[go: up one dir, main page]

KR101513066B1 - Method for reinforcing masonry wall - Google Patents

Method for reinforcing masonry wall Download PDF

Info

Publication number
KR101513066B1
KR101513066B1 KR1020140114093A KR20140114093A KR101513066B1 KR 101513066 B1 KR101513066 B1 KR 101513066B1 KR 1020140114093 A KR1020140114093 A KR 1020140114093A KR 20140114093 A KR20140114093 A KR 20140114093A KR 101513066 B1 KR101513066 B1 KR 101513066B1
Authority
KR
South Korea
Prior art keywords
wall
bolt
epoxy
perforation hole
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
KR1020140114093A
Other languages
Korean (ko)
Inventor
이장희
Original Assignee
이장희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이장희 filed Critical 이장희
Priority to KR1020140114093A priority Critical patent/KR101513066B1/en
Application granted granted Critical
Publication of KR101513066B1 publication Critical patent/KR101513066B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0222Replacing or adding wall ties
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0203Arrangements for filling cracks or cavities in building constructions
    • E04G23/0211Arrangements for filling cracks or cavities in building constructions using injection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

본 발명에 따른 조적벽체의 보강공법은 외부 치장벽체의 각 치장벽돌의 중심을 드릴을 이용하여 관통하고 이어서 내부 벽체에도 소정의 깊이까지 천공홀을 형성하는 단계와, 상기 외부 치장벽체의 관통공과 내부 벽체의 천공홀에 에폭시를 주입하고 전산볼트를 외부 치장벽체의 관통공을 통해 내부 벽체의 천공홀에 매입시키는 단계와, 상기 외부 치장벽체의 외부로 돌출된 상기 전산볼트에 고정너트를 체결하는 단계와, 상기 고정너트의 외측에서 고정너트를 덮을 수 있도록 보호캡을 결합시키되, 상기 보호캡 내부에 에폭시 씰링재를 채운 다음 고정너트를 감싸도록 결합시키는 단계와, 서로 이격된 한 쌍의 수평빔과 이와 결합되는 한 쌍의 수직빔으로 이루어져 외부 치장벽체의 내측에 위치하는 내부 벽체에 부착할 내부 철골프레임을 준비하는 단계와, 상기 내부 철골프레임이 부착되는 내부 벽체의 실내측에 드릴을 이용하여 천공홀을 형성하고 에폭시를 주입하는 단계와, 상기 내부 철골프레임을 내부 벽체에 부착한 다음 전산볼트를 내부 철골프레임에 형성되는 결합공을 통해 내부 벽체에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 고정하는 단계를 포함하여 이루어지는 것을 특징으로 한다.The method for reinforcing a masonry wall according to the present invention comprises the steps of: drilling a center of each of the stucco bricks of an external stucco wall and then forming a perforation hole in the inner wall to a predetermined depth; Inserting an epoxy into the perforation hole of the wall and embedding the bolt into the perforation hole of the inner wall through the through hole of the external stitched wall; and fastening the fixing nut to the external bolt of the external stitched wall A step of coupling a protective cap to cover the fixing nut at the outside of the fixing nut, filling the inside of the protective cap with the epoxy sealing material and wrapping the fixing nut so as to surround the fixing nut, A pair of vertical beams which are joined to each other to prepare an inner steel frame to be attached to the inner wall located inside the outer stucco wall Forming a perforation hole in the inner side of the inner wall to which the inner frame is attached by using a drill and injecting epoxy; attaching the inner frame to the inner wall; And fixing the nut to the protruding end of the bolt. [5] According to another aspect of the present invention,

Description

조적벽체의 보강공법{Method for reinforcing masonry wall}A method for reinforcing masonry wall

본 발명은 조적벽체의 보강공법에 관한 것으로, 보다 상세하게는 콘크리트 벽체 등의 외부에 외장을 위해 축조되는 조적벽체의 보강공법에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for reinforcing a masonry wall, and more particularly, to a method for reinforcing a masonry wall constructed for exterior use on a concrete wall or the like.

일반적으로 콘크리트 벽체 등으로 이루어지는 내부 벽체의 외관을 미려하게 하기 위하여 치장벽돌로 외장벽체를 형성시키고 있다. 이러한 외장 벽돌 벽체는 각 단(段)마다 내부 벽체와의 연결을 위해 연결철선 및 간이브라켓을 설치하고 그 위에 벽돌을 쌓아 올라가는데, 시공부실, 장기적 노화작용 또는 부동침하, 횡하중(풍하중, 지진하중)으로 인하여 벽체에 균열, 배부름 현상 등의 하자가 발생하고 심할 경우 외부의 치장벽돌이 탈락하여 전도되는 안전사고를 발생시키기도 한다. 또한, 창문의 상측에 위치한 상인방 벽돌은 구조적으로 취약하여 균열이 발생하거나 벽돌이 탈락하는 등의 문제점이 많이 노출되고 있다.Generally, exterior walls are formed of stucco bricks in order to make the appearance of interior walls made of concrete walls etc. more beautiful. These exterior brick walls are constructed with connecting wires and simple brackets for connection to the inner wall for each stage, and bricks are stacked on top of it. ) Causes defects such as cracks in the wall and ship's folding phenomenon, and in the case of severe cases, external stucco bricks are dropped and lead to safety accidents. In addition, the upper shell brick located on the upper side of the window is structurally fragile, causing problems such as cracks or falling bricks.

