KR19980053385A - Formwork for building wall slabs and construction method thereof - Google Patents

Formwork for building wall slabs and construction method thereof Download PDF

Info

Publication number
KR19980053385A
KR19980053385A KR1019960072484A KR19960072484A KR19980053385A KR 19980053385 A KR19980053385 A KR 19980053385A KR 1019960072484 A KR1019960072484 A KR 1019960072484A KR 19960072484 A KR19960072484 A KR 19960072484A KR 19980053385 A KR19980053385 A KR 19980053385A
Authority
KR
South Korea
Prior art keywords
formwork
wall
slab
building
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
KR1019960072484A
Other languages
Korean (ko)
Other versions
KR100219039B1 (en
Inventor
홍순조
유용민
양동훈
Original Assignee
정순착
선경건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정순착, 선경건설 주식회사 filed Critical 정순착
Priority to KR1019960072484A priority Critical patent/KR100219039B1/en
Publication of KR19980053385A publication Critical patent/KR19980053385A/en
Application granted granted Critical
Publication of KR100219039B1 publication Critical patent/KR100219039B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

1. 청구범위에 기재된 발명이 속한 기술분야1. TECHNICAL FIELD OF THE INVENTION

벽체 슬라브 구축용 거푸집 및 그 시공방법Formwork for building wall slabs and construction method thereof

2. 발명이 해결하고자 하는 기술적 요지2. The technical gist of the invention

본 발명은 벽체와 슬라브를 동시에 구축시키면서 벽면의 일면을 형성할 수 있도록 상하단 거푸집이 접철이 가능하도록 결합되고, 지지부재로 지탱할 수 있도록 하여 거푸집의 설치 및 탈형을 손쉽게 이룰 수 있는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 그 목적이 있다.The present invention is to form the wall and the slab at the same time to form a surface of the wall while the upper and lower formwork is combined to be foldable, can be supported by a support member to form a wall slab building formwork that can easily achieve the installation and demoulding formwork And its construction method.

3. 발명의 해결방법의 요지3. Summary of Solution to Invention

본 발명은 소정크기를 가지는 상단부재 및 하단부재; 및 상기 상단부재 및 하단부재가 접철이 가능하도록 연결하는 수단을 포함하는 벽체 슬라브 구축용 거푸집을 제공한다. 또한, 본 발명은 바닥면에서 천장 소요높이를 정하여 바닥면에서 수평높이를 레벨링 기구를 조정하여 일치시키는 제1 단계; 상기 레벨링 기구의 상면에 하단 거푸집을 올려 놓고 상단 거푸집을 세우는 제2 단계; 상기 상단부재 및 하단부재의 수직높이가 유지되도록 길이조정기구의 길이를 조정하여 바닥면에 대는 제3 단계; 상기 상단부재와 하단부재의 수직위치가 유지되도록 길이조정수단을 바닥면에 볼트로 고정하는 제4 단계; 상기 상단부재의 수평부재에 천장슬라브를 지지시키는 제5 단계; 및 상기 직립된 상하단 거푸집과 천장에 콘크리트를 타설하여 벽체 및 천장 슬라브를 형성하는 제6 단계를 포함하는 벽체 슬라브 구축용 거푸집의 시공방법을 제공한다.The present invention has a top member and a lower member having a predetermined size; And it provides a wall slab building formwork comprising a means for connecting the upper and lower members to be folded. In addition, the present invention provides a first step of determining the required height of the ceiling at the bottom surface to adjust the leveling mechanism to match the horizontal height at the bottom surface; A second step of placing a lower formwork on an upper surface of the leveling mechanism and setting up an upper formwork; A third step of adjusting the length of the length adjusting mechanism to the bottom surface so that the vertical heights of the upper and lower members are maintained; A fourth step of fixing the length adjusting means to the bottom surface with a bolt to maintain the vertical position of the upper member and the lower member; A fifth step of supporting the ceiling slab on the horizontal member of the upper member; And a sixth step of forming walls and ceiling slabs by placing concrete on the upright upper and lower formwork and the ceiling.

4. 발명의 중요한 용도4. Important uses of the invention

벽체 슬라브를 신속하고 안전하게 설치 및 탈형할 수 있는 것임.Wall slabs can be installed and demolished quickly and safely.

Description

벽체 슬라브 구축용 거푸집 및 그 시공방법Formwork for building wall slabs and construction method thereof

본 발명은 벽체 및 슬라브의 구축시 사용되는 거푸집에 관한 것으로, 특히 상하단 거푸집을 접철이 가능하도록 힌지에 의해 결합하고, 지지부재로 지탱할 수 있도록 하여 거푸집의 설치 및 탈형을 손쉽게 이룰 수 있는 벽체 슬라브 구축용 거푸집 및 그 시공방법에 관한 것이다.The present invention relates to a formwork used in the construction of walls and slabs, in particular, to form a wall slab that can be easily formed and demoulded by combining the upper and lower formwork by a hinge so as to be foldable, and can be supported by a support member It relates to a formwork for the dragon and its construction method.

일반적으로, 건축물과 같은 구조물의 시공에 있어서, 건물의 벽체나 바닥 등의 시공은 한 장의 크기가 최대 600㎜ ×1200㎜ 정도인 유니트 패널로 이루어진 거푸집을 복수개 결합하여 하나의 벽체면을 형성하고, 슬라브는 합판과 각재를 이용하여 사방 1m 정도마다 지지대를 받쳐서 슬라브면을 형성하며, 상기 벽면체나 슬라브면을 형성한 거푸집에 콘크리트를 타설하여 벽체와 슬라브를 동시에 구축하고 있다.In general, in the construction of a structure such as a building, the construction of a wall or floor of the building to form a single wall surface by combining a plurality of formwork consisting of unit panels having a size of up to 600 mm × 1200 mm, The slab forms a slab surface by supporting the support every 1m using plywood and lumber, and builds the wall and the slab at the same time by placing concrete on the wall or the formwork forming the slab surface.

또한, 상기 벽체면의 시공시 슬라브면의 높이를 일정하게 유지하기 위하여 소정 높이를 가지는 각목을 바닥면에 댄후 그 위에 거푸집을 세워 벽체면를 형성하고 있다.In addition, in order to maintain a constant height of the slab surface during the construction of the wall surface, the wooden surface having a predetermined height on the floor surface and then form the formwork on it to form a wall surface.

여기서, 상기 벽체면이나 슬라브면을 형성하기 위한 종래의 거푸집은 통상 사각틀을 이루는 철재프레임에 합판을 댄 후 고정하여 형성한 것이나, 또는 합판 자체의 일면에 지지부재로서의 목재를 댄 후 고정한 유니트 패널을 조합하여 형성하고 있다.Here, the conventional formwork for forming the wall surface or the slab surface is usually formed by fixing the plywood to the steel frame forming a square frame, or fixed to the unit panel or the unit panel fixed after the wood as a support member on one side of the plywood itself It is formed in combination.

