KR100768524B1 - Installation structure of road facility post and construction method - Google Patents

Installation structure of road facility post and construction method Download PDF

Info

Publication number
KR100768524B1
KR100768524B1 KR1020060046142A KR20060046142A KR100768524B1 KR 100768524 B1 KR100768524 B1 KR 100768524B1 KR 1020060046142 A KR1020060046142 A KR 1020060046142A KR 20060046142 A KR20060046142 A KR 20060046142A KR 100768524 B1 KR100768524 B1 KR 100768524B1
Authority
KR
South Korea
Prior art keywords
post
formwork
boundary stone
concrete
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020060046142A
Other languages
Korean (ko)
Inventor
최승일
Original Assignee
최승일
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최승일 filed Critical 최승일
Priority to KR1020060046142A priority Critical patent/KR100768524B1/en
Application granted granted Critical
Publication of KR100768524B1 publication Critical patent/KR100768524B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/28Stressing the soil or the foundation structure while forming foundations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 보도 및 차도를 구분하는 경계석 주위에 설치되는 각종 시설물(펜스(fence) 등)의 설치를 위한 도로 시설물용 포스트의 설치구조 및 그 시공방법에 관한 것으로, 더욱 상세하게는 도로 경계석 주위에 터파기 작업을 하여 공간을 확보한 후 이 공간에 사다리꼴 형태의 거푸집을 설치하고 거푸집 내부에 포스트를 위치시킨 다음 콘크리트를 주입함으로써, 포스트의 견고한 시공이 이루어지게 하고 종래에 거푸집 없이 콘크리트만으로 포스트를 시공함에 따라 지저분하고 불규칙하게 시공된 콘크리트에 의해 다른 시설물의 설치 시 포스트의 설치 장소를 변경해야 하는 번거로움을 방지할 수 있도록 한 도로 시설물용 포스트의 설치구조 및 그 시공방법에 관한 것이다.The present invention relates to an installation structure of a road facility post for installation of various facilities (fences, etc.) installed around a boundary stone separating a sidewalk and a roadway, and a construction method thereof, and more particularly, around a road boundary stone. After securing the space by digging work, the trapezoidal formwork is installed in this space, the post is placed inside the formwork, and the concrete is injected to make the posts solid. Therefore, the present invention relates to an installation structure of a road facility post and a method of constructing the same to prevent the hassle of changing the installation location of the post when installing other facilities due to dirty and irregularly constructed concrete.

Description

도로 시설물용 포스트의 설치구조 및 그 시공방법{installation structure of post for street facilities and its construction method}Installation structure of post for street facilities and its construction method

도 1은 본 발명의 일실시예에 따른 사시도.1 is a perspective view according to an embodiment of the present invention.

도 2는 본 발명의 일실시예에 따른 측단면도.Figure 2 is a side cross-sectional view according to an embodiment of the present invention.

도 3은 본 발명의 일실시예에 따른 포스트의 시공 순서도.Figure 3 is a construction flowchart of the post according to an embodiment of the present invention.

삭제delete

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

10:포스트 20:거푸집 21:후판10: Post 20: die 21: thick plate

22:측판 30:기초석 40:경계석22: side plate 30: foundation stone 40: boundary stone

60:콘크리트 211:관통공 221:관통공 60: concrete 211: through hole 221: through hole

222:수평면 223:절개부222: horizontal plane 223: incision

본 발명은 보도 및 차도를 구분하는 경계석 주위에 설치되는 각종 시설물(펜스(fence) 등)의 설치를 위한 도로 시설물용 포스트의 설치구조 및 그 시공방법에 관한 것으로, 더욱 상세하게는 도로 경계석 주위에 터파기 작업을 하여 공간을 확보한 후 이 공간에 사다리꼴 형태의 거푸집을 설치하고 거푸집 내부에 포스트를 위치시킨 다음 콘크리트를 주입함으로써, 포스트의 견고한 시공이 이루어지게 하고 종래에 거푸집 없이 콘크리트만으로 포스트를 시공함에 따라 지저분하고 불규칙하게 시공된 콘크리트에 의해 다른 시설물의 설치 시 포스트의 설치 장소를 변경해야 하는 번거로움을 방지할 수 있도록 한 도로 시설물용 포스트의 설치구조 및 그 시공방법에 관한 것이다.The present invention relates to an installation structure of a road facility post for installation of various facilities (fences, etc.) installed around a boundary stone separating a sidewalk and a roadway, and a construction method thereof, and more particularly, around a road boundary stone. After securing the space by digging work, the trapezoidal formwork is installed in this space, the post is placed inside the formwork, and the concrete is injected to make the posts solid. Therefore, the present invention relates to an installation structure of a road facility post and a method of constructing the same to prevent the hassle of changing the installation location of the post when installing other facilities due to dirty and irregularly constructed concrete.