이러한 문제점을 해결하기 위한 종래의 대표적인 외장벽돌 보수 보강공법으로 공개특허 10-2005-0121764의 조적벽체 보강공법을 들 수 있다. 상기 종래의 보강공법은 도 1에서 도시하고 있는 바와 같이, 벽돌 교체구간을 선정하여 그 상단에 보강핀(P)을 이용하여 조적벽체와 내부벽체를 연결하는 보강핀 압입단계, 교체 구간 벽돌의 줄눈을 파쇄하여 교체 구간 벽돌을 제거하는 교체 벽돌 제거단계, 교체 구간 상단에 위치한 상부 조적벽체의 하단면에 맞추어 보강용 브래킷(100)을 내부 벽체에 고정하는 보강용 브래킷 설치단계, 상인방 부위 세워 쌓기 한 벽돌을 앵글과 행거를 이용하여 매달아 고정하는 앵글 및 행거 설치단계, 상기 앵글 위에 벽돌을 쌓아 교체 구간에 벽돌을 새로 쌓아 마감하는 마감 조적단계로 이루어진다.To overcome such a problem, a typical exterior brick repairing and repairing method is a method of reinforcing a masonry wall in Japanese Patent Laid-Open No. 10-2005-0121764. As shown in FIG. 1, the conventional reinforcing method includes a reinforcing fin pressing step of selecting a brick replacement section and connecting the masonry wall and the inner wall using a reinforcing pin P at the upper end thereof, A replacement brick removing step of removing the replacement section brick by crushing the replacement brick, a reinforcing bracket installing step of fixing the reinforcing bracket 100 to the inner wall in conformity with the lower end surface of the upper masonry wall located at the upper end of the replacement section, An angle and a hanger installation step of fixing the bricks by hanging using an angle and a hanger, and a finishing step of stacking the bricks on the angle and newly stacking the bricks in the replacement section.

그런데, 이러한 종래기술은 보강핀, 앵글, 브래킷 등의 많은 부속품을 필요로 할 뿐 아니라, 시공이 번잡하여 공사기간이 길어지는 문제점이 있다. 또, 벽돌을 철거한 후 이를 재시공하여야 하며, 아울러 벽돌 등 건축폐기물이 대량으로 발생하기 때문에 이를 처리하는 비용이 추가되어야 하는 등 경제적으로 많은 비용을 필요로 한다. However, such conventional techniques require many accessories such as reinforcing pins, angles, brackets, and the like, and there is a problem that the construction is complicated and the construction period is prolonged. In addition, bricks must be demolished and then rebuilt. In addition, since a large amount of construction waste such as bricks is generated, a cost for processing the bricks must be added, which is economically costly.

또한, 보강핀 압입단계에서 단순히 보강핀을 압입함으로써 충분한 고정력을 발휘하지 못하고 노후화로 다시 배부름 현상이 발생하거나 치장벽돌이 탈락하는 문제점이 있을 수 있다.In addition, when the reinforcing fin is simply press-fitted in the reinforcing fin indenting step, sufficient fixing force can not be exerted, and there may be a problem that the embossing phenomenon occurs again or the stoning brick is dropped off due to aging.

따라서, 본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위해 안출된 것으로 기존 벽돌을 제거하지 않고 외부 치장벽체의 고정력을 강화하여 배부름 현상의 재발생을 방지하면서도 건물의 내구성을 보다 향상시킬 수 있는 조적벽체의 보강공법을 제공하는 것을 목적으로 한다.SUMMARY OF THE INVENTION Accordingly, the present invention has been made to solve the above-mentioned problems occurring in the prior art, and it is an object of the present invention to improve the durability of a building while preventing the re- It is an object of the present invention to provide a method for reinforcing a masonry wall.

본 발명에 따른 조적벽체의 보강공법은 외부 치장벽체의 각 치장벽돌의 중심을 드릴을 이용하여 관통하고 이어서 내부 벽체에도 소정의 깊이까지 천공홀을 형성하는 단계와, 상기 외부 치장벽체의 관통공과 내부 벽체의 천공홀에 에폭시를 주입하고 전산볼트를 외부 치장벽체의 관통공을 통해 내부 벽체의 천공홀에 매입시키는 단계와, 상기 외부 치장벽체의 외부로 돌출된 상기 전산볼트에 고정너트를 체결하는 단계와, 상기 고정너트의 외측에서 고정너트를 덮을 수 있도록 보호캡을 결합시키되, 상기 보호캡 내부에 에폭시 씰링재를 채운 다음 고정너트를 감싸도록 결합시키는 단계와, 서로 이격된 한 쌍의 수평빔과 이와 결합되는 한 쌍의 수직빔으로 이루어져 외부 치장벽체의 내측에 위치하는 내부 벽체에 부착할 내부 철골프레임을 준비하는 단계와, 상기 내부 철골프레임이 부착되는 내부 벽체의 실내측에 드릴을 이용하여 천공홀을 형성하고 에폭시를 주입하는 단계와, 상기 내부 철골프레임을 내부 벽체에 부착한 다음 전산볼트를 내부 철골프레임에 형성되는 결합공을 통해 내부 벽체에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 고정하는 단계를 포함하여 이루어지는 것을 특징으로 한다.The method for reinforcing a masonry wall according to the present invention comprises the steps of: drilling a center of each of the stucco bricks of an external stucco wall and then forming a perforation hole in the inner wall to a predetermined depth; Inserting an epoxy into the perforation hole of the wall and embedding the bolt into the perforation hole of the inner wall through the through hole of the external stitched wall; and fastening the fixing nut to the external bolt of the external stitched wall A step of coupling a protective cap to cover the fixing nut at the outside of the fixing nut, filling the inside of the protective cap with the epoxy sealing material and wrapping the fixing nut so as to surround the fixing nut, A pair of vertical beams which are joined to each other to prepare an inner steel frame to be attached to the inner wall located inside the outer stucco wall Forming a perforation hole in the inner side of the inner wall to which the inner frame is attached by using a drill and injecting epoxy; attaching the inner frame to the inner wall; And fixing the nut to the protruding end of the bolt. [5] According to another aspect of the present invention,

