KR100634726B1 - Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib - Google Patents
Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib Download PDFInfo
- Publication number
- KR100634726B1 KR100634726B1 KR1020050032213A KR20050032213A KR100634726B1 KR 100634726 B1 KR100634726 B1 KR 100634726B1 KR 1020050032213 A KR1020050032213 A KR 1020050032213A KR 20050032213 A KR20050032213 A KR 20050032213A KR 100634726 B1 KR100634726 B1 KR 100634726B1
- Authority
- KR
- South Korea
- Prior art keywords
- slab
- retaining wall
- space
- support
- underground
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 128
- 238000009415 formwork Methods 0.000 claims abstract description 102
- 239000004567 concrete Substances 0.000 claims abstract description 49
- 230000002787 reinforcement Effects 0.000 claims description 67
- 238000000034 method Methods 0.000 claims description 28
- 238000009434 installation Methods 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 239000002689 soil Substances 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 5
- 210000000988 bone and bone Anatomy 0.000 claims 1
- 230000002265 prevention Effects 0.000 claims 1
- 239000003351 stiffener Substances 0.000 claims 1
- 230000003014 reinforcing effect Effects 0.000 abstract description 28
- 239000011120 plywood Substances 0.000 abstract description 12
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 abstract description 11
- 229910052802 copper Inorganic materials 0.000 abstract description 11
- 239000010949 copper Substances 0.000 abstract description 11
- 230000009467 reduction Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 16
- 239000010959 steel Substances 0.000 description 16
- 238000005266 casting Methods 0.000 description 8
- 230000004888 barrier function Effects 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000005304 joining Methods 0.000 description 3
- 210000003813 thumb Anatomy 0.000 description 3
- 239000004593 Epoxy Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 230000002542 deteriorative effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000007688 edging Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 210000004185 liver Anatomy 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0069—Welding
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
본 발명은 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 관한 것으로서, 슬래브의 시공시에 테두리보 시공이 생략 가능하여 테두리보 시공에 따른 여러 문제점들이 해결될 수 있고, 동바리 및 합판 거푸집의 사용이 필요 없으며, 지하옹벽 내 접합면 축소에 따른 누수 방지 효과와 더불어, 테두리보와 상, 하층 옹벽간을 연결하던 연결철근이 필요 없게 되는 동시에 테두리보에 들어가던 철근량이 줄어들어 경제적이고, 옹벽 콘크리트 타설을 위한 충전파이프를 테두리보에 매입할 필요가 없으므로 시공성을 향상시킬 수 있는 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 관한 것이다. The present invention relates to a slab construction structure of the basement structure and the slab and underground retaining wall construction method with the rim beam omitted using the same, various problems can be solved due to the rim beam construction can be omitted when the slab construction. It does not require the use of copper bars and plywood formwork, and prevents leaks due to the reduction of the joint surface in the underground retaining wall, and eliminates the need for connecting reinforcing bar beams between the upper and lower retaining walls. The present invention relates to a slab construction structure of an underground structure that can improve constructability because it is less economical and does not need to purchase filling pipes for retaining wall concrete laying on a rim beam, and a slab and underground retaining wall construction method without the rim beam using the same. .
Description
도 1a는 종래기술에 따른 슬래브 및 테두리보의 시공을 위한 거푸집 구조체의 설치상태를 보여주는 단면도,Figure 1a is a cross-sectional view showing the installation state of the formwork for the construction of the slab and the rim beam according to the prior art,
도 1b는 종래기술에 따른 슬래브 및 테두리보의 시공이 완료된 상태를 보여주는 단면도,1b is a cross-sectional view showing a state in which the construction of the slab and the rim beam according to the prior art is completed;
도 2는 종래 슬래브, 테두리보 및 지하옹벽 시공이 이루어진 상태의 예를 도시한 단면도Figure 2 is a cross-sectional view showing an example of a state made a conventional slab, rim beam and underground retaining wall construction
도 3은 본 발명에 따른 슬래브 구축용 구조체의 제1실시예를 도시한 사시도,3 is a perspective view showing a first embodiment of a structure for constructing slab according to the present invention;
도 4는 본 발명에 따른 슬래브 구축용 구조체의 제1실시예를 도시한 부분평면도,Figure 4 is a partial plan view showing a first embodiment of the slab construction structure according to the present invention,
도 5a는 도 4의 선 'A-A'를 따라 취한 단면도, 5A is a cross-sectional view taken along the line 'A-A' of FIG. 4,
도 5b는 도 4의 선 'B-B'를 따라 취한 단면도, 5B is a cross-sectional view taken along the line 'B-B' of FIG. 4,
도 6은 도 5b의 선 'C-C'를 따라 취한 단면도로서 내측보강보의 단부와 지지거더의 거싯 플레이트간 연결구조를 보여주는 도면,Figure 6 is a cross-sectional view taken along the line 'C-C' of Figure 5b showing the connection structure between the end of the inner reinforcement beam and the gusset plate of the support girder,
도 7은 본 발명에 따른 제1실시예에서 내측보강보로 ㄷ-형강 대신 H-형강이 사용된 경우를 도시한 단면도, Figure 7 is a cross-sectional view showing a case in which the H-beam instead of the c-beam as the inner reinforcement beam in the first embodiment according to the present invention,
도 8a와 도 8b는 각각 본 발명에 따른 제1실시예에서 흙막이벽에 상부 브라켓 및 웨일, 스트럿, 버팀부재가 설치된 상태를 도시한 정면도와 부분평면도,8A and 8B are respectively a front view and a partial plan view showing a state in which an upper bracket and a wale, a strut, and a support member are installed on the retaining wall in the first embodiment according to the present invention;
도 9는 본 발명에 따른 제1실시예에서 웨일의 방향을 달리하여 설치한 상태도,9 is a state diagram installed in a different direction of the wale in the first embodiment according to the present invention,
도 10은 본 발명에서 사용 가능한 스트럿의 예를 도시한 단면도, 10 is a cross-sectional view showing an example of a strut usable in the present invention;
도 11a는 본 발명에서 뒷채움의 다른 예를 도시한 부분평면도,Figure 11a is a partial plan view showing another example of the backfill in the present invention,
도 11b는 도 11a의 선 'A'-A''를 따라 취한 단면도,FIG. 11B is a cross sectional view taken along the line 'A'-A' 'in FIG. 11A,
도 12a ~ 도 12f는 본 발명에서 슬래브 시공 후 지하옹벽 순타시공 과정을 보인 단면도,12a to 12f is a cross-sectional view showing a process for the net retaining wall after the slab construction in the present invention,
도 13은 본 발명에 따른 슬래브 구축용 구조체의 제2실시예를 도시한 부분평면도, 13 is a partial plan view showing a second embodiment of the slab construction structure according to the present invention;
도 14a는 도 13의 선 'D-D'를 따라 취한 단면도로서 내측보강보로 ㄷ-형강을 사용한 예를 도시한 도면, 14A is a cross-sectional view taken along the line 'D-D' of FIG. 13, showing an example of using a c-beam as an inner reinforcement beam;
도 14b는 본 발명에 따른 슬래브 구축용 구조체의 제2실시에에서 내측보강보로 H-형강을 사용한 예를 도시한 단면도,14B is a cross-sectional view showing an example of using the H-shaped steel as the inner reinforcement beam in the second embodiment of the slab construction structure according to the present invention;
도 15는 본 발명에 따른 슬래브 구축용 구조체의 제3실시예를 도시한 부분평면도, 15 is a partial plan view showing a third embodiment of the slab construction structure according to the present invention;
도 16은 도 15의 선 'E-E'를 따라 취한 단면도,16 is a cross-sectional view taken along the line 'E-E' of FIG. 15,
도 17은 본 발명에 따른 슬래브 구축용 구조체의 제4실시예를 도시한 사시도, 17 is a perspective view showing a fourth embodiment of the slab construction structure according to the present invention;
도 18은 본 발명에 따른 슬래브 구축용 구조체의 제4실시예를 도시한 부분평면도, 18 is a partial plan view showing a fourth embodiment of a slab construction structure according to the present invention;
도 19은 도 18의 선 'F-F'를 따라 취한 단면도,19 is a cross-sectional view taken along the line 'F-F' of FIG. 18,
도 20은 본 발명에 따른 제4실시예에서 엔드 플레이트의 형상을 달리하여 제작한 그레이팅 지지틀의 여러 예를 도시한 단면도, 20 is a cross-sectional view showing several examples of the grating support frame manufactured by varying the shape of the end plate in the fourth embodiment according to the present invention;
도 21은 본 발명에 따른 제4실시예에서 크로스 철근의 배치방향을 달리하여 제작한 그레이팅 지지틀의 여러 예를 도시한 평면도, FIG. 21 is a plan view showing various examples of a grating support frame manufactured by varying an arrangement direction of cross bars in a fourth embodiment according to the present invention; FIG.
도 22는 도 21에 도시한 그레이팅 지지틀의 설치예를 도시한 평면도,22 is a plan view showing an installation example of the grating support frame shown in FIG.
도 23은 본 발명에 따른 제4실시예에서 크로스 철근이 플랫 바의 상하 중간부분을 관통하도록 하여 제작된 그레이팅 지지틀의 예를 도시한 단면도.FIG. 23 is a cross-sectional view showing an example of a grating support frame manufactured by allowing the cross bars to penetrate the upper and lower middle portions of the flat bar in the fourth embodiment according to the present invention; FIG.
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
100 : 흙막이벽 101 : H-파일100: retaining wall 101: H- pile
102 : 슬래브 103 : 지하옹벽102: slab 103: basement retaining wall
104 : 슬래브 구축용 구조체 110 : 지지거더104: slab construction structure 110: support girder
111 : 하부 브라켓 112 : 받침보111: lower bracket 112: support beam
113 : 내측보강보 114 : 거싯 플레이트113: medial reinforcement 114: gusset plate
115 : 체결수단 116 : 데크 플레이트115: fastening means 116: deck plate
117 : 거푸집 수단 118 : 철망형 거푸집117: formwork 118: wire mesh formwork
119 : 상부 브라켓 120 : 지지틀 구조체119: upper bracket 120: support frame structure
121 : 웨일 지지틀 122 : 웨일121: wale support frame 122: wale
123 : 스트럿 124 : 버팀부재123: strut 124: bracing member
125a, 125b : 뒷채움부 126 : 철근125a, 125b: backfill 126: rebar
127 : 철망형 거푸집 128 : 스터드127: wire mesh formwork 128: stud
129a : 상부 연결철근 129b : 하부 연결철근129a: Upper connecting
131a, 131b : 수직철근 132 : 엔드 플레이트131a, 131b: vertical rebar 132: end plate
133 : 스터드 134 : 개별 엔드 플레이트133: stud 134: individual end plate
135 : 스터드 141 : 그레이팅 지지틀135: stud 141: grating support frame
142a, 142b : 엔드 플레이트 144b : 플랫 바142a, 142b:
144c : 크로스 철근144c: cross rebar
본 발명은 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 관한 것으로서, 더욱 상세하게는 흙막이벽으로 SCW 또는 CIP가 시공된 경우에 적용될 수 있는 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 관한 것이다.The present invention relates to a slab construction structure of the underground structure and the slab and the base retaining wall construction method omitted the rim beam using the same, more specifically, the construction of the slab of the underground structure that can be applied when the SCW or CIP is constructed as a retaining wall The present invention relates to a construction method for slabs and basement retaining walls, in which a structural structure and a frame beam using the same are omitted.
일반적으로 지하구조물을 구축하는 방법에는 두 가지가 있다.In general, there are two ways to build underground structures.
지하구조물이 축조되는 지반에 흙막이 공사를 한 다음 지반을 굴착하면서 흙막이를 지지할 수 있는 가시설물을 설치하고 토사를 전부 반출한 뒤 맨 아래층부터 구조물을 축조해 올라가는 순타설공법과, 흙막이를 시공하고 1층 구조물을 축조한 다음 그 구조물을 흙막이용 버팀부재로 이용하여 상부에서 하부로 지반을 굴착하면서 구조물을 축조해 내려가는 역타설공법이 그것이다.After constructing the earthquake on the ground where the underground structure is constructed, install the temporary facility to support the earthquake while excavating the ground, take out all the earth and sand, and build the structure from the bottom floor, After the construction of the first-floor structure, using the structure as a retaining member for the earthquake, the reverse casting method is to construct the structure while drilling the ground from the top to the bottom.
최근 토지 이용의 극대화 차원에서 지하공사가 점차 고심도화되고 있고, 특히 순타설공법에 의한 시공시에는 흙막이 붕괴의 위험이나 주변 건물들 침하 등으로 인한 균열 발생은 물론, 시각적으로도 불안할 뿐만 아니라 공사기간이 길어지는 등 여러 문제가 있어서, 근래에는 역타설공법이 널리 적용되고 있다.In recent years, underground construction has been increasingly intensified in order to maximize land use. In particular, when the construction is carried out by the net pouring method, not only the construction of cracks due to the risk of earthquake collapse or the settlement of nearby buildings, but also visually unstable construction Due to various problems such as long periods of time, the reverse casting method has been widely applied in recent years.