일반적으로 각종 시설물의 설치를 위해 보도 및 차도의 경계석 주위에 포스트를 설치하게 되는데 이러한 포스트는 포스트를 기초로 설치되는 시설물의 안정인 설치를 위해 최적의 설치 장소에 견고하게 시공하는 것이 무엇보다 중요하다.Generally, posts are installed around the boundary of sidewalks and driveways for the installation of various facilities. It is important to firmly install the posts at the optimal installation site for the stable installation of the facilities installed based on the posts. .

한편, 종래의 포스트의 설치방법을 살펴보면, 보도에 설치된 가로수 등과 같은 각종 시설물과의 간섭이 생기지 않도록 되도록 경계석에 밀착하여 포스트를 설치하기 위해 먼저 경계석 주위에 터파기 작업을 하여 공간을 확보한 다음 이 공간에 포스트를 넣고 콘크리트를 주입하여 포스트의 설치작업을 하였다.On the other hand, if you look at the installation method of the conventional post, in order to install the post in close contact with the boundary stone so as not to interfere with various facilities such as roadside trees installed on the sidewalk, first secure the space by digging around the boundary stone. The post was put into the space and concrete was injected to install the post.

그러나 이와 같이 터파기를 통해 공간을 확보한 다음 이 공간에 포스트를 넣고 콘크리트만을 주입하여 포스트를 설치할 경우 콘크리트가 지저분하고 불규칙하 게 굳어지기 때문에 시공 후 포스트가 견고한 설치상태를 유지할 수 없어 작은 외부 충격에도 쉽게 흔들릴 뿐만 아니라 이로 인해 포스트를 기초로 설치되는 시설물 또한 그 설치상태가 견고하지 못하게 되는 문제점이 발생하였다.However, if the space is secured through the trench and then the post is placed in this space and the concrete is installed by injecting only the post, the concrete becomes dirty and irregularly hardened. Not only easily shaken due to this, there is a problem that the installation of the installation of the post-based facility is also not secure.

또한, 지저분하고 불규칙하게 굳어진 콘크리트 때문에 지반이 어지럽혀 지고, 다른 시설물의 설치시에도 지저분하게 튀어나온 콘크리트로 인해 원하는 위치에 설치하지 못하고 시설물의 설치위치를 변경해야 하는 번거로운 문제가 발생하였다.In addition, the ground is cluttered due to dirty and irregularly hardened concrete, and the installation of other facilities has caused a troublesome problem of changing the installation location of the facility due to the messy projecting concrete.

본 발명은 상기와 같은 문제를 해결하기 위해 안출된 것으로, 본 발명의 목적은 경계석 부근에 터파기 작업을 하여 공간을 확보한 후 이 공간에 사다리꼴 형태의 거푸집을 설치하고 거푸집 내부 중앙에 포스트를 위치시킨 다음 콘크리트를 주입하여 포스트를 견고하게 설치함으로써, 종래의 지저분하고 무분별한 콘크리트 시공에 따른 다른 시설물의 설치시 시설물의 설치 위치를 변경해야 하는 번거로움을 방지할 수 있도록 한 도로 시설물용 포스트의 설치구조 및 그 시공방법을 제공함에 그 목적이 있다.The present invention has been made to solve the above problems, the object of the present invention is to provide a trapezoidal formwork in this space after the digging work near the boundary stone to secure the space and to place the post in the center of the formwork After installation of the posts by injecting concrete, the installation structure of the road facility posts to prevent the hassle of changing the installation location of the facilities when installing other facilities according to the conventional dirty and indiscriminate concrete construction And its construction method.

상기와 같은 기술적 과제를 해결하기 위해 본 발명은, 경계석 부근에 터파기 작업을 한 후 설치되는 것으로서, 상부는 폭이 좁고 하부로 갈수록 폭이 넓어지는 사다리꼴 형태의 후판과, 상기 후판의 좌우 양측으로 대칭되게 전방으로 연장 형성되는 측판으로 이루어지는 거푸집과; 하단이 상기 거푸집 내부 중앙에 설치되는 포스트를; 포함하여 구성됨을 기술적 구성상의 특징으로 한다.In order to solve the above technical problem, the present invention is installed after the digging work near the boundary stone, the upper portion is a trapezoidal thick plate that is narrow in width and wider toward the lower side, and the left and right sides of the thick plate A formwork comprising a side plate symmetrically extending forward; A post having a lower end installed in the center of the die; It is characterized by including the technical configuration.