또한, 상기 내부 벽체의 실내에서 상측에 위치하는 보에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 한 쌍의 수평빔 중 상부 수평빔에 형성되는 결합공을 통해 상기 보에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 상부 수평빔을 상기 보에 고정하는 단계와, 상기 내부 벽체의 실내측에서 각 측벽에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 각 수직빔에 형성되는 결합공을 통해 상기 측벽에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 각 수직빔을 각 측벽에 고정하는 단계와, 상기 내부 벽체의 실내측 바닥 슬래브에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 한 쌍의 수평빔 중 하부 수평빔에 형성되는 결합공을 통해 상기 바닥 슬래브에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 하부 수평빔을 상기 바닥 슬래브에 고정하는 단계를 더 포함하여 이루어지는 것을 특징으로 한다.In addition, a perforation hole is formed in the beam located on the upper side of the inner wall of the inner wall, and epoxy is injected. Then, the bolt is inserted into the perforation hole formed in the beam through the coupling hole formed in the upper horizontal beam of the pair of horizontal beams A step of fixing the upper horizontal beam to the beam by fastening a nut to the protruding end of the bolt, and forming a perforation hole in each side wall of the inner wall, injecting epoxy, The method comprising the steps of: filling a through hole formed in the side wall through a coupling hole formed in a beam, fixing a vertical beam to each side wall by fastening a nut to a protruding end portion of the bolt, Holes are formed and epoxy is injected into the perforation holes formed in the bottom slab through the coupling holes formed in the lower horizontal beam of the pair of horizontal beams And a lower horizontal beam by tightening the nut on the protruding end of the bolt characterized in that the computing further comprises the step of fixing to the floor slab.

또한, 바람직하게는 상기 내부 철골프레임은 한 쌍의 수평빔의 내측에 한 쌍의 추가적인 수평빔을 더 포함하여 이루어진다.Preferably, the inner frame further comprises a pair of additional horizontal beams inside the pair of horizontal beams.

본 발명에 따르면 기존 벽돌을 제거하지 않고 외부 치장벽체의 고정력을 강화하여 배부름 현상의 재발생을 방지하면서도 건물의 내구성을 보다 향상시킬 수 있는 조적벽체의 보강공법이 제공된다. According to the present invention, there is provided a method of reinforcing a masonry wall, which can enhance the durability of a building while preventing the reoccurrence of a folding phenomenon by enhancing the fixing force of the exterior stonewall without removing existing bricks.

도1은 종래 조적벽체의 보강공법을 보여주는 도면이고,
도2는 본 발명에 따른 조적벽체의 보강공법 시행 후 실내측에서 보여지는 모습을 도시한 도면이며,
도3은 도2에서 A-A'선의 단면도이고,
도4는 도2에서 일부 단면 상세도이다.
1 is a view showing a conventional method of reinforcing a masonry wall,
FIG. 2 is a view showing a state of being seen from a room side after the method of reinforcing a masonry wall according to the present invention,
3 is a sectional view taken along the line A-A 'in Fig. 2,
Fig. 4 is a partial cross-sectional view in Fig. 2. Fig.

본 발명에 따른 조적벽체의 보강공법은, 외부 치장벽체(10)의 각 치장벽돌(11)의 중심을 드릴을 이용하여 관통하고 이어서 내부 벽체(40)에도 소정의 깊이까지 천공홀(40a)을 형성하는 단계와, 상기 외부 치장벽체(10)의 관통공(12)과 내부 벽체(40)의 천공홀(40a)에 에폭시를 주입하고 전산볼트(20)를 외부 치장벽체(10)의 관통공(12)을 통해 내부 벽체(40)의 천공홀(40a)에 매입시키는 단계와, 상기 외부 치장벽체(10)의 외부로 돌출된 상기 전산볼트(20)에 고정너트(21)를 체결하는 단계와, 상기 고정너트(21)의 외측에서 고정너트(21)를 덮을 수 있도록 보호캡(30)을 결합시키되, 보호캡(30) 내부에 에폭시 씰링재(31)를 채운 다음 고정너트(21)를 감싸도록 결합시키는 단계와, 서로 이격된 한 쌍의 수평빔(51)과 이와 결합되는 한 쌍의 수직빔(53)으로 이루어져 외부 치장벽체(10)의 내측에 위치하는 내부 벽체(40)에 부착할 내부 철골프레임(50)을 준비하는 단계와, 상기 내부 철골프레임(50)이 부착되는 내부 벽체(40)의 실내측에 드릴을 이용하여 천공홀(40b)을 형성하고 에폭시를 주입하는 단계와, 상기 내부 철골프레임(50)을 내부 벽체(40)에 부착한 다음 전산볼트(60)를 내부 철골프레임(50)에 형성되는 결합공을 통해 내부 벽체(40)에 형성된 천공홀(40b)에 매입하고 전산볼트(60)의 돌출된 단부에 너트(61)를 체결하여 고정하는 단계와, 내부 벽체(40)의 상측에 위치하는 보(41)에 천공홀(41a)을 형성하고 에폭시를 주입한 다음 전산볼트(70)를 한 쌍의 수평빔(51) 중 상부 수평빔(51)에 형성되는 결합공을 통해 보(41)에 형성된 천공홀(41a)에 매입하고 전산볼트(70)의 돌출된 단부에 너트(71)를 체결하여 상부 수평빔(51)을 보(41)에 고정하는 단계와, 내부 벽체(40)의 실내측에서 각 측벽(80)에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 각 수직빔(53)에 형성되는 결합공을 통해 측벽(80)에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 각 수직빔(53)을 각 측벽(80)에 고정하는 단계와, 상기 내부 벽체(40)의 실내측 바닥 슬래브(42)에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 한 쌍의 수평빔(51) 중 하부 수평빔(51)에 형성되는 결합공을 통해 바닥 슬래브(42)에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 하부 수평빔(51)을 바닥 슬래브(42)에 고정하는 단계를 포함하여 이루어진다.The method of reinforcing a masonry wall according to the present invention is characterized in that the center of each of the decorated bricks 11 of the external stucco wall 10 is penetrated by using a drill and then a perforation hole 40a is formed in the inner wall 40 to a predetermined depth And injecting epoxy into the perforation hole 40a of the through hole 12 of the outer staked wall 10 and the inner wall 40 to form the through hole 12 of the outer stitched wall 10, (21) into the perforation hole (40a) of the inner wall (40) through the through hole (12), and fastening the fixing nut (21) to the bolt (20) protruding outside the outer staked wall And a protective cap 30 is attached to cover the fixing nut 21 from the outside of the fixing nut 21. The protective cap 30 is filled with an epoxy sealing material 31 and then a fixing nut 21 A pair of horizontal beams 51 spaced apart from each other, and a pair of vertical beams 53 coupled to the pair of horizontal beams 51 to form an outer stucco 10, Preparing an inner steel frame 50 to be attached to the inner wall 40 located on the inner side of the inner steel frame 50 by using a drill; (50) is attached to the inner wall (40), and then the bolts (60) are inserted into the inner steel frame (50) through the coupling holes formed in the inner steel frame (50) A step of embedding the metal bolt 60 in the perforation hole 40b formed in the wall 40 and fastening and fixing the nut 61 to the protruding end of the bolt 60 and fixing the bolt 41 located on the upper side of the inner wall 40, And the epoxy bolts 70 are inserted into the holes 41 formed in the beam 41 through the coupling holes formed in the upper horizontal beam 51 of the pair of horizontal beams 51. [ (41a) and fixing the upper horizontal beam (51) to the beam (41) by fastening the nut (71) to the projected end of the bolt (70) A perforation hole is formed in each side wall 80 on the inner side of the secondary wall body 40 and an epoxy is injected into the perforation hole formed in the side wall 80 through a coupling hole formed in each vertical beam 53 A step of fixing the vertical beams 53 to the side walls 80 by fastening the nuts to the protruding end portions of the bolts to form the perforated holes in the indoor side bottom slab 42 of the inner wall 40 The epoxy resin is injected into the perforation hole formed in the bottom slab 42 through the joint hole formed in the lower horizontal beam 51 of the pair of horizontal beams 51 and the epoxy resin is injected into the projected end of the bolt And fixing the lower horizontal beam (51) to the bottom slab (42) by fastening the nut.

