JPH1160167A JP24612397A JP24612397A JPH1160167A JP H1160167 A JPH1160167 A JP H1160167A JP 24612397 A JP24612397 A JP 24612397A JP 24612397 A JP24612397 A JP 24612397A JP H1160167 A JPH1160167 A JP H1160167A
Authority
JP
Japan
Prior art keywords
tower
swing lever
main winding
split
tower boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24612397A
Other languages
Japanese (ja)
Inventor
Takayuki Suzuki
隆之 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP24612397A priority Critical patent/JPH1160167A/en
Publication of JPH1160167A publication Critical patent/JPH1160167A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily remove a swing lever from a tower boom in a condition in which the tower boom is erected. SOLUTION: One connection member 10B positioned on a pin 13 side of a swing lever 32 more than a main winding rope 23 among a plurality of connection members 10B which constitute a frame body 10 of the swing lever 32 is used as a split connection member 33, and this split connection member 33 consists of right and left split pipes 34, 34 which oppose with a larger clearance than a diameter of the main winding rope 23 and a connection pipe 35 displaced between a connection position where each split pipe 34 is connected and a split position where each split pipe 34 is split. Consequently, when the swing lever 32 is removed from a tip side of a tower boom which is erected, the connection pipe 35 is displaced to the split position to ensure a clearance sufficient for the main winding rope 23 which passes therethrough between each split pipe 34 so that the swing lever 32 can be removed by avoiding the interference of the split connection member 33 and the main winding rope 23.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明が属する技術分野】本発明は、例えば建設現場に
おける高所への資材運搬等に好適に用いられるタワーク
レーンに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower crane which is suitably used, for example, for transporting materials to a high place at a construction site.

【0002】[0002]

【従来の技術】一般に、高層ビル等の建設現場において
は、通常、地上から高所への資材運搬等を行うためにタ
ワークレーンが用いられる(例えば、実開昭60−85
589号公報等)。
2. Description of the Related Art In general, at construction sites such as high-rise buildings, tower cranes are usually used to carry materials from the ground to high places (for example, see Japanese Utility Model Application Laid-Open No. 60-85).
No. 589).

【0003】そこで、図9ないし図11にこの種の従来
技術によるタワークレーンを示すに、図において、1は
下部走行体、2は下部走行体1上に旋回可能に設けられ
たクレーン本体としての上部旋回体を示し、上部旋回体
2上には、先端側にガイドシーブ3Aを有するA型フレ
ーム3が設けられている。また、上部旋回体2には、主
巻ドラム4、補巻ドラム5および起伏ドラム6が設けら
れている。
FIGS. 9 to 11 show such a conventional tower crane. In the drawings, reference numeral 1 denotes a lower traveling body, and 2 denotes a crane main body provided on the lower traveling body 1 so as to be pivotable. 1 shows an upper revolving structure, and an A-shaped frame 3 having a guide sheave 3A on the distal end side is provided on the upper revolving structure 2. In addition, the upper rotating body 2 is provided with a main winding drum 4, an auxiliary winding drum 5, and an undulating drum 6.

【0004】7は基端側が上部旋回体2の前部に起伏可
能に設けられたタワーブームで、タワーブーム7は堅固
な骨組構造をなし、その先端側には後述するタワージブ
8、スイングレバー9等を支持する支持フレーム7Aが
設けられている。そして、タワーブーム7は、後述の起
伏ロープ14を起伏ドラム6によって巻取ることにより
図示の如く起立し、この状態でタワージブ8を俯仰動可
能に支持するものである。
Reference numeral 7 denotes a tower boom whose base end is provided on the front portion of the upper swing body 2 so as to be able to undulate. The tower boom 7 has a rigid frame structure, and a tower jib 8 and a swing lever 9 to be described later are provided at its distal end. A support frame 7A for supporting the above is provided. The tower boom 7 stands up as shown in the figure by winding up and down an ups and downs rope 14 by an up and down drum 6, and supports the tower jib 8 in this state so as to be able to move up and down.

【0005】8はタワーブーム7の支持フレーム7Aに
俯仰動可能に設けられたタワージブを示し、タワージブ
8は堅固な骨組構造を有している。そして、タワージブ
8は、後述の補巻ロープ18を補巻ドラム5によって巻
取り、巻出すことによりタワーブーム7に対して俯仰動
するものである。
[0005] Reference numeral 8 denotes a tower jib provided on the support frame 7A of the tower boom 7 so as to be able to move up and down, and the tower jib 8 has a rigid frame structure. Then, the tower jib 8 is configured to wind up and down the below-described auxiliary rope 18 by the auxiliary winding drum 5 and to move up and down with respect to the tower boom 7.

【0006】9はタワージブ8の近傍に位置してタワー
ブーム7の支持フレーム7Aに揺動可能に取付けられた
スイングレバーを示し、スイングレバー9は、図10に
示すように、基端側がタワーブーム7の支持フレーム7
Aに揺動可能に設けられた一対の枠体10,11と、各
枠体10,11の先端側を連結する2本の連結体12,
12とから三角形状に形成されている。
Reference numeral 9 denotes a swing lever which is located near the tower jib 8 and is swingably attached to a support frame 7A of the tower boom 7. As shown in FIG. 7 support frame 7
A, a pair of frame members 10 and 11 provided to be swingable, and two connecting members 12 connecting the front ends of the frame members 10 and 11 to each other.
12 are formed in a triangular shape.

【0007】ここで、枠体10は、左,右の梁材10
A,10Aと、各梁材10A間を連結する複数の連結材
10B,10B,…とからなり、各梁材10Aの基端側
は、揺動中心としてのピン13,13を介して支持フレ
ーム7Aに揺動可能に支持されている。また、枠体11
は、左,右の梁材11A,11Aと、各梁材11A間を
連結する複数の連結材11B,11B,…とからなり、
各梁材11Aの基端側は枠体10を構成する各梁材10
Aの基端側にピン結合されている。
Here, the frame body 10 is made up of the left and right beam members 10.
A, 10A and a plurality of connecting members 10B, 10B,... Connecting the respective beam members 10A, and the base end side of each of the beam members 10A is supported by pins 13 as a swing center. 7A swingably supported. Also, the frame 11
Consists of left and right beam members 11A, 11A, and a plurality of connecting members 11B, 11B,.
The base end side of each beam 11A is the beam 10 constituting the frame 10.
A is pin-connected to the base end side.