또한, 좌우 양측으로 형성되는 상기 측판의 앞면 상부는 수평면으로 형성하여 사각의 경계석과 밀착 시공이 이루어지도록 하고, 측판의 앞면 하부는 부채꼴 모양의 절개부를 형성하여 기초석에 간섭을 받지 않고 거푸집이 경계석에 밀착 설치될 수 있게 함을 특징으로 한다.In addition, the front upper portion of the side plate formed in both left and right sides is formed in a horizontal plane so as to be in close contact with the square boundary stone, and the front lower portion of the side plate forms a fan-shaped cutout so that the formwork is not affected by the foundation stone at the boundary stone. Characterized in that it can be installed in close contact.

또한, 상기 거푸집의 후판 및 측판에는 다수개의 관통공을 천공함으로써, 거푸집 내부에 주입되는 콘크리트가 이 관통을 통해 외부로 흘러나와 주변에 다른 물체와 과 함께 굳어지게 하여 견고한 결합이 이루어지게 함을 특징으로 한다.In addition, by forming a plurality of through holes in the back plate and the side plate of the formwork, concrete injected into the formwork flows out through the through to be hardened together with other objects in the periphery, thereby making a firm coupling. It is done.

또한, (1) 거푸집의 설치공간을 확보하기 위해 경계석 주변에 터파기 작업을 시행하는 단계와; (2) 터파기 작업으로 형성된 공간에 거푸집을 설치하되, 기초석이 측판의 앞면 하부에 형성된 절개부 아래에 위치하도록 측판의 앞면 상부에 형성된 수평면을 경계석 측면과 밀착되게 설치하는 단계와; (3) 거푸집 내부 중앙에 포스트 하단이 위치되도록 설치하는 단계와; (4) 마지막으로 거푸집 내부에 콘크리트를 주입하고 콘크리트를 양생하는 단계로; 이루어짐을 특징으로 한다.In addition, (1) the step of digging around the boundary stone to secure the installation space of the formwork; (2) installing the formwork in the space formed by the excavation work, the step of installing the horizontal surface formed in the upper part of the front surface of the side plate in close contact with the side of the boundary stone so that the foundation stone is located below the cutout formed in the front lower portion of the side plate; (3) installing the lower end of the post in the center of the formwork; (4) finally injecting concrete into the formwork and curing the concrete; Characterized in that made.

도 1은 본 발명의 일실시예에 따른 사시도이고, 도 2는 본 발명의 일실시예에 따른 측단면도이며, 도 3은 본 발명의 일실시예에 따른 포스트의 시공 순서도로서, 이하 첨부되는 도면을 참조하여 본 발명의 구성을 설명하면 다음과 같다.1 is a perspective view according to an embodiment of the present invention, Figure 2 is a side cross-sectional view according to an embodiment of the present invention, Figure 3 is a construction flowchart of a post according to an embodiment of the present invention, the accompanying drawings Referring to the configuration of the present invention with reference to.

도 1에 도시된 바와 같이 본 발명의 포스트 설치구조는, 차도 및 보도를 구분하는 경계석(40) 주위의 터파기 작업 후 설치되는 거푸집(20)과, 상기 거푸집(20) 내부 중앙에 설치되는 포스트(10)로 이루어진다.As shown in Figure 1, the post installation structure of the present invention, the formwork 20 is installed after the digging around the boundary stone 40 for separating the driveway and the sidewalk, and the post is installed in the center of the formwork 20 It consists of 10.

도 2에 도시된 바와 같이 상기 거푸집(20)은, 콘크리트 구조물을 소정의 형태 및 치수로 만들기 위하여 설치하는 구조물로서, 상부는 폭이 좁고 하부로 갈수록 폭이 점차로 넓어지는 사다리꼴 형태의 후판(21)과, 상기 후판(21)의 좌우 양측으로 연장형성되되 전방으로 돌출되는 측판(22)으로 구성된다.As shown in FIG. 2, the formwork 20 is a structure installed to make a concrete structure in a predetermined shape and dimensions. The upper portion is narrow and the trapezoidal type thick plate 21 gradually becomes wider toward the lower portion. And, the side plate 22 is extended to the left and right sides of the rear plate 21 and protrudes forward.

상기 거푸집(20)의 상, 하는 콘크리트(60)를 용이하게 주입할 수 있도록 개방된 상태로 형성되며, 거푸집(20)의 전방 또한 콘크리트(60)의 주입시 경계석(40)과의 견고한 밀착 결합을 위해 개방된 상태로 형성된다.The form 20 is formed in an open state so that the concrete 60 can be easily injected, and the front of the form 20 is also firmly coupled with the boundary stone 40 when the concrete 60 is injected. It is formed to be open for.

상기 후판(21)은, 상부에서 하부로 갈수록 폭이 넓어지는“

Figure 112006035999667-pat00001
”와 같은 사다리꼴 형태로 형성된다.The thick plate 21 is wider from the top to the bottom "
Figure 112006035999667-pat00001
It is shaped like a trapezoid.