이하 본 발명의 바람직한 실시예에 따른 조적벽체의 보강방법을 첨부된 도면을 참조하여 각 단계별로 상세하게 설명한다.Hereinafter, a method of reinforcing a masonry wall according to a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도2는 본 발명에 따른 조적벽체의 보강공법 시행 후 실내측에서 보여지는 모습을 도시한 도면이며, 도3은 도2에서 A-A'선의 단면도이고, 도4는 도2에서 일부 단면 상세도이다.2 is a cross-sectional view taken along the line A-A 'in FIG. 2, and FIG. 4 is a partial cross-sectional view of FIG. 2, to be.

본 발명은 조적벽체로 이루어지는 외부 치장벽체의 균열 또는 배부름현상 등을 보수 또는 보강하기 위한 방법이다.The present invention is a method for repairing or reinforcing a crack or an embossing phenomenon of an external stitched wall body made of a rough wall body.

본 발명에 따른 조적벽체의 보강공법에서는 먼저, 외부 치장벽체(10)에서 균열 등이 발생하여 보강할 부분을 결정하고 보강하고자 하는 외부 치장벽체(10) 부분의 각 치장벽돌(11)의 중심에 드릴을 이용하여 관통하고 이어서 내부 벽체(40)에도 소정의 깊이까지 천공홀(40a)을 형성하는 단계를 수행한다(도3 및 도4 참조).In the method for reinforcing a masonry wall according to the present invention, firstly, a portion to be reinforced due to cracks or the like is generated in the exterior stucco wall 10, and a portion of the external stucco wall 10, A step of drilling through the drill and then forming a perforation hole 40a in the inner wall 40 to a predetermined depth (see FIGS. 3 and 4).

그 다음, 각 외부 치장벽체(10)의 관통공(12)과 내부 벽체(40)의 천공홀(40a)에 에폭시를 주입하고 전산볼트(20)를 외부 치장벽체(10)의 관통공(12)을 통해 내부 벽체(40)의 천공홀(40a)에 매입시키는 단계를 수행한다. 에폭시는 전산볼트(20)를 외부 치장벽체(10)와 내부 벽체(40)에 고착시키기 위한 것으로 주입 후 에폭시가 경화되면서 매입된 전산볼트(20)가 내부 벽체(40)와 일체화된다. 여기서 전산볼트(20)의 선단은 외부 치장벽체(10)로부터 돌출되도록 매입한다. Epoxy is then injected into the through holes 12 of the outer staked wall 10 and the perforation holes 40a of the inner wall 40 and the through holes 12 of the outer staked wall 10 Into the perforation hole 40a of the inner wall 40 through the through hole 40a. The epoxy is used to fix the bolts 20 to the external stowing wall 10 and the internal wall 40. After the injection, the epoxy bolts are hardened and the embedded bolts 20 are integrated with the internal wall 40. Here, the tip of the computer bolt 20 is embedded so as to protrude from the external stitched wall body 10.

