- JPS61183073A JPS61183073A JP1665385A JP1665385A JPS61183073A JP S61183073 A JPS61183073 A JP S61183073A JP 1665385 A JP1665385 A JP 1665385A JP 1665385 A JP1665385 A JP 1665385A JP S61183073 A JPS61183073 A JP S61183073A
- Authority
- JP
- Japan
- Prior art keywords
- rope
- machine room
- floor
- hoistway
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔発明の利用分野〕
本発明は、2:10−ピングエレベータ用ロープ掛け作
業方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Field of Application of the Invention] The present invention relates to a method for roping a 2:10-ping elevator.
近時、2:10−ピングエレベータのロープ掛け作業の
方法として、例えば実公昭58−3705号公報に示さ
れるように、機械室のロープ穴から垂下されたエレベー
タ用ロープの先端に装着された引留金具と、同じく機械
室の他のロープ穴から垂下された案内ロープとを着脱自
在な接続具によって結合し、案内ロープと引留金具を互
いに一直線状に規制して、機械室に設けられて巻取装置
を操作することによりロープ掛け作業を行なうものが提
案された。Recently, as a method of rope hanging work for 2:10-ping elevators, for example, as shown in Japanese Utility Model Publication No. 58-3705, a tether is attached to the tip of an elevator rope suspended from a rope hole in a machine room. The metal fitting and the guide rope, which is also suspended from another rope hole in the machine room, are connected by a removable connector, and the guide rope and the hold-down fitting are regulated in a straight line with each other, and the winding device is installed in the machine room. A device was proposed in which rope hanging work was performed by operating the device.
この方法は、比較的低い建物に設置する場合には便利な
方法であるが、高い建物になると、エレベータ用ロープ
の自重により機械室に設けられた巻取装置を手動により
操作することは難しく、電動巻取装置を必要とする等の
問題点がある。This method is convenient when installing in relatively low buildings, but in tall buildings, it is difficult to manually operate the winding device installed in the machine room due to the weight of the elevator rope. There are problems such as the need for an electric winding device.
即ち、機械室に電動巻取装置を設置する場合、この装置
が重いため、数人で運搬しなければならず、また、電動
巻取装置を床へ固定する場合、設置場所の確保、床埋込
みボルトの処理等が必要となるなど種々の問題があった
。In other words, when installing an electric winding device in a machine room, the device is heavy and must be carried by several people, and when securing the electric winding device to the floor, it is difficult to secure the installation location and embed it in the floor. There were various problems such as the need to dispose of the bolts.
〔発明の目的〕
本発明の目的は、前記の問題点を生ずることなく、かつ
効果的にロープ掛け作業を行なうことのできる方法を提
供することにある。[Object of the Invention] An object of the present invention is to provide a method that can effectively perform rope hanging work without causing the above-mentioned problems.
本発明は、最上階に設置したワイヤードラム、昇降路最
下階に置かれたつり合いおもり、前記ワイヤードラムよ
り引き出されたロープの一端を昇降路最上部のエレベー
タ機械室に設置される綱車及びそらせ車に巻き掛けた後
、前記機械室床に設けられたロープ穴から昇降路を経由
して機械室に戻し、ロープ端部にシンブルロッドを連結
し、このシンブルロッドにスプリングを嵌合し、このス
プリングの上部には吊り板及び下部スプリング受座、上
部には上部スプリング受座を設け、かつ前記シンブルロ
ッドにロックナツトを螺合し、このロックナツトを前記
上部スプリング受座を介して締付けることによりロープ
端部の固定を行ない。The present invention provides a wire drum installed on the top floor, a counterweight placed on the bottom floor of the hoistway, a sheave installed in the elevator machine room at the top of the hoistway, and After wrapping the rope around the deflection wheel, the rope is returned to the machine room via a hoistway through a rope hole provided in the floor of the machine room, a thimble rod is connected to the end of the rope, and a spring is fitted to the thimble rod. A suspension plate and a lower spring seat are provided on the upper part of this spring, and an upper spring seat is provided on the upper part, and a lock nut is screwed onto the thimble rod, and this lock nut is tightened through the upper spring seat, so that the rope can be tightened. Fix the ends.
