Aerial expansion type suspended scaffold and its construction

Info

Publication number
JPH1113275A
JPH1113275A JP17135197A JP17135197A JPH1113275A JP H1113275 A JPH1113275 A JP H1113275A JP 17135197 A JP17135197 A JP 17135197A JP 17135197 A JP17135197 A JP 17135197A JP H1113275 A JPH1113275 A JP H1113275A
Authority
JP
Japan
Prior art keywords
pipe
tip
parent
chain
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17135197A
Other languages
Japanese (ja)
Inventor
Yoshio Taguchi
芳男 田口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Kizai Forming Co Ltd
Original Assignee
Kawatetsu Kizai Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawatetsu Kizai Kogyo Co Ltd filed Critical Kawatetsu Kizai Kogyo Co Ltd
Priority to JP17135197A priority Critical patent/JPH1113275A/en
Publication of JPH1113275A publication Critical patent/JPH1113275A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an aerial expansion type suspended scaffold with high safety and efficient workability at a high place. SOLUTION: A wire pope 5 with a turn buckle is locked at one end thereof to the rear end of a master pipe 1 provided at the end of an existing suspended scaffold and locked at the other end thereof through a wire guide 33 for a suspension chain 4 suspending the master pipe 1 at this end of the end of a mater pipe 1a to be next connected thereto. After the master pipe 1a is connected thereto, it is mounted with a sleeper 6, a plywood panel 7 is placed thereon, a new suspension chain 4a is mounted at the end and connected to an upper structure G and the turn buckle 53 is loosened to carry the master pipe 1a onto the new suspension chain 4a.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁建設現場など
の下部から支持されていない高所(以下これを空中とい
う)において作業床として使用する吊り足場であって、
順次その床面を拡張していくことのできる空中拡張式吊
り足場およびその構築方法に関する。
BACKGROUND OF THE INVENTION The present invention relates to a suspension scaffold used as a work floor in a high place not supported from below such as a bridge construction site (hereinafter referred to as aerial),
The present invention relates to an aerial-expandable suspension scaffold capable of sequentially expanding its floor surface and a construction method thereof.

【0002】[0002]

【従来の技術】橋梁建設現場において架設した橋桁の塗
装工事を行う場合や、既存の橋梁の補修、塗り替え工事
を行う場合など、作業場所の上方には橋脚等の構造物が
あるものの、下方には作業床を支持するもののない高所
作業において、いわゆる吊り足場を架設することが行わ
れている。そのやり方にはさまざまあるが、代表的と思
われるつぎの4つの工法について、以下図面により説明
する。 1)ワイヤブリッジ 2)パイプ吊り足場 3)枠はり式吊り足場 4)パネル吊り足場 第1のワイヤブリッジの全体斜視図を図11、その標準断
面であるXX矢視による断面図を図12に示す。Pはこの
橋梁においてワイヤブリッジを架設するスパンの両端に
ある一対の橋脚、60は橋脚P上面にケミカルアンカー等
で固定されたアンカー金具、61は一対の橋脚間にアンカ
ー金具60により両端を係止されて平行に張られた複数本
のメインケーブル、62は複数本のメインケーブル61にわ
たって、これと直角方向に多数所定間隔に取り付けられ
る「ころばし」と称される足場パイプ、63は各ころばし
の先端を結んで取り付けられるはな止めパイプ、64はこ
ろばしに対して垂直方向、かつスパン方向に取り付けら
れる手すり、65は手すり64の近傍に、ころばし62に対し
てスパン方向に取り付けられる足場板、66はころばし62
およびはな止めパイプ63に四辺を係止してこれらの下面
に張られる安全ネット、67は上部にある橋梁の主桁Gか
ら適当間隔で吊りさげられてメインケーブル61を支持す
る吊りチェーンである。
2. Description of the Related Art Although there are structures such as piers above a work site, such as when painting a bridge girder erected at a bridge construction site, or when repairing or repainting an existing bridge, there is a structure such as a pier. In high places where there is no support for the work floor, a so-called hanging scaffold is erected. Although there are various methods, the following four methods considered to be typical will be described below with reference to the drawings. 1) Wire bridge 2) Pipe suspended scaffold 3) Frame beam suspended scaffold 4) Panel suspended scaffold FIG. 11 shows an overall perspective view of the first wire bridge, and FIG. . P is a pair of piers at both ends of a span where a wire bridge is to be erected in this bridge, 60 is an anchor fitting fixed to the upper surface of the pier P with a chemical anchor or the like, and 61 is an anchor between the pair of piers at both ends by the anchor fitting 60. A plurality of main cables 62 extending in parallel with each other, a plurality of main cables 61, a scaffolding pipe called "roller" which is attached at a predetermined interval in a direction perpendicular to the main cable 61, 63 is a tip of each roll A stop pipe which is attached by connecting the rails, 64 is a handrail which is mounted vertically and spanwise to the roller, 65 is a scaffold plate which is mounted near the handrail 64, and which is mounted in the span direction on the roller 62, 66 is Roll 62
A safety net 67 is attached to the lower surface of the bridge by locking the four sides to a stop pipe 63. Reference numeral 67 denotes a suspension chain suspended from the main girder G of the bridge at an appropriate interval to support the main cable 61. .

