Watt-hour meter

Info

Publication number
JPH11150863A
JPH11150863A JP9312938A JP31293897A JPH11150863A JP H11150863 A JPH11150863 A JP H11150863A JP 9312938 A JP9312938 A JP 9312938A JP 31293897 A JP31293897 A JP 31293897A JP H11150863 A JPH11150863 A JP H11150863A
Authority
JP
Japan
Prior art keywords
power
load
hour meter
measuring
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP9312938A
Other languages
Japanese (ja)
Inventor
Toshiyuki Kudo
敏行 工藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP9312938A priority Critical patent/JPH11150863A/en
Publication of JPH11150863A publication Critical patent/JPH11150863A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to reduce electric power consumption, by controlling in such a manner that transfer means is interrupted when a load factor based on the electric energy measured by electric energy measuring means exceeds a predetermined level. SOLUTION: A central arithmetic section 37 integrates signals depending on an electric energy transmitted from a power arithmetic section 34, determines the integrated watt-hour and outputs to a display section 38. Moreover, the central arithmetic section 37 determines load factor and, if this load factor exceeds a predetermined value, a switching control section 36 drives a switch gear 35 so as to open switches 35a and 35b, thereby creating an interrupted state between the conductor 33 and output terminals 32e, 32f and interrupting power supply to a controllable load 5. By doing this, the power consumption at the controllable lad can be reduced and, as a whole, the electric energy consumed can be reduced. Also, a possibility of exceeding the current limit predetermined by contract can be lowered and the power failure due to an excessive current consumption can be also prevented.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、電力量計に関す
る。
[0001] The present invention relates to a watt-hour meter.

【0002】[0002]

【従来の技術】従来、一般家庭等における電力の負荷制
御は、電力量計と家電製品等の負荷機器との間に遮断器
を設け、所定以上の電流が流れた場合に回路を遮断し電
力供給を停止する方法が一般的である。
2. Description of the Related Art Conventionally, load control of electric power in general homes or the like is performed by providing a circuit breaker between a watt hour meter and a load device such as a home electric appliance to cut off a circuit when a predetermined current or more flows. The method of stopping supply is common.

【0003】この場合、多数の負荷機器は単一の遮断器
に接続されているので、電流量が超過して遮断器が作動
すると全ての負荷機器が一度に電源を断たれることにな
ってしまっていた。
In this case, since a large number of load devices are connected to a single circuit breaker, if the amount of current is exceeded and the circuit breaker is activated, all the load devices are turned off at once. Was gone.

【0004】また高圧需要家等については電力供給会社
とデマンド契約を結んで単位時間毎の消費電力量を細か
く管理しているため、消費電力量が前記契約で定められ
ている値を越えたか否かは厳密に管理されているため突
然に電源を断たれるような事態が生じることはない。し
かし、このようなデマンド契約を一般家庭等の需要家に
まで拡大して適用することは現実的ではない。
[0004] In addition, for high-voltage consumers and the like, a demand contract is concluded with a power supply company to finely manage the power consumption per unit time. Since the power is strictly controlled, there is no possibility that the power is suddenly cut off. However, it is not realistic to extend and apply such a demand contract to consumers such as ordinary households.

【0005】[0005]

【発明が解決しようとする課題】エアコンの普及に伴っ
て、特に夏場の特定時間における電力消費量は他の季節
や時間帯の電力消費量に比べて突出しており、この特定
時間における電力消費量を削減することが望まれてい
る。
With the widespread use of air conditioners, the power consumption at a specific time in the summer, in particular, is more prominent than the power consumption in other seasons and time zones. It is desired to reduce.

【0006】前述の一般家庭等においては、契約によっ
て定められている電流量までは電力消費に制限がないの
で何時でも許されている電流量までは自由に電力消費が
可能な環境にあるので自主的に意識して負荷の制御をし
ない限り電力量を削減することは困難である。
[0006] In the above-mentioned general homes, there is no restriction on the power consumption up to the amount of current specified by the contract, and there is an environment in which power can be freely consumed up to the amount of current allowed at any time. It is difficult to reduce the amount of power unless the load is controlled consciously.

