[go: up one dir, main page]

KR100275464B1 - A method of the service provisioning process for broadband access network - Google Patents

A method of the service provisioning process for broadband access network Download PDF

Info

Publication number
KR100275464B1
KR100275464B1 KR1019980043993A KR19980043993A KR100275464B1 KR 100275464 B1 KR100275464 B1 KR 100275464B1 KR 1019980043993 A KR1019980043993 A KR 1019980043993A KR 19980043993 A KR19980043993 A KR 19980043993A KR 100275464 B1 KR100275464 B1 KR 100275464B1
Authority
KR
South Korea
Prior art keywords
service
management system
subscriber network
broadband subscriber
anoss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1019980043993A
Other languages
Korean (ko)
Other versions
KR20000026463A (en
Inventor
조동권
이건복
하동석
김범수
황복규
최윤희
임현민
Original Assignee
이계철
한국전기통신공사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이계철, 한국전기통신공사 filed Critical 이계철
Priority to KR1019980043993A priority Critical patent/KR100275464B1/en
Publication of KR20000026463A publication Critical patent/KR20000026463A/en
Application granted granted Critical
Publication of KR100275464B1 publication Critical patent/KR100275464B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0896Bandwidth or capacity management, i.e. automatically increasing or decreasing capacities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/04Network management architectures or arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/32Specific management aspects for broadband networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/64Hybrid switching systems
    • H04L12/6418Hybrid transport
    • H04L2012/6478Digital subscriber line, e.g. DSL, ADSL, HDSL, XDSL, VDSL

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Telephonic Communication Services (AREA)

Abstract

1. 청구범위에 기재된 발명이 속하는 기술분야1. TECHNICAL FIELD OF THE INVENTION

본 발명은 광대역 가입자망 서비스의 가설관리 방법에 관한 것임.The present invention relates to a hypothesis management method of broadband subscriber network service.

2. 발명이 해결하고자 하는 기술적 과제2. Technical problem to be solved by the invention

본 발명은 광대역 가입자망 서비스 회선구성을 신속하게 처리하여, 서비스 가설 청약 신청을 한 고객에게 즉각적인 응대를 하는 광대역 가입자망 서비스 가설관리 방법을 제공하고자 함.The present invention is to provide a broadband subscriber network service hypothesis management method to promptly process the broadband subscriber network service circuit configuration, the immediate response to the customer who applied for a service hypothesis subscription.

3. 발명의 해결 방법의 요지3. Summary of the Solution of the Invention

본 발명은 광대역 가입자망 서비스 가설관리 방법에 있어서, 광대역 가입자망 운용관리 시스템이 서비스 공사명령을 수령하여, 서비스의 종류에 따라 분류하는 제 1 단계; 상기 광대역 가입자망 운용관리 시스템이 망자원의 경로선정을 하는 제 2 단계; 상기 광대역 가입자망 운용관리 시스템이 광대역 가입자망 전송장치의 포트선정 작업을 실시하는 제 3 단계; 및 상기 광대역 가입자망 운용관리 시스템이 개통시험을 실시하여, 양호하면 상기 서비스청약관리시스템에 준공 결과를 통보하고, 양호하지 않으면 망자원을 재선정하는 제 4 단계를 포함.The present invention provides a broadband subscriber network service hypothesis management method, comprising: a first step in which a broadband subscriber network operation management system receives a service construction order and classifies the service according to a type of service; A second step of the broadband subscriber network operation management system selecting a network resource; A third step of performing, by the broadband subscriber network operation management system, port selection of the broadband subscriber network transmitter; And a fourth step in which the broadband subscriber network operation management system performs an opening test, notifying the service subscription management system of completion of the service, and reselecting network resources if not satisfactory.

4. 발명의 중요한 용도4. Important uses of the invention

본 발명은 광대역 가입자망 서비스 가설관리에 이용됨The present invention is used for the provisional management of broadband subscriber network service

Description

광대역 가입자망 서비스 가설관리 방법Broadband subscriber network service hypothesis management method

본 발명은 광대역 가입자망을 기반으로 하여 수용되는 기존 서비스 및 신규 서비스의 가설을 지원하는 방법에 관한 것으로써, 특히 광대역 가입자망 서비스 가설을 위하여, 서비스 청약, 설치장소 변경, 서비스 해지 신청을 받아 서비스 신청에 따른 광대역 가입자망 시설을 선정하고 관련된 시설의 할당 및 설치업무를 수행하도록 하는 광대역 가입자망 서비스 가설관리 방법에 관한 것이다.The present invention relates to a method for supporting the hypothesis of existing services and new services that are accommodated based on broadband subscriber networks. In particular, for the hypothesis of broadband subscriber network services, a service subscription, a change in installation location, and a service termination request are received. The present invention relates to a broadband subscriber network service hypothesis management method for selecting a broadband subscriber network facility according to an application and performing assignment and installation of related facilities.

일반적으로, 동선을 기반으로한 일반 전화 가입자, 종합정보통신망(ISDN) 전화 가입자에 대한 가설 업무는 가입전화설치관리시스템(TIMS)에서 전산화하여 수행하고 있으며, 전용회선에 대한 서비스가설 업무는 전용회선영업관리시스템(CUSUS)에서 수행하고 있다.In general, temporary work for general telephone subscribers and ISDN telephone subscribers based on copper lines is carried out by computerization in the TMS (Telephone Installation Management System). It is performed by the sales management system (CUSUS).

이들 동선을 기반으로 한 서비스에 대한 가설 신청은 전화를 이용하여 한다. 그러나 광전송시스템(FLC)과 비대칭디지털가입자선로(ASDL)로 구성된 광대역 가입자망에 대한 가설 업무는 체계적으로 이루어지고 있지 않다. 즉, 광대역 가입자망이 제공할 수 있는 종합정보통신망(ISDN), 전용회선, 일반 전화, 비대칭디지털가입자선로(ASDL)를 이용한 고속 인터넷 서비스 등에 대한 망서비스 가설을 체계적으로 제공하기 위한 전산화 시스템이 존재하지 않는다.Application for hypotheses for services based on these routes is by telephone. However, the hypothesis work for broadband subscriber network composed of optical transmission system (FLC) and asymmetric digital subscriber line (ASDL) is not systematic. In other words, the computerized system to systematically provide the network service hypothesis for the integrated information communication network (ISDN), leased line, landline, and high-speed Internet service using the asymmetric digital subscriber line (ASDL) that can be provided by the broadband subscriber network. does not exist.

따라서, 가설 청약을 하는 고객은 서비스가 수용된 시설을 구별하여 기존 동선 시설인 경우는 기존의 가입전화설치관리시스템(TIMS), 전용회선영업관리시스템(CUSUS)에 서비스 가설청약을 신청하여야 하며, 서비스를 제공하는 시설이 광대역 시설인 경우는 가설청약 신청을 광대역 시설을 관리하는 전화국의 조직에 하여야만 한다.Therefore, customers who make a temporary offer must apply for the service provisional contract to the existing TMS and CUSUS in case of existing copper facilities. If the facility providing the services is a broadband facility, the application for a temporary offer shall be made to the organization of the telephone office administering the broadband facility.