【0003】以上の説明からも明らかなように、このワ
イヤブリッジは、一対の橋脚P、Pにアンカー金具60に
より両端を固定して複数本のメインケーブル61を張りわ
たし、それと直角方向にころばし62を取り付け、下面に
安全ネット66を張るとともに上面にスパン方向の手すり
64ならびに足場板65を設置して作業足場を構築するもの
であるが、最初にメインケーブル61を張る段階で大きな
危険を伴うばかりでなく、スパンが大きいと中間で吊り
チェーン67を併用してつり上げないと中央付近がカテナ
リ状に垂れさがって上部の橋梁から大きく離れてしまう
などの問題点がある。
As is clear from the above description, this wire bridge has a plurality of main cables 61 fixed at both ends to a pair of piers P, P by anchoring brackets 60, and is rolled at right angles to the main cables 61. Attach the safety net 66 on the lower surface and span rails on the upper surface
The work scaffold is constructed by installing the scaffolding board 64 and the scaffold board 65, but not only involves a great danger at the stage of initially stretching the main cable 61, but also when the span is large, it is lifted together with the hanging chain 67 in the middle. If not, there is a problem that the vicinity of the center hangs in a catenary shape and is greatly separated from the upper bridge.

【0004】第2のパイプ吊り足場はこの点を改善した
もので、図13はその構築手順を示す斜視図、図14は出来
上がった状態を示す斜視図で、図11、12と共通するもの
については同一符号を使用しているが、68はワイヤブリ
ッジ工法におけるメインケーブル61に代わる親パイプ
(「おやご」ともいう)である。まず、図13の(a)に
示すように橋梁の主桁Gに適当な間隔で吊りチェーン67
を取り付ける。つづいて(b)に示すようにこれらの吊
りチェーン67の間に親パイプ68を通す。さらに(c)に
示すように親パイプ68と直角に、自在クランプ等を使用
してころばし62を取り付けて行く。さらに(d)に示す
ようにころばし62の上面にスパン方向の足場板65を敷
き、同じくころばし62の下面に安全ネット66を張る。必
要に応じて(e)に示すように足場板65を隙間なく全面
的に敷き、パイプ吊り足場が完成する。出来上がった状
態をあらためて図14に示す。
FIG. 13 is a perspective view showing a construction procedure of the second pipe hanging scaffold, and FIG. 14 is a perspective view showing a completed state, which is common to FIGS. 11 and 12. Although the same reference numerals are used, reference numeral 68 denotes a parent pipe (also referred to as an “oyago”) replacing the main cable 61 in the wire bridge method. First, as shown in FIG. 13A, the suspension chains 67 are attached to the main girder G of the bridge at appropriate intervals.
Attach. Subsequently, the parent pipe 68 is passed between these suspension chains 67 as shown in FIG. Further, as shown in (c), the roller 62 is attached at right angles to the parent pipe 68 using a free clamp or the like. Further, as shown in (d), a scaffold plate 65 in the span direction is laid on the upper surface of the roller 62, and a safety net 66 is also provided on the lower surface of the roller 62. If necessary, a scaffold plate 65 is laid entirely without any gap as shown in FIG. FIG. 14 shows the completed state.