【0008】14は一端側が起伏ドラム6に巻回された
起伏ロープで、起伏ロープ14の他端側は、A型フレー
ム3のガイドシーブ3Aを介してタワーブームハンガ1
5の各シーブとタワーブームブライドル16の各シーブ
(いずれも図示せず)との間に順次巻回された後、タワ
ーブームハンガ15に掛止めされている。また、タワー
ブームブライドル16とタワーブーム7の支持フレーム
7Aとは、ペンダントロープ17によって連結されてい
る。
Reference numeral 14 denotes an up-and-down rope wound at one end on the up-and-down drum 6. The other end of the up-and-down rope 14 is connected to the tower boom hanger 1 via the guide sheave 3A of the A-type frame 3.
5 and each of the sheaves (not shown) of the tower boom bridle 16 are sequentially wound and then hooked to the tower boom hanger 15. The tower boom bridle 16 and the support frame 7A of the tower boom 7 are connected by a pendant rope 17.

【0009】そして、起伏ロープ14を起伏ドラム6に
よって巻取り、巻出すことにより、タワーブームハンガ
15とタワーブームブライドル16とが接近、離間し、
ペンダントロープ17を介してタワーブーム7が起伏す
る構成となっている。
The hoisting rope 14 is wound and unwound by the hoisting drum 6, so that the tower boom hanger 15 and the tower boom bridle 16 approach and separate from each other.
The tower boom 7 is configured to undulate via a pendant rope 17.

【0010】18は一端側が補巻ドラム5に巻回された
補巻ロープで、補巻ロープ18の他端側は、タワージブ
ハンガ19の各シーブとタワージブブライドル20の各
シーブ(いずれも図示せず)との間に順次巻回された
後、タワージブハンガ19に掛止めされている。ここ
で、タワージブブライドル20は、ペンダントロープ2
1を介してスイングレバー9を構成する枠体10の各梁
材10A先端側に連結されている。また、スイングレバ
ー9を構成する枠体11の各梁材11A先端側は、ペン
ダントロープ22を介してタワージブ8の先端側に連結
されている。
Reference numeral 18 denotes an auxiliary rope wound on one end of the auxiliary drum 5. The other end of the auxiliary rope 18 is connected to each sheave of the tower jib hanger 19 and each of the sheaves of the tower jib bridle 20 (both in the figure). (Not shown), and is hung on a tower jib hanger 19. Here, the tower jib bridle 20 is a pendant rope 2
1 is connected to the front end side of each beam 10A of the frame 10 constituting the swing lever 9. The distal end of each beam 11A of the frame 11 constituting the swing lever 9 is connected to the distal end of the tower jib 8 via a pendant rope 22.

【0011】そして、補巻ロープ18を補巻ドラム5に
よって巻取り、巻出すことにより、タワージブハンガ1
9とタワージブブライドル20とが接近、離間し、スイ
ングレバー9がタワーブーム7の支持フレーム7Aとの
連結部(ピン13)を中心として揺動する。そして、こ
のスイングレバー9の揺動に応じてタワージブ8がタワ
ーブーム7に対して俯仰動する構成となっている。
Then, the auxiliary rope 18 is wound and unwound by the auxiliary drum 5, so that the tower jib hanger 1
The 9 and the tower jib bridle 20 approach and separate from each other, and the swing lever 9 swings about the connecting portion (pin 13) of the tower boom 7 with the support frame 7A. The tower jib 8 moves up and down with respect to the tower boom 7 in response to the swing of the swing lever 9.

【0012】23は一端側が主巻ドラム4に巻回された
主巻ロープで、主巻ロープ23の他端側はタワージブ8
の先端から垂下される吊荷フック24に巻回されてい
る。そして、主巻ロープ23が主巻ドラム4に巻取られ
ることにより、吊荷フック24が荷物を吊上げるように
なっている。
Reference numeral 23 denotes a main winding rope having one end wound around the main winding drum 4. The other end of the main winding rope 23 is connected to the tower jib 8.
Is wound around a hanging load hook 24 hanging down from the tip of the hook. When the main winding rope 23 is wound around the main winding drum 4, the hanging load hook 24 lifts the load.

【0013】従来技術によるタワークレーンは上述の如
き構成を有するもので、このタワークレーンを用いて吊
荷作業を行う場合には、まず、起伏ドラム6により起伏
ロープ14を巻取り、タワーブーム7を図示の如く起立
させる。
The tower crane according to the prior art has the above-described configuration. When carrying out the lifting work using the tower crane, first, the hoisting rope 14 is wound by the hoisting drum 6 and the tower boom 7 is lifted. Stand up as shown.

【0014】そして、補巻ドラム5により補巻ロープ1
8を巻取り、巻出すことにより、タワージブ8の先端側
を所望の高さ位置まで移動させた後、主巻ドラム4によ
って主巻ロープ23を巻取ることにより、吊荷フック2
4によって荷物を高所に吊上げることができる。
Then, the auxiliary winding drum 1 is used by the auxiliary winding drum 5.
After winding and unwinding, the tip side of the tower jib 8 is moved to a desired height position, and then the main winding rope 23 is wound by the main winding drum 4 so that the hanging load hook 2
4 allows the luggage to be lifted to a high place.

【0015】ところで、上述したタワークレーンを作業
現場で分解する場合には、図11に示すように、タワー
ジブ8をタワーブーム7側に折畳み、連結装置(図示せ
ず)によってタワーブーム7とタワージブ8とを連結し
た状態で、タワーブーム7とタワージブ8とを地上側に
倒す。そして、例えばタワーブーム7からタワージブ
8、スイングレバー9等を取外し、その後、上部旋回体
2からタワーブーム7を取外すようにしている。
When the above-mentioned tower crane is disassembled at the work site, as shown in FIG. 11, the tower jib 8 is folded toward the tower boom 7 and is connected to the tower boom 7 and the tower jib 8 by a connecting device (not shown). With the two connected, the tower boom 7 and the tower jib 8 are lowered to the ground side. Then, for example, the tower jib 8, the swing lever 9, and the like are removed from the tower boom 7, and then the tower boom 7 is removed from the upper swing body 2.

【0016】これに対し、例えば作業スペースが狭小な
都市部等においては、タワークレーンを作業現場で分解
する際に、タワーブーム7等を地上側に倒すのが困難な
場合があり、この場合には、図11に示すように、タワ
ーブーム7を起立させたまま、他のクレーン(図示せ
ず)等を用いてスイングレバー9をタワーブーム7から
取外し、その後、タワージブ8等をタワーブーム7から
順次取外していく必要がある。
On the other hand, for example, in an urban area where the work space is small, when disassembling the tower crane at the work site, it may be difficult to lower the tower boom 7 or the like to the ground side. As shown in FIG. 11, with the tower boom 7 standing up, the swing lever 9 is removed from the tower boom 7 using another crane (not shown) or the like, and then the tower jib 8 or the like is removed from the tower boom 7. It is necessary to remove them sequentially.