이와 같이 후판(21)을 상부에서 하부로 갈수록 폭이 넓어지는 형태로 형성할 경우, 거푸집(20) 내부에 콘크리트(60)가 주입되면 콘크리트(60) 역시 거푸집(20)과 같은 하부가 넓은 사다리꼴 형태로 굳어지기 때문에 안정적이고 견고한 포스 트(10)의 설치가 이루어지며, 거푸집(20)을 흙으로 매몰할 경우에도 거푸집(20) 외곽의 상부 쪽은 흙이 많이 덮이고 거푸집(20)의 아래쪽은 흙이 적에 덮여 흙의 하중에 의해 거푸집(20)이 쉽게 움직이지 않는 상태가 이루어진다.As such, when the thick plate 21 is formed in a shape that becomes wider from the upper side to the lower side, when the concrete 60 is injected into the formwork 20, the concrete 60 also has a trapezoid having a wide bottom like the formwork 20. Since it is solidified in the form of the installation of a stable and robust post 10 is made, even when the formwork 20 is buried with soil, the upper side of the outside of the formwork 20 is covered with a lot of soil and the bottom of the formwork 20 is The soil is covered with the enemy, the formwork 20 is not easily moved by the load of the soil is made.

또한, 상기 후판(21)의 일측에는 다수개의 관통공(211)을 천공하여 거푸집(20) 내부에 주입되는 콘크리트(60)가 이 관통공(211)을 통해 거푸집(20) 외부로 흘러나와 거푸집(20) 주변의 다른 물체(돌, 흙, 경계석 등)와 함께 굳어지게 함으로써, 견고한 결합이 이루어지게 한다.In addition, one side of the rear plate 21 is drilled through a plurality of through-holes 211, the concrete 60 injected into the formwork 20 flows out of the formwork 20 through the through-holes 211. (20) By hardening together with other objects (stones, soil, boundary stones, etc.) around it, a strong bond is achieved.

상기 후판(21)에 형성되는 관통공(211)은 원형으로 여러 개를 형성할 경우 가공이 번거로우므로 원형으로 여러 개를 형성하는 것보다는 가로 방향으로 긴 장공 형태로 형성하는 것이 바람직하다.The through-holes 211 formed on the rear plate 21 are difficult to process when forming a plurality of circular, it is preferable to form a long long hole in the horizontal direction rather than forming a plurality of circular.

상기 측판(22)은, 후판(21)의 좌우 양측으로부터 전방으로 돌출되게 연장형성되며, 측판(22) 역시 일측에 하나 이상의 관통공(221)을 천공하여 거푸집(20) 내부에 주입되는 콘크리트(60)가 이 관통공(221)을 통해 거푸집(20) 외부로 흘러나와 거푸집(20) 주변의 다른 물체(돌, 흙, 경계석 등)와 함께 굳어지게 함으로써, 더욱 견고한 결합이 이루어지게 한다.The side plate 22 is formed so as to protrude forward from both the left and right sides of the rear plate 21, the side plate 22 also drills one or more through holes 221 on one side of the concrete injected into the form 20 ( 60 is passed through the through hole 221 to the outside of the formwork 20 to harden together with other objects (stones, soil, boundary stone, etc.) around the formwork 20, thereby making a more firm coupling.

상기 측판(22)에 형성되는 관통공(221) 역시 후판(21)에 형성된 관통공(211)과 같이 장공으로 형성하는 것이 바람직하다.The through hole 221 formed in the side plate 22 is also preferably formed in a long hole like the through hole 211 formed in the rear plate 21.

한편, 측판(22)의 앞면 상부는 수평면(222)으로 형성하여 거푸집(20) 내로 주입되는 콘크리트(60)가 사각의 경계석(40)에 밀착된 상태로 결합되게 한다.On the other hand, the front upper portion of the side plate 22 is formed as a horizontal surface 222 to be coupled in a state in which the concrete 60 injected into the formwork 20 is in close contact with the rectangular boundary stone 40.

그리고 측판(22)의 앞면 하부는 부채꼴 모양의 절개부(223)를 형성하여 측판(22)을 경계석(40)에 밀착시킬 때 경계석(40)보다 돌출된 기초석(30)이 이 절개부(223) 아래에 위치되게 한다.In addition, the lower portion of the front surface of the side plate 22 forms a fan-shaped cutout 223 so that when the side plate 22 is in close contact with the boundary stone 40, the foundation stone 30 protruding from the boundary stone 40 is cut out 223. ) To be positioned below.

상기 절개부(223)의 모양은 사각 또는 다양한 모양으로도 가능하다.The cutout 223 may have a square or various shapes.