이 역타설공법은 지하구조물 축조시에 지상 1층부터 단계적으로 시공해 내려가는 방식이므로, 지하구조물과 지상구조물의 시공이 동시에 진행 가능하고, 지상 1층의 바닥을 작업장으로 활용할 수 있어 별도의 복공판이 필요하지 않은 장점이 있다.Since the reverse casting method is a method of constructing the ground structure from the ground floor step by step, construction of the underground structure and ground structure can proceed at the same time, and the floor of the ground floor can be used as a workshop. There is an advantage that is not necessary.
이러한 역타설공법으로는 지반을 정지한 상태에서 지반 위에 콘크리트 슬래브와 보를 타설하는 방법(Concrete on Grade)과, 지반을 어느 정도 굴착하고 지반을 고른 뒤 동바리를 세우고 거푸집을 설치하여 콘크리트를 타설하는 방법(Form on Supporting) 등이 있다. Such a reverse casting method involves placing concrete slabs and beams on the ground while the ground is stopped (concrete on grade), and excaving the ground to some extent, selecting the ground, and then placing the clubs and installing the formwork to place the concrete. (Form on Supporting).
한편, 역타설 시공시에는 통상적으로 흙막이벽과 바닥 슬래브가 만나는 외곽 경계부분에 띠장 또는 접합거더 역할을 하는 철근 콘크리트 테두리보(perimeter beam)가 설치되고, 모든 지하층의 슬래브 시공이 끝난 뒤에는 맨 아래층부터 위층으로 올라가면서 흙막이벽 안쪽에 합벽(지하옹벽)을 시공하게 된다.On the other hand, in the case of reverse casting, a reinforced concrete perimeter beam, which acts as a strip or a joining girder, is usually installed at the outer boundary where the earth wall and the floor slab meet, and after completion of the slab construction of all basement floors, As you go upstairs, you will build a plywood (underground retaining wall) inside the retaining wall.
여기서, 종래기술에 따른 지하층의 슬래브 및 테두리보 시공을 위한 거푸집 구성 및 작업에 대하여 첨부한 도면을 참조하여 설명하면 다음과 같다.Here, with reference to the accompanying drawings for the formwork and work for the slab and rim beam construction of the basement layer according to the prior art as follows.
도 1a는 종래기술에 따른 슬래브 및 테두리보의 시공을 위한 거푸집 구조체의 설치상태를 보여주는 단면도이고, 도 1b는 종래기술에 따른 슬래브 및 테두리보의 시공이 완료된 상태를 보여주는 단면도이다.Figure 1a is a cross-sectional view showing the installation state of the formwork structure for the construction of the slab and the rim beam according to the prior art, Figure 1b is a cross-sectional view showing a state of completion of the construction of the slab and the rim beam according to the prior art.
도 1a는 거푸집 설치상태에서 콘크리트의 양생 중을, 도 1b는 콘크리트의 양생 후 거푸집 해체상태를 나타내며, 이들 도면은 데크 플레이트(deck plate)(15) 지지를 위한 지지거더(7)가 설치된 위치에서의 단면도이다. Figure 1a shows the concrete during curing in the form installed state, Figure 1b shows the state of the form dismantled after curing of the concrete, these figures are in the position where the support girder (7) for supporting the deck plate (15) is installed It is a cross section of.
도 1a에서 도면부호 2는 흙막이벽(1) 내에 수직 시공된 엄지말뚝, 즉 수직 강재빔인 H-파일(pile)을 나타낸다.In FIG. 1 a,
주지된 바와 같이, 흙막이벽(1)의 형식으로는 주열식 벽으로서 SCW(Soil Cement Wall)와 CIP(Cast In-Place Pile)가 있고, 이들은 엄지말뚝으로서 통상 H-파일(2)을 사용하고 있으며, 이 H-파일(2)이 배면의 토압 및 수압을 직접 지지하는 수직 휨부재로서의 역할을 하게 된다.As is well known, the form of the
테두리보(17)의 시공을 위하여, 도시한 바와 같이, 종래에는 흙막이벽(1)을 시공한 뒤 굴토작업을 먼저 하고, 버림 콘크리트(3)를 타설한 뒤 동바리(4)를 설치하여 거푸집을 지지시키게 된다.For the construction of the
여기서, 시공하고자 하는 테두리보(17)의 길이방향에 대하여 그 횡방향으로 길게 배치되는 각재(5)를 복수개의 동바리(4)로 지지시키고, 이 각재(5) 위에는 테두리보 하면 성형을 위한 합판 거푸집(6)을 수평으로 배치하여 지지시키며, 이 수평의 합판 거푸집, 즉 거푸집 하판(6) 위로는 테두리보 측면 성형을 위한 합판 거푸집(거푸집 옆판, 미도시됨)을 수직으로 고정 배치하여 지지시킨다.Here, the
이때 상기 각재(5)는 시공하고자 하는 테두리보(17)의 길이방향을 따라 다수개가 소정 간격을 두고 배치되는데, 각각의 각재(5)가 모두 도시한 바와 같이 복수개의 동바리(4)로 지지된다.At this time, a plurality of the lumber (5) is arranged at a predetermined interval along the longitudinal direction of the
또한, 슬래브 구축용 구조체로서, 도면부호 7은 철골보 구조물인 지지거더를 나타내고, 도면부호 15는 지지거더(7)에 의해 지지되는 데크 플레이트를 나타내는 바, 상기 지지거더(7)로는 통상 H-형강이 사용되고, 그 일단부가 동바리(4) 및 거푸집 하판(6) 등에 의해 지지되며, 일단부 끝단에는 임베디드 플레이트(embedded plate)(8)가 용접 및/또는 고정 브라켓(9a)과 체결부재(9b)에 의해 수직으로 결합된다.In addition, as a slab construction structure,
이와 같이 지지거더(7)가 설치되는 부분에서는 상기 임베디드 플레이트(8)가 테두리보 측면 성형을 위한 거푸집의 역할을 하는 동시에 지지거더(7)에서 테두리보(17)에 결합되는 구조체가 된다. In this way, in the portion where the
그리고, 도 1a는 지지거더(7)가 설치되는 위치에서의 종방향 단면도이기 때문에 테두리보 측면 성형을 위한 합판 거푸집, 즉 거푸집 옆판이 미도시되었으나, 이 거푸집 옆판은 시공하고자 하는 테두리보(17)의 길이방향을 따라서 임베디드 플레이트(8)의 양 측방으로 길게 설치되며, 이는 각 지지거더(7) 끝단의 임베디드 플 레이트(8)와 함께 테두리보 성형공간의 측면을 이루게 된다.And, Figure 1a is a longitudinal cross-sectional view at the position where the support girder (7) is installed, plywood formwork for forming the side beams, that is, the formwork side plate is not shown, this formwork side plate is the
또한, 테두리보용 콘크리트가 타설되는 성형공간, 즉 H-파일(2)을 포함한 흙막이벽(1), 거푸집 하판(6), 임베디드 플레이트(8) 및 미도시된 거푸집 옆판이 형성하는 사각 단면형상의 테두리보 성형공간 내에는 길이방향의 철근(11) 및 스터럽 철근(12)을 설치함과 더불어 지하옹벽 공간 내 매립되는 연결철근(19)을 상하로 연결하여 설치하는 배근작업을 하고, 테두리보 성형공간 내에서 흙막이벽(1)에 내장된 H-파일(2)의 플랜지면에는 벽의 일부를 제거한 후 전단연결부재인 스터드(예, 3 ×2열 = 6개)(13)가 용접 시공된다.In addition, the square space of the cross-section formed by the molding space in which the frame for the concrete is poured, that is, the retaining wall (1) including the H- pile (2), the form lower plate (6), the embedded plate (8) and the formwork side plate (not shown) In the frame beam forming space, the longitudinal reinforcing
또한, 테두리보 성형공간 내에서 상기 임베디드 플레이드(8)에도 전단연결부재인 스터드(14)가 용접 시공되는데, 이와 같이 설치되는 스터드(13,14)는 테두리보 콘크리트 속에 매립되는 바, 이들은 H-파일(2)과 테두리보(17)간, 그리고 테두리보(17)와 임베디드 플레이트(8)간 상호 결착력을 증대시키기 위하여 시공되는 것들이다.In addition, the
이와 같이 슬래브(16) 및 테두리보(17) 시공을 위한 거푸집 등 구조체를 모두 설치하고 나면, 슬래브 및 보 콘크리트 타설시에 상기 테두리보 성형공간 내에 콘크리트를 함께 타설하여 테두리보(17)를 성형한다.After installing all the structures such as formwork for the construction of the slab (16) and the rim beam (17), when the slab and beam concrete is poured, the concrete is poured together in the rim beam forming space to form the rim beam (17). .
그리고, 콘크리트가 양생되고 나면, 동바리(4) 및 각재(5), 합판 거푸집(거푸집 하판 및 옆판)(6) 등은 해체하고, 철골보인 지지거더(7) 및 임베디드 플레이트(8) 등은 영구 구조체로 사용하게 된다.Then, after the concrete is cured, the copper bar (4) and the lumber (5), plywood formwork (form lower plate and side plate) (6), etc. are dismantled, the steel girders support girder (7) and embedded plate (8) is permanent It will be used as a structure.
이후 하층으로 내려가면서 각 층에 대해 상기와 같은 작업을 반복하여 슬래 브 및 테두리보를 단계적으로 시공하게 되며, 모든 지하층에 대하여 슬래브 및 테두리보의 시공이 완료되면, 옹벽 거푸집 설치 및 콘크리트 시공을 하여 테두리보가 드러나지 않도록 옹벽(합벽) 순타시공을 하게 된다.After going down to the lower floor and repeating the above operations for each floor step by step slab and rim beam construction step by step, and when the construction of the slab and rim beam for all basement is completed, retaining wall formwork and concrete construction border The retaining wall (plywood) is to be constructed so that the beam is not exposed.
통상, 옹벽 시공은, 상기와 같이 맨 아래층부터 위로 올라가면서 순타시공하는 순타시공 방식으로 작업이 이루어지거나, 슬래브 시공 후 그 상측의 옹벽을 시공하고 이후 하층의 슬래브 시공을 한 뒤 다시 그 상측의 옹벽을 시공하는 역타시공 방식으로 작업이 이루어진다.In general, the retaining wall construction is performed in a smooth construction method of smooth construction while rising from the bottom layer as described above, or after the slab construction, constructs the retaining wall on the upper side, and then performs the lower slab construction, and then again the retaining wall on the upper side. Work is done in reverse construction method to construct the construction.
도 2는 종래 슬래브, 테두리보 및 지하옹벽 시공이 이루어진 상태의 예를 도시한 단면도로서, 이는 지지거더가 설치되지 않은 위치, 즉 지지거더와 지지거더 사이의 중간위치에서 취한 단면도이다.2 is a cross-sectional view showing an example of a state in which a conventional slab, rim beam and underground retaining wall construction is made, which is a cross-sectional view taken at a position where the support girder is not installed, that is, an intermediate position between the support girder and the support girder.
도시한 바와 같이, 슬래브(16)와 테두리보(17)의 시공이 완료된 후에 흙막이벽(1) 내측으로 옹벽 거푸집(도시하지 않음)을 설치하고, 이 거푸집 공간에 콘크리트를 타설하여 옹벽(18)을 시공하게 된다.As shown, after the construction of the
도 2를 참조로 하여 간단히 지하 2층까지만의 예를 설명하면, '경우 1'에서 ①→②→③→④→⑤의 시공순서는 옹벽(18)을 순타시공할 경우의 순서를 나타낸 것이며, '경우 2'에서 ①→②→③→④→⑤의 시공순서는 옹벽(18)을 역타시공할 경우의 순서를 나타낸 것이다. Referring to FIG. 2, a simple example up to the second basement floor will be described. In the
한편, 도 1a 및 도 1b, 그리고 도 2에 도시한 종래기술에 따르면 다음과 같은 문제점이 있게 된다.On the other hand, according to the prior art shown in Figures 1a and 1b, and Figure 2 has the following problems.
테두리보 시공에 따른 문제점으로서, 위에서 설명한 바와 같이 일반 합판 거 푸집(6)과 동바리(4)를 이용함으로써, 동바리 설치에 따른 토공작업 지연과 콘크리트 타설시 가끔 거푸집 파괴 등에 의해 작업 차질이 많이 발생하고, 거푸집 설치가 복잡하여 시공성 저하 및 원가 증대의 문제가 발생한다. As a problem due to the construction of the rim beam, as described above, by using the general plywood formwork (6) and the copper barry (4), a lot of work disturbances occur due to the delay of earthwork work due to the installation of the copper bar and the occasional formwork destruction during concrete pouring As a result, the formwork is complicated to install, resulting in poor constructionability and cost increase.