【0007】また、電流量が契約によって定められてい
る値を越えた途端に電力の供給が断たれるので、特に夜
間においては照明が落ちてしまい好ましくない。さら
に、最近では各種家電製品には時計やタイマー等を内臓
しているものが多く、電源が断たれるとセットしてあっ
た時刻などがキャンセルされてしまうという問題もあ
る。本発明の目的は、このような課題を解決することに
ある。
Further, since the supply of electric power is stopped as soon as the amount of current exceeds the value specified by the contract, the lighting is undesirably reduced especially at night. Furthermore, recently, many home electric appliances have a built-in clock, timer, and the like, and there is a problem that when the power is cut off, the set time and the like are canceled. An object of the present invention is to solve such a problem.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するた
め、請求項1記載の発明は、外部の電力供給源と負荷と
の間に介在し、負荷が消費する電力を計測する電力量計
であって、前記電力供給源に接続される入力端子と、電
力を消費する第1の負荷機器に接続される第1の出力端
子と、この導体に流れる電流及び電圧を計測して前記負
荷が消費する電力量を計測する電力量計測手段と、前記
第1の出力端子に並列に設けられ、電力を消費する第2
の負荷機器に接続される第2の出力端子と、前記入力端
子と前記出力端子とを接続する導体と、前記導体と前記
第2の出力端子とを接続または遮断する切替え手段と、
前記電力量計測手段で計測される電力量に基づく負荷率
が所定以上となった場合に前記切替え手段を遮断するよ
う制御する制御手段とを備えたことを特徴とする電力量
計である。
According to a first aspect of the present invention, there is provided a watt hour meter interposed between an external power supply and a load for measuring the power consumed by the load. An input terminal connected to the power supply source, a first output terminal connected to a first load device that consumes power, and measuring a current and a voltage flowing through this conductor, thereby consuming the load. A power amount measuring means for measuring the amount of power to be consumed, and a second power consumption means provided in parallel with the first output terminal and consuming power.
A second output terminal connected to the load device, a conductor that connects the input terminal and the output terminal, and a switching unit that connects or disconnects the conductor and the second output terminal;
A watt hour meter having control means for controlling the switching means to shut off when a load factor based on the amount of power measured by the watt-hour measuring means becomes a predetermined value or more.

【0009】また、請求項2記載の発明は、外部の電力
供給源と負荷との間に介在し、負荷が消費する電力を計
測する電力量計であって、前記電力供給源に接続される
入力端子と、電力を消費する負荷機器に接続される出力
端子と、前記入力端子と前記出力端子とを接続する導体
と、この導体に流れる電流及び電圧を計測して前記負荷
が消費する電力量を計測する電力量計測手段と、前記電
力量計測手段で計測される電力量に基づく負荷率が所定
以上となった場合に外部に警報を出力する警報出力手段
とを備えたことを特徴とする電力量計である。
According to a second aspect of the present invention, there is provided a watt hour meter interposed between an external power supply source and a load for measuring power consumed by the load, and connected to the power supply source. An input terminal, an output terminal connected to a load device that consumes power, a conductor connecting the input terminal and the output terminal, and an amount of power consumed by the load by measuring current and voltage flowing through the conductor. And an alarm output unit that outputs an alarm to the outside when a load factor based on the amount of power measured by the power amount measurement unit becomes a predetermined value or more. It is an electricity meter.

【0010】請求項3記載の発明は、請求項1記載の発
明において、前記警報出力手段は、前記電力量計測手段
で計測される電力量に基づく負荷率が前記切替え手段を
遮断する負荷率よりも低く設定されたレベル以上となっ
た場合に外部に警報を出力するものであることを特徴と
する電力量計である。
According to a third aspect of the present invention, in the first aspect of the invention, the alarm output means is configured such that a load factor based on the electric energy measured by the electric energy measurement means is higher than a load factor at which the switching means is shut off. A watt hour meter that outputs an alarm to the outside when the power level becomes equal to or higher than a low level.

