JPS56131716A - Removal of pile - Google Patents
Removal of pileInfo
- Publication number
- JPS56131716A JPS56131716A JP3557880A JP3557880A JPS56131716A JP S56131716 A JPS56131716 A JP S56131716A JP 3557880 A JP3557880 A JP 3557880A JP 3557880 A JP3557880 A JP 3557880A JP S56131716 A JPS56131716 A JP S56131716A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- steel material
- under
- drawn out
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 abstract 7
- 239000010959 steel Substances 0.000 abstract 7
- 239000000463 material Substances 0.000 abstract 6
- 238000002347 injection Methods 0.000 abstract 2
- 239000007924 injection Substances 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 2
- 239000011083 cement mortar Substances 0.000 abstract 1
- 239000004570 mortar (masonry) Substances 0.000 abstract 1
- 238000000926 separation method Methods 0.000 abstract 1
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
PURPOSE: To exactly remove an under pile by a method in which a steel material is inserted down to the under pile of existing concrete joint pile, the lower end of the steel material is fixed to the under pile by cement mortar, etc., and the steel material is drawn out.
CONSTITUTION: The ground is excavated until the head of a pile A is exposed, the hollow portions of the pile are connected with each other in case where the joints of the pile A is closed by concrete, etc. Then, a drawing steel material 2 is inserted into the hollow portion of the lower pile A, and a mortar, e.g., expansive concrete, etc., is injected. At the same time, an injection pipe 3 is inserted and the drawing steel material is fixed to the under pile A1 as the motor 4 hardens while drawing out the injection pipe 3. Furthermore, a steel pipe 5 is inserted by driving into the ground surrounding the pile A for separation. After the processes, the upper pile A2 is first drawn out, the drawing steel material 2 is then pulled, the lower pile A1 is removed, and the pipe 5 is drawn out while back filling the hole.
COPYRIGHT: (C)1981,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3557880A JPS56131716A (en) | 1980-03-19 | 1980-03-19 | Removal of pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3557880A JPS56131716A (en) | 1980-03-19 | 1980-03-19 | Removal of pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS56131716A true JPS56131716A (en) | 1981-10-15 |
Family
ID=12445642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3557880A Pending JPS56131716A (en) | 1980-03-19 | 1980-03-19 | Removal of pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS56131716A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58222215A (en) * | 1982-06-17 | 1983-12-23 | Taisei Shoji Kk | Pile drawing work |
-
1980
- 1980-03-19 JP JP3557880A patent/JPS56131716A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58222215A (en) * | 1982-06-17 | 1983-12-23 | Taisei Shoji Kk | Pile drawing work |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS56131716A (en) | Removal of pile | |
JPS5670324A (en) | Concrete crushing body and crushing method of concrete structure | |
JPS57151722A (en) | Filling work for space formed after drawing out sheet pile | |
JPS5673722A (en) | Withdrawing work for existing hollow pile | |
JPS5520816A (en) | Foundation construction method | |
JPS56135625A (en) | Construction of underwater structure | |
JPS5513338A (en) | Caison sinking method | |
JPS5771923A (en) | Construction work of continuous underground wall | |
JPS5545910A (en) | Pile pulling method | |
JPS57108313A (en) | Construction work and device for cut-off wall of in-site driven pile row and head of earth auger therefor | |
JPS579920A (en) | Extracting method for pile and equipment thereof | |
JPS56142922A (en) | Treatment of top of in-place concrete pile | |
JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
JPS6417920A (en) | Construction of precast pile with bag | |
JPS5595711A (en) | Forming process for underground hardened matter | |
JPS56153016A (en) | Application of reinforced foundation pile | |
JPS5724720A (en) | Increasing method for pull resistance of structure material driven into ground | |
JPS5771926A (en) | Treatment of extra-banking concrete at head of pile driven at site | |
JPS56135627A (en) | Construction of foundation pile | |
JPS56163318A (en) | Settling guider for foundation pile | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPS5768419A (en) | Executing method for underground continuous wall | |
JPS55161123A (en) | Sg-reinforced piping method | |
JPS5670322A (en) | Construction of underground wall by column strip | |
JPS5532809A (en) | Pile foundation practice |