【0005】図13からもわかるように、このパイプ吊り
足場工法は、構築の各段階ともに高度の熟練を要する危
険な作業である。第3の枠はり式吊り足場の斜視図を図
15に示す。この吊り足場は、梁材70と桁材71を溶接で組
み立てた「枠梁材」をかんざし取り付け金具72により親
パイプ68に挿通し、上面に足場板(床材)65を敷き並べ
た水平面の作業床69と、建地取り付け金具、建地、養生
ネット等よりなり、やらず73を介して作業床69の端部に
取り付けられる防護工74とから構成され、安全な地上に
設置した図示しない作業桁上において組み立てを行い、
組み立て完了したものを一括して所定の高所へ吊り上
げ、架設したのち作業桁のみを地上へ吊り下げる工法で
ある。従って安全性については格段に改善されている
が、工事現場の条件により、真下の地上部分が組み立て
作業に利用できない場合には採用できないという欠点が
ある。
As can be seen from FIG. 13, this pipe hanging scaffolding method is a dangerous operation that requires a high level of skill at each stage of construction. Figure 3 is a perspective view of the third frame-type hanging scaffold.
See Figure 15. This suspended scaffold has a horizontal surface where a beam 70 and a girder 71 are assembled by welding, and a frame beam is welded and inserted into a parent pipe 68 by a mounting bracket 72, and a scaffold plate (floor material) 65 is laid on the upper surface. A work floor 69 and a protection work 74 which is made up of a construction site mounting bracket, a construction site, a curing net, etc., and is attached to the end of the work floor 69 via 73 without being installed, and is installed on a safe ground (not shown) Assemble on the work girder,
This is a construction method in which the assembled parts are collectively lifted to a predetermined height, erected, and then only the work girder is hung above the ground. Therefore, although the safety is remarkably improved, there is a disadvantage that it cannot be used when the ground portion directly below cannot be used for the assembly work due to the conditions of the construction site.

【0006】第4のパネル吊り足場を図16、17により説
明する。図16はこの工法に使用するパネル75を示す斜視
図で、76はころばしに相当する布フレーム、77は親パイ
プに相当する親フレームパイプ、78は親フレームパイプ
77を相互に連結する連結ジョイント、65はパネル上面に
敷設された軽合金縞板でなる床材である。パネル75の幅
は 660mm、長さは2000、3000、3850mmなどの種類が
ある。一方、図17における符号79は垂直の柱状体の上端
に主桁Gへの固着部を、下端にパネル75を載置する水平
方向の腕を設けたスタートブラケットである。
A fourth panel-suspended scaffold will be described with reference to FIGS. FIG. 16 is a perspective view showing a panel 75 used in this method, 76 is a cloth frame corresponding to a roller, 77 is a parent frame pipe corresponding to a parent pipe, and 78 is a parent frame pipe.
A connecting joint for connecting 77 to each other, and 65 is a flooring made of light alloy strips laid on the upper surface of the panel. The width of the panel 75 is 660 mm, and the length is 2000, 3000, or 3850 mm. On the other hand, reference numeral 79 in FIG. 17 denotes a start bracket provided with a fixed portion to the main girder G at the upper end of a vertical columnar body and a horizontal arm for mounting the panel 75 at the lower end.