특히, 동바리(4)의 이용시에는 연약 지반상에서의 지지가 불안정하고, 또한 콘크리트의 강도가 일정 이상으로 보양되지 않으면 해체가 불가하기 때문에 콘크리트 양생 중 동바리의 존치로 인해 아래층의 굴토공사가 진행되지 못하여 공기가 지연될 수 밖에 없는 문제가 있다.In particular, when the
더구나, 동바리 등 가설자재는 역타설 시공시 굴토작업장 외부로 반출한 뒤 굴토 후 다시 아래층으로 이동하여 설치해야 하고, 이를 각 층의 시공시마다 반복해야 하는 바, 이러한 작업을 반복 수행하는데 있어서 번잡한 문제점이 있게 된다.In addition, temporary materials such as dongbari should be moved to the lower floor after the excavation after installation to the outside of the gulto workshop during the construction of reverse casting, and this should be repeated for the construction of each floor. This will be.
또한, 동바리의 소운반 및 재조립에 소요되는 비용과 시간이 과다하여 비경제적일 뿐만 아니라, 모든 작업이 인력에 의존하는 노동집약적이기 때문에 기능공의 인력 부족이 점차 심화되는 현실에서 동바리의 사용은 원가 절감을 어렵게 한다.In addition, the cost and time required for transporting and reassembling the club are not only economically unfavorable, but also the labor-intensive labor shortage of all workers makes the use of copper club cost-effective. Makes it difficult.
그리고, 철골구조를 사용한 역타 공사시에 테두리보 시공을 위하여 거푸집 작업을 위한 목공작업이 중간 중간에 실시되어야 하는 문제점도 있다.In addition, there is a problem that the woodworking work for the formwork for the rim beam construction during the reverse construction using the steel structure has to be carried out in the middle.
특히, 역타설 시공시에 데크 플레이트(15)를 설치하여 데크 슬래브(deck slab)(16)를 시공하고 있는데 반하여, 테두리보(17)의 시공을 위해 목재로 된 합판 거푸집(6)을 그대로 사용하는 경우에는 테두리보 거푸집 작업을 위한 목공작업 인원이 단속적으로 투입되어야 한다. In particular, the deck slab (16) is installed by installing the deck plate (15) during reverse casting, whereas the plywood formwork (6) made of wood is used as it is for the construction of the rim beam (17). In such cases, woodworking personnel for the edging beam formwork should be intermittent.
이와 같이 철공공 외에 목공작업공의 이질공종 인력이 투입됨으로써, 공사원가가 상승함은 물론 인력 투입의 효율성이 크게 떨어지는 문제점을 가진다.In this way, by adding the heterogeneous workforce of the woodworker in addition to the ironworker, the construction cost is increased and the efficiency of manpower input is greatly reduced.
또한, 테두리보(17)와 철골보(지지거더)(7)의 접합부 부분 거푸집 작업시에 철골보(7)를 거푸집으로 지지하여야 하므로 이 또한 시공성을 떨어뜨리는 요인이 되고 있고, 큰 춤의 철골보(7)와 테두리보(17)의 접합을 위하여 테두리보 춤이 필요 이상으로 커지는 등 비경제적으로 설계되고 있다.In addition, since the
또한, 거푸집 옆판 설치시에 거푸집 하판 등을 발판으로 하여 작업자가 그 위로 올라가 작업을 해야 하므로 안전사고의 위험성이 높은 문제가 있다.In addition, there is a high risk of safety accidents because the worker has to work on the formwork as a scaffold when the formwork side plate is installed as a scaffold.
또한, 스터럽 및 보강 철근량의 과다 소요, 연결철근의 사용량 과다로 인한 재료 낭비의 문제점이 있고, 테두리보 철근 배근을 위한 철근 가공 및 조립이 복잡할 뿐만 아니라, 배근 설치를 위한 조립시간이 필요하여 공기 지연 및 공사비 증대의 요인이 되고 있다.In addition, there is a problem of excessive amount of stirrup and reinforcing bar, waste of material due to excessive use of connecting bar, complicated reinforcing and assembly of reinforcing bar reinforcement, and assembly time for installing reinforcement is needed. It is a factor of delay and increase of construction cost.
또한, 슬래브(16)가 선시공되고 옹벽(18)이 후시공됨에 따라서 테두리보(17)의 상, 하면과 옹벽(18)간에는 접합면이 발생하는 바, 이 접합면에서의 누수가 문제점으로 지적되고 있으며, 이러한 누수문제를 해결하기 위해서는 시공 후 접합면간에 에폭시를 주입해야 하는 보수작업이 반드시 필요하다. In addition, as the
상기한 테두리보와 옹벽간의 접합 관련 문제는 도 2의 '경우 2'에서와 같은 옹벽 역타시공시에 특히 문제가 되는데, 콘크리트의 수축에 따라서 테두리보(17)의 하면과 옹벽(18) 상단의 접합면간에 틈새가 크게 발생할 수 있는 바, 이는 에폭시 주입 등 보수작업을 실시하여 해결하였으나 반드시 개선이 필요한 부분이다.The above problem related to the joining between the rim beam and the retaining wall is particularly a problem when the retaining wall reverse construction as shown in the 'case 2' of FIG. 2, the bottom of the
또한, 옹벽 콘크리트 타설을 위한 별도의 투입구(충전파이프를 테두리보에 대략 1m 간격으로 매입함)가 필요하며, 이에 따라 시공성이 저하되는 문제점도 가지고 있다.In addition, a separate inlet for filling the retaining wall concrete (buying the filling pipe at intervals of about 1 m to the rim beam) is required, which also has a problem in that the workability is deteriorated.
따라서, 본 발명은 상기와 같은 문제점을 해결하기 위하여 발명한 것으로서, 슬래브의 시공시에 테두리보 시공이 생략 가능하여 테두리보 시공에 따른 여러 문제점들이 해결될 수 있고, 동바리 및 합판 거푸집의 사용이 필요 없으며, 지하옹벽 내 접합면 축소에 따른 누수 방지 효과와 더불어, 테두리보와 상, 하층 옹벽간을 연결하던 연결철근이 필요 없게 되는 동시에 테두리보에 들어가던 철근량이 줄어들어 경제적이고, 옹벽 콘크리트 타설을 위한 충전파이프를 테두리보에 매입할 필요가 없으므로 시공성을 향상시킬 수 있는 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been invented to solve the above problems, it is possible to omit the edge beam construction when the slab construction can be solved a number of problems according to the construction of the edge beam, it is necessary to use the copper bar and plywood formwork In addition, it is possible to prevent leakage due to the reduction of the joint surface in the basement retaining wall, and to eliminate the need for connecting reinforcing bars between the upper and lower retaining walls. The purpose of the present invention is to provide a slab construction structure of the underground structure that can improve the workability because the filling pipe does not need to be embedded in the rim beam, and a slab and underground retaining wall construction method in which the rim beam is omitted.
이하, 첨부한 도면을 참조하여 본 발명을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
본 발명은, 지지거더 및 데크 플레이트를 포함하는 지하층의 슬래브 구축용 구조체에 있어서,The present invention, in the slab construction structure of the basement layer including a support girder and a deck plate,
일단부가 지하옹벽 공간 내에 삽입되어 흙막이벽의 H-파일에 설치된 거더 지 지수단에 의해 지지되는 지지거더와; 상기 지지거더와 동일 높이로 하여 이웃한 두 상기 지지거더의 일단부에 단부가 거싯 플레이트를 매개로 고정되어 각 지지거더간에 설치되는 내측보강보와; 상기 지지거더와 내측보강보 위에 지지되면서 슬래브 공간에 설치되는 데크 플레이트와; 슬래브의 선시공 및 지하옹벽의 후시공이 가능하도록, 상기 지지거더와 내측보강보 위에 슬래브 공간과 지하옹벽 공간의 경계면을 따라서 설치되는 슬래브 경계면 성형을 위한 거푸집 수단과; 흙막이벽과 슬래브간 힘 전달이 가능하도록 지하옹벽 공간에서 흙막이벽과 슬래브 공간 사이에 연결 설치되는 지지틀 구조체;를 포함하는 것을 특징으로 한다.A support girder having one end inserted into the underground retaining wall space and supported by the girder supporting means installed in the H-pile of the retaining wall; An inner reinforcement beam having end portions fixed to one end of two adjacent support girders through a gusset plate at the same height as the support girders and installed between the support girders; A deck plate installed in the slab space while being supported on the support girder and the inner reinforcement beam; Forming means for slab interface forming on the support girder and the inner reinforcement reinforcement along the interface between the slab space and the underground retaining wall space to enable pre-installation of the slab and post-installation of the base retaining wall; It characterized in that it comprises a; support structure which is installed between the retaining wall and the slab space in the underground retaining wall space to enable the force transfer between the retaining wall and the slab.
특히, 상기 지지틀 구조체가 흙막이벽과 슬래브 공간 사이에 연속 배치되는 복수개의 웨일 지지틀로 구성되고, 상기 각 웨일 지지틀은,In particular, the support frame structure is composed of a plurality of wale support frame that is continuously disposed between the retaining wall and the slab space, each of the wale support frame,
흙막이벽의 H-파일에 설치된 상부 브라켓들 위에 횡으로 지지되도록 용접 설치되고 흙막이벽과의 사이에 토압 전달을 위한 뒷채움부가 시공되는 웨일과; 일단부가 상기 웨일에 용접된 상태로 타단부가 상기 거푸집 수단을 통해 상기 지지거더 및 내측보강보 상측의 슬래브와 연결될 수 있게 설치되는 복수개의 스트럿;으로 구성되는 것을 특징으로 한다.A wales welded to be supported transversely on the upper brackets installed on the H-pile of the retaining wall, and having a backfill portion installed for transferring earth pressure between the retaining wall; And a plurality of struts, one end of which is connected to the support girder and the upper slab of the inner side reinforcement through the formwork, with the other end welded to the wale.
여기서, 상기 거푸집 수단이 경계면 전구간을 따라 설치되는 철망형 거푸집이고, 상기 각 스트럿이 이 철망형 거푸집을 관통하여 슬래브 공간 내에 삽입되는 것을 특징으로 한다.Here, the formwork means is a wire mesh formwork which is installed along the interface of the entire boundary surface, characterized in that each strut is inserted into the slab space through the wire mesh formwork.
다른 실시예로서, 상기 거푸집 수단이 경계면 전구간을 따라 설치되는 철망형 거푸집이고, 상기 각 스트럿의 타단부 끝단에 개별 엔드 플레이트가 용접 설치 되어 이 엔드 플레이트가 지지거더 및 내측보강보 위에 고정 지지되며, 상기 각 엔드 플레이트의 이면에는 상기 철망형 거푸집을 관통하여 슬래브 공간 내에 삽입되는 스터드가 용접 설치되는 것을 특징으로 한다.In another embodiment, the formwork means is a wire mesh formwork is installed along the entire boundary surface, the individual end plate is welded to the other end of each strut is fixed and supported on the support girder and the inner reinforcement, Studs inserted into the slab space through the wire mesh formwork are welded to the rear surface of each end plate.
또 다른 실시예로서, 상기 지지틀 구조체가 흙막이벽과 슬래브 공간 사이에 연속 배치는 복수개의 그레이팅 지지틀로 구성되되, 상기 각 그레이팅 지지틀은 양측의 두 엔드 플레이트와, 이 두 엔드 플레이트 사이에서 끝단이 상기 엔드 플레이트에 고정되어 설치되는 복수개의 플랫 바와, 이 플랫 바에 대해 횡으로 고정되어 설치되는 복수개의 크로스 철근으로 이루어지고, 상기 두 엔드 플레이트 중 일측의 엔드 플레이트가 상기 거푸집 수단 바깥쪽으로 내측보강보 위에, 타측의 엔드 플레이트가 흙막이벽과의 사이에 토압 전달을 위한 뒷채움부를 가지면서 이웃한 상부 브라켓들 위에 횡으로 지지되어 용접되는 것을 특징으로 한다.In another embodiment, the support frame structure is composed of a plurality of grating support frames in a continuous arrangement between the retaining wall and the slab space, each grating support frame having two end plates on both sides and an end between the two end plates. It consists of a plurality of flat bars fixed to the end plate is installed, a plurality of cross reinforcing bars are fixed laterally fixed to the flat bar, the end plate on one side of the two end plates is the inner reinforcement outside the formwork means Above, the other end plate is characterized in that it is supported laterally on the adjacent upper brackets and welded while having a backfill for earth pressure transmission between the earth wall.
상기 또 다른 실시예에서, 상기 거푸집 수단이 경계면 전구간을 따라 설치되는 철망형 거푸집이고, 상기 철망형 거푸집을 관통하는 연결철근들이 상기 그레이팅 지지틀 상측에서 지하옹벽 공간과 슬래브 공간에 연결 설치되는 것을 특징으로 한다.In another embodiment, the formwork means is a wire mesh formwork is installed along the interface between the entire boundary surface, the connecting bars penetrating the wire mesh formwork is installed in the basement retaining wall space and the slab space above the grating support frame It is done.
