KR101234201B1 - Method for constructing tower silo - Google Patents
Method for constructing tower silo Download PDFInfo
- Publication number
- KR101234201B1 KR101234201B1 KR1020120052183A KR20120052183A KR101234201B1 KR 101234201 B1 KR101234201 B1 KR 101234201B1 KR 1020120052183 A KR1020120052183 A KR 1020120052183A KR 20120052183 A KR20120052183 A KR 20120052183A KR 101234201 B1 KR101234201 B1 KR 101234201B1
- Authority
- KR
- South Korea
- Prior art keywords
- support
- ceiling frame
- silo
- formwork
- wall
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/22—Containers for fluent solids, e.g. silos, bunkers; Supports therefor
- E04H7/24—Constructions, with or without perforated walls, depending on the use of specified materials
- E04H7/26—Constructions, with or without perforated walls, depending on the use of specified materials mainly of concrete, e.g. reinforced concrete or other stone-like materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
본 발명은 탑사일로시공방법에 관한 것으로서, 탑모양의 사일로벽체와 사일로천장의 뼈대를 형성하도록 상기 사일로벽체의 상단에 고정되는 천장프레임를 갖는 탑사일로를 시공하기 위한 탑사일로시공방법에 있어서, 상기 천장프레임을 제작하는 천장프레임제작단계와; 상단에 기초지지면를 갖는 기초지지벽을 형성하는 기초지지벽형성단계와; 상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 거푸집지지체를 설치하는 거푸집지지체설치단계와; 상기 거푸집지지체보다 높은 위치에 배치되고 상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 천장프레임지지체를 설치하는 천장프레임지지체설치단계와; 상기 거푸집지지체에 폼패널을 결합하여 상기 사일로벽체의 횡단면에 대응하는 사이 공간을 갖는 사일로벽체거푸집을 형성하는 사일로벽체거푸집형성단계와; 상기 천장프레임지지체와 함께 상승이동할 수 있도록 상기 천장프레임을 상기 천장프레임지지체에 고정하는 천장프레임고정단계와; 상기 거푸집지지체를 상승시키기 위한 거푸집지지체상승구동부와 상기 천장프레임지지체를 상승시키기 위한 천장프레임지지체상승구동부를 사용하여 상기 거푸집지지체와 상기 천장프레임지지체를 각각 단계적으로 상승시키는 지지체상승단계와; 상기 사일로벽체거푸집의 내부공간에 철근을 배근하는 철근배근공정(S011)과 상기 사일로벽체거푸집의 내부공간에 콘크리트를 타설하는 콘크리트타설공정(S012)과 상기 사일로벽체거푸집의 내부공간에 타설된 콘크리트를 양생하는 콘크리트양생공정(S013)을 거쳐 단위구간사일로벽체를 형성하는 과정을 반복하는 방법으로 상기 사일로벽체를 상기 기초지지면에 형성하는 사일로벽체형성단계와; 상기 사일로벽체를 형성한 후 상기 천장프레임을 상기 사일로벽체에 고정하는 천장프레임사일로벽체고정단계와; 상기 천장프레임을 상기 사일로벽체에 고정한 후 상기 천장프레임으로부터 상기 천장프레임지지체를 분리하는 천장프레임지지체분리단계를 포함하는 것을 특징으로 한다. 이에 의해, 거푸집지지체상승구동부의 상승구동동작과 천장프레임지지체상승구동부의 상승구동동작을 독립적으로 제어할 수 있고, 사일로벽체를 형성하는 동안 거푸집지지체와 천장프레임 간의 상호 간섭을 줄일 수 있다.The present invention relates to a top silo construction method, the top silo construction method for constructing a top silo having a ceiling frame fixed to the top of the silo wall to form a skeleton of the silo wall and the silo ceiling, the ceiling A ceiling frame manufacturing step of manufacturing a frame; A base support wall forming step of forming a base support wall having a base support surface at an upper end thereof; A form support mounting step of installing a form support to be supported by the base support wall and to move upward with respect to the base support surface; A ceiling frame support mounting step of installing a ceiling frame support disposed at a position higher than the formwork support and supported by the base support wall to move upward with respect to the base support surface; A silo wall formwork forming step of forming a silo wall formwork having an interspace corresponding to a cross section of the silo wall by coupling a foam panel to the form support; A ceiling frame fixing step of fixing the ceiling frame to the ceiling frame support to move upward with the ceiling frame support; A support raising step of raising the form support and the ceiling frame support step by step using a form support rise driving unit for raising the form support and a ceiling frame support raising drive unit for raising the ceiling frame support; Reinforcing bar reinforcement step (S011) for reinforcing the reinforcing bar in the inner space of the silo wall formwork and concrete placing process (S012) for placing concrete in the inner space of the silo wall formwork and the concrete placed in the inner space of the silo wall formwork A silo wall forming step of forming the silo wall on the base ground by repeating a process of forming a unit section silo wall through curing curing step (S013); A ceiling frame silo wall fixing step of fixing the ceiling frame to the silo wall after forming the silo wall; And fixing the ceiling frame to the silo wall and separating the ceiling frame support from the ceiling frame. As a result, it is possible to independently control the upward driving operation of the form support rising drive unit and the upward driving operation of the ceiling frame support rising drive unit, and to reduce mutual interference between the form support and the ceiling frame while forming the silo wall.
Description
본 발명은 탑사일로시공방법에 관한 것으로서, 보다 상세하게는 원통형 또는 다각형 탑모양의 사일로벽체와 사일로벽체의 상단에 고정된 천장프레임을 갖는 탑사일로를 슬립폼공법을 적용하여 시공하는 방법에 관한 것이다.The present invention relates to a top silo construction method, and more particularly, to a method for constructing a top silo having a cylindrical or polygonal top-shaped silo wall and a ceiling frame fixed to the top of the silo wall by applying a slip foam method. .
골재, 곡물 등을 저장하기 위해 사일로(Silo)를 설치하는 방법이 안출되어 사용되고 있고, 이들 사일로는 저장공간의 형태에 따라 탑사일로, 트렌치사일로 등으로 구분할 수 있다.A method of installing silos is conceived and used to store aggregates, grains, and the like, and these silos can be classified into top silos, trench silos, and the like, depending on the shape of the storage space.
탑사일로는 원통형 또는 다각형 탑모양의 사일로벽체와, 사일로벽체의 상단에 고정된 천장프레임과, 천장프레임에 설치된 천장덮개를 갖고 있다.The top silo has a cylindrical or polygonal tower-shaped silo wall, a ceiling frame fixed to the top of the silo wall, and a ceiling cover installed on the ceiling frame.
사일로벽체는 콘크리트, 벽돌 등을 사용하여 시공할 수 있다.Silo walls can be constructed using concrete, bricks, etc.
콘트리트를 사용하여 사일로벽체를 시공할 때 슬립폼(Slip Form)공법이 널리 사용되고 있으며 종래 사일로벽체를 시공하는 방법을 상세하게 설명하면 다음과 같다.When constructing the silo wall using concrete, the slip form method is widely used, and the method of constructing the conventional silo wall will be described in detail as follows.
도21은 종래의 탑사일로시공방법에 따라 설치된 기초지지벽, 거푸집지지체, 천장프레임지지체, 프레임보강지지체 및 천장프레임의 배치관계를 도시한 도면이고, 도22는 도21에 도시된 기초지지벽, 거푸집지지체 및 천장프레임지지체 영역의 상세도이고, 도23은 종래의 탑사일로시공방법에 따른 거푸집지지체, 가동작업대 및 고정작업대의 설치상태를 도시한 도면이고, 도24는 종래의 탑사일로시공방법에 따른 천장프레임지지체의 설치상태를 도시한 도면이고, 도25는 종래의 탑사일로시공방법에 따른 거푸집지지체와 천장프레임지지체의 설치상태를 도시한 도면이고, 도26 및 도27은 각각 종래의 탑사일로시공방법에 따른 천장프레임이 천장프레임지지체에 고정된 상태를 도시한 도면이고, 도28은 도21에 도시된 프레임보강지지체의 일부를 도시한 도면이고, 도33은 종래의 탑사일로시공방법에 따른 탑사일로시공방법의 흐름도이다.FIG. 21 is a view showing an arrangement relationship between a foundation support wall, a formwork support, a ceiling frame support, a frame reinforcement supporter and a ceiling frame installed according to a conventional top silo construction method, and FIG. 22 is a foundation support wall shown in FIG. Figure 23 is a detailed view of the formwork support and ceiling frame support region, Figure 23 is a view showing the installation state of the formwork, the movable workbench and the fixed workbench according to the conventional top silo construction method, Figure 24 is a conventional top silo construction method FIG. 25 is a view illustrating an installation state of the ceiling frame support according to the related art, and FIG. 25 is a view illustrating an installation state of the formwork support and the ceiling frame support according to the conventional top silo construction method, and FIGS. 26 and 27 are each conventional top silos. The ceiling frame according to the construction method is a view showing a state fixed to the ceiling frame support, Figure 28 is a view showing a part of the frame reinforcement support shown in Figure 21 And, Figure 33 is a flow diagram of the construction method according to the construction method tapsa days days conventional tapsa.