【0007】図17はこのパネル吊り足場の構築手順を示
す斜視図で、(a)に示すように、まず橋梁の主桁下フ
ランジにスタートブラケット79を吊り下げる。つづいて
(b)に示すように1枚目のパネル75a の両端に吊りチ
ェーン67a を取り付けてその上端を同じく主桁下フラン
ジに取り付け、パネル75a を吊り下げてスタートブラケ
ット79の腕に載置する。引き続き(c)に示すように、
2枚目のパネル75b に取り付ける吊りチェーン67b を1
枚目のパネル75a の前方およそ 300mmの主桁下フラン
ジに取り付ける。(d)に示すようにこの吊りチェーン
67b に2枚目のパネル75b を取り付け、(e)に示すよ
うに1枚目のパネル75a と2枚目のパネル75b を連結ジ
ョイント78により連結する。以下同様にして吊りチェー
ン、パネルを順次取り付け、連結して行けば作業床が構
築される。
[0007] Fig. 17 is a perspective view showing a procedure for constructing the panel suspension scaffold. As shown in Fig. 17 (a), first, a start bracket 79 is suspended from a lower flange of a main girder of a bridge. Subsequently, as shown in (b), a suspension chain 67a is attached to both ends of the first panel 75a, and the upper end thereof is also attached to the lower flange of the main girder, and the panel 75a is suspended and placed on the arm of the start bracket 79. . Continuing as shown in (c),
One hanging chain 67b attached to the second panel 75b
It is attached to the main girder lower flange about 300 mm in front of the panel 75a. This hanging chain as shown in (d)
A second panel 75b is attached to 67b, and the first panel 75a and the second panel 75b are connected by a connection joint 78 as shown in (e). The work floor is constructed by sequentially attaching and connecting the hanging chains and panels in the same manner.

【0008】この工法は、これまでの第1、第2の工法
に比較すると作業の危険性少なく、また施工にあたり下
部の条件に左右されないので第3の工法のような制約は
ないが、取り付け終わったパネル上から、やや身体を乗
り出して次のパネルを吊り下げるための吊りチェーンを
取り付けなければならないので、あまり遠い距離にこれ
を取り付けることができず、前記したようにこれを前方
およそ 300mmの位置とすれば1回の作業単位が 660m
mという小さい値となり、作業能率が悪いという問題点
がある。
[0008] This construction method has less danger of work than the first and second construction methods so far, and is not affected by lower conditions in construction, so there is no restriction as in the third construction method, but the installation is completed. Since it is necessary to attach a suspension chain to hang the body slightly from the top of the panel and suspend the next panel, it can not be attached too far away, and as mentioned above, place it about 300 mm forward. One work unit is 660m
m, which is problematic in that the work efficiency is poor.

【0009】[0009]

【発明が解決しようとする課題】本発明は、従来の技術
における上記のような問題点を解消し、安全でかつ能率
よく構築できる空中拡張式吊り足場を実現することを目
的とする。
SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned problems in the prior art and to realize an aerial expansion type suspended scaffold that can be constructed safely and efficiently.

【0010】[0010]