상기와 같이 전산볼트(20)의 매입작업이 완료되면 외부 치장벽체(10)로부터 돌출된 전산볼트(20)에 고정너트(21)를 체결하는 단계를 수행한다. 본 발명에서는 이와 같이 전산볼트(20)를 외부 치장벽체(10)로부터 돌출되도록 매입하고, 돌출된 전산볼트(20)의 선단에 고정너트(21)를 체결하고 조임으로써 오랜기간이 경과하더라도 외부 치장벽체(10)가 건물 하중이나 부동침하로 인해 다시 배부름현상이 발생하는 것을 방지하게 된다.When the embossing operation of the bolts 20 is completed, the fastening nut 21 is fastened to the bolts 20 protruding from the external stencil 10. According to the present invention, as described above, the bolts 20 are embedded so as to protrude from the external stitched wall body 10, and the fastening nut 21 is tightened and fastened to the tip of the projected bolt 20, Thereby preventing the wall 10 from reoccurring due to building load or floating settlement.

이와 같이 외부 치장벽체(10)의 외부로 돌출된 전산볼트(20)의 선단에 고정너트(21)를 체결한 다음에는 고정너트(21)의 외측에서 고정너트(21)를 덮을 수 있도록 보호캡(30)을 결합시키는데 이 때에는 보호캡(30) 내부에 에폭시 씰링재(31)를 채운 다음 고정너트(21)를 감싸도록 결합시킨다. 그 후 일정 시간이 경과되면 에폭시 씰링재(31)가 경화되면서 고정너트(21)와 일체화되어 고정됨으로써 고정너트(21)의 풀림이 방지되고, 노후화로 인한 고정너트(21)의 부식 또한 방지하게 된다.After the fixing nut 21 is fastened to the tip of the computer bolt 20 protruding from the exterior stitched wall 10 as described above, the fixing nut 21 is covered with the protective nut 21 so as to cover the fixing nut 21 from the outside. The protective cap 30 is filled with the epoxy sealing material 31, and then the fixing nut 21 is wrapped around the protective cap 30. The epoxy sealing material 31 is hardened and integrated with the fixing nut 21 so as to prevent the fixing nut 21 from being loosened and the corrosion of the fixing nut 21 due to deterioration is also prevented .

한편, 외부 치장벽체(10)의 내측에 위치하는 내부 벽체(40)의 실내측에서는 내부 벽체(40)에 부착할 내부 철골프레임(50)을 준비한다. 내부 철골프레임(50)은 도2에 도시된 바와 같이 서로 이격된 한 쌍의 수평빔(51)과 한 쌍의 수직빔(53)이 결합되어 이루어지는데, 그 크기는 한 쌍의 수직빔(53)이 내부 벽체(40)의 실내 양 측벽(80)에 접하도록 형성되고, 한 쌍의 수평빔(51)은 상부 수평빔(51)이 내부 벽체(40) 상측의 보(girder, 41)에 접하고 하부 수평빔(51)은 바닥 슬래브(42)에 접하도록 형성된다. 그리고, 본 실시예에서 내부 철골프레임(50)은 한 쌍의 수평빔(51)의 내측에 내부 벽체(40)에 형성되는 창문(W)의 직상하방에 위치하는 한 쌍의 추가적인 수평빔(52)이 더 구비된다. 각 수평빔(51,52)과 수직빔(53)에는 내부 벽체(40)와의 결합을 위해 다수의 결합공이 형성된다.On the other hand, an inner steel frame 50 to be attached to the inner wall 40 is prepared on the inner side of the inner wall 40 located inside the outer stucco 10. The inner frame 50 is formed by a pair of horizontal beams 51 and a pair of vertical beams 53 separated from each other as shown in FIG. And the pair of horizontal beams 51 are formed so that the upper horizontal beam 51 is directed to the girder 41 on the upper side of the inner wall 40 And the lower horizontal beam 51 is formed in contact with the bottom slab 42. [ In this embodiment, the inner steel frame 50 includes a pair of additional horizontal beams 52 positioned on the inner side of the pair of horizontal beams 51 and positioned directly below the window W formed on the inner wall 40 ). A plurality of coupling holes are formed in each of the horizontal beams 51 and 52 and the vertical beam 53 for coupling with the inner wall 40.

이와 같이 준비된 내부 철골프레임(50)을 내부 벽체(40)에 고정시키기 위해 내부 벽체(40)에서 내부 철골프레임(50)의 결합공에 대응되는 위치에 드릴을 이용하여 천공홀(40b)을 형성하고 천공홀(40b)에 에폭시를 주입한 다음 준비된 내부 철골프레임(50)을 내부 벽체(40)에 부착하고 전산볼트(60)를 내부 철골프레임(50)의 결합공을 통해 내부 벽체(40)에 매입하고 전산볼트(60)의 돌출된 단부에 너트(61)를 체결하여 고정하게 된다.In order to fix the inner steel frame 50 thus prepared to the inner wall 40, a perforation hole 40b is formed in the inner wall 40 by using a drill at a position corresponding to the engaging hole of the inner steel frame 50 Epoxy is injected into the perforation hole 40b and then the prepared inner frame 50 is attached to the inner wall 40 and the bolts 60 are inserted into the inner wall 40 through the coupling hole of the inner frame 50, And the nut 61 is fastened to the protruding end of the bolt 60 to be fixed.

이와 같이 내부 철골프레임(50)을 내부 벽체(10)에 고정시키는 단계과 함께 내부 철골프레임(50)을 내부 벽체(40)의 상측에 위치하는 보(41), 실내 측벽(80), 및 바닥 슬래브(42)에 결합시키는 단계를 수행한다. In this way, the inner steel frame 50 is fixed to the inner wall 10 by fixing the beam 41, the inner side wall 80, and the bottom slab 50 located above the inner wall 40, (42).

