[go: up one dir, main page]

KR102685846B1 - Head reinforcement cap for PHC pile - Google Patents

Head reinforcement cap for PHC pile Download PDF

Info

Publication number
KR102685846B1
KR102685846B1 KR1020220124983A KR20220124983A KR102685846B1 KR 102685846 B1 KR102685846 B1 KR 102685846B1 KR 1020220124983 A KR1020220124983 A KR 1020220124983A KR 20220124983 A KR20220124983 A KR 20220124983A KR 102685846 B1 KR102685846 B1 KR 102685846B1
Authority
KR
South Korea
Prior art keywords
pile
head
flange portion
reinforcing bar
upper flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020220124983A
Other languages
Korean (ko)
Other versions
KR20240045540A (en
Inventor
배희달
Original Assignee
배희달
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배희달 filed Critical 배희달
Priority to KR1020220124983A priority Critical patent/KR102685846B1/en
Publication of KR20240045540A publication Critical patent/KR20240045540A/en
Application granted granted Critical
Publication of KR102685846B1 publication Critical patent/KR102685846B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/223Details of top sections of foundation piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

본 발명은 PHC 파일용 두부 보강캡에 관한 것으로서, 파일의 두부 정리된 상태에서 상부로부터 사이즈에 맞게 씌워지는 보강캡은 몸통부를 기준으로 파일의 외측과 제1상부플랜지부 및 제2상부플랜지부에 의한 파일의 상단부를 보호함과 동시에 보강철근을 파일의 내외측으로 배치시키고, 파일의 내부에서서는 받침판과 보강철근을 연결한 상태에서 콘크리트의 타설작업으로 파일의 상단부를 포함한 내측과 외측을 견고하게 보강하여 줌으로써, 두부파일 절단후 발생한 파일의 절단면 콘크리트 손상, 종크랙부분에 대한 보강이 견고하게 이루어지고, 나아가 바닥기초 형성시 기초바닥(매트형성)과 더불어 견고한 지반을 구축할 수 있는 효과가 제공된다.The present invention relates to a head reinforcing cap for a PHC pile. The reinforcing cap, which is fitted to the size from the top in a state where the head of the pile is arranged, is attached to the outside of the pile, the first upper flange portion, and the second upper flange portion based on the body portion. At the same time, reinforcing bars are placed on the inside and outside of the pile, and the inside and outside of the pile, including the top part, are firmly reinforced by pouring concrete while connecting the support plate and reinforcing bars inside the pile. By doing this, the concrete damage and vertical cracks on the cut surface of the pile that occur after cutting the head pile are firmly reinforced, and furthermore, when forming the floor foundation, the effect of building a solid ground along with the foundation floor (mat formation) is provided. .

Description

PHC 파일용 두부 보강캡{Head reinforcement cap for PHC pile}Head reinforcement cap for PHC pile}

본 발명은 PHC 파일용 두부 보강캡에 관한 것으로서, 좀더 상세하게는 항타에 의해 지면에 박힌 파일의 두부 정리후 두부를 보강하는 과정에서 파일의 상단부를 포함한 내측과 외측을 견고하게 보강하여 파일의 두부 절단시 발생한 파일의 절단면 콘크리트 손상, 종크랙부분에 대한 보강이 견고하게 이루어질 수 있도록 한 PHC 파일용 두부 보강캡에 관한 것이다.The present invention relates to a head reinforcing cap for a PHC pile, and more specifically, in the process of reinforcing the head of a pile driven into the ground by driving, the inner and outer sides, including the upper end of the pile, are firmly reinforced to secure the head of the pile. This relates to a head reinforcement cap for PHC piles that firmly reinforces the longitudinal cracks and damage to the concrete on the cut surface of the pile that occurs during cutting.

일반적으로 토목 혹은 건축 구조물의 기초공사시 보강하고자 하는 연약지반이라 함은 지반 자체가 상부 구조물로부터 전해오는 하중을 견딜 수 없거나 혹은 예측 침하량이 허용치를 넘는 경우로서, 연약한 점토, 느슨한 사질토, 유기질토 등이 이에 속한다.In general, soft ground that is to be reinforced during the foundation construction of civil engineering or building structures refers to cases where the ground itself cannot withstand the load transmitted from the upper structure or the predicted settlement exceeds the allowable limit, such as soft clay, loose sandy soil, organic soil, etc. It belongs to this.

이러한 연약한 점토나 유기질토로 구성된 지반 위에 도로, 교통, 건물 등을 그대로 건설하게 되면 전단면(剪斷面) 침하량이 과대해짐은 물론, 지지력의 약화로 안전상의 문제가 발생됨은 익히 잘 알려져 있다.It is well known that if roads, transportation, buildings, etc. are constructed on the ground composed of such soft clay or organic soil, not only will the shear area settlement be excessive, but also safety problems will arise due to weakening of bearing capacity.

이와 같은 연약지반을 기초로 하는 구조물의 안정성과 침하문제에 대한 대책 중 흔히 사용되는 성토 하중을 지지층에 도달하는 공법(PILE이용 공법)은 공장에서 미리 생산된 강관 파일, PHC(Prestressed High-Strenghth Concrete Pile)파일, PC(Prestressed Concrete)파일, 및 RC(Reinforced Concrete)파일 등을 타입공법(타격, 진동)이나 매입공법 등의 방법으로 시공하게 된다.Among the countermeasures against the stability and settlement problems of structures based on such soft ground, the commonly used method of reaching the support layer with the embankment load (PILE method) is to use steel pipe piles pre-produced at the factory, and PHC (Prestressed High-Strength Concrete). Pile) piles, PC (Prestressed Concrete) piles, and RC (Reinforced Concrete) piles are constructed using methods such as type method (percussion, vibration) or embedded method.

이때 PHC 파일은 PC 파일보다 축방향 하중 지지력이 우수하고, 타격에 강하며, 휨내력이 크다는 장점을 갖추고 있어서, 지정공사를 위한 파일로 널리 사용되고 있다.At this time, PHC piles have the advantages of superior axial load bearing capacity, resistance to blows, and large bending resistance compared to PC piles, so they are widely used as piles for designated construction.