이러한 시공방법은 작업자가 일일이 유니트 패널을 조립하여야 하는데, 거푸집의 크기가 작아 설치에 많은 시간이 걸리고, 또한 상기 거푸집 연결부위마다 많은 접합줄눈이 생겨 벽체 구축후 거푸집 탈형시 그 접합줄눈을 갈아내어 벽면을 매끄럽게 해야 하는 작업상의 불편함이 존재하였다. 또한, 상기 벽체 구축후 거푸집 탈형방식에 있어서는 강제탈형 방식으로 작업자가 쇠꼬챙이 등으로 거푸집의 모서리 부분을 제껴 탈형하고 있다. 이에 따라 상기 거푸집이 떨어지면서 바닥면을 손상시키기도 하고, 콘크리트 바닥면의 강도에도 심각한 영향을 끼칠 뿐만 아니라, 상기 거푸집 탈형시 작업자의 위해요소로 작용하여 안전상의 문제를 안고 있다.This construction method requires the operator to assemble the unit panel one by one, and the size of the formwork requires a lot of time to install, and also, many joint joints are formed at each of the formwork connecting parts. There was an inconvenience in work that had to be smooth. In addition, in the formwork demoulding method after the wall construction, the worker is demolding the corner part of the formwork with an iron skewer in a forced demoulding method. Accordingly, the formwork falls and damages the floor surface, and not only seriously affects the strength of the concrete floor surface, but also acts as a hazard to the worker when demolding the formwork, thereby causing safety problems.

또한, 콘크리트면에 부착되는 면판이 철재나 합판인 경우는 거푸집의 1개층 사용후 면판에 기름칠을 하는 등, 별도의 청소작업을 수행해야 한다.In addition, when the face plate attached to the concrete surface is made of steel or plywood, after one layer of formwork, the face plate needs to be oiled on the face plate.

한편, 거푸집 한판의 크기가 1200㎜ × 2400㎜ 정도인 대형 거푸집으로 벽체 높이에 대응하고, 1~2개의 판으로만 벽체길이를 대응할 수 있도록 제안된 것도 있으나, 이러한 거푸집은 먼저 벽체 거푸집을 설치하고 콘크리트를 타설하여 벽체를 형성시킨 후, 다시 슬라브 거푸집을 설치하고 콘크리트를 타설하여 슬라브를 형성하는 수평, 수직 분리타설공법에 적용하고 있다. 이러한 공법의 적용은 유니트 패널을 사용했을 때의 품질이나 안전상의 문제는 어느 정도 해결하고 있으나, 벽체와 슬라브의 접합면의 강도가 저하되는 문제점이 있으며, 또한 대형 거푸집이기 때문에 운반이나 설치시 작업자가 직접 설치할 수 없고 타워크레인 등과 같은 장비를 이용하여 설치하여야 한다. 이때, 상기 타워크레인 기사와 지상의 작업자와의 의사소통이 원활히 이루어지지 않고 있으며, 더욱이 거푸집 설치시 미세한 조정이 쉽지 않아 실제 설치 및 탈형시 많은 시간이 소요되는 문제점이 있었다.On the other hand, it is proposed that the size of the formwork board corresponds to the height of the wall as a large formwork with a size of 1200mm × 2400mm, and that only one or two plates can support the wall length. After pouring concrete to form a wall, the slab formwork is installed again, and the concrete is applied to horizontal and vertical separation casting methods to form slabs. The application of this method solves some of the problems of quality and safety when using the unit panel, but there is a problem that the strength of the joint surface of the wall and the slab is degraded. It should not be installed directly and should be installed using equipment such as tower crane. At this time, communication between the tower crane driver and the worker on the ground is not made smoothly, and there is a problem that it takes a lot of time during the actual installation and demolding because the fine adjustment is not easy when the formwork is installed.

또한, 벽체와 슬라브의 양생기간의 차이로 인해 슬라브 거푸집의 탈형시간이 다른점 때문에 종래 벽체 일면을 형성하는 대형 거푸집의 문제점 즉, 벽체를 구축한 후 슬라브를 구축하므로 인해 발생하는 문제점과 또한, 벽체와 슬라브를 동시에 구축할 수 있으나, 소판 거푸집으로 여러개를 결합하여야 하나의 벽면을 형성할 수 있는 것으로 인하여 발생하는 생산성 저하의 문제점을 내포하고 있다.In addition, due to the difference in the demolding time of the slab formwork due to the difference in the curing period of the wall and the slab, the problem of the large formwork forming one side of the conventional wall, that is, the problem caused by building the slab after building the wall and also, the wall And slab can be constructed at the same time, but it is implicated in the productivity degradation caused by combining a plurality of platelets to form a single wall.

따라서, 본 발명은 상기의 제반 문제점을 해결하기 위해 안출된 것으로서, 벽체와 슬라브를 동시에 구축시키면서 벽면의 일면을 형성할 수 있도록 상하단 거푸집이 접철이 가능하도록 결합되고, 지지부재로 지탱할 수 있도록 하여 거푸집의 설치 및 탈형을 손쉽게 이룰 수 있는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 그 목적이 있다.Therefore, the present invention has been devised to solve the above problems, the upper and lower formwork is coupled to be folded so as to form a surface of the wall while simultaneously building the wall and the slab, the formwork to be supported by the support member. The purpose of the present invention is to provide a formwork for building wall slab and a construction method thereof, which can easily achieve the installation and demoulding of the product.

또한, 본 발명의 다른 목적은 상단 거푸집에 슬라브 거푸집의 일부를 접철이 가능하도록 힌지로 결합하여 벽체면과 슬라브를 동시에 콘크리트 구축할 수 있는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 있다.In addition, another object of the present invention is to provide a wall slab construction formwork and construction method that can be a concrete construction of the wall surface and the slab at the same time by combining a portion of the slab formwork with the hinge to enable folding.

또한, 본 발명의 또 다른 목적은 벽체거푸집 한판을 벽체면의 크기에 대응하는 크기로 형성하여 작업생산성을 향상시키는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 있다.In addition, another object of the present invention to provide a wall slab construction formwork and construction method to improve the work productivity by forming a wall formwork baffle to a size corresponding to the size of the wall surface.

또한, 본 발명의 또 다른 목적은 상단 및 하단 거푸집에 바퀴를 부착하여 운반을 용이하게 하며, 작업의 안전성을 향상시킨 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 있다.In addition, another object of the present invention is to provide wheels to the upper and lower formwork to facilitate transport, to provide a wall slab construction formwork and construction method that improved the safety of the work.

또한, 본 발명의 또 다른 목적은 상, 하단의 거푸집의 일면에 합성수지재를 부착하여 벽체면 및 슬라브면의 매끄러움을 이루어 품질을 향상시키며, 또한 탈형을 용이하게 하는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 있다.In addition, another object of the present invention by attaching a synthetic resin material on one side of the upper and lower formwork to achieve the smoothness of the wall surface and the slab surface to improve the quality, and also to facilitate the wall slab construction formwork and its construction In providing a method.