상기 포스트(10)는 설치물을 시공하기 위한 기초가 되는 지주로서 필요에 따라 사각 또는 봉 등 여러 가지 형태로 형성된다.The post 10 is formed as various pillars, such as squares or rods, as necessary as a support for the installation of the installation.

상기 포스트(10)의 하단 부위는 거푸집(20) 내부 중앙에 위치되어 거푸집(20) 내에 주입되는 콘크리트(60)에 의해 견고하게 결합 된다.The lower portion of the post 10 is firmly coupled by the concrete 60 which is located in the center of the formwork 20 and is injected into the formwork 20.

다음은 포스트의 시공방법에 관해 설명하기로 한다.Next, the post construction method will be described.

도 3과 같이 (1)의 단계는 차도와 보도의 경계를 구분하는 경계석(40) 주변에 거푸집(20)을 설치할 수 있는 공간을 확보하기 위해 터파기 작업을 시행하는 단계로서 이때, 거푸집(20) 설치에 지장을 주지 않는 한 공간을 작게 형성하는 것이 바람직하다.As shown in FIG. 3, step (1) is a step of carrying out a burrowing operation to secure a space for installing the formwork 20 around the boundary stone 40 separating the boundary between the roadway and the sidewalk. It is desirable to form a small space so long as it does not interfere with the installation.

다음 (2)의 단계는 터파기 작업을 시행하여 확보한 공간에 거푸집(20)을 설치하는 단계로서 이때, 안정적인 시공을 위해 거푸집(20)을 경계석(40) 쪽에 밀착 되도록 시공한다.The next step (2) is to install the formwork 20 in the space secured by carrying out the digging operation, at this time, the formwork 20 to be in close contact with the boundary stone 40 for stable construction.

즉, 거푸집(20)의 측판(22) 앞면 하부에 형성된 절개부(223) 아래에는 기초석(30)이 위치되게 하고, 측판(22) 앞면 상부에 형성된 수평면(222)은 경계석(40) 면에 밀착되게 설치한다.That is, the foundation stone 30 is positioned below the cutout 223 formed at the lower side of the side plate 22 of the formwork 20, and the horizontal surface 222 formed on the upper side of the side plate 22 is disposed on the boundary stone 40 surface. Install closely.

다음 (3)의 단계는 거푸집(20) 내부에 포스트(10)를 설치하는 단계로서, 포스트(10)의 설치시 안정적인 지지력으로 얻기 위해 포스트(10)가 한쪽으로 쏠리지 않도록 거푸집(20) 내부 정 중앙에 포스트(10)를 설치한다.The next step (3) is to install the post 10 inside the formwork 20, so that the post 10 does not lean toward one side to obtain stable support when installing the post 10. The post 10 is installed in the center.

다음은 마지막 (4) 단계로서, 거푸집(20) 내부 중앙에 포스트(10)가 설치된 상태에서 거푸집(20) 내부에 콘크리트(60)를 주입하여 콘크리트(60)를 양생하는 단계이다.Next step (4) is a step of curing the concrete 60 by injecting the concrete 60 into the form 20 in a state in which the post 10 is installed in the center of the form 20.

상기 (1)~(4) 단계가 완료되면 터파기 작업으로 파헤쳐진 공간에 흙을 채운 다음 지면을 평평하게 고르고 그 위를 보도 블록으로 포장한다.When the steps (1) to (4) are completed, the soil is filled in the space dug by the digging work, and then the ground is leveled and paved with a sidewalk block.

이상에서 상세히 살펴본 바와 같이 본 발명의 포스트의 설치구조 및 그 시공방법은, 터파기 작업에 의해 공간을 확보한 후 이 공간에 거푸집(20)을 설치하는 한편, 거푸집(20) 내부 중앙에 포스트(10)를 위치시킨 다음 거푸집(20) 내부에 콘크리트(60)를 주입하여 견고한 포스트(10)의 설치가 이루어지게 하는 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 작용을 살펴보면 다음과 같다.As described in detail above, the installation structure and the construction method of the post of the present invention, while securing the space by the digging operation to install the formwork 20 in this space, while the post (in the center of the formwork 20 ( Positioning 10) and then injecting the concrete 60 into the formwork 20 to make the installation of a solid post 10, look at the operation of the present invention with reference to the accompanying drawings as follows.

먼저, 도 2, 3과 같이 차도 및 보도의 경계를 구분하는 경계석(40) 주위에 일정 공간이 형성되도록 터파기 작업을 시행한다.First, as shown in FIGS. 2 and 3, the digging operation is performed so that a predetermined space is formed around the boundary stone 40 that separates the boundary between the roadway and the sidewalk.