그러나 고객은 서비스를 제공하는 시설이 광대역 시설인지 또는 기존의 동선 시설인지 구별할 수 없는 것이 일반적이므로, 가입자가 가설청약 신청을 가입전화설치관리시스템(TIMS)에 하면 이 시스템은 해당 시설이 광대역 시설일 경우 광대역 시설에 대한 가설업무를 수행하지 못하므로, 각 시스템의 운용자는 이런 시설에 대한 가설업무를 수행하기 위하여 해당 시설을 관리하는 조직으로 광대역 시설을 식별하여 가설 공사명령을 재전송하여야만 한다.However, customers are generally indistinguishable from whether the facility providing the service is a broadband facility or an existing copper facility, so if the subscriber submits a subscription application to the TMS, the system is a broadband facility. In this case, since the construction of the broadband facility is not performed, the operator of each system must identify the broadband facility and retransmit the construction order to the organization managing the facility in order to perform the construction of such facility.

그러나 현재 가입전화설치관리시스템(TIMS)은 서비스를 제공하는 시설이 동선인지 광대역 시설인지 식별하지 않으며 단지 동선 시설에 대한 정보만을 보유하고 있어서 동선에 대한 설치업무만을 수행하고 있다.However, the current TMS does not identify whether the facility that provides the service is a copper or broadband facility, and only has information on the copper facility and performs only the installation of copper.

서비스가설 청약을 접수받은 전화국에서는 서비스를 제공하는 시설 분류를 하여 동선에 수용된 경우는 각 서비스를 관리하는 시스템에 공사명령을 내리며, 광대역 시설에 수용된 경우는 해당 시설을 관리하는 조직에 연락을 하여 관련된 시설유무 파악, 회선구성 등을 수행하는 실정이다.The telephone company that receives the service hypothesis offers a classification of the facilities that provide the service, and if it is accommodated on the copper line, orders the construction system to manage each service, and if it is accommodated at the broadband facility, contact the organization that manages the facility. It is to find out the presence of facilities and to establish the line.

즉, 상기 종래의 광대역 가입자망 서비스 가설 방법은, 가설 업무를 체계적으로 수행하지 못하기 때문에 서비스 시설재고 파악, 시설의 상태관리 업무 등을 수행하는 시간이 길어져 고객에게 즉각적인 응대를 할 수 없다는 문제점이 있다.That is, the conventional broadband subscriber network service hypothesis method has a problem that it is not possible to immediately respond to customers due to the long time to perform service facility inventory, facility status management work, etc., because the hypothesis cannot be systematically performed. have.

상기 문제점을 해결하기 위하여 안출된 본 발명은, 서비스 가설 청약 신청을 한 고객에게 즉각적인 응대를 하며, 광대역 가입자망 서비스 회선구성을 신속하게 처리하는 광대역 가입자망 서비스 가설관리 방법을 제공하는데 그 목적이 있다.The present invention devised to solve the above problems is to provide a broadband subscriber network service hypothesis management method that promptly responds to a customer who applied for a service hypothesis subscription, and quickly processes the broadband subscriber network service circuit configuration. .

도 1 은 본 발명이 적용되는 광대역 가입자망 운용관리 시스템의 가설관련 구성예시도.1 is an exemplary configuration of a broadband subscriber network operation management system to which the present invention is applied.

도 2 는 본 발명이 적용되는 광대역 가입자망 운용관리 시스템의 가설관리체계에 관한 설명도.2 is an explanatory diagram of a hypothesis management system of a broadband subscriber network operation management system to which the present invention is applied.

도 3 은 본 발명에 따른 광대역 가입자망 서비스 가설관리에 관한 일실시예 흐름도.3 is a flowchart illustrating an exemplary embodiment of a broadband subscriber network service hypothesis management according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

101 : 고객응대시스템 102 : 전용회선관리시스템101: customer response system 102: dedicated line management system

103 : 가입전화설치관리시스템 104 : 민원응대 모듈103: subscription telephone installation management system 104: civil complaint module

105 : 서비스분류 모듈 106, 113, 118 : 웹관리 모듈105: service classification module 106, 113, 118: web management module

111 : 시설관리 모듈 112 : 시설선정모듈111: facility management module 112: facility selection module

117 : 광접속망 시설 관리 모듈 121 : 서비스노드 관리시스템117: optical access network facility management module 121: service node management system

123, 124 : 광전송시스템123, 124: optical transmission system

116 : 비대칭디지털가입자선로 관리 모듈116: asymmetric digital subscriber line management module

107 : 광대역가입자망운용관리시스템-프런트107: Broadband Subscriber Network Management System-Front

114 : 광대역가입자망운용관리시스템-센터114: Broadband Subscriber Network Management System-Center

119 : 광대역가입자망운용관리시스템-로컬119: Broadband Subscriber Network Management System-Local

122 : 비대칭디지털가입자선로(ASDL) 시설122: Asymmetric Digital Subscriber Line (ASDL) Facilities

상기 목적을 달성하기 위한 본 발명은, 광대역 가입자망 운용관리 시스템에서의 광대역 가입자망 서비스 가설 방법에 있어서, 광대역 가입자망 운용관리 시스템이 서비스청약시스템으로부터의 통지에 의하여 서비스 공사명령을 수령하거나, 인터넷을 통한 고객의 서비스청약에 의하여 서비스 공사명령을 수령하여, 서비스의 종류에 따라 분류하는 제 1 단계; 상기 광대역 가입자망 운용관리 시스템이 공사명령에 대한 서비스 분류가 끝나면 망자원의 선정작업을 하여 고객의 위치에서 전송장치까지의 망자원의 경로선정을 하는 제 2 단계; 망자원들간의 경로선정이 끝나면 상기 광대역 가입자망 운용관리 시스템이 할당된 각 광대역 가입자망 전송장치의 포트선정 작업을 실시하여, 실제 할당할 수 있는 여유 자원이 있으면 할당작업을 수행하고, 여유 자원이 없으면 전송장치 자원을 재선정하는 제 3 단계; 및 상기 광대역 가입자망 운용관리 시스템이 고객의 위치에서 교환기 혹은 전송시스템까지의 경로(Loop)에 대하여 개통시험을 실시하여, 개통시험결과가 양호하면 공사명령을 내린 상기 서비스청약관리시스템에 준공 결과를 통보하고, 완료된 가설현황을 입력하며, 양호하지 않으면 상기 광대역가입자망운용관리시스템이 망자원을 재선정하는 제 4 단계를 포함한다.In order to achieve the above object, the present invention provides a broadband subscriber network service hypothesis method in a broadband subscriber network operation management system, wherein the broadband subscriber network operation management system receives a service construction instruction by a notification from a service subscription system, or the Internet. Receiving a service construction order according to the service subscription of the customer through the first step of classifying according to the type of service; A second step of, when the broadband subscriber network operation management system finishes classifying a service for a construction order, selects network resources and routes network resources from a customer's location to a transmission device; After the path selection between network resources is completed, the broadband subscriber network operation management system performs port selection of each allocated broadband subscriber network transmitter, and if there is spare resource that can be allocated, the allocation operation is performed. A third step of reselecting a transmitter resource if none; And the broadband subscriber network operation management system performs an opening test on a loop from a customer's location to an exchange or transmission system. If the opening test result is satisfactory, the broadband subscriber network operation management system completes the result of the completion of the construction of the service subscription management system. A fourth step of notifying, entering a completed hypothesis status, and if not satisfactory, by the broadband subscriber network operation management system to reselect network resources.