この状態でロープを前記ワイヤードラムにより繰り出し
昇降路へ垂下させて、前記つり合いおもり用プーリに巻
き掛け、しかるのち前記ロープの他端をドラムより切断
、切り離し、昇降路最上階に置いたかごのかご用プーリ
に巻き掛け後、前記機械室床に固定するようにしたロー
プ掛け作業を行なうエレベータにおいて、前記ロープ固
定部分の前記上部スプリング受座部分にスプリングを圧
縮するすように圧力を掛け、前記スプリングを圧縮させ
て、前記上部スプリング受座と前記ロックナツトを離間
させ、前記シンブルロッドの自由回転を許容させる装置
を備え、この装置を備えた状態において前記ロープ掛け
作業を行なうようにしたものである。In this state, the rope is let out by the wire drum, suspended down to the hoistway, and wound around the counterweight pulley.The other end of the rope is then cut and separated from the drum, and the car is placed on the top floor of the hoistway. In an elevator that performs a rope hanging operation in which the rope is wound around a pulley and then fixed to the floor of the machine room, pressure is applied to the upper spring seat part of the rope fixing part to compress the spring. The thimble rod is provided with a device that compresses the upper spring seat and separates the lock nut from each other to allow free rotation of the thimble rod, and the rope hanging operation is performed with this device in place.
以下、本発明の一実施例を図に基づき説明する。 Hereinafter, one embodiment of the present invention will be described based on the drawings.
第1図は1本発明の方法によるロープ掛け作業の状態を
示す説明図を示し、1aはかご用ガイドレール、1bは
つり合いおもり用ガイドレール、2は、かご4に設けら
れたワイヤードラム3を支えるドラム台、5はつり合い
おもり、6はエレベータの機械室に設置される綱車、7
はそらせ車、8はかご上プーリ、9は吊り板27に取り
付けられたつり合いおもり側プーリ、10はロープ、I
laはエレベータの機械室に設置するかご側ロープ固定
部、11bはつり合いおもり側ロープ固定部、12はシ
ンブルロッド13に自由回転を許容させるだめのシング
ルロッド回転装置、28はつり合いおもり5を支える支
持柱である。FIG. 1 shows an explanatory diagram showing the state of rope hanging work according to the method of the present invention, in which 1a is a car guide rail, 1b is a counterweight guide rail, and 2 is a wire drum 3 provided on a car 4. A supporting drum base, 5 a counterweight, 6 a sheave installed in the elevator machine room, 7
8 is a pulley on the car, 9 is a pulley on the counterweight side attached to the hanging plate 27, 10 is a rope, I
la is a car side rope fixing part installed in the machine room of the elevator; 11b is a counterweight side rope fixing part; 12 is a single rod rotating device for allowing the thimble rod 13 to rotate freely; 28 is a support for supporting the counterweight 5. It is a pillar.
第2図は、かご側ロープ固定部11a及びつり合いおも
り側ロープ固定部11bの断面図である。FIG. 2 is a sectional view of the car side rope fixing part 11a and the counterweight side rope fixing part 11b.
ロープ10端部には、ロープソケット14が設けられ、
ピン15を介して吊り板16に貫通するシンブルロッド
13が固定されている。21はシンブルロッド13に貫
通する割ピン、20はシンブルロッド13を固定するロ
ックナツトで、このロックナツト20と吊り板16間に
は、下部スプリング受座17、スプリング18、上部ス
プリング受座19が設けられている。第3図は、つり合
いおもり側ロープ固定部11bにシンブルロッド回転装
置12を取付けた断面図である。23はシンブルロッド
13を貫通させ上部スプリング受座19の上に置いた筒
、22は筒23の上にベアリング受座24を介しておい
たベアリング、25は締付ナツト26にてベアリング2
2、ベアリング受座24および筒23を介して上部スプ
リング受座19を押し下げるための押庄である。この回
転装置12は、締付ナツト26を締付けることにより、
シンプルロット13が上動し、ロックナツト2oを受座
19から離間させ、ロープ1oを自由回転できるように
するものである。A rope socket 14 is provided at the end of the rope 10,
A thimble rod 13 penetrating the hanging plate 16 via a pin 15 is fixed. 21 is a split pin that penetrates through the thimble rod 13; 20 is a lock nut that fixes the thimble rod 13; between the lock nut 20 and the hanging plate 16, a lower spring seat 17, a spring 18, and an upper spring seat 19 are provided. ing. FIG. 3 is a sectional view of the thimble rod rotating device 12 attached to the counterweight side rope fixing portion 11b. Reference numeral 23 denotes a cylinder that is passed through the thimble rod 13 and placed on the upper spring seat 19, 22 is a bearing that is placed on the cylinder 23 via a bearing seat 24, and 25 is a tightening nut 26 that holds the bearing 2.
2. A pusher for pushing down the upper spring seat 19 via the bearing seat 24 and the cylinder 23. This rotating device 12 can be rotated by tightening the tightening nut 26.
The simple rod 13 moves upward to separate the lock nut 2o from the seat 19, allowing the rope 1o to rotate freely.
次にロープ掛け作業方法について説明する。まず、かご
4内にドラム台2を設はワイヤードラム3を置き、この
ワイヤードラム3からロープを引き出し、このロープ1
0の一端にロープソケット14をソケツテイングする。Next, the rope hanging method will be explained. First, set up the drum stand 2 in the car 4, place the wire drum 3, pull out the rope from this wire drum 3, and then pull out the rope 1.
0. Socket the rope socket 14 at one end of the cable.
この後、かご内からエレベータ機械室の綱車6及びそら
せ車7へ掛け回し、一方のつり合いおもり側ロープ落し
穴より昇降路へ降した後、他のつり合いおもり側ロープ
落し穴よりエレベータ機械室へ引き上げる。次に第2図
に示したようにつり合いおもり側ロープ固定部11bの
ごとく固定する。Thereafter, the rope is routed from inside the car to the sheave 6 and diversion wheel 7 in the elevator machine room, lowered into the hoistway through one counterweight-side rope pit, and then pulled up into the elevator machine room through the other counterweight-side rope pit. Next, as shown in FIG. 2, it is fixed like the counterweight side rope fixing part 11b.
ついで、シンブルロッド回転装置12を第3図に示すご
とく取付はロープ1oが自由回転できるようにする。そ
の後、ロープ10をワイヤードラム3より引き出して、
つり合いおもり側プーリ9まで降し、つり合いおもり側
プーリ吊り板27の片側を取り外し、つり合いおもり側
プーリ9にロープ10を掛け回す。しかる後、前記ロー
プ10をかご上プーリ8部分にて引張り張らせた後昇降
路内に仮止めし、仮止め部よりかご上プーリ8を経由し
てエレベータ機械室かご側ローブ固定部までの長さを実
測し、この実測値に合せてロープ10をワイヤードラム
3より切断する。以上の作業を使用ロープ本数分実施し
た後、取り外した前記つり合いおもり側プーリ吊り板2
7の片側を取付け、前記切断した側のロープ端部にロー
プソケット14をロープ本数分ソケツテイングし、これ
をかご上プーリ8に掛け回し、第1図に示すようにロー
プ固定部11aのごとく固定する。この後で、前記昇降
路内に仮止めした部分を取外し作業を完了する。Next, the thimble rod rotating device 12 is installed as shown in FIG. 3 so that the rope 1o can freely rotate. After that, the rope 10 is pulled out from the wire drum 3,
Lower the balance weight side pulley 9, remove one side of the balance weight side pulley hanging plate 27, and wrap the rope 10 around the balance weight side pulley 9. After that, the rope 10 is pulled by the car upper pulley 8 and then temporarily fixed in the hoistway, and the length from the temporarily fixed part to the car side lobe fixing part in the elevator machine room is passed through the car upper pulley 8. The rope 10 is cut from the wire drum 3 according to the measured value. After performing the above operations for the number of ropes used, the pulley hanging plate 2 on the counterweight side was removed.
Attach one side of the rope 7, socket the rope sockets 14 for the number of ropes on the cut end of the rope, wrap this around the car pulley 8, and fix it like the rope fixing part 11a as shown in Fig. 1. . After this, the portion temporarily fixed in the hoistway is removed to complete the work.
以上のごとくロープ掛け作業することにより。By doing the rope hanging work as described above.
電動巻取装置を必要とせず2又、ロープ掛け作業時発生
するロープの撚り、キング、曲り、ロープの汚れ等も防
止できる。すなわち、シンブルロッド回転装置を備える
ことによりロープに自由回転を許容することができるた
め1作業時ロープに発生した力はロープ内に停滞するこ
となく逃げることができるためである。又、ロープをワ
イヤードラムより直接引き出し作業するため、ロープの
曲り、ロープの汚れ等も防止できる。It is possible to prevent rope twisting, kinging, bending, rope staining, etc. that occur during rope hanging work without the need for an electric winding device. That is, by providing the thimble rod rotating device, the rope can be allowed to rotate freely, so that the force generated in the rope during one operation can escape without being stagnated within the rope. In addition, since the rope is pulled out directly from the wire drum, bending of the rope and soiling of the rope can be prevented.
本発明によれば、ロープの撚り、キング、曲り、ロープ
の汚れ等が発生しないので著しく品質の向上を計れるば
かりか、電動巻取装置を必要としないので工数の低減等
を計ることができる。According to the present invention, not only can the quality be significantly improved since rope twisting, kinging, bending, rope staining, etc. do not occur, but also the number of man-hours can be reduced because an electric winding device is not required.
第1図は、本発明の一実施例になるロープ掛け作業方法
を示す説明図、第2図は、ロープ固定部の状態を示す断
面図、第3図は、つり合いおもり側ロープ固定部にシン
プルロット回転装置を取付けた断面図である。
2・・・ドラム台、3・・・ワイヤードラム、4・・・
かご。
5・・・つり合いおもり、6・・・綱車、7・・・そら
せ車。
8・・・かご上プーリ、9・・・つり合いおもり側プー
リ、10・・・ロープ、llb・・・つり合いおもり側
ロープ固定部、12・・・シンプルロット回転装置、1
3・・・シンブルロッド、19・・・上部スプリング受
座、20・・・ロックナツト、22・・・ベアリング、
23・・・筒、25・・・押庄、26・・・締付ナツト
、27・・・つり1に1−−;+−,j、−
第 1 図
第2 図
′I/73fi7J
昭和61年 3月 夕日Fig. 1 is an explanatory diagram showing a rope hanging work method according to an embodiment of the present invention, Fig. 2 is a sectional view showing the state of the rope fixing part, and Fig. 3 is a simple illustration of the rope fixing part on the counterweight side. FIG. 3 is a cross-sectional view of the rot rotation device. 2...Drum stand, 3...Wire drum, 4...
Basket. 5... Counterweight, 6... Sheave, 7... Deflection wheel. 8... Car pulley, 9... Balance weight side pulley, 10... Rope, llb... Balance weight side rope fixing part, 12... Simple lot rotating device, 1
3... Thimble rod, 19... Upper spring seat, 20... Lock nut, 22... Bearing,
23... Tube, 25... Pressure, 26... Tightening nut, 27... Hanging 1 to 1--; +-, j, - Figure 1 Figure 2 Figure 'I/73fi7J 1988 March sunset
Claims (1)
置かれたつり合いおもり、前記ワイヤードラムより引き
出されたロープの一端を昇降路最上部のエレベータ機械
室に設置される綱車及びそらせ車に巻き掛けた後、前記
機械室床に設けられたロープ穴から昇降路を経由して機
械室に戻し、ロープ端部にシンブルロッドを連結し、こ
のシンブルロッドにスプリングを嵌合し、このスプリン
グの下部には吊り板及び下部スプリング受座、上部には
上部スプリング受座を設け、かつ前記シンブルロッドに
ロックナットを螺合し、このロックナットを前記上部ス
プリング受座を介して締付けることによりロープ端部の
固定を行ない、この状態でロープを前記ワイヤードラム
より繰り出し昇降路へ垂下させて、前記つり合いおもり
用プーリに巻き掛け、しかるのち前記ロープの他端をド
ラムより切断、切り離し、昇降路最上階に置いたかごの
かご用プーリに巻き掛け後、前記機械室床に固定するよ
うにしたロープ掛け作業を行なうエレベータにおいて、
前記ロープ固定部分の前記上部スプリング受座部分にス
プリングを圧縮するように圧力を掛け、前記スプリング
を圧縮させて、前記上部スプリング受座と前記ロックナ
ットを離間させ、前記シンブルロッドの自由回転を許容
させる装置を備え、この装置を備えた状態において前記
ロープ掛け作業を行なうようにしたことを特徴とするエ
レベータ用ロープ掛け作業方法。1. A wire drum installed on the top floor, a counterweight placed on the bottom floor of the hoistway, and one end of the rope pulled out from the wire drum connected to a sheave and deflector wheel installed in the elevator machine room at the top of the hoistway. After wrapping the rope around the machine room floor, the rope is returned to the machine room via the hoistway through a rope hole provided in the machine room floor, a thimble rod is connected to the end of the rope, a spring is fitted to this thimble rod, and this spring A hanging plate and a lower spring catch are provided at the lower part of the rod, and an upper spring catch is provided at the upper part of the rope. The end of the rope is fixed, and in this state the rope is let out from the wire drum, suspended down to the hoistway, and wrapped around the counterweight pulley.Then, the other end of the rope is cut and separated from the drum, and is placed at the top of the hoistway. In an elevator that performs a rope hanging operation in which the car is wrapped around a car pulley placed on a floor and then fixed to the floor of the machine room,