【0017】[0017]

【発明が解決しようとする課題】しかし、上述した従来
技術によるタワークレーンにおいて、例えば図10に示
すように、主巻ロープ23が、タワーブーム7の支持フ
レーム7Aに設けられたガイドシーブ25に案内され、
スイングレバー9の枠体10を構成する各連結材10
B、枠体11を構成する各連結材11Bのうち、それぞ
れ最もスイングレバー9の揺動中心(ピン13)側に位
置する連結材10B,11B間を通過する構成となって
いる場合には、タワーブーム7を起立させた状態でスイ
ングレバー9を取外す場合、スイングレバー9の揺動中
心側に位置する連結材10Bが主巻ロープ23と干渉し
てしまう。
However, in the tower crane according to the prior art described above, the main winding rope 23 is guided by a guide sheave 25 provided on a support frame 7A of the tower boom 7 as shown in FIG. And
Each connecting member 10 constituting the frame 10 of the swing lever 9
B, among the connecting members 11B constituting the frame 11, when the connecting member 10B is located between the connecting members 10B and 11B located closest to the swing center (pin 13) of the swing lever 9, respectively, When removing the swing lever 9 with the tower boom 7 standing up, the connecting member 10 </ b> B located on the swing center side of the swing lever 9 interferes with the main winding rope 23.

【0018】このため、仮にタワーブーム7の支持フレ
ーム7Aとスイングレバー9とを連結する各ピン13を
取外したとしても、スイングレバー9をタワーブーム7
から取外すことができず、タワークレーンの分解作業を
円滑に行うことが困難であるという問題がある。
For this reason, even if each pin 13 connecting the support frame 7A of the tower boom 7 and the swing lever 9 is removed, the swing lever 9 is moved to the tower boom 7
There is a problem that it is difficult to disassemble the tower crane smoothly.

【0019】本発明は上述した従来技術の問題に鑑みな
されたもので、タワーブームを起立させた状態で分解作
業を行うに際して、タワーブームからスイングレバーを
容易に取外すことができるようにしたタワークレーンを
提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems of the prior art, and a tower crane in which a swing lever can be easily removed from a tower boom when performing a disassembling operation with the tower boom upright. It is intended to provide.

【0020】[0020]

【課題を解決するための手段】上述した課題を解決する
ために本発明は、主巻ドラムを有するクレーン本体と、
前記クレーン本体に起伏可能に設けられたタワーブーム
と、前記タワーブームの先端に俯仰動可能に設けられた
タワージブと、左,右の梁材間を複数の連結材で連結し
た一対の枠体とこれら枠体の先端部を連結体で連結する
ことにより三角形状に形成され、前記枠体の基端側が前
記タワーブームの先端に揺動可能に設けられたスイング
レバーと、一端側が前記主巻ドラムに巻回され、他端側
が前記スイングレバーの連結材間を通過して前記タワー
ジブの先端から垂下される吊荷フックに取付けられた主
巻ロープとからなるタワークレーンに適用される。
In order to solve the above-mentioned problems, the present invention provides a crane body having a main winding drum,
A tower boom provided up and down on the crane body, a tower jib provided movably at the tip of the tower boom, and a pair of frames connecting left and right beam members with a plurality of connecting members. A swing lever, which is formed in a triangular shape by connecting the distal ends of these frames with a connecting body, and whose base end is swingably provided at the tip of the tower boom, and whose one end is the main winding drum The present invention is applied to a tower crane comprising a main winding rope attached to a hanging load hook whose other end side passes between connecting members of the swing lever and hangs from the tip of the tower jib.

【0021】そして、請求項1の発明の特徴は、スイン
グレバーの枠体を構成する各連結材のうち主巻ロープよ
りもスイングレバーの揺動中心側に位置する連結材を、
主巻ロープが通り抜けるのを許すため長さ方向に分割可
能となった分割連結材として構成したことにある。
A feature of the first aspect of the present invention is that, among the connecting members constituting the frame of the swing lever, the connecting member located on the swing center side of the swing lever with respect to the main winding rope,
In order to allow the main winding rope to pass through, it is configured as a split connecting member that can be split in the length direction.

【0022】このように構成したことにより、例えばタ
ワーブームを起立させた状態でタワーブームの先端側か
らスイングレバーを取外すときに、分割連結材を分割し
て主巻ロープを通り抜けさせることができ、スイングレ
バーの取外し作業を容易に行うことができる。
With this configuration, for example, when the swing lever is removed from the tip end of the tower boom with the tower boom standing up, the split connecting member can be divided and passed through the main winding rope, The swing lever can be easily removed.

【0023】また、請求項2の発明は、分割連結材は、
基端側が枠体に固着され先端側が主巻ロープの直径より
も大きな隙間をもって対向した左,右一対の軸体と、前
記各軸体の先端側に着脱可能に設けられた継ぎ部材とか
ら構成したことにある。
Further, according to a second aspect of the present invention, the split connecting material is
A pair of left and right shafts whose base end is fixed to the frame and whose front end faces with a gap larger than the diameter of the main winding rope, and a connecting member detachably provided on the front end of each shaft. I did it.

【0024】このように構成したことにより、継ぎ部材
を左,右の軸体の先端側に取付けたときには、左,右の
軸体が継ぎ部材を介して一体化され分割連結材の強度を
確保することができる。一方、継ぎ部材を左,右の軸体
の先端側から取外したときには、各軸体間に主巻ロープ
が通り抜けるだけの隙間を確保することができる。
With this configuration, when the joining member is attached to the distal ends of the left and right shafts, the left and right shafts are integrated via the joining member to secure the strength of the split connecting member. can do. On the other hand, when the splicing member is removed from the distal ends of the left and right shafts, it is possible to secure a gap between the shafts for the main winding rope to pass through.

【0025】さらに、請求項3の発明は、継ぎ部材は、
各軸体の外周側に摺動可能に嵌合し、各軸体間を連結す
る連結位置と各軸体間を分割する分割位置との間で変位
する継ぎパイプにより構成したことにある。
Further, according to a third aspect of the present invention, the joining member is
The joint pipe is slidably fitted on the outer peripheral side of each shaft body and is displaced between a connecting position for connecting the shaft bodies and a dividing position for dividing between the shaft bodies.

【0026】このように構成したことにより、継ぎパイ
プを連結位置に変位させたときには、左,右の軸体が継
ぎパイプを介して一体化され分割連結材の強度を確保す
ることができる。一方、継ぎパイプを分割位置に変位さ
せたときには、各軸体間に主巻ロープが通り抜けるだけ
の隙間を確保することができる。
With this configuration, when the connecting pipe is displaced to the connecting position, the left and right shafts are integrated via the connecting pipe, and the strength of the split connecting member can be secured. On the other hand, when the joint pipe is displaced to the dividing position, a gap can be secured between the shafts for the main winding rope to pass through.

【0027】また、請求項4の発明は、継ぎ部材は、一
端側が各軸体のうち一方に揺動可能に支持され、他端側
が各軸体のうち他方に着脱される継ぎ板により構成した
ことにある。
According to a fourth aspect of the present invention, the joining member is constituted by a joining plate whose one end is swingably supported by one of the shafts and the other end of which is detachably attached to the other of the shafts. It is in.