하지만 이러한 파일은 그 지반의 상태에 따라 타격 후에 연속으로 이어 타격되며, 적정하게 타격된 뒤에는 지반상부로 돌출된 파일이 각기 다르기 때문에 이를 적당하게 절단하고, 그 끝 부분을 보강하게 되는데, 이렇게 파일 끝을 보강하는 것을 "두부(頭部)정리"라 한다.However, these piles are struck continuously depending on the condition of the ground, and after being struck appropriately, the piles protruding above the ground are different, so they are cut appropriately and the ends are reinforced. This is how the end of the pile is formed. Reinforcing is called “head cleaning.”

이러한 파일의 두부를 정리하고 보강한 다음에는 경우에 따라 버림콘크리트타설 후 파일의 상단으로부터 수직으로 철근 고정배치와 더불어 그 상부에서는 수평 방향으로 기초바닥(매트)를 형성하기 위한 철근들을 가로,세로로 배근하고, 기초콘크리트를 타설하게 된다.After arranging and reinforcing the head of such a pile, in some cases, after pouring the abandoned concrete, the reinforcement bars are fixed vertically from the top of the pile, and the reinforcement bars to form a foundation floor (mat) are placed horizontally and vertically at the top of the pile in a horizontal direction. The foundation concrete is placed and the foundation concrete is poured.

상기와 같이 항타한 파일과 타설된 콘크리트를 기초로 구조물을 건축하게 되면 구조물을 보다 안정적으로 지지할 수 있는 것이다.If a structure is built based on driven piles and poured concrete as described above, the structure can be supported more stably.

참고로 항타된 파일을 지면으로부터 150mm 노출되도록 동일한 높이로 절단하는 과정을 거치게 되는데 강선 절단후 콘크리트 제거 등으로 발생되는 작은 크랙(종크랙)이 발생하거나, 절단된 파일로부터 콘크리트 제거를 위해 핸드햄머로 쳐내는 과정에서 일부 콘크리부분이 깨어져 떨어져 나가기도 한다.For reference, the driven pile goes through the process of cutting at the same height so that it is exposed 150mm from the ground. Small cracks (longitudinal cracks) may occur due to concrete removal after cutting the steel wire, or the pile may be cut with a hand hammer to remove concrete from the cut pile. During the removal process, some concrete parts may break and fall off.

통상 깨어진 부분 위에 콘크리트를 쳐서 미세하게 깨진 부분에 콘크리트를 채우는 것은 부수적이지만 근본적으로 두부 보강을 하여야만 한다.Normally, pouring concrete on top of the broken part and filling the finely broken part with concrete is incidental, but fundamentally, head reinforcement must be done.

두부보강시 철근으로 바닥슬래브와 엮어주기 위한 것으로, 이때 상부구조물 하중을 파일에 정확하게 전달하기 위하여 파일두부 보강을 실시하여야만 한다.When reinforcing the head, it is used to connect the floor slab with reinforcing bars. At this time, the pile head must be reinforced in order to accurately transmit the load of the superstructure to the pile.

만약 두부보강을 하지 않는 경우 슬라브와 파일 연결부분에 균열이 발생하여 상부하중을 제대로 전달하지 못하여 하중에의한 파일두부의 파손은 하중의 잘못된 전달로 인하여 구조물이 침하할수 있는 원인이 되기 때문에 두부보강은 중요한 과정중 하나이다.If head reinforcement is not provided, cracks may occur at the connection between the slab and the pile, preventing the upper load from being transmitted properly, and damage to the pile head due to the load may cause the structure to sink due to incorrect transfer of the load. is one of the important processes.

상기와 같은 두부보강과 관련하여 각각의 파일은 그 간격을 유지해야만 전체적으로 힘을 유지하고 발현되며, 파일 간격을 영구히 유지하기 위함에 있어서도 두부보강 및 매트타설이 필수적이다. 즉, 각각의 파일이 받고 있는 힘을 기초매트로 전달하기 위함이며, 이는 각각의 파일이 암반 층까지 박혀있는 상태에서 그 힘을 상부에 구조물에 전달하려면 중간 연결구조물이 있어야 하는데 그것이 두부 보강 및 기초 매트를 만들기 위함이며, 여기서 두부 보강은 기초와 연결되는 부분이 취약하지 않고 단단히 되게 하기 위하여 기초와 파일의 연결력을 높여주는 역할로서 기초공사의 핵심이라 할 수 있다.In relation to the head reinforcement as described above, each pile must maintain its spacing to maintain and develop overall strength, and head reinforcement and mat placement are essential to permanently maintain the pile spacing. In other words, it is to transmit the force being received by each pile to the foundation mat. This means that in order to transmit the force to the structure at the top while each pile is embedded into the rock layer, there must be an intermediate connection structure, which is the head reinforcement and foundation mat. This is to make a mat, and here, head reinforcement can be said to be the core of foundation construction as it increases the connection between the foundation and the pile to ensure that the part connected to the foundation is strong and not weak.

이렇게 항타한 파일의 두부정리(두부보강)의 경우, 항타한 파일에는 두부 보강캡이 설치되는데, 파일의 두부정리 및 보강과 관련한 선원기술을 살피면 다음과 같다.In the case of head preparation (head reinforcement) of the pile driven in this way, a head reinforcement cap is installed on the driven pile, and the crew technology related to head preparation and reinforcement of the pile is as follows.

해당 선원기술 중 대한민국 등록특허제10-1027788호(명칭: PHC 파일의 두부보강 구조물, 이하 이를 '특허문헌 1'이라 함), 등록특허 제10-1515344호(명칭: PHC 파일 두부보강 구조체, 이하 이를 '특허문헌 2'라 함) 및 등록특허 제10-1050458호(명칭: PHC 파일의 두부 보강구조물, 이하 이를 '특허문헌 3'이라 함)이 개시되어 있다.Among the relevant source technologies, Republic of Korea Patent No. 10-1027788 (name: PHC pile head reinforcement structure, hereinafter referred to as 'Patent Document 1'), Registered Patent No. 10-1515344 (name: PHC pile head reinforcement structure, hereinafter referred to as 'Patent Document 1') This is referred to as 'Patent Document 2') and Registered Patent No. 10-1050458 (name: Head reinforcement structure of PHC pile, hereinafter referred to as 'Patent Document 3') are disclosed.