Pressure is applied to the upper spring seat portion of the rope fixing portion to compress the spring, and the spring is compressed to separate the upper spring seat and the lock nut, allowing free rotation of the thimble rod. 1. A method for hanging a rope for an elevator, characterized in that the rope hanging work is carried out in a state in which the apparatus is equipped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1665385A JPS61183073A (en) | 1985-02-01 | 1985-02-01 | How to hang an elevator rope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1665385A JPS61183073A (en) | 1985-02-01 | 1985-02-01 | How to hang an elevator rope |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS61183073A true JPS61183073A (en) | 1986-08-15 |
JPS632873B2 JPS632873B2 (en) | 1988-01-21 |
Family
ID=11922298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1665385A Granted JPS61183073A (en) | 1985-02-01 | 1985-02-01 | How to hang an elevator rope |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61183073A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012106863A (en) * | 2010-10-21 | 2012-06-07 | Hitachi Building Systems Co Ltd | Device and system for adjusting rope tension in elevator |
-
1985
- 1985-02-01 JP JP1665385A patent/JPS61183073A/en active Granted
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012106863A (en) * | 2010-10-21 | 2012-06-07 | Hitachi Building Systems Co Ltd | Device and system for adjusting rope tension in elevator |
Also Published As
Publication number | Publication date |
---|---|
JPS632873B2 (en) | 1988-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115285821A (en) | System and method for quickly separating and replacing new steel wire rope and old steel wire rope of multi-rope friction type elevator | |
JPS61183073A (en) | How to hang an elevator rope | |
JP3277486B2 (en) | Existing main rope winding device of the elevator | |
JP3213686B2 (en) | Main rope replacement method and moving jig for elevator | |
JPH11165966A (en) | Main rope replacing method of hydraulic elevator and fixture therefor | |
WO2024069711A1 (en) | Elevator main cable replacement method and replacement assisting tool | |
JP2603729B2 (en) | Elevator main rope hanging method | |
JPH0791012B2 (en) | Driving method of elevator main rope | |
JPH09278325A (en) | Construction work elevator lifting method and construction work elevator device | |
JP2839970B2 (en) | Elevator main cable replacement method | |
JP3340322B2 (en) | Elevator main cable entanglement prevention device | |
JP3211621B2 (en) | Elevator main cable erection equipment | |
JP2912989B2 (en) | Main rope hanging method of elevator | |
JP7444317B1 (en) | Attachments, lifting aids and lifting aids | |
JP2000344440A (en) | Main rope hanging work method of 2: 1 roping elevator and main rope guide device thereof | |
JP3193643B2 (en) | Winding device for elevator main rope | |
JPH082850A (en) | Work method in elevator shaft | |
JPH11189378A (en) | 2: 1 Roping elevator main rope mounting jig | |
JPH10203751A (en) | Main rope replacement method and apparatus for 2: 1 roping elevator | |
JPH0881155A (en) | Main rope length adjusting device for hydraulic elevator | |
JPH11189377A (en) | Main rope replacement method for 2: 1 roping elevator | |
SU1708738A1 (en) | Method for installation of traction ropes of mine hoists | |
JPH02117581A (en) | How to replace elevator rope | |
JPH0262390A (en) | Main rope setting method for 2:1 roping elevator | |
JP2003112875A (en) | Mounting structure and mounting method of elevator compensation rope |