【0011】請求項4記載の発明は、請求項1記載の発
明において、前記警報出力手段は、前記電力量計測手段
で計測される電力量に基づく負荷率が前記切替え手段を
遮断する負荷率に到達するまでの余裕時間を推定し、当
該余裕時間が所定以下となった場合に外部に警報を出力
するものであることを特徴とする電力量計である。
According to a fourth aspect of the present invention, in the first aspect of the present invention, the alarm output means is adapted to reduce a load factor based on the electric energy measured by the electric energy measuring means to a load factor for interrupting the switching means. The watt hour meter is characterized by estimating a margin time until the arrival, and outputting an alarm to the outside when the margin time becomes equal to or less than a predetermined value.

【0012】[0012]

【発明の実施の形態】本発明の第1の実施の形態を図1
及び図2を用いて説明する。図1は本発明に係る電力量
計の接続関係を説明する図であり、図2は本発明に係る
電力量計の構成を説明する構成図である。
FIG. 1 shows a first embodiment of the present invention.
This will be described with reference to FIG. FIG. 1 is a diagram illustrating the connection relationship of the watt hour meter according to the present invention, and FIG. 2 is a configuration diagram illustrating the configuration of the watt hour meter according to the present invention.

【0013】図1において、電力量計3は電力供給源1
及び並列に接続された通常負荷4と制御可能負荷5が接
続されており、電力供給源1が供給し通常負荷4や制御
可能負荷5が消費する電力を計測する。
In FIG. 1, a watt-hour meter 3 has a power supply source 1.
The normal load 4 and the controllable load 5 are connected in parallel, and the power supplied by the power supply source 1 and consumed by the normal load 4 and the controllable load 5 is measured.

【0014】通常負荷4には常時電力が供給されるが、
電力量計3内部には切替え手段としてスイッチ31が設
けられ、制御可能負荷5はこのスイッチ31を介して接
続されており、スイッチ31のオン・オフにより制御可
能負荷5への電力供給を制御可能に構成されている。
Normally, power is always supplied to the load 4,
A switch 31 is provided inside the watt-hour meter 3 as a switching means, and the controllable load 5 is connected through the switch 31. The power supply to the controllable load 5 can be controlled by turning on / off the switch 31. Is configured.

【0015】一般家庭等においては、前記の通常負荷4
としては照明器具や冷蔵庫等の常に電力供給されている
必要のある機器を接続し、制御可能負荷5としてはテレ
ビ等の必ずしも電力供給の必要のない機器を接続する。
なお、それぞれの負荷として接続する機器は必要に応じ
て選択し接続すればよいのであって、前述の例に限られ
るものではない。
In a general home or the like, the normal load 4
As a controllable load 5, a device that does not always need to supply power, such as a television, is connected as a controllable load 5.
The devices to be connected as the respective loads may be selected and connected as needed, and are not limited to the above-described example.

【0016】次に、図2を用いて第1の実施の形態に係
る電力量計3の構成を説明する。電力量計3には電力供
給源1や負荷4,5に接続するための端子台32が設け
られ、この端子台32には電力供給源1に接続する入力
端子(1S,2S)32a,32b及び負荷に接続する
出力端子(1L,2L,LA,LB)32d,32c,
32e,32fが設けられている。
Next, the configuration of the watt hour meter 3 according to the first embodiment will be described with reference to FIG. The watt-hour meter 3 is provided with a terminal block 32 for connection to the power supply source 1 and the loads 4 and 5, and the terminal block 32 has input terminals (1S, 2S) 32a and 32b connected to the power supply source 1. And output terminals (1L, 2L, LA, LB) 32d, 32c,
32e and 32f are provided.

【0017】前記の入力端子(1S,2S)32a,3
2bは、それぞれ導体33により出力端子(1L,2
L)32d,32cに接続されており、また導体33は
スイッチ35a,35bを備えた開閉器35を介して出
力端子(LA,LB)32e,32fが接続されてい
る。
The input terminals (1S, 2S) 32a, 3
2b are output terminals (1L, 2
L) 32d, 32c, and the conductor 33 is connected to output terminals (LA, LB) 32e, 32f via a switch 35 having switches 35a, 35b.