천장프레임제작단계(Ceiling frame production stage S111S111 ))
강재나 강성 플라스틱을 사용하여 다수의 프레임다리(111a)를 갖는 천장프레임(111)을 제작한다.Using a steel or rigid plastic to produce a
기초지지벽형성단계(Foundation support wall forming step S112S112 ))
지면에 거푸집을 설치하고 콘크리트를 타설하는 등의 방법으로 기초지지벽(202)을 형성한다.The
기초지지벽(202)은 상단에 기초지지면(202a)을 갖도록 형성되고, 내부에는 저장물을 분리하기 위한 격벽(202b)이 다수 개 형성될 수 있다.The
지지체상승구동부설치(Support lift drive installation S113S113 ))
먼저 거푸집지지체(120)를 상승시키기 위한 거푸집지지체상승구동부(140)와 천장프레임지지체(170)를 상승시키기 위한 천장프레임지지체상승구동부(160)를 설치한다.First, the form support
거푸집지지체상승구동부(140)는 거푸집지지체상승잭로드(141, Jack Rod), 거푸집지지체상승유압잭(142), 거푸집지지체상승상부클램프(143), 거푸집지지체상승하부클램프(144), 거푸집지지체상승유압펌프(도시되지 않음)를 다음과 같은 방법으로 설치함으로써 구성할 수 있다.The die support
거푸집지지체상승잭로드(141)는 일정간격으로 이격되도록 기초지지면(202a) 상에 기립 설치한다. 거푸집지지체상승잭로드(141)는 사일로벽체(201) 형성공정이 진행되는 동안 나사결합방법으로 그 길이구간이 연장된다.The die support rising
그리고 거푸집지지체상승잭로드(141)는 기초지지벽(202)의 내부로 삽입되도록 설치된다.And the form support
거푸집지지체상승유압잭(142)은 내부로 거푸집지지체상승잭로드(141)가 상하방향을 따라 통과하도록 설치된다.The die supporting body lifting
거푸집지지체상승유압잭(142)은 각 거푸집지지체상승잭로드(141)에 하나씩 설치된다.The die support lifting
거푸집지지체상승상부클램프(143)는 거푸집지지체상승유압잭(142)의 피스톤로드에 결합되어 있고, 거푸집지지체상승유압잭(142)의 상측에 배치되도록 거푸집지지체상승잭로드(141)에 결합되어 있다. 거푸집지지체상승상부클램프(143)에는 거푸집지지체상승잭로드(141)를 타고 하강하는 것이 저지되도록 이(Teeth)가 형성되어 있다.The form
거푸집지지체상승하부클램프(144)는 거푸집지지체상승유압잭(142)에 결합되어 있고 거푸집지지체상승유압잭(142)의 하측에 배치되도록 거푸집지지체상승잭로드(141)에 결합되어 있다. 거푸집지지체상승하부클램프(144)에는 거푸집지지체상승잭로드(141)를 타고 하강하는 것이 저지되도록 이(Teeth)가 형성되어 있다.The form support rise
거푸집지지체상승유압펌프(도시되지 않음)는 거푸집지지체상승유압잭(142)에 고압의 오일을 공급한다.The die support rise hydraulic pump (not shown) supplies high pressure oil to the die support rise
전술한 구성을 갖는 거푸집지지체상승구동부(140)의 동작을 설명하면 다음과 같다.Referring to the operation of the form support
먼저 거푸집지지체상승유압펌프(도시되지 않음)로부터 실린더의 피스톤 하측공간으로 고압의 오일이 공급될 때 거푸집지지체상승하부클램프(144)는 하강하지 아니하기 때문에 피스톤로드와 거푸집지지체상승상부클램프(143)는 상승하게 된다.First, when the high pressure oil is supplied from the formwork support hydraulic pressure pump (not shown) to the piston lower space of the cylinder, the formwork support elevation
다음에 거푸집지지체상승유압펌프(도시되지 않음)로부터 실린더의 피스톤 상측공간으로 고압의 오일이 공급될 때 거푸집지지체상승상부클램프(143)와 피스톤로드는 하강하지 않기 때문에 거푸집지지체상승유압잭(142)과 거푸집지지체상승하부클램프(144)는 상승하게 된다.Next, when the high pressure oil is supplied from the die support upward hydraulic pump (not shown) to the piston upper space of the cylinder, the die support upward
이와 같이 피스톤로드와 거푸집지지체상승상부클램프(143)를 상승시키는 동작과 거푸집지지체상승유압잭(142)과 거푸집지지체상승하부클램프(144)는 상승시키는 동작을 1회 반복할 때마다 거푸집지지체상승유압잭(142)에 결합된 물체는 일정높이구간만큼 상승시킬 수 있다.In this way, the piston rod and the die supporting body upward raising
이러한 구성을 갖는 거푸집지지체상승구동부(140)의 구성과 동작은 종래의 슬립폼(Slip Form) 공법에 그대로 적용하고 있으므로 상세한 설명은 생략하기로 한다.Since the structure and operation of the form support
천장프레임지지체상승구동부(160)는 거푸집지지체상승구동부(140)와 동일한 구조와 기능을 갖는 천장프레임지지체상승잭로드(161, Jack Rod), 천장프레임지지체상승유압잭(162), 천장프레임지지체상승상부클램프(163), 천장프레임지지체상승하부클램프(164), 천장프레임지지체상승유압펌프(도시되지 않음)를 다음과 같은 방법으로 설치함으로써 구성할 수 있다.Ceiling frame support
천장프레임지지체상승잭로드(161)는 거푸집지지체상승잭로드(141)의 사이영역에 배치되도록 기초지지면(202a) 상에 기립 설치한다. 천장프레임지지체상승잭로드(161)는 사일로벽체(201) 형성공정이 진행되는 동안 나사결합방법으로 그 길이구간이 연장된다.The ceiling frame support rising
그리고 천장프레임지지체상승잭로드(161)는 기초지지벽(202)의 내부로 삽입되도록 설치된다.The ceiling frame support rising
전술한 구성을 갖는 천장프레임지지체상승구동부(160)는 거푸집지지체상승구동부(140)와 동일한 방법으로 동작하며, 피스톤로드와 천장프레임지지체상승상부클램프(163)를 상승시키는 동작과 천장프레임지지체상승유압잭(162)과 천장프레임지지체상승하부클램프(164)는 상승시키는 동작을 1회 반복할 때마다 천장프레임지지체상승유압잭(162)에 결합된 물체는 일정높이구간만큼 상승시킬 수 있다.The ceiling frame support
거푸집지지체설치단계(Formwork Support Installation Step ( S114S114 ))
기초지지벽(202)에 거푸집지지체(120)를 설치하는 방법을 설명하면 다음과 같다.The method of installing the
먼저 2개의 거푸집내부수직부재(131), 2개의 거푸집외부수직부재(132), 4개의 거푸집부재연결상부수평부재(133), 4 개의 거푸집부재연결하부수평부재(134), 3개의 거푸집내부패널고정수평부재(135) 및 3개의 거푸집외부패널고정수평부재(136)를 갖는 거푸집요크(130, Yoke)를 제작한다.First two formwork inner
거푸집부재연결상부수평부재(133)는 거푸집내부수직부재(131)의 상측영역과 거푸집외부수직부재(132)의 상측영역을 연결하도록 거푸집내부수직부재(131)와 거푸집외부수직부재(132)에 결합되어 있다.The form member connection upper
거푸집부재연결하부수평부재(134)는 거푸집내부수직부재(131)의 중간영역과 거푸집외부수직부재(132)의 중간영역을 연결하도록 거푸집내부수직부재(131)와 거푸집외부수직부재(132)에 결합되어 있다. The form member connecting lower
거푸집내부패널고정수평부재(135)는 호형(弧形)으로 형성되고, 거푸집내부수직부재(131) 상호간을 연결하도록 거푸집내부수직부재(131)의 하측 영역에 결합되어 있다. 여기서 거푸집내부패널고정수평부재(135)의 결합은 거푸집부재연결하부수평부재(134)의 하측에 배치되도록 이루어진다. The formwork inner panel fixed
거푸집외부패널고정수평부재(136)는 호형(弧形)으로 형성되고, 거푸집외부수직부재(132) 상호간을 연결하도록 거푸집외부수직부재(132)의 하측 영역에 결합되어 있다. 여기서 거푸집외부패널고정수평부재(136)의 결합은 거푸집부재연결하부수평부재(134)의 하측에 배치되도록 이루어진다. The formwork outer panel fixed
다음에 거푸집내부패널고정수평부재(135) 상호간이 서로 연결되고 거푸집외부패널고정수평부재(136) 상호간이 서로 연결되도록 거푸집요크를 기초지지벽(202) 상에 연속적으로 설치하여 폐루프형태의 거푸집지지체(120)를 형성한다.Next, the formwork yoke is continuously installed on the
여기서 거푸집요크(130)의 설치는 거푸집부재연결상부수평부재(133)가 천장프레임지지체상승유압잭(162)에 결합되도록 이루어진다. 이에 따라 거푸집지지체(120)는 천장프레임지지체상승유압잭(162)과 거푸집지지체상승잭로드(141)를 통해 기초지지벽(202)에 지지된다.Wherein the installation of the
그리고 거푸집지지체(120)는 거푸집지지체상승유압잭(142)에 결합되기 전 유압잭(205)을 통해 기초지지벽(202)에 지지된다.The
가동작업대설치단계(Movable workbench installation phase ( S115S115 ))
가동작업대(203, Deck)를 제작하여 작업대연결수직프레임(192)을 통해 거푸집부재연결상부수평부재(133)와 후술하는 천장프레임부재연결상부수평부재(173)에 설치한다.Movable work platform (203, Deck) is manufactured and installed on the formwork member connecting upper
천장프레임지지체설치단계(Ceiling frame support installation step ( S116S116 ))
천장프레임지지체(170)는 2개의 천장프레임내부수직부재(171), 2개의 천장프레임외부수직부재(172), 2개의 천장프레임부재연결상부수평부재(173) 및 2개의 천장프레임부재연결상부수평부재(173)를 갖고 있다.The
2개의 천장프레임내부수직부재(171)는 인접하는 거푸집요크(130, Yoke)에 속하는 거푸집내부패널고정수평부재(135)에 하나씩 나누어 결합되고, 2개의 천장프레임외부수직부재(172)는 인접하는 거푸집요크(130, Yoke)에 속하는 거푸집외부패널고정수평부재(136)에 하나씩 나누어 결합된다. 이에 따라 천장프레임지지체(170)는 거푸집지지체(120)와 일체로 상승하게 된다.The two ceiling frame inner
천장프레임부재연결상부수평부재(173)는 천장프레임내부수직부재(171)의 상측영역과 천장프레임외부수직부재(172)의 상측영역을 연결하도록 천장프레임내부수직부재(171)와 천장프레임외부수직부재(172)에 결합되어 있다. 이에 따라 천장프레임(111)은 거푸집지지체(120)에 지지된다.Ceiling frame member connection upper
천장프레임부재연결하부수평부재(174)는 천장프레임내부수직부재(171)의 중간영역과 천장프레임외부수직부재(172)의 중간영역을 연결하도록 천장프레임내부수직부재(171)와 천장프레임외부수직부재(172)에 결합되어 있다.The ceiling frame member connecting lower
이러한 구성을 갖는 천장프레임지지체(170)는 천장프레임부재연결상부수평부재(173)를 통해 천장프레임지지체상승유압잭(162)에 결합된다.The
이에 따라 천장프레임(111)은 천장프레임지지체상승유압잭(162)과 천장프레임지지체상승잭로드(161)를 통해 기초지지벽(202)에 지지된다.Accordingly, the
천장프레임(111)이 천장프레임지지체상승유압잭(162)에 결합되기 전 유압잭(205)을 통해 기초지지벽(202)에 지지된다.The
사일로벽체거푸집형성단계(Silo wall formwork forming step ( S117S117 ))
거푸집외부패널고정수평부재(136)와 거푸집내부패널고정수평부재(135)에 폼패널을 결합하여 사일로벽체의 횡단면에 대응하는 사이공간을 갖는 사일로벽체거푸집(113)을 형성한다.The form panel is coupled to the formwork outer panel fixed
여기서 사일로벽체거푸집(113)의 형성은 그 내부공간이 사일로벽체의 단면과 동일한 형태가 되도록 이루어진다.Here, the
천장프레임보강지지단계(Ceiling frame reinforcement support step ( S118S118 ))
천장프레임(111)을 지면에 대하여 보강 지지하는 방법을 설명하면 다음과 같다.Referring to the method of reinforcing the
먼저 프레임보강지지체바디부(151)와, 프레임보강지지체바디부(151)의 상단에 승강가능하도록 설치된 보강승강부(152)를 포함하는 프레임지지체(150)를 제작한다.First, a
프레임보강지지체바디부(151)는 트러스(Truss)구조 형태로 제작되는 것이 바람직하다.Frame
보강승강부(152)는 나사식 잭(Screw jack)을 사용하여 구현할 수 있다.The
다음에 프레임보강지지체바디부(151)가 지면에 지지되고 천장프레임(111)이 보강승강부(152)에 지지되도록 프레임지지체(150)를 격벽(202b)의 상단에 설치한다.Next, the frame
천장프레임(111)을 지면에 대하여 보강 지지하는 단계는 천장프레임(111)을 천장프레임지지체(170)에 고정하기 전에 이루어지는 것이 바람직하다.Reinforcing and supporting the
천장프레임(111)에 대한 천장프레임지지체(170)의 지지상태는 첫 번째 단위사일로벽체구간이 형성된 후 보강승강부(152)를 하강 조작하여 해제된다.The support state of the
천장프레임고정단계(Ceiling frame fixing step S119S119 ))
천장프레임(111)을 천장프레임지지체(170)에 고정하는 방법을 상세히 설명하면 다음과 같다.Hereinafter, a method of fixing the
먼저 프레임고정판(114)을 프레임다리(111a)에 일 대 일로 대응하도록 천장프레임(111)에 결합한다.First, the
다음에 천장프레임부재연결하부수평부재(174)에 판지지형강(119)을 결합한다.Next, the
다음에 프레임고정판(114)을 판지지형강(119)에 결합시켜 천장프레임(111)을 천장프레임지지체(170))에 고정시킨다.Next, the
이와 같이 천장프레임(111)이 천장프레임지지체(170)에 고정된 상태에서 천장프레임(111)은 천장프레임지지체(170)와 함께 상승할 수 있게 된다.As such, the
지지체상승단계(Support rise step ( S120S120 ))
거푸집지지체(120)는 거푸집지지체상승유압잭(142)의 피스톤로드와 거푸집지지체상승상부클램프(143)를 상승시키는 동작과 거푸집지지체상승유압잭(142)과 거푸집지지체상승하부클램프(144)는 상승시키는 동작을 1회 반복할 때마다 일정높이구간만큼 상승된다. 거푸집지지체(120)가 상승하는 거리만큼 사일로벽체거푸집(113)도 상승하게 된다.The
그리고 천장프레임지지체(170)는 천장프레임지지체상승유압잭(162)의 피스톤로드와 천장프레임지지체상승상부클램프(163)를 상승시키는 동작과 천장프레임지지체상승유압잭(162)과 천장프레임지지체상승하부클램프(164)는 상승시키는 동작을 1회 반복할 때마다 일정높이구간만큼 상승된다. 천장프레임지지체(170)가 상승하는 거리만큼 천장프레임(111)도 상승하게 된다.And the
여기서 거푸집지지체(120)의 상승동작과 천장프레임지지체(170)의 상승동작은 동시에 동일한 거리만큼 상승되도록 실시된다.In this case, the lifting operation of the
사일로벽체형성단계(Silo wall formation step ( S121S121 ))
사일로벽체(201)를 기초지지면(202a)에 형성하는 과정을 도29 및 도30을 참조하여 설명하면 다음과 같다.A process of forming the
먼저 사일로벽체거푸집(113)의 내부공간에서 기초지지면(202a)에 지지되도록 철근을 배근한다(S011).First, the reinforcing bar is reinforced so as to be supported by the
다음에 사일로벽체거푸집(113)의 내부공간에 콘크리트를 타설한다(S012).Next, the concrete is poured into the inner space of the silo wall formwork 113 (S012).