상기 특허문헌 1 내지 3은 모두 파일의 두부 절단 후 두부를 보강하기 위한 구조물으로서, 파일의 원주상에 배치되는 긴장재와, 파일 내부 직경에 안내되는 지지판, 지지판을 지탱하여 기초바닥을 형성시 파일과 연결되는 보강철근들과의 결속으로 이루어져 파일의 두부 보강과 함께 정리가 이루어지도록 한 것이다.The above patent documents 1 to 3 are all structures for reinforcing the head of a pile after cutting the head of the pile, and include a tendon material disposed on the circumference of the pile, a support plate guided to the inner diameter of the pile, and a pile when forming a foundation floor by supporting the support plate. It is made by binding with connected reinforcing bars so that it can be organized along with reinforcement of the head of the pile.

하지만, 상술한 바와 같이 두부정리를 위해 절단과정에서 파생된 두부의 절단면 손상 또는 종크랙부분에 대해서는 보강이 제대로 이루지지 않은 상태에서 파일의 두부 내경측에 한하여 철근과 콘크리트의 타설로서 보강하는 정도이기 때문에 향후 내구성이 떨어지는 문제점이 있었다.However, as mentioned above, damage to the cut surface of the head or longitudinal cracks resulting from the cutting process for head preparation are not properly reinforced, and only the inner diameter side of the head of the pile is reinforced by pouring rebar and concrete. Because of this, there was a problem of poor durability in the future.

상기와 같은 파일의 두부 보강은 지면으로부터 설정된 높이만으로 드러난 파일의 외경부위에는 기초 바닥형성을 위한 콘크리트 타설에 의해 감추어지기 때문에 근본적인 파일의 보강이 꼭 필요한 실정이다.Since the head reinforcement of the pile as described above is hidden by pouring concrete to form the foundation floor in the outer diameter area of the pile, which is exposed only at a set height from the ground, fundamental reinforcement of the pile is essential.

한국 등록특허 제10-1027788호(등록 2011년 04월 25일)Korean Patent No. 10-1027788 (registered on April 25, 2011) 한국 등록특허 제10-1515344호(등록 2015년 04월 21일)Korean Patent No. 10-1515344 (registered on April 21, 2015) 한국 등록특허 제10-1050458호(등록 2011년 07월 13일)Korean Patent No. 10-1050458 (registered on July 13, 2011)

본 발명은 상기와 같이 제반되는 종래의 문제점을 해결하기 위하여 발명한 것으로서, 항타에 의해 지면에 박힌 파일의 두부 정리후 두부를 보강하는 과정에서 파일의 상단부를 포함한 내측과 외측을 견고하게 보강하여 파일의 두부 절단시 발생한 파일의 절단면 콘크리트 손상, 종크랙부분에 대한 보강이 견고하게 이루어질 수 있도록 한 PHC 파일용 두부 보강캡을 제공하는데 그 목적이 있다.The present invention was invented to solve the conventional problems as described above. In the process of reinforcing the head of a pile driven into the ground by driving, the inside and outside of the pile, including the upper end, are firmly reinforced to strengthen the pile. The purpose is to provide a head reinforcement cap for PHC piles that can firmly strengthen the longitudinal cracks and damage to the concrete on the cut surface of the pile that occurs when cutting the head of the pile.

상기 목적을 달성하기 위한 본 발명에 의하면, 지면 내에 항타되고 노출된 파일의 절단된 두부를 보강하기 위한 파일용 두부 보강캡에 있어서,According to the present invention for achieving the above object, in the head reinforcement cap for piles for reinforcing the cut head of the pile driven and exposed in the ground,

상기 두부 보강캡은, 원통형으로 절단된 파일의 외경을 감싸는 형태로 일측에 절개부가 형성되며, 절개부로부터 상호 대응되게 결합공이 등간격지게 형성된 지지편을 갖는 몸통부와, 상기 몸통부의 상단 외측둘레에 보강철근을 파일의 외측으로 배열 설치하기 위한 철근삽입공이 원주상으로 배열 형성되며, 상기 몸통부의 절개부를 따라 일측이 절개된 제1상부플랜지부 및 상기 몸통부의 상단 내측둘레에 보강철근을 파일의 내측으로 배열 설치하기 위한 철근삽입공이 원주상으로 배열 형성되며, 상기 몸통부의 절개부를 따라 일측이 절개된 제2상부플랜지부와, 상기 몸통부의 하단 외측둘레에 형성되어 상부플랜지부의 철근삽입공을 통해 삽입된 보강철근의 하단을 체결하기 위한 철근체결공이 원주상으로 배열 형성되며, 상기 몸통부의 절개부를 따라 일측이 절개된 하부플랜지부와, 원판형으로 상기 파일의 내측에 위치되어 상기 제2상부플랜지부를 통해 몸통부 내측으로 배열되는 보강철근의 하단부와 연결 고정되면서 콘크리트의 타설시 파일의 내부로 콘크리트가 주입되는 것을 방지하도록 상부에는 제2상부플랜지부를 통해 파일 내측으로 고정되는 보강철근의 하단부를 체결하기 위한 체결보스가 원주상으로 배열 형성된 받침판과, 지면으로부터 노출되는 상기 몸통부 및 제1상부플랜지부의 외측에 간격을 두고 배치되고, 그 내부에 콘크리트 타설에 의해 파일 두부의 상측 외측둘레를 보강하는 원통형 틀과, 상기 몸통부의 지지편측 결합공에 체결되어 파일의 외경에 맞게 몸통부를 고정하는 볼트 및 너트를 포함하여 구성된 것을 특징으로 한다.The head reinforcement cap has a cutout portion formed on one side in a form that surrounds the outer diameter of a file cut into a cylindrical shape, a body portion having a support piece with coupling holes formed at equal intervals corresponding to each other from the cut portion, and an upper outer circumference of the body portion. Reinforcing bar insertion holes for arranging and installing reinforcing bars to the outside of the pile are formed in a circumferential arrangement, and reinforcing bars are placed around the first upper flange portion, which has one side cut along the cut portion of the body portion, and the inner circumference of the top of the body portion of the pile. Reinforcing bar insertion holes for inward arrangement are formed in a circumferential arrangement, a second upper flange portion with one side cut along the incision of the body portion, and a reinforcing bar insertion hole of the upper flange portion formed on the lower outer circumference of the body portion. Reinforcement fastening holes for fastening the lower end of the reinforcing bar inserted through are arranged in a circumferential shape, a lower flange portion with one side cut along the cut portion of the body portion, and a disk-shaped portion located inside the pile to form the second upper portion. The reinforcing bar is connected and fixed to the lower part of the reinforcing bar arranged inside the body through the flange part and is fixed to the inside of the pile through the second upper flange part at the top to prevent concrete from being injected into the inside of the pile when pouring concrete. Fastening bosses for fastening the lower part are arranged at intervals on the outer side of the supporting plate arranged in a circumferential shape, the body part and the first upper flange part exposed from the ground, and the upper outer side of the pile head is formed by pouring concrete therein. It is characterized by comprising a cylindrical frame that reinforces the circumference, and bolts and nuts that are fastened to the coupling hole on the support side of the body portion and secure the body portion according to the outer diameter of the pile.