【0028】このように構成したことにより、継ぎ板の
他端側を他方の軸体に取付けたときには、左,右の軸体
が継ぎ板を介して一体化され分割連結材の強度を確保す
ることができる。一方、継ぎ板の他端側を他方の軸体か
ら取外したときには、各軸体間に主巻ロープが通り抜け
るだけの隙間を確保することができる。
With this configuration, when the other end of the joint plate is attached to the other shaft, the left and right shafts are integrated via the joint plate to secure the strength of the split connecting member. be able to. On the other hand, when the other end side of the joint plate is detached from the other shaft body, it is possible to secure a gap between the respective shaft bodies for the main winding rope to pass through.

【0029】[0029]

【発明の実施の形態】以下、本発明によるタワークレー
ンの実施形態を図1ないし図8を参照しつつ詳細に説明
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a tower crane according to the present invention will be described below in detail with reference to FIGS.

【0030】まず、図1ないし図6は第1の実施形態を
示し、本実施形態では上述した従来技術と同一の構成要
素に同一の符号を付し、その説明を省略するものとす
る。
First, FIGS. 1 to 6 show a first embodiment. In the present embodiment, the same components as those in the above-described prior art are denoted by the same reference numerals, and description thereof will be omitted.

【0031】図1において、31は本実施形態によるタ
ワークレーンを示し、このタワークレーン31は従来技
術と同様に、下部走行体1と、主巻ドラム4等を有する
クレーン本体としての上部旋回体2と、上部旋回体2に
起伏可能に設けられたタワーブーム7と、タワーブーム
7に俯仰動可能に設けられたタワージブ8と、タワーブ
ーム7に揺動可能に設けられたスイングレバー32と、
一端側が主巻ドラム4に巻回され、他端側がタワージブ
8の先端側から垂下される吊荷フック24に取付けられ
た主巻ロープ23とから大略構成されている。
In FIG. 1, reference numeral 31 denotes a tower crane according to the present embodiment. This tower crane 31 is, similarly to the prior art, a lower traveling unit 1 and an upper revolving unit 2 as a crane body having a main winding drum 4 and the like. A tower boom 7 provided on the upper swing body 2 so as to be able to undulate, a tower jib 8 provided on the tower boom 7 so as to be able to move up and down, and a swing lever 32 provided swingably on the tower boom 7;
One end of the main winding drum 4 is wound around the main winding drum 4, and the other end of the main winding drum 4 is attached to a hanging load hook 24 suspended from the tip end of the tower jib 8.

【0032】しかし、本実施形態によるタワークレーン
31は、スイングレバー32の構成の点で従来技術とは
異なっており、以下、このスイングレバー32について
説明する。
However, the tower crane 31 according to the present embodiment is different from the prior art in the configuration of the swing lever 32, and the swing lever 32 will be described below.

【0033】図2において、32は従来技術によるスイ
ングレバー9に代えて本実施形態に適用されたスイング
レバーを示し、このスイングレバー32は、一対の枠体
10,11と、各枠体10,11の先端側を連結する2
本の連結体12,12とから三角形状に形成され、枠体
10は、左,右の梁材10A,10Aと、各梁材10A
間を連結する複数本の連結材10B,10B,…とから
構成されている。
In FIG. 2, reference numeral 32 denotes a swing lever applied to the present embodiment in place of the swing lever 9 according to the prior art. The swing lever 32 includes a pair of frames 10, 11 and each of the frames 10, 11. 2 to connect the tip side of 11
The frame body 10 is formed into a triangular shape from the book connecting bodies 12, 12, and the frame body 10 includes left and right beam members 10 A, 10 A, and each beam member 10 A
. Are connected to each other.

【0034】しかし、本実施形態では、複数本の連結材
10Bのうち、主巻ロープ23よりもスイングレバー3
2の揺動中心(ピン13)側に位置する1本が、後述す
る分割連結材33として構成されている点で異なってい
る。
However, in the present embodiment, of the plurality of connecting members 10B, the swing lever 3
2 in that one of them located on the side of the swing center (pin 13) is configured as a split connecting member 33 described later.

【0035】33は本実施形態に用いられるスイングレ
バー32の枠体10を構成する各連結材10Bのうち、
最もタワーブーム7(支持フレーム7A)側に設けられ
た分割連結材で、この分割連結材33は、後述する左,
右一対の分割パイプ34と、継ぎパイプ35とから構成
されている。
Reference numeral 33 denotes a connecting member 10B constituting the frame 10 of the swing lever 32 used in the present embodiment.
The split connecting member 33 is provided on the tower boom 7 (support frame 7A) side.
It is composed of a pair of right divided pipes 34 and a joint pipe 35.

【0036】34,34は分割連結材33を構成する軸
体としての左,右の分割パイプを示し、各分割パイプ3
4は、図3ないし図5に示すように、基端側が枠体10
を構成する各梁材10Aの基端側に溶接等によって固着
され、先端側が主巻ロープ23の直径dよりも大きな隙
間Dをもって対向する構成となっている。そして、各分
割パイプ34の先端側には、後述の連結ピン36が挿通
される2個のピン穴34A,34Aが径方向に貫通する
ように穿設されている。また、各分割パイプ34の外周
面には、継ぎパイプ35の摺動範囲を規制する板状のス
トッパ34Bが突設されている。
Reference numerals 34, 34 denote left and right split pipes as shafts constituting the split connecting member 33, and each split pipe 3
As shown in FIGS. 3 to 5, the base 4 has a frame body 10 at the base end side.
Are fixed to the base end side of each beam member 10A by welding or the like, and the front end side faces with a gap D larger than the diameter d of the main winding rope 23. Two pin holes 34A, 34A, through which a connecting pin 36 described later is inserted, are formed in the distal end side of each divided pipe 34 so as to penetrate in the radial direction. Further, a plate-like stopper 34B that protrudes from the outer peripheral surface of each divided pipe 34 to regulate the sliding range of the joint pipe 35 is provided in a protruding manner.

【0037】35は左,右の分割パイプ34の先端側に
着脱可能に設けられた継ぎ部材としての継ぎパイプで、
継ぎパイプ35は、分割パイプ34の外径寸法よりも大
径の内径寸法を有し、各分割パイプ34の外周側に摺動
可能に嵌合することにより、各分割パイプ34間を連結
する連結位置(図4の位置)と、各分割パイプ34間を
分割する分割位置(図5の位置)との間で変位するもの
である。そして、継ぎパイプ35には4個の透孔35
A,35A,…が径方向に貫通するように穿設され、各
透孔35Aは、継ぎパイプ35が連結位置に変位したと
きに、各分割パイプ34の先端側に穿設されたピン穴3
4Aと一致するように設定されている。
Reference numeral 35 denotes a splicing pipe as a splicing member which is detachably provided at the distal end side of the left and right split pipes 34.
The connecting pipe 35 has an inner diameter that is larger than the outer diameter of the divided pipe 34, and is slidably fitted to the outer peripheral side of each divided pipe 34 to connect the divided pipes 34. It is displaced between a position (the position in FIG. 4) and a division position (the position in FIG. 5) for dividing between the respective divided pipes. The joint pipe 35 has four through holes 35.
A, 35A,... Are penetrated so as to penetrate in the radial direction.
4A.