다음에 사일로벽체거푸집(113)의 내부공간에 타설된 콘크리트를 양생한다(S013).Next, the concrete placed in the interior space of the
콘크리트양생공정이 완료되면 단위구간사일로벽체가 형성된다.When the concrete curing process is completed, the unit section silo wall is formed.
다음에 거푸집지지체상승구동부(140)와 천장프레임지지체상승구동부(160)를 동시에 조작하여 거푸집지지체(120), 사일로벽체거푸집(113), 천장프레임지지체(170) 및 천장프레임(111)을 일정구간만큼 상승시킨다.Next, by simultaneously operating the
다음에 S011 내지 S013 과정을 반복하여 단위구간사일로벽체를 형성한다.Next, repeating the steps S011 to S013 to form a unit section silo wall.
전술한 단위구간사일로벽체를 형성하는 과정을 사일로벽체(201)의 목표높이까지 반복하면 사일로벽체(201)가 기초지지면(202a)에 기립된 상태로 완성된다.When the above-described process of forming the unit section silo wall is repeated up to the target height of the
천장프레임사일로벽체고정단계(Ceiling frame silo wall fixing step ( S122S122 ))
사일로벽체(201)가 형성된 후 천장프레임(111)을 사일로벽체(201)에 고정하는 방법을 도31 및 도32를 참조하여 설명하면 다음과 같다.A method of fixing the
먼저 앵커볼트(115)를 천장프레임(111)에 설치한다.First,
앵커볼트(115)의 설치는 거푸집지지체(120)가 단위구간사일로벽체의 마지막 층을 형성하는 위치로 상승되었을 때 사일로벽체거푸집(113)의 내부로 진입하도록 이루어진다.Installation of the
다음에 사일로벽체(201)의 형성이 완료된 후 앵커볼트(115)가 매몰되도록 천장프레임(111)과 사일로벽체(201) 사이에 콘크리트를 타설하여 고정블럭(116)을 형성한다.Next, after the formation of the
여기서 고정블럭(116)은 사일로벽체(201)보다 큰 두께를 가지고 사일로벽체(201)에 대하여 외측을 향해 절곡된 형태로 형성할 수도 있다.The fixed
그리고 고정블럭(116)의 형성은 사일로벽체거푸집(113)과 별개로 천장프레임(111)과 사일로벽체(201) 사이에 거푸집을 설치하고 배근과정, 콘크리트타설과정, 양생과정을 거쳐 실시할 수 있다.In addition, the formation of the fixed
다음에 천장프레임(111)이 고정블럭(116)의 상면에 지지된 상태로 앵커볼트(115)에 천장프레임(111)을 결합시킨다.Next, the
천장프레임지지체분리단계Ceiling frame support separation step (123)(123)
천장프레임(111)이 사일로벽체(201)에 고정된 후 천장프레임(111)으로부터 천장프레임지지체(170)를 분리한다.After the
거푸집지지체분리단계(Formwork support separation step ( S124S124 ))
사일로벽체(201)로부터 거푸집지지체(120)를 분리한다.The
사일로벽체거푸집분리단계(Silo wall formwork separating step ( S125S125 ))
거푸집지지체(120)로부터 사일로벽체거푸집(113)을 분리한다.The
그런데 종래의 탑사일로시공방법에 따르면, 천장프레임지지체(170)가 거푸집지지체(120)에 결합되어 천장프레임지지체(170)가 거푸집지지체(120)와 일체로 상승하기 때문에 거푸집지지체상승구동부(140)의 상승구동동작과 천장프레임지지체상승구동부(160)의 상승구동동작을 연동제어해야 한다는 문제점이 있었다.However, according to the conventional top silo construction method, since the
그리고 천장프레임지지체(170)가 거푸집지지체(120)에 결합되어 있기 때문에 천장프레임(111)에 가해지는 외부 힘(바람 등)에 의해 거푸집지지체(120)의 초기 설치상태를 안정적으로 유지할 수 없다는 문제점이 있었다.In addition, since the
또한 천장프레임지지체(170)가 거푸집지지체(120)에 결합되어 있기 때문에 거푸집지지체(120)의 기울어짐(단위구간사일로벽체를 형성할 때 햇빛 등의 영향을 받아 위치에 따라 양생속도가 달라지는 경우 등의 이유로 거푸집지지체의 상승속도가 차이가 발생하고 이에 따라 한 쪽으로 기울어지는 현상이 발생할 수 있음)은 그대로 천장프레임(111)에 전달된다는 문제점이 있었다. 천장프레임(111)이 기울어지면 천장프레임(111)이 무너지거나 천장프레임(111)에 외부투입장치 등을 설치하기 어렵다는 2차적인 문제점이 발생한다.In addition, since the
따라서 본 발명의 목적은, 거푸집지지체상승구동부의 상승구동동작과 천장프레임지지체상승구동부의 상승구동동작을 독립적으로 제어할 수 있고, 사일로벽체를 형성하는 동안 거푸집지지체와 천장프레임 간의 상호 간섭을 줄일 수 있도록 한 탑사일로시공방법을 제공하는 것이다.Therefore, an object of the present invention, it is possible to independently control the rising drive operation of the form support riser drive and the rising drive operation of the ceiling frame support riser drive independently, it is possible to reduce the mutual interference between the form support and the ceiling frame while forming the silo wall. One way to do this is to provide a top silo construction method.
상기 목적은, 본 발명에 따라, 탑모양의 사일로벽체와 사일로천장의 뼈대를 형성하도록 상기 사일로벽체의 상단에 고정되는 천장프레임를 갖는 탑사일로를 시공하기 위한 탑사일로시공방법에 있어서, 상기 천장프레임을 제작하는 천장프레임제작단계와; 상단에 기초지지면를 갖는 기초지지벽을 형성하는 기초지지벽형성단계와; 상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 거푸집지지체를 설치하는 거푸집지지체설치단계와; 상기 거푸집지지체보다 높은 위치에 배치되고 상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 천장프레임지지체를 설치하는 천장프레임지지체설치단계와; 상기 거푸집지지체에 폼패널을 결합하여 상기 사일로벽체의 횡단면에 대응하는 사이 공간을 갖는 사일로벽체거푸집을 형성하는 사일로벽체거푸집형성단계와; 상기 천장프레임지지체와 함께 상승이동할 수 있도록 상기 천장프레임을 상기 천장프레임지지체에 고정하는 천장프레임고정단계와; 상기 거푸집지지체를 상승시키기 위한 거푸집지지체상승구동부와 상기 천장프레임지지체를 상승시키기 위한 천장프레임지지체상승구동부를 사용하여 상기 거푸집지지체와 상기 천장프레임지지체를 각각 단계적으로 상승시키는 지지체상승단계와; 상기 사일로벽체거푸집의 내부공간에 철근을 배근하는 철근배근공정(S011)과 상기 사일로벽체거푸집의 내부공간에 콘크리트를 타설하는 콘크리트타설공정(S012)과 상기 사일로벽체거푸집의 내부공간에 타설된 콘크리트를 양생하는 콘크리트양생공정(S013)을 거쳐 단위구간사일로벽체를 형성하는 과정을 반복하는 방법으로 상기 사일로벽체를 상기 기초지지면에 형성하는 사일로벽체형성단계와; 상기 사일로벽체를 형성한 후 상기 천장프레임을 상기 사일로벽체에 고정하는 천장프레임사일로벽체고정단계와; 상기 천장프레임을 상기 사일로벽체에 고정한 후 상기 천장프레임으로부터 상기 천장프레임지지체를 분리하는 천장프레임지지체분리단계를 포함하는 것을 특징으로 하는 탑사일로시공방법에 의해 달성된다.The above object, according to the present invention, in the top silo construction method for constructing a top silo having a ceiling frame fixed to the top of the silo wall to form a skeleton of the silo wall and silo ceiling, the ceiling frame, Manufacturing a ceiling frame manufacturing step; A base support wall forming step of forming a base support wall having a base support surface at an upper end thereof; A form support mounting step of installing a form support to be supported by the base support wall and to move upward with respect to the base support surface; A ceiling frame support mounting step of installing a ceiling frame support disposed at a position higher than the formwork support and supported by the base support wall to move upward with respect to the base support surface; A silo wall formwork forming step of forming a silo wall formwork having an interspace corresponding to a cross section of the silo wall by coupling a foam panel to the form support; A ceiling frame fixing step of fixing the ceiling frame to the ceiling frame support to move upward with the ceiling frame support; A support raising step of raising the form support and the ceiling frame support step by step using a form support rise driving unit for raising the form support and a ceiling frame support raising drive unit for raising the ceiling frame support; Reinforcing bar reinforcement step (S011) for reinforcing the reinforcing bar in the inner space of the silo wall formwork and concrete placing process (S012) for placing concrete in the inner space of the silo wall formwork and the concrete placed in the inner space of the silo wall formwork A silo wall forming step of forming the silo wall on the base ground by repeating a process of forming a unit section silo wall through curing curing step (S013); A ceiling frame silo wall fixing step of fixing the ceiling frame to the silo wall after forming the silo wall; And a ceiling frame support separation step of separating the ceiling frame support from the ceiling frame after fixing the ceiling frame to the silo wall.