또한, 본 발명의 또 다른 목적은 하단 거푸집에 레벨링 거푸집을 구비하여 천장의 높이를 일정하게 유지하며, 탈형 및 설치를 용이하게 하는 벽체 슬라브 구축용 거푸집 및 그 시공방법을 제공함에 있다.In addition, another object of the present invention is to provide a leveling formwork at the bottom formwork to maintain a constant height of the ceiling, to provide a wall slab construction formwork and construction method that facilitates the demoulding and installation.

도 1은 본 발명에 의한 벽체 슬라브 구축용 거푸집의 일실시예 구성을 나타낸 전체사시도;1 is an overall perspective view showing an embodiment configuration of the formwork for building wall slabs according to the present invention;

도 2A 및 도 2B는 본 발명에 의한 벽체 슬라브 구축용 거푸집의 정면도 및 측면도;2A and 2B are front and side views of the formwork for building wall slabs according to the present invention;

도 3은 본 발명에 의한 레벨링기구의 구성을 나타낸 사시도;3 is a perspective view showing the configuration of a leveling mechanism according to the present invention;

도 4는 본 발명에 의한 패널 지지기구의 구성을 나타낸 정면도;4 is a front view showing the configuration of the panel support mechanism according to the present invention;

도 5는 본 발명의 거푸집을 이용하여 벽체면을 형성하고 탈형시키는 상태를 나타낸 단면도;5 is a cross-sectional view showing a state of forming and demoulding a wall surface using the formwork of the present invention;

도 6은 본 발명에 의한 거푸집의 운반상태도;6 is a state of transport of the formwork according to the present invention;

도 7A 내지 도 7F는 본 발명에 의한 벽체 슬라브 구축용 거푸집의 시공순서도이다.7A to 7F are construction flowcharts of the formwork for building wall slabs according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 상단 거푸집2 : 하단 거푸집1: upper formwork 2: lower formwork

3 : 제1 힌지4 : 레벨링기구3: first hinge 4: leveling mechanism

5 : 길이조정기구11 : 프레임5: length adjusting mechanism 11: frame

12 : 합판13 : 합성수지재12 plywood 13: synthetic resin material

14 : 슬라브 브라켓15 : 운반용 캐스터14 slab bracket 15 transport caster

상기 목적을 달성하기 위하여 본 발명은, 소정크기를 가지는 상단부재 및 하단부재; 및 상기 상단부재 및 하단부재를 접철이 가능하도록 연결하는 수단을 포함하는 벽체 슬라브 구축용 거푸집을 제공한다.The present invention, the upper member and the lower member having a predetermined size to achieve the above object; And it provides a form for building the wall slab comprising a means for connecting the upper member and the lower member to be foldable.

또한, 본 발명은 바닥면에서 천장 소요높이를 정하여 바닥면에서 수평높이를 레벨링 기구를 조정하여 일치시키는 제1 단계; 상기 레벨링 기구의 상면에 하단 거푸집을 올려 놓고 상단 거푸집을 세우는 제2 단계; 상기 상단부재 및 하단부재의 수직높이가 유지되도록 길이조정기구의 길이를 조정하여 바닥면에 대는 제3 단계; 상기 상단부재와 하단부재가 수직위치가 되도록 조정한 후 길이조정수단을 바닥면에 볼트로 고정하는 제4 단계; 상기 상단부재의 수평부재에 천장슬라브를 지지시키는 제5 단계; 및 상기 직립된 상하단 거푸집과 천장에 콘크리트를 타설하여 벽체 및 슬라브를 형성하는 제6 단계를 포함하는 벽체 슬라브 구축용 거푸집의 시공방법을 제공한다.In addition, the present invention provides a first step of determining the required height of the ceiling at the bottom surface to adjust the leveling mechanism to match the horizontal height at the bottom surface; A second step of placing a lower formwork on an upper surface of the leveling mechanism and setting up an upper formwork; A third step of adjusting the length of the length adjusting mechanism to the bottom surface so that the vertical heights of the upper and lower members are maintained; A fourth step of adjusting the top member and the bottom member to the vertical position and then fixing the length adjusting means to the bottom surface with bolts; A fifth step of supporting the ceiling slab on the horizontal member of the upper member; And a sixth step of forming walls and slabs by placing concrete on the upright upper and lower formwork and the ceiling.

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 상세히 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of the present invention;

도 1은 본 발명에 의한 벽체 슬라브 구축용 거푸집의 일실시예 구성을 나타낸 전체사시도; 도 2A 및 도 2B는 본 발명에 의한 벽체 슬라브 구축용 거푸집의 정면도 및 측면도; 도 3은 본 발명에 의한 레벨링기구의 구성을 나타낸 사시도; 도 4는 본 발명에 의한 패널 지지기구의 구성을 나타낸 정면도; 도 5는 본 발명의 거푸집을 이용하여 벽체면을 형성하고 탈형시키는 상태를 나타낸 단면도; 도 6은 본 발명에 의한 거푸집의 운반상태도; 도 7A 내지 도 7F는 본 발명에 의한 벽체 슬라브 구축용 거푸집의 시공순서도이다.1 is an overall perspective view showing an embodiment configuration of the formwork for building wall slabs according to the present invention; 2A and 2B are front and side views of the formwork for building wall slabs according to the present invention; 3 is a perspective view showing the configuration of a leveling mechanism according to the present invention; 4 is a front view showing the configuration of the panel support mechanism according to the present invention; 5 is a cross-sectional view showing a state of forming and demoulding a wall surface using the formwork of the present invention; 6 is a state of transport of the formwork according to the present invention; 7A to 7F are construction flowcharts of the formwork for building wall slabs according to the present invention.

도면에서 1은 상단 거푸집, 2는 하단 거푸집, 3은 제1 힌지, 4는 레벨링기구, 5는 길이조정기구, 11은 프레임, 12는 합판, 13은 합성수지재, 14는 슬라브 브라켓, 15는 운반용 캐스터, 21은 고정판넬, 21a는 수평판넬, 21b는 수직판넬, 22는 이동편, 23은 제2 힌지, 24는 받침대, 25는 고정바, 25a는 수나사부, 25b는 안내장공, 26은 이동바, 27은 위치고정바, 28은 조정나사, 29는 핸들, 31은 제1 지지부재, 32는 제2 지지부재, 31a, 32a는 중공바, 31b, 32b는 길이가변바, 31c, 32c는 돌기, 31d, 32d는 고정편, 33은 고정부재, 34는 제3 힌지, 35는 고정볼트, 36은 벽체면, 37은 패널, 38은 슬라브 지지기구, 39는 천장슬라브, 41은 건축물, 42는 와이어 로우프, 43은 타워크레인을 각각 나타낸다.In the drawing, 1 is the top formwork, 2 is the bottom formwork, 3 is the first hinge, 4 is the leveling mechanism, 5 is the length adjusting mechanism, 11 is the frame, 12 is plywood, 13 is synthetic resin, 14 is slab bracket, 15 is for transport Caster, 21 is fixed panel, 21a is horizontal panel, 21b is vertical panel, 22 is moving piece, 23 is second hinge, 24 is bracket, 25 is fixing bar, 25a is male thread, 25b is guide worker, 26 is moving Bar, 27 is position fixing bar, 28 is adjustment screw, 29 is handle, 31 is first supporting member, 32 is second supporting member, 31a, 32a is hollow bar, 31b, 32b is variable bar, 31c, 32c is Protrusion, 31d, 32d is fixed piece, 33 is fixed member, 34 is third hinge, 35 is fixed bolt, 36 is wall surface, 37 is panel, 38 is slab support mechanism, 39 is ceiling slab, 41 is architecture, 42 Are wire ropes, and 43 are tower cranes, respectively.