【課題を解決するための手段】本発明の空中拡張式吊り
足場は、上部構造物に所定間隔で取り付けた吊りチェー
ンにより水平方向に吊り下げられる親パイプを順次長手
方向に接続し、この親パイプに、これと直角方向のころ
ばしを取り付け、このころばしの上部に合板パネルを載
置してなる空中拡張式吊り足場において、前記吊りチェ
ーンは、ワイヤロープを側面に滑動可能に係止するワイ
ヤガイドを有するワイヤガイド付き吊り金具を介して上
部構造物に吊り下げられ、また前記親パイプは鋼管製の
パイプ本体の先端にワイヤロープを係止する孔と、連結
ボルトが挿入されるボルト用の孔と、前記吊りチェーン
を係止する孔とを設けた先端フックプレートと、後端に
ワイヤロープを係止する孔と、前記先端フックプレート
に接続して重なり合った状態で連結ボルトが挿入される
ボルト用の孔とを設けた後端フックプレートとをそれぞ
れパイプ本体上方に取り付けるとともに、パイプ本体の
両端にこのパイプ本体を軸方向に順次接続する継手部を
有することを特徴とする。
According to the present invention, there is provided an aerial expanding suspension scaffold according to the present invention, in which a main pipe suspended in a horizontal direction by a suspending chain attached to an upper structure at predetermined intervals is sequentially connected in a longitudinal direction. In this case, in the aerial expansion type suspension scaffold comprising a plywood panel mounted on the top of the roller, the suspension chain includes a wire guide that slidably locks a wire rope on a side surface. The parent pipe is suspended from the upper structure through a suspension fitting having a wire guide, and the parent pipe has a hole for locking a wire rope at a tip of a pipe body made of a steel pipe, and a hole for a bolt into which a connection bolt is inserted. A tip hook plate provided with a hole for locking the suspension chain, a hole for locking a wire rope at a rear end, and an overlap connected to the tip hook plate. A rear end hook plate provided with a hole for a bolt into which a connection bolt is inserted in a state where the connection bolt is inserted is mounted above the pipe main body, and a joint portion for sequentially connecting the pipe main body in the axial direction to both ends of the pipe main body. It is characterized by having.

【0011】また、本発明は、上部構造物に所定間隔で
取り付けた吊りチェーンにより水平方向に吊り下げられ
る親パイプを順次長手方向に接続し、この親パイプに、
これと直角方向のころばしを取り付け、このころばしの
上部に合板パネルを載置してなる請求項1に記載の空中
拡張式吊り足場の構築方法において、既設の吊り足場の
先端部分にある親パイプの後端フックプレートにターン
バックル付きワイヤロープの一端を係止し、この親パイ
プの先端を吊っている吊りチェーン上方のワイヤガイド
付き吊り金具のワイヤガイドを経由して他端を次に接続
する親パイプの先端側のフックプレートに係止し、次に
接続する親パイプの後端部分を継手部を介して既設の吊
り足場の先端部分にある親パイプの先端部分に接続した
のち、新たに接続した親パイプの先端部分を前記のター
ンバックル付きワイヤロープで吊り上げ支持しながらこ
の新たに接続した親パイプに直角方向のころばしを取り
付け、さらにその上部に合板パネルを載置してから、こ
の新たに接続した親パイプの先端部分に吊りチェーンを
取り付けてこれをワイヤガイド付き吊り金具を介して上
部構造物に接続し、しかる後前記ターンバックル付きワ
イヤロープのターンバックルをゆるめて新たに接続した
親パイプの先端を吊りチェーンに預けることを特徴とす
る。
The present invention also relates to a main pipe which is suspended in a horizontal direction by a suspension chain attached to an upper structure at a predetermined interval, and is sequentially connected in a longitudinal direction.
2. A method for constructing an aerial expansion type suspended scaffold according to claim 1, wherein a roll is attached at right angles to the roll, and a plywood panel is placed on top of the roll. One end of a wire rope with a turnbuckle is fixed to the rear end hook plate, and the other end is connected to the other end through a wire guide of a hanging metal fitting with a wire guide above a hanging chain hanging the tip of the parent pipe. After hooking on the hook plate on the tip side of the pipe, the rear end of the parent pipe to be connected next is connected to the tip of the parent pipe at the end of the existing hanging scaffold via the joint, and then a new connection is made Attach a right angle roller to this newly connected parent pipe while lifting and supporting the tip of the parent pipe with the wire buckle with the turn buckle, After placing the plywood panel on the part, attach a suspension chain to the tip of the newly connected parent pipe, connect it to the upper structure via a suspension fitting with a wire guide, and then attach the turnbuckle It is characterized in that the turnbuckle of the wire rope is loosened and the tip of the newly connected parent pipe is deposited in the suspension chain.