여기서 거푸집지지체를 이용하여 천장프레임이 기울어지는 것을 방지할 수 있도록, 상기 천장프레임지지체설치단계는 천장프레임지지체바디부와 상기 거푸집지지체의 상단보다 낮은 위치에 도달하도록 상기 천장프레임지지체바디부로부터 연장형성된 흔들림방지내측다리부와 상기 흔들림방지내측다리부와의 사이에 상기 거푸집지지체가 진입할 수 있는 공간이 형성되고 상기 거푸집지지체의 상단보다 낮은 위치에 도달하도록 상기 천장프레임지지체바디부로부터 연장형성된 흔들림방지외측다리부를 갖도록 상기 천장프레임지지체를 제작하고, 상기 흔들림방지내측다리부와 상기 흔들림방지외측다리부와의 사이에 상기 거푸집지지체가 진입한 상태에서 상기 천장프레임지지체바디부를 통해 상기 기초지지벽에 지지되도록 실시되는 것이 바람직하다.Here, the ceiling frame support installation step is formed to extend from the ceiling frame support body portion to reach a lower position than the top of the ceiling frame support body portion and the form support to prevent the ceiling frame is inclined by using the form support. An anti-shake extending from the ceiling frame support body to form a space between the anti-shake inner leg and the anti-shake inner leg to reach a position lower than an upper end of the die support. The ceiling frame support is manufactured to have an outer leg, and is supported by the ceiling frame support body through the ceiling frame support body in a state where the form support enters between the anti-shake inner leg and the anti-shake outer leg. To be carried out It is.
그리고 천장프레임을 사일로벽체에 고정하는 동안 천장프레임의 지지상태를 보강할 수 있도록, 마지막 단위구간사일로벽체를 형성하기 위해 상기 S011 내지 S013 공정을 실시할 때 상기 천장프레임지지체를 지지할 수 있도록 상기 사일로벽체거푸집에 천장프레임보조지지체를 설치하는 천장프레임보조지지체설치단계를 더 포함하는 것이 바람직하다.And the silo to support the ceiling frame support when performing the step S011 to S013 to form the last unit section silo wall to reinforce the support state of the ceiling frame while fixing the ceiling frame to the silo wall It is preferable to further include a ceiling frame auxiliary support installation step of installing the ceiling frame auxiliary support to the wall formwork.
삭제delete
따라서 본 발명에 따르면, 기초지지벽에 지지되도록 거푸집지지체를 설치하고 거푸집지지체와 독립적으로 기초지지벽에 지지되도록 천장프레임지지체를 설치하는 한편, 거푸집지지체와 천장프레임지지체를 각각 단계적으로 상승시키도록 함으로써, 거푸집지지체상승구동부의 상승구동동작과 천장프레임지지체상승구동부의 상승구동동작을 독립적으로 제어할 수 있고, 사일로벽체를 형성하는 동안 거푸집지지체와 천장프레임 간의 상호 간섭 즉, 사일로벽체거푸집과 천장프레임 간의 상호 간섭을 줄일 수 있다.
사일로벽체를 형성하는 동안 사일로벽체거푸집과 천장프레임 간의 상호 간섭을 줄일 수 있게 되면 사일로벽체를 형성하는 동안 사일로벽체거푸집의 기울어짐 현상(단위구간사일로벽체를 형성할 때 햇빛 등의 영향을 받아 위치에 따라 양생속도가 달라지는 경우 등의 이유로 거푸집지지체의 상승속도가 차이가 발생하고 이에 따라 한 쪽으로 거푸집지지체가 기울어지는 현상이 발생할 수 있음)이 천장프레임에 전달되는 것을 방지할 수 있게 된다. 이에 따라 천장프레임이 무너지거나 천장프레임에 외부투입장치 등을 설치하기 어렵게 된다는 종래의 문제점을 해결할 수 있다.
나아가 천장프레임에 가해지는 외부 힘(바람 등)에 의해 사일로벽체를 형성하는 동안 사일로벽체거푸집(거푸집지지체)의 기울어짐 현상이 발생하는 것을 방지하여 사일로벽체를 안정적으로 형성할 수 있다.Therefore, according to the present invention, by installing the formwork support to be supported on the foundation support wall and the ceiling frame support to be supported on the foundation support wall independent of the formwork support, while increasing the formwork support and ceiling frame support step by step respectively In addition, it is possible to independently control the up-driving operation of the form support riser driving part and the up-driving operation of the ceiling frame support rising drive part, and mutual interference between the form support and the ceiling frame during forming the silo wall, Mutual interference can be reduced.
When the silo wall formwork and the ceiling frame can reduce the mutual interference while the silo wall is formed, the tilting of the silo wall formwork during formation of the silo wall (when forming the unit section silo wall is affected by sunlight, etc.). As a result, if the curing speed is changed, the ascending speed of the form support may be different, and thus, the form support may be inclined to one side), thereby preventing transmission of the formwork to the ceiling frame. Accordingly, it is possible to solve the conventional problem that the ceiling frame is collapsed or it is difficult to install an external input device to the ceiling frame.
Furthermore, the silo wall can be stably formed by preventing the tilting of the silo wall formwork (form support) while the silo wall is formed by the external force (wind, etc.) applied to the ceiling frame.
도1은 본 발명의 일 실시예에 따른 탑사일로시공방법에 따라 설치된 기초지지벽, 거푸집지지체, 천장프레임지지체, 프레임보강지지체 및 천장프레임의 배치관계를 도시한 도면,
도2는 도1에 도시된 기초지지벽, 거푸집지지체 및 천장프레임지지체 영역의 상세도,
도3은 본 발명의 일 실시예에 따른 거푸집지지체, 가동작업대 및 고정작업대의 설치상태를 도시한 도면,
도4는 본 발명의 일 실시예에 따른 천장프레임지지체의 설치상태를 도시한 도면,
도5는 본 발명의 일 실시예에 따른 거푸집지지체와 천장프레임지지체의 설치상태를 도시한 도면,
도6 및 도7은 각각 본 발명의 일 실시예에 따른 천장프레임이 천장프레임지지체에 고정된 상태를 도시한 도면,
도8은 도1에 도시된 프레임보강지지체의 일부를 도시한 도면,
도9, 도10, 및 도11은 각각 본 발명의 일 실시예에 따라 사일로벽체를 형성하는 방법을 도시한 도면,
도12 및 도13은 각각 본 발명의 일 실시예에 따라 천장프레임을 사일로벽체에 고정하는 방법으로 도시한 도면,
도14는 본 발명의 일 실시예에 따른 탑사일로시공방법의 흐름도,
도15는 본 발명의 다른 실시예에 따른 메인거푸집지지체, 천장프레임지지체 및 보조거푸집지지체의 설치상태를 도시한 도면,
도16, 도17 및 도18은 각각 본 발명의 다른 실시예에 따라 사일로벽체를 형성하는 방법을 도시한 도면,
도19는 본 발명의 또 다른 실시예에 따른 거푸집지지체, 천장프레임지지체 및 천장프레임보조지지체의 설치상태를 도시한 도면,
도20은 본 발명의 또 다른 실시예에 따라 사일로벽체를 형성하는 방법을 도시한 도면,
도21은 종래의 탑사일로시공방법에 따라 설치된 기초지지벽, 거푸집지지체, 천장프레임지지체, 프레임보강지지체 및 천장프레임의 배치관계를 도시한 도면,
도22는 도21에 도시된 기초지지벽, 거푸집지지체 및 천장프레임지지체 영역의 상세도,
도23은 종래의 탑사일로시공방법에 따른 거푸집지지체, 가동작업대 및 고정작업대의 설치상태를 도시한 도면,
도24는 종래의 탑사일로시공방법에 따른 천장프레임지지체의 설치상태를 도시한 도면,
도25는 종래의 탑사일로시공방법에 따른 거푸집지지체와 천장프레임지지체의 설치상태를 도시한 도면,
도26 및 도27은 각각 종래의 탑사일로시공방법에 따른 천장프레임이 천장프레임지지체에 고정된 상태를 도시한 도면,
도28는 도21에 도시된 프레임보강지지체의 일부를 도시한 도면,
도29 및 도30은 각각 종래의 탑사일로시공방법에 따라 사일로벽체를 형성하는 방법을 도시한 도면,
도31 및 도32는 종래의 탑사일로시공방법에 따라 천장프레임을 사일로벽체에 고정하는 방법으로 도시한 도면,
도33은 종래의 탑사일로시공방법에 따른 탑사일로시공방법의 흐름도이다.1 is a view showing the layout relationship of the foundation support wall, formwork support, ceiling frame support, frame reinforcement support and ceiling frame installed according to the top silo construction method according to an embodiment of the present invention,
FIG. 2 is a detailed view of the area of the base support wall, the form support and the ceiling frame support shown in FIG.
Figure 3 is a view showing the installation state of the formwork support, the movable workbench and the fixed workbench according to an embodiment of the present invention,
4 is a view showing an installation state of the ceiling frame support according to an embodiment of the present invention,
5 is a view showing an installation state of the formwork support and the ceiling frame support according to an embodiment of the present invention,
6 and 7 are views showing a state in which the ceiling frame is fixed to the ceiling frame support, respectively, according to an embodiment of the present invention;
8 is a view showing a part of the frame reinforcement support shown in FIG.
9, 10, and 11 respectively illustrate a method of forming a silo wall according to an embodiment of the present invention;
12 and 13 are diagrams respectively showing a method of fixing a ceiling frame to a silo wall according to an embodiment of the present invention;
14 is a flowchart of a top silo construction method according to an embodiment of the present invention;
15 is a view showing the installation state of the main formwork support, the ceiling frame support and the auxiliary formwork support according to another embodiment of the present invention;
16, 17 and 18 respectively illustrate a method of forming a silo wall according to another embodiment of the present invention;
19 is a view showing the installation state of the formwork support, the ceiling frame support and the ceiling frame auxiliary support according to another embodiment of the present invention;
20 illustrates a method of forming a silo wall according to another embodiment of the present invention;
FIG. 21 is a view showing an arrangement relationship between a foundation support wall, a form support, a ceiling frame support, a frame reinforcement support, and a ceiling frame installed according to a conventional top silo construction method; FIG.
FIG. 22 is a detailed view of the area of the base support wall, the form support and the ceiling frame support shown in FIG. 21;
Figure 23 is a view showing the installation state of the formwork support, the movable workbench and the fixed workbench according to the conventional top silo construction method,
24 is a view showing an installation state of the ceiling frame support according to the conventional top silo construction method,
25 is a view showing an installation state of the formwork support and the ceiling frame support according to the conventional top silo construction method;
26 and 27 are views illustrating a state in which the ceiling frame is fixed to the ceiling frame support according to the conventional top silo construction method, respectively.
28 is a view showing a part of the frame reinforcing supporter shown in FIG. 21;
29 and 30 respectively show a method of forming a silo wall according to a conventional top silo construction method;
31 and 32 are views showing a method of fixing a ceiling frame to a silo wall according to a conventional top silo construction method;
33 is a flowchart of a top silo construction method according to a conventional top silo construction method.
이하에서, 첨부도면을 참조하여 본 발명을 상세히 설명하기로 한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도1은 본 발명의 일 실시예에 따른 탑사일로시공방법에 따라 설치된 기초지지벽, 거푸집지지체, 천장프레임지지체, 프레임보강지지체 및 천장프레임의 배치관계를 도시한 도면이고, 도2는 도1에 도시된 기초지지벽, 거푸집지지체 및 천장프레임지지체 영역의 상세도이고, 도3은 본 발명의 일 실시예에 따른 거푸집지지체, 가동작업대 및 고정작업대의 설치상태를 도시한 도면이고, 도4는 본 발명의 일 실시예에 따른 천장프레임지지체의 설치상태를 도시한 도면이고, 도5는 본 발명의 일 실시예에 따른 거푸집지지체와 천장프레임지지체의 설치상태를 도시한 도면이고, 도6 및 도7은 각각 본 발명의 일 실시예에 따른 천장프레임이 천장프레임지지체에 고정된 상태를 도시한 도면이고, 도8은 도1에 도시된 프레임보강지지체의 일부를 도시한 도면이고, 도14는 본 발명의 일 실시예에 따른 탑사일로시공방법의 흐름도이다.1 is a view showing the layout relationship of the foundation support wall, formwork support, ceiling frame support, frame reinforcement support and ceiling frame installed in accordance with the top silo construction method according to an embodiment of the present invention, Figure 2 Figure 3 is a detailed view of the basic support wall, formwork support and ceiling frame support region shown, Figure 3 is a view showing the installation of the formwork, movable workbench and stationary workbench according to an embodiment of the present invention, Figure 4 5 is a view showing an installation state of the ceiling frame support according to an embodiment of the present invention, Figure 5 is a view showing an installation state of the formwork support and the ceiling frame support according to an embodiment of the present invention, Figures 6 and 7 Is a view showing a state in which the ceiling frame is fixed to the ceiling frame support according to an embodiment of the present invention, Figure 8 is a view showing a part of the frame reinforcement support shown in Figure 1, Figure 1 4 is a flowchart of a top silo construction method according to an embodiment of the present invention.