삭제delete

본 발명에 따른 상기 두부 보강캡의 하부플랜지부는 지면으로부터 600~700mm의 깊이로 매입되어 파일의 두부보강이 이루어지는 것을 특징으로 한다.The lower flange portion of the head reinforcement cap according to the present invention is characterized in that head reinforcement of the pile is performed by being buried to a depth of 600 to 700 mm from the ground.

삭제delete

본 발명에 따른 PHC 파일용 두부 보강캡은, 파일의 두부 정리된 상태에서 상부로부터 사이즈에 맞게 씌워지는 보강캡은 몸통부를 기준으로 파일의 외측과 제1상부플랜지부 및 제2상부플랜지부에 의한 파일의 상단부를 보호함과 동시에 보강철근을 파일의 내외측으로 배치시키고, 파일의 내부에서서는 받침판과 보강철근을 연결한 상태에서 콘크리트의 타설작업으로 파일의 상단부를 포함한 내측과 외측을 견고하게 보강하여 줌으로써, 두부파일 절단후 발생한 파일의 절단면 콘크리트 손상, 종크랙부분에 대한 보강이 견고하게 이루어지고, 나아가 바닥기초 형성시 기초바닥(매트형성)과 더불어 견고한 지반을 구축할 수 있는 효과가 있다.The head reinforcing cap for a PHC pile according to the present invention is a reinforcing cap that is covered according to size from the top in a state where the head of the pile is arranged, and is formed on the outside of the pile with respect to the body and by the first upper flange portion and the second upper flange portion. At the same time as protecting the upper part of the pile, reinforcing bars are placed inside and outside the pile, and inside the pile, the inner and outer sides, including the upper part of the pile, are firmly reinforced by pouring concrete while connecting the support plate and reinforcing bar. By doing this, the concrete damage and vertical cracks on the cut surface of the pile that occur after cutting the head pile are firmly reinforced, and furthermore, when forming the floor foundation, there is an effect of building a solid ground along with the foundation floor (mat formation).

도 1은 본 발명인 PHC 파일용 두부 보강캡을 도시한 사시도,
도 2는 본 발명에 따른 두부 보강캡을 종방향으로 절단하여 도시한 사시도,
도 3는 본 발명에 따른 두부 보강캡에 보강철근을 배치시킨 상태를 도시한 사시도,
도 4는 본 발명에 따른 두부 보강캡을 PHC 파일에 적용한 상태를 도시한 단면도,
도 5는 도 4에서 보강철근 삽입후 콘크리트를 타설한 상태를 예시한 단면도,
도 6은 본 발명에 따른 PHC 파일에 두부 보강캡과 보강철근이 배치되어 보강된 상태를 도시한 횡단면도이다.
Figure 1 is a perspective view showing the head reinforcement cap for PHC pile of the present invention,
Figure 2 is a perspective view showing the head reinforcement cap according to the present invention cut in the longitudinal direction;
Figure 3 is a perspective view showing a state in which reinforcing bars are placed in the head reinforcement cap according to the present invention;
Figure 4 is a cross-sectional view showing a state in which the head reinforcement cap according to the present invention is applied to a PHC pile;
Figure 5 is a cross-sectional view illustrating the state in which concrete is placed after inserting the reinforcing bars in Figure 4;
Figure 6 is a cross-sectional view showing a reinforced state in which the head reinforcement cap and reinforcing bar are arranged in the PHC pile according to the present invention.

이하, 본 발명을 첨부된 도면을 참조하여 더욱 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the attached drawings.

이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 발명자는 그 자신의 발명을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 발명의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Prior to this, terms or words used in this specification and claims should not be construed as limited to their usual or dictionary meanings, and the inventor should appropriately use the concept of terms to explain his or her invention in the best way. It must be interpreted as meaning and concept consistent with the technical idea of the present invention based on the principle of definability.

따라서, 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 발명의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 발명의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in this specification and the configurations shown in the drawings are only one of the most preferred embodiments of the present invention and do not represent the entire technical idea of the present invention, so at the time of filing this application, they can be replaced. It should be understood that various equivalents and variations may exist.

본 발명에 따른 PHC 파일용 두부 보강캡은 첨부된 도 1 내지 도 6을 참조하여 설명하면 다음과 같다.The head reinforcement cap for PHC pile according to the present invention will be described with reference to the attached Figures 1 to 6 as follows.

지면에 항타되고 노출된 파일(1)의 절단된 두부를 보강하기 위한 파일용 두부 보강캡에 있어서,In the head reinforcement cap for a pile to reinforce the cut head of the pile (1) driven and exposed on the ground,

상기 두부 보강캡(100)은, 금속재로 제작되며, 그 외형적으로 원통형의 몸통부(10)와, 제1상부플랜지부(20), 제2상부플랜지부(20'), 하부플랜지부(30) 및 받침판(40)으로 구성된다.The head reinforcement cap 100 is made of metal, and has a body portion 10 that is cylindrical in appearance, a first upper flange portion 20, a second upper flange portion 20', and a lower flange portion ( 30) and a support plate 40.