즉, 내부 벽체(40)의 상측에 위치하는 보(41)에는 한 쌍의 수평빔(51) 중 상부 수평빔(51)을 결합시키는데 이를 위해 도4에서와 같이 내부 벽체(40)의 상측에 위치하는 보(41)에 천공홀(41a)을 형성하고 에폭시를 주입한 다음 전산볼트(70)를 상부 수평빔(51)에 형성되는 결합공을 통해 보(41)에 형성된 천공홀(41a)에 매입하고 전산볼트(70)의 돌출된 단부에 너트(71)를 체결하여 상부 수평빔(51)을 보(41)에 고정하는 단계를 수행한다.4, the upper horizontal beam 51 of the pair of horizontal beams 51 is coupled to the upper beam 41 located on the upper side of the inner wall 40, A perforation hole 41a is formed in the beam 41 positioned and the epoxy bolt is injected into the perforation hole 41a formed in the beam 41 through the coupling hole formed in the upper horizontal beam 51, And fixing the upper horizontal beam 51 to the beam 41 by fastening the nut 71 to the protruding end of the bolt 70. [

또한, 내부 벽체(40)의 실내 측벽(80)에는 내부 철골프레임(50) 중 각 수직빔(53)을 결합시키는데, 이러한 수직빔(53)을 양 측벽(80)에 결합시키는 과정은 상부 수평빔(51)을 보(41)에 결합시키는 과정과 유사하게 내부 벽체(40)의 실내측에서 각 측벽(80)에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 각 수직빔(53)에 형성되는 결합공을 통해 측벽(80)에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 각 수직빔(53)을 각 측벽(80)에 고정하는 단계를 수행한다. The process of joining such a vertical beam 53 to both side walls 80 is performed by joining the vertical beams 53 of the inner steel frame 50 to the inner side wall 80 of the inner wall 40, Holes are formed in the side walls 80 on the inner side of the inner wall 40 and the epoxy is injected and then the bolts are inserted into the vertical beams 53 in a similar manner to the process of coupling the beam 51 to the beam 41. [ And fixing the vertical beams 53 to the respective side walls 80 by fastening the projections of the bolts to the projecting ends of the bolts.

그리고, 한 쌍의 수평빔(51) 중 하부 수평빔(51)은 실내 바닥 슬래브(42)에 고정시키는데, 마찬가지로 내부 벽체(40)의 실내측 바닥 슬래브(42)에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 하부 수평빔(51)에 형성되는 결합공을 통해 바닥 슬래브(42)에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 하부 수평빔(51)을 바닥 슬래브(42)에 고정하는 단계를 수행하여 본 발명의 조적벽체의 보강공법을 완료하게 된다.The lower horizontal beam 51 of the pair of horizontal beams 51 is fixed to the indoor floor slab 42. Likewise, a hole is formed in the indoor bottom slab 42 of the inner wall 40 and an epoxy The bolts are embedded in the perforation holes formed in the bottom slab 42 through the coupling holes formed in the lower horizontal beams 51 and the nuts are fastened to the projected ends of the bolts to connect the lower horizontal beams 51 to the bottom And then fixing the slab 42 to the slab 42 to complete the reinforcing method of the present invention.

이와 같은 과정을 거쳐 이루어지는 본 발명은 전술한 바와 같이 외부 치장벽체(10)의 외측에서 전산볼트(20)에 고정너트(21)를 체결하고 조임으로써 오랜 기간이 경과하더라도 외부 치장벽체(10)가 압력으로 인해 다시 배부름현상이 발생하는 것을 방지하게 되고 또한 고정너트(21)를 덮을 수 있도록 보호캡(30)을 결합시켜 보호캡(30) 내의 에폭시 씰링재(31)가 경화되면서 고정너트(21)와 일체화되어 고정됨으로써 고정너트(21)의 풀림이 방지되면서도 노후화로 인한 고정너트(21)의 부식 등을 방지하게 된다.As described above, according to the present invention, when the fixing nut 21 is fastened to the bolts 20 on the outside of the external stitched wall 10 and tightened, the external stitched wall 10 The epoxy sealing material 31 in the protective cap 30 is hardened and the fixing nut 21 is fixed to the fixing nut 21. In this case, So that the fixing nut 21 is prevented from being loosened and corrosion of the fixing nut 21 due to deterioration can be prevented.

그리고, 이와 같이 외부 치장벽체(10)를 내부 벽체(40)에 고정함과 동시에 내부 벽체(40)를 내부 철골프레임(50)으로 고정시키고, 내부 철골프레임(50)은 또한, 내부 벽체(40)의 보(41), 측벽(80), 바닥 슬래브(42)에 고정함으로써 내부 벽체(40)가 내부 철골프레임(50)을 통해 보(41), 측벽(80) 및 바닥 슬래브(42)와 결합되어 내부 벽체(40)의 구조적 안정성이 보다 향상되는 효과를 가져 내부 벽체(40)의 변형으로 인한 외부 벽체(10)의 배부름 현상 등을 미연에 방지할 수 있게 된다.The inner steel frame 50 is fixed to the inner wall 40 by fixing the outer staked wall 10 to the inner wall 40 and fixing the inner wall 40 to the inner steel frame 50 The side wall 80 and the bottom slab 42 of the inner steel frame 50 by means of the inner steel frame 50 and the side slab 42 So that the structural stability of the inner wall 40 is further improved. Thus, the outer wall 10 can be prevented from being folded due to the deformation of the inner wall 40.

이상, 본 발명을 바람직한 실시예를 참조하여 설명하였으나, 본 발명은 이에 한정되지 아니하며, 당해 기술분야의 당업자는 하기의 특허청구범위에 기재된 본 발명의 요지를 벗어나지 않는 범위 내에서 다양한 변형이 가능함을 용이하게 이해할 수 있을 것이다.While the present invention has been particularly shown and described with reference to exemplary embodiments thereof, it is to be understood that the invention is not limited to the disclosed embodiments, but many variations and modifications may be made without departing from the scope of the present invention. It will be easily understood.