본 발명에 의한 벽체 슬라브 구축용 거푸집 및 그 시공방법은 설치시간 및 해체, 조립을 간단히 하면서, 고품질의 벽체면 및 슬라브면을 동시에 형성할 수 있도록 구현한 것으로, 본 실시예에서는 도 1 및 도 2에 도시한 바와 같이 소정크기를 가지는 상단거푸집(1)과 하단거푸집(2)이 구비되며, 상기 상단거푸집(1)과 하단거푸집(2)은 접철이 가능하도록 제1 힌지(3)에 의해 연결된 구조로 되어 있으며, 상기 상단거푸집(1)과 하단거푸집(2)은 벽체면 전체를 커버할 수 있는 크기를 가지도록 1~2개의 조합으로 이루어진다.Formwork for building wall slabs and construction method thereof according to the present invention is to implement a high-quality wall surface and slab surface at the same time, while simplifying the installation time, dismantling, assembly, in this embodiment Figures 1 and 2 As shown in the upper formwork (1) and the lower formwork (2) having a predetermined size is provided, the upper formwork (1) and the lower formwork (2) is connected by a first hinge (3) to be foldable The upper formwork (1) and the lower formwork (2) is made of a combination of one to two so as to have a size that can cover the entire wall surface.

여기서, 상단거푸집(1)과 하단거푸집(2)은 소정크기의 사각틀을 이루는 프레임(11)과, 상기 프레임(11)의 일면을 커버하며 콘크리트 타설에 따른 벽체면을 형성하는 수단을 포함하는데, 이때 상기 벽체면 형성 수단이 합판 자체만으로 형성할 수도 있지만, 본 실시예에서는 벽체로부터 쉽게 탈형되고 또 벽체면을 매끄럽게 형성하여 고품질을 얻을 수 있도록 상기 프레임(11)을 커버하는 합판(12)에 소정두께를 가지는 합성수지판(13)을 덧대어 설치한 구조로 되어 있으며, 이때의 상기 합성수지판은 ABS 수지판으로 이루어져 있다.Here, the upper formwork 1 and the lower formwork (2) includes a frame 11 forming a rectangular frame of a predetermined size, and means for covering one surface of the frame 11 and forming a wall surface according to the concrete placing, At this time, the wall surface forming means may be formed only of the plywood itself, but in this embodiment, it is easily demolded from the wall and smoothly formed on the wall surface so that the plywood 12 covering the frame 11 can be obtained. The synthetic resin plate 13 having a thickness is padded and installed, wherein the synthetic resin plate is made of an ABS resin plate.

또한, 상기 상단거푸집(1)의 상측에는 가로방향으로 소정길이만큼 연장된 슬라브 브라켓(14)이 장착되는데, 상기 슬라브 브라켓(14)에는 각재가 길이방향으로 설치되며, 또한 상기 각재와 직각방향으로 설치하고 그 위에 합판을 깔아 천장슬라브의 설치를 완료할 수 있도록 한다.In addition, the upper side of the upper die (1) is mounted on the slab bracket 14 extending by a predetermined length in the transverse direction, the slab bracket 14 is installed in the longitudinal direction, and also in a direction perpendicular to the corner member Install and install the plywood on it to complete the installation of the ceiling slab.

또한, 상기 상단거푸집(1) 및 하단거푸집(2)의 사각 모서리측에는 그의 접철후 운반이 용이하도록 운반용 캐스터(15)가 장착된 구조를 가진다. 이때의 상기 운반용 캐스터(15)는 접고 펼 수 있는 구조를 가지며, 또한 360°방향 변경이 가능한 구조로 되어 있다.In addition, the square corners of the upper formwork 1 and the lower formwork 2 has a structure in which the transport caster 15 is mounted to facilitate transport after folding. At this time, the transport caster 15 has a structure that can be folded and unfolded, and also has a structure capable of changing the 360 ° direction.

상기 하단거푸집(2)의 저면에는 그를 지지하며, 바닥면으로부터 소요 천장까지의 높이를 조절하는 레벨링기구(4)가 장착된다.On the bottom of the lower formwork 2 is mounted a leveling mechanism 4 which supports it and adjusts the height from the bottom to the required ceiling.

상기 레벨링기구(4)는 작업자가 바닥면에서 천장 소요 높이의 결정에 따라 바닥의 수평높이를 조정하여 일치시키고, 그 상부에 하단거푸집을 올려놓도록 하는 것이며, 거푸집 해체시 탈형공간을 확보할 수 있도록 한 것이다.The leveling mechanism (4) is to adjust the horizontal height of the floor according to the determination of the required height of the ceiling on the floor surface, and to place the lower formwork on the top, to secure the demolding space when dismantling the formwork It would be.

이의 구성을 상세히 설명하면, 상기 레벨링 기구는 도 3에 도시한 바와 같이 일측이 바닥면에 고정되는 수평부재(21a)와, 상기 수평부재(21a)에서 직립되며 소정간격을 두고 장착된 두 개의 수직부재(21b)를 구비하는 고정판넬(21)과, 상기 고정판넬(21)의 수직부재(21b) 사이에 끼워져 소요 높이에 따라 상하이동되는 이동편(22)과, 상기 이동편(22)의 일측면에 연결되며, 회동가능하도록 힌지(23)에 의해 결합되는 받침대(24)와, 상기 고정판넬(21)의 수평부재(21a) 상에 직립되게 설치되며, 상하 길이를 조절하면서 받침대(24)의 저부를 지지하는 수단을 구비한다.When the configuration thereof is described in detail, the leveling mechanism includes two horizontal members 21a, one side of which is fixed to the bottom surface as shown in FIG. 3, and two vertical uprights mounted at the horizontal members 21a at predetermined intervals. Between a fixed panel 21 having a member 21b, a movable piece 22 fitted between the vertical member 21b of the fixed panel 21, and moving in accordance with a required height; It is connected to one side, the pedestal 24 is coupled by the hinge 23 so as to be rotatable, and is installed upright on the horizontal member (21a) of the fixed panel 21, while adjusting the length of the pedestal 24 Means for supporting the bottom of the head).

