JPS5862217A - Pile construction work - Google Patents
Pile construction workInfo
- Publication number
- JPS5862217A JPS5862217A JP15985281A JP15985281A JPS5862217A JP S5862217 A JPS5862217 A JP S5862217A JP 15985281 A JP15985281 A JP 15985281A JP 15985281 A JP15985281 A JP 15985281A JP S5862217 A JPS5862217 A JP S5862217A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- soil
- spiral auger
- steel pipe
- hollow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【発明の詳細な説明】
不発明は杭の嬬込み工法、轡にhわゆる中掘り工法の改
良に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improvement in a method for inserting piles, or a method for digging in the pile.
従来の中掘り工法は、杭の中空孔内にスパイラルオーガ
を挿入し、こn會回転させクク下降させ1掘削及び掘削
土の排出(排出)七行い、ここに形成された掘削孔内に
杭klL人させていたが、この時、杭の内面に掘削土に
よる圧力が作用し、この圧力に1つ1杭に縦割れが生じ
たり、更に掘削土中に玉石が貧1れる場合a1この玉石
が杭の内面と虜失し1杭を破損させ1しまうことかりる
欠点がめった。In the conventional hollow excavation method, a spiral auger is inserted into the hollow hole of the pile, rotated and lowered for one excavation and seven excavated soil discharges (discharge), and the pile is inserted into the excavated hole formed here. However, at this time, pressure from the excavated soil acts on the inner surface of the piles, and this pressure may cause vertical cracks in each pile, and if the cobbles are lost in the excavated soil, a1 this cobble. However, the problem was that the inner surface of the pile could be damaged, resulting in damage to the pile.
本発明は1紀に−み、杭O内−に掘削土による圧力がか
かることなく掘削土中に玉石が言まれても杭を破損させ
ることがないものt″提供んとし1なされた−のでるり
、そのJI!、旨は杭の中空孔内に排土ガイド−雷t1
該排土ガイド鋼管内にスパイラルオーガを夫々挿入し、
該スパイラルオーガ七回転させ9つ下降させ、I!ij
時に排土ガイド−′IFも下降させて掘削及び排土上行
い、ここに形成された掘削孔内に杭’k1人させ、打撃
を与えるか又は根固めt竹ってこ九t−固足させること
に%倣とする杭の嬬込み工法にめる0以下、図示の爽抛
例に基づい1本発明を詳細に説明すると、第1図に本発
明の施工順序の一実施例を示すI!要図で、先ず同図0
)で示すように杭lの中空孔1a内に中空゛円筒状の排
土ガイドー管2を挿入し1杭1の中空孔l&の内面2c
nで覆うと共に、この排土ガイド−雷2内にはスパイラ
ルオーガ3t#入する。The present invention was developed in the 1st century with the aim of providing a pile that would not be damaged even if there were boulders in the excavated soil without applying pressure from the excavated soil inside the pile. Ruri, its JI!, the meaning is earth removal guide in the hollow hole of the pile - lightning t1
Insert a spiral auger into each of the soil removal guide steel pipes,
The spiral auger rotates seven times and descends nine times, and I! ij
At the same time, the earth removal guide IF is also lowered to carry out excavation and earth removal, and a pile is placed in the excavation hole formed here, and a blow is applied or a bamboo lever is used to secure the pile. In particular, the present invention will be explained in detail based on the illustrated example of the construction method for piles, which is based on the construction method of piles. In the main map, first the same figure 0
), a hollow cylindrical soil removal guide pipe 2 is inserted into the hollow hole 1a of the pile 1, and the inner surface 2c of the hollow hole 1& of the pile 1 is inserted.
At the same time, a spiral auger 3t# is inserted into this soil removal guide-lighter 2.
この状態でスパイラルオーガarum転させつつ下降さ
せてその先端のオーガ、ヘッド3aで掘削を行うことに
より掘削孔4を形成し、同時に耕土ガイド鋼管2を下廃
さぜ1掘削により発生した掘削±1r排土ガイドー雪2
とスIくイラルオーガ3との間を通過させ、上部に排出
さぜる0この時、掘削土は杭lの中空孔1aQ17’3
面と巌触しないため、ここに掘削土による圧力がかから
ず、また掘削土中に玉石がtまれ1い1%排土ガイド−
管2にガードされて杭IO中空孔1aの内面と衝突する
ことがないので、杭lは掘削土による圧力、玉石等によ
つ1破損することはないのでるる。In this state, the spiral auger is rotated and lowered, and the auger and head 3a at the tip of the spiral auger are used to perform excavation to form the excavation hole 4, and at the same time, the tilled soil guide steel pipe 2 is removed by the excavation ±1r caused by the excavation of the soil guide steel pipe 2. Earth removal guide-Snow 2
At this time, the excavated soil is passed between the hollow hole 1aQ17'3 of the pile 1 and the soil auger 3, and is discharged to the top.
Since it does not come into contact with the surface, no pressure is applied by the excavated soil, and the 1% soil removal guide prevents cobbles from being trapped in the excavated soil.
Since the pile 1 is guarded by the pipe 2 and does not collide with the inner surface of the hollow hole 1a of the pile 1, the pile 1 will not be damaged by pressure from excavated soil, boulders, etc.
なお、排土ガイド−管2tスパイラルオーガ3の回転方
間と逆方向に回転させることによりスパイラルオーガ3
の排土ガイド−管2に対する相対的な回転速成上増加さ
ぜ1#土効率を誦めることができる。Note that the spiral auger 3 can be rotated by rotating the earth removal guide tube 2t in the opposite direction to the rotation direction of the spiral auger 3.
As the rotational speed increases relative to the soil removal guide-tube 2, the soil efficiency can be recited.
そして、上記掘削孔4内に杭1t@貞に1、双は摩優力
か発生し1自貞では沈下しない揚台は藺圧ジヤツキ等に
よる圧入又は打撃會与えるこζにより貫入さぜるのでる
る。Then, in the above-mentioned excavation hole 4, 1 ton of piles are inserted into the excavated hole 4, and the platform, which does not sink due to mechanical force and does not sink by itself, is penetrated by press-fitting with a pressure jack or the like or by applying a percussion ζ. Ruru.
なお、オーガヘッド3a v先4から水を送り込むこと
により杭lのズ人抵抗t−感じると同時に排土効4ct
″^めることもできる。In addition, by sending water from the tip 4 of the auger head 3a, the soil resistance of the pile can be felt and at the same time the soil removal effect can be increased by 4ct.
″^You can also stop.
そして、杭lの先端が支持層5vc達したとき、排土ガ
イド−f2及びスパイラルオーガ3に引き上げ(同図(
ロ))、久に杭1の頭部にハンマー6等による打撃を与
え′LI9r定の叉愕力′?を確認するまで打込み(同
図(ハ))こ九kit!d足させ完全な支持杭とするの
でるる。Then, when the tip of the pile l reaches the support layer 5vc, it is pulled up to the earth removal guide f2 and the spiral auger 3 (see the same figure).
(b)) Then, the head of the pile 1 was hit with a hammer 6, etc., and a shock force of ``LI9r constant'' was applied. Type in until you confirm (same figure (c)) This nine kit! Add d to make a complete support pile.
第2図rx J: =cハンマー6による打撃を与える
代わりに根固#)を行った場合を示すものでるり、杭l
の下部にモルタル(父にセメントミルク)71に注入し
、これt硬化させたものでろる0なお、この場合土泥打
撃′を与える場合より杭ltやや深く貫入させ、七め先
glAか支持層5内に位置するようにする0
またオーガヘッド3&の先端からモルタル7會注入する
ようにしても良く、オーガヘッド3& (Q先jail
より水を送り込みつつ掘削した場合a、これを引き抜く
際にオーガヘッド3act元膚よりモルタル7を注入す
る必要がりるO
本発明は、上記のように杭lの中空孔la内に排土ガイ
ド鋼管2t1この排土ガイドーt2内にスパイラルオー
ガ3を夫々挿入し、このスパイラルオーガ3を回転させ
つつ下rI#させ、同時に排土ガイド−管2毛下降させ
て掘削及び排土を行い、ここに形成された掘′削孔4円
に杭1を貫入させ、打撃を与えるか又Fi根固め1行り
てこ−nt固定させたので、杭lの中空孔1aの円面に
は掘削土による圧力がかからず、また玉石と衝突するこ
とがないので、この圧力及び玉石による杭lの破損σ完
全に防止することができるOまた、排土ガイド鋼’l’
2’にスパイラルオーガ3の回転方間と逆方向に回転さ
せれば、排土効率kdlliめることかできるといった
#I!効米がろる。Figure 2 rx J: = c Shows the case where root support #) is performed instead of blowing with hammer 6. Ruri, stake l
Inject mortar (my father used cement milk) 71 into the bottom of the pile and let it harden. In addition, the mortar 7 may be injected from the tip of the auger head 3& (Q destination
When excavating while sending more water a, it is necessary to inject mortar 7 from the base of the auger head 3 act when pulling it out. The present invention provides an earth removal guide steel pipe in the hollow hole la of the pile l as described above. 2t1 Insert the spiral augers 3 into each of the earth removal guides t2, rotate the spiral augers 3 and lower them, and at the same time lower the earth removal guide tube 2 to perform excavation and earth removal. Pile 1 was inserted into the excavated hole 4 circles, and the pressure was applied to the circular surface of the hollow hole 1a of pile 1 by the excavated soil. Also, since there is no collision with the cobblestones, damage to the pile l due to this pressure and cobbles can be completely prevented.
If the spiral auger 3 is rotated in the opposite direction to the rotation direction of the spiral auger 3, the soil removal efficiency can be improved by #I! The rice is effective.
第1図は本発明のゐエノー序の一実施例【示すl・・・
杭、la・・・同中空孔、2@・・排土ガイド−管、3
1111・スパイラルオーガ、3a・・・同オーガヘッ
ド、4・・・掘削孔、5・・・支持層、
6・・・ハンマー、7e・・モルタル
(セメントミルク)。FIG. 1 shows an embodiment of the invention sequence [shown in FIG.
Pile, la... hollow hole, 2@... earth removal guide pipe, 3
1111 Spiral auger, 3a...Auger head, 4...Drilling hole, 5...Support layer, 6...Hammer, 7e...Mortar (cement milk).
Claims (1)
土ガイド綱管円にスパイラルオーガを夫々挿入し、該ス
パイラルオーガを回転させつつ下降させ、同時rc排排
土ガイド雷管下降させて掘削及び排土を行い、ここに形
成された掘削孔内に机を貫入させ、打St与えるか又は
磯固め【行ってこれ’i+m定させることt特徴とする
杭O嵯込み工法O Q)排土ガイド−管をスパイラルオーガの回転方向と逆
方向に回転させ排土効率kAめたことt特徴とする脣I
FF請求の範囲第1項配躯の杭0建込み工法。(1) Insert a spiral auger into the soil removal guide tubes t and aJ into the hollow hole of the pile, respectively, lower the spiral auger while rotating, and simultaneously lower the RC soil removal guide detonator. Then excavate and remove the soil, insert a table into the excavated hole, and apply hammering or rock hardening [to set the soil] Pile embedding method O Q ) Soil removal guide - The pipe is rotated in the opposite direction to the rotation direction of the spiral auger to improve soil removal efficiency.
FF Claims Paragraph 1: Construction method with zero piles for construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15985281A JPS5862217A (en) | 1981-10-07 | 1981-10-07 | Pile construction work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15985281A JPS5862217A (en) | 1981-10-07 | 1981-10-07 | Pile construction work |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5862217A true JPS5862217A (en) | 1983-04-13 |
Family
ID=15702635
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15985281A Pending JPS5862217A (en) | 1981-10-07 | 1981-10-07 | Pile construction work |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5862217A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60238516A (en) * | 1984-05-08 | 1985-11-27 | Nishimura Kogyo Kk | Inner drilling work of hollow pile |
US5066168A (en) * | 1991-03-05 | 1991-11-19 | A.B. Chance Company | Cylindrical foundation support drivable into ground with removable helix |
KR100411662B1 (en) * | 2001-05-22 | 2003-12-24 | 이윤주 | Construction Method of Prestressed spun High strength Concrete Pile |
CN114991129A (en) * | 2022-06-16 | 2022-09-02 | 广西建工集团第三建筑工程有限责任公司 | Device for quickly removing floating slurry of pile head of cast-in-place pile |
-
1981
- 1981-10-07 JP JP15985281A patent/JPS5862217A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60238516A (en) * | 1984-05-08 | 1985-11-27 | Nishimura Kogyo Kk | Inner drilling work of hollow pile |
US5066168A (en) * | 1991-03-05 | 1991-11-19 | A.B. Chance Company | Cylindrical foundation support drivable into ground with removable helix |
KR100411662B1 (en) * | 2001-05-22 | 2003-12-24 | 이윤주 | Construction Method of Prestressed spun High strength Concrete Pile |
CN114991129A (en) * | 2022-06-16 | 2022-09-02 | 广西建工集团第三建筑工程有限责任公司 | Device for quickly removing floating slurry of pile head of cast-in-place pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102758633B (en) | The construction method of the good large cross-section tunnel of a kind of country rock situation | |
WO2021088349A1 (en) | Method for excavating tunnel shaft | |
JP2000160980A (en) | Sardine bone construction method for large cross section tunnel | |
CN109667276A (en) | A kind of karst cave treatment and tracking grouting construction method | |
CN109914395A (en) | Rapid construction method and structure of large-diameter socketed pile | |
JPS5862217A (en) | Pile construction work | |
JP2001336149A (en) | Taper pile for civil engineering and building work foundation construction, foundation construction equipment therefor, and embedding method therefor | |
US11988494B2 (en) | Piston-type explosive loading and blasting structure and method for hard rock cable pit | |
JPS59173424A (en) | Driving of steel material | |
JP3165997B2 (en) | Casting method and equipment for sheet piles | |
CN108894230B (en) | Method for treating boulder during sinking of pile casing | |
CN100398781C (en) | Tunnel fracture type excavation method and excavation unit thereof | |
CN115898481B (en) | Blasting excavation method for transition section of non-coaxial stepped rock tunnel with high construction precision | |
JPS5894598A (en) | Level drilling method and drill guide used therein | |
JPH0533577A (en) | Method for excavating steel tower foundation hole, etc. | |
JPS60119816A (en) | Formation of continuous pile | |
JPH02140311A (en) | Pipe anchor construction for avalanche preventing fence | |
JPS61221413A (en) | Oblique pile driving method | |
CN222362470U (en) | A single-pile variable-diameter rock-embedded interlocking pile | |
SU1712532A1 (en) | Pressure tunnel lining and method for its accomplishment | |
JPS603396A (en) | Tunnel drilling method | |
JP2894674B2 (en) | Diameter expanding reaming up method and its device | |
JPS6141832Y2 (en) | ||
JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
JP2586919B2 (en) | Construction method of continuous drilling hole and underground drilling device |