이하 첨부된 도면을 참조하여 본 발명의 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명이 적용되는 광대역 가입자망 운용관리 시스템의 가설관련 구성 예시도이다.1 is an exemplary diagram of a hypothesis related configuration of a broadband subscriber network operation management system to which the present invention is applied.

도면에 도시된 바와 같이, 광대역 가입자망 운용관리 시스템은 광대역가입자망운용관리시스템-프런트(ANOSS-F)(이하, "ANOSS-F"라 함)(107), 광대역가입자망운용관리시스템-센터(ANOSS-C)(이하, "ANOSS-C"라 함)(114), 광대역가입자망운용관리시스템-로컬(ANOSS-L)(이하, "ANOSS-L"이라 함)(119)로 구성되며, 광대역 가입자망 운용관리 시스템과 연동하는 시스템들은 고객응대 시스템(101), 전용회선 관리 시스템(102), 가입전화 설치관리 시스템(103)이 있다.As shown in the figure, the broadband subscriber network operation management system includes a broadband subscriber network operation management system-front (ANOSS-F) (hereinafter referred to as "ANOSS-F") 107, a broadband subscriber network operation management system-center. (ANOSS-C) (hereinafter referred to as "ANOSS-C") (114), Broadband Subscriber Network Management System-Local (ANOSS-L) (hereinafter referred to as "ANOSS-L") (119) In addition, the systems interworking with the broadband subscriber network operation management system include a customer response system 101, a dedicated line management system 102, and a subscription telephone installation management system 103.

고객응대시스템(101)은 고객이 요구하는 다양한 서비스를 고객응대 창구에서 신속하고 편리하게 일괄처리해 줄 수 있는 시스템이다.Customer response system 101 is a system that can quickly and conveniently batch processing a variety of services required by the customer at the customer service window.

전용회선관리시스템(102)은 전용회선의 유지보수 및 운용에 관련된 업무를 집중화하여 수행하는 전산화 시스템이다.Dedicated line management system 102 is a computerized system that centralizes and performs tasks related to maintenance and operation of leased lines.

가입전화설치관리시스템(103)은 가입자의 전화 설치관리요구를 접수한 후부터 전화가설 설치가 끝날 때까지 수행하는 전화가설업무 전산화 시스템이다.The subscription telephone installation management system 103 is a telephone temporary work computerization system that is performed after receiving the telephone installation management request of the subscriber until the end of the telephone hypothesis installation.

ANOSS-F(107)는 광대역 가입자망 서비스 가설을 위하여 고객응대시스템(101), 전용회선관리시스템(102), 가입전화설치관리시스템(103)과 상호 연동한다.The ANOSS-F 107 interoperates with the customer response system 101, the dedicated line management system 102, and the subscription telephone installation management system 103 to construct a broadband subscriber network service.

고객은 일반전화, 종합정보통신망(ISDN) 서비스, 비대칭디지털가입자선로(ASDL) 서비스 가설을 고객응대시스템(101)에 청약한다.The customer subscribes to the customer service system 101 for the hypothesis of a general telephone, an ISDN service, and an asymmetric digital subscriber line (ASDL) service.

고객응대시스템(101)은 일반전화는 가입전화설치관리시스템(103)에 서비스가설 공사명령을 내리며, 가입전화설치관리시스템(103)은 서비스제공 시설중 광대역 가입자망 시설 구간은 ANOSS-F(105)에 재 서비스가설 공사명령을 내린다.The customer response system 101 issues a construction service order for the general telephone to the subscription telephone installation management system 103, and the subscription telephone installation management system 103 is ANOSS-F 105 for the broadband subscriber network facility section among the service providing facilities. Re-service temporary construction order

전용회선에 대한 서비스가설은 전용회선관리시스템(102)에 청약한다. 전용회선 관리시스템(102)은 전용회선 서비스를 제공하는 시설이 광대역 가입자망 시설이면 ANOSS-F(107)에 서비스 공사명령을 내리며, ANOSS-F(107)는 광대역 가입자망 구간의 전용회선 가설을 완수하고 그 결과를 전용회선관리시스템(102)으로 통보해준다.The service hypothesis for the leased line subscribes to the leased line management system 102. The leased line management system 102 issues a service construction order to the ANOSS-F 107 if the facility providing the leased line service is a broadband subscriber network facility, and the ANOSS-F 107 constructs a leased line hypothesis of the broadband subscriber network section. Complete and notify the result to the dedicated line management system (102).

ANOSS-F(107)는 집중국에 존재한다. ANOSS-F(107)는 서비스청약 시스템들(101, 102, 103)로부터 서비스가설 공사명령을 접수받으면, 망라우트에 따라 서비스를 분류(105)하여 ANOSS-C(114)에 서비스 제공을 위한 시설선정(112)을 의뢰한다. ANOSS-F(107)는 서비스청약 시스템들(101, 102, 103)과 통신을 하기 위하여 네트웍을 사용한다.ANOSS-F 107 is present in the centralized station. When the ANOSS-F 107 receives a service temporary construction order from the service subscription systems 101, 102, and 103, the ANOSS-F 107 classifies the service according to the network route and installs the service to the ANOSS-C 114. Request selection 112. The ANOSS-F 107 uses a network to communicate with the service subscription systems 101, 102, 103.

또한, 고객(110)은 인터넷(108)을 경유하여 가능한 서비스의 가설 청약을 할 수 있으며, 서비스가설 진행상황을 조회해 볼 수 있고, 서비스가설과 관련한 고객 민원을 인터넷(1-28)을 경유하여 제기할 수 있으며, ANOSS-F(107)는 이에 민원응대(104)기능이 있다. 이때 ANOSS-F(107)는 웹(106) 기능을 제공한다.In addition, the customer 110 may subscribe to a possible service hypothesis via the Internet 108, and view the progress of the service hypothesis, and receive a customer complaint related to the service hypothesis via the Internet 1-28. The ANOSS-F 107 has a function to respond to complaints 104. The ANOSS-F 107 then provides the web 106 functionality.