상기 받침대 지지수단은 외주면에 소정길이만큼 수나사(25a)가 형성되며, 수직으로 관통된 안내장공(25b)이 형성된 중공형상의 고정바(25)와, 상기 고정바(25)내에 삽입되어 상하 이동하면서 받침대(24)의 저부를 지지하며 그 소정위치에 가로방향으로 관통홀이 형성된 이동바(26)와, 상기 이동바(26)의 관통홀에 끼워지며 고정바(25)의 안내장공(25b)을 따라 상하이동하면서 이동바(26)의 위치를 고정하는 위치고정바(27)와, 상기 고정바(25)의 수나사(25a)에 체결되며 위치고정바(27)를 지지하는 조정나사(28)가 구비된다. 이때, 상기 조정나사(28)의 외주면에는 수평으로 돌출된 조작핸들(29)이 구비되어 작업자가 쉽게 조정나사(28)를 돌릴 수 있도록 한다.The pedestal support means has a male screw 25a formed on the outer circumferential surface by a predetermined length, and has a hollow fixing bar 25 having a guide hole 25b vertically penetrated therein, and is inserted into the fixing bar 25 to move up and down. While supporting the bottom of the pedestal 24 and the through-hole formed in the transverse direction at the predetermined position 26, the guide hole 25b of the fixed bar 25 is fitted into the through-hole of the movable bar 26 Position fixing bar 27 for fixing the position of the moving bar 26 while moving along the (), and an adjustment screw that is fastened to the male screw 25a of the fixing bar 25 and supports the position fixing bar 27 ( 28). At this time, the outer circumferential surface of the adjustment screw 28 is provided with an operation handle 29 protruding horizontally so that the operator can easily turn the adjustment screw 28.

한편, 도 4에 도시한 바와 같이 상기 상단거푸집(1)과 하단거푸집(2)이 수직면을 유지하도록 지지하는 길이조정기구(5)가 되는데, 상기 길이조정기구(5)는 일단이 상단거푸집(1)의 소정위치에 고정되며, 길이조정이 가능하도록 중공바(31a)와 그에 삽입되는 길이가변바(31b)로 이루어진 제1 지지부재(31)와, 일단이 상기 하단거푸집(2)의 소정 위치에 고정되며, 길이 조정이 가능하도록 중공바(32a)와 그에 삽입되어 슬라이딩 이동하는 길이가변바(32b)로 이루어진 제2 지지부재(32)와, 상기 제1 지지부재(31)와 제2 지지부재(32) 각각의 타단부를 연결하는 고정부재(33)로 구성되며, 상기 고정부재(33)내에서 제1 및 제2 지지부재(31, 32)가 회동가능하도록 결합하는 제3 힌지(34)가 구비된다.On the other hand, as shown in Figure 4, the upper die (1) and the lower die (2) is a length adjusting mechanism (5) to maintain the vertical plane, the length adjusting mechanism (5) is one end of the upper die ( It is fixed at a predetermined position of 1), the first support member 31 made of a hollow bar (31a) and the variable length bar (31b) inserted into it so that the length can be adjusted, and one end of the lower die (2) The second support member 32 is fixed to the position, and made of a hollow bar (32a) and the variable length bar (32b) is inserted into it and sliding sliding so as to adjust the length, the first support member 31 and the second The third hinge is composed of a fixing member 33 for connecting the other end of each of the supporting members 32, the first and second supporting members 31, 32 to be rotatable in the fixing member 33 34 is provided.

여기서, 상기 제1 및 제2 지지부재(31, 32)의 길이가변바(31b 32b)에는 소정간격마다 걸림돌기(31c, 32c)가 구비되어 있어 길이가변바(31b, 32b)를 중공바(31a, 32a)에서 삽입, 인출시키면서 걸림돌기(31c, 32c)에 의해 걸려 고정되는 작용으로 조정할 수 있도록 하고 있으며, 중공바(31a, 32a)에 끼워지는 고정편(31d, 32d)에 의해 길이가변바(31b, 32b)를 고정하는 구조로 되어 있다.Here, the length-variable bars 31b 32b of the first and second support members 31 and 32 are provided with engaging protrusions 31c and 32c at predetermined intervals, so that the length-variable bars 31b and 32b are hollow bars ( The insertion and withdrawal at 31a and 32a can be adjusted by the action of being caught and fixed by the locking projections 31c and 32c, and the length is changed by the fixing pieces 31d and 32d fitted to the hollow bars 31a and 32a. The bar 31b and 32b are fixed.

또한, 상기 제1 및 제2 지지부재(31, 32)가 상단거푸집(1) 및 하단거푸집(2)을 유지하였을 때, 이 위치를 바닥면에 고정하기 위하여 고정볼트(35)를 매개로 상기 고정부재(33)가 바닥면에 고정되도록 한다.In addition, when the first and second support members 31 and 32 hold the upper die 1 and the lower die 2, the fixing bolt 35 is fixed to fix the position to the bottom surface. Fixing member 33 is fixed to the bottom surface.

상기와 같은 구성을 가지는 본 발명의 거푸집은 도 5에 도시한 바와 같은 상태로 길이조정기구(5)를 이용하여 세워진 후 콘크리트를 타설하여 벽체면(36)을 형성하는 것이며, 또한 상기 벽체면(36)의 양생후 거푸집 설치의 역순으로 레벨링기구(4)를 해체시켜 탈형공간을 확보하고, 상단거푸집(1)과, 하단거푸집(2)을 접어 탈형하는 것이다.Formwork of the present invention having the configuration as described above is erected using the length adjusting mechanism 5 in the state as shown in Figure 5 and then to cast concrete to form a wall surface 36, and also the wall surface ( After curing the curing of 36), the leveling mechanism 4 is dismantled in the reverse order of the installation of the formwork to secure the demolding space, and the upper formwork 1 and the lower formwork 2 are folded and demolded.

도 5도에서 미설명부호 37은 패널, 38은 슬라브 지지기구, 39는 천장슬라브를 나타낸 것이다.In FIG. 5, reference numeral 37 denotes a panel, 38 denotes a slab support mechanism, and 39 denotes a ceiling slab.

상기와 같이 구성된 본 발명의 거푸집을 이용하여 시공하는 과정을 도 7A 내지 도 7F를 참조하여 설명하면 다음과 같다.The construction process using the formwork of the present invention configured as described above will be described with reference to FIGS. 7A to 7F.

먼저, 바닥면에 먹줄넣기를 수행한 후 작업자가 바닥면에서 천장 소요높이를 정하여 바닥면으로부터 수평높이를 레벨링 기구(4)를 조정하여 일치시킨다 (도 7A). 그리고, 상기 레벨링 기구(4)의 상면에 하단 거푸집(2)을 올려 놓고 상단 거푸집(1)을 세우는데 (도 7B), 이때, 상기 레벨링 기구(4)상에 하단거푸집(2)이 올려지게 되며, 또 상기 하단 거푸집(2)의 위치를 유지하도록 별도의 클램프를 이용하여 긴결시킨다.First, after performing the ink line on the bottom surface, the operator determines the required height of the ceiling at the bottom surface and adjusts the horizontal height from the bottom surface by adjusting the leveling mechanism 4 (FIG. 7A). Then, the lower formwork 2 is placed on the upper surface of the leveling mechanism 4 and the upper formwork 1 is erected (FIG. 7B). At this time, the lower formwork 2 is placed on the leveling mechanism 4. Also, it is tightly connected using a separate clamp to maintain the position of the lower formwork (2).