상기 몸통부(10)는, 파일(1)의 외직경에 준하는 원통형의 사이즈로, 절단된 파일(1)의 외경을 감싸는 형태로, 일측에 절개부(11)가 형성되며, 절개부(11)로부터 상호 대응되게 결합공(12a)이 등간격지게 형성된 지지편(12)이 일체로 형성된다.The body portion 10 has a cylindrical size corresponding to the outer diameter of the pile 1, is shaped to surround the outer diameter of the cut pile 1, and has a cut portion 11 formed on one side, and the cut portion 11 ), the support pieces 12 in which the coupling holes 12a are formed at equal intervals to correspond to each other are formed integrally.

상기 제1상부플랜지부(20)는 몸통부(10)의 상단 외측둘레에 일체로 형성되는 것으로, 보강철근(2)을 파일(1)의 외측으로 배열 설치하기 위한 철근삽입공(21)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 형태를 갖는다.The first upper flange portion 20 is formed integrally around the upper outer circumference of the body portion 10, and has a reinforcing bar insertion hole 21 for arranging and installing the reinforcing bars 2 to the outside of the pile 1. It is arranged in a circumferential shape and has one side cut along the cut portion 11 of the body portion 10.

또한, 제2상부플랜지부(20')는 제1상부플랜지부(20)와 동일선상으로 상기 몸통부(10)의 상단 내측둘레에 연장된 것으로, 보강철근(2)을 파일(1)의 내측으로 배열 설치하기 위한 철근삽입공(22)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 형태를 갖는다.In addition, the second upper flange portion 20' extends along the same line as the first upper flange portion 20 to the upper inner circumference of the body portion 10, and attaches the reinforcing bar 2 to the pile 1. The reinforcing bar insertion holes 22 for arranging the inside are arranged in a circumferential shape, and have a shape with one side cut along the cut portion 11 of the body portion 10.

상기 하부플랜지부(30)는 몸통부(10)의 하단 외측둘레에 일체로 형성되어 제1상부플랜지부(20)의 철근삽입공(21)을 통해 삽입된 보강철근(2)의 하단을 체결하기 위한 철근체결공(31)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 형태이다.The lower flange portion 30 is integrally formed around the lower outer circumference of the body portion 10 and fastens the lower end of the reinforcing bar 2 inserted through the reinforcing bar insertion hole 21 of the first upper flange portion 20. The reinforcement fastening holes 31 for this purpose are arranged in a circumferential shape, and one side is cut along the cut portion 11 of the body portion 10.

즉, 상기 제1상부플랜지부(20)와 제2상부플랜지부(20') 및 하부플랜지부(30)는 별도로 제작되어 몸통부(10)의 상부와 하부에 각각 용접되어 제작되는 것으로, 상기 철근삽입공(21)(22) 및 철근체결공(31)은 각 플랜지부에 대해 내측과 외측, 즉 파일(1)의 내측과 외측으로 배치되어 보강될 수 있게 배열 형성된 것이다.That is, the first upper flange portion 20, the second upper flange portion 20', and the lower flange portion 30 are manufactured separately and welded to the upper and lower portions of the body portion 10, respectively. The rebar insertion holes 21 and 22 and the rebar fastening holes 31 are arranged on the inside and outside of each flange part, that is, on the inside and outside of the pile 1, so that they can be reinforced.

상기 철근체결공(31) 대신 각각 안내되는 보강철근의 하단부분을 소정 깊이 수용하여 체결할 있는 보스형태로도 형성될 수 있다.Instead of the reinforcing bar fastening hole 31, it can also be formed in the form of a boss that can accommodate and fasten the lower part of each guided reinforcing bar to a predetermined depth.

상기 받침판(40)은 파일(1)의 내측에 위치되어 상기 제2상부플랜지부(20')를 통해 몸통부 내측으로 배열되는 보강철근(2)의 하단부와 연결 고정되면서 콘크리트(C)의 타설시 파일(1)의 내부로 콘크리트가 주입되는 것을 방지하도록 한다.The support plate 40 is located on the inside of the pile 1 and is connected and fixed to the lower end of the reinforcing bar 2 arranged inside the body through the second upper flange portion 20', allowing the pouring of concrete (C). Be sure to prevent concrete from being injected into the interior of the pile (1).

상기 받침판(40)은 원판형으로, 그 상부에는 제2상부플랜지부(20')를 통해 파일(1) 내측으로 고정되는 보강철근(2)의 하단부를 체결하기 위한 체결보스(41)가 원주상으로 배열 형성된다.The support plate 40 is in the shape of a disk, and on its upper part is a circular fastening boss 41 for fastening the lower end of the reinforcing bar 2 fixed to the inside of the pile 1 through the second upper flange portion 20'. It is formed in a columnar arrangement.

상기 보강철근의 하단부분은 체결나사부를 마련하여 상기 하부플랜지부의 철근체결공, 받침판의 체결보스에 체결하는 방식으로 연결하거나 혹은 그 외측둘레에고정링(R)을 추가하여 상기 제1상부플랜지부, 제2상부플랜지부의 상부에서 콘크리트의 타설 이전 간단히 고정될 수 있도록 할 수 있다.The lower part of the reinforcing bar is connected by providing a fastening screw portion and fastening it to the reinforcing bar fastening hole of the lower flange part and the fastening boss of the support plate, or by adding a fixing ring (R) to the outer circumference of the first upper plank. It can be easily fixed before pouring concrete at the top of the branch and second upper flange section.

한편, 상기 몸통부(10)의 지지편(12)측 결합공(12a)에는 파일(1)의 외경에 맞게 몸통부(10)를 고정하는 볼트(B) 및 너트(N)가 체결된다.Meanwhile, a bolt (B) and a nut (N) for fixing the body 10 according to the outer diameter of the pile 1 are fastened to the coupling hole 12a on the support piece 12 side of the body 10.

상기 받침판(40)은 파일(1) 내에서 요구하는 깊이로 위치시킬 수 있으며, 몸통부(10)의 절개부(11)를 통해 상기 파일(1)의 내부 직경에 근접되게 위치시킨 상태에서 볼트(B) 및 너트(N)의 체결이 이루어지도록 한다.The support plate 40 can be positioned at a required depth within the pile 1, and can be bolted while positioned close to the inner diameter of the pile 1 through the cutout 11 of the body 10. Ensure that (B) and nut (N) are fastened.