천장프레임제작단계(Ceiling frame production stage S11S11 ))
강재나 강성 플라스틱을 사용하여 다수의 프레임다리(11a)를 갖는 천장프레임(11)을 제작한다.The
기초지지벽형성단계(Foundation support wall forming step S12S12 ))
지면에 거푸집을 설치하고 콘크리트를 타설하는 등의 방법으로 기초지지벽(202)을 형성한다.The
기초지지벽(202)은 상단에 기초지지면(202a)을 갖도록 형성되고, 내부에는 저장물을 분리하기 위한 격벽(202b)이 다수 개 형성될 수 있다.The
지지체상승구동부설치(Support lift drive installation S13S13 ))
먼저 거푸집지지체(20)를 상승시키기 위한 거푸집지지체상승구동부(40)와, 천장프레임지지체(70)를 상승시키기 위한 천장프레임지지체상승구동부(60)를 설치한다.First, the form support
거푸집지지체상승구동부(40)는 거푸집지지체상승잭로드(41, Jack Rod), 거푸집지지체상승유압잭(42), 거푸집지지체상승상부클램프(43), 거푸집지지체상승하부클램프(44), 거푸집지지체상승유압펌프(도시되지 않음)를 다음과 같은 방법으로 설치함으로써 구성할 수 있다.The die support
거푸집지지체상승잭로드(41)는 일정간격으로 이격되도록 기초지지면(202a) 상에 기립 설치한다. 거푸집지지체상승잭로드(41)는 사일로벽체(201) 형성공정이 진행되는 동안 나사결합방법으로 그 길이구간이 연장된다.The form support rising
그리고 거푸집지지체상승잭로드(41)는 기초지지벽(202)의 내부로 삽입되도록 설치된다.And the die support rise
거푸집지지체상승유압잭(42)은 거푸집지지체상승유압잭(42)의 내부로 거푸집지지체상승잭로드(41)가 상하방향을 따라 통과하도록 설치된다.The die supporting body lifting
거푸집지지체상승유압잭(42)은 각 거푸집지지체상승잭로드(41)에 하나씩 설치된다.The die support lifting
거푸집지지체상승상부클램프(43)는 거푸집지지체상승유압잭(42)의 피스톤로드에 결합되어 있고, 거푸집지지체상승유압잭(42)의 상측에 배치되도록 거푸집지지체상승잭로드(41)에 결합되어 있다. 거푸집지지체상승상부클램프(43)에는 거푸집지지체상승잭로드(41)를 타고 하강하는 것이 저지되도록 이(Teeth)가 형성되어 있다.The form
거푸집지지체상승하부클램프(44)는 거푸집지지체상승유압잭(42)에 결합되어 있고 거푸집지지체상승유압잭(42)의 하측에 배치되도록 거푸집지지체상승잭로드(41)에 결합되어 있다. 거푸집지지체상승하부클램프(44)에는 거푸집지지체상승잭로드(41)를 타고 하강하는 것이 저지되도록 이(Teeth)가 형성되어 있다.The form support rise
거푸집지지체상승유압펌프(도시되지 않음)는 거푸집지지체상승유압잭(42)에 고압의 오일을 공급한다.The form support rise hydraulic pump (not shown) supplies a high pressure oil to the form support rise
전술한 구성을 갖는 거푸집지지체상승구동부(40)의 동작을 설명하면 다음과 같다.Referring to the operation of the formwork
먼저 거푸집지지체상승유압펌프(도시되지 않음)로부터 실린더의 피스톤 하측공간으로 고압의 오일이 공급될 때 거푸집지지체상승하부클램프(44)는 하강하지 아니하기 때문에 피스톤로드와 거푸집지지체상승상부클램프(43)는 상승하게 된다.First, when the high pressure oil is supplied from the formwork support hydraulic pressure pump (not shown) to the piston lower space of the cylinder, the formwork support elevation
다음에 거푸집지지체상승유압펌프(도시되지 않음)로부터 실린더의 피스톤 상측공간으로 고압의 오일이 공급될 때 거푸집지지체상승상부클램프(43)와 피스톤로드는 하강하지 않기 때문에 거푸집지지체상승유압잭(42)과 거푸집지지체상승하부클램프(44)는 상승하게 된다.Next, when the high pressure oil is supplied from the formwork support hydraulic pump (not shown) to the piston upper space of the cylinder, the formwork support lift
이와 같이 피스톤로드와 거푸집지지체상승상부클램프(43)를 상승시키는 동작과 거푸집지지체상승유압잭(42)과 거푸집지지체상승하부클램프(44)는 상승시키는 동작을 1회 반복할 때마다 거푸집지지체상승유압잭(42)에 결합된 물체는 일정높이구간만큼 상승시킬 수 있다.As such, the piston rod and the die supporting body upward
이러한 구성을 갖는 거푸집지지체상승구동부(40)의 구성과 동작은 종래의 슬립폼(Slip Form) 공법에 그대로 적용하고 있으므로 상세한 설명은 생략하기로 한다.Since the configuration and operation of the form support
천장프레임지지체상승구동부(60)는 거푸집지지체상승구동부(40)와 동일한 구조와 기능을 갖는 천장프레임지지체상승잭로드(61, Jack Rod), 천장프레임지지체상승유압잭(62), 천장프레임지지체상승상부클램프(63), 천장프레임지지체상승하부클램프(64), 천장프레임지지체상승유압펌프(도시되지 않음)를 다음과 같은 방법으로 설치함으로써 구성할 수 있다.The ceiling frame support
천장프레임지지체상승잭로드(61)는 거푸집지지체상승잭로드(41)의 사이영역에 배치되도록 기초지지면(202a) 상에 기립 설치한다. 천장프레임지지체상승잭로드(61)는 사일로벽체(201) 형성공정이 진행되는 동안 나사결합방법으로 그 길이구간이 연장된다.The ceiling frame support rising
그리고 천장프레임지지체상승잭로드(61)는 기초지지벽(202)의 내부로 삽입되도록 설치된다.And the ceiling frame support rising
전술한 구성을 갖는 천장프레임지지체상승구동부(60)는 거푸집지지체상승구동부(40)와 동일한 방법으로 동작하며, 피스톤로드와 천장프레임지지체상승상부클램프(63)를 상승시키는 동작과 천장프레임지지체상승유압잭(62)과 천장프레임지지체상승하부클램프(64)는 상승시키는 동작을 1회 반복할 때마다 천장프레임지지체상승유압잭(62)에 결합된 물체는 일정높이구간만큼 상승시킬 수 있다.The ceiling frame support
거푸집지지체설치단계(Formwork Support Installation Step ( S14S14 ))
기초지지벽(202)에 거푸집지지체(20)를 설치하는 방법을 설명하면 다음과 같다.The method of installing the
먼저 2개의 거푸집내부수직부재(31), 2개의 거푸집외부수직부재(32), 4개의 거푸집부재연결상부수평부재(33), 4개의 거푸집부재연결하부수평부재(34), 3개의 거푸집내부패널고정수평부재(35) 및 3개의 거푸집외부패널고정수평부재(36)를 갖는 거푸집요크(30, Yoke)를 제작한다.First two formwork inner
거푸집부재연결상부수평부재(33)는 거푸집내부수직부재(31)의 상측영역과 거푸집외부수직부재(32)의 상측영역을 연결하도록 거푸집내부수직부재(31)와 거푸집외부수직부재(32)에 결합되어 있다.The form member connection upper
거푸집부재연결하부수평부재(34)는 거푸집내부수직부재(31)의 중간영역과 거푸집외부수직부재(32)의 중간영역을 연결하도록 거푸집내부수직부재(31)와 거푸집외부수직부재(32)에 결합되어 있다. The form member connecting lower
거푸집내부패널고정수평부재(35)는 호형(弧形)으로 형성되고, 거푸집내부수직부재(31) 상호간을 연결하도록 거푸집내부수직부재(31)의 하측 영역에 결합되어 있다. 여기서 거푸집내부패널고정수평부재(35)의 결합은 거푸집부재연결하부수평부재(34)의 하측에 배치되도록 이루어진다.The formwork inner panel fixed
거푸집외부패널고정수평부재(36)는 호형(弧形)으로 형성되고, 거푸집외부수직부재(32) 상호간을 연결하도록 거푸집외부수직부재(32)의 하측 영역에 결합되어 있다. 여기서 거푸집외부패널고정수평부재(36)의 결합은 거푸집부재연결하부수평부재(34)의 하측에 배치되도록 이루어진다. The formwork outer panel fixed
다음에 거푸집내부패널고정수평부재(35) 상호간이 서로 연결되고 거푸집외부패널고정수평부재(36) 상호간이 서로 연결되도록 거푸집요크(30)를 기초지지벽(202) 상에 연속적으로 설치하여 폐루프형태의 거푸집지지체(20)를 형성한다.Next, the
이러한 구성을 갖는 거푸집지지체(20)는 거푸집지지체상승유압잭(42)에 결합된다. 이에 따라 거푸집지지체(20)는 거푸집지지체상승잭로드(41)와 거푸집지지체상승유압잭(42)을 통해 기초지지벽(202)에 지지된다.The
그리고 거푸집지지체(20)는 거푸집지지체상승유압잭(42)에 결합되기 전 유압잭(205)을 통해 기초지지벽(202)에 지지된다.And the
가동작업대설치단계(Movable workbench installation phase ( S15S15 ))
가동작업대(203, Deck)를 제작하여 작업대연결수직프레임(92)을 통해 거푸집부재연결상부수평부재(33)에 설치한다. 이에 따라 가동작업대(203, Deck)는 거푸집지지체(20)와 함께 상승할 수 있게 된다.Movable work platform (203, Deck) is produced and installed on the formwork member connecting upper
천장프레임지지체설치단계(Ceiling frame support installation step ( S16S16 ))
기초지지면(202a)에 천장프레임지지체(70)를 설치하는 방법을 설명하면 다음과 같다.A method of installing the
먼저 천장프레임지지체바디부(80)와, 천장프레임지지체바디부(80)로부터 연장 형성된 2개의 흔들림방지내측다리부(71) 및 2개의 흔들림방지외측다리부(72)를 갖는 천장프레임지지체(70)를 제작한다.First, the ceiling
천장프레임지지체바디부(80)는 2개의 천장프레임내부수직부재(81), 2개의 천장프레임외부수직부재(82), 2개의 천장프레임부재연결상부수평부재(83) 및 2개의 천장프레임부재연결하부수평부재(84)를 갖고 있다.The ceiling frame
천장프레임부재연결상부수평부재(83)는 천장프레임내부수직부재(81)의 상측영역과 천장프레임외부수직부재(82)의 상측영역을 연결하도록 천장프레임내부수직부재(81)와 천장프레임외부수직부재(82)에 결합되어 있다.The ceiling frame member connection upper
천장프레임부재연결하부수평부재(84)는 천장프레임내부수직부재(81)의 중간영역과 천장프레임외부수직부재(82)의 중간영역을 연결하도록 천장프레임내부수직부재(81)와 천장프레임외부수직부재(82)에 결합되어 있다. The ceiling frame member connecting lower
각 흔들림방지내측다리부(71)는 천장프레임내부수직부재(81)로부터 거푸집지지체(20)의 상단보다 낮은 위치에 도달하도록 연장 형성되어 있다.Each of the anti-shake
각 흔들림방지내측다리부(71)는 거푸집내부수직부재(31)의 하단보다 낮은 위치에 도달하도록 연장 형성되어 있다.Each anti-shake
이러한 구성을 갖는 천장프레임지지체(70)는 흔들림방지내측다리부(71)와 흔들림방지외측다리부(72)와의 사이에 거푸집지지체(20)가 진입한 상태에서 천장프레임지지체바디부(80)를 통해 천장프레임지지체상승유압잭(62)에 결합된다.The ceiling
이에 따라 천장프레임지지체(70)는 천장프레임지지체상승잭로드(61)와 천장프레임지지체상승유압잭(62)을 통해 기초지지벽(202)에 지지된다.Accordingly, the
천장프레임지지체(70)는 천장프레임지지체상승유압잭(62)에 결합되기 전 유압잭(205)을 통해 기초지지벽(202)에 지지된다.The
사일로벽체거푸집형성단계(Silo wall formwork forming step ( S17S17 ))
거푸집외부패널고정수평부재(36)와 거푸집내부패널고정수평부재(35)에 폼패널을 결합하여 사일로벽체의 횡단면에 대응하는 사이공간을 갖는 사일로벽체거푸집(13)을 형성한다.The form panel is coupled to the formwork outer panel fixed