한편, 본 발명은, 지하층의 슬래브 및 지하옹벽을 시공하는 방법에 있어서,On the other hand, the present invention, in the method for constructing the slab and basement retaining wall of the basement layer,
(a)시공되는 건물의 경계선을 따라 흙막이벽을 설치하고, 그 안쪽 지중에 골조용 기둥을 시공하는 단계와; (b)흙막이벽 안쪽 지반의 터파기를 진행하여 흙막이벽과 골조용 기둥의 상부 일부가 노출되도록 하는 단계와; (c)흙막이벽의 해당 H-파일에 각각 하부 브라켓을 설치한 뒤 이웃한 두 하부 브라켓 위에 받침보를 설 치하고, 이어 받침보 위에 일단부를 지지 및 고정하는 방법으로 각 지지거더를 상기 받침보와 골조용 기둥 사이에 설치하는 단계와; (d)흙막이벽과 골조용 기둥 사이에 설치된 각 이웃한 두 지지거더의 일단부 사이에 지지거더와 동일 높이로 하여 거싯 플레이트를 매개로 내측보강보를 고정 설치하는 단계와; (e)상기 지지거더 및 내측보강보 위로 슬래브 공간에 데크 플레이트를 설치하는 단계와; (e)상기 지지거더와 내측보강보 위에 슬래브 공간과 지하옹벽 공간의 경계면을 따라서 슬래브 경계면 성형을 위한 거푸집 수단을 설치하고, 지하옹벽 공간에서 흙막이벽과 슬래브 공간 사이에 지지틀 구조체를 연결 설치하는 단계와; (g)상기 거푸집 수단을 경계로 하는 슬래브 공간 내에 콘크리트를 타설하여 슬래브를 시공하는 단계와; (h)상기 (b)단계 ~ (g)단계를 하층으로 내려가면서 단계적으로 반복하여 전 지하층의 슬래브를 시공하는 단계와; (i)지하옹벽의 거푸집을 설치한 후 콘크리트를 타설하여 하층부터 상층으로 올라가면서 지하옹벽의 순타시공을 하는 단계;를 포함하는 것을 특징으로 한다.(a) installing a retaining wall along the boundary of the building to be constructed, and constructing a frame pillar in the inner ground thereof; (b) exploding the ground of the soil wall to expose the upper portion of the soil wall and the frame pillar; (c) each supporting girders are installed on the supporting beams by installing a lower bracket on the corresponding H-pile of the retaining wall, and then installing a support beam on two adjacent lower brackets, and then supporting and fixing one end on the support beam. Installing between the frame pillars; (d) fixing the inner reinforcement beams through the gusset plate at the same height as the support girder between one end of each neighboring two support girders installed between the retaining wall and the frame pillar; (e) installing a deck plate in the slab space above the support girder and the inner reinforcement beams; (e) Forming means for forming the slab interface along the interface between the slab space and the underground retaining wall space on the support girder and the inner reinforcement beam, and connecting the support frame structure between the retaining wall and the slab space in the underground retaining wall space Steps; (g) constructing the slab by placing concrete in the slab space bounded by the formwork means; (h) constructing the slabs of the entire basement layer by repeating step (b) to (g) down to the lower layer step by step; (i) installing the formwork of the basement retaining wall and placing concrete to perform the net construction of the basement retaining wall while going up from the lower floor to the upper floor; and characterized in that it comprises a.
특히, 상기 (e)단계에서, 상기 거푸집 수단으로 경계면 전구간을 따라 철망형 거푸집을 설치하고, 상기 지지틀 구조체로서 웨일에 스트럿들을 설치하여 제작한 복수개의 웨일 지지틀을 지하옹벽 공간에서 흙막이벽과 슬래브 공간 사이에 연속 배치하되, 상기 각 웨일을 흙막이벽의 H-파일에 설치한 상부 브라켓들 위에 횡으로 지지시키는 동시에 상기 각 스트럿의 단부를 상기 철망형 거푸집에 관통시켜 슬래브 공간 내에 삽입하고, 흙막이벽과 상기 웨일 사이에는 토압 전달을 위한 뒷채움부를 시공하는 것을 특징으로 한다.Particularly, in the step (e), a plurality of wale support frames are prepared by installing the wire mesh formwork along the entire boundary surface with the formwork means and installing the struts on the wales as the support frame structure. The slabs are continuously arranged between the slab spaces, and each of the wales is horizontally supported on the upper brackets installed on the H-pile of the wall, and the end of each strut is inserted into the slab space by inserting the end of the strut into the slab space. Between the wall and the wale is characterized in that the backfill for the earth pressure transmission.
다른 실시예로서, 상기 (e)단계에서, 상기 거푸집 수단으로 경계면 전구간을 따라 철망형 거푸집을 설치하고, 상기 지지틀 구조체로서 복수개의 그레이팅 지지틀을 지하옹벽 공간에서 흙막이벽과 슬래브 공간 사이에 연속 배치하되, 양측의 두 엔드 플레이트와, 이 두 엔드 플레이트 사이에서 끝단이 상기 엔드 플레이트에 고정되어 설치되는 복수개의 플랫 바와, 이 플랫 바에 횡으로 고정되어 설치되는 복수개의 크로스 철근으로 이루어진 그레이팅 지지틀을 사용하고, 상기 두 엔드 플레이트 중 일측의 엔드 플레이트를 상기 거푸집 수단 바깥쪽으로 내측보강보 위에, 타측의 엔드 플레이트를 흙막이벽의 H-파일에 설치한 상부 브라켓들 위에 고정 지지시키는 한편, 흙막이벽과 상기 타측의 엔드 플레이트 사이에는 토압 전달을 위한 뒷채움부를 시공하는 것을 특징으로 한다.In another embodiment, in the step (e), a wire mesh formwork is installed in the formwork along the entire boundary surface, and a plurality of grating support frames are continuously connected between the retaining wall space and the slab space in the basement wall space as the support frame structure. A grating support frame including two end plates on both sides, and a plurality of flat bars having ends fixed to the end plates between the two end plates, and a plurality of cross bars installed laterally fixed to the flat bars. One end of the two end plates on the inner reinforcement to the outside of the formwork means, while the other end plate is fixedly supported on the upper brackets installed on the H-pile of the retaining wall, while the retaining wall and the Between the end plates on the other side, a backfill for the earth pressure And that is characterized.
여기서, 상기 크로스 철근들이 상기 플랫 바의 윗부분과 아랫부분에 각각 고정되어 있는 그레이팅 지지틀을 사용하는 것을 특징으로 한다.Here, the cross bars are characterized in that using a grating support frame is fixed to the upper portion and the lower portion of the flat bar, respectively.
또는, 상기 크로스 철근들이 상기 플랫 바의 상하 중간부분을 관통하는 그레이팅 지지틀을 사용하는 것을 특징으로 한다.Alternatively, the cross bars are characterized in that using a grating support frame penetrating the upper and lower middle portions of the flat bar.
또한, 상기 지지틀 구조체로서 크로스 철근들이 플랫 바와 직각으로 배치된 직교형 그레이팅 지지틀과, 크로스 철근들이 플랫 바에 대해 경사방향으로 배치된 경사배치형 그레이팅 지지틀을 조합하여 사용하는 것을 특징으로 한다.In addition, the support frame structure is characterized by using a combination of orthogonal grating support frame cross bars are arranged at right angles to the flat bar, and inclined arrangement type grating support frame cross bars are arranged in an inclined direction with respect to the flat bar.
이하, 첨부한 도면을 참조하여 본 발명을 더욱 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.
본 발명은 흙막이벽으로서 SCW 또는 CIP가 시공된 경우에 적용될 수 있는 지 하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 관한 것이다. The present invention relates to a slab construction structure of the underground structure that can be applied when the SCW or CIP is constructed as a retaining wall, and a slab and underground retaining wall construction method is omitted using the same.
본 발명은 엄지말뚝으로서 H-파일이 수직 시공된 CIP나 SCW에 모두 적용될 수 있는 것이므로, 이하 본 명세서에서는 이들을 따로 구분하지 않고 '흙막이벽'으로 통칭하기로 한다.Since the present invention can be applied to both the vertical construction CIP or SCW as a thumb pile, it will be referred to collectively as 'soil wall' in the present specification without separating them.
도 3은 본 발명에 따른 슬래브 구축용 구조체의 제1실시예를 도시한 사시도이고, 도 4는 본 발명에 따른 슬래브 구축용 구조체의 제1실시예를 도시한 부분평면도로서 흙막이벽(100) 및 그 내부의 H-파일(101)을 횡방향으로 단면하여 도시하였다.Figure 3 is a perspective view showing a first embodiment of the slab construction structure according to the present invention, Figure 4 is a partial plan view showing a first embodiment of the slab construction structure according to the present invention the
또한, 도 5a는 도 4의 선 'A-A'를 따라 취한 단면도이고, 도 5b는 도 4의 선 'B-B'를 따라 취한 단면도이며, 도 6은 도 5b의 선 'C-C'를 따라 취한 단면도로서 내측보강보(113)의 단부와 지지거더(110)의 거싯 플레이트(gusset plate)(114)간 연결구조를 보여주는 도면이다.5A is a cross-sectional view taken along the line 'A-A' of FIG. 4, FIG. 5B is a cross-sectional view taken along the line 'B-B' of FIG. 4, and FIG. 6 is a line 'C-C' of FIG. 5B. As a cross-sectional view taken along a view showing a connection structure between the end of the
도 5a와 도 5b는 슬래브(deck slab)(102)가 시공된 상태이면서 지하옹벽이 시공되기 전 상태를 도시한 것으로, 도 5a는 지지거더가 설치되지 않은 위치, 즉 지지거더와 지지거더 사이의 위치에서 취한 단면도이고, 도 5b는 하부 브라켓(111), 받침보(112) 및 지지거더(110)를 함께 도시한 단면도이다.5A and 5B show a state where the
도 6에서는 연결구조를 명확히 보이기 위하여 내측보강보(113)와 거싯 플레이트(114), 이들을 체결하고 있는 체결수단(115), 지지거더(110)의 단면만을 도시하였다.6 shows only the cross section of the
또한, 도 7은 본 발명에 따른 제1실시예에서 내측보강보로 ㄷ-형강 대신 H-형강이 사용된 경우를 도시한 단면도이고, 도 8a와 도 8b는 각각 본 발명에 따른 제1실시예에서 흙막이벽에 상부 브라켓 및 웨일(wale), 스트럿(strut)이 설치된 상태를 도시한 정면도와 부분평면도이다.In addition, Figure 7 is a cross-sectional view showing a case in which the H-beam instead of the c-beam as the inner reinforcement beam in the first embodiment according to the present invention, Figures 8a and 8b is a first embodiment according to the present invention, respectively Is a front view and a partial plan view showing a state in which an upper bracket, a wale, and a strut are installed on the retaining wall.