ANOSS-F(107)의 운용자(109)는 서비스를 분류하는 요원, 민원응대 요원, ANOSS-F(107)의 시스템 관리를 하는 시스템 관리 요원으로 분류된다.The operator 109 of the ANOSS-F 107 is classified into an agent who classifies a service, a civil service agent, and a system administrator who manages the system of the ANOSS-F 107.

ANOSS-F(107)의 운용자(109)는 웹(106) 기능을 이용하여 인터넷(108)을 통하여 시스템 운용을 할 수 있다.The operator 109 of the ANOSS-F 107 may operate the system via the Internet 108 using the web 106 function.

ANOSS-C(114)는 집중국에 존재한다. 서비스 형태에 따라 현재 가입자로부터 전송망 혹은 교환기까지 접속 경로를 선정하고, 관련된 광가입자망 시설을 선정(112)하며, 전화번호나 고객식별번호에 해당하는 디렉토리 주소를 정한다.ANOSS-C 114 resides in the centralized station. According to the service type, the access path is selected from the current subscriber to the transmission network or the exchange, the optical subscriber network facility is selected (112), and the directory address corresponding to the telephone number or the customer identification number is determined.

전용회선 서비스인 경우에는 전용회선 경로중 광가입자 경로에 대한 선정작업을 수행한다. 이와 같이 선정된 시설을 이용하여 서비스 개통이 가능하도록 ANOSS-L(119)에 광전송시스템(FLC-A,B,C)(123, 124) 및 비대칭디지털가입자선로(ASDL)(122) 시설 선택 및 할당을 요청한다.In the case of a leased line service, the selection of the optical subscriber path among the leased line paths is performed. Selection of optical transmission systems (FLC-A, B, C) 123, 124 and asymmetric digital subscriber line (ASDL) 122 facilities to ANOSS-L 119 to enable service opening using the selected facilities. And request allocation.

ANOSS-F(107)로 부터의 서비스가설 공사명령 요청을 기록하고, 가설진행상황을 파악하며, 갱신한 정보를 관리한다(111). 또한 고객이 신청한 서비스 및 서비스 특성에 관한 정보를 조회가 가능하도록 ANOSS-F(107)에 제공한다.A service temporary construction order request from the ANOSS-F 107 is recorded, the progress of the temporary construction is checked, and the updated information is managed (111). In addition, the ANOSS-F 107 is provided to the ANOSS-F 107 so as to be able to inquire information about the service and the service characteristics requested by the customer.

ANOSS-C(114)의 운용자(115)는 웹(113) 기능을 이용하여 인터넷을 통하여 시스템 운용을 할 수 있다.The operator 115 of the ANOSS-C 114 may operate the system through the Internet using the web 113 function.

ANOSS-L(119)은 광대역 가입자망 시설(122, 123, 124)을 제공하는 각 전화국에 존재한다. ANOSS-L(119)은 동선을 기반으로 한 고속 인터넷 서비스를 제공하는 비대칭디지털가입자선로(ASDL)(Asymmetric Digital Subscriber Line)(122)를 관리하는 비대칭디지털가입자선로(ASDL) 모듈(1-18)과 광시설(123, 124)을 관리하는 광접속망(OAN:Optical Access Network) 시설 관리 모듈(117)이 있다.ANOSS-L 119 is present at each telephone station providing broadband subscriber network facilities 122, 123, and 124. The ANOSS-L 119 is an asymmetric digital subscriber line (ASDL) module for managing an asymmetric digital subscriber line (ASDL) 122 that provides a high speed internet service based on a copper wire. 18) and an optical access network (OAN) facility management module 117 that manages the optical facilities 123 and 124.

ANOSS-L(119)은 광대역 가입자망 시설 전송장치에 포트를 할당하고 장치의 구성관리를 담당한다.The ANOSS-L 119 assigns a port to the broadband subscriber network facility transmitter and is responsible for configuration management of the device.

ANOSS-L(119)의 운용자(120)는 전화국의 시험실, 전송실, 전자실의 운용요원들이며 광대역 전송장치 자원 선택 및 할당 명령의 수령, 서비스가설 진행 상황 입력등의 작업을 웹(118)기능을 이용하여 수행한다. 이때 ANOSS-L(119)의 운용자(120)는 ANOSS-L(119)의 시스템 관리 업무도 수행한다.The operator 120 of the ANOSS-L 119 is an operator of a test room, a transmission room, and an electronic room of a telephone station, and has a web 118 function of receiving a broadband transmission resource selection and allocation command and inputting a service hypothesis progress. Perform using At this time, the operator 120 of the ANOSS-L 119 also performs a system management task of the ANOSS-L 119.

ANOSS-L(119)은 V5 인터페이스를 제공하는 교환기의 V5 관련 운용업무를 담당하는 서비스노드관리시스템(SNOSS)(121)과 상호 연동하여 V5 관련 교환기와 광대역 가입자망 전송장치(122, 123, 124)간의 경로설정 업무를 수행한다.The ANOSS-L 119 interoperates with a service node management system (SNOSS) 121 in charge of V5 related operations of an exchange providing a V5 interface, and the V5-related exchange and the broadband subscriber network transmitters 122, 123, and 124. Perform routing tasks between

제 2 도는 본 발명이 적용되는 광대역 가입자망 운용관리 시스템의 가설 관리체계에 관한 설명도이다.2 is an explanatory diagram of a hypothesis management system of a broadband subscriber network operation management system to which the present invention is applied.

고객(110)은 서비스청약(201)을 고객응대시스템(101) 및 전용회선관리시스템(102)에 한다. 또한 서비스청약을 인터넷(108)을 통하여 할 수도 있다.The customer 110 applies the service subscription 201 to the customer response system 101 and the dedicated line management system 102. Service subscription may also be made via the Internet 108.

광대역 가입자망 운용관리 시스템(107, 114, 119)은 네트웍 요소(214)들로부터 망자원 구성정보(204, 207, 210), 망자원재고 및 망자원 운용상태정보(205, 208, 211), 서비스 가설 진행 상태 정보(206, 209, 212) 데이터를 수집하여 광대역 가입자망의 서비스가설업무를 수행한다.Broadband subscriber network operation management system (107, 114, 119) is the network resource configuration information (204, 207, 210), network resource inventory and network resource operation status information (205, 208, 211) from the network elements 214, The service hypothesis progress status information 206, 209, and 212 are collected to perform the service hypothesis of the broadband subscriber network.

ANOSS-F(107)는 서비스청약 시스템들(101, 102, 103)로부터 공사명령(202, 203, 215)을 수령한다. 이때 공사명령은 가입자주민등록번호, 청약번호, 가입자주소, 서비스종류, 개통일시 데이터를 포함한다.ANOSS-F 107 receives construction orders 202, 203, 215 from service subscription systems 101, 102, 103. In this case, the construction order shall include subscriber's resident registration number, subscription number, subscriber address, service type, and date and time of opening.