그리고, 상기 길이조정기구(5)를 상, 하단 거푸집(1, 2)에 부착하여 일단 지지시킨 후 (도 7C), 상기 길이조정기구(5)의 제1 지지부재(31) 및 제2 지지부재(32)의 길이를 조정하여 상단거푸집(1) 및 하단거푸집(2)의 수직도에 맞춰 벽체 거푸집을 세우고, 길이조정기구(5)의 고정부재(33)를 고정볼트(35)를 매개로 바닥면에 고정한다 (도 7D). 상기 벽체 거푸집(1, 2)이 세워지면 반대측 거푸집과 거푸집용 긴결재(도면에 도시하지 않음)를 설치하여 벽체거푸집의 설치를 완료한다. 그리고, 상기 벽체 거푸집의 설치가 끝나면 상단 거푸집(1)에 설치된 슬라브 브라켓(14)에 각재를 설치하고, 그 위에 또 다른 각재를 직각방향으로 설치한 후 그 위에 합판을 깔아 슬라브 거푸집 설치을 완료한다.Then, the length adjusting mechanism 5 is attached to the upper and lower molds 1 and 2 to be supported once (FIG. 7C), and then the first supporting member 31 and the second support of the length adjusting mechanism 5 are supported. By adjusting the length of the member 32, the wall formwork is erected in accordance with the verticality of the upper formwork 1 and the lower formwork 2, and the fixing member 33 of the length adjusting mechanism 5 is carried through the fixing bolt 35. Fix to the bottom surface with (Fig. 7D). When the wall formwork (1, 2) is erected, the installation of the wall formwork is completed by installing the opposite side formwork and the formwork for the formwork (not shown). Then, when the installation of the wall formwork is finished, the angle is installed in the slab bracket 14 installed in the upper formwork (1), and the installation of another angle on the right angles on it and then laid a plywood thereon to complete the slab formwork installation.

상기와 같이 완료된 거푸집에 콘크리트를 타설하여 양생시킨다.The concrete is poured into the completed form as described above to cure.

반대로 거푸집을 탈형하는 과정을 설명하면, 콘크리트가 양생됨에 따라 먼저 거푸집용 긴결재를 해체하고, 벽체거푸집(1, 2)과 레벨링기구(4)를 고정하는 클램프를 풀어 해체한다.On the contrary, when demonstrating the process of demolding the formwork, as the concrete is cured, first dismantle the formwork for the formwork, and then dismantle the clamp to fix the wall formwork (1, 2) and the leveling mechanism (4).

그리고, 상기 레벨링기구(4)의 위치고정바(27)를 별도의 해머 등과 같은 기구를 이용하여 이동바(26)의 관통홀로부터 이탈시킨 후 조정나사(28)에 일체로 형성된 핸들(29)을 돌려 상기 조정나사(28)를 풀고 난 후 이동바(26)를 하강시킨다. 이에 따라 상기 벽체 거푸집을 지지하고 있던 받침대(24)가 하측으로 회동하여 벽체 거푸집(1, 2)이 탈형될 수 있도록 하부 공간을 확보한다. 이 상태에서 길이조정기구(5)의 제1 및 제2 지지부재(31, 32)의 길이를 조정시켜 벽체거푸집을 벽체면로부터 떼어내어 상단거푸집(1)과 하단거푸집(2)을 접는다. 그리고, 상기 거푸집 사각부에 장착된 운반용 캐스터(15)가 바닥에 닿도록 한 후 길이조정기구(5)를 제거한다.The handle 29 is formed integrally with the adjusting screw 28 after the position fixing bar 27 of the leveling mechanism 4 is separated from the through hole of the moving bar 26 by using a mechanism such as a hammer. To loosen the adjusting screw 28 and then move the lowering bar 26. Accordingly, the base 24 supporting the wall formwork is rotated downward to secure a lower space so that the wall formwork 1 and 2 can be demolded. In this state, lengths of the first and second supporting members 31 and 32 of the length adjusting mechanism 5 are adjusted to separate the wall formwork from the wall surface, and the upper formwork 1 and the lower formwork 2 are folded. Then, the transport caster 15 mounted on the formwork blind spot to the bottom and remove the length adjusting mechanism (5).

이 상태에서 도 6에 도시한 바와 같이 작업자가 상, 하단 거푸집(1, 2)을 밀어 건축물(41)의 외부로 개방된 곳까지 운반한 후, 상기 벽체 거푸집의 힌지 부분을 와이어 로우프(42)에 걸고 타워크레인(43)과 같은 장비로 다음 상층부로 이동시킨다. 또한, 상단 거푸집의 슬라브 브라켓에 의해 지지되었던 슬라브 거푸집은 벽체 거푸집을 탈형한 2~3일 후 지지서포트 각목을 제거하고 각재 합판을 제거하는 순으로 탈형한다. 이렇게 매층 반복하므로써 소정의 높이 층수까지 벽체와 슬라브를 구축해 나가는 것이다.In this state, as shown in FIG. 6, the operator pushes the upper and lower formwork 1 and 2 to the open position outside the building 41, and then the hinge part of the wall formwork is moved to the wire rope 42. On top of it, it moves to the next upper part with equipment such as tower crane (43). In addition, the slab formwork supported by the slab bracket of the upper formwork is demolded in the order of removing the support support timber and removing the lumber plywood two to three days after demolding the wall formwork. By repeating every floor like this, walls and slabs are built up to a predetermined number of floors.

이상에서 설명한 본 발명은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능함은 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and various substitutions, modifications, and changes are possible within the scope without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

전술한 바와 같이, 본 발명에 따르면 하나의 거푸집 패널을 대형화하여 벽체 전면을 수용하므로써 거푸집 설치 및 탈형시에 작업시간을 대폭 단축하고 원가절감을 이룰 수 있다. 또한, 상기 패널간의 접합수가 적으므로 콘크리트 양생후 접합눈줄을 갈아내는 마무리 면 손보기 작업을 대폭 감소하며, 더욱이 콘크리트 벽체와 슬라브를 동시에 타설하여 구축할 수 있으므로 접합면이 강성유지가 우수하며 레벨링 기구 및 길이조정기구를 이용하여 시공하므로써 설치 및 탈형이 신속히 이루어져 시공작업능률을 향상시킨다. 이에 따라 건축물 공기를 단축시켜 공사비를 절감할 수 있을 뿐만 아니라, 콘크리트 부착면이 합성수지재로 이루어져 있으므로 탈형이 쉽게 이루어지고 벽체면의 매끄러움을 이룰 수 있어 벽체 슬라브의 품질을 향상시키는 효과를 가진다.As described above, according to the present invention by enlarging one formwork panel to accommodate the front surface of the wall, it is possible to drastically shorten the work time and reduce the cost at the time of formwork installation and demoulding. In addition, since the number of joints between the panels is small, the work of repairing the finishing surface for grinding the joint lines after concrete curing is greatly reduced, and since the concrete walls and slabs can be cast at the same time, the joint surface is excellent in maintaining rigidity and leveling mechanism. And by using the length adjusting mechanism, the installation and demoulding can be done quickly to improve the construction work efficiency. Accordingly, the construction cost can be reduced by shortening the building air, and since the concrete attachment surface is made of synthetic resin, demolding can be easily performed and the smoothness of the wall surface can be achieved, thereby improving the quality of the wall slab.