상기 두부 보강캡(100)의 하부플랜지부(30)는 지면으로부터 600~700mm의 깊이로 매입되어 파일(1)의 두부보강이 이루어지도록 한다.The lower flange portion 30 of the head reinforcement cap 100 is embedded to a depth of 600 to 700 mm from the ground to reinforce the head of the pile 1.

참고로 지면으로 노출된 파일의 길이는 대략적으로 150mm정도로서 본 발명에 따른 두부 보강캡의 전반적인 길이는 750~850mm의 길이로 제작된다.For reference, the length of the pile exposed to the ground is approximately 150 mm, and the overall length of the head reinforcement cap according to the present invention is manufactured to be 750 to 850 mm.

한편, 지면으로부터 노출된 몸통부(10) 및 상부플랜지부(20)의 외측에 배치되어 콘크리트(C) 타설에 의해 파일(1) 두부의 상측 외측둘레를 보강하는 원통형 틀(50)이 더 구비된다.Meanwhile, a cylindrical frame 50 is disposed on the outside of the body portion 10 and the upper flange portion 20 exposed from the ground and reinforces the upper outer circumference of the head of the pile (1) by pouring concrete (C). do.

상기 제1상부플랜지부(20)에 배치되는 보강철근(2)은 제2상부플랜지부(20') 내측에 배치되는 철근보다 굵은 직경으로 배치되어 향후 기초바닥 형성에 의한 횡압을 높일 수 있도록 한다.The reinforcing bars 2 disposed in the first upper flange portion 20 are arranged with a larger diameter than the reinforcing bars disposed inside the second upper flange portion 20' to increase the lateral pressure due to the formation of the foundation floor in the future. .

이와 같이 구성된 본 발명인 두부 보강캡을 PHC 파일에 적용하여 보강하는 상태를 기술하면 다음과 같다.The state of reinforcing the head reinforcement cap of the present invention configured as described above by applying it to the PHC pile is described as follows.

먼저, 항타되어 지면에 간격을 두고 박힌 파일(1)의 두부정리를 위해 지면상으로부터 150mm 정도를 남겨두고 절단 후 그 상부에 두부 보강캡(100)을 씌우는 형태로 결합한 다음, 보강철근(2)의 배치와 함께 콘크리트(C)의 타설로서 파일(1)의 두부를 보강할 수 있게 한다.First, in order to prepare the head of the pile (1) that has been driven and driven into the ground at intervals, it is cut leaving about 150 mm above the ground, and then combined by covering the top with a head reinforcing cap (100), and then reinforcing bar (2). It is possible to reinforce the head of the pile (1) by pouring concrete (C) along with the placement of.

두부 보강캡(100)의 하단부분을 해당 파일(1)의 상부로부터 씌우기 이전 파일(1)의 외직경에 대해 몸통부(10)에 마련된 지지편(12)측으로부터는 볼트(B)와 너트(N)의 체결하되, 그 이전 준비된 받침판(40)을 절개부(11)를 통해 몸통부(10) 내측에 안내시키고, 제2상부플랜지부(20')를 통한 보강철근(2)을 받침판(40)의 체결보스(41)에 연결한 상태에서 상기 볼트(B)와 너트(N)의 체결하여 몸통부(10)를 최대한 파일(1)의 외경에 근접되는 사이즈로 조정한다.Before covering the lower part of the head reinforcement cap 100 from the upper part of the pile 1, a bolt (B) and a nut ( N) is fastened, and the previously prepared support plate 40 is guided to the inside of the body 10 through the cut part 11, and the reinforcing bar 2 through the second upper flange part 20' is connected to the support plate ( While connected to the fastening boss 41 of 40), the bolt (B) and nut (N) are fastened to adjust the body portion (10) to a size that is as close to the outer diameter of the pile (1) as possible.

상기와 같은 상태에서 제1상부플랜지부(20)를 통해 하부플랜지부(30)에 보강철근(2)을 각각 꽂아 원주형으로 배치시켜 주며, 이와 같은 형태는 첨부된 도 3 및 도 4에서 도시한 바와 같다.In the above state, reinforcing bars (2) are respectively inserted into the lower flange part (30) through the first upper flange part (20) and arranged in a cylindrical shape, and this form is shown in the attached Figures 3 and 4. It is the same as what was said.

상기와 같이 보강철근(2)은 제1상부플랜지부(20)와 하부플랜지부(30)의 외측에, 제2상부플랜지부(20')를 통한 파일(1) 내측에 배치된 상태에서 두부 보강캡(10)의 상부에서 콘크리트(C)를 타설한다. 이때 콘크리트(C)의 타설은 파일(1) 내측 및 몸통부(10)의 절개부(11) 사이에 콘크리트(C)가 채워지는 형태로 타설이 이루어진다.As described above, the reinforcing bar (2) is disposed on the outside of the first upper flange part (20) and the lower flange part (30) and on the inside of the pile (1) through the second upper flange part (20'). Concrete (C) is poured from the top of the reinforcement cap (10). At this time, the concrete (C) is poured in such a way that the concrete (C) is filled between the inside of the pile (1) and the cut portion (11) of the body portion (10).

지면으로 노출된 파일(1)의 상부측에는 원통형 틀(50)을 배치한 상태에서 콘크리트 타설을 실시하면, 최종적으로 상기 몸통부(10)의 절개부(11)를 통한 내측과 외측부분은 콘크리트(C)로 채워지고, 이후 일정시간 콘크리트의 양생을 거치면 파일(1)의 두부 상측 외측둘레부분 또한 보강이 완료된다.When concrete is poured with a cylindrical frame 50 placed on the upper side of the pile 1 exposed to the ground, the inner and outer portions through the incision 11 of the body 10 are finally formed with concrete ( C) is filled, and after the concrete is cured for a certain period of time, the reinforcement of the upper outer circumferential part of the head of the pile (1) is also completed.