【0018】導体33には電力演算部34が接続されて
おり、この電力演算部34は導体33に流れる電流と電
圧を測定し、測定結果から演算により電力量を求めて当
該電力量に応じた信号を中央制御部37に出力する。
A power calculation unit 34 is connected to the conductor 33. The power calculation unit 34 measures the current and voltage flowing through the conductor 33, calculates the power amount from the measurement result, and calculates the power amount according to the power amount. The signal is output to the central control unit 37.

【0019】中央演算部37では電力演算部34から送
られてきた電力量に応じた信号を積算して積算電力量を
求め、表示部38に出力する。表示部38は、中央演算
部37から送られてきた積算電力量を図示しない液晶表
示器等により表示するものである。
The central processing unit 37 integrates a signal corresponding to the power amount sent from the power calculation unit 34 to obtain an integrated power amount, and outputs the integrated power amount to the display unit 38. The display unit 38 displays the integrated power amount sent from the central processing unit 37 on a liquid crystal display (not shown) or the like.

【0020】さらに、中央演算部37では負荷率を求
め、この負荷率が所定の値を越えた場合には開閉制御部
36に信号を送り、開閉制御部36は開閉器35のスイ
ッチ35a,35bが開となるよう駆動して導体33と
出力端子(LA,LB)32e,32fとの間を遮断状
態にし、制御可能負荷5への電力供給を遮断する。
Further, the central processing unit 37 calculates a load factor, and when the load factor exceeds a predetermined value, sends a signal to the switching control unit 36. The switching control unit 36 switches the switches 35a and 35b of the switch 35. Is driven to be open, so that the conductor 33 and the output terminals (LA, LB) 32e, 32f are cut off, and the power supply to the controllable load 5 is cut off.

【0021】これにより、制御可能負荷5での電力消費
を削減することが可能となり、全体として消費電力量の
削減を行うことが可能となる。また、前記のように負荷
率で制御可能負荷への電力供給を制御するので、契約に
より定められている電流量を越える可能性も低くするこ
とができ、電流量超過による停電を未然に防止すること
も可能になる。
As a result, the power consumption of the controllable load 5 can be reduced, and the power consumption can be reduced as a whole. Further, since the power supply to the controllable load is controlled by the load factor as described above, the possibility of exceeding the amount of current specified by the contract can be reduced, and a power failure due to excess amount of current is prevented beforehand. It becomes possible.

【0022】次に本発明に係る第2の実施の形態を図3
を用いて説明する。図3記載の第2の実施の形態は、前
記第1の実施の形態に警報出力を追加したものであるの
で、図2と同一構成には同一符号を付し、説明を省略す
る。
Next, a second embodiment according to the present invention will be described with reference to FIG.
This will be described with reference to FIG. In the second embodiment shown in FIG. 3, an alarm output is added to the first embodiment, and therefore, the same components as those in FIG.

【0023】第2の実施の形態の構成上の特徴は、第1
の実施の形態の構成に加えて端子台32に出力端子(A
NN)32gが追加され、開閉制御部36に接続された
信号線36aが出力端子(ANN)32gに接続されて
いることである。
The features of the configuration of the second embodiment are as follows.
In addition to the configuration of the embodiment, the output terminal (A
NN) 32g is added, and the signal line 36a connected to the open / close control unit 36 is connected to the output terminal (ANN) 32g.

【0024】本第2の実施の形態においては、第1の実
施の形態と同様に中央制御部37において負荷率を求
め、この負荷率が所定の値を越えた場合には開閉制御部
36に信号を送りスイッチ35a,35bが開となるよ
う制御すると同時に、開閉制御部36は信号線36aに
も警報信号を出力する。このため、信号線36aに接続
された出力端子(ANN)32gに警報器等を接続して
おくことで、制御可能負荷5への電力供給が遮断された
ことを報知させることが可能となる。
In the second embodiment, the load factor is obtained in the central control unit 37 as in the first embodiment, and when the load factor exceeds a predetermined value, the switching control unit 36 At the same time as sending a signal to control the switches 35a and 35b to open, the open / close control unit 36 also outputs an alarm signal to the signal line 36a. Therefore, by connecting an alarm device or the like to the output terminal (ANN) 32g connected to the signal line 36a, it is possible to notify that the power supply to the controllable load 5 has been cut off.