10 : 외부 치장벽체 12 : 관통공
20 : 전산볼트 21 : 고정너트
30 : 보호캡 40 : 내부 벽체
41 : 보 42 : 바닥 슬래브
50 : 내부 철골프레임 51 : 수평빔
52 : 추가적인 수평빔 53 : 수직빔
10: exterior stucco 12: through-hole
20: Numerical bolt 21: Fixing nut
30: protective cap 40: inner wall
41: beam 42: bottom slab
50: inner steel frame 51: horizontal beam
52: additional horizontal beam 53: vertical beam

Claims (3)

외부 치장벽체의 각 치장벽돌의 중심을 드릴을 이용하여 관통하고 이어서 내부 벽체에도 소정의 깊이까지 천공홀을 형성하는 단계와,
상기 외부 치장벽체의 관통공과 내부 벽체의 천공홀에 에폭시를 주입하고 전산볼트를 외부 치장벽체의 관통공을 통해 내부 벽체의 천공홀에 매입시키는 단계와,
상기 외부 치장벽체의 외부로 돌출된 상기 전산볼트에 고정너트를 체결하는 단계와,
상기 고정너트의 외측에서 고정너트를 덮을 수 있도록 보호캡을 결합시키되, 상기 보호캡 내부에 에폭시 씰링재를 채운 다음 고정너트를 감싸도록 결합시키는 단계와,
서로 이격된 한 쌍의 수평빔과 이와 결합되는 한 쌍의 수직빔으로 이루어져 외부 치장벽체의 내측에 위치하는 내부 벽체에 부착할 내부 철골프레임을 준비하는 단계와,
상기 내부 철골프레임이 부착되는 내부 벽체의 실내측에 드릴을 이용하여 천공홀을 형성하고 에폭시를 주입하는 단계와,
상기 내부 철골프레임을 내부 벽체에 부착한 다음 전산볼트를 내부 철골프레임에 형성되는 결합공을 통해 내부 벽체에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 고정하는 단계를 포함하여 이루어지는 것을 특징으로 하는 조적벽체의 보강공법.
Drilling the center of each stucco brick of the exterior stucco wall and subsequently forming perforations in the interior wall to a predetermined depth,
Injecting epoxy into the through holes of the external stitched wall and the perforated holes of the internal wall and embedding the perforated holes of the internal wall through the through holes of the external stitched wall,
Tightening a fixing nut to the bolt protruding outside the outer stitched wall,
A step of coupling a protective cap to cover the fixing nut at the outside of the fixing nut, filling the inside of the protective cap with the epoxy sealing material and wrapping the fixing nut,
Preparing an inner steel frame which is composed of a pair of horizontal beams spaced apart from each other and a pair of vertical beams to be attached to an inner wall positioned inside the outer stitched wall,
Forming a perforation hole by using a drill on the inner side of the inner wall to which the inner frame is attached and injecting epoxy;
Attaching the inner steel frame to the inner wall and then inserting the bolt into the hole formed in the inner wall through the coupling hole formed in the inner steel frame and fastening the nut to the projected end of the bolt, And a reinforcing method of the masonry wall.
제1항에 있어서,
상기 내부 벽체의 상측에 위치하는 보에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 한 쌍의 수평빔 중 상부 수평빔에 형성되는 결합공을 통해 상기 보에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 상부 수평빔을 상기 보에 고정하는 단계와,
상기 내부 벽체의 실내측에서 각 측벽에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 각 수직빔에 형성되는 결합공을 통해 상기 측벽에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 각 수직빔을 각 측벽에 고정하는 단계와,
상기 내부 벽체의 실내측 바닥 슬래브에 천공홀을 형성하고 에폭시를 주입한 다음 전산볼트를 한 쌍의 수평빔 중 하부 수평빔에 형성되는 결합공을 통해 상기 바닥 슬래브에 형성된 천공홀에 매입하고 전산볼트의 돌출된 단부에 너트를 체결하여 하부 수평빔을 상기 바닥 슬래브에 고정하는 단계를 더 포함하여 이루어지는 것을 특징으로 하는 조적벽체의 보강공법.
The method according to claim 1,
A perforation hole is formed in the beam located on the upper side of the inner wall, an epoxy is injected, and the bolt is embedded in the perforation hole formed in the beam through the coupling hole formed in the upper horizontal beam of the pair of horizontal beams, Securing an upper horizontal beam to the beam by fastening a nut to the projecting end of the upper horizontal beam,
A perforation hole is formed in each side wall of the inner wall and an epoxy is injected. Then, a computer bolt is embedded in a perforation hole formed in the side wall through a coupling hole formed in each vertical beam, Securing each vertical beam to each side wall,
A perforation hole is formed in the indoor bottom slab of the inner wall and an epoxy is injected. Then, the computer bolt is inserted into the perforation hole formed in the bottom slab through the coupling hole formed in the lower horizontal beam of the pair of horizontal beams, And fixing the lower horizontal beam to the bottom slab by fastening the nut to the protruding end of the bottom wall slab.
제1항에 있어서,
상기 내부 철골프레임은 한 쌍의 수평빔의 내측에 한 쌍의 추가적인 수평빔을 더 포함하여 이루어지는 조적벽체의 보강공법.
The method according to claim 1,
Wherein the inner steel frame further comprises a pair of additional horizontal beams inside a pair of horizontal beams.
KR1020140114093A 2014-08-29 2014-08-29 Method for reinforcing masonry wall Active KR101513066B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020140114093A KR101513066B1 (en) 2014-08-29 2014-08-29 Method for reinforcing masonry wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020140114093A KR101513066B1 (en) 2014-08-29 2014-08-29 Method for reinforcing masonry wall

Publications (1)

Publication Number Publication Date
KR101513066B1 true KR101513066B1 (en) 2015-04-17