ANOSS-F(107)는 가입자의 위치나 요구된 서비스를 기초로 하여 가입자망 루트를 결정하고 서비스 번호를 부여한 후 ANOSS-C(114)에 회선구성(204)을 의뢰한다.The ANOSS-F 107 determines the subscriber network route based on the subscriber's location or the requested service, assigns a service number, and then requests the circuit configuration 204 to the ANOSS-C 114.

ANOSS-C(114)는 가입자망루트 정보를 바탕으로 망자원의 선정 및 할당을 수행한다. 망자원을 할당한 후 ANOSS-C(114)는 ANOSS-L(119)에게 상세한 광대역전송장치의 할당(207)을 요구한다. 이때 송부되는 정보는 고객청약번호, 회선식별번호, 라우팅 설정, 설비설정, 전용회선설정, 선택자원, 개통일시 데이터이다.The ANOSS-C 114 selects and allocates network resources based on subscriber network root information. After allocating the network resources, the ANOSS-C 114 requests the ANOSS-L 119 to allocate a detailed broadband transmission device 207. The information sent at this time is customer subscription number, line identification number, routing setting, equipment setting, dedicated line setting, selection resource, opening date data.

ANOSS-C(114)는 ANOSS-L(119)로부터 망자원의 서비스 상태 정보(208)를 제공받으며, ANOSS-L(119)이 망자원 할당후 개통실패시 재설정을 요구받는다. 이때 통보받는 정보는 청약번호, 회선식별번호, 서비스상태, 서비스개통실패 보고서이다. 일반전화이외의 서비스중에서 동선이 포함된 가입자망 회선구성은 특별히 가입전화설치관리시스템(103)에 요구한다(216).The ANOSS-C 114 receives the service status information 208 of the network resource from the ANOSS-L 119, and the ANOSS-L 119 is required to reset the opening failure after allocating the network resource. The informed information is subscription number, circuit identification number, service status, service opening failure report. The subscriber network line configuration including the copper wire among the services other than the ordinary telephone is specifically required by the subscriber telephone installation management system 103 (216).

ANOSS-L(119)은 광대역전송장치의 포트선택 및 할당(210)을 수행하고, 전송매개변수설정, 제어신호조정(213)을 행한다. 이때 광대역 전송장치에 송부하는 정보는 청약번호, 전송장치식별번호, 전송장치 경로, 전송장치구성 설정, 매개변수 설정, 관련 서비스 특성, 개통일시이다.The ANOSS-L 119 performs port selection and allocation 210 of the broadband transmission apparatus, sets transmission parameters, and adjusts the control signal 213. The information sent to the broadband transmission device is a subscription number, transmission device identification number, transmission device path, transmission device configuration settings, parameter settings, related service characteristics, opening date and time.

또한 ANOSS-L(119)은 ANOSS-C(114)에게 시설현황 통계 및 분석을 위하여 요구되는 전송장치정보(211)를 보고하며, 서비스노드관리시스템(SNOSS)(121)과 연동하여 교환기와 광대역 가입자망 전송장치간의 경로설정 업무를 수행하며(217), ANOSS-F(107)는 서비스 개통 정보를 ANOSS-C(114)로 부터 수령하여 서비스청약시스템들(101, 102, 103)에 준공통보한다. 이때 준공통보는 서비스 상태정보(211)를 포함한다In addition, the ANOSS-L 119 reports the transmission device information 211 required for the facility status statistics and analysis to the ANOSS-C 114, and works in conjunction with the service node management system (SNOSS) 121 and the broadband. The ANOSS-F 107 receives the service opening information from the ANOSS-C 114 and completes the notification on the service subscription systems 101, 102 and 103. do. In this case, the completion notification includes service status information 211.

도 3 은 본 발명에 따른 광대역 가입자망 서비스 가설관리에 관한 일실시예 상세흐름도이다.3 is a detailed flowchart illustrating an exemplary embodiment of a broadband subscriber network service hypothesis management according to the present invention.

도면에 도시된 바와 같이, 광대역 가입자망 운용관리 시스템은 서비스청약시스템으로부터의 통지에 의하여 서비스 공사명령을 수령하거나, 인터넷을 통한 고객의 서비스청약에 의하여 서비스 공사명령을 수령할 수 있다. 수령된 공사명령을 서비스에 따라 서비스 분류를 실시한다(301).As shown in the figure, the broadband subscriber network operation management system may receive a service construction order by the notification from the service subscription system, or may receive a service construction order by the service subscription of the customer through the Internet. The received construction order is service classified according to the service (301).

광대역 가입자망 운용관리 시스템은 공사명령에 대한 서비스분류가 끝나면 망자원의 선정작업을 하여, 고객의 위치에서 교환기까지 혹은 전송장치까지의 망자원의 경로선정(회선구성) 작업을 실시한다(302).The broadband subscriber network operation management system selects the network resources after the service classification for the construction order is completed, and performs the route selection (line configuration) of the network resources from the customer's location to the exchange or the transmission device (302). .

망자원에 대한 경로선정을 토대로 망자원을 실제 할당할 수 있는 여유 광대역 시설자원이 있는지 조사하여 가능하면 전송장치 자원 할당 작업(304)을 수행하고, 망자원 할당재고의 여유가 없으면 망자원의 재선정을 의뢰한다(303).Based on the path selection for the network resources, it is checked whether there is a spare broadband facility resource that can actually allocate the network resources, and if possible, performs a transmission device resource allocation operation 304, and if there is no space in the network resource allocation inventory, Request for selection (303).

광대역 가입자망 운용관리 시스템은 할당된 망자원들간의 회선구성이 끝나면 각 광대역 전송장치의 포트선정 등 전송장치 자원의 포트선정 작업을 실시한다(304).The broadband subscriber network operation management system performs port selection of transmission device resources such as port selection of each broadband transmission device after the circuit configuration between the allocated network resources is completed (304).

광대역 가입자망 운용관리 시스템은 전송장치 자원에 대한 포트선정 자료를 토대로 실제 할당할 수 있는 여유 자원이 있는지 조사하여 할당작업을 수행한다. 그러나 전송장치자원의 할당재고의 여유가 없으면 전송장치 자원의 재선정을 의뢰한다(305).Broadband subscriber network operation management system performs allocation by investigating whether there are free resources that can be allocated on the basis of port selection data of transmission device resources. However, if there is no room for allocation of the transmission device resources, a request for reselection of the transmission device resources is requested (305).

광대역 가입자망 운용관리 시스템은 고객의 위치에서 교환기 혹은 전송시스템까지의 경로(Loop)에 대하여 개통시험을 실시한다(306).The broadband subscriber network operation management system performs an opening test on the loop from the customer's location to the exchange or transmission system (306).

광대역 가입자망 운용관리 시스템은 개통시험결과가 양호하면 공사명령을 내린 청약관리시스템에 준공 결과를 통보하고, 그렇지 않으면 망자원의 재선정을 의뢰한다(307).If the opening test result is satisfactory, the broadband subscriber network operation management system notifies the subscription management system that issued the construction order, and otherwise requests reselection of network resources (307).

