M3)의 축상에 설치되어 몰딩튜브(5)를 이송안내하는 안내롤(32)과, 그 하부로 상기 이송안내되는 몰딩튜브(5)를 삽입하여 지지하는 하부 히터부(60)상의 튜브가이드핀(35)과, 상기 몰딩튜브(5)를 커팅하는 커터(40) 및 상기 튜브가이드핀(35)의 일측으로 이에 삽입되는 몰딩튜브(5)를 지지하는 길이조절플레이트(36)로 구성하되,A guide roll 32 installed on the shaft of the transfer motor M3 to guide the molding tube 5 and a lower heater portion 60 which inserts and supports the molding tube 5 to be guided downward. To the tube guide pin 35, the cutter 40 for cutting the molding tube (5) and the length adjustment plate 36 for supporting the molding tube (5) inserted into one side of the tube guide pin (35). Configure it, 상기 길이조절플레이트(36)는 그 일측 하단이 탄발스트링(37)에 탄발지지되고, 상단은 프레싱암(12)과 와이어(W)로 연결되어 상기 프레싱암(12)이 적층된 지편(2)의 두께에 따라 승하강함과 동시에 상기 길이조절플레이트(36)가 대응되게 승하강작동하면서 몰딩튜브(5)의 절단길이를 자동 조절하도록 이루어진 것을 특징으로 하는 제본기의 몰딩튜브 공급장치.The length adjustment plate 36 is one side of the lower end is supported by the elastic ball string 37, the upper end is connected to the pressing arm 12 and the wire (W), the pressing piece 12 is laminated with the pressing arm 12 Molding tube supply apparatus of the bookbinding machine, characterized in that made to automatically adjust the cutting length of the molding tube (5) while moving up and down and corresponding to the length adjustment plate 36 corresponding to the lifting and lowering according to the thickness of. 제1항에 있어서, 상기 커터(40)와 길이조절플레이트(36)사이의 몰딩튜브(5) 길이는 적층된 지편의 두께(T)에 몰딩을 위한 여유길이(a)를 더한 길이로 형성하도록 이루어진 것을 특징으로 하는 제본기의 몰딩튜브 공급장치.The length of the molding tube (5) between the cutter (40) and the length adjustment plate (36) is formed so that the length (T) of the laminated sheet is added to the length (A) for molding. Molding tube supply apparatus of the bookbinding machine, characterized in that made.
KR2020000004010U 2000-02-15 2000-02-15 Tube supply device for filing machine Expired - Fee Related KR200193629Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020000004010U KR200193629Y1 (en) 2000-02-15 2000-02-15 Tube supply device for filing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020000004010U KR200193629Y1 (en) 2000-02-15 2000-02-15 Tube supply device for filing machine

Publications (1)

Publication Number Publication Date
KR200193629Y1 true KR200193629Y1 (en) 2000-08-16

Family

ID=19642076

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020000004010U Expired - Fee Related KR200193629Y1 (en) 2000-02-15 2000-02-15 Tube supply device for filing machine

Country Status (1)

Country Link
KR (1) KR200193629Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101953360B1 (en) 2017-10-20 2019-05-23 노희옥 Removable table device for binding-boring machine
KR20190131373A (en) 2018-05-16 2019-11-26 노희옥 Bookbinding and boring machine
KR102490128B1 (en) 2022-01-17 2023-01-17 노희옥 Moving table device for the bookbinding and boring machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101953360B1 (en) 2017-10-20 2019-05-23 노희옥 Removable table device for binding-boring machine
KR20190131373A (en) 2018-05-16 2019-11-26 노희옥 Bookbinding and boring machine
KR102490128B1 (en) 2022-01-17 2023-01-17 노희옥 Moving table device for the bookbinding and boring machine

Similar Documents

Publication Publication Date Title
KR100415590B1 (en) Perforation device for filing machine
CN103710897B (en) A method for processing webbing loops on shoe tongues
CN110877489B (en) Full-intelligent porous binding machine with wire and binding method using same
KR101953360B1 (en) Removable table device for binding-boring machine
CN107776228B (en) Wire-mounted drilling binding machine capable of automatically threading
JP2012166319A (en) Perforating device structure of automatic bookbinding machine
CN107791709B (en) Double-station full-automatic drilling binding machine
JPWO2010143448A1 (en) Paper binding device and binding method
CN103710898B (en) A shoe tongue processing equipment
KR200193629Y1 (en) Tube supply device for filing machine
KR200191047Y1 (en) Perforation device for filing machine
CN207510052U (en) A kind of double-station Full-automatic drilling binder
KR200193628Y1 (en) Molding device for filing machine
JP6081197B2 (en) Binding device
KR102194224B1 (en) Press arm fastening device for bookbinding and boring machine
CN207657448U (en) A kind of automatic clamp moves the double-station drilling binder of pipe
CN107225885B (en) Automatic bookbinding machine and lever linkage device thereof
KR102081224B1 (en) Upper heater block position confirmation device for bookbinding and boring machine
CN210553721U (en) Press riveting base linkage reset mechanism of binding machine
CN110254065B (en) Pressing riveting seat linkage reset mechanism of bookbinding machine
CN111572232B (en) Automatic punching and binding equipment for account book
CN212636648U (en) Simple plane mask manufacturing machine
KR102619387B1 (en) Molding tube supply device for the bookbinding and boring machine
JP2802599B2 (en) Tatami sewing method
CN119858825B (en) Winding device for rubber rope hangtag

Legal Events

Date Code Title Description
UA0108 Application for utility model registration

Comment text: Application for Utility Model Registration

Patent event code: UA01011R08D

Patent event date: 20000215

REGI Registration of establishment
UR0701 Registration of establishment

Patent event date: 20000613

Patent event code: UR07011E01D

Comment text: Registration of Establishment

UR1002 Payment of registration fee

Start annual number: 1

End annual number: 1

Payment date: 20000216

UG1601 Publication of registration
UR1001 Payment of annual fee

Payment date: 20010613

Start annual number: 2

End annual number: 3

T201 Request for technology evaluation of utility model
UT0201 Request for technical evaluation

Patent event date: 20020705

Comment text: Request for Technology Evaluation of Utility Model

Patent event code: UT02011R01D

T701 Written decision to grant on technology evaluation
UT0701 Decision on maintenance of utility model

Patent event date: 20030324

Comment text: Written Decision on Result of Technology Evaluation

Patent event code: UT07011S01D

UR1001 Payment of annual fee

Payment date: 20030613

Start annual number: 4

End annual number: 4

UR1001 Payment of annual fee

Payment date: 20040525

Start annual number: 5

End annual number: 5

FPAY Annual fee payment

Payment date: 20050608

Year of fee payment: 6

UR1001 Payment of annual fee

Payment date: 20050608

Start annual number: 6

End annual number: 6

LAPS Lapse due to unpaid annual fee
UC1903 Unpaid annual fee

Termination date: 20070510

Termination category: Default of registration fee