Family

ID=53053474

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020140114093A Active KR101513066B1 (en) 2014-08-29 2014-08-29 Method for reinforcing masonry wall

Country Status (1)

Country Link
KR (1) KR101513066B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101654332B1 (en) 2015-08-13 2016-09-09 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
KR20170041014A (en) 2015-10-06 2017-04-14 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
CN106939704A (en) * 2017-03-28 2017-07-11 西安建筑科技大学 Brick mix structure punches wall fast repairing method after shake
KR102265882B1 (en) 2020-10-06 2021-06-16 한국건설기술연구원 Outer wall structure for strengthening face bricks using grid reinforcement and shotcrete, and strengthening method for the same
CN115506623A (en) * 2022-10-14 2022-12-23 北京房地集团有限公司 Reinforcing method for enlarged cross section of lower structural beam of existing wall
CN117231004A (en) * 2023-09-21 2023-12-15 上海宝冶集团有限公司 Method for installing light decorative square tube on outer wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766519B1 (en) * 2006-06-30 2007-10-12 권기혁 Masonry structure of masonry wall with openings and its construction method
KR20090061437A (en) * 2007-12-11 2009-06-16 양재상 Masonry reinforcement method
KR101061015B1 (en) * 2011-04-19 2011-08-31 주식회사 원준하이테크 Masonry insulation and reinforcement method
KR101348577B1 (en) * 2013-03-18 2014-01-09 삼영엠텍(주) Seismic retrofit method using lateral beam-type damper installed in opening space of building structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100766519B1 (en) * 2006-06-30 2007-10-12 권기혁 Masonry structure of masonry wall with openings and its construction method
KR20090061437A (en) * 2007-12-11 2009-06-16 양재상 Masonry reinforcement method
KR101061015B1 (en) * 2011-04-19 2011-08-31 주식회사 원준하이테크 Masonry insulation and reinforcement method
KR101348577B1 (en) * 2013-03-18 2014-01-09 삼영엠텍(주) Seismic retrofit method using lateral beam-type damper installed in opening space of building structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101654332B1 (en) 2015-08-13 2016-09-09 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
KR20170041014A (en) 2015-10-06 2017-04-14 전원경 Maintenance apparatus for Brick wall and maintenance method of brick wall using the same
CN106939704A (en) * 2017-03-28 2017-07-11 西安建筑科技大学 Brick mix structure punches wall fast repairing method after shake
KR102265882B1 (en) 2020-10-06 2021-06-16 한국건설기술연구원 Outer wall structure for strengthening face bricks using grid reinforcement and shotcrete, and strengthening method for the same
CN115506623A (en) * 2022-10-14 2022-12-23 北京房地集团有限公司 Reinforcing method for enlarged cross section of lower structural beam of existing wall
CN115506623B (en) * 2022-10-14 2023-10-31 北京房地集团有限公司 Reinforcing method for expanding section of existing wall lower structural beam
CN117231004A (en) * 2023-09-21 2023-12-15 上海宝冶集团有限公司 Method for installing light decorative square tube on outer wall

Similar Documents

Publication Publication Date Title
KR101513066B1 (en) Method for reinforcing masonry wall
KR100922386B1 (en) Masonry reinforcement method
KR101638155B1 (en) Anchor connector by using cube
JP3899366B1 (en) Boxing formwork and boxing method using the same
ES2716004T3 (en) Connection arrangement and procedure for manufacturing a reinforcement against a perforation, a supplementary reinforcement against a transverse force and / or a reinforcement connection
JP5492656B2 (en) Seismic reinforcement structure separator and seismic reinforcement method
JP2010150871A (en) Decorative plate attaching method for thermal insulation material doubling as form and latching member for outer wall
KR101847827B1 (en) Exterior panel anchorage for building, and outer wall and exterior panel install method with form combined with insulation
CN201901941U (en) Building system combining precast concrete member and cast-in-place concrete template
KR20170113862A (en) The block decreasing the amount of concret mortar to build Nonbearing wall
JP2013036269A (en) Sc pile
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
CN107152161A (en) The drawknot construction method of external scaffolding and wall interconnecting piece
JP3140216U (en) Crack-induced waterproof structure
JP6228955B2 (en) Exterior material connector and building exterior forming method
KR20180075447A (en) How to repair exterior wall or floor of a building
JP2017020235A (en) Precast concrete foundation
TW202031985A (en) Structure for fixing temporary support
JP3210507U (en) Gutter block
JP6769666B2 (en) Reinforcing bar connection structure and box culvert reinforcement method
KR101677858B1 (en) Column section enlargement method using socket shaped anchor
JP6898626B2 (en) Precast concrete foundation
JP2006342497A (en) Foundation structure of steel column base
JP7049980B2 (en) Construction method of composite foundation structure
JP2006097358A (en) Concrete floor structure and its construction method

Legal Events

Date Code Title Description
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20140829

PA0201 Request for examination
PA0302 Request for accelerated examination

Patent event date: 20141023

Patent event code: PA03022R01D

Comment text: Request for Accelerated Examination

Patent event date: 20140829

Patent event code: PA03021R01I

Comment text: Patent Application

PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20141219

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20150410

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20150413

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20150414

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
FPAY Annual fee payment

Payment date: 20180212

Year of fee payment: 4

PR1001 Payment of annual fee

Payment date: 20180212

Start annual number: 4

End annual number: 4

FPAY Annual fee payment

Payment date: 20190304

Year of fee payment: 5

PR1001 Payment of annual fee

Payment date: 20190304

Start annual number: 5

End annual number: 5

PR1001 Payment of annual fee

Payment date: 20200323

Start annual number: 6

End annual number: 6

PR1001 Payment of annual fee

Payment date: 20210223

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 20230116

Start annual number: 9

End annual number: 9