개통시험결과가 양호하면 완료된 가설현황을 입력한다. 이때 가설현황입력은 각 국사내의 시험실, 전자실, 전송실등의 요원이 광대역 가입자망 운용관리 시스템의 웹기능을 이용하여 입력한다(308).If the test results are good, enter the completed hypothesis. At this time, the hypothesis status input is input by the personnel of the laboratory, electronic room, transmission room, etc. in each office using the web function of the broadband subscriber network operation management system (308).

이상에서 설명한 본 발명은, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에 있어 본 발명의 기술적 사상을 벗어나지 않는 범위내에서 여러 가지 치환, 변형 및 변경이 가능하므로 전술한 실시예 및 첨부된 도면에 한정되는 것이 아니다.The present invention described above is capable of various substitutions, modifications, and changes without departing from the spirit of the present invention for those skilled in the art to which the present invention pertains, and the above-described embodiments and accompanying It is not limited to the drawing.

상기한 바와 같은 본 발명에 따르면, 서비스 청약을 한 고객에게는 즉각적인 서비스 가설응대를 할 수 있고, 망자원의 재고 여부 파악, 회선구성상태 파악, 및 서비스 가설진행상태 조회를 신속하게 처리할 수 있는 우수한 효과가 있다.According to the present invention as described above, it is possible to immediately respond to the service hypothesis to the customer who subscribed to the service, and excellent processing that can quickly determine whether the inventory of the network resources, the line configuration status, and the service temporary progress status inquiry It works.

Claims (6)