먼저, 흙막이벽(100)으로서 SCW 또는 CIP를 시공한 뒤, 흙막이벽(100)에 각 지지거더(110)의 일단부를 지지하기 위한 거더 지지수단이 설치되며, 이 거더 지지수단은 흙막이벽(100)의 H-파일(101)에 고정 설치되는 하부 브라켓(111)과, 이 하부 브라켓(111) 위에 고정 지지되는 받침보(112)로 구성된다. First, after constructing the SCW or CIP as the
보다 상세히 설명하면, 우선 이웃한 두 H-파일(101)의 플랜지면이 외부로 노출되도록 H-파일(101)이 설치된 위치에서 흙막이벽(100)의 일부를 면갈이하고, 노출된 두 H-파일(101)의 플랜지면상에 하부 브라켓(111)을 용접하여 설치한다.In more detail, first, a portion of the
이 하부 브라켓(111)으로는 H-형강을 절단하여 사용할 수 있으며, 이 하부 브라켓(111)상에는 횡으로 지지되도록 받침보(112)가 용접 설치된다.The
상기 받침보(112)는 도 5b에서와 같이 지지거더(110)의 일단부를 직접 지지하기 위한 것으로서, H-형강의 사용이 가능하다.The
그리고, 데크 플레이트(116)를 지지하기 위한 철골보 구조물인 지지거더(110)가 각 위치에 설치되는데, 이때 각 지지거더(110)는 일단부가 상기 받침보(112)에 의해 지지되고, 반대쪽 타단부가 종래와 마찬가지로 미도시된 골조용 기둥에 지지된다.In addition, the
여기서, 각 지지거더(110)의 일단부는 받침보(112) 위에 지지된 상태로 용접 되며, 결국 지지거더(110)는 일단부가 받침보(112)와 하부 브라켓(111)을 매개로 하여 흙막이벽(100)의 H-파일(101)에 고정 지지되는 형태를 취하게 된다.Here, one end of each
상기 지지거더(110)의 일단부는 추후 시공되는 지하옹벽(도 12f에서 도면부호 103임)의 공간(도면상 옹벽 콘크리트 타설 라인의 좌측 공간) 내에 삽입되어 지하옹벽의 콘크리트 속에 완전 매립되도록 되어 있으며, 이와 같이 지하구조물에서 상기 지지거더(110)는 일단부가 지하옹벽 내에 매립되어 영구 구조체로 사용된다.One end of the
그리고, 이웃한 두 지지거더(110)의 일단부 사이에는 내측보강보(113)가 수평으로 길게 설치되며, 이 내측보강보(113)는 지지거더(110)와는 횡방향으로 배치되어 슬래브(102)와 지하옹벽간 경계부를 따라 길게 설치된다.In addition, the
상기 내측보강보(113)는 양 단부가 두 지지거더(110)에 설치된 거싯 플레이트(114)에 볼팅되어 고정되는데, 내측보강보의 단부가 거싯 플레이트를 매개로 지지거더의 일단부에 연결되는 구조는 도 6에 도시한 바와 같다.The
각 지지거더(110)의 일단부에서 내측보강보(113)의 단부가 지지되는 위치에는 지지거더(110) 양측 내부 공간에 각각 거싯 플레이트(114)가 용접되어 고정 설치되고, 각 거싯 플레이트(114)와 해당 방향쪽 내측보강보(113)의 단부가 중첩되는 대응면끼리 서로 볼팅되어 체결되는 바, 이에 의해 좌, 우측 내측보강보(113)가 지지거더(110)를 중심으로 양측으로 길게 고정 지지될 수 있게 된다.In the position where the end of the inner reinforcement beams 113 are supported at one end of each
상기 각 거싯 플레이트(114)는 일부가 지지거더(110)의 측방으로 돌출된 구조로 되어 있는 바, 이 돌출된 부분이 내측보강보(113)의 단부 대응면(수직부면)에 중첩된 상태로 볼팅되도록 되어 있다.Each
상기 내측보강보(113)로는 도 5a와 도 5b에 도시한 바와 같이 ㄷ-형강(channel)이 사용될 수 있으며, 이때 ㄷ-형강은 그 상면이 지지거더(110)의 상부 플랜지면과 동일 높이가 되도록 설치된다.As the
또는 도 7에 도시한 바와 같이 상기 내측보강보(113)로서 ㄷ-형강 대신 H-형강이 사용될 수 있으며, H-형강이 사용되는 경우에서도 ㄷ-형강이 사용될 때와 마찬가지로 거싯 플레이트(114)와 해당 방향쪽 H-형강의 단부가 중첩되는 대응면끼리 서로 볼팅되어 체결되고, 이에 의해 H-형강으로 실시된 내측보강보(113)가 지지거더(110)를 중심으로 양측으로 길게 고정될 수 있게 된다.Alternatively, as shown in FIG. 7, the inner reinforcement beams 113 may be H-beams instead of c-beams, and even when H-beams are used, the
상기 내측보강보(113)로 사용되는 H-형강은 상부 플랜지면이 지지거더(110)의 상부 플랜지면과 동일 높이가 되도록 설치된다.H-shaped steel used as the
그리고, 상기와 같이 지지거더(110)가 설치된 상태에서 지지거더(110) 위로는 슬래브 시공용 거푸집 구조체인 데크 플레이트(116)가 종래와 마찬가지로 설치되며, 슬래브 공간과 지하옹벽 공간의 경계면에는 거푸집 수단(117)이 설치된다.In addition, the
상기 거푸집 수단(117)은 슬래브(102)의 선시공 및 지하옹벽(103)의 후시공이 가능하도록 지지거더(110)와 내측보강보(113) 위에 슬래브 공간과 지하옹벽 공간의 경계면을 따라 설치되는 슬래브 경계면 성형을 위한 것으로서, 이는 철망형 거푸집(118)의 사용이 가능하다.The formwork means 117 is installed along the interface between the slab space and the underground retaining wall space on the
이 철망형 거푸집(118)은 통상 메탈 리브 라스(metal rib lath)라고 불리는 거푸집으로, 이는 철망 라스(lath)에 리브(rib)를 두어 제작된 거푸집이며, 현재 네트 거푸집 공법에서 사용되는 거푸집이다.The
상기 철망형 거푸집(118)은 내측보강보(113), 그리고 후술하는 스트럿(123) 및 연결철근(129a,129b)들과 용접하여 고정할 수 있다. The
상기와 같이 데크 플레이트(116)가 설치된 슬래브 공간과 지하옹벽 공간(종래의 테두리보 성형공간임)의 경계면을 따라 철망형 거푸집(118)이 설치됨으로써, 지하옹벽 공간과는 별개로 슬래브 공간에만 콘크리트를 우선적으로 타설할 수 있게 되며, 종래의 테두리보가 삭제된 채 슬래브(102) 시공 후 지하옹벽(도 12f의 도면부호 103임) 시공이 가능해진다.As described above, the
또한, H-파일(101)이 설치된 위치에서 흙막이벽(100)을 면갈이한 후 노출된 H-파일(101)의 플랜지면상에 상부 브라켓(119)을 용접하여 설치하며, 이 상부 브라켓(119)으로는 'ㄱ'자 단면의 앵글(angle)을 필요한 길이로 절단하여 사용할 수 있다.In addition, the surface of the H-
상기 상부 브라켓(119)과 하부 브라켓(111)이 모두 설치되는 H-파일(101)에서는 상부 브라켓(119)을 하부 브라켓(111) 상측으로 일정 거리를 두고 설치하며, 하부 브라켓(111)이 설치되지 않은 H-파일(101)에도 동일 높이로 하여 상부 브라켓(119)을 설치한다.In the H-
그리고, 상기 상부 브라켓(119)상에는 횡으로 지지되도록 웨일(122)을 용접하여 설치하는데, 도 8a와 도 8b의 바람직한 실시예에서와 같이, 흙막이벽(100)에서 이웃한 H-파일(101) 3개씩을 반복되는 하나의 단위로 하여, 3개 H-파일(101) 중 중간에 위치한 H-파일을 제외한 나머지 양쪽 2개의 H-파일에 상부 브라켓(119)을 설치하고, 2개의 상부 브라켓(119) 위에 웨일(122) 1개씩을 용접하여 설치할 수 있 다. In addition, the
상기 각 단위의 H-파일(101) 3개에 대하여 2개의 상부 브라켓(119)과 1개의 웨일(122)이 설치될 수가 있는 것이다.Two
또한, 상기 각 웨일(122)에는 횡방향 배치되는 복수개의 스트럿(123)이 일정 간격으로 설치되는데, 이 스트럿(123)들은 일단부가 해당 웨일(122)에 용접된 상태로 타단부가 슬래브 공간 내에 삽입되어 설치된다.In addition, a plurality of
여기서, 상기 각 스트럿(123)은 일단부가 슬래브 공간과 지하옹벽 공간의 경계면에 설치되는 철망형 거푸집(118)의 절개부위를 통과하여 슬래브 공간 내측으로 삽입된다. Here, each of the
상기 웨일(122)으로는 ㄷ-형강(channel)을 사용할 수 있으며, 이 ㄷ-형강은 개구되는 방향을 달리하여 도 9의 (a)도면 또는 (b)도면과 같이 설치할 수 있다.The w-
도 9에서 (a)도면의 예는 웨일(122)의 개구되는 방향이 슬래브(102)를 향하도록 한 것으로, 우측의 스트럿(123)들이 웨일(122)의 내측면에 단부가 용접되어 설치되고, 웨일(122)의 반대쪽 외측면과 흙막이벽(100) 사이에는 콘크리트가 뒷채움된다.In the example of FIG. 9A, the opening direction of the
반면, (b)도면의 예는 웨일(122)의 개구되는 방향이 흙막이벽(100)을 향하도록 한 것으로, 우측의 스트럿(123)들이 웨일(122)의 외측면에 단부가 용접되어 설치되고, 웨일(122)의 내부공간을 포함한 흙막이벽(100)과의 사이에 콘크리트가 뒷채움된다.On the other hand, (b) the drawing is such that the opening direction of the
그리고, 상기 스트럿(123)으로는 도 10의 단면을 갖는 여러 종류의 길이부재 중에 선택된 하나가 사용될 수 있다.As the
도 10은 본 발명에서 스트럿으로 사용 가능한 각 부재의 예를 도시한 단면도로서, 상기 스트럿(123)으로 (a)'ㄱ'자 단면의 앵글, (b)ㄷ-형강(채널부재), (c)스틸 바(steel bar), (d)원형 파이프, (e)각형 파이프 중에 선택된 하나가 사용될 수 있다.10 is a cross-sectional view showing an example of each member that can be used as a strut in the present invention, the angle of the (a) 'a' cross section, (b) c-beam (channel member), (c) to the
본 발명에서 상기 2개의 상부 브라켓(119)에 의해 지지되는 1개의 웨일(122)과, 이 웨일(122)에 설치된 복수개의 스트럿(123)은 1조의 웨일 지지틀(121)을 구성하며, 전술한 바와 같이 흙막이벽(100)의 H-파일(101) 3개씩 마다 1조의 웨일 지지틀(121)이 동일하게 반복 설치되어, 전체적으로는 지지틀 구조체(120)로서 흙막이벽(100)과 슬래브 공간 사이에 복수개의 웨일 지지틀(121)이 연결 설치된다.In the present invention, one
이와 같이 상기 지지틀 구조체(120)는 흙막이벽(100)과 슬래브(102)간 힘 전달이 가능하도록 지하옹벽 공간에서 흙막이벽(100)과 슬래브 공간 사이에 연결 설치되는 것으로, 흙막이벽(100)과 슬래브 공간 사이에 연속 배치되는 복수개의 웨일 지지틀(121)로 구성된다.As such, the
상기 각 웨일 지지틀(121)의 크기는 현장 작업조건에 따라 적절히 조정한다. The size of each
바람직하기로는, 상기 각 웨일 지지틀(121)이 흙막이벽(100)으로부터 전해지는 불균등 토압에 의해 비틀리지 않도록 하기 위하여, 도 8b에 도시한 바와 같이 복수개의 비틀림방지용 버팀부재(124)를 설치하며, 각 버팀부재(124)는 이웃한 두 스트럿(123) 사이에 경사방향으로 설치한다.Preferably, in order to prevent each of the wale support frames 121 from being twisted by the uneven earth pressure transmitted from the retaining
상기 버팀부재(124)는 스트럿(123)의 상면에 용접되어 설치되는데, 'ㄱ'자 단면의 앵글이나 바(bar) 등의 금속 길이부재로 실시 가능하며, 바람직한 설치예로서 2개의 버팀부재(124)가 3개의 스트럿(123)에 경사방향으로 설치되되, 중앙에 위치된 스트럿(123)의 흙막이벽(100)쪽 일단부에 두 버팀부재(124)의 일단부가 용접되고, 두 버팀부재(124)의 타단부가 좌우 측방으로 위치된 스트럿(123)의 슬래브(102)쪽 타단부에 용접된다. The
그리고, 상기와 같이 각 구조체를 설치한 상태에서 흙막이벽(100)과 웨일(122) 사이의 공간에는 뒷채움부(125a)를 시공하여, 이 뒷채움부(125a)에 의해 흙막이벽(100)과 웨일(122)이 서로 연결되도록 한다.Then, the
상기 뒷채움부(125a)는 흙막이벽(100)으로부터 전해지는 토압을 웨일(122)로 전달하는 역할을 하며, 이와 같이 웨일(122)로 전달된 토압은 스트럿(123)들을 통해 슬래브(102)로 고르게 분산될 수 있게 된다.The
뒷채움부의 시공예로서, 흙막이벽과 웨일 사이의 공간 전체에 무근 콘크리트 채움을 하거나, 또는 흙막이벽과 웨일 사이의 공간에 H-형강이나 ㄷ-형강(채널)의 토막을 복수 위치에 끼워 넣는 것으로 실시될 수 있다. As an example of the construction of the backfill, it is performed by filling the entire concrete space between the retaining wall and the wale or inserting a piece of H-beam or c-shaped steel into the space between the retaining wall and the wale in multiple positions. Can be.
