KR100775645B1 - 그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 - Google Patents
그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 Download PDFInfo
- Publication number
- KR100775645B1 KR100775645B1 KR1020040067454A KR20040067454A KR100775645B1 KR 100775645 B1 KR100775645 B1 KR 100775645B1 KR 1020040067454 A KR1020040067454 A KR 1020040067454A KR 20040067454 A KR20040067454 A KR 20040067454A KR 100775645 B1 KR100775645 B1 KR 100775645B1
- Authority
- KR
- South Korea
- Prior art keywords
- time
- grout
- elapsed time
- elapsed
- checking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/003—Injection of material
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Physics & Mathematics (AREA)
- Agronomy & Crop Science (AREA)
- Soil Sciences (AREA)
- Fluid Mechanics (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
Claims (14)
- 삭제
- 배합비가 재조정된 그라우트를 기준압력하에서 지속적으로 주입시키는 시간인 제1경과시간을 체크하여 제1경과시간이 경과되었는지를 확인하고, 상기 제1경과시간이 경과한 시점부터 시간을 체크하여 제2경과시간이 경과하였는지를 확인하는 시간관리부;상기 시간관리부에 의해 상기 제2경과시간이 경과되었다고 확인되면 시공이 종료되었음을 알리는 표시부; 및상기 시간관리부에 의해 상기 제1경과시간이 경과되었다고 확인되면 주입관 측으로의 그라우트 공급을 차단하도록 제어하고, 상기 시간관리부에 의해 상기 제2경과시간이 경과되었다고 확인되면 상기 표시부를 통해 시공이 종료되었음을 알리도록 제어하는 제어부; 를 포함하는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치.
- 제2항에 있어서,상기 시간관리부에 의해 체크되는 시간을 전시하는 전시부; 를 더 포함하는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치.
- 제2항에 있어서,상기 제1경과시간을 체크하는 시점을 입력하기 위한 입력부를 더 포함하는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치.
- 제2항에 있어서,상기 기준압력을 입력시키기 위한 입력부;상기 입력부에 의해 입력된 기준압력을 저장하기 위한 저장부;상기 주입관 측으로 공급되는 그라우트의 압력을 검출하는 압력검출기로부터 검출되는 시공압력을 수신하는 수신부; 및상기 수신부에 의해 수신된 시공압력과 상기 저장부에 저장된 기준압력을 전시하는 전시부; 를 더 포함하는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치.
- 삭제
- 그라우트를 공급하는 교반기;상기 교반기로부터 공급되는 그라우트를 대상물에 주입시키기 위한 주입관;상기 교반기로부터 상기 주입관으로 공급되는 그라우트를 펌핑하는 펌프;상기 펌프와 주입관 사이에 설치되어 상기 펌프로부터 공급되는 그라우트에 대한 압력을 검출하는 압력검출기;상기 펌프와 압력검출기 사이에 구비되는 자동제어밸브; 및상기 주입관으로 배합비가 재조정된 그라우트를 기준압력하에서 지속적으로 주입시키는 시간인 제1경과시간을 체크하여 제1경과시간이 경과되면 상기 주입관 측으로의 그라우트 공급이 차단되도록 상기 펌프 또는 자동제어밸브 중 적어도 어느 하나를 제어하고, 상기 제1경과시간이 경과한 시점부터 시간을 체크하여 제2경과시간이 경과되었는지를 확인한 후 상기 제2경과시간이 경과되었다고 확인되면 시공이 종료되었음을 표시하는 자동제어장치; 를 포함하는 것을 특징으로 하는 그라우트 주입시스템.
- 삭제
- 삭제
- 배합비가 재조정된 그라우트를 기준압력하에서 지속적으로 주입시키는 시간인 제1경과시간을 체크하여 제1경과시간이 경과되었는지는 확인하는 제1경과시간확인단계;상기 제1경과시간확인단계에서 제1경과시간이 경과되었다고 확인되면 주입관 측으로의 그라우트 공급을 차단하도록 제어하는 그라우트공급차단단계;상기 제1경과시간이 경과한 시점부터 시간을 체크하여 제2경과시간이 경과되었는지를 확인하는 제2경과시간확인단계; 및상기 제2경과시간확인단계에서 제2경과시간이 경과되었다고 확인되면 시공이 종료되었음을 표시하는 표시단계; 를 더 포함하는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치의 제어방법.
- 제10항에 있어서,사용자로 하여금 상기 제1경과시간을 체크하도록 하는 체크명령을 수신하는 명령수신단계; 를 더 포함하고,상기 제1경과시간확인단계는, 상기 명령수신단계에서 상기 체크명령이 수신된 시점부터 수행되는 것을 특징으로 하는 그라우트 주입제어를 위한 자동제어장치의 제어방법.