여기서 사일로벽체거푸집(13)의 형성은 그 내부공간이 사일로벽체의 단면과 동일한 형태가 되도록 이루어진다.Here, the
천장프레임보강지지단계(Ceiling frame reinforcement support step ( S18S18 ))
천장프레임(11)을 지면에 대하여 보강 지지하는 방법을 설명하면 다음과 같다.Referring to the method of reinforcing and supporting the
먼저 프레임보강지지체바디부(51)와, 프레임보강지지체바디부(51)의 상단에 승강 가능하도록 설치된 보강승강부(52)를 포함하는 프레임보강지지체(50)를 제작한다.First, a frame
프레임보강지지체바디부(51)는 트러스(Truss)구조 형태로 제작되는 것이 바람직하다.Frame reinforcing
보강승강부(52)는 나사식 잭(Screw jack)을 사용하여 구현할 수 있다.The
다음에 프레임보강지지체바디부(51)가 지면에 지지되고 천장프레임(11)이 보강승강부(52)에 지지되도록 프레임보강지지체(50)를 격벽(202b)의 상단에 설치한다.Next, the frame
천장프레임고정단계(Ceiling frame fixing step S19S19 ))
천장프레임(11)을 천장프레임지지체(70)에 고정하는 방법을 상세히 설명하면 다음과 같다.Hereinafter, a method of fixing the
먼저 프레임고정판(14)을 프레임다리(11a)에 일 대 일로 대응하도록 천장프레임(11)에 결합한다.First, the
다음에 천장프레임부재연결하부수평부재(84)에 판지지형강(19)을 결합한다.Next, the cardboard plated
다음에 프레임고정판(14)을 판지지형강(19)에 결합시켜 천장프레임(11)을 천장프레임지지체(70)에 고정시킨다.Next, the
이와 같이 천장프레임(11)이 천장프레임지지체(70)에 고정된 상태에서 천장프레임(11)은 천장프레임지지체(70)와 함께 상승할 수 있게 된다.As such, the
지지체상승단계(Support rise step ( S20S20 ))
거푸집지지체(20)는 거푸집지지체상승유압잭(42)의 피스톤로드와 거푸집지지체상승상부클램프(43)를 상승시키는 동작과 거푸집지지체상승유압잭(42)과 거푸집지지체상승하부클램프(44)는 상승시키는 동작을 1회 반복할 때마다 일정높이구간만큼 상승된다. 거푸집지지체(20)이 상승하는 거리만큼 사일로벽체거푸집(13)도 상승하게 된다.The
그리고 천장프레임지지체(70)는 천장프레임지지체상승유압잭(62)의 피스톤로드와 천장프레임지지체상승상부클램프(63)를 상승시키는 동작과 천장프레임지지체상승유압잭(62)과 천장프레임지지체상승하부클램프(64)는 상승시키는 동작을 1회 반복할 때마다 일정높이구간만큼 상승된다. 천장프레임지지체(70)가 상승하는 거리만큼 천장프레임(11)도 상승하게 된다.And the
여기서 거푸집지지체(20)의 상승동작과 천장프레임지지체(70)의 상승동작은 시간차를 두고 동일한 거리만큼 상승되도록 실시된다.Here, the ascending operation of the
사일로벽체형성단계(Silo wall formation step ( S21S21 ))
사일로벽체(201)를 기초지지면(202a)에 형성하는 과정을 도9 내지 도11을 참조하여 상세히 설명하면 다음과 같다.A process of forming the
먼저 사일로벽체거푸집(13)의 내부공간에서 기초지지면(202a)에 지지되도록 철근을 배근한다(S011).First, the reinforcing bar is reinforced so as to be supported by the
다음에 사일로벽체거푸집(13)의 내부공간에 콘크리트를 타설한다(S012).Next, concrete is poured into the inner space of the silo wall formwork 13 (S012).
다음에 사일로벽체거푸집(13)의 내부공간에 타설된 콘크리트를 양생한다(S013).Next, the concrete placed in the interior space of the
콘크리트양생공정이 완료되면 단위구간사일로벽체가 형성된다(도9 참조).When the concrete curing process is completed, the unit section silo wall is formed (see Fig. 9).
다음에 거푸집지지체상승구동부(40)를 조작하여 거푸집지지체(20)와 사일로벽체거푸집(13)을 일정구간만큼 상승시킨다(도10 참조).Next, the
다음에 천장프레임지지체상승구동부(60)를 조작하여 천장프레임지지체(70)와 천장프레임(11)을 일정구간만큼 상승시킨다(도11 참조).Next, by operating the ceiling frame support lifting
다음에 S011 내지 S013 과정을 반복하여 단위구간사일로벽체를 형성한다.Next, repeating the steps S011 to S013 to form a unit section silo wall.
전술한 단위구간사일로벽체를 형성하는 과정을 사일로벽체(201)의 목표높이까지 반복하면 사일로벽체(201)가 기초지지면(202a)에 기립된 상태로 완성된다. 다만 마지막 단위구간사일로벽체를 형성할 때에는 천장프레임지지체(70)와 천장프레임(11)만 일정높이구간만큼 상승시키고 천장프레임지지체(70)와 천장프레임(11)은 상승시키지 아니한다.When the above-described process of forming the unit section silo wall is repeated up to the target height of the
천장프레임사일로벽체고정단계(Ceiling frame silo wall fixing step ( S22S22 ))
사일로벽체(201)가 형성된 후 천장프레임(11)을 사일로벽체(201)에 고정하는 방법을 도12와 도13을 참조하여 설명하면 다음과 같다.After the
먼저 앵커볼트(15)를 천장프레임(11)에 설치한다.First, the
앵커볼트(15)의 설치는 거푸집지지체(20)가 단위구간사일로벽체의 마지막 층을 형성하는 위치로 상승되었을 때 사일로벽체거푸집(13)의 내부로 진입하도록 이루어진다.Installation of the
다음에 사일로벽체(201)의 형성이 완료된 후 앵커볼트(15)가 매몰되도록 천장프레임(11)과 사일로벽체(201) 사이에 콘크리트를 타설하여 고정블럭(16)을 형성한다.Next, after the formation of the
여기서 고정블럭(16)은 사일로벽체(201)보다 큰 두께를 가지고 사일로벽체(201)에 대하여 외측을 향해 절곡된 형태로 형성할 수도 있다.The fixed
그리고 고정블럭(16)의 형성은 사일로벽체거푸집(13)과 별개로 천장프레임(11)과 사일로벽체(201) 사이에 거푸집을 설치하고 배근과정, 콘크리트타설과정, 양생과정을 거쳐 실시할 수 있다.And the formation of the fixed
다음에 천장프레임(11)이 고정블럭(16)의 상면에 지지된 상태로 앵커볼트(15)에 천장프레임(11)을 결합시킨다.Next, the
천장프레임지지체분리단계Ceiling frame support separation step (23)(23)
천장프레임(11)이 사일로벽체(201)에 고정된 후 천장프레임(11)으로부터 천장프레임지지체(70)를 분리한다.After the
거푸집지지체분리단계(Formwork support separation step ( S24S24 ))
사일로벽체(201)로부터 거푸집지지체(20)를 분리한다.The
사일로벽체거푸집분리단계(Silo wall formwork separating step ( S25S25 ))
거푸집지지체(20)로부터 사일로벽체거푸집(13)을 분리한다.The
한편 전술한 실시예에서는 사일로벽체거푸집(13) 전부가 거푸집지지체(20)와 함께 상승하도록 구성하고 있으나, 도15에 도시된 바와 같이, 사일로벽체거푸집(13)의 일부를 천장프레임지지체(70)와 함께 상승하도록 본 발명을 실시할 수 있다.Meanwhile, in the above-described embodiment, all of the
도15는 본 발명의 다른 실시예에 따른 메인거푸집지지체, 천장프레임지지체 및 보조거푸집지지체의 설치상태를 도시한 도면이고, 도16, 도17 및 도18은 각각 본 발명의 다른 실시예에 따라 사일로벽체를 형성하는 방법을 도시한 도면이다.15 is a view showing the installation state of the main formwork support, the ceiling frame support and the auxiliary formwork support according to another embodiment of the present invention, Figures 16, 17 and 18 are silos according to another embodiment of the present invention, respectively. It is a figure which shows the method of forming a wall.
본 발명의 다른 실시예에 따른 탑사일로시공방법을 이들 도면을 참조하여 상세히 설명하면 다음과 같다.Referring to these silos construction method according to another embodiment of the present invention in detail as follows.
천장프레임제작단계와 기초지지벽형성단계Ceiling frame manufacturing step and foundation support wall forming step
본 발명의 일 실시예에 따른 탑사일로시공방법의 경우와 동일한 방법으로 천장프레임(11)과 기초지지벽(202)을 형성한다.The
지지체상승구동부설치단계Mounting step of driving support
먼저 메인거푸집지지체(20')를 상승시키기 위한 메인거푸집지지체상승구동부를 본 발명의 일 실시예에 따른 거푸집지지체상승구동부(40)와 동일하게 설치하고, 천장프레임지지체(70')를 상승시키기 위한 천장프레임지지체상승구동부(60)를 본 발명의 일 실시예에 따른 천장프레임지지체상승구동부(60)와 동일하게 설치한다.First, the main formwork supporting body driving unit for raising the main formwork support 20 'is installed in the same way as the formwork supporting
메인거푸집지지체설치단계Main formwork installation step
기초지지벽(202)에 메인거푸집지지체(20')를 설치하는 방법을 설명하면 다음과 같다.A method of installing the
먼저 본 발명의 일 실시예에 따른 거푸집요크(30, Yoke)와 동일한 구조를 갖는 거푸집요크를 제작한다.First, a form yoke having the same structure as a
다음에 제작된 거푸집요크를 기초지지벽(202)에 분리 설치하여 메인거푸집지지체(20')를 형성한다. 여기서 거푸집요크의 설치는 천장프레임지지체(70')의 하부영역에서 분리되도록 이루어진다.Next, the formed die yoke is separately installed on the
이러한 구성을 갖는 메인거푸집지지체(20')는 메인거푸집지지체상승구동부에 속하는 상승유압잭에 결합된다. 이에 따라 메인거푸집지지체(20')는 메인거푸집지지체상승구동부에 속하는 상승유압잭을 통해 기초지지벽(202)에 지지된다.The
가동작업대설치단계Movable workbench installation stage
가동작업대(203, Deck)는 본 발명의 일 실시예와 동일한 방법으로 메인거푸집지지체에 속하는 거푸집부재연결상부수평부재에 설치한다. 이에 따라 가동작업대(203, Deck)는 메인거푸집지지체(20')와 함께 상승할 수 있게 된다.The
천장프레임지지체설치단계Ceiling frame support installation step
기초지지벽(202)에 천장프레임지지체(70')를 설치하는 방법을 설명하면 다음과 같다.A method of installing the
먼저 천장프레임지지체바디부(80')와, 천장프레임지지체바디부(80')로부터 연장 형성된 4개의 보조거푸집지지체연결다리부(71')를 갖는 천장프레임지지체(70')를 제작한다.First, a ceiling frame support 70 'having a ceiling frame support body portion 80' and four auxiliary formwork support connecting leg portions 71 'extending from the ceiling frame support body portion 80' is manufactured.