상기 터파기 작업시 지반의 침하를 최소화하기 위해 거푸집(20)을 설치할 수 있는 최소한의 공간만을 확보하고 될 수 있는 한 공간을 작게 형성한다.In order to minimize the settlement of the ground during the excavation work to ensure only the minimum space to install the formwork 20 is formed as small as possible space.

이와 같은 터파기 작업으로 공간이 확보되면 이 공간에 거푸집(20)을 설치한다.If space is secured by such a digging operation, the formwork 20 is installed in this space.

이때, 거푸집(20)은 안정적인 설치를 위하여 경계석(40)의 측면에 밀착되게 설치한다.At this time, the formwork 20 is installed in close contact with the side of the boundary stone 40 for a stable installation.

즉, 측판(22)의 앞면 상부에 형성된 수평면(222)은 경계석(40) 측면에 밀착되게 하고, 측판(22)의 앞면 하부에 형성된 절개부(223) 아래에는 기초석(30)이 위치되도록 측판(22)을 경계석(40)에 밀착한다.That is, the horizontal surface 222 formed on the front surface of the side plate 22 is in close contact with the side of the boundary stone 40, and the side plate so that the foundation stone 30 is positioned under the cutout 223 formed in the lower front surface of the side plate 22. (22) is in close contact with the boundary stone (40).

이처럼 측판(22)이 경계석(40)에 밀착된 상태에서 거푸집(20) 내부로 콘크리트(60)가 주입되면 콘트리트(60)가 경계석(40)과 함께 고착되기 때문에 견고한 시공이 이루어진다.When the concrete 60 is injected into the formwork 20 in the state in which the side plate 22 is in close contact with the boundary stone 40, the concrete 60 is fixed together with the boundary stone 40, thereby making a solid construction.

다음 거푸집(20)의 설치가 완료되면 거푸집(20)의 내부 중앙에 포스트(10)를 위치시키고 콘크리트(60)를 거푸집(20) 내부로 주입한다.Next, when the installation of the formwork 20 is completed, the post 10 is positioned at the inner center of the formwork 20 and the concrete 60 is injected into the formwork 20.

거푸집(20) 내부로 주입된 콘크리트(60)는 서서히 굳으면서 포스트(10) 하단을 견고하게 지지하여 포스트(10)가 수직으로 서 있는 상태가 되게 하며, 또한 거 푸집(20) 내부로 투입된 콘크리트(60)는 거푸집(20) 내부뿐만 아니라 개방된 상태의 정면과 후판(21) 및 측판(22)에 형성된 관통공(211, 221)을 통해 흘러나와 주변의 물체(경계석, 돌 등)와 함께 고착되기 때문에 시공 후 견고한 결합상태가 유지된다.The concrete 60 injected into the form 20 is firmly supported by the bottom of the post 10 while being gradually hardened so that the post 10 stands vertically, and also the concrete injected into the form 20. 60 flows through the through holes 211 and 221 formed in the front and rear plates 21 and the side plates 22 as well as inside the form 20 and with surrounding objects (boundary stones, stones, etc.). Because of the fixation, the firm coupling state is maintained after construction.

또한, 거푸집(20)은 상부에서 하부로 갈수록 폭이 점점 넓어지는 사다리꼴 형태이므로 거푸집(20) 내부로 주입되는 콘크리트(60) 또한 사다리꼴 형태로 굳어지게 되기 때문에 심한 충격에도 흔들리지 않는 견고한 결합상태를 유지할 수 있다.In addition, since the formwork 20 has a trapezoidal shape that becomes wider from the top to the lower portion thereof, the concrete 60 injected into the formwork 20 also hardens in a trapezoidal shape, thus maintaining a firm coupling state that is not shaken even in a severe impact. Can be.

그리고 콘크리트(60)가 완전히 굳으면 터파기 작업으로 형성된 공간을 흙을 매워 평평하게 다진 후 지면을 벽돌로 포장하고, 지면으로부터 돌출되게 시공된 포스트(10)를 기초로 하여, 펜스(fence) 등의 설치물을 설치하면 된다.When the concrete 60 is completely hardened, the space formed by the digging work is filled with earth, and then chopped flat. Then, the ground is paved with bricks, and based on the posts 10 protruded from the ground, fences and the like. Just install the fixtures.