【0025】出力端子(ANN)32gは開閉制御部3
6に接続されているが、前記のように開閉器35に信号
を出力する所定時間前に出力端子(ANN)32gへ警
報信号を出力する場合には、中央制御部37に接続して
中央制御部37から警報信号を出力してもよい。
The output terminal (ANN) 32g is connected to the open / close control unit 3
However, when an alarm signal is output to the output terminal (ANN) 32g a predetermined time before the signal is output to the switch 35 as described above, it is connected to the central control unit 37 to control the central control. An alarm signal may be output from the unit 37.

【0026】このように、中央制御部37から警報信号
を出力する構成にすれば、負荷率の増加率から前記所定
値を越えるまでの時間を推定し、開閉制御部36が開閉
器35に信号を出力する所定時間前に出力端子(AN
N)32gへ警報信号を出力するようにしたり、また開
閉器35を動作させる負荷率よりも低く設定した負荷率
で前記警報信号を出力するようにしてもよく、このよう
にしておくことにより制御可能負荷5への電力供給が遮
断される前に報知し制御可能負荷5として複数の機器が
接続されている場合には自主的に必要性の低い機器の電
源を切ることにより開閉器35が動作することを未然に
防止することも可能となる。
In this way, when the alarm signal is output from the central control unit 37, the time until the predetermined value is exceeded is estimated from the rate of increase of the load factor, and the switching control unit 36 sends a signal to the switch 35. The output terminal (AN
N) An alarm signal may be output to 32g, or the alarm signal may be output at a load factor set lower than the load factor at which the switch 35 is operated. The power supply to the possible load 5 is notified before the power supply is cut off. If a plurality of devices are connected as the controllable load 5, the switch 35 is operated by voluntarily turning off the power of a device which is less necessary. Can be prevented from occurring.

【0027】[0027]

【発明の効果】本発明によれば、予め設定した負荷率を
越えた場合には電力量計に内臓された開閉器を開とし、
当該開閉器に接続されている負荷への電力供給を遮断す
ることにより電力消費の削減が可能となった。
According to the present invention, when the load factor exceeds a preset load factor, the switch incorporated in the watt hour meter is opened,
By cutting off the power supply to the load connected to the switch, power consumption can be reduced.

【0028】また、従来のように電流量が超過した場合
全ての負荷への電力供給を遮断するものではなく、前記
開閉器に接続されている負荷への電力供給のみを遮断す
るので、端子と負荷との接続を前もって選択しておけば
常時電力供給が必要な負荷への電力供給は継続すること
が可能である。
Also, when the amount of current is exceeded as in the prior art, the power supply to all the loads is not cut off, but only the power supply to the load connected to the switch is cut off. If the connection to the load is selected in advance, it is possible to continue supplying power to a load that requires constant power supply.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明における電力量計の接続関係を説明する
接続図。
FIG. 1 is a connection diagram illustrating a connection relationship of a watt hour meter in the present invention.

【図2】本発明の第1の実施の形態を説明する構成図。FIG. 2 is a configuration diagram illustrating a first embodiment of the present invention.