천장프레임지지체바디부(80')는 본 발명의 일 실시예에 따른 천장프레임지지체바디부(80)와 동일한 구조를 갖는 천장프레임내부수직부재(81'), 천장프레임외부수직부재(82'), 천장프레임부재연결상부수평부재(83') 및 천장프레임부재연결하부수평부재(84')를 갖고 있다.The ceiling frame support body portion 80 'is a ceiling frame inner vertical member 81' and a ceiling frame outer vertical member 82 'having the same structure as the ceiling frame
각 보조거푸집지지체연결다리부(71')는 천장프레임내부수직부재(81')와 천장프레임외부수직부재(82')로부터 거푸집내부수직부재의 하단보다 낮은 위치에 도달하도록 연장 형성되어 있다.Each auxiliary formwork support connecting leg portion 71 'extends from the ceiling frame inner vertical member 81' and the ceiling frame outer vertical member 82 'to reach a position lower than the lower end of the form inner vertical member.
이러한 구성을 갖는 천장프레임지지체(70')는 천장프레임지지체바디부(80')를 통해 천장프레임지지체상승유압잭에 결합된다.The ceiling frame support 70 'having such a configuration is coupled to the ceiling frame support upward hydraulic jack through the ceiling frame support body 80'.
이에 따라 천장프레임지지체(70')는 천장프레임지지체상승유압잭을 통해 기초지지벽(202)에 지지된다.Accordingly, the ceiling frame support 70 'is supported by the
보조거푸집지지체설치단계Secondary form support installation step
3개의 거푸집내부패널고정수평부재(21") 및 3개의 거푸집외부패널고정수평부재(22")를 갖는 보조거푸집지지체(20")를 천장프레임지지체(70')에 설치한다.An
보조거푸집지지체(20")에 속하는 거푸집내부패널고정수평부재(21")와 거푸집외부패널고정수평부재(22")는 메인거푸집지지체(20')에 속하는 거푸집내부패널고정수평부재(35') 및 거푸집외부패널고정수평부재(36')와 협조하여 폐루프를 이루도록(메인거푸집지지체에 속하는 거푸집내부패널고정수평부재 사이의 이격공간과 거푸집외부패널고정수평부재 사이의 이격공간을 메우도록) 설치된다.The formwork inner panel fixed horizontal member 21 'belonging to the auxiliary formwork support 20' 'and the formwork outer panel fixed horizontal member 22' 'are formed on the formwork inner panel fixed horizontal member 35' belonging to the main formwork support 20 '. And co-operating with the formwork outer panel fixed horizontal member 36 'to form a closed loop (filling the spaced space between the formwork inner panel fixed horizontal member belonging to the main formwork support and the space between the formwork outer panel fixed horizontal member) do.
그리고 보조거푸집지지체(20")에 속하는 거푸집내부패널고정수평부재(21") 와 거푸집외부패널고정수평부재(22")는 안내홈(20"a)과 안내레일(20'a)을 통해 메인거푸집지지체(20')에 속하는 거푸집내부패널고정수평부재(35')와 거푸집외부패널고정수평부재(36')에 대하여 초기설치상태를 유지하면서 상대적 이동할 수 있다.In addition, the formwork inner panel fixed
사일로벽체거푸집형성단계Silo wall formwork forming step
보조거푸집지지체(20")에 속하는 거푸집내부패널고정수평부재(21") 및 거푸집외부패널고정수평부재(22")와 메인거푸집지지체(20')에 속하는 거푸집내부패널고정수평부재(35") 및 거푸집외부패널고정수평부재(36")에 폼패널을 결합하여 사일로벽체의 횡단면에 대응하는 사이공간을 갖는 사일로벽체거푸집(13)을 형성한다.Formwork inner panel fixed
여기서 사일로벽체거푸집(13)의 형성은 그 내부공간이 사일로벽체의 단면과 동일한 형태가 되도록 이루어진다.Here, the
천장프레임보강지지단계, 천장프레임고정단계, 지지체상승단계, 사일로벽체형성단계, 천장프레임사일로벽체고정단계, 천장프레임지지체분리단계, 거푸집지지체분리단계 및 사일로벽체거푸집분리단계는 각각 본 발명의 일 실시예와 동일한 방법으로 실시할 수 있다.Ceiling frame reinforcement support step, ceiling frame fixing step, support rise step, silo wall forming step, ceiling frame silo wall fixing step, ceiling frame support separating step, formwork support separating step and silo wall formwork separating step respectively It can implement in the same way as an example.
그리고 전술한 실시예에서는 흔들림방지내측다리부(71)와 흔들림방지내측다리부(71)를 갖는 천장프레임지지체(70)를 설치하도록 천장프레임지지체설치단계를 구성하고 있으나, 도19 및 도20에 도시된 바와 같이 흔들림방지내측다리부(71)와 흔들림방지내측다리부(71)가 없는 천장프레임지지체(70")를 설치하는 한편 마지막 단위구간사일로벽체를 형성하기 위해 S011 내지 S013 공정을 실시할 때 천장프레임지지체(70")를 지지할 수 있도록 거푸집지지체(20)에 천장프레임보조지지체(91)를 설치하는 천장프레임보조지지체설치단계를 더 포함하도록 본 발명을 실시할 수 있다.In the above-described embodiment, the ceiling frame support mounting step is configured to install the
천장프레임보조지지체(91)는 천장프레임지지체바디부(80)와 동일한 구조를 갖도록 구성할 수 있다.The ceiling frame
또한 전술한 실시예에서는 가동작업대(203, Deck)가 거푸집지지체(20)와 함께 상승할 수 있도록 구성하고 있으나, 가동작업대(203, Deck)가 제작하여 천장프레임지지체(70)와 함께 상승할 수 있도록 본 발명을 실시할 수 있다.In addition, in the above-described embodiment, the
상술한 바와 같이 본 발명의 실시예에 따르면, 기초지지벽(202)에 지지되도록 거푸집지지체(20)를 설치하고 거푸집지지체(20)와 독립적으로 기초지지벽(202)에 지지되도록 천장프레임지지체(70)를 설치하는 한편, 거푸집지지체(20)와 천장프레임지지체(70)를 각각 단계적으로 상승시키도록 함으로써, 거푸집지지체상승구동부(40)의 상승구동동작과 천장프레임지지체상승구동부(60)의 상승구동동작을 독립적으로 제어할 수 있고, 사일로벽체(201)를 형성하는 동안 거푸집지지체(20)와 천장프레임(11) 간의 상호 간섭 즉, 사일로벽체거푸집(13)과 천장프레임(11) 간의 상호 간섭을 줄일 수 있다.
사일로벽체(201)를 형성하는 동안 사일로벽체거푸집(13)과 천장프레임(11) 간의 상호 간섭을 줄일 수 있게 되면 사일로벽체를 형성하는 동안 사일로벽체거푸집의 기울어짐 현상(단위구간사일로벽체를 형성할 때 햇빛 등의 영향을 받아 위치에 따라 양생속도가 달라지는 경우 등의 이유로 거푸집지지체의 상승속도가 차이가 발생하고 이에 따라 한 쪽으로 거푸집지지체가 기울어지는 현상이 발생할 수 있음)이 천장프레임에 전달되는 것을 방지할 수 있게 된다. 이에 따라 천장프레임이 무너지거나 천장프레임에 외부투입장치 등을 설치하기 어렵게 된다는 종래의 문제점을 해결할 수 있게 된다.
나아가 천장프레임에 가해지는 외부 힘(바람 등)에 의해 사일로벽체를 형성하는 동안 사일로벽체거푸집(거푸집지지체)의 기울어짐 현상이 발생하는 것을 방지하여 사일로벽체를 안정적으로 형성할 수 있게 된다.According to the embodiment of the present invention as described above, the
When the
Furthermore, while the silo wall is formed by the external force (wind, etc.) applied to the ceiling frame, it is possible to stably form the silo wall by preventing the tilt of the silo wall formwork (form support) from occurring.