【0038】36,36,…は各分割パイプ34と継ぎ
パイプ35との間を連結する連結ピンで、各連結ピン3
6は、継ぎパイプ35が図4に示す連結位置に変位した
状態で、継ぎパイプ35の各透孔35A、各分割パイプ
34の各ピン穴34Aに挿通される。これにより、左,
右の分割パイプ34が継ぎパイプ35を介して一体化さ
れ、分割連結材33の強度を確保できる構成となってい
る。
Are connecting pins for connecting between the divided pipes 34 and the joint pipes 35.
6 is inserted into each through hole 35A of the joint pipe 35 and each pin hole 34A of each divided pipe 34 in a state where the joint pipe 35 is displaced to the connecting position shown in FIG. As a result,
The right split pipe 34 is integrated via a joint pipe 35 so that the strength of the split connecting member 33 can be ensured.

【0039】一方、継ぎパイプ35から各連結ピン36
を抜き取ったときには、継ぎパイプ35が各分割パイプ
34に沿って図5に示す分割位置に変位し、各分割パイ
プ34の間に主巻ロープ23が通り抜けるだけの隙間D
が確保できる構成となっている。
On the other hand, each connecting pin 36
5, the joint pipe 35 is displaced along the divided pipes 34 to the dividing position shown in FIG. 5, and the gap D is large enough for the main rope 23 to pass between the divided pipes 34.
Is ensured.

【0040】本実施形態によるタワークレーン31は上
述の如く構成されたスイングレバー32を有するもの
で、このタワークレーン31を用いて吊荷作業を行うと
きには、図4に示すように、継ぎパイプ35を連結位置
に変位させた状態で、継ぎパイプ35の各透孔35A、
左,右の分割パイプ34の各ピン穴34Aに連結ピン3
6を挿通し、継ぎパイプ35を介して左,右の分割パイ
プ34を一体化することにより、分割連結材33の強度
を確保することができる。
The tower crane 31 according to the present embodiment has the swing lever 32 configured as described above. When the tower crane 31 is used to carry a load, as shown in FIG. In a state displaced to the connection position, each through-hole 35A of the joint pipe 35,
A connecting pin 3 is inserted into each pin hole 34A of the left and right split pipes 34.
6 and the left and right split pipes 34 are integrated via the joint pipe 35, whereby the strength of the split connecting member 33 can be ensured.

【0041】次に、タワーブーム7を起立させた状態
で、タワーブーム7の先端側からスイングレバー32を
取外す作業を行う場合には、例えば図6に示すように、
他のクレーンの吊荷フック37によってスイングレバー
32を支持した状態で、このスイングレバー32から各
ペンダントロープ21,22を取外す。
Next, when the work of removing the swing lever 32 from the tip side of the tower boom 7 with the tower boom 7 standing up is performed, for example, as shown in FIG.
With the swing lever 32 supported by the hanging hooks 37 of the other cranes, the pendant ropes 21 and 22 are removed from the swing lever 32.

【0042】そして、図5に示すように、継ぎパイプ3
5から各連結ピン36を抜取り、継ぎパイプ35を分割
位置まで変位させる。これにより、各分割パイプ34の
間に、主巻ロープ23が通り抜けるだけの隙間Dを確保
することができる。
Then, as shown in FIG.
Each connecting pin 36 is removed from 5 and the joint pipe 35 is displaced to the dividing position. Thereby, a gap D that allows the main winding rope 23 to pass through can be secured between the divided pipes 34.

【0043】この状態で、スイングレバー32とタワー
ブーム7の支持フレーム7Aとを連結するピン13を取
外した後、他のクレーンの吊荷フック37によって、図
6中の矢印A方向にスイングレバー32を吊上げる。こ
のとき、スイングレバー32の分割連結材33を構成す
る各分割パイプ34の間には、上述した如く隙間Dが確
保されているから、スイングレバー32を吊上げるとき
に、主巻ロープ23が隙間Dを通り抜けることにより、
主巻ロープ23と分割連結材33との干渉を回避するこ
とができる。
In this state, after the pin 13 connecting the swing lever 32 and the support frame 7A of the tower boom 7 is removed, the swing lever 32 in the direction of arrow A in FIG. Hoist. At this time, since the gap D is secured between the divided pipes 34 constituting the divided connecting member 33 of the swing lever 32 as described above, when the swing lever 32 is lifted, the main winding rope 23 is By going through D
Interference between the main winding rope 23 and the split connecting member 33 can be avoided.

【0044】かくして、タワーブーム7を起立させた状
態でもスイングレバー32をタワーブーム7から取外す
ことができ、タワーブーム7等を地面側に倒すだけのス
ペースが確保できない狭小な作業現場においても、タワ
ークレーン31の分解作業を円滑に行うことができる。
Thus, even when the tower boom 7 is upright, the swing lever 32 can be removed from the tower boom 7, and even in a small work site where it is not possible to secure a space enough to tilt the tower boom 7 or the like to the ground side, the tower can be used. The disassembling operation of the crane 31 can be performed smoothly.

【0045】次に、図7および図8は本発明による第2
の実施形態を示している。なお、本実施形態では、前記
第1の実施形態と同一の構成要素に同一の符号を付し、
その説明を省略するものとする。
Next, FIGS. 7 and 8 show a second embodiment according to the present invention.
Is shown. In the present embodiment, the same components as those in the first embodiment are denoted by the same reference numerals,
The description is omitted.

【0046】図において、41は第1の実施形態による
継ぎパイプ35に代えて本実施形態に適用される継ぎ部
材としての継ぎ板を示し、この継ぎ板41は、左,右の
分割パイプ34を径方向から挟んで対向する一対の板体
42,42と、各板体42間に分割パイプ34の外径よ
りも若干大きなスペースを確保するスペーサ43とから
H形状に形成され、各板体42には、各分割パイプ34
に穿設されたピン穴34Aに対応するピッチをもって4
個の透孔42A,42A,…が穿設されている。
In the drawing, reference numeral 41 denotes a splicing plate as a splicing member applied to the present embodiment in place of the splicing pipe 35 according to the first embodiment. Each of the plate members 42 is formed into an H shape from a pair of plate members 42, 42 facing each other across the radial direction, and a spacer 43 between the plate members 42 for securing a space slightly larger than the outer diameter of the divided pipe 34. Each divided pipe 34
4 with the pitch corresponding to the pin hole 34A
Are formed in the through holes 42A.