Claims (14)

소정크기를 가지는 상단부재 및 하단부재 및Upper and lower members having a predetermined size and 상기 상단부재 및 하단부재가 접철이 가능하도록 연결하는 수단을 포함하는 벽체 슬라브 구축용 거푸집.Formwork for building wall slabs comprising a means for connecting the upper member and the lower member to be folded. 제 1 항에 있어서,The method of claim 1, 상기 하단부재의 저면을 지지하며, 바닥면으로부터 소요 천장고 까지의 높이를 조절하는 수단을 더 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Supporting the bottom surface of the lower member, the wall slab building formwork further comprises a means for adjusting the height from the bottom surface to the required ceiling. 제 2 항에 있어서,The method of claim 2, 상기 높이 조절수단은The height adjusting means 일측이 바닥면에 고정되는 수평부재와, 상기 수평부재에서 직립되며 소정간격을 두고 장착된 두 개의 수직부재를 구비하는 고정판넬;A fixed panel having a horizontal member having one side fixed to the bottom surface, and two vertical members mounted upright at a predetermined distance from the horizontal member; 상기 고정판넬의 수직부재 사이에 끼워져 소요 높이에 따라 상하이동되는 이동편;A moving piece sandwiched between the vertical members of the fixed panel and moved in accordance with a required height; 상기 이동편의 일측면에 연결된 받침대;Pedestal connected to one side of the moving piece; 상기 이동편에서 받침대가 회동가능하도록 연결하는 힌지;A hinge connecting the pedestal to the rotatable piece; 상기 고정판넬의 수평부재 상에 직립되게 설치되며, 상하 길이를 조절하면서 받침대의 저부를 지지하는 수단을 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.It is installed upright on the horizontal member of the fixed panel, the wall slab building formwork, characterized in that it comprises a means for supporting the bottom of the base while adjusting the vertical length. 제 1 항에 있어서,The method of claim 1, 일단이 상단부재의 소정위치에 고정되며 길이 조정이 가능한 제1 지지부재와,A first support member whose one end is fixed to a predetermined position of the upper member and whose length is adjustable; 일단이 상기 하단부재의 소정 위치에 고정되며, 길이 조정이 가능한 제2 지지부재와,A second support member whose one end is fixed to a predetermined position of the lower member and whose length is adjustable; 상기 제1 지지부재와 제2 지지부재 각각의 타단부를 연결하는 고정부재와,A fixing member connecting the other end of each of the first and second support members; 상기 고정부재내에서 제1 및 제2 지지부재가 회동가능하도록 결합하는 수단을 더 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.The wall slab building formwork further comprises means for engaging the first and second support members in the fixing member to be rotatable. 제 4 항에 있어서,The method of claim 4, wherein 상기 고정부재가 바닥면에 고정되도록 체결하는 수단을 더 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Forming wall slabs form further comprises means for fastening so that the fixing member is fixed to the bottom surface. 제 1 항에 있어서,The method of claim 1, 상기 상단부재의 상측에 가로방향으로 장착되어 천장슬라브를 지지하는 수단을 더 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Wall slab building formwork characterized in that it further comprises a means for supporting the ceiling slab mounted horizontally on the upper side of the upper member. 제 1 항에 있어서,The method of claim 1, 상기 상단부재와 하단부재는The upper member and the lower member 소정크기의 사각틀을 이루는 프레임과,A frame forming a rectangular frame of a predetermined size, 상기 프레임의 일면을 커버하며 콘크리트 타설에 따른 벽체면을 형성하는 수단을 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.A formwork for building wall slabs, comprising means for covering one surface of the frame and forming a wall surface according to concrete pouring. 제 7 항에 있어서,The method of claim 7, wherein 상기 벽체면 형성수단은 합판으로 형성된 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.The wall surface forming means is a wall slab building form, characterized in that formed of plywood. 제 7 항에 있어서,The method of claim 7, wherein 상기 벽체면 형성수단은The wall surface forming means 상기 프레임을 커버하는 합판과, 상기 합판에 소정 두께로 덧대어진 합성수지판을 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Formwork for building wall slabs, characterized in that it comprises a plywood covering the frame, and a synthetic resin plate is added to the plywood to a predetermined thickness. 제 7 항에 있어서,The method of claim 7, wherein 상기 벽체면 형성수단은The wall surface forming means 상기 프레임을 커버하는 철재판을 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Formwork for building wall slabs comprising a steel plate covering the frame. 제 9 항에 있어서,The method of claim 9, 상기 합성수지판은 ABS 수지재로 이루어진 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.The synthetic resin board is a formwork for building wall slabs, characterized in that made of ABS resin material. 제 1 항에 있어서,The method of claim 1, 상기 상단부재 및 하단부재의 사각 모서리측에 운반용 캐스터가 장착된 것을 특징으로 하는 벽체 슬라브 구축용 거푸집.Formwork for building wall slabs, characterized in that the transport caster is mounted on the square corner side of the upper member and the lower member. 벽체 슬라브 구축용 거푸집의 시공방법에 있어서,In the construction method of the wall slab construction formwork, 바닥면에서 천장 소요높이를 정하여 바닥면에서 수평높이를 레벨링 기구를 조정하여 일치시키는 제1 단계;A first step of determining the ceiling height from the bottom to match the horizontal height from the bottom by adjusting the leveling mechanism; 상기 레벨링 기구의 상면에 하단 거푸집을 올려 놓고 상단 거푸집을 세우는 제2 단계;A second step of placing a lower formwork on an upper surface of the leveling mechanism and setting up an upper formwork; 상기 상단부재 및 하단부재의 수직높이가 유지되도록 길이조정기구의 길이를 조정하여 바닥면에 대는 제3 단계;A third step of adjusting the length of the length adjusting mechanism to the bottom surface so that the vertical heights of the upper and lower members are maintained; 상기 상단부재와 하단부재의 수직위치가 유지되도록 길이조정수단을 바닥면에 볼트로 고정하는 제4 단계;A fourth step of fixing the length adjusting means to the bottom surface with a bolt to maintain the vertical position of the upper member and the lower member; 상기 상단부재의 수평부재에 천장슬라브를 지지시키는 제5 단계; 및A fifth step of supporting the ceiling slab on the horizontal member of the upper member; And 상기 직립된 상하단 거푸집과 천장에 콘크리트를 타설하여 벽체 및 천장 슬라브를 형성하는 제6 단계를 포함하는 벽체 슬라브 구축용 거푸집의 시공방법.The construction method of the wall slab building formwork comprising the sixth step of forming a wall and ceiling slab by placing concrete on the upright and down-end formwork and the ceiling. 제 13 항에 있어서,The method of claim 13, 제 2 단계는 레벨링 기구와 하단 거푸집을 별도의 클램프를 이용하여 긴결시키는 과정을 포함하는 것을 특징으로 하는 벽체 슬라브 구축용 거푸집의 시공방법.The second step comprises the step of tightening the leveling mechanism and the lower formwork using a separate clamp construction method of the wall slab construction formwork.
KR1019960072484A 1996-12-26 1996-12-26 Formwork for building wall slabs and construction method thereof Expired - Lifetime KR100219039B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019960072484A KR100219039B1 (en) 1996-12-26 1996-12-26 Formwork for building wall slabs and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019960072484A KR100219039B1 (en) 1996-12-26 1996-12-26 Formwork for building wall slabs and construction method thereof