【図3】本発明の第2の実施の形態を説明する構成図。FIG. 3 is a configuration diagram illustrating a second embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1…電力供給源,3…電力量計,32d,32c,32
e,32f,32g…出力端子,34…電力演算部,3
5…開閉器,35a,35b…スイッチ,36…開閉制
御部,37…中央制御部,38…表示部,4…通常負
荷,5…制御可能負荷。
DESCRIPTION OF SYMBOLS 1: Power supply source, 3: Electricity meter, 32d, 32c, 32
e, 32f, 32g output terminal, 34 power calculation unit, 3
5 switch, 35a, 35b switch, 36 switch control section, 37 central control section, 38 display section, 4 normal load, 5 controllable load.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 外部の電力供給源と負荷との間に介在
し、負荷が消費する電力を計測する電力量計であって、
前記電力供給源に接続される入力端子と、電力を消費す
る第1の負荷機器に接続される第1の出力端子と、この
導体に流れる電流及び電圧を計測して前記負荷が消費す
る電力量を計測する電力量計測手段と、前記第1の出力
端子に並列に設けられ、電力を消費する第2の負荷機器
に接続される第2の出力端子と、前記入力端子と前記第
1及び第2の出力端子とを接続する導体と、前記導体と
前記第2の出力端子とを接続または遮断する切替え手段
と、前記電力量計測手段で計測される電力量に基づく負
荷率が所定以上となった場合に前記切替え手段を遮断す
るよう制御する制御手段とを備えたことを特徴とする電
力量計。
1. A watt hour meter interposed between an external power supply source and a load for measuring power consumed by the load,
An input terminal connected to the power supply source, a first output terminal connected to a first load device consuming power, and an amount of power consumed by the load by measuring current and voltage flowing through the conductor , A second output terminal connected in parallel to the first output terminal and connected to a second load device consuming power, the input terminal, the first and the second And a switching means for connecting or disconnecting the conductor and the second output terminal, and a load factor based on the electric energy measured by the electric energy measuring means is equal to or greater than a predetermined value. And a control means for controlling the switching means to shut off when the power meter is turned off.
【請求項2】 外部の電力供給源と負荷との間に介在
し、負荷が消費する電力を計測する電力量計であって、
前記電力供給源に接続される入力端子と、電力を消費す
る負荷機器に接続される出力端子と、前記入力端子と前
記出力端子とを接続する導体と、この導体に流れる電流
及び電圧を計測して前記負荷が消費する電力量を計測す
る電力量計測手段と、前記電力量計測手段で計測される
電力量に基づく負荷率が所定以上となった場合に外部に
警報を出力する警報出力手段とを備えたことを特徴とす
る電力量計。
2. A watt hour meter interposed between an external power supply and a load for measuring power consumed by the load,
An input terminal connected to the power supply source, an output terminal connected to a load device that consumes power, a conductor connecting the input terminal and the output terminal, and measuring a current and a voltage flowing through the conductor. Power amount measuring means for measuring the amount of power consumed by the load, and alarm output means for outputting an alarm to the outside when a load rate based on the amount of power measured by the power amount measuring means has become a predetermined value or more. A watt-hour meter comprising:
【請求項3】 請求項1記載の電力量計であって、前記
警報出力手段は、前記電力量計測手段で計測される電力
量に基づく負荷率が前記切替え手段を遮断する負荷率よ
りも低く設定されたレベル以上となった場合に外部に警
報を出力するものであることを特徴とする電力量計。
3. The watt hour meter according to claim 1, wherein said alarm output means is configured such that a load factor based on the power amount measured by said power amount measurement means is lower than a load factor at which said switching means is shut off. A watt hour meter characterized by outputting an alarm to the outside when the level exceeds a set level.
【請求項4】 請求項1記載の電力量計であって、前記
警報出力手段は、前記電力量計測手段で計測される電力
量に基づく負荷率が前記切替え手段を遮断する負荷率に
到達するまでの余裕時間を推定し、当該余裕時間が所定
以下となった場合に外部に警報を出力するものであるこ
とを特徴とする電力量計。
4. The watt hour meter according to claim 1, wherein the alarm output means reaches a load rate at which the load factor based on the power amount measured by the power amount measurement means shuts off the switching means. A watt hour meter for estimating a margin time up to and outputting an alarm to the outside when the margin time falls below a predetermined value.
JP9312938A 1997-11-14 1997-11-14 Watt-hour meter Withdrawn JPH11150863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9312938A JPH11150863A (en) 1997-11-14 1997-11-14 Watt-hour meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9312938A JPH11150863A (en) 1997-11-14 1997-11-14 Watt-hour meter

Publications (1)

Publication Number Publication Date
JPH11150863A true JPH11150863A (en) 1999-06-02

Family

ID=18035291

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9312938A Withdrawn JPH11150863A (en) 1997-11-14 1997-11-14 Watt-hour meter