광대역 가입자망 운용관리 시스템에서의 광대역 가입자망 서비스 가설관리 방법에 있어서,In the broadband subscriber network service hypothesis management method in the broadband subscriber network operation management system, 광대역 가입자망 운용관리 시스템이 서비스청약시스템으로부터의 통지에 의하여 서비스 공사명령을 수령하거나, 인터넷을 통한 고객의 서비스청약에 의하여 서비스 공사명령을 수령하여, 서비스의 종류에 따라 분류하는 제 1 단계;A first step in which the broadband subscriber network operation management system receives a service construction order by notification from a service subscription system or receives a service construction order by a service subscription of a customer through the Internet, and classifies according to the type of service; 상기 광대역 가입자망 운용관리 시스템이 공사명령에 대한 서비스 분류가 끝나면 망자원의 선정작업을 하여 고객의 위치에서 전송장치까지의 망자원의 경로선정을 하는 제 2 단계;A second step of, when the broadband subscriber network operation management system finishes classifying a service for a construction order, selects network resources and routes network resources from a customer's location to a transmission device; 상기 광대역 가입자망 운용관리 시스템이 할당된 각 광대역 가입자망 전송장치의 포트선정 작업을 실시하여, 실제 할당할 수 있는 여유 자원이 있으면 할당작업을 수행하고, 여유 자원이 없으면 새로운 전송장치 자원을 재선정하는 제 3 단계; 및The broadband subscriber network operation management system performs port selection of each allocated broadband subscriber network transmitter, and performs an allocation task if there is spare resource that can be allocated, and reselects a new transmitter resource if there is no spare resource. Third step; And 상기 광대역 가입자망 운용관리 시스템이 고객의 위치에서 교환기 혹은 전송시스템까지의 경로(Loop)에 대하여 개통시험을 실시하여, 개통시험결과가 양호하면 공사명령을 내린 상기 서비스청약관리시스템에 준공 결과를 통보하고, 완료된 가설현황을 입력하며, 양호하지 않으면 새로운 망자원을 재선정하는 제 4 단계The broadband subscriber network operation management system performs an opening test on the loop from the customer's location to the exchange or transmission system, and if the opening test result is satisfactory, notify the completion of the construction to the service subscription management system that issued the construction order. 4th step of inputting completed hypothesis status and reselecting new network resources if not satisfactory 를 포함하는 광대역 가입자망 서비스 가설관리 방법.Broadband subscriber network service hypothesis management method comprising a. 제 1 항에 있어서,The method of claim 1, 상기 제 1 단계는,The first step is, 고객응대시스템, 전용회선관리시스템, 가입전화설치관리시스템으로 구성된 상기 서비스청약시스템의 고객응대시스템이 고객으로부터 일반전화, 종합정보통신망 서비스, 비대칭디지털가입자선로 서비스 가설 청약을 받아 그 종류를 판단하는 제 5 단계;The service response system of the service subscription system, which consists of a customer response system, a dedicated line management system, and a subscription telephone installation management system, receives a general telephone, integrated telecommunication network service, and asymmetric digital subscriber line service hypothesis from the customer to determine the type. A fifth step; 상기 제 5 단계의 판단결과, 일반전화의 가설 청약이면 고객응대시스템이 가입전화설치관리시스템에 서비스 가설 공사명령을 전송하는 제 6 단계;A sixth step of transmitting, by the customer response system, a service temporary construction order to the subscription telephone installation management system when the result of the determination of the fifth step is a temporary subscription of a general telephone; 상기 제 6 단계의 서비스제공 시설중 광대역 가입자망 시설 구간에 대해서는 광대역가입자망운용관리시스템-프런트(ANOSS-F), 광대역가입자망운용관리시스템-센터(ANOSS-C), 광대역가입자망운용관리시스템-로컬(ANOSS-L)로 구성된 상기 광대역 가입자망 운용관리 시스템의 광대역가입자망운용관리시스템-프런트(ANOSS-F)에 가입전화설치관리시스템이 재 서비스가설 공사명령을 전송하는 제 7 단계;Broadband subscriber network operation management system-front (ANOSS-F), broadband subscriber network operation management system-center (ANOSS-C), broadband subscriber network operation management system A seventh step of subscribing to the broadband subscriber network operation management system-front (ANOSS-F) of the broadband subscriber network operation management system composed of local (ANOSS-L), the subscription telephone installation management system to transmit a re-service temporary construction instruction; 상기 제 5 단계의 판단결과, 전용회선에 대한 서비스 가설 청약이면 고객응대시스템이 전용회선관리시스템에 서비스 가설 공사명령을 전송하는 제 8 단계;An eighth step of transmitting, by the customer response system, a service temporary construction order to the dedicated line management system if the service provisional subscription for the leased line is determined as the result of the fifth step; 상기 제 8 단계의 전용회선 서비스를 제공하는 시설이 광대역 가입자망 시설이면 가입전화설치관리시스템이 상기 광대역가입자망운용관리시스템-프런트(ANOSS-F)에 재 서비스가설 공사명령을 전송하는 제 9 단계; 및Step 9, if the facility providing the leased line service of the eighth step is a broadband subscriber network facility, the subscriber telephone installation management system transmits a re-service temporary construction order to the broadband subscriber network operation management system-front (ANOSS-F). ; And 상기 광대역가입자망운용관리시스템-프런트(ANOSS-F)가 상기 서비스청약 시스템들로부터 서비스가설 공사명령을 수령하여, 가입자의 위치나 요구된 서비스를 기초로 가입자망 루트를 결정하고 서비스 번호를 부여하여 광대역가입자망운용관리시스템-센터(ANOSS-C)에 서비스 제공을 위한 망자원의 선정을 의뢰하는 제 10 단계The broadband subscriber network operation management system-front (ANOSS-F) receives a service construction construction order from the service subscription systems, determines the subscriber network route based on the subscriber's location or the requested service, and assigns a service number. The tenth step to request the selection of network resources to provide services to the broadband subscriber network operation management system-center (ANOSS-C) 를 포함하는 광대역 가입자망 서비스 가설관리 방법.Broadband subscriber network service hypothesis management method comprising a. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 제 2 단계는,The second step, 상기 광대역가입자망운용관리시스템-프런트(ANOSS-F)로부터 공사명령을 분배받은 상기 광대역가입자망운용관리시스템-센터(ANOSS-C)가 서비스 형태에 따라 현재 가입자로부터 전송망 혹은 교환기 까지 접속 경로를 선정하고 관련된 광가입자망 시설을 선정하는 제 11 단계;The Broadband Subscriber Network Management System-Center (ANOSS-C), which receives the construction order from the Broadband Subscriber Network Management System-front (ANOSS-F), selects a connection path from the current subscriber to the transmission network or the switching center according to the service type. And an eleventh step of selecting an associated optical subscriber network facility; 상기 광대역가입자망운용관리시스템-센터(ANOSS-C) 가 망자원에 대한 경로선정을 토대로 망자원을 실제 할당할 수 있는 여유 광대역 시설자원이 있는지를 판단하여, 망자원 할당재고의 여유가 없으면 망자원을 재선정하는 제 12 단계;The ANOSS-C determines whether there is a spare broadband facility resource that can actually allocate the network resource based on the path selection for the network resource. A twelfth step of reselecting resources; 제 12 단계의 판단결과, 망자원 할당재고의 여유가 있으면 상기 광대역가입자망운용관리시스템-센터(ANOSS-C)가 상기 광대역가입자망운용관리시스템-로컬(ANOSS-L)에 광전송시스템-A,B(FLC-A,B), 광전송시스템-C(FLC-C) 및 비대칭디지털가입자선로(ASDL) 시설 선택 및 할당을 요구하는 제 13 단계As a result of the determination in the twelfth step, if there is sufficient network resource allocation inventory, the broadband subscriber network operation management system-center (ANOSS-C) transmits the optical transmission system-A to the broadband subscriber network operation management system-local (ANOSS-L). Thirteenth step requiring selection and allocation of B (FLC-A, B), Optical Transmission System-C (FLC-C) and Asymmetric Digital Subscriber Line (ASDL) facilities 를 포함하는 광대역 가입자망 서비스 가설관리 방법.Broadband subscriber network service hypothesis management method comprising a. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 제 3 단계는,The third step, 상기 광대역가입자망운용관리시스템-센터(ANOSS-C)로부터 상세한 광대역전송장치의 할당을 요청받은 광대역가입자망운용관리시스템-로컬(ANOSS-L)이 광전송시스템-A,B(FLC-A,B), 광전송시스템-C(FLC-C) 및 비대칭디지털가입자선로(ASDL) 시설 중의 하나를 선택 및 할당하는 제 11 단계; 및The Broadband Subscriber Network Management System-Local (ANOSS-L), which has been requested to allocate a detailed broadband transmission device from the Broadband Subscriber Network Management System-Center (ANOSS-C), has established an optical transmission system-A, B (FLC-A, B). 11) selecting and assigning one of the optical transmission system-C (FLC-C) and the asymmetric digital subscriber line (ASDL) facility; And 상기 광대역가입자망운용관리시스템-로컬(ANOSS-L)이 선택된 전송장치가 실제 설정이 가능한지 판단하여,가능하지 않으면 전송장치 자원선택 및 할당을 재 수행하고, 가능하면 광대역가입자망운용관리시스템-센터(ANOSS-C)에 결과를 보고하는 제 12 단계The ANOSS-L determines whether the selected transmission device can actually be configured, and if not possible, reselects and allocates transmission device resources, and if possible, the broadband subscriber network operation management system-center. Step 12 to report results to ANOSS-C 를 포함하는 광대역 가입자망 서비스 가설관리 방법.Broadband subscriber network service hypothesis management method comprising a. 제 1 항 또는 제 2 항에 있어서,The method according to claim 1 or 2, 상기 제 4 단계는,The fourth step, 상기 광대역가입자망운용관리시스템-센터(ANOSS-C)가 고객의 위치에서 교환기 혹은 전송시스템까지의 경로에 대하여 개통시험을 실시하는 제 11 단계; 및An eleventh step, wherein the broadband subscriber network operation management system-center (ANOSS-C) performs an opening test on a path from a customer's location to an exchange or transmission system; And 상기 제 11 단계의 개통시험결과, 양호한 상태이면 상기 광대역가입자망운용관리시스템-센터(ANOSS-C)가 광대역가입자망운용관리시스템-프런트(ANOSS-F)에게 준공결과를 통보하고, 광대역가입자망운용관리시스템-프런트(ANOSS-F)는 준공결과를 서비스청약시스템들에게 통보하며, 양호한 상태가 아니면 광대역가입자망운용관리시스템-센터(ANOSS-C)가 망자원을 재선정하는 제 12 단계If the opening test of the eleventh step is satisfactory, the broadband subscriber network operation management system-center (ANOSS-C) notifies the broadband subscriber network operation management system-front (ANOSS-F) of the completion result, and the broadband subscriber network The operation management system-front (ANOSS-F) notifies the service subscription systems of the completion, and if it is not in good condition, the twelfth step of reselecting the network resources by the broadband subscriber network operation management system-center (ANOSS-C). 를 포함하는 광대역 가입자망 서비스 가설관리 방법.Broadband subscriber network service hypothesis management method comprising a. 대용량 프로세서를 구비한 광대역 가입자망 서비스 가설관리 시스템에 있어서,In the broadband subscriber network service hypothesis management system having a large capacity processor, 광대역 가입자망 운용관리 시스템이 서비스청약시스템으로부터의 통지에 의하여 서비스 공사명령을 수령하거나, 인터넷을 통한 고객의 서비스청약에 의하여 서비스 공사명령을 수령하여, 서비스의 종류에 따라 분류하는 제 1 기능;A first function of the broadband subscriber network operation management system receiving a service construction order by a notification from a service subscription system, or receiving a service construction order by a service subscription of a customer through the Internet, and classifying according to the type of service; 상기 광대역 가입자망 운용관리 시스템이 공사명령에 대한 서비스 분류가 끝나면 망자원의 선정작업을 하여 고객의 위치에서 전송장치까지의 망자원의 경로선정을 하는 제 2 기능;A second function of selecting, by the broadband subscriber network operation management system, service classification for a construction order and selecting network resources to route network resources from a customer's location to a transmission device; 상기 광대역 가입자망 운용관리 시스템이 할당된 각 광대역 가입자망 전송장치의 포트선정 작업을 실시하여, 실제 할당할 수 있는 여유 자원이 있으면 할당작업을 수행하고, 여유 자원이 없으면 새로운 전송장치 자원을 재선정하는 제 3 기능; 및The broadband subscriber network operation management system performs port selection of each allocated broadband subscriber network transmitter, and performs an allocation task if there is spare resource that can be allocated, and reselects a new transmitter resource if there is no spare resource. Third function; And 상기 광대역 가입자망 운용관리 시스템이 고객의 위치에서 교환기 혹은 전송시스템까지의 경로(Loop)에 대하여 개통시험을 실시하여, 개통시험결과가 양호하면 공사명령을 내린 상기 서비스청약관리시스템에 준공 결과를 통보하고, 완료된 가설현황을 입력하며, 양호하지 않으면 새로운 망자원을 재선정하는 제 4 기능The broadband subscriber network operation management system performs an opening test on the loop from the customer's location to the exchange or transmission system, and if the opening test result is satisfactory, notify the completion of the construction to the service subscription management system that issued the construction order. 4th function to input the completed hypothesis status and to reselect a new network resource if it is not good 을 실현시키기 위한 프로그램을 기록한 컴퓨터로 읽을 수 있는 기록 매체.A computer-readable recording medium having recorded thereon a program for realizing this.
KR1019980043993A 1998-10-20 1998-10-20 A method of the service provisioning process for broadband access network Expired - Fee Related KR100275464B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019980043993A KR100275464B1 (en) 1998-10-20 1998-10-20 A method of the service provisioning process for broadband access network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019980043993A KR100275464B1 (en) 1998-10-20 1998-10-20 A method of the service provisioning process for broadband access network