상기와 같은 상태의 보강철근(2)들은 두부 보강캡(100)의 내외측에서 배치되어 타설된 콘크리트(C)에 의해 첨부된 도 6에서 도시한 바와 같이 파일(1)의 상부내,외측을 동시에 보강하여 줌으로써 보다 튼튼한 파일 보강이 이루어진다.The reinforcing bars (2) in the above state are arranged on the inside and outside of the head reinforcement cap (100) and are formed on the inside and outside of the top of the pile (1) by the poured concrete (C), as shown in Figure 6 attached. By reinforcing at the same time, stronger pile reinforcement is achieved.

즉, 파일(1)의 두부 정리시 발생하였던 절단면 콘크리트 손상부위 또는 파일에 가해진 종크랙 부분을 보강하여 줌으로써, 기초 이전에 파일을 상기와 같이 견고하게 보강할 수 있게 된다.In other words, by reinforcing the damaged area of concrete on the cut surface that occurred when the head of the pile 1 was cleaned or the longitudinal crack applied to the pile, it is possible to firmly reinforce the pile as described above before foundation.

도면에서 미도시하였지만 상기 보강철근(2)은 이후 그 상부로 수평 또는 수직으로 연장하거나 엮어 줌으로써 콘크리트 타설에 의한 기초바닥(매트)을 형성할 수 있게 하고, 나아가 각각의 파일들은 하나의 지반 구축 구조물 형성시 견고한 바닥을 제공할 수 있다.Although not shown in the drawing, the reinforcing bars (2) are later extended or woven horizontally or vertically to the top to form a foundation floor (mat) by pouring concrete, and each pile is a single ground construction structure. When formed, it can provide a solid floor.

이상과 같이 본 발명에서는 구체적인 구성 요소 등과 같은 특정 사항들과 한정된 실시예 및 도면에 의해 설명되었으나 이는 본 발명의 보다 전반적인 이해를 돕기 위해서 제공된 것일 뿐, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 본 발명이 속하는 분야에서 통상적인 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다.As described above, the present invention has been described with specific details such as specific components and limited embodiments and drawings, but this is only provided to facilitate a more general understanding of the present invention, and the present invention is not limited to the above embodiments. , those skilled in the art can make various modifications and variations from this description.

따라서, 본 발명의 사상은 설명된 실시예에 국한되어 정해져서는 아니 되며, 후술하는 특허청구범위뿐 아니라 이 특허청구범위와 균등하거나 등가적 변형이 있는 모든 것들은 본 발명 사상의 범주에 속한다고 할 것이다.Therefore, the spirit of the present invention should not be limited to the described embodiments, and the scope of the patent claims described below as well as all things that are equivalent or equivalent to the scope of the claims will be said to fall within the scope of the spirit of the present invention. .

1: 파일 2: 보강철근
10: 몸통부 11: 절개부
12: 지지편 12a: 결합공
20: 제1상부플랜지부 20' 제2상부플랜지부
21, 22: 철근삽입공 30: 하부플랜지부
31: 철근체결공 40: 받침판
41: 체결보스 50: 원통형 틀
100: 두부 보강캡 B: 볼트
C: 콘크리트 N: 너트
1: Pile 2: Rebar
10: body 11: incision
12: support piece 12a: coupling hole
20: 1st upper flange 20' 2nd upper flange
21, 22: Rebar insertion hole 30: Lower flange part
31: rebar fastener 40: support plate
41: fastening boss 50: cylindrical frame
100: Head reinforcement cap B: Bolt
C: Concrete N: Nut

Claims (4)

지면 내에 항타되고 노출된 파일(1)의 절단된 두부를 보강하기 위한 파일용 두부 보강캡(100)에 있어서,
상기 두부 보강캡(100)은,
원통형으로 절단된 파일(1)의 외경을 감싸는 형태로 일측에 절개부(11)가 형성되며, 절개부(11)로부터 상호 대응되게 결합공(12a)이 등간격지게 형성된 지지편(12)을 갖는 몸통부(10)와,
상기 몸통부(10)의 상단 외측둘레에 보강철근(2)을 파일(1)의 외측으로 배열 설치하기 위한 철근삽입공(21)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 제1상부플랜지부(20) 및,
상기 몸통부(10)의 상단 내측둘레에 보강철근(2)을 파일(1)의 내측으로 배열 설치하기 위한 철근삽입공(22)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 제2상부플랜지부(20')와,
상기 몸통부(10)의 하단 외측둘레에 형성되어 상부플랜지부(20)의 철근삽입공(21)을 통해 삽입된 보강철근(2)의 하단을 체결하기 위한 철근체결공(31)이 원주상으로 배열 형성되며, 상기 몸통부(10)의 절개부(11)를 따라 일측이 절개된 하부플랜지부(30)와,
원판형으로 상기 파일(1)의 내측에 위치되어 상기 제2상부플랜지부(20')를 통해 몸통부 내측으로 배열되는 보강철근(2)의 하단부와 연결 고정되면서 콘크리트(C)의 타설시 파일(1)의 내부로 콘크리트가 주입되는 것을 방지하도록 상부에는 제2상부플랜지부(20')를 통해 파일(1) 내측으로 고정되는 보강철근(2)의 하단부를 체결하기 위한 체결보스(41)가 원주상으로 배열 형성된 받침판(40)과,
지면으로부터 노출되는 상기 몸통부(10) 및 제1상부플랜지부(20)의 외측에 간격을 두고 배치되고, 그 내부에 콘크리트(C) 타설에 의해 파일(1) 두부의 상측 외측둘레를 보강하는 원통형 틀(50)과,
상기 몸통부(10)의 지지편(12)측 결합공(12a)에 체결되어 파일(1)의 외경에 맞게 몸통부(10)를 고정하는 볼트(B) 및 너트(N)를 포함하여 구성된 것을 특징으로 하는 PHC 파일용 두부 보강캡.
In the head reinforcement cap 100 for a pile to reinforce the cut head of the pile 1 driven and exposed in the ground,
The head reinforcement cap 100,
A cutout part 11 is formed on one side in a form that surrounds the outer diameter of the file 1 cut into a cylindrical shape, and a support piece 12 is provided with coupling holes 12a formed at equal intervals to correspond to each other from the cutout part 11. A body portion (10) having,
Reinforcing bar insertion holes 21 for arranging and installing reinforcing bars 2 to the outside of the pile 1 are formed circumferentially around the upper outer circumference of the body 10, and an incision in the body 10 is formed. A first upper flange portion (20) with one side cut along the portion (11),
Reinforcing bar insertion holes 22 for arranging and installing reinforcing bars 2 to the inside of the pile 1 are formed circumferentially around the upper inner circumference of the body 10, and an incision in the body 10 is formed. A second upper flange portion (20') with one side cut along the portion (11),
A reinforcing bar fastening hole 31 is formed on the lower outer circumference of the body portion 10 and is used to fasten the lower end of the reinforcing bar 2 inserted through the reinforcing bar insertion hole 21 of the upper flange portion 20. A lower flange portion (30) formed in an array and cut on one side along the cut portion (11) of the body portion (10),
It is located inside the pile (1) in a disk shape and is connected and fixed to the lower end of the reinforcing bar (2) arranged inside the body through the second upper flange portion (20'), so that when pouring concrete (C), the pile To prevent concrete from being injected into the interior of (1), there is a fastening boss (41) at the top for fastening the lower end of the reinforcing bar (2), which is fixed to the inside of the pile (1) through the second upper flange portion (20'). A support plate 40 arranged in a columnar shape,
It is disposed at intervals on the outside of the body portion 10 and the first upper flange portion 20 exposed from the ground, and reinforces the upper outer circumference of the head of the pile (1) by pouring concrete (C) therein. A cylindrical frame 50,
Consisting of a bolt (B) and a nut (N) fastened to the coupling hole (12a) on the support piece (12) side of the body portion (10) to secure the body portion (10) according to the outer diameter of the pile (1). Head reinforcement cap for PHC pile, characterized in that.
삭제delete 제1항에 있어서,
상기 두부 보강캡(100)의 하부플랜지부(30)는 지면으로부터 600~700mm의 깊이로 매입되어 파일(1)의 두부보강이 이루어지는 것을 특징으로 하는 PHC 파일용 두부 보강캡.
According to paragraph 1,
A head reinforcement cap for PHC piles, characterized in that the lower flange portion 30 of the head reinforcement cap 100 is embedded to a depth of 600 to 700 mm from the ground to achieve head reinforcement of the pile 1.
삭제delete
KR1020220124983A 2022-09-30 2022-09-30 Head reinforcement cap for PHC pile Active KR102685846B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020220124983A KR102685846B1 (en) 2022-09-30 2022-09-30 Head reinforcement cap for PHC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020220124983A KR102685846B1 (en) 2022-09-30 2022-09-30 Head reinforcement cap for PHC pile