우선, 도 4에 도시한 바와 같이 흙막이벽(100)과 웨일(122) 사이의 공간 전체에 무근 콘크리트 채움을 하기 위하여, 이웃한 상부 브라켓(119) 위에 복수 가닥의 철근(126)들을 횡으로 지지시켜 설치한 후, 그 위에 철망형 거푸집(127)을 깔고, 이 철망형 거푸집(127) 위에 콘크리트를 대략 웨일(122) 높이까지 채움하여(도 5a 및 도 5b 참조), 공간의 전구간에 걸쳐 무근 콘크리트 뒷채움부(125a)를 형성한다.First, as shown in FIG. 4, the plurality of strands of reinforcing
또는 도 11a와 도 11b에서와 같이 뒷채움부(125b)로서 H-형강이나 ㄷ-형강의 토막(125c)들을 사용하는 경우, 각 형강 토막(125c)을 H-파일(101)이 시공되지 않은 위치에서 흙막이벽(100)과 웨일(122) 사이에 끼워 넣는다. Alternatively, when using H-beam or c-
한편, 첨부한 도면에서 도면부호 128은 내측보강보(113)의 상면에 그 길이방향을 따라 등간격으로 용접 설치되는 스터드를 나타내고, 도면부호 129a 및 129b는 각각 철망형 거푸집(118)을 통과하여 슬래브 공간과 지하옹벽 공간에 연결 설치되는 상부 연결철근 및 하부 연결철근을 나타낸다.Meanwhile, in the accompanying drawings,
상기 내측보강보(113) 상면의 스터드(128)는 슬래브(102) 시공 후 그 콘크리트 속에 매립되어 슬래브(102)와 내측보강보(113)간 결착력을 증대시키는 역할을 하며, 상기 상부 및 하부 연결철근(129a,129b)은 슬래브(102)와 지하옹벽(103)간 접합부의 전구간을 따라 상하 각 위치에 설치되어 추후 콘크리트 시공되는 슬래브(102)와 지하옹벽(도 12f에서 도면부호 103임)을 구조적으로 연결하게 된다.The
결국, 본 발명에서는, 종래의 테두리보가 설치되지 않더라도, 흙막이벽(100)의 H-파일(101)에 용접된 하부 브라켓(111), 이 하부 브라켓(111) 위에 고정된 받침보(112), 이 받침보(112) 위에 고정된 지지거더(110) 및 이 지지거더(110)에 의해 지지되는 내측보강보(113), 이 내측보강보(113)와 슬래브(102)를 상호 결착하는 스터드(128), 슬래브(102)와 지하옹벽(103)을 연결하는 상,하부 연결철근(129a,129b)에 의하여, 흙막이벽(100), 슬래브(102) 및 지하옹벽(도 12f에서 103임)이 구조적으로 안정되게 일체화될 수 있게 된다. As a result, in the present invention, even if a conventional rim beam is not installed, the
도면부호 131a, 131b는 지하옹벽의 순타시공시 옹벽 공간 내에 수직으로 설 치되는 수직철근(옹벽철근)을 나타내며, 이 수직철근으로 내부쪽 수직철근(131a)과 외부쪽 수직철근(131b)이 함께 설치된다.
여기서, 도 11a에서와 같이 내부쪽 수직철근(131a)은 철망형 거푸집(118) 바로 바깥쪽 옹벽 공간 내에 상하 수직으로 설치되고, 외부쪽 수직철근은 웨일(122)을 기준으로 바깥쪽(도면상의 좌측 P1 위치) 또는 안쪽(도면상의 우측 P2 위치)에 상하 수직으로 설치된다.Here, as shown in FIG. 11A, the inner
그리고, 도 4에서와 같이 흙막이벽(100)과 웨일(122) 사이 공간의 전구간에 대하여 무근 콘크리트 뒷채움부(125a)를 시공하는 경우에는 상기 외부쪽 수직철근(131b)을 웨일(122)의 안쪽(P2 위치)에 설치한다.In addition, when constructing the plain
상기 수직철근(131a,131b)들은 순타시공된 지하옹벽(103)의 콘크리트 내에서 상층과 하층의 지하옹벽을 연결하게 된다. The vertical reinforcing
이하, 상기와 같이 이루어진 슬래브 구축용 구조체를 이용하여 지하층의 슬래브 및 지하옹벽을 시공하는 과정을 도 12a ~ 도 12f를 참조하여 설명하면 다음과 같다.Hereinafter, a process of constructing the slab and the base retaining wall of the basement layer using the slab construction structure made as described above will be described with reference to FIGS. 12A to 12F.
우선, 종래와 동일하게, 시공되는 건물의 경계선을 따라 흙막이벽(100)을 설치하고, 그 안쪽 지중에 골조용 기둥(도시하지 않음)을 시공한 후, 1차로 소정 깊이의 터파기를 진행하여 흙막이벽(100)과 골조용 기둥의 상부 일부가 노출되도록 한다(도 12a).First, as in the prior art, after installing the
이어, 흙막이벽(100)의 해당 H-파일(101)에 각각 하부 브라켓(111)을 설치한 뒤 이 하부 브라켓(111) 위에 받침보(112)를 설치하고, 이어 상기 받침보(112) 위 에 지지거더(110)의 일단부를 지지시켜 고정하는 방법으로(도 5b 참조), 각 지지거더를 받침보와 골조용 기둥 사이(흙막이벽과 골조용 기둥 사이)에 설치하며, 골조용 기둥들 사이에도 종래와 동일한 방법으로 지지거더를 설치한다. Subsequently, after installing the
이때 상기 받침보(112) 위에 지지되는 각 지지거더(110)의 일단부는 도 5b에서와 같이 지하옹벽 공간 내에 삽입된 상태가 되며, 골조용 기둥 위치에서 지지거더의 타단부를 지지수단에 의해 지지시키는 방법 및 지지거더와 골조용 기둥간 연결구조는 종래와 동일하므로 도 12a ~ 도 12f에서는 도시를 생략하였다. At this time, one end of each
이후, 흙막이벽(100)과 골조용 기둥 사이에 설치된 이웃한 두 지지거더(110)의 일단부 사이에 내측보강보(113)를 지지거더(110)와 동일 높이로 하여 거싯 플레이트(114)를 매개로 수평으로 길게 고정 설치한다(도 4와 도 5b 참조).Thereafter, the
이후, 상기 지지거더(110) 및 내측보강보(113) 위의 모든 슬래브 공간에 데크 플레이트(116)를 지지시켜 설치하고, 슬래브(102)의 선시공 및 지하옹벽(103)의 후시공이 가능하도록, 상기 지지거더(110)와 내측보강보(113) 위에 슬래브 공간과 지하옹벽 공간의 경계면을 따라서는 슬래브(102)의 경계면 성형을 위한 거푸집 수단, 즉 철망형 거푸집(118)을 설치한다.Thereafter, the
이후, 흙막이벽(100)의 해당 H-파일(101)에 각각 상부 브라켓(119)을 설치하고, 지하옹벽 공간에서 흙막이벽(100)과 슬래브 공간 사이에 전술한 바의 지지틀 구조체(120)를 연결 설치하는데, 이때 지지틀 구조체(120)를 구성하는 각 웨일(122)은 상부 브라켓(119) 위에 지지시켜 고정하게 되고, 각 스트럿(123)은 철망형 거푸집(118)을 관통시켜 단부가 슬래브 공간 내에 삽입되도록 한다. Thereafter, the
또한, 웨일(122)의 뒷채움부(125a) 시공, 내측보강보(113) 상면의 스터드(128) 설치, 슬래브 공간과 지하옹벽 공간 사이의 연결철근(129a,129b) 설치 작업을 한다. In addition, the construction of the
이와 같이 본 발명의 슬래브 구축용 구조체(104)를 구성하는 각 요소를 해당 위치에 모두 설치한 후에는 철망형 거푸집(118)을 경계로 하는 도면상 우측의 슬래브 공간 내에 우선적으로 콘크리트를 타설하여 슬래브(102)를 시공하며, 이때 지하옹벽 공간 내에는 콘크리트를 타설하지 않는다(도 12b).Thus, after installing all the elements constituting the
슬래브(102)의 시공이 완료되면, 그 하층의 슬래브(102)를 동일하게 작업하여 시공하고, 이후 계속해서 하층으로 내려가면서 단계적으로 작업을 반복하여 전 지하층의 슬래브(102)를 모두 시공한다(도 12c).When the construction of the
이와 같이 지하옹벽 공간(종래 테두리보 성형공간 포함) 내에 콘크리트가 타설되지 않은 상태에서 슬래브(102)의 시공이 우선적으로 완료되므로, 지하옹벽 시공 전에 흙막이벽(100)과 슬래브(102)를 연결하던 종래의 테두리보는 모두 생략되고, 대신 슬래브(102)의 콘크리트 하중을 지지거더(110)와 웨일 지지틀(121)이 분산 지지하게 된다.Thus, since the construction of the
기초층 및 전 지하층의 슬래브(102) 시공을 모두 완료한 후(도 12d)에는 지하옹벽(103) 시공을 하게 되는데, 지하옹벽 공간 내에 수직철근(131a,131b)을 설치하고, 이어 종래와 같이 옹벽 콘크리트 타설 라인을 따라 거푸집(도시하지 않음)을 고정 설치한 다음, 거푸집 내부에 콘크리트를 타설하여 실시하며, 순타시공, 즉 하층부터 상층으로 올라가면서 시공을 한다(도 12e 및 도 12f).After completing the construction of the
결국, 상기 과정을 통하여 테두리보가 생략된 지하층의 슬래브(102) 및 지하옹벽(103) 시공이 가능해진다. As a result, the construction of the
이와 같이 하여, 종래에는 상층과 하층의 지하옹벽 사이에 테두리보가 반드시 설치됨에 따라, 테두리보 상, 하면과 옹벽간에 누수문제를 일으키는 접합면이 발생하였고, 특히 콘크리트 수축에 따른 테두리보 하면과 옹벽 상단 접합면간의 틈새 발생이 큰 문제로 지적되었으나, 본 발명에 따른 슬래브 및 지하옹벽 시공에 의하면, 테두리보 삭제에 의해 상, 하층 두 옹벽간에 접합면 1개소(시공 조인트)만이 발생하여 누수방지에 더 효과적이다.In this way, in the prior art, since the edge beam is necessarily installed between the upper and lower basement retaining walls, a joint surface causing leakage problems occurs between the edge compensation, the lower surface and the retaining wall. Although the generation of gaps between the joint surfaces has been pointed out as a big problem, according to the construction of the slab and the underground retaining wall according to the present invention, only one joint surface (construction joint) is generated between the upper and lower retaining walls due to the elimination of the rim beam, thereby preventing leakage. effective.
또한, 종래의 테두리보와 상, 하층 옹벽간을 연결하던 연결철근이 필요 없게 되는 동시에 테두리보에 들어가던 철근량이 줄어들어 경제적이며, 옹벽 콘크리트 타설을 위한 충전파이프를 테두리보에 매입할 필요가 없으므로 시공성도 좋아진다.In addition, there is no need for connecting reinforcing bar beams and connecting upper and lower retaining walls, and at the same time, the amount of reinforcing bars is reduced and economical, and there is no need to purchase filling pipes for retaining wall concrete castings. Also gets better.
한편, 도 13은 본 발명에 따른 슬래브 구축용 구조체의 제2실시예를 도시한 부분평면도이고, 도 14a는 도 13의 선 'D-D'를 따라 취한 단면도로서 내측보강보(113)로 ㄷ-형강을 사용한 예를 도시한 도면이며, 도 14b는 내측보강보(113)로 H-형강을 사용한 예를 도시한 도면이다.On the other hand, Figure 13 is a partial plan view showing a second embodiment of the slab construction structure according to the present invention, Figure 14a is a cross-sectional view taken along the line 'D-D' of Figure 13 c as the
도 13에서는 뒷채움부(125b)로서 H-형강이나 ㄷ-형강의 토막(125c)들이 설치된 예를 도시하였으나, 도 14a와 도 14b에는 뒷채움부(125a)로서 무근 콘크리트 채움을 한 예로 도시하였음을 미리 밝혀둔다. FIG. 13 illustrates an example in which H-shaped or c-shaped
본 제2실시예의 구성에서 제1실시예와 동일한 구성에 대해서는 앞서 상세히 설명하였으므로 그 설명을 생략하기로 한다.In the configuration of the second embodiment, the same configuration as in the first embodiment has been described above in detail, and thus description thereof will be omitted.
도시한 바와 같이, 본 제2실시예의 경우, 데크 플레이트(116)가 설치되고 콘크리트 선시공이 이루어지는 슬래브 공간과, 슬래브(102) 시공 후 콘크리트 후타설이 이루어지는 지하옹벽 공간의 경계면에 철망형 거푸집 대신 엔드 플레이트(132)가 위치된다.As shown, in the second embodiment, the
이 엔드 플레이트(132)는 웨일 지지틀(121)을 구성하는 스트럿(123)들의 슬래브(102)쪽 단부 끝단에 공통으로 용접되어 슬래브(102)의 경계면 위치 전구간을 따라 설치되며, 내측보강보(113) 및 지지거더(미도시됨) 위에 고정 지지된다.The
이와 같이 엔드 플레이트(132)가 설치되면서 스트럿(123)이 슬래브 공간 내에 삽입될 수 없고, 또한 슬래브 공간의 연결철근(129a,129b)들을 엔드 플레이트(132)를 관통하여 지하옹벽 공간으로 연결 설치하기는 어렵기 때문에, 본 제2실시예에서는 스터드를 통한 힘전달이 이루어지도록 한다.As the
즉, 내측보강보(113)의 상면에 그 길이방향을 따라 등간격으로 스터드(128)를 용접 설치하고, 내측보강보(113)의 수직부면에는 지하옹벽 공간 내에 삽입될 수 있게 스터드(133)를 길이방향을 따라 등간격으로 용접 설치한다.That is, the
상기 수직부면에 설치되는 스터드(133)는 상하 2열로 설치할 수 있으며, 슬래브(102) 시공 후 내측보강보(113) 상면의 스터드(128)는 슬래브 콘크리트 속에, 지하옹벽 시공 후 수직부면의 스터드는 지하옹벽 콘크리트 속에 매립되어, 결국 슬래브(102)와 지하옹벽은 상기 내측보강보(113)와 스터드(128,133)를 매개로 하여 안정적으로 연결되게 된다.The
필요에 따라서는 추가적으로 슬래브 공간 내에 배근된 상부 연결철근(129a) 과 하부 연결철근(129b)의 일단을 상기 엔드 플레이트(132)에 용접하여 연결시킨다.If necessary, one end of the upper connecting
한편, 도 15는 본 발명에 따른 슬래브 구축용 구조체의 제3실시예를 도시한 부분평면도이고, 도 16은 도 15의 선 'E-E'를 따라 취한 단면도이다.On the other hand, Figure 15 is a partial plan view showing a third embodiment of the slab construction structure according to the present invention, Figure 16 is a cross-sectional view taken along the line 'E-E' of FIG.
도 15에서는 뒷채움부(125b)로서 H-형강이나 ㄷ-형강의 토막(125c)들이 설치된 예를 도시하였으나, 도 16에는 뒷채움부(125a)로서 무근 콘크리트 채움을 한 예로 도시하였음을 미리 밝혀둔다. FIG. 15 shows an example in which H-shaped or c-shaped
본 제3실시예의 구성에서 제1실시예와 동일한 구성에 대해서는 앞서 상세히 설명하였으므로 그 설명을 생략하기로 한다.In the configuration of the third embodiment, the same configuration as that of the first embodiment has been described above in detail, and thus description thereof will be omitted.
도시한 바와 같이, 본 제3실시예의 경우, 슬래브 공간과 지하옹벽 공간의 경계면에 철망형 거푸집(118)을 제1실시예와 동일하게 설치하나, 스트럿(123)을 철망형 거푸집(118)을 관통하지 않게 설치한다.As shown, in the third embodiment, the
단, 각 스트럿(123)의 슬래브(102)쪽 끝단에 사각형의 개별 엔드 플레이트(134)를 용접하여 설치하고, 이 엔드 플레이트(134)의 이면에는 철망형 거푸집(118)을 관통하여 슬래브 공간 내에 삽입되는 스터드(135)를 용접하여 설치한다.However, a rectangular
상기 각 엔드 플레이트(134)는 내측보강보(113) 및 지지거더(미도시됨) 위에 지지되도록 하여 고정하며, 엔드 플레이트(134)의 위치를 제외한 나머지 철망형 거푸집(118) 전구간에 상, 하부 연결철근(129a,129b)을 관통시켜 설치한다.Each
상기 상, 하부 연결철근(129a,129b)은 제1실시예의 것과 동일하게 슬래브 공간과 지하옹벽 공간에 연결 설치되어, 추후 콘크리트 시공된 슬래브(102)와 지하옹 벽을 구조적으로 연결하게 된다.The upper and lower connecting reinforcing
또한, 내측보강보(113)의 상면에도 제1실시예와 동일하게 그 길이방향을 따라 등간격으로 스터드(128)가 용접 설치된다.In addition, the
결국, 흙막이벽(100)과 슬래브(102)는 내측보강보(113) 및 스터드(128)와 도시하지 않은 하부 브라켓, 받침보 및 지지거더에 의해 연결되고, 또한 지하옹벽과 슬래브(102)는 스트럿(123), 엔드 플레이트(134), 스터드(135), 연결철근(129a,129b)에 의해 연결된다.As a result, the retaining
한편, 도 17은 본 발명에 따른 슬래브 구축용 구조체의 제4실시예를 도시한 사시도이고, 도 18은 본 발명에 따른 슬래브 구축용 구조체의 제4실시예를 도시한 부분평면도이며, 도 19은 도 18의 선 'F-F'를 따라 취한 단면도이다.On the other hand, Figure 17 is a perspective view showing a fourth embodiment of the slab construction structure according to the present invention, Figure 18 is a partial plan view showing a fourth embodiment of the slab construction structure according to the present invention, Figure 19 is 18 is a cross-sectional view taken along the line 'F-F' in FIG. 18.
또한, 도 20은 본 발명에 따른 제4실시예에서 엔드 플레이트의 형상을 달리하여 제작한 그레이팅 지지틀의 여러 예를 도시한 단면도이고, 도 21은 본 발명에 따른 제4실시예에서 크로스 철근의 배치방향을 달리하여 제작한 그레이팅 지지틀의 여러 예를 도시한 평면도이며, 도 22는 도 21에 도시한 그레이팅 지지틀의 설치예를 도시한 평면도이다. 20 is a cross-sectional view showing various examples of the grating support frame manufactured by varying the shape of the end plate in the fourth embodiment according to the present invention, and FIG. 21 is a cross-sectional view of the cross rebar in the fourth embodiment according to the present invention. It is a top view which shows the various example of the grating support frame manufactured by changing an arrangement direction, and FIG. 22 is a top view which shows the installation example of the grating support frame shown in FIG.
그리고, 도 23은 본 발명에 따른 제4실시예에서 크로스 철근이 플랫 바의 상하 중간부분을 관통하도록 하여 제작된 그레이팅 지지틀의 예를 도시한 단면도이다.And, Figure 23 is a cross-sectional view showing an example of the grating support frame manufactured by allowing the cross bars to penetrate the upper and lower middle portions of the flat bar in the fourth embodiment according to the present invention.
본 제4실시예는, 지하옹벽 공간에서 흙막이벽(100)과 슬래브 공간 사이에 연결 설치되는 지지틀 구조체(120)로서, 제1실시예와 비교하여, 웨일, 스트럿, 버팀 부재로 이루어진 웨일 지지틀이 사용되는 대신에, 플랫 바(flat bar)(144b), 크로스 철근(144c), 엔드 플레이트(142a,142b)로 이루어진 그레이팅 지지틀(141)이 사용되는 것에 차이가 있는 것이다.The fourth embodiment is a
본 제4실시예에서 웨일 지지틀을 대신하여 그레이팅 지지틀(141)을 사용한 것을 제외하고는 나머지 구성요소는 앞서 설명한 제1실시예와 모두 동일하다.Except for using the
상기 그레이팅 지지틀(141)은 도로 하수구 등에 이미 널리 사용되고 있는 그레이팅의 공지된 형태와 유사한 구조로 되어 있으며, 그 구조를 보다 상세히 설명하면 다음과 같다. The
상기 각 그레이팅 지지틀(141)은 나란히 배치된 양측의 두 엔드 플레이트(142a,142b)와, 이 두 엔드 플레이트(142a,142b) 사이에서 등간격으로 나란히 배치되고 끝단이 상기 엔드 플레이트(142a,142b)에 고정되어 설치되는 복수개의 플랫 바(144b)와, 상기 플랫 바(144b)에 대해 횡으로 배치되어 각각 플랫 바(144b)의 윗부분과 아랫부분에 고정되어 설치되는 복수개의 크로스 철근(144c)으로 구성된다.Each of the grating support frames 141 is disposed side by side at equal intervals between the two
여기서, 상기 크로스 철근(144c)들은 등간격 배치된 플랫 바(144b)들의 윗부분과 아랫부분에 직접 고정되어 있으며, 각 그레이팅 지지틀(141)에서 플랫 바(144b)들과 크로스 철근(144c)들이 양측의 두 엔드 플레이트(142a,142b) 사이에서 격자구조를 이루어 고정된다.Here, the cross bars 144c are directly fixed to the upper and lower portions of the
상기 그레이팅 지지틀(141)은 요구되는 지지 하중을 적절히 고려한 강도 및 치수의 플랫 바(144b)들과 크로스 철근(144c)들을 조합하여서 제작되며, 각 그레이팅 지지틀(141)에서 양측의 두 엔드 플레이트(142a,142b)로는 도 20에 도시한 바와 같이 'ㄱ'자 단면의 앵글, 채널부재(ㄷ-형강), 평면 플레이트 중 선택된 하나를 사용하거나 선택된 둘을 혼합하여 사용할 수 있다.The
또한, 크로스 철근의 사용량을 줄이기 위하여, 도 20에 도시한 그레이팅 지지틀을 사용하는 대신에, 도 23에 도시한 바와 같이 크로스 철근(144c)들을 플랫 바(144b)의 상하 중간부분에 관통시켜 제작한 또 다른 형태의 그레이팅 지지틀(141)을 사용할 수도 있다.In addition, in order to reduce the amount of cross bars used, instead of using the grating support frame shown in FIG. 20, the cross bars 144c are formed by penetrating the upper and lower middle portions of the
상기한 구조의 그레이팅 지지틀(141) 복수개를 상기 내측보강보(113)와 상부 브라켓(119) 위에 연속 배치하여 용접 고정함으로써 흙막이벽(100)과 슬래브(102) 사이의 지지틀 구조체(120)를 구성하게 된다.The
상기 각 그레이팅 지지틀(141)을 고정함에 있어서, 일측의 엔드 플레이트(142a)는 슬래브(102) 경계면의 철망형 거푸집(118) 바깥쪽으로 내측보강보(113) 위에 지지시켜 용접하고, 타측의 엔드 플레이트(142b)는 이웃한 두 상부 브라켓(119)에 횡으로 지지시켜 용접한다.In fixing the
또한, 지지틀 구조체(120)를 설치함에 있어서, 도 21에 예시한 여러 형태의 그레이팅 지지틀(141)을 조합하여 사용할 수 있는데, 크로스 철근(144c)들의 배치방향을 플랫 바(144b)와 직각으로 배치하여 제작한 직교형(TYPE A)과, 크로스 철근(144c)들의 배치방향을 플랫 바(144b)에 대해 경사방향으로 배치하여 제작한 경사배치형(TYPE B, TYPE C)의 그레이팅 지지틀(141)을 사용할 수 있다.In addition, in installing the
여기서, 상기 경사배치형의 그레이팅 지지틀로는 크로스 철근(144c)들의 배치방향을 서로 반대로 한 두 가지 타입(TYPE B, TYPE C)의 그레이팅 지지틀 (141b,141c)이 사용될 수 있다. Here, as the inclined arrangement type grating support frame, grating support frames 141b and 141c of two types (TYPE B and TYPE C) having opposite arrangement directions of the cross bars 144c may be used.
도 22는 직교형 및 경사배치형 그레이팅 지지틀(141)들을 조합하여 설치한 예를 개략적으로 도시한 것으로, 경사배치형 그레이팅 지지틀(TYPE B, TYPE C)은 불평형 토압 작용시 찌그러짐을 방지하기 위하여 도 22에 도시한 바와 같이 필요한 부분에 직교형 그레이팅 지지틀(TYPE A)과 조합하여 사용된다. FIG. 22 schematically illustrates an example in which orthogonal and inclined grating support frames 141 are installed in combination, and the inclined batch grating support frames TYPE B and TYPE C prevent crushing during unbalanced earth pressure. In order to be used in combination with orthogonal grating support frame (TYPE A) to the required portion as shown in FIG.
본 제4실시예에서 그레이팅 지지틀(141)을 사용하는 것 외에 상부 브라켓(119), 하부 브라켓(111), 받침보(112), 지지거더(110), 데크 플레이트(116), 철망형 구조체, 내측보강보(113), 스터드, 연결철근, 뒷채움부(125a) 등의 각 구성은 제1실시예와 모두 동일하다.In addition to using the
여기서, 뒷채움부(125a)는 흙막이벽(100)과 그레이팅 지지틀(141)의 엔드 플레이트(142b) 사이에 시공되어 흙막이벽(100)과의 그레이팅 지지틀(141)간에 토압을 전달하는 역할을 하며, 그레이팅 지지틀(141)의 엔드 플레이트(142b) 면 전체에 균등한 토압이 전달될 수 있도록 무근 콘크리트 뒷채움부 형태로 시공하는 것이 바람직하다. Here, the
도 19는 상부 브라켓(119)에 고정 지지되는 엔드 플레이트(142b)로서 채널부재를 사용한 예를 도시한 것이며, 이 채널부재의 엔드 플레이트(142b)는 실시예 1의 웨일과 마찬가지로 개구되는 방향을 달리하여 (a)도면 또는 (b)도면과 같이 설치할 수 있다.19 shows an example in which the channel member is used as the
도 19에서 (a)도면의 예는 엔드 플레이트(142b)의 개구되는 방향이 슬래브(102)를 향하도록 한 것으로, 엔드 플레이트(142b)의 반대쪽 외측면과 흙막이벽 (100) 사이에 콘크리트가 뒷채움된다.In the example of (a) of FIG. 19, the opening direction of the
반면, (b)도면의 예는 엔드 플레이트(142b)의 개구되는 방향이 흙막이벽(100)을 향하도록 한 것으로, 엔드 플레이트(142b)의 내부공간을 포함한 흙막이벽(100)과의 사이에 콘크리트가 뒷채움된다.On the other hand, in the example of (b), the opening direction of the
제2 내지 제4실시예의 슬래브 구축용 구조체(104)를 사용하여 슬래브(102) 및 지하옹벽(103)을 시공하는 과정은 전술한 제1실시예의 슬래브 구축용 구조체(104)를 사용하는 경우에 준하여 실시된다.The process of constructing the
즉, 지지틀 구조체(120)를 포함하는 슬래브 구축용 구조체(104)를 설치한 후 슬래브(102)를 선시공하고, 추후 거푸집 및 수직철근(131a,131b)을 설치한 다음 지하옹벽(103)을 후시공하는 과정을 거치게 되며, 모두 테두리보가 삭제되는 동시에 상층과 하층의 지하옹벽에 대하여 상, 하층 두 옹벽간 접합면 1개소만이 발생하므로 누수가 효과적으로 방지될 수 있게 된다. That is, after installing the
이상에서 설명한 바와 같이, 본 발명에 따른 지하구조물의 슬래브 구축용 구조체와 이를 이용한 테두리보가 생략된 슬래브 및 지하옹벽 시공방법에 의하면 다음과 같은 장점이 있게 된다.As described above, according to the slab construction structure of the underground structure according to the present invention and the slab and underground retaining wall construction method omitted the edge beam using the same has the following advantages.
1)테두리보 삭제로 합판 거푸집 및 동바리가 불필요하여 그 사용에 따른 문제점이 해소되고, 따라서 시공성이 현저히 향상된다. 1) The elimination of the edge ribs eliminates the need for plywood formwork and bundling, thereby eliminating the problems associated with its use, thus significantly improving workability.
2)거푸집 옆판 등을 설치하기 위한 발판 작업이 불필요하므로 안전 관리에 절대적으로 유리하다. 2) It is absolutely advantageous for safety management because scaffolding work for installing formwork side panels is unnecessary.
3)목공작업, 거푸집 해체 작업 등이 필요 없게 되는 등 테두리보 시공에 따른 모든 문제점들이 해소될 수 있고, 따라서 설치작업의 간단화, 시공성 개선 및 공기 단축, 비용 절감이 가능해진다.3) All problems caused by the construction of the rim beam can be eliminated, such as eliminating the need for carpentry work, formwork dismantling work, etc., thus simplifying installation work, improving workability and reducing air, and reducing costs.
4)테두리보의 삭제에 따라 스터럽 및 보강 철근량 절감이 가능하고, 슬래브의 두께를 얇게 할 수 있다.4) By eliminating the edge ribs, it is possible to reduce the amount of stirrups and reinforcement bars and to reduce the thickness of the slab.
5)종래에는 상층과 하층의 지하옹벽 사이에 테두리보가 반드시 설치됨에 따라, 테두리보 상, 하면과 옹벽간에 누수문제를 일으키는 접합면이 발생하였고, 특히 콘크리트 수축에 따른 테두리보 하면과 옹벽 상단 접합면간의 틈새 발생이 큰 문제로 지적되었으나, 테두리보의 삭제에 따라 상, 하층 두 옹벽간에 접합면 1개소(시공 조인트)만이 발생하여 누수방지에 더욱 효과적이다.5) In the past, as the rim beam was necessarily installed between the upper and lower basement retaining walls, the joint surface causing leakage problems occurred between the rim compensation, the lower surface and the retaining wall. Although the gap of the liver was pointed out as a big problem, only one joint surface (construction joint) occurs between the upper and lower retaining walls due to the deletion of the rim beam, which is more effective in preventing leakage.
6)종래의 테두리보와 상, 하층 옹벽간을 연결하던 연결철근이 불필요하고 테두리보에 들어가던 철근량이 줄어들어 경제적이며, 옹벽 콘크리트 타설을 위한 충전파이프를 테두리보에 매입할 필요가 없으므로 시공성도 좋아진다.6) It is economical because there is no need for connecting reinforcing bar between the conventional rim beam and upper and lower retaining wall, and the amount of reinforcing bar is reduced. Lose.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050032213A KR100634726B1 (en) | 2005-04-19 | 2005-04-19 | Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050032213A KR100634726B1 (en) | 2005-04-19 | 2005-04-19 | Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100634726B1 true KR100634726B1 (en) | 2006-10-16 |
Family
ID=37626344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050032213A KR100634726B1 (en) | 2005-04-19 | 2005-04-19 | Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100634726B1 (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100938395B1 (en) | 2008-12-24 | 2010-01-21 | 재단법인 포항산업과학연구원 | Construction method of underground roadway using steel composite wall pile |
KR101005780B1 (en) | 2008-09-24 | 2011-01-06 | 이동희 | Underground Structure Construction Method for Crack Prevention of Underground Slab Concrete and Girder Concrete |
KR101027921B1 (en) | 2008-09-29 | 2011-04-12 | 이동희 | Underground Structure Construction Method for Crack Prevention of Underground Slab Concrete and Girder Concrete |
KR101037578B1 (en) | 2010-03-16 | 2011-05-27 | 주식회사 한빛구조엔지니어링 | Band member using span reinforcement and earth retaining method using same |
KR101198286B1 (en) | 2010-09-15 | 2012-11-07 | 주식회사 액트파트너 | Non-wale strut system for top-down construction and top-down construction method thereby |
KR101215764B1 (en) | 2011-05-13 | 2013-01-09 | 삼성중공업 주식회사 | A burial slab structure of an outer wall of an underground construction |
KR101296857B1 (en) * | 2011-08-24 | 2013-08-20 | 주식회사 세진에스씨엠 | Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same |
KR101483865B1 (en) | 2013-07-03 | 2015-01-19 | (주)더나은구조엔지니어링 | Construction Method of Underground Structure using Composite Wale |
KR20160110699A (en) * | 2015-03-11 | 2016-09-22 | (주)대우건설 | Structure for connecting earth retaining wall |
KR101713674B1 (en) * | 2015-11-05 | 2017-03-23 | 주식회사 한빛구조엔지니어링 | Underground slab structure and underground construction method using the same |
CN108104157A (en) * | 2018-01-26 | 2018-06-01 | 佛山科学技术学院 | A kind of T-shaped retaining wall |
KR102582018B1 (en) | 2022-04-28 | 2023-09-22 | 삼호엔지니어링 주식회사 | Steel beam reverse punching method using embedded edge beam at the end of steel beam |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH101957A (en) | 1996-06-14 | 1998-01-06 | Ohbayashi Corp | Underground construction method for building |
JPH101956A (en) | 1996-06-14 | 1998-01-06 | Ohbayashi Corp | Underground construction method for building |
KR200381303Y1 (en) | 2005-01-12 | 2005-04-14 | (주)한국건설공법 | Form system for joint between retaining wall and slab of basement floor |
KR100531385B1 (en) | 2004-09-17 | 2005-11-29 | 주식회사 한빛구조엔지니어링 | Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab |
-
2005
- 2005-04-19 KR KR1020050032213A patent/KR100634726B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH101957A (en) | 1996-06-14 | 1998-01-06 | Ohbayashi Corp | Underground construction method for building |
JPH101956A (en) | 1996-06-14 | 1998-01-06 | Ohbayashi Corp | Underground construction method for building |
KR100531385B1 (en) | 2004-09-17 | 2005-11-29 | 주식회사 한빛구조엔지니어링 | Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab |
KR200381303Y1 (en) | 2005-01-12 | 2005-04-14 | (주)한국건설공법 | Form system for joint between retaining wall and slab of basement floor |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101005780B1 (en) | 2008-09-24 | 2011-01-06 | 이동희 | Underground Structure Construction Method for Crack Prevention of Underground Slab Concrete and Girder Concrete |
KR101027921B1 (en) | 2008-09-29 | 2011-04-12 | 이동희 | Underground Structure Construction Method for Crack Prevention of Underground Slab Concrete and Girder Concrete |
KR100938395B1 (en) | 2008-12-24 | 2010-01-21 | 재단법인 포항산업과학연구원 | Construction method of underground roadway using steel composite wall pile |
KR101037578B1 (en) | 2010-03-16 | 2011-05-27 | 주식회사 한빛구조엔지니어링 | Band member using span reinforcement and earth retaining method using same |
KR101198286B1 (en) | 2010-09-15 | 2012-11-07 | 주식회사 액트파트너 | Non-wale strut system for top-down construction and top-down construction method thereby |
KR101215764B1 (en) | 2011-05-13 | 2013-01-09 | 삼성중공업 주식회사 | A burial slab structure of an outer wall of an underground construction |
KR101296857B1 (en) * | 2011-08-24 | 2013-08-20 | 주식회사 세진에스씨엠 | Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same |
KR101483865B1 (en) | 2013-07-03 | 2015-01-19 | (주)더나은구조엔지니어링 | Construction Method of Underground Structure using Composite Wale |
KR20160110699A (en) * | 2015-03-11 | 2016-09-22 | (주)대우건설 | Structure for connecting earth retaining wall |
KR101664668B1 (en) * | 2015-03-11 | 2016-10-13 | (주)대우건설 | Structure for connecting earth retaining wall |
KR101713674B1 (en) * | 2015-11-05 | 2017-03-23 | 주식회사 한빛구조엔지니어링 | Underground slab structure and underground construction method using the same |
CN108104157A (en) * | 2018-01-26 | 2018-06-01 | 佛山科学技术学院 | A kind of T-shaped retaining wall |
KR102582018B1 (en) | 2022-04-28 | 2023-09-22 | 삼호엔지니어링 주식회사 | Steel beam reverse punching method using embedded edge beam at the end of steel beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100951097B1 (en) | Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket | |
KR100927344B1 (en) | Construction method for connecting underground structure and underground structure using connection structure for underground construction | |
KR101331261B1 (en) | Underground prefabricated precast concrete rainwater recycling facility using precast concrete continuous wall in strut structure or earth anchor and construction method of the same | |
KR101687495B1 (en) | Partial top-down construction method for building underground structures | |
TWM428973U (en) | Building structure with stay-in-place mould | |
KR100401279B1 (en) | Method of building underground structure | |
KR100634726B1 (en) | Slab construction structure of underground structure and slab and underground retaining wall construction method without frame rib | |
KR101221970B1 (en) | Construction Method for Basement Structure without Temporary Structure | |
JP5619646B2 (en) | Construction method of underground structure and underground structure | |
KR101169462B1 (en) | Top-down construction method using post member | |
KR102362257B1 (en) | Top-down construction method | |
KR102269141B1 (en) | Deck plate wall installation method using underground pavement | |
JP5764245B2 (en) | Construction method of underground structure and underground structure | |
JP4037187B2 (en) | Underground structure construction method and underground structure | |
KR20200104534A (en) | Method for constructing underground structure busing PC integrating method without support | |
KR200381303Y1 (en) | Form system for joint between retaining wall and slab of basement floor | |
KR200370135Y1 (en) | Forms for edge girder construction | |
JP5828986B1 (en) | PC formwork material and foundation construction method using the same | |
KR101545713B1 (en) | Composite type cutoff wall of steel temporary facility and construction method of the same | |
CN210421120U (en) | Assembled hole pile dado system | |
JP7213154B2 (en) | Top slab construction method for shaft and top slab structure | |
KR200385376Y1 (en) | Form system for construction of underground slab | |
KR200383309Y1 (en) | Form system for construction of underground slab | |
KR20110034831A (en) | Non-fixed excavation method using steel pipe and perforated pipe | |
KR20220065461A (en) | WIRE STRUCTURE FOR STAGGERED LAPPING IN SLURRY WALL, SLURRY WALL and CONSTRUCTION METHOD FOR THE SAME |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20050419 |
|
PA0201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20060921 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20061010 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20061011 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
PR1001 | Payment of annual fee |
Payment date: 20091005 Start annual number: 4 End annual number: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20101005 Start annual number: 5 End annual number: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20111006 Start annual number: 6 End annual number: 6 |
|
FPAY | Annual fee payment |
Payment date: 20121008 Year of fee payment: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20121008 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20131001 Year of fee payment: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20131001 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20141006 Year of fee payment: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20141006 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20151001 Year of fee payment: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20151001 Start annual number: 10 End annual number: 10 |
|
FPAY | Annual fee payment |
Payment date: 20161004 Year of fee payment: 11 |
|
PR1001 | Payment of annual fee |
Payment date: 20161004 Start annual number: 11 End annual number: 11 |
|
FPAY | Annual fee payment |
Payment date: 20171010 Year of fee payment: 12 |
|
PR1001 | Payment of annual fee |
Payment date: 20171010 Start annual number: 12 End annual number: 12 |
|
FPAY | Annual fee payment |
Payment date: 20181008 Year of fee payment: 13 |
|
PR1001 | Payment of annual fee |
Payment date: 20181008 Start annual number: 13 End annual number: 13 |
|
FPAY | Annual fee payment |
Payment date: 20191010 Year of fee payment: 14 |
|
PR1001 | Payment of annual fee |
Payment date: 20191010 Start annual number: 14 End annual number: 14 |
|
PR1001 | Payment of annual fee |
Payment date: 20201110 Start annual number: 15 End annual number: 15 |
|
PR1001 | Payment of annual fee |
Payment date: 20211012 Start annual number: 16 End annual number: 16 |
|
PR1001 | Payment of annual fee |
Payment date: 20221011 Start annual number: 17 End annual number: 17 |
|
PR1001 | Payment of annual fee |
Payment date: 20231010 Start annual number: 18 End annual number: 18 |
|
PR1001 | Payment of annual fee |
Payment date: 20241010 Start annual number: 19 End annual number: 19 |