- 삭제
- 삭제
- 삭제
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040067454A KR100775645B1 (ko) | 2004-08-26 | 2004-08-26 | 그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040067454A KR100775645B1 (ko) | 2004-08-26 | 2004-08-26 | 그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20060019025A KR20060019025A (ko) | 2006-03-03 |
KR100775645B1 true KR100775645B1 (ko) | 2007-11-13 |
Family
ID=37126478
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040067454A Expired - Fee Related KR100775645B1 (ko) | 2004-08-26 | 2004-08-26 | 그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100775645B1 (ko) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100981007B1 (ko) * | 2009-10-30 | 2010-09-07 | 현대건설주식회사 | 그라우팅 시스템 및 그 제어방법 |
CN102322253B (zh) * | 2011-05-06 | 2015-08-12 | 三一重工股份有限公司 | 一种工程机械及其工况控制方法、装置 |
EP3628781B1 (de) * | 2018-09-26 | 2023-06-07 | BAUER Spezialtiefbau GmbH | Verfahren zum herstellen eines injektionsankers im boden und nachverpressautomat hierfür |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920016666A (ko) * | 1991-02-28 | 1992-09-25 | 임병구 | 약액주입관리방법 및 그 장치 |
KR920018296A (ko) * | 1991-03-02 | 1992-10-21 | 임병구 | 약액주입관리방법 및 그 장치 |
JPH0718661A (ja) * | 1993-07-02 | 1995-01-20 | Yoshida Tekkosho:Kk | ジェットグラウト工法における注入圧力管理方法及びその管理盤 |
JPH07166535A (ja) * | 1993-12-17 | 1995-06-27 | Front Eng Kk | グラウト注入管理装置 |
JP2002294685A (ja) | 2001-03-30 | 2002-10-09 | Raito Kogyo Co Ltd | 薬液注入工法 |
JP2003027456A (ja) | 2001-07-19 | 2003-01-29 | Kajima Corp | 流動性材料の注入方法および装置 |
KR200319461Y1 (ko) | 2003-02-18 | 2003-07-12 | 주식회사 한국 지오텍 | 고성능 그라우팅 장치 |
-
2004
- 2004-08-26 KR KR1020040067454A patent/KR100775645B1/ko not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR920016666A (ko) * | 1991-02-28 | 1992-09-25 | 임병구 | 약액주입관리방법 및 그 장치 |
KR920018296A (ko) * | 1991-03-02 | 1992-10-21 | 임병구 | 약액주입관리방법 및 그 장치 |
JPH0718661A (ja) * | 1993-07-02 | 1995-01-20 | Yoshida Tekkosho:Kk | ジェットグラウト工法における注入圧力管理方法及びその管理盤 |
JPH07166535A (ja) * | 1993-12-17 | 1995-06-27 | Front Eng Kk | グラウト注入管理装置 |
JP2002294685A (ja) | 2001-03-30 | 2002-10-09 | Raito Kogyo Co Ltd | 薬液注入工法 |
JP2003027456A (ja) | 2001-07-19 | 2003-01-29 | Kajima Corp | 流動性材料の注入方法および装置 |
KR200319461Y1 (ko) | 2003-02-18 | 2003-07-12 | 주식회사 한국 지오텍 | 고성능 그라우팅 장치 |
Also Published As
Publication number | Publication date |
---|---|
KR20060019025A (ko) | 2006-03-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6257803B1 (en) | Three component chemical grout injector | |
CN101660309B (zh) | 多钻头高压喷射搅拌基础防渗加固设备的施工方法 | |
KR100775645B1 (ko) | 그라우트 주입을 위한 자동제어장치, 주입시스템 및 그제어방법 | |
KR101719456B1 (ko) | 약액농도 조절용 유량조정분배기를 구비한 그라우팅 장치 | |
KR102500465B1 (ko) | 스마트 그라우팅 공법 | |
KR100737833B1 (ko) | 그라우트 주입시스템 | |
CN113738386B (zh) | 盾构机高水压条件下常压刀筒的堵漏方法 | |
JP2008174934A (ja) | 杭穴掘削管理方法及び装置 | |
JP3383157B2 (ja) | 薬液注入工法 | |
KR20130026046A (ko) | 유류지하비축기지의 주수터널 수벽공들에 설치되는 수압가압분기시스템 및 그 시공방법 및 그 운영방법. | |
DK3184732T3 (en) | Method and arrangement for injection of rock and soil material | |
KR20200134709A (ko) | 실시간 그라우팅 통합 모니터링 시스템 | |
CN110159866B (zh) | 一种暗埋钢管补强加固的施工方法 | |
JP4101150B2 (ja) | グラウト注入制御装置 | |
JP2017089162A (ja) | 薬液注入工法 | |
JP7206081B2 (ja) | 気泡注入システムおよび気泡シールド工法 | |
JP2005120673A (ja) | 多液同時注入システム | |
CN114060044A (zh) | 一种盾构对接方法及其设备 | |
JP2003002400A (ja) | 集中給油システム | |
JP2004251043A (ja) | 二液混合グラウチングにおける流量圧力の自動制御システム | |
JPS58218511A (ja) | 薬液注入管理方法およびその装置 | |
JP7063529B1 (ja) | 注入材施工管理システム | |
KR102677356B1 (ko) | 자동 제어 장치를 이용한 그라우팅 시스템 및 방법 | |
CN114857344B (zh) | 注脂方法及注脂设备 | |
JP2018012522A (ja) | 燃料供給装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20040826 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20060626 Patent event code: PE09021S01D |
|
E90F | Notification of reason for final refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Final Notice of Reason for Refusal Patent event date: 20070410 Patent event code: PE09021S02D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20070906 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20071105 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20071106 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
PR1001 | Payment of annual fee |
Payment date: 20100924 Start annual number: 4 End annual number: 4 |
|
FPAY | Annual fee payment |
Payment date: 20111024 Year of fee payment: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20111024 Start annual number: 5 End annual number: 5 |
|
FPAY | Annual fee payment |
Payment date: 20121105 Year of fee payment: 6 |
|
PR1001 | Payment of annual fee |
Payment date: 20121105 Start annual number: 6 End annual number: 6 |
|
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |