JPS58153900A - Primary coating method of tunnel - Google Patents
Primary coating method of tunnelInfo
- Publication number
- JPS58153900A JPS58153900A JP57037079A JP3707982A JPS58153900A JP S58153900 A JPS58153900 A JP S58153900A JP 57037079 A JP57037079 A JP 57037079A JP 3707982 A JP3707982 A JP 3707982A JP S58153900 A JPS58153900 A JP S58153900A
- Authority
- JP
- Japan
- Prior art keywords
- ground
- jack
- frame
- plate
- rigid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000576 coating method Methods 0.000 title 1
- 239000000463 material Substances 0.000 claims description 15
- 238000009415 formwork Methods 0.000 claims description 10
- 239000004035 construction material Substances 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 238000010276 construction Methods 0.000 description 10
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 4
- 229910052802 copper Inorganic materials 0.000 description 4
- 239000010949 copper Substances 0.000 description 4
- 238000005507 spraying Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241000270666 Testudines Species 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
この発明は、トンネルの一次嶺エエ法に関するものであ
る。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a primary ridge method for tunnels.
従来のこの種の工法としては、典形的な亀のとしてNA
TM工法における吹付は嶺エエ法をあけることができる
が、この工法は仕上9面が平滑とならないだけで碌<、
吹付は時におけるり/々ンド量が多くて不経済であp、
また吹付は時の初産によってトンネル内の濃境を海化し
、湧水部分での吹付は嶺工紘施工不嵐を起して剥離脱落
を生じ、さらに吹付は嶺工作業中帆他の炸薬を併行して
行えない勢の幾多の欠点がある。As a conventional construction method of this type, NA is used as a typical turtle.
Spraying in the TM construction method can open up the Rene-Ee method, but this construction method is not as good as the 9 finished surfaces are not smooth.
Spraying requires a large amount of glue/pump and is uneconomical.
In addition, the spraying turned the dense boundary inside the tunnel into a sea due to the first production of water, and the spraying at the spring water part caused the mine construction work to be disrupted, causing flaking and falling off. There are many drawbacks that prevent it from being carried out simultaneously.
この発明は、前記のような従来O工法のもたらす欠点を
排除することのできる工法を提供することを目的とする
ものである。The object of the present invention is to provide a construction method that can eliminate the drawbacks of the conventional O construction method as described above.
この発明を図面に示す実施例を参照してgi明する。The present invention will be explained with reference to embodiments shown in the drawings.
第1.2図には坑道1内に設置された剛体架台2が示さ
れており、この剛体架台2は複数本のアーチ型のH形鋼
2aを、その周方向の適宜個所においてH形鋼2bで連
結固定して構成され、全体に覆工内空と相似形で、かつ
それより小さく、長さは覆工個所の長さよシ長くなって
いる。Fig. 1.2 shows a rigid frame 2 installed in a mine shaft 1, and this rigid frame 2 has a plurality of arch-shaped H-beams 2a installed at appropriate locations in the circumferential direction. It is connected and fixed at 2b, has a similar shape to the inner lining, is smaller in size, and is longer than the length of the lining.
剛体架台2の各に形鋼2b上に社油圧等で作動するジヤ
ツキ3が設置されておplこのジヤツキ3の作動杆3a
には複数に分割された鋼製蓋枠板4が取付けられ、剛体
架台2はこれらの鋼製蓋枠板4によって扱われている。A jack 3 that is operated by hydraulic pressure or the like is installed on each of the rigid frames 2 on the shaped steel 2b, and the operating rod 3a of this jack 3 is
A steel lid frame plate 4 divided into a plurality of parts is attached, and the rigid body frame 2 is handled by these steel lid frame plates 4.
さらにこれらの鋼製型枠板4ICはその全面に亘ってゴ
ム板6が被覆されている。また剛体架台20前後端端部
は剛体架台2と地山との間の空間を塞ぐII型枠9.9
′が設けられている。Further, the entire surface of these steel formwork plates 4IC is covered with a rubber plate 6. In addition, the front and rear ends of the rigid frame 20 are formed by II formwork 9.9 that closes the space between the rigid frame 2 and the ground.
' is provided.
各鋼IIW枠板4は第3〜6図に示すように、端部に歯
形4aが形成されておシ、この歯形4@の咬合によ〕隣
接する鋼製型枠板4,4が互いに接続している。そし、
て□ジヤツキ3の作動杆1mの非伸長時にはlI*する
銅製蓋枠板4゜4の歯形4亀が深く咬合しく第s 、
4vj!A)、tたジヤツキ3を作動させて作動杆3a
を伸長させ九時には銅am枠板4,4が外方に拡大して
隣接する銅製型枠板4.4の歯形4aが浅く咬合するよ
うになっている(第S、6図)。As shown in Figs. 3 to 6, each steel IIW frame plate 4 has a tooth profile 4a formed at the end thereof, and the engagement of the tooth profile 4@ allows the adjacent steel form frame plates 4, 4 to intersect with each other. Connected. stop,
□ When the operating rod of the jack 3 is not extended by 1 m, the tooth profile 4 of the copper lid frame plate 4° 4 engages deeply and s.
4vj! A), operate the jack 3 and press the operating rod 3a.
At 9 o'clock, the copper am frame plates 4, 4 expand outward so that the tooth profiles 4a of the adjacent copper frame plates 4.4 are shallowly interlocked (Fig. S, Fig. 6).
歯形4aの咬合深さは、シャツ命SO作動杆31の最大
伸長時における隣接すみ鋼製蓋枠板4.4の接続部の弧
長4と、作動杆3aの非伸長時における弧長4との差よ
シも大きくすることによp1隣接する鋼製蓋枠板4.4
の離脱を防止でき、またゴム板器の―れ下が)も防止で
きる。The occlusion depth of the tooth profile 4a is determined by the arc length 4 of the connecting portion of the adjacent corner steel cover frame plate 4.4 when the shirt life SO operating rod 31 is fully extended, and the arc length 4 when the operating rod 3a is not extended. By increasing the difference between p1 and the adjacent steel lid frame plate 4.4
It is possible to prevent the rubber plate from coming off, and also to prevent the rubber plate from falling down.
このような一体架台2を、坑道l内O覆工個所に移動し
て銅mu枠板4を地山SO掬さく面に合わせ、ジヤツキ
3を作動させて鋼製型枠板4を拡大し、地山6との間に
間IIsを構成したのち、輸送管10を介してこの間1
11F’3に急結性のコンクリート等よりなる覆工材を
填充する。Move such an integrated frame 2 to the O lining part in the tunnel 1, align the copper mu frame plate 4 with the ground SO scooping surface, operate the jack 3 to enlarge the steel form plate 4, After configuring the gap IIs between the ground and the ground 6, the gap 1 is
Fill 11F'3 with lining material made of quick-setting concrete, etc.
この場合ジヤツキ3−作動杆3aの伸び長さを調整する
ことによシ設計機工厚O確保が可能となる。また剛体架
台2に設けた前側の11覧枠9を地山6に、後側のam
枠9′を既設−次験エコンタリー)7にそれぞれ密接さ
せることによシ、機工材の外部への漏洩が防止される。In this case, the designed mechanical thickness O can be ensured by adjusting the extension length of the jack 3-operating rod 3a. In addition, the front 11 view frame 9 provided on the rigid frame 2 is placed on the ground 6, and the rear am
By bringing the frames 9' into close contact with the existing and future ecotourism structures 7, leakage of mechanical materials to the outside can be prevented.
前記のようにして覆工材を填充した俵、再度ジヤツキ3
を作動させその圧力によりa工材と地山6との間に生ず
る空隙を排除するとともに、覆工材の地山6への圧着を
促進し、このような状態のもとで覆工材を固化させる。The bales filled with lining material as described above are jacked again 3.
is activated, and its pressure eliminates the voids that occur between the material a and the ground 6, and also promotes the crimping of the lining material to the ground 6, and under such conditions, the lining material is Let solidify.
機工材の固化後、ジヤツキ3を逆作動させて鋼1141
1m枠板4を後工材から剥離し、剛体架台2を移動して
以後同様の操作によシ連続的に一次榎工を行う。4
なお上記実施例では剛体架台2をH形鋼21゜2kによ
って構成し九が、半円筒状の一体的なものとしてもよい
。ま九ゴム板5を鋼製型枠板4の全面に亘って被覆した
が、鋼製型枠板4の接続部分のみを被覆するようにして
もよい。−この発明は上記のようであって、覆工個所に
移動された剛体架台は、複数に分割しかつ接続部にゴム
板を被覆した型枠板で嶺われるとともに、両者間にジヤ
ツキが般社られ、また剛体架台の前後端部に妻皺枠が設
けられていて、ジヤツキを作動させて型枠板を拡大した
うえ、地山との間に形成され大関11Km工材を填充し
、その後再度ジヤツキを作動させてその圧力によシ後工
材と地山との間の空隙を排除するとと4に機工材を地山
に圧着させるようにし九ので、従来の吹付工法にみられ
るような諸欠点を排除できるのに加えて、コンクリート
等の覆工材の配合や品質管理t−宕易にでき、しかも特
殊な機械や技能を必要とすることなく均質でかつ扱工面
が平滑な一次蝋工を迅速□に行うことがで龜る。After the machine material has solidified, reversely operate the jack 3 to remove the steel 1141.
The 1 m frame plate 4 is peeled off from the post-work material, the rigid frame 2 is moved, and the same operation is performed continuously to carry out the primary cutting. 4. In the above embodiment, the rigid frame 2 is made of H-shaped steel 21°2k, and 9 may be an integral semi-cylindrical structure. Although the entire surface of the steel formwork plate 4 is covered with the rubber plate 5, only the connecting portion of the steel formwork plate 4 may be covered. - This invention is as described above, and the rigid frame moved to the lining area is divided into a plurality of parts and covered with a formwork plate whose connection part is covered with a rubber plate, and the jacking between the two is prevented by the general public. In addition, a gable frame was provided at the front and rear ends of the rigid frame, and the formwork plate was expanded by operating the jack, and the Ozeki 11km material formed between it and the ground was filled, and then it was rebuilt again. After the jack is activated and the pressure is applied, the gap between the construction material and the ground is eliminated, and the construction material is crimped to the ground. In addition to being able to eliminate defects, the mixing and quality control of lining materials such as concrete can be easily performed, and the primary wax is homogeneous and has a smooth surface to work with, without the need for special machinery or skills. It is difficult to do this quickly.
また覆工個所の内空は剛体架台および型枠板によって嶺
われるので、地山の落石崩ll!勢を考慮することなく
安全に作業を行うことができ、さらに切羽の発破後剛体
架台が移動可能なように坑道の両脇のすシを排除してお
けば、−次後工作業、坑道中央部のすpの排除作業およ
び穿孔作業を並行して行うことかで奄ゐから、工程を短
縮できるとともに工費を低減できる勢の幾多のすぐれた
効果がある。Also, since the interior of the lining area is covered by the rigid frame and formwork plates, there is no risk of rocks falling from the ground! The work can be carried out safely without having to consider the situation, and if the slats on both sides of the tunnel are removed so that the rigid frame can be moved after the blasting of the face, then the next construction work will be carried out in the center of the tunnel. By performing the removal work and the drilling work in parallel, there are many excellent effects such as shortening the process and reducing construction costs.
第1図はこの発明工法の実施例の縦断正面図、第s!!
!l嬬同上の5i−iによる断面図、第3図はジヤツキ
の作動杆O非伸長時における型枠板OIa続部の断面図
、第41図は同上の平面図、第5図はジヤツキの作動杆
の伸長時における第3図と同様な図、第sgは同上の平
面図。
1・・・坑道 2・・・剛体架台3・・・ジ
ヤツキ 4・・・fll製型枠板5・・・ゴム板
6・・・地山7・・・−次覆エコンクリート
8・・・関@ 9 、9’・・・妻型枠1
G・・・コンクリート輸送管
ff11図
ff12図
eL4cL
昭和87年 特 許 願第87079号2、*明の名称
シンネルの一次覆エエ法
3、補正をする者
事件との関係 特許出願人
東京都千代田区三崎町2丁目6番3号
鉄建建設株式金社
代表者 大 石 重 成
4、代理人
5、補正の対象
ム 補正の内容
(1) 特許請求の範囲を別紙のとおり補正する07
添付書類の目録
別 紙 l1l)・:。
別 紙
特許請求0SS
1、トンネル0III工に当り、覆工内空と相似形で、
かつそれより小さい剛体架台をトンネル坑道内の覆工個
所に設置し、こOWa体架合圧沿った地山側に複数に分
割した蓋枠板を接続して配置し、この蓋枠板によって剛
体架台tM1うとともに蓋枠板と剛体架台との間にジヤ
ツキを設け、剛体架台の前後端部に妻置枠を固設して地
山と剛体架台との間の空間を塞ぎ、少なくとも型枠板の
接続部分を弾性板で置い、ジヤツキを作動させて蓋枠板
を地山11に拡大したのち、地山と蓋枠板との間の間−
に覆工材を填充し、填充完了後再度ジヤツキを作動させ
てその圧力により覆・工材を地山に圧着させ、覆工材、
の固化後ジヤツキを逆作動させて[1;枠を覆工材から
剥離し、剛体架台を移動することを特徴とする一次覆エ
エ法。Figure 1 is a longitudinal sectional front view of an embodiment of this invention construction method, No. s! !
! Figure 3 is a cross-sectional view of the continuation of the form plate OIa when the operating rod O of the jack is not extended, Figure 41 is a plan view of the same, and Figure 5 is the operation of the jack. A view similar to FIG. 3 when the rod is extended, and sg is a plan view of the same. 1... Mine shaft 2... Rigid frame 3... Jacket 4... FLL form board 5... Rubber plate 6... Earth 7... - Next covering concrete 8... Seki @ 9, 9'...Give formwork 1
G...Concrete transport pipe ff11 diagram ff12 diagram eL4cL 1987 Patent Application No. 87079 2, *Ming name Shinnel primary overturning law 3, relationship with the person making the amendment case Patent applicant Chiyoda-ku, Tokyo Misaki-cho 2-6-3 Tekken Construction Co., Ltd. Representative Shige Oishi 4, Agent 5 Subject of amendment Contents of amendment (1) Amend the scope of claims as shown in the attached sheet 07
List of attached documents (paper l1l)・:. Attachment Patent Claim 0SS 1. Regarding the tunnel 0III construction, it has a similar shape to the inner lining,
A rigid body frame smaller than that is installed at the lining part of the tunnel shaft, and a lid frame plate divided into multiple parts is connected and placed on the ground side along the OWA body joint pressure, and the rigid frame plate is At the same time, a jack is provided between the lid frame plate and the rigid frame, and gable frames are fixed to the front and rear ends of the rigid frame to close the space between the ground and the rigid frame, and at least prevent the form plate from forming. After placing the connecting part with an elastic board and operating the jack to expand the lid frame board to the ground 11, the space between the ground and the lid frame board -
Fill with lining material, and after filling is completed, operate the jack again and use the pressure to press the lining material to the ground.
After solidification, the jack is operated in reverse to remove the frame from the lining material and move the rigid frame.
Claims (1)
かつそれよp小さい剛体架台をトンネル坑道内の覆工個
所Ilc設置し、この剛体架台に沿った地山側に複数に
分割した蓋枠板を接続して配置し、この蓋枠板によって
剛体架台を伽うとともに蓋枠板と剛体架台との間にジヤ
ツキを設け、剛体ガードの前後一部に妻型枠を固設して
地山を剛体架台との間の窒間を嵐ぎ、少なくとも型枠板
の接続部分を弾性板モ嶺い、ジヤツキを作動させて蓋枠
板を地山側に拡大したのち、地山と蓋枠板との間の関−
に−工材を填充し、填充完了後再度ジヤツキを作動させ
てその圧力によシ機工材を地山に圧着させ、榎工材の同
化後ジヤツキを逆作動させて蓋枠を援工材から剥離し、
剛体ガードを移動することを特徴とする一次榎エエ法。1.) There is a shadow on the tunnel lining, similar to the interior of the machine,
A rigid mount smaller than the rigid mount is installed at the lining part Ilc in the tunnel shaft, and a lid frame plate divided into multiple parts is connected and placed on the ground side along this rigid mount, and the rigid mount is mounted using this lid frame plate. At the same time, a jack is installed between the lid frame plate and the rigid body frame, and a gable formwork is fixed to the front and rear parts of the rigid body guard, and the ground is swept through the gap between the rigid body frame and the frame, and at least the formwork is After applying an elastic plate to the connecting part of the plate and operating the jack to expand the cover frame plate toward the ground, the connection between the ground and the cover frame plate is
- After filling with construction materials, operate the jack again and use the pressure to press the construction materials to the ground, and after assimilating the Enoki materials, operate the jack in reverse to remove the cover frame from the reinforcement material. Peel off,
The first-order Enoki method is characterized by moving a rigid body guard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57037079A JPS58153900A (en) | 1982-03-09 | 1982-03-09 | Primary coating method of tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP57037079A JPS58153900A (en) | 1982-03-09 | 1982-03-09 | Primary coating method of tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS58153900A true JPS58153900A (en) | 1983-09-13 |
JPS6228279B2 JPS6228279B2 (en) | 1987-06-19 |
Family
ID=12487537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP57037079A Granted JPS58153900A (en) | 1982-03-09 | 1982-03-09 | Primary coating method of tunnel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58153900A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0540869A (en) * | 1990-11-20 | 1993-02-19 | Nippon Kinsen Kikai Kk | Medal delivery device in game system |
-
1982
- 1982-03-09 JP JP57037079A patent/JPS58153900A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS6228279B2 (en) | 1987-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS58153900A (en) | Primary coating method of tunnel | |
JPS61294098A (en) | Method and device for manufacturing tubular underground hollow section, such as tunnel, heading or similar article through shielding excavation | |
JPH06129194A (en) | Temporary timbering | |
JPS6047413B2 (en) | Construction method for constructing a new structure underground below an existing structure and filling material used therein | |
JPH10259697A (en) | Concrete plate, tunnel lining, and method of manufacturing concrete plate | |
JP2908354B2 (en) | Tunnel support, frame for assembling the same, and construction method of the support | |
JPS62288298A (en) | Cutter device for shield excavator | |
JPH05311995A (en) | Construction method of tunnel structure using bellows steel plate | |
JPH02132295A (en) | Constructing method for tunnel lining work | |
JP2797218B2 (en) | Wife stop | |
JP2666633B2 (en) | Construction method of earth retaining wall for underground structure | |
JPH06129181A (en) | Tunnel boring construction method and tunnel construction support device | |
JPS62202200A (en) | Method of lining shield tunnel | |
JPH01271600A (en) | Concrete construction method for cast-in-place concrete lining method | |
US1950778A (en) | Grave vault and method of constructing the same | |
JPH0438247B2 (en) | ||
JPH1144190A (en) | Tunnel support structure and method of assembling the same | |
JP2710671B2 (en) | Formwork equipment for tunnel lining | |
JPS59141700A (en) | Mold frame apparatus for linng tunnel | |
JPS6366995B2 (en) | ||
JP3796892B2 (en) | Method of vertical joining of continuous underground wall and partition panel used in this method | |
JPH03208994A (en) | Construction of tunnel lining | |
JPH0312877Y2 (en) | ||
JPS5818519B2 (en) | Jiyu Tenzai Sekidomekousou | |
JPH0631550B2 (en) | Internal formwork equipment for direct-cast concrete lining method. |