【0047】44は左,右の分割パイプ34のうち一方
の分割パイプ34に対して継ぎ板41を揺動可能に支持
する支持ピンで、支持ピン44は、継ぎ板41の長さ方
向の一端側に穿設された1個の透孔42Aと、各分割パ
イプ34のうち一方に穿設された1個のピン穴34Aと
に挿通されている。従って、継ぎ板41は支持ピン44
を中心として、図7に示す連結位置と図8に示す分割位
置との間で揺動変位するものである。
Reference numeral 44 denotes a support pin for swingably supporting the joint plate 41 with respect to one of the left and right divided pipes 34. The support pin 44 is one end in the longitudinal direction of the joint plate 41. One of the through holes 42A drilled on the side and one pin hole 34A drilled in one of the divided pipes 34 are inserted. Therefore, the joint plate 41 is supported by the support pins 44.
Is pivoted between the connection position shown in FIG. 7 and the division position shown in FIG.

【0048】45,45,…は左,右の分割パイプ34
と継ぎ板41との間を連結する3個の連結ピンで、各連
結ピン45は、継ぎ板41が図7に示す連結位置に揺動
変位した状態で、継ぎ板41の一端側に穿設した各透孔
42Aのうち支持ピン44が挿通されていない1個の透
孔42A、継ぎ板41の他端側に穿設した2個の透孔4
2Aと、他方の分割パイプ34に穿設された各ピン穴3
4Aに挿通される。これにより、左,右の分割パイプ3
4が継ぎ板41を介して一体化され、分割連結材33の
強度を確保できる構成となっている。
45, 45,...
The connection pins 45 are provided on one end side of the joint plate 41 in a state where the joint plate 41 swings to the connecting position shown in FIG. One of the through holes 42A through which the support pin 44 is not inserted, and two through holes 4 formed at the other end of the joint plate 41.
2A and each pin hole 3 formed in the other divided pipe 34
4A. Thereby, the left and right split pipes 3
4 are integrated via a joint plate 41, so that the strength of the divided connecting member 33 can be ensured.

【0049】一方、継ぎ板41から各連結ピン45を抜
き取ったときには、継ぎ板41が支持ピン44を中心と
して図8に示す分割位置に揺動変位し、左,右の分割パ
イプ34の間に主巻ロープ23が通り抜けるだけの隙間
Dが確保できる構成となっている。
On the other hand, when each connecting pin 45 is removed from the joint plate 41, the joint plate 41 swings about the support pin 44 to the dividing position shown in FIG. The structure is such that a gap D enough for the main winding rope 23 to pass through can be secured.

【0050】本実施形態は上述の如き構成を有するもの
で、タワークレーン31を用いて吊荷作業を行うときに
は、図7に示すように、継ぎ板41を連結位置に固定
し、継ぎ板41を介して各分割パイプ34を一体化する
ことにより、分割連結材33の強度を確保することがで
きる。
The present embodiment has the above-described configuration. When carrying out the lifting work using the tower crane 31, as shown in FIG. 7, the joining plate 41 is fixed at the connecting position, and the joining plate 41 is fixed. By integrating the divided pipes 34 through each other, the strength of the divided connecting member 33 can be secured.

【0051】一方、タワーブーム7を起立させた状態
で、タワーブーム7の先端側からスイングレバー32を
取外す作業を行うときには、図8に示すように、継ぎ板
41から各連結ピン45を抜取り、継ぎ板41を分割位
置まで揺動変位させるとにより、左,右の分割パイプ3
4の間に主巻ロープ23が通り抜けるだけの隙間Dを確
保することができ、上述した第1の実施形態と同様に、
主巻ロープ23と分割連結材33とが干渉することな
く、スイングレバー32をタワーブーム7から取外すこ
とができる。
On the other hand, when the work of removing the swing lever 32 from the tip end of the tower boom 7 with the tower boom 7 standing up is performed, as shown in FIG. By displacing the joint plate 41 to the dividing position, the left and right divided pipes 3
4, a gap D enough to allow the main winding rope 23 to pass through can be secured, and similar to the first embodiment described above,
The swing lever 32 can be removed from the tower boom 7 without the main winding rope 23 and the split connecting member 33 interfering with each other.

【0052】なお、前記各実施形態では、分割連結材3
3を構成する左,右の分割パイプ34と継ぎパイプ35
(継ぎ板41)とを、連結ピン36(45)によって連
結した場合を例に挙げたが、本発明はこれに限るもので
はなく、例えばボルト等によって各分割パイプ34と継
ぎパイプ35(継ぎ板41)とを連結してもよい。
In each of the above embodiments, the split connecting member 3
The left and right split pipes 34 and the joint pipes 35 constituting the third pipe 3
Although the case where the connection pipe 41 and the connection plate 41 are connected by the connection pin 36 (45) has been described as an example, the present invention is not limited to this. For example, each divided pipe 34 and the connection pipe 35 (connection plate 41) may be connected.

【0053】また、前記各実施形態では、下部走行体1
を有するタワークレーン31を例に挙げて説明したが、
本発明はこれに限らず、例えば下部走行体等を有しない
固定式のタワークレーン等にも適用することができる。
In each of the above embodiments, the undercarriage 1
The tower crane 31 having is described as an example,
The present invention is not limited to this, and can be applied to, for example, a fixed tower crane having no undercarriage or the like.

【0054】[0054]

【発明の効果】以上詳述した如く、請求項1の発明によ
れば、タワーブームの先端側に設けられたスイングレバ
ーの枠体を構成する各連結材のうち、主巻ロープよりも
スイングレバーの揺動中心側に位置する連結材を、主巻
ロープが通り抜けるのを許すため長さ方向に分割可能と
なった分割連結材として構成したから、例えばタワーブ
ームを起立させた状態でタワーブームの先端側からスイ
ングレバーを取外すときに、主巻ロープが分割連結材を
通り抜けることができる。このため、主巻ロープがスイ
ングレバーの連結材と干渉するのを防止でき、タワーブ
ーム等を地面側に倒すだけのスペースが確保できない狭
小な作業現場においても、起立したタワーブームからス
イングレバーを容易に取外すことができ、しタワークレ
ーンの分解作業を円滑に行うことができる。
As described above in detail, according to the first aspect of the present invention, of the connecting members forming the frame of the swing lever provided on the tip side of the tower boom, the swing lever is more than the main rope. Since the connecting member located on the rocking center side of the tower boom is configured as a split connecting member that can be split in the length direction to allow the main winding rope to pass through, for example, the tower boom When the swing lever is removed from the distal end side, the main winding rope can pass through the split connecting member. As a result, the main rope can be prevented from interfering with the connecting material of the swing lever, and the swing lever can be easily moved from the standing tower boom even in a small work site where there is not enough space for the tower boom or the like to fall to the ground side. The tower crane can be disassembled smoothly.