이상에서 상세히 살펴본 바와 같이 본 발명은 경계석 부근에 터파기 작업을 하여 공간을 확보한 다음 이 공간에 사다리꼴 형태의 거푸집을 설치하고 거푸집의 내부 중앙에 포스트를 위치시켜 거푸집 내부에 콘크리트를 주입함으로써, 포스트의 견고한 시공은 물론 종래에 거푸집 없이 콘크리트만으로 포스트를 시공함에 따라 지저분하고 불규칙하게 시공된 콘크리트에 의해 다른 시설물의 설치 시 포스트의 설치 장소를 변경해야 하는 번거로움을 방지할 수 있도록 한 것이다.As described in detail above, the present invention secures a space by digging near the boundary stone, and then installs a trapezoidal formwork in this space and places a post in the center of the formwork, thereby injecting concrete into the formwork. As well as the solid construction of the conventional construction of the post without the formwork only posts to prevent the hassle of changing the installation location of the post when the installation of the other facilities by dirty and irregularly constructed concrete.

Claims (4)

삭제delete 경계석 부근에 터파기 작업을 한 후 설치되는 것으로서, 상부는 폭이 좁고 하부로 갈수록 폭이 넓어지는 사다리꼴 형태의 후판과, 상기 후판의 좌우 양측으로 대칭되게 전방으로 연장 형성되는 측판으로 이루어지는 거푸집과; 하단이 상기 거푸집 내부 중앙에 설치되는 포스트를; 포함하여 구성되는 도로 시설물용 포스트의 설치구조에 있어서,It is installed after the excavation work near the boundary stone, the upper portion is formed of a trapezoidal thick plate that is narrow in width and wider toward the lower portion, and a side plate formed to be symmetrically extended forward to the left and right sides of the thick plate; A post having a lower end installed in the center of the die; In the installation structure of the post for road facilities comprising, 좌우 양측으로 형성되는 상기 측판의 앞면 상부는 수평면으로 형성하여 사각의 경계석과 밀착 시공이 이루어지도록 하고, 측판의 앞면 하부는 부채꼴 모양의 절개부를 형성하여 기초석에 간섭을 받지 않고 거푸집이 경계석에 밀착 설치될 수 있게 함을 특징으로 하는 도로 시설물용 포스트의 설치구조.The front upper part of the side plate formed in both left and right sides is formed in a horizontal plane to be in close contact with the rectangular boundary stone, and the lower part of the front side of the side plate forms a fan-shaped cutout so that the formwork is in close contact with the boundary stone without interference from the foundation stone. Installation structure of the post for road installations, characterized in that it can be. 삭제delete (1) 거푸집의 설치공간을 확보하기 위해 경계석 주변에 터파기 작업을 시행하는 단계와;(1) performing a digging work around the boundary stone to secure the installation space of the formwork; (2) 터파기 작업으로 형성된 공간에 설치되는 것으로서, 상부는 폭이 좁고 하부로 갈수록 폭이 넓어지는 사다리꼴 형태의 후판과, 상기 후판의 좌우 양측으로 대칭되게 전방으로 연장 형성되는 것으로서 앞면 상부는 수평면으로 형성되고 앞면 하부는 부채꼴 모양의 절개부로 이루어지는 측판으로 구성되는 거푸집을 설치하되, 기초석이 측판의 앞면 하부에 형성된 절개부 아래에 위치하도록 측판의 앞면 상부에 형성된 수평면을 경계석 측면과 밀착되게 설치하는 단계와;(2) It is installed in the space formed by the digging operation, the upper portion is a trapezoidal thick plate that is narrow in width and wider toward the lower portion, and is formed to extend forwardly symmetrically to both sides of the rear plate, the front upper portion is a horizontal plane It is formed in the form of a front surface of the lower portion is formed of a side plate consisting of a fan-shaped incision, the horizontal surface formed in the upper part of the front surface of the side plate to be in close contact with the side of the boundary stone so that the foundation stone is located below the incision formed in the lower side of the front plate Steps; (3) 거푸집 내부 중앙에 포스트 하단이 위치되도록 설치하는 단계와;(3) installing the lower end of the post in the center of the formwork; (4) 마지막으로 거푸집 내부에 콘크리트를 주입하고 콘크리트를 양생하는 단계로; 이루어짐을 특징으로 하는 도로 시설물용 포스트의 시공방법.(4) finally injecting concrete into the formwork and curing the concrete; Construction method of the post for road facilities, characterized in that made.
KR1020060046142A 2006-05-23 2006-05-23 Installation structure of road facility post and construction method Expired - Fee Related KR100768524B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060046142A KR100768524B1 (en) 2006-05-23 2006-05-23 Installation structure of road facility post and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060046142A KR100768524B1 (en) 2006-05-23 2006-05-23 Installation structure of road facility post and construction method

Publications (1)

Publication Number Publication Date
KR100768524B1 true KR100768524B1 (en) 2007-10-18

Family

ID=38815255

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060046142A Expired - Fee Related KR100768524B1 (en) 2006-05-23 2006-05-23 Installation structure of road facility post and construction method

Country Status (1)