그리고 흔들림방지내측다리부(71)와 흔들림방지외측다리부(72)를 포함하도록 천장프레임지지체(70)를 구성함으로써, 거푸집지지체(20)를 이용하여 천장프레임(11)이 기울어지는 것을 방지할 수 있게 된다.Then, by configuring the
또한 거푸집지지체(20)에 천장프레임보조지지체(91)를 설치함으로써, 천장프레임(11)을 사일로벽체(201)에 고정하는 동안 천장프레임(11)의 지지상태를 보강할 수 있게 된다.In addition, by installing the ceiling frame
11, 111 : 천장프레임
13, 113 : 사일로벽체거푸집 14 : 프레임고정판
15 : 앵커볼트 16, 116 : 고정블럭
20 : 거푸집지지체 20' : 메인거푸집지지체
20" : 보조거푸집지지체 30, 130 : 거푸집요크
31, 131 : 거푸집내부수직부재 32, 132 : 거푸집외부수직부재
33, 133 : 거푸집부재연결상부수평부재 34, 134 : 거푸집부재연결하수평부재
35, 135 : 거푸집내부패널고정수평부재
36, 136 : 거푸집외부패널고정수평부재 40, 140 : 거푸집지지체상승구동부
41, 141 : 거푸집지지체상승잭로드 42, 142 : 거푸집지지체상승유압잭
43, 143 : 거푸집지지체상승상부클램프
60, 160 : 천장프레임지지체상승구동부
61, 161 : 천장프레임지지체상승잭로드
62, 162 : 천장프레임지지체상승유압잭
63, 163 : 천장프레임지지체상승상부클램프
64, 164 : 천장프레임지지체상승하부클램프
70, 70', 70" : 천장프레임지지체 71 : 흔들림방지내측다리부
72 : 흔들림방지외측다리부 80 : 천장프레임지지체바디부
81 : 천장프레임내부수직부재, 82 : 천장프레임외부수직부재
83 : 천장프레임부재연결상부수평부재
84 : 천장프레임부재연결하부수평부재 91 : 천장프레임보조지지체
201 : 사일로벽체 202 : 기초지지벽11, 111: ceiling frame
13, 113: silo wall formwork 14: frame fixing plate
15:
20: formwork support 20 ': main formwork support
20 ":
31, 131: form inner
33, 133: form member connecting upper
35, 135: Formwork inner panel fixed horizontal member
36, 136: formwork outer panel fixed
41, 141: die support rise
43, 143: formwork support rise upper clamp
60, 160: ceiling frame support rise drive
61, 161: ceiling frame support rising jack rod
62, 162: hydraulic jacks for ceiling frame support
63, 163: ceiling frame support rise upper clamp
64, 164: ceiling frame support rise lower clamp
70, 70 ', 70 ": Ceiling frame support 71: Anti-shake inner leg
72: shake-resistant outer leg portion 80: ceiling frame support body
81: ceiling frame inner vertical member, 82: ceiling frame outer vertical member
83: ceiling frame member connection upper horizontal member
84: ceiling frame member connection lower horizontal member 91: ceiling frame auxiliary support
201: silo wall 202: foundation support wall
Claims (4)
상기 천장프레임을 제작하는 천장프레임제작단계와;
상단에 기초지지면를 갖는 기초지지벽을 형성하는 기초지지벽형성단계와;
상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 거푸집지지체를 설치하는 거푸집지지체설치단계와;
상기 거푸집지지체보다 높은 위치에 배치되고 상기 기초지지벽에 지지되고 상기 기초지지면에 대하여 상승이동할 수 있도록 천장프레임지지체를 설치하는 천장프레임지지체설치단계와;
상기 거푸집지지체에 폼패널을 결합하여 상기 사일로벽체의 횡단면에 대응하는 사이 공간을 갖는 사일로벽체거푸집을 형성하는 사일로벽체거푸집형성단계와;
상기 천장프레임지지체와 함께 상승이동할 수 있도록 상기 천장프레임을 상기 천장프레임지지체에 고정하는 천장프레임고정단계와;
상기 거푸집지지체를 상승시키기 위한 거푸집지지체상승구동부와 상기 천장프레임지지체를 상승시키기 위한 천장프레임지지체상승구동부를 사용하여 상기 거푸집지지체와 상기 천장프레임지지체를 각각 단계적으로 상승시키는 지지체상승단계와;
상기 사일로벽체거푸집의 내부공간에 철근을 배근하는 철근배근공정(S011)과 상기 사일로벽체거푸집의 내부공간에 콘크리트를 타설하는 콘크리트타설공정(S012)과 상기 사일로벽체거푸집의 내부공간에 타설된 콘크리트를 양생하는 콘크리트양생공정(S013)을 거쳐 단위구간사일로벽체를 형성하는 과정을 반복하는 방법으로 상기 사일로벽체를 상기 기초지지면에 형성하는 사일로벽체형성단계와;
상기 사일로벽체를 형성한 후 상기 천장프레임을 상기 사일로벽체에 고정하는 천장프레임사일로벽체고정단계와;
상기 천장프레임을 상기 사일로벽체에 고정한 후 상기 천장프레임으로부터 상기 천장프레임지지체를 분리하는 천장프레임지지체분리단계를 포함하는 것을 특징으로 하는 탑사일로시공방법.In the top silo construction method for constructing a top silo having a ceiling frame fixed to the top of the silo wall to form a skeleton of the silo wall and the silo ceiling,
A ceiling frame manufacturing step of manufacturing the ceiling frame;
A base support wall forming step of forming a base support wall having a base support surface at an upper end thereof;
A form support mounting step of installing a form support to be supported by the base support wall and to move upward with respect to the base support surface;
A ceiling frame support mounting step of installing a ceiling frame support disposed at a position higher than the formwork support and supported by the base support wall to move upward with respect to the base support surface;
A silo wall formwork forming step of forming a silo wall formwork having an interspace corresponding to a cross section of the silo wall by coupling a foam panel to the form support;
A ceiling frame fixing step of fixing the ceiling frame to the ceiling frame support to move upward with the ceiling frame support;
A support raising step of raising the form support and the ceiling frame support step by step using a form support rise driving unit for raising the form support and a ceiling frame support raising drive unit for raising the ceiling frame support;
Reinforcing bar reinforcement step (S011) for reinforcing the reinforcing bar in the inner space of the silo wall formwork and concrete placing process (S012) for placing concrete in the inner space of the silo wall formwork and the concrete placed in the inner space of the silo wall formwork A silo wall forming step of forming the silo wall on the base ground by repeating a process of forming a unit section silo wall through curing curing step (S013);
A ceiling frame silo wall fixing step of fixing the ceiling frame to the silo wall after forming the silo wall;
And a ceiling frame support separation step of separating the ceiling frame support from the ceiling frame after fixing the ceiling frame to the silo wall.
상기 천장프레임지지체설치단계는 천장프레임지지체바디부와 상기 거푸집지지체의 상단보다 낮은 위치에 도달하도록 상기 천장프레임지지체바디부로부터 연장형성된 흔들림방지내측다리부와 상기 흔들림방지내측다리부와의 사이에 상기 거푸집지지체가 진입할 수 있는 공간이 형성되고 상기 거푸집지지체의 상단보다 낮은 위치에 도달하도록 상기 천장프레임지지체바디부로부터 연장형성된 흔들림방지외측다리부를 갖도록 상기 천장프레임지지체를 제작하고, 상기 흔들림방지내측다리부와 상기 흔들림방지외측다리부와의 사이에 상기 거푸집지지체가 진입한 상태에서 상기 천장프레임지지체바디부를 통해 상기 기초지지벽에 지지되도록 실시되는 것을 특징으로 하는 탑사일로시공방법.The method of claim 1,
The ceiling frame support mounting step may be performed between the anti-shake inner leg and the anti-shake inner leg extended from the ceiling frame support body so as to reach a lower position than the upper end of the die frame support. The ceiling frame support is manufactured to have an anti-shake outer leg extending from the ceiling frame support body to form a space into which the form support can enter and reach a lower position than the top of the form support, and the anti-shake inner leg Top silo construction method characterized in that it is supported to the base support wall through the ceiling frame support body in a state where the form support is entered between the portion and the anti-shake outer leg portion.
마지막 단위구간사일로벽체를 형성하기 위해 상기 S011 내지 S013 공정을 실시할 때 상기 천장프레임지지체를 지지할 수 있도록 상기 거푸집지지체에 천장프레임보조지지체를 설치하는 천장프레임보조지지체설치단계를 더 포함하는 것을 특징으로 하는 탑사일로시공방법.The method of claim 1,
Further comprising the step of installing a ceiling frame auxiliary support for installing the ceiling frame auxiliary support on the formwork support to support the ceiling frame support when performing the step S011 to S013 to form the last unit section silo wall Top silo construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120052183A KR101234201B1 (en) | 2012-05-16 | 2012-05-16 | Method for constructing tower silo |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020120052183A KR101234201B1 (en) | 2012-05-16 | 2012-05-16 | Method for constructing tower silo |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130001479A Division KR101314170B1 (en) | 2013-01-07 | 2013-01-07 | Method for constructing tower silo |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101234201B1 true KR101234201B1 (en) | 2013-02-18 |
Family
ID=47899687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020120052183A KR101234201B1 (en) | 2012-05-16 | 2012-05-16 | Method for constructing tower silo |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101234201B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101407780B1 (en) | 2013-06-24 | 2014-06-17 | 이광열 | transform Protector of circle type slipform |
CN112936565A (en) * | 2019-11-26 | 2021-06-11 | 金科新能源有限公司 | Pouring assembly of prefabricated tower cylinder and pouring device of prefabricated tower cylinder |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101100252B1 (en) * | 2011-05-18 | 2011-12-28 | 주식회사 엔케이 | Top silo construction method |
-
2012
- 2012-05-16 KR KR1020120052183A patent/KR101234201B1/en active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101100252B1 (en) * | 2011-05-18 | 2011-12-28 | 주식회사 엔케이 | Top silo construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101407780B1 (en) | 2013-06-24 | 2014-06-17 | 이광열 | transform Protector of circle type slipform |
CN112936565A (en) * | 2019-11-26 | 2021-06-11 | 金科新能源有限公司 | Pouring assembly of prefabricated tower cylinder and pouring device of prefabricated tower cylinder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10829927B2 (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith | |
KR102360372B1 (en) | Top-down construction method using an elevating movable truss body | |
KR100746552B1 (en) | Wall Climbing Unit | |
KR20200032316A (en) | Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support | |
KR101889064B1 (en) | Construction method of a long span bridge main tower | |
KR100746551B1 (en) | Construction method of elevating the building's form and building system | |
KR101567628B1 (en) | The jackup device for the extension and floor increase | |
CN108005684B (en) | Separated steel mould trolley and construction method thereof | |
US3201502A (en) | Method of erecting concrete structures | |
KR101100252B1 (en) | Top silo construction method | |
KR101234201B1 (en) | Method for constructing tower silo | |
KR101314170B1 (en) | Method for constructing tower silo | |
JP2009024449A (en) | Building internal staircase and method of constructing the same | |
KR20110105489A (en) | High-rise building construction method using table form that rises through slab opening | |
KR102027499B1 (en) | Slip form apparatus using tower structure and having member for transportation and method for forming vertical structure | |
JP6391135B2 (en) | How to install temporary pillars | |
KR20120122800A (en) | Apparatus for forming underground dome structure by oil pressure type lift and constructing method using the same | |
EP3779097A1 (en) | A shuttering panel | |
KR102060692B1 (en) | Construction method using road soundproof wall concrete retaining wall construction device | |
CN115110765A (en) | Construction method and device for shear wall at deformation joint | |
CN115338966A (en) | Caisson manufacturing integrated platform | |
KR101243705B1 (en) | Apparatus of Deassembling Precast Concrete Box Automatically and Method Using the Same | |
JP2018096163A (en) | Method of constructing building | |
KR102504211B1 (en) | Improvement down-up method of construction of the underground structure | |
KR102579674B1 (en) | Manufacturing of caisson |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20120516 |
|
PA0201 | Request for examination | ||
A302 | Request for accelerated examination | ||
PA0302 | Request for accelerated examination |
Patent event date: 20120531 Patent event code: PA03022R01D Comment text: Request for Accelerated Examination Patent event date: 20120516 Patent event code: PA03021R01I Comment text: Patent Application |
|
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20120919 Patent event code: PE09021S01D |
|
AMND | Amendment | ||
N231 | Notification of change of applicant | ||
PN2301 | Change of applicant |
Patent event date: 20121130 Comment text: Notification of Change of Applicant Patent event code: PN23011R01D |
|
E601 | Decision to refuse application | ||
PE0601 | Decision on rejection of patent |
Patent event date: 20121220 Comment text: Decision to Refuse Application Patent event code: PE06012S01D Patent event date: 20120919 Comment text: Notification of reason for refusal Patent event code: PE06011S01I |
|
A107 | Divisional application of patent | ||
AMND | Amendment | ||
PA0107 | Divisional application |
Comment text: Divisional Application of Patent Patent event date: 20130107 Patent event code: PA01071R01D |
|
PX0901 | Re-examination |
Patent event code: PX09011S01I Patent event date: 20121220 Comment text: Decision to Refuse Application Patent event code: PX09012R01I Patent event date: 20121012 Comment text: Amendment to Specification, etc. |
|
PX0701 | Decision of registration after re-examination |
Patent event date: 20130207 Comment text: Decision to Grant Registration Patent event code: PX07013S01D Patent event date: 20130107 Comment text: Amendment to Specification, etc. Patent event code: PX07012R01I Patent event date: 20121220 Comment text: Decision to Refuse Application Patent event code: PX07011S01I Patent event date: 20121012 Comment text: Amendment to Specification, etc. Patent event code: PX07012R01I |
|
X701 | Decision to grant (after re-examination) | ||
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20130212 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20130212 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
FPAY | Annual fee payment |
Payment date: 20151123 Year of fee payment: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20151123 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20170410 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20170410 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20180207 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20180207 Start annual number: 6 End annual number: 6 |
|
FPAY | Annual fee payment |
Payment date: 20190312 Year of fee payment: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20190312 Start annual number: 7 End annual number: 7 |
|
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20201123 |