Country Status (1)

Country Link
JP (1) JPH11150863A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002037126A1 (en) * 2000-11-01 2002-05-10 Mitsubishi Denki Kabushiki Kaisha Electronic watt-hour meter
JP2006524028A (en) * 2003-04-17 2006-10-19 エネル ディストリビュズィオーネ ソシエタ ペル アチオニ Electric circuit breaker
JP2006292442A (en) * 2005-04-06 2006-10-26 Toshiba Corp Electronic watt-hour meter and extraction member for electronic watt-hour meter
JP2008022650A (en) * 2006-07-13 2008-01-31 Univ Of Tsukuba Self-sustained operation support device and power supply system
JP2010279160A (en) * 2009-05-28 2010-12-09 Chugoku Electric Power Co Inc:The Power-load adjusting system, power-load adjusting device, watthour meter, and power-load adjusting method
JP2011247901A (en) * 2011-07-26 2011-12-08 Chugoku Electric Power Co Inc:The Watt-hour meter

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002037126A1 (en) * 2000-11-01 2002-05-10 Mitsubishi Denki Kabushiki Kaisha Electronic watt-hour meter
JPWO2002037126A1 (en) * 2000-11-01 2004-03-11 三菱電機株式会社 Electronic watt-hour meter
JP2006524028A (en) * 2003-04-17 2006-10-19 エネル ディストリビュズィオーネ ソシエタ ペル アチオニ Electric circuit breaker
US7564667B2 (en) 2003-04-17 2009-07-21 Enel Distributions S.p.A. Electric circuit breaker
US8559150B2 (en) 2003-04-17 2013-10-15 Enel Distribuzione S.P.A. Electric circuit breaker
JP2006292442A (en) * 2005-04-06 2006-10-26 Toshiba Corp Electronic watt-hour meter and extraction member for electronic watt-hour meter
JP2008022650A (en) * 2006-07-13 2008-01-31 Univ Of Tsukuba Self-sustained operation support device and power supply system
JP2013051879A (en) * 2006-07-13 2013-03-14 Univ Of Tsukuba Electrical power system
JP2010279160A (en) * 2009-05-28 2010-12-09 Chugoku Electric Power Co Inc:The Power-load adjusting system, power-load adjusting device, watthour meter, and power-load adjusting method
JP2011247901A (en) * 2011-07-26 2011-12-08 Chugoku Electric Power Co Inc:The Watt-hour meter

Similar Documents

Publication Publication Date Title
US6718213B1 (en) Variable base load energy management system and method
US20110032070A1 (en) Wireless switching and energy management
US6731484B2 (en) Integrated high voltage transient surge suppression with automatic transfer switch for alternate source of electricity
US11705736B2 (en) Load control architecture of an energy control system
JPH11150863A (en) Watt-hour meter
EP2244353B1 (en) Energy saving device
CA1060980A (en) Demand controller
JP2005094930A (en) Indoor power line current control device
US6639330B2 (en) Transfer relay for computer based equipment
US8941269B1 (en) System and method to reduce electrical transients
KR20190047336A (en) Low voltage electronic watt-hour meter and Method for controlling the same
AU2015100624A4 (en) Domestic Electrical Demand Limiting Controller
JP2003333750A (en) Power-saving controller for power distribution facility
CN208001161U (en) A kind of phase-change switch module
JPH0427876A (en) Watthour meter
JPH11164559A (en) Ac voltage adjusting apparatus
TWI834994B (en) Power consumption detection and distribution device and power consumption detection and distribution method
US12244133B2 (en) Solid state circuit breaker
KR200415570Y1 (en) Thin switch
US7944093B2 (en) Off-peak power distribution system
KR20070073546A (en) Power saving system with automatic voltage regulation
JP2002139238A (en) Demand control device for air conditioner
KR20140133719A (en) Apparatus and method for power distribution
US6670728B2 (en) Method and system to automatically reduce generated power
JP2003244842A (en) Device for preventing interruption of commercial power

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040715

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20050414

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050606

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060317

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060414

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20060607