Publications (2)

Publication Number Publication Date
KR20240045540A KR20240045540A (en) 2024-04-08
KR102685846B1 true KR102685846B1 (en) 2024-07-19

Family

ID=90715124

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020220124983A Active KR102685846B1 (en) 2022-09-30 2022-09-30 Head reinforcement cap for PHC pile

Country Status (1)

Country Link
KR (1) KR102685846B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200245408Y1 (en) * 2001-06-04 2001-10-29 주식회사 스마텍엔지니어링 Couplers for Steel Pipe Piles

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101016002B1 (en) * 2008-05-21 2011-02-23 김일 Peg tofu coupling device
KR101027788B1 (en) 2008-06-27 2011-04-12 이동현 Head reinforcement structure of PHC pile
KR101050458B1 (en) 2008-08-13 2011-07-19 조은경 Head reinforcement structure of PHC pile
KR101515344B1 (en) 2012-05-30 2015-04-27 최성희 Reinforcing structure for phc pipe head
KR20170130105A (en) * 2016-05-18 2017-11-28 원병천 Pile and the installing method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200245408Y1 (en) * 2001-06-04 2001-10-29 주식회사 스마텍엔지니어링 Couplers for Steel Pipe Piles

Also Published As

Publication number Publication date
KR20240045540A (en) 2024-04-08

Similar Documents

Publication Publication Date Title
KR102290220B1 (en) Precast counterfort retaining walls and the construction method thereof
JP6924682B2 (en) Pile head seismic isolation structure and its construction method
KR20090041707A (en) Assembly for pile head connection, connection structure of pile and precast concrete pier structure using same and construction method
KR100946879B1 (en) Assembly for connection of steel pipe pile and precast concrete pier structure, connection structure of steel pipe pile and precast concrete pier structure using same and construction method
KR101341260B1 (en) Method of reinforcing existing concrete footing structure using micropile
KR102560642B1 (en) Composite pile using micro pile and its construction method
KR101283672B1 (en) Non open cut method using the lifting device
KR101864857B1 (en) Construction method of foundation pile with reinforced casing structure
JP7304248B2 (en) Pile head connection structure and construction method of pile head connection structure
KR20100086162A (en) Attachable and detachable joint apparatus of steelpipepile and concretepile for foundation work
KR102685846B1 (en) Head reinforcement cap for PHC pile
KR20110052360A (en) Underground construction method that allows continuous construction of the basement outer wall by using the slab's steel film without the installation of strips
JP7028728B2 (en) Joint structure of foundation pile and foundation slab
KR100922121B1 (en) Combined structure of composite pile and expansion foundation composed of concrete pile
KR102639094B1 (en) Steel Column Foundation Connection Structure with Improved Resistance to Cone Breakage and its Construction Method
KR101313046B1 (en) complex pile including a steel pipe inserted into the central cavity of a concrete pile
JP4451699B2 (en) Pile head joint structure
KR101056655B1 (en) Detachment joint device of concrete pile
KR101171285B1 (en) Attachable joint apparatus of the different sized pile for foundation work
KR102051386B1 (en) construction method of flexural and seismic reinforcing high strength concrete pile with metal cap
KR101304501B1 (en) Steel Pipe Pile head reinforcement device
KR102650575B1 (en) Phc pile with shear key and head reinforcement structure of phc pile using the same
KR100983633B1 (en) A head reinforcement PHC pile
KR102650570B1 (en) Phc pile with shear groove and head reinforcement structure of phc pile using the same
JP2004162414A (en) Construction method of cast-in-place concrete filled steel pipe pile and cast-in-place concrete filled steel pipe pile

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20220930

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20240315

Patent event code: PE09021S01D

PG1501 Laying open of application
E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20240709

PG1601 Publication of registration