Publications (2)

Publication Number Publication Date
KR20000026463A KR20000026463A (en) 2000-05-15
KR100275464B1 true KR100275464B1 (en) 2000-12-15

Family

ID=19554756

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019980043993A Expired - Fee Related KR100275464B1 (en) 1998-10-20 1998-10-20 A method of the service provisioning process for broadband access network

Country Status (1)

Country Link
KR (1) KR100275464B1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100543305B1 (en) * 2002-06-28 2006-01-20 주식회사 케이티 Applicant processing device and method thereof for Internet service
KR100441892B1 (en) * 2002-07-05 2004-07-27 주식회사 케이티 Apparatus and method for integrally managing subscriber for CO-LAN
KR100723881B1 (en) * 2005-12-09 2007-05-31 한국전자통신연구원 Subscriber network management system and its method in virtual private network
KR100926569B1 (en) * 2007-12-13 2009-11-12 한국전자통신연구원 Method and device for individual subscriber configuration management of customer network management system

Also Published As

Publication number Publication date
KR20000026463A (en) 2000-05-15

Similar Documents

Publication Publication Date Title
CN1653847B (en) Apparatus and method for preventing disruption of fibre channel fabrics caused by reconfigure fabric (RCF) messages
US5640505A (en) Operational support structure for a telecommunications network
US6760762B2 (en) Intelligent network providing network access services (INP-NAS)
US6745235B2 (en) Intelligent network providing network access services (INP-NAS)
US7305623B2 (en) Method and apparatus for managing and representing elements in a network
US7636350B1 (en) System and method for access provisioning in multiple telecommunications technologies
US6847639B2 (en) Managing feature interaction among a plurality of independent feature servers in telecommunications servers
CN113872817B (en) Network connection control method, device, equipment, storage medium and system
KR100275464B1 (en) A method of the service provisioning process for broadband access network
US6728352B1 (en) Switch interaction subsystems for facilitating network information management
CA2385203A1 (en) Method and system for providing an efficient use of broadband network resources
US6879679B1 (en) Analysis method for provisioning subscribers in a next generation telecommunications network
US6661888B2 (en) Method for moving telecommunications customers onto a network
CA2385208A1 (en) Method and system for provisioning broadband network resources
Li et al. Complexity in 5G Network Applications and use cases
EP3704894B1 (en) A method and arrangement for allocating communication resources in a communication network
EP2584735B1 (en) Method and system for troubleshooting in in-house networks
CA2348577A1 (en) Management of terminations in a communications network
KR100495088B1 (en) Method for processing ADSL service command
US7492882B1 (en) C2P provisioning late-breaking scenarios
US12028660B2 (en) Cascaded optical switch
Zanzi et al. Latency-driven network slices orchestration
US7155217B1 (en) Method and apparatus for managing adjunct access and leased facilities
TR2023002609A2 (en) A SYSTEM THAT PROVIDES THE MANAGEMENT OF INTERNET SERVICE NETWORK INFRASTRUCTURE RESOURCES
KR100275523B1 (en) Remote Delivery of System Output Message Using E-mail Function

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

R17-X000 Change to representative recorded

St.27 status event code: A-3-3-R10-R17-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-3-3-R10-R18-oth-X000

PN2301 Change of applicant

St.27 status event code: A-3-3-R10-R11-asn-PN2301

St.27 status event code: A-3-3-R10-R13-asn-PN2301

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

R17-X000 Change to representative recorded

St.27 status event code: A-3-3-R10-R17-oth-X000

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

Fee payment year number: 1

St.27 status event code: A-2-2-U10-U11-oth-PR1002

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

St.27 status event code: A-5-5-R10-R13-asn-PN2301

PR1001 Payment of annual fee

Fee payment year number: 4

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PR1001 Payment of annual fee

Fee payment year number: 5

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PR1001 Payment of annual fee

Fee payment year number: 6

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PR1001 Payment of annual fee

Fee payment year number: 7

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PR1001 Payment of annual fee

Fee payment year number: 8

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PR1001 Payment of annual fee

Fee payment year number: 9

St.27 status event code: A-4-4-U10-U11-oth-PR1001

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

L13-X000 Limitation or reissue of ip right requested

St.27 status event code: A-2-3-L10-L13-lim-X000

U15-X000 Partial renewal or maintenance fee paid modifying the ip right scope

St.27 status event code: A-4-4-U10-U15-oth-X000

PR1001 Payment of annual fee

Fee payment year number: 10

St.27 status event code: A-4-4-U10-U11-oth-PR1001

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R11-asn-PN2301

St.27 status event code: A-5-5-R10-R13-asn-PN2301

FPAY Annual fee payment

Payment date: 20100909

Year of fee payment: 11

PR1001 Payment of annual fee

Fee payment year number: 11

St.27 status event code: A-4-4-U10-U11-oth-PR1001

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Not in force date: 20110922

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

St.27 status event code: A-4-4-U10-U13-oth-PC1903

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PC1903 Unpaid annual fee

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20110922

St.27 status event code: N-4-6-H10-H13-oth-PC1903

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000