【0012】[0012]

【発明の実施の形態】本発明の実施例を図面により詳細
に説明する。図1は後から説明することとして、図2は
本発明において使用する親パイプ1の接続状況を示す斜
視図、図3は同じく正面図である。親パイプ1は、鋼管
を所定長さに切断してなるパイプ本体10の先端部と後端
部に軸方向に順次接続する継手部を有し、例えば先端側
には連結ピン11を備え、これを次の親パイプ1aのパイプ
本体10の後端に挿入することにより、長手方向に随意に
接続される。またパイプ本体10の両端には上方に向けて
フックプレートが取り付けられており、先端フックプレ
ート12には、内側より順に孔13、14、15が設けられてい
る。また、後端フックプレート16には、外側より順に孔
17、18が設けられている。
Embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 will be described later, FIG. 2 is a perspective view showing a connection state of a parent pipe 1 used in the present invention, and FIG. 3 is a front view of the same. The parent pipe 1 has a joint portion which is sequentially connected in the axial direction to a front end portion and a rear end portion of a pipe main body 10 obtained by cutting a steel pipe into a predetermined length. Is inserted into the rear end of the pipe body 10 of the next parent pipe 1a, so that it is optionally connected in the longitudinal direction. Hook plates are attached to both ends of the pipe body 10 upward, and holes 13, 14, 15 are provided in the tip hook plate 12 in order from the inside. The rear end hook plate 16 has holes in order from the outside.
17, 18 are provided.

【0013】孔13、14はいずれも丸孔で、それぞれ後に
説明するターンバックル付きワイヤロープおよび吊りチ
ェーンの一端を係止する。孔18も丸孔で、ターンバック
ル付きワイヤロープの他の一端を係止する。孔15および
孔17は親パイプの長手方向に平行な長孔で、図3に示す
ようにパイプ本体10を接続した状態で先端、後端フック
プレート12、16が重なり、連結ボルト2を挿入して締め
つけることにより隣接する親パイプ1、1aは確実に接合
される。
Each of the holes 13 and 14 is a round hole for locking one end of a wire rope with a turnbuckle and one end of a suspension chain, which will be described later. The hole 18 is also a round hole and locks the other end of the wire rope with a turnbuckle. The holes 15 and 17 are elongated holes parallel to the longitudinal direction of the parent pipe. The front and rear hook plates 12, 16 overlap with the pipe body 10 connected as shown in FIG. The adjacent parent pipes 1 and 1a are securely joined by tightening.

【0014】図4、5は親パイプとしてパイプ本体10a
、10b を2本平行に設けた場合の変形実施例で、両者
を適当な位置でスペーサ19により結合し、先端フックプ
レート12、後端フックプレート16はスペーサ19に取り付
ける。図6は本発明において使用するワイヤガイド付き
吊り金具3を橋梁の主桁Gの下フランジに取り付け、こ
れに吊りチェーン4を吊り下げた状態を示す側面図、図
7は同じく正面図である。ワイヤガイド付き吊り金具3
は、主桁Gのフランジ等に固着するシャコ万力等の固着
部31、これに接続するリング金物32、リング金物32の側
面に設けられ、ワイヤロープを滑動可能に係止するRを
有する溝状のワイヤガイド33により構成される。吊りチ
ェーン4は両端にフックを有する通常のものである。
FIGS. 4 and 5 show a pipe body 10a as a parent pipe.
, 10b are provided in parallel with each other, and the two are connected at an appropriate position by a spacer 19, and the front hook plate 12 and the rear hook plate 16 are attached to the spacer 19. FIG. 6 is a side view showing a state in which a hanging metal fitting 3 with a wire guide used in the present invention is attached to a lower flange of a main girder G of a bridge, and a hanging chain 4 is suspended therefrom. FIG. Suspension fitting with wire guide 3
Is a fixing portion 31, such as a vise, fixed to a flange or the like of the main girder G, a ring metal member 32 connected thereto, and a groove provided on a side surface of the ring metal member 32 for locking a wire rope slidably. A wire guide 33 is formed. The suspension chain 4 is a normal one having hooks at both ends.

