Bulk cargo carrier shipInfo
- Publication number
- JPS6038283A JPS6038283A JP14583783A JP14583783A JPS6038283A JP S6038283 A JPS6038283 A JP S6038283A JP 14583783 A JP14583783 A JP 14583783A JP 14583783 A JP14583783 A JP 14583783A JP S6038283 A JPS6038283 A JP S6038283A
- Authority
- JP
- Japan
- Prior art keywords
- hold
- bulk cargo
- scraper
- ship
- cargo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B25/00—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
- B63B25/02—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
- B63B25/04—Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods solid
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Ship Loading And Unloading (AREA)
Abstract
Description
【発明の詳細な説明】
本発明は、浚渫土のごとbバラ荷の運搬船に関し、特に
バラ荷の陸揚げを行なうようにした運搬船に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a carrier for carrying bulk cargo such as dredged soil, and particularly to a carrier for unloading bulk cargo.
従来、上部間ロ型パラ荷用船倉をそなえた運搬船から浚
渫土を陸上へ揚荷後する場合は、運搬船を接岸させた後
、泥倉内からグラブバケットにより揚荷後することが行
なわれていた。Conventionally, when unloading dredged soil onto land from a carrier equipped with an upper-barrel type para cargo hold, the carrier was berthed and then unloaded using a grab bucket from inside the mud hold. .
1−
しかしながら、このようなグラブバケットによる揚荷後
では、狭い船倉内に挿入できる小型のグラブバケットし
か使用できないので、長時間にわたる荷役作業を必要と
し、運搬船の稼動率の低下を招くという問題点がある。1- However, after unloading using such grab buckets, only small grab buckets that can be inserted into the narrow cargo hold can be used, which requires long hours of cargo handling work, leading to a reduction in the operating rate of the carrier ship. There is.
本発明は、このような問題点の解決をはかろうとするも
ので、浚渫土等のバラ荷を効率良く迅速に揚荷後できる
ようにしたバラ荷運搬船を提供することを目的とする。The present invention attempts to solve these problems, and aims to provide a bulk cargo carrier that can efficiently and quickly unload bulk cargo such as dredged soil.
このため本発明のバラ荷運搬船は、船長方向に配設され
た上部間ロ型バラ荷用船倉をそなえ、同船倉内のバラ荷
を揚荷後すべく、同船倉の両端部の間を往復動しうるス
クレーパーと、上記船倉の端部において同船倉の底面か
ら昇傾斜する傾斜路と、同傾斜路に沿い上記スクレーパ
ーにより掻き上げられたバラ荷を受ける船外排出用荷役
部材とが設けられたことを特徴としている。For this reason, the bulk cargo carrier of the present invention is equipped with an upper-to-bottom round-shaped bulk cargo hold arranged in the direction of the ship's ship, and in order to unload the bulk cargo in the hold, a reciprocating movement is made between both ends of the cargo hold. a scraper that can be scraped up, a ramp that ascends and slopes from the bottom of the hold at the end of the hold, and a cargo handling member for overboard discharge that receives the bulk cargo scraped up by the scraper along the ramp. It is characterized by
このように、上部間ロ型バラ荷用船愈の底面から昇傾斜
する傾斜路と、同傾斜路に沿いバラ荷を掻き上げ2−
るスクレーパーとが組合わされることにより、掻す上げ
られたバラ荷を受ける船外排出用荷役部材と相まって、
バラ荷の揚荷後が極めて能率良く行なわれるようになる
効果がある。In this way, by combining the ramp that ascends and slopes from the bottom of the upper-to-bottom type bulk cargo vessel with the scraper that scrapes up the bulk cargo along the ramp, it is possible to Coupled with cargo handling components for overboard discharge that receive bulk cargo,
This has the effect that the process after unloading bulk cargo can be carried out extremely efficiently.
以下図面により、本発明の一実施例としてのバラ荷運搬
船について説明すると、第1図はその船体平面図、第2
図はその船体側面図、第3図はその左半部において船尾
部付近の横断面を示し右半部において船体中央部付近の
横断面を示す船体横断面図である。A bulk cargo carrier as an embodiment of the present invention will be explained below with reference to the drawings. Figure 1 is a plan view of the hull,
The figure is a side view of the hull, and FIG. 3 is a cross-sectional view of the hull, with the left half showing a cross section near the stern and the right half showing a cross section near the center of the hull.
これらの図に示すように、浚渫土等を収容する上部間ロ
型バラ荷用船倉1が船長方向に配設されており、同船倉
1の端部には底面1aから弯曲して昇傾斜する弯曲面1
bが形成されている。As shown in these figures, an upper, round-shaped bulk cargo hold 1 for storing dredged soil, etc. is arranged in the direction of the ship's ship, and the end of the hold 1 is curved and sloped upward from the bottom surface 1a. Curved surface 1
b is formed.
そして、船尾部の1−甲板2上には」二部構造物3が設
けられ、この構造物3を利用して船倉弯曲面1bに接続
する傾斜部材4が設けられている。A two-part structure 3 is provided on the first deck 2 of the stern section, and an inclined member 4 is provided which utilizes this structure 3 to connect to the hold curved surface 1b.
このようにして、船倉弯曲面1bと傾斜部材4とにより
船倉1の底面1aから昇傾斜する傾斜路Aが形成されて
いる。In this way, the hold curved surface 1b and the inclined member 4 form a ramp A that ascends and slopes from the bottom surface 1a of the hold 1.
3−
また、船倉1の両端部の間を往復動するスクレーパー5
が左イイにi基ずつ設けられていて、各スクレーパー5
の駆動は、船尾部の戻し用ウィンチ6から」二部構造物
3上の滑11t7および船首部上の滑車8を経てスクレ
ーパー5に至る索9aと、同スクレーパー5から上部構
造物3」二の滑車10を経て船尾部の掻き上げ用ウィン
チ11へ至る索9bとを用いて行なわれる。3- There is also a scraper 5 that reciprocates between both ends of the hold 1.
There are i groups of scrapers on the left side, and each scraper 5
is driven by a cable 9a that runs from the return winch 6 at the stern section through a slide 11t7 on the two-part structure 3 and a pulley 8 on the bow section to the scraper 5, and from the scraper 5 to the superstructure 3 section. This is carried out using a cable 9b that passes through a pulley 10 and reaches a raking winch 11 at the stern of the ship.
したがって、掻き」二げ用ウィンチ11による索9bの
巻取り作動に伴い、スクレーパー5により船倉1内から
掻き出される浚渫土が、傾斜路Aに沿い掻ト上げられて
、傾斜部材4の上部4aまで運ばれるようになっている
。Therefore, with the winding operation of the cable 9b by the scraping winch 11, the dredged soil scraped out from inside the hold 1 by the scraper 5 is scraped up along the ramp A, and the dredged soil is scraped up into the upper part 4a of the ramp member 4. It is designed to be carried up to
そして、傾斜部材上部4aには、スクレーバー5内の浚
渫」−を落下させる開口12が形成されており、この開
「]12の下方には、上部構造物3を利用してホッパー
13が設けられている。An opening 12 is formed in the upper part 4a of the inclined member, and a hopper 13 is provided below this opening 12 by using the upper structure 3. ing.
さらに、ホッパー13を通して落下した浚渫土を受ける
ベルトコンベヤ14が設けられ、これにより浚渫土を陸
−1−の浚渫土受入れ手段へ送り出せるようになり4−
ている。Furthermore, a belt conveyor 14 is provided to receive the dredged soil that has fallen through the hopper 13, so that the dredged soil can be sent to the dredged soil receiving means on land-1-4.
上述の構成により、掻き上げ用ウィンチ11を作動させ
て、スクレーパー5による浚渫土の掻き−にげを傾斜路
Aの上部の開口12*で行なう操作と、戻し用ウィンチ
6を作動させてスクレーパー5を船倉1の船首部寄り端
部へ戻す操作とを繰返すことが行なわれ、このようにし
て開口12からホッパー13を通じベルトコンベヤ14
へ落下した浚渫土が陸上へ円滑に揚荷後されるのである
。With the above-described configuration, the scraping winch 11 is operated to scrape and scrape the dredged soil by the scraper 5 through the opening 12* at the top of the ramp A, and the return winch 6 is operated to scrape and scrape the dredged soil using the scraper 5. The operation of returning the material to the bow end of the hold 1 is repeated, and in this way, the material is transported from the opening 12 through the hopper 13 to the belt conveyor 14.
Dredged soil that has fallen onto the ground can be smoothly unloaded onto land.
なお、各ウィンチ6.11の運転は、上部構造物3」二
のフントロールボックス15において、スクレーパー5
の作動の監視とともに行なわれる。In addition, each winch 6.11 is operated by the scraper 5 in the upper structure 3'' second hunt roll box 15.
This is done in conjunction with monitoring the operation of the
上述の実施例では、スクレーパー5の船尾方向への移動
に際してのみ浚渫土の掻き出しが行なわれるようになっ
ているが、スクレーパー5の180度反転機構を設ける
ことにより、その船首部方向への移動に際しても浚渫土
の掻外出しを行なわせるようにして、船首部gIItこ
も設けた傾斜路、ホッパーおよびベルトコンベヤ等を介
し、浚渫土の揚荷後を一層効率良く行なわせ5−
ることもできる。In the above embodiment, the dredged soil is scraped out only when the scraper 5 moves toward the stern, but by providing a 180-degree reversal mechanism for the scraper 5, dredged soil is scraped out only when the scraper 5 moves toward the bow. It is also possible to more efficiently unload the dredged soil through the ramp, hopper, belt conveyor, etc. provided at the bow of the ship by scraping out the dredged soil.
また、ホッパー13およびベルトコンベヤ14からなる
船外排出用荷役部材の代わりに、シュートのごとき船外
排出用荷役部材を設けてもよい。Further, instead of the overboard discharge material handling member consisting of the hopper 13 and the belt conveyor 14, an overboard discharge material handling member such as a chute may be provided.
以上詳述したように、本発明のパラ荷運搬船によれば、
船長方向に配設された上部間ロ型バラ荷用船倉をそなえ
、同船倉内のバラ荷を揚荷後すべく、同船倉の両端部の
間を往復動しうるスクレーパーと、上記船倉の端部にお
いて同船倉の底面から昇傾斜する傾斜路と、同傾斜路に
沿い上記スクレーパーにより掻き上げられたバラ荷を受
ける船外排出用荷役部材とが設けられるという簡素な構
造で、従来長時間の作業を必要としていた浚渫土等の揚
荷後を、極めて短時間のうちに能率良くかつ安全に行な
える利点がある。As detailed above, according to the para cargo carrier of the present invention,
It is equipped with an upper square-type bulk cargo hold arranged in the direction of the ship's ship, and includes a scraper that can reciprocate between both ends of the hold in order to unload the bulk cargo in the hold, and an end of the above-mentioned hold. The simple structure includes a ramp that ascends and slopes from the bottom of the hold, and a cargo handling member for discharging overboard that receives the bulk cargo scraped up by the scraper along the ramp. This method has the advantage that dredged soil, etc., can be unloaded efficiently and safely in an extremely short period of time, which previously required the unloading of dredged soil.
第1〜3図は本発明の一実施例としてのパラ荷運搬船を
示すもので、#&1図はその船体平面図、第2図はその
船体側面図、第3図はその左半部において船尾部付近の
横断面を示し右半部において船体中央部付近の6−
横断面を示す船体横断面図である。
1・・上部間ロ型バラ荷用船倉、1a・・船倉底面、1
b・・船倉弯曲面、2・・上甲板、3・・上部構造物、
4・・傾斜部材、4a・・傾斜部材」二部、5・・スク
レーパー、6・中戻し用ウィンチ、7,8・・滑車、9
a、9b・・索、10・・滑車、11・・掻き−にげ用
ウィンチ、12・φ開口、13・・ホッパー、14・・
ベルトコンベヤ、1511・コントロールボックス、A
・・傾斜路。
代理人 弁理士 飯沼義彦
7−
特開昭GO−38283(4)Figures 1 to 3 show a para-cargo ship as an embodiment of the present invention. Figures #&1 are a plan view of the hull, Figure 2 is a side view of the hull, and Figure 3 is a stern view of the left half of the ship. FIG. 4 is a cross-sectional view of the hull showing a cross section near the center of the ship and a cross section near the center of the hull in the right half. 1. Upper part round bulk cargo hold, 1a. Bottom of hold, 1
b... Hold curved surface, 2... Upper deck, 3... Upper structure,
4... Inclined member, 4a... Inclined member' 2 parts, 5... Scraper, 6. Winch for returning the middle, 7, 8... Pulley, 9
a, 9b... Cable, 10... Pulley, 11... Winch for scraping, 12... φ opening, 13... Hopper, 14...
Belt conveyor, 1511 control box, A
...Ramp. Agent Patent Attorney Yoshihiko Iinuma 7- Tokukai Sho GO-38283 (4)
Claims (1)
、同船倉内のバラ荷を揚荷後すべく、同船倉の両端部の
開を往復動しうるスクレーパーと、上記船倉の端部にお
いて同船倉の底面から碧傾斜する傾斜路と、同傾斜路に
沿い上記スクレーパーにより掻す上げられたバラ荷を受
ける船外排出用荷役部材とが設けられたことを特徴とす
る、パラ荷運搬船。It is equipped with an upper square-type bulk cargo hold arranged in the direction of the ship's ship, and a scraper that can reciprocate between openings at both ends of the hold in order to unload the bulk cargo in the hold, and an end of the above-mentioned hold. A para-cargo carrier, characterized in that it is provided with a ramp that slopes upward from the bottom of the cargo hold, and a cargo handling member for overboard discharge that receives bulk cargo scraped up by the scraper along the ramp. .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14583783A JPS6038283A (en) | 1983-08-10 | 1983-08-10 | Bulk cargo carrier ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14583783A JPS6038283A (en) | 1983-08-10 | 1983-08-10 | Bulk cargo carrier ship |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6038283A true JPS6038283A (en) | 1985-02-27 |
JPS6341359B2 JPS6341359B2 (en) | 1988-08-16 |
Family
ID=15394248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14583783A Granted JPS6038283A (en) | 1983-08-10 | 1983-08-10 | Bulk cargo carrier ship |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6038283A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6390492A (en) * | 1986-10-01 | 1988-04-21 | Ube Ind Ltd | In-ship cargo handling device |
JPS63218432A (en) * | 1987-03-09 | 1988-09-12 | Ube Ind Ltd | Onboard cargo handling equipment |
JPH0644662U (en) * | 1991-07-15 | 1994-06-14 | 株式会社曙ブレーキ中央技術研究所 | Brake control device |
-
1983
- 1983-08-10 JP JP14583783A patent/JPS6038283A/en active Granted
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6390492A (en) * | 1986-10-01 | 1988-04-21 | Ube Ind Ltd | In-ship cargo handling device |
JPS63218432A (en) * | 1987-03-09 | 1988-09-12 | Ube Ind Ltd | Onboard cargo handling equipment |
JPH0644662U (en) * | 1991-07-15 | 1994-06-14 | 株式会社曙ブレーキ中央技術研究所 | Brake control device |
Also Published As
Publication number | Publication date |
---|---|
JPS6341359B2 (en) | 1988-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0295999A (en) | Water surface floating object processing system | |
US5564878A (en) | Apparatus and method for continuous handling of bulk materials | |
US6390006B1 (en) | Sea bulk transfer vessel | |
JPS6038283A (en) | Bulk cargo carrier ship | |
US3002634A (en) | Bulk-cargo carrying ship | |
EP0566575B1 (en) | Unloading means for bulk material | |
JP2515955B2 (en) | Method for unloading space and device for implementing this method | |
EP0404273B1 (en) | Vessel with unloading device | |
JP4502241B2 (en) | Bulk carrier | |
SU1689263A1 (en) | Floating reloader of loose materials | |
JPS5823787Y2 (en) | Soil lifting device | |
JPH0659200U (en) | Special ship | |
JP2853363B2 (en) | Unloader handling method | |
DE2701393A1 (en) | Deep sea mining system - has main surface ship controlling nodule harvesting and mining machines on sea bed | |
US3228539A (en) | Water-borne transport and dispensing vehicle | |
US1604676A (en) | Barge | |
JP2002053230A (en) | Loading-unloading system of bulk carrier | |
US4477220A (en) | Method and apparatus for unloading burden from a tow comprised of barges | |
JPH09202456A (en) | Unloading device for cargo in bulk in hold | |
JPS6145838A (en) | Soil unloading ship | |
SU751710A1 (en) | Floating scraper-type cargo reloader | |
JPS5815354B2 (en) | Method of unloading powder and granular cargo from a ship and powder and granular cargo carrier | |
SU965929A1 (en) | Method of unloading loose cargo from non-selfpropelled ships | |
JP3002734B2 (en) | Self-unloading system for bulk carriers | |
JPH11334683A (en) | Carrier for bulk matrials |