Country Link
KR (1) KR100768524B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951870A (en) * 2016-06-04 2016-09-21 山西运城建工集团有限公司 Inner hole formwork frame of steel structure building concrete cup foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5744028A (en) * 1980-08-29 1982-03-12 Toyo Doro Shisetsu Kk Construction method for shallow foundation
JPH08144297A (en) * 1994-11-24 1996-06-04 Matsushita Electric Works Ltd Bundled foundation frame, bundled foundation fixture and execution method of bundled foundation
JP2004293210A (en) * 2003-03-27 2004-10-21 Jfe Metal Products & Engineering Inc Renovation method for electric pole
KR200391038Y1 (en) * 2005-05-03 2005-07-29 공현덕 Fabricated baseplate for post

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5744028A (en) * 1980-08-29 1982-03-12 Toyo Doro Shisetsu Kk Construction method for shallow foundation
JPH08144297A (en) * 1994-11-24 1996-06-04 Matsushita Electric Works Ltd Bundled foundation frame, bundled foundation fixture and execution method of bundled foundation
JP2004293210A (en) * 2003-03-27 2004-10-21 Jfe Metal Products & Engineering Inc Renovation method for electric pole
KR200391038Y1 (en) * 2005-05-03 2005-07-29 공현덕 Fabricated baseplate for post

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
20-0391038 Y1

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951870A (en) * 2016-06-04 2016-09-21 山西运城建工集团有限公司 Inner hole formwork frame of steel structure building concrete cup foundation

Similar Documents

Publication Publication Date Title
KR101105092B1 (en) Construction method of this precast retaining wall panel using precast retaining wall panel and semi-dry backfill
CA2649612A1 (en) Building element for making walls using filling material, particularly earth or the like
JP2013040467A (en) Pole foundation block for curb combination type protective fence
US20100272509A1 (en) Traffic barrier section
KR20210108262A (en) Road side ditch repair method
KR100768524B1 (en) Installation structure of road facility post and construction method
KR20090028964A (en) Retaining wall structure with drainage system and construction method
KR100592416B1 (en) How to secure the sidewalk and widen the roadway using concrete retaining wall blocks and truss-shaped pedestals on narrow roads
KR101351462B1 (en) Construction method for supporting post of viewing facility for natural scene
KR200437489Y1 (en) Footpath boundary block installation
JP3856791B2 (en) How to lay an overhanging sidewalk
JP2004084184A (en) Precast continuous foundation for guard fence
KR100758231B1 (en) Environmentally friendly sloped block structure for landscaping
KR101186563B1 (en) Construction method and foundation structure used pile foundation of precast concrete for soundproofing fence
KR101045411B1 (en) Road construction method
JP5318257B1 (en) CONCRETE EXTENDED WAY COMPOSITION AND METHOD FOR CONSTRUCTING A VEHICLE WITH AN EXTENDED WAY
KR101109724B1 (en) Construction method of open road in slope area or urban flat area
JP2019108677A (en) Drain pile and liquefaction countermeasures method
CN220284869U (en) Ecological barricade is restoreed to mine trace land vegetation
JP3486771B2 (en) Precast basic blocks such as protective fences and signs
KR100488130B1 (en) Precast concrete counterforts retaining wall
KR101455202B1 (en) Construction method of an underground structure using lower member installed temporary system
KR200323116Y1 (en) Precast concrete block for retaining wall
JP6473559B1 (en) Prop fixing method
KR20130142443A (en) Foundation construction of bus stop using concrete block and method for constructionn the same

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20060523

PA0201 Request for examination
N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 20061107

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20070223

Patent event code: PE09021S01D

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20070705

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 20071012

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 20071012

End annual number: 3

Start annual number: 1

PG1601 Publication of registration
G170 Re-publication after modification of scope of protection [patent]
PG1701 Publication of correction
PR1001 Payment of annual fee

Payment date: 20101011

Start annual number: 4

End annual number: 4

PR1001 Payment of annual fee

Payment date: 20110915

Start annual number: 5

End annual number: 5

FPAY Annual fee payment

Payment date: 20121012

Year of fee payment: 6

PR1001 Payment of annual fee

Payment date: 20121012

Start annual number: 6

End annual number: 6

FPAY Annual fee payment

Payment date: 20130812

Year of fee payment: 7

PR1001 Payment of annual fee

Payment date: 20130812

Start annual number: 7

End annual number: 7

FPAY Annual fee payment

Payment date: 20141007

Year of fee payment: 8

PR1001 Payment of annual fee

Payment date: 20141007

Start annual number: 8

End annual number: 8

FPAY Annual fee payment

Payment date: 20160104

Year of fee payment: 9

PR1001 Payment of annual fee

Payment date: 20160104

Start annual number: 9

End annual number: 9

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20170722