【0015】図8はターンバックル付きワイヤロープ5
を一部省略して示す斜視図で、回転して長さを調節でき
るターンバックル53の両側に、それぞれの両端にシャッ
クル51を取り付けた長さの異なる2本のワイヤロープ52
を接続したものである。2本のワイヤロープ52の長さを
変えているのは、中央付近のワイヤガイド33にかかる部
分にターンバックル53が来ないようにするためである。
FIG. 8 shows a wire rope 5 with a turnbuckle.
In a perspective view partially omitted, two wire ropes 52 of different lengths each having a shackle 51 attached to both ends of a turnbuckle 53 that can be rotated to adjust the length.
Are connected. The reason why the lengths of the two wire ropes 52 are changed is to prevent the turnbuckle 53 from coming to a portion near the wire guide 33 near the center.

【0016】では図1に戻って、本発明の空中拡張式吊
り足場の構築方法を説明する。図1はこの吊り足場がす
でに一部構築された状態を示す正面図で、Gは上部にあ
る橋梁の主桁、1は主桁Gから吊りチェーン4を介して
吊り下げられる親パイプで、長さは例えば3.6 mであ
る。3は図6、7で説明した吊りチェーン4を主桁Gに
吊り下げるためのワイヤガイド付き吊り金具、5は図8
で説明したターンバックル付きワイヤロープ、6は親パ
イプ1に、これと直角方向に取り付けられるころばし、
7はその上部に載置される合板パネルである。図1
(a)において、すでに吊り足場が何スパンか構築され
ており、これからこの先端に次のスパンを取り付けるわ
けである。
Returning to FIG. 1, the construction method of the aerial expansion type suspended scaffold of the present invention will be described. FIG. 1 is a front view showing a state in which this hanging scaffold has already been partially constructed. G is the main girder of the bridge at the top, and 1 is a main pipe suspended from the main girder G via a hanging chain 4. The length is, for example, 3.6 m. Reference numeral 3 denotes a hanging bracket with a wire guide for suspending the suspension chain 4 described in FIGS.
The wire rope 6 with a turnbuckle described in the above is a roller that is attached to the parent pipe 1 in a direction perpendicular thereto.
Reference numeral 7 denotes a plywood panel mounted on the upper part. FIG.
In (a), the suspension scaffold has already been constructed for several spans, and the next span will be attached to this tip.

【0017】既設の吊り足場上に次の親パイプ1aを用意
して、ターンバックル付きワイヤロープ5の一端をこの
既設部分の先端の親パイプ1の図2で説明した後端フッ
クプレート16の孔18に係止し、他端を次の親パイプ1aの
先端フックプレート12の孔13に係止し、中間のワイヤロ
ープ部分をワイヤガイド付き吊り金具3のワイヤガイド
33にひっかける。このとき、ターンバックル53を締めつ
けて、ターンバックル付きワイヤロープ5の全長を前回
使用した状態よりも短めにしておく。
The next main pipe 1a is prepared on the existing hanging scaffold, and one end of the wire rope 5 with the turnbuckle is connected to the hole of the rear end hook plate 16 of the front main pipe 1 at the end of the existing part as described with reference to FIG. 18 and the other end is locked in the hole 13 of the tip hook plate 12 of the next main pipe 1a, and the intermediate wire rope portion is connected to the wire guide of the hook 3 with the wire guide.
Hook on 33. At this time, the turnbuckle 53 is tightened so that the total length of the wire rope 5 with the turnbuckle is shorter than the last use.