【0055】また、請求項2の発明によれば、分割連結
材を、基端側が枠体に固着され先端側が主巻ロープの直
径よりも大きな隙間をもって対向した左,右一対の軸体
と、各軸体の先端側に着脱可能に設けられた継ぎ部材と
から構成したから、継ぎ部材を各軸体の先端側に取付け
たときには、左,右の軸体が継ぎ部材を介して一体化さ
れ吊荷作業時における分割連結材の強度を確保すること
ができる。一方、継ぎ部材を各軸体の先端側から取外し
たときには、左,右の軸体間に主巻ロープが通り抜ける
だけの隙間を確保することができ、例えばタワーブーム
を起立させた状態でタワーブームの先端側からスイング
レバーを取外すときに、主巻ロープがスイングレバーの
連結材と干渉するのを防止できる。
According to the second aspect of the present invention, the split connecting member includes a pair of left and right shafts whose base ends are fixed to the frame and whose front ends are opposed to each other with a gap larger than the diameter of the main winding rope. Since the connecting member is detachably provided at the distal end of each shaft, the left and right shafts are integrated via the connecting member when the connecting member is attached to the distal end of each shaft. It is possible to ensure the strength of the split connecting member during the hanging load operation. On the other hand, when the splicing member is removed from the distal end side of each shaft body, a gap can be secured between the left and right shaft bodies so that the main winding rope passes therethrough. When the swing lever is removed from the front end of the swing lever, it is possible to prevent the main winding rope from interfering with the connecting member of the swing lever.

【0056】さらに、請求項3の発明によれば、継ぎ部
材を各軸体の外周側に摺動可能に嵌合する継ぎパイプに
より構成したから、継ぎパイプを連結位置に変位させる
だけで各軸体が継ぎパイプを介して一体化され、吊荷作
業時における分割連結材の強度を確保することができ
る。一方、継ぎパイプを分割位置に変位させるだけで、
各軸体間に主巻ロープが通り抜けるだけの隙間を確保す
ることができるから、起立したタワーブームからスイン
グレバーを取外す作業を容易に行うことができる。
Further, according to the third aspect of the present invention, since the joining member is constituted by the joining pipe slidably fitted to the outer peripheral side of each shaft body, each shaft is merely displaced to the connecting position. The body is integrated via the joint pipe, and the strength of the divided connecting member during the lifting operation can be ensured. On the other hand, just by displacing the joint pipe to the split position,
Since a gap enough for the main winding rope to pass through between the shaft bodies can be secured, the work of removing the swing lever from the standing tower boom can be easily performed.

【0057】また、請求項4の発明によれば、継ぎ部材
を一端側が各軸体のうち一方に揺動可能に支持された継
ぎ板により構成したから、継ぎ板の他端側を各軸体のう
ち他方に取付けるだけで各軸体が継ぎ板を介して一体化
され、吊荷作業時における分割連結材の強度を確保する
ことができる。一方、継ぎ板の他端側を他方の軸体から
取外すだけで、各軸体間に主巻ロープが通り抜けるだけ
の隙間を確保することができるから、起立したタワーブ
ームからスイングレバーを取外す作業を容易に行うこと
ができる。
According to the fourth aspect of the present invention, since the connecting member is constituted by a connecting plate whose one end is swingably supported by one of the shafts, the other end of the connecting plate is connected to each of the shafts. By simply attaching the shaft member to the other of the shaft members, the shaft members are integrated via the joint plate, and the strength of the divided connecting member during the lifting operation can be ensured. On the other hand, by simply removing the other end of the joint plate from the other shaft, it is possible to secure a gap between the shafts for the main winding rope to pass through, so the work of removing the swing lever from the standing tower boom It can be done easily.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施形態が適用されるタワーク
レーンを示す外観図である。
FIG. 1 is an external view showing a tower crane to which a first embodiment of the present invention is applied.

【図2】図1中のスイングレバーを拡大して示す斜視図
である。
FIG. 2 is an enlarged perspective view showing a swing lever in FIG. 1;

【図3】図2中の分割連結材等を示す矢示 III−III 方
向からみた要部拡大図である。
FIG. 3 is an enlarged view of a main part viewed from a direction indicated by arrows III-III, showing a split connecting member in FIG. 2;

【図4】図3中の継ぎパイプが連結位置に変位した状態
を示す斜視図である。
FIG. 4 is a perspective view showing a state where the joint pipe in FIG. 3 is displaced to a connection position.

【図5】継ぎパイプが分割位置に変位した状態を示す斜
視図である。
FIG. 5 is a perspective view showing a state where the joint pipe is displaced to a division position.

【図6】起立したタワーブームからスイングレバーを取
外す状態を拡大して示す外観図である。
FIG. 6 is an enlarged external view showing a state in which a swing lever is removed from an upright tower boom.

【図7】本発明の第2の実施形態による継ぎ板が連結位
置に揺動変位した状態を示す斜視図である。
FIG. 7 is a perspective view showing a state in which a joint plate according to a second embodiment of the present invention is rocked to a connection position.

【図8】継ぎ板が分割位置に揺動変位した状態を示す斜
視図である。
FIG. 8 is a perspective view showing a state in which the joint plate is pivotally displaced to a dividing position.

【図9】従来技術によるタワークレーンを示す外観図で
ある。
FIG. 9 is an external view showing a conventional tower crane.

【図10】図9中のスイングレバーを拡大して示す斜視
図である。
FIG. 10 is an enlarged perspective view showing a swing lever in FIG. 9;

【図11】タワージブをタワーブーム側に折畳んだ状態
を示す外観図である。
FIG. 11 is an external view showing a state where the tower jib is folded toward the tower boom.