Publications (2)

Publication Number Publication Date
KR19980053385A true KR19980053385A (en) 1998-09-25
KR100219039B1 KR100219039B1 (en) 1999-09-01

Family

ID=19491094

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019960072484A Expired - Lifetime KR100219039B1 (en) 1996-12-26 1996-12-26 Formwork for building wall slabs and construction method thereof

Country Status (1)

Country Link
KR (1) KR100219039B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010099532A (en) * 2000-04-27 2001-11-09 정순착 System form for constructing wall concrete and method of constructing using the same
KR100404930B1 (en) * 2001-03-20 2003-11-07 태성판넬 주식회사 Mold fabricated as one and fabrication and disjoint method thereof
KR101039876B1 (en) * 2009-05-11 2011-06-09 (주)블루폼 Corner reinforced system panel
WO2016010487A1 (en) * 2014-07-16 2016-01-21 Siam Mortar Co., Ltd. A method for constructing cast-in-place walls
WO2016010488A1 (en) * 2014-07-16 2016-01-21 Siam Mortar Co., Ltd. A method for constructing cast-in-place walls with binder
CN111236627A (en) * 2020-01-16 2020-06-05 浙江省一建建设集团有限公司 High wall body concrete once only pours shaping template

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102198890B1 (en) * 2018-08-09 2021-01-15 서보산업 주식회사 Width adjust type Concrete mold Jig and System Form include this same and Set up and Removal of Concrete mold

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010099532A (en) * 2000-04-27 2001-11-09 정순착 System form for constructing wall concrete and method of constructing using the same
KR100404930B1 (en) * 2001-03-20 2003-11-07 태성판넬 주식회사 Mold fabricated as one and fabrication and disjoint method thereof
KR101039876B1 (en) * 2009-05-11 2011-06-09 (주)블루폼 Corner reinforced system panel
WO2016010487A1 (en) * 2014-07-16 2016-01-21 Siam Mortar Co., Ltd. A method for constructing cast-in-place walls
WO2016010488A1 (en) * 2014-07-16 2016-01-21 Siam Mortar Co., Ltd. A method for constructing cast-in-place walls with binder
CN111236627A (en) * 2020-01-16 2020-06-05 浙江省一建建设集团有限公司 High wall body concrete once only pours shaping template

Also Published As

Publication number Publication date
KR100219039B1 (en) 1999-09-01

Similar Documents

Publication Publication Date Title
CN212453615U (en) Formwork support system
KR101587400B1 (en) For any mold of construction for an extension of Bridge Deck
US20070051867A1 (en) Apparatus and method for forming concrete panels
KR20170034065A (en) Slab Form System
KR19980053385A (en) Formwork for building wall slabs and construction method thereof
KR20010099532A (en) System form for constructing wall concrete and method of constructing using the same
KR101531329B1 (en) Strechable steel forms
KR100946192B1 (en) Formwork Joining and Dismantling Device
KR100302161B1 (en) Formwork for building walls / slabs
CN201671355U (en) Template early-dismantling system of bowl-scaffold support
KR200156465Y1 (en) Leveling concrete form
KR20020032487A (en) A mold supporting device of slab
KR200414945Y1 (en) European panel slab casting panel
KR20100042377A (en) Device for supporting the die for forming slab
KR200182865Y1 (en) A height calibration apparatus for formwork
JPH0874361A (en) Fixture for mounting external wall material and method of laminating high-and-medium-rise building by using the same
KR200300525Y1 (en) A folding horizontal adjustable underpinning for wall foam panel
KR200378317Y1 (en) slab table mould
KR102242175B1 (en) Mold for prefabricated double wall precast concrete
KR200198576Y1 (en) A sheeting panel of a plastics
KR102636240B1 (en) Tableform system and method of disassembling by the same
KR100247608B1 (en) Scaffolding for Construction
KR200326613Y1 (en) The Lemod for adjustment to horizontal one'ns figure
KR950011366B1 (en) Slab casting method and form table used
CN112962960B (en) Early formwork stripping support system of coincide floor rigid coupling independent stay

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 19961226

PA0201 Request for examination

Patent event code: PA02012R01D

Patent event date: 19961226

Comment text: Request for Examination of Application

PG1501 Laying open of application
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 19981218

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 19990517

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 19990614

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 19990615

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
PR1001 Payment of annual fee

Payment date: 20020508

Start annual number: 4

End annual number: 6

PR1001 Payment of annual fee

Payment date: 20050615

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 20060302

Start annual number: 8

End annual number: 8

PR1001 Payment of annual fee

Payment date: 20070330

Start annual number: 9

End annual number: 9

PR1001 Payment of annual fee

Payment date: 20080320

Start annual number: 10

End annual number: 10

PR1001 Payment of annual fee

Payment date: 20090413

Start annual number: 11

End annual number: 11

PR1001 Payment of annual fee

Payment date: 20100324

Start annual number: 12

End annual number: 12

PR1001 Payment of annual fee

Payment date: 20110321

Start annual number: 13

End annual number: 13

PR1001 Payment of annual fee

Payment date: 20120404

Start annual number: 14

End annual number: 14

FPAY Annual fee payment

Payment date: 20130410

Year of fee payment: 15

PR1001 Payment of annual fee

Payment date: 20130410

Start annual number: 15

End annual number: 15

FPAY Annual fee payment

Payment date: 20140326

Year of fee payment: 16

PR1001 Payment of annual fee

Payment date: 20140326

Start annual number: 16

End annual number: 16

PR1001 Payment of annual fee

Payment date: 20150326

Start annual number: 17

End annual number: 17

FPAY Annual fee payment

Payment date: 20160328

Year of fee payment: 18

PR1001 Payment of annual fee

Payment date: 20160328

Start annual number: 18

End annual number: 18

EXPY Expiration of term
PC1801 Expiration of term