【符号の説明】[Explanation of symbols]

2 上部旋回体(クレーン本体) 4 主巻ドラム 7 タワーブーム 8 タワージブ 10,11 枠体 10A,11A 梁材 10B,11B 連結材 23 主巻ロープ 24 吊荷フック 32 スイングレバー 33 分割連結材 34 分割パイプ(軸体) 35 継ぎパイプ(継ぎ部材) 41 継ぎ板(継ぎ部材) 2 Upper Revolving Structure (Crane Body) 4 Main Winding Drum 7 Tower Boom 8 Tower Jib 10, 11 Frame 10A, 11A Beam 10B, 11B Connecting Material 23 Main Winding Rope 24 Suspended Hook 32 Swing Lever 33 Split Connecting Material 34 Split Pipe (Shaft) 35 Joint pipe (joint member) 41 Joint plate (joint member)

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 主巻ドラムを有するクレーン本体と、前
記クレーン本体に起伏可能に設けられたタワーブーム
と、前記タワーブームの先端側に俯仰動可能に設けられ
たタワージブと、左,右の梁材間を複数の連結材で連結
した一対の枠体とこれら枠体の先端側を連結体で連結す
ることにより三角形状に形成され、前記枠体の基端側が
前記タワーブームの先端側に揺動可能に設けられたスイ
ングレバーと、一端側が前記主巻ドラムに巻回され、他
端側が前記スイングレバーの連結材間を通過して前記タ
ワージブの先端側から垂下される吊荷フックに取付けら
れた主巻ロープとからなるタワークレーンにおいて、 前記スイングレバーの枠体を構成する各連結材のうち前
記主巻ロープよりも前記スイングレバーの揺動中心側に
位置する連結材を、前記主巻ロープが通り抜けるのを許
すため長さ方向に分割可能となった分割連結材として構
成したことを特徴とするタワークレーン。
1. A crane body having a main winding drum, a tower boom provided on the crane body so as to be able to move up and down, a tower jib provided on the tip end side of the tower boom so as to be able to move up and down, and left and right beams. A pair of frames in which the members are connected by a plurality of connecting members and the front ends of these frames are connected by a connecting body to form a triangular shape, and the base end of the frame swings toward the front end of the tower boom. A swing lever movably provided, one end of which is wound around the main winding drum, and the other end of which is attached to a hanging load hook which passes between connecting members of the swing lever and hangs down from a tip end of the tower jib. In a tower crane comprising a main winding rope, a connecting member located on the swing center side of the swing lever with respect to the main winding rope among the connecting members constituting a frame body of the swing lever, Tower crane characterized by being configured as a split connecting member made possible split lengthwise to allow the passing through the main winding ropes.
【請求項2】 前記分割連結材は、基端側が前記枠体に
固着され先端側が前記主巻ロープの直径よりも大きな隙
間をもって対向した左,右一対の軸体と、前記各軸体の
先端側に着脱可能に設けられた継ぎ部材とから構成して
なる請求項1に記載のタワークレーン。
2. A pair of left and right shafts having a base end fixed to the frame and a front end opposed with a gap larger than the diameter of the main winding rope, and a tip end of each of the shafts. The tower crane according to claim 1, further comprising a connecting member detachably provided on the side.
【請求項3】 前記継ぎ部材は、前記各軸体の外周側に
摺動可能に嵌合し、前記各軸体間を連結する連結位置と
前記各軸体間を分割する分割位置との間で変位する継ぎ
パイプにより構成してなる請求項2に記載のタワークレ
ーン。
3. The joint member is slidably fitted to an outer peripheral side of each of the shaft bodies, and is between a connecting position for connecting the shaft bodies and a dividing position for dividing the shaft bodies. 3. The tower crane according to claim 2, wherein the tower crane is constituted by a joint pipe displaced by:
【請求項4】 前記継ぎ部材は、一端側が前記各軸体の
うち一方に揺動可能に支持され、他端側が各軸体のうち
他方に着脱される継ぎ板により構成してなる請求項2に
記載のタワークレーン。
4. The joint member is constituted by a joint plate having one end side swingably supported by one of the shaft bodies and the other end side detachably attached to the other of the shaft bodies. A tower crane as described in.
JP24612397A 1997-08-27 1997-08-27 Tower crane Pending JPH1160167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24612397A JPH1160167A (en) 1997-08-27 1997-08-27 Tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24612397A JPH1160167A (en) 1997-08-27 1997-08-27 Tower crane

Publications (1)

Publication Number Publication Date
JPH1160167A true JPH1160167A (en) 1999-03-02

Family

ID=17143832

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24612397A Pending JPH1160167A (en) 1997-08-27 1997-08-27 Tower crane

Country Status (1)

Country Link
JP (1) JPH1160167A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110118795A (en) * 2009-02-11 2011-11-01 파우 운트 엠 도이칠란트 게엠베하 Towing rod to support crane jib
CN102795557A (en) * 2012-09-03 2012-11-28 徐州重型机械有限公司 Crane
CN103332609A (en) * 2013-07-15 2013-10-02 中联重科股份有限公司 Tower head and tower crane with same
CN104528556A (en) * 2014-12-31 2015-04-22 徐州重型机械有限公司 Automatic third support folding and unfolding device and crane
CN104528546A (en) * 2015-01-20 2015-04-22 江苏振东港口机械制造有限公司 Stay-rope fixing device for arm rest

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110118795A (en) * 2009-02-11 2011-11-01 파우 운트 엠 도이칠란트 게엠베하 Towing rod to support crane jib
JP2012517393A (en) * 2009-02-11 2012-08-02 ファウ・ウント・エム・ドイチュラント・ゲゼルシャフト・ミット・ベシュレンクテル・ハフツング Tension bar to support the crane boom
CN102795557A (en) * 2012-09-03 2012-11-28 徐州重型机械有限公司 Crane
CN102795557B (en) * 2012-09-03 2014-10-29 徐州重型机械有限公司 Crane
CN103332609A (en) * 2013-07-15 2013-10-02 中联重科股份有限公司 Tower head and tower crane with same
CN104528556A (en) * 2014-12-31 2015-04-22 徐州重型机械有限公司 Automatic third support folding and unfolding device and crane
CN104528546A (en) * 2015-01-20 2015-04-22 江苏振东港口机械制造有限公司 Stay-rope fixing device for arm rest

Similar Documents

Publication Publication Date Title
JP5693031B2 (en) Assembly method of mobile lift crane
JP2019069838A (en) Crane and jib assembling method
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP2008114978A (en) Mobile tower crane
JPH1160167A (en) Tower crane
JP6638434B2 (en) Crane boom mounting method
JP6683086B2 (en) Mobile crane assembly method
JP3399356B2 (en) crane
JPH0761773A (en) Jib crane
JP7306080B2 (en) Crane and crane assembly method
JP2002255478A (en) Luffing jib crane and method of assembling it
WO2024018913A1 (en) Crane and crane assembly method
JP7624859B2 (en) Crane and method for lowering the boom of the crane
JP7163607B2 (en) Crane and crane assembly method
JP7234811B2 (en) A crane strut, a method for folding a crane strut, and a method for assembling a crane strut
JPH07187574A (en) Jib device of crane
JP3234883B2 (en) Luffing jib crane boom suspension structure
JP7293921B2 (en) Pin anti-rotation structure
JP2019199310A (en) Specification changing method of crane and specification-changeable crane
WO2022264497A1 (en) Backstop
JP2019112152A (en) Crane and crane assembling method
JPH07291587A (en) Tower crane
JP3917236B2 (en) Roughing jib crane
JP7102861B2 (en) crane
JP6579172B2 (en) Crane and crane strut raising method