【0018】つぎに(b)に示すように既設の吊り足場
上からこの親パイプ1aを先端方向に差し出し、図2で説
明した連結ピン11により既設の親パイプ1に接続する。
さらに図2において説明した連結ボルト2を連結部の孔
15、 17に挿通して親パイプ1、1aを確実に接続する。こ
のとき親パイプ1aの先端はターンバックル付きワイヤロ
ープ5により水平よりもやや上向きに吊り上げ支持され
ている。
Next, as shown in FIG. 2B, the parent pipe 1a is inserted in the direction of the tip from the existing suspension scaffold, and is connected to the existing parent pipe 1 by the connecting pin 11 described with reference to FIG.
Further, the connecting bolt 2 described in FIG.
Insert the parent pipes 1 and 1a securely by inserting them through 15 and 17. At this time, the tip of the parent pipe 1a is supported by being lifted slightly above the horizontal by a wire rope 5 with a turnbuckle.

【0019】つづいて(c)に示すように接続した親パ
イプ1aに適宜直角方向のころばし6を取り付け、上部に
合板パネル7を敷設して、新たに接続された吊り足場上
でも作業ができるようにする。そして(d)に示すよう
に親パイプ1a先端の先端フックプレート12の孔14に新た
な吊りチェーン4aの一端を係止し、その上方の主桁Gに
ワイヤガイド付き吊り金具3aを取り付け、チェーン4aの
他端をこれに接続する。吊りチェーン4aは親パイプ1aを
水平に吊る長さに調整してあるが、現在親パイプ1aの先
端は水平よりもやや上向きになっているから、吊りチェ
ーン4aはゆるんだ状態である。
Subsequently, a right-angled roller 6 is attached to the main pipe 1a connected as shown in (c), and a plywood panel 7 is laid on the upper part so that work can be performed even on a newly connected hanging scaffold. To Then, as shown in (d), one end of the new suspension chain 4a is locked in the hole 14 of the tip hook plate 12 at the tip of the main pipe 1a, and the suspension fitting 3a with a wire guide is attached to the main girder G above the chain. Connect the other end of 4a to this. The length of the hanging chain 4a is adjusted so that the main pipe 1a is hung horizontally. However, since the tip of the main pipe 1a is slightly upward from the horizontal at present, the hanging chain 4a is in a loosened state.

【0020】最後に(e)に示すようにターンバックル
付きワイヤロープ5のターンバックル53をゆるめ、親パ
イプ1aの先端を吊りチェーン4aに預け、ターンバックル
付きワイヤロープ5を取り外せば1スパン分の吊り足場
の拡張が完了する。以後この手順を繰り返し、先端が所
定の位置、例えば隣の橋脚の直近付近に到達するまで吊
り足場を拡張する。
Finally, as shown in (e), the turnbuckle 53 of the wire rope 5 with a turnbuckle is loosened, the tip of the parent pipe 1a is stored in the hanging chain 4a, and the wire rope 5 with the turnbuckle is removed. The extension of the suspended scaffold is completed. Thereafter, this procedure is repeated, and the suspended scaffold is extended until the tip reaches a predetermined position, for example, the vicinity of the adjacent pier.

【0021】図9、10は、図4、5に示したパイプ本体
を2本平行に設けた親パイプを使用し、ころばし及び合
板パネルに代えてスペーサ19の両側のパイプ本体10a 、
10bに、それぞれ軽合金製の床付き布枠8の端部を載置
するようにした他の実施例を示す部分断面図である。図
10に示すように、吹き上げ防止のため床付き布枠8の端
部に親パイプを裏面側から挟持する爪81を水平方向出入
自在に設けるようにすることが望ましい。
FIGS. 9 and 10 show the use of a main pipe having two parallel pipe bodies shown in FIGS. 4 and 5 and a pipe body 10a on both sides of a spacer 19 in place of a roller and a plywood panel.
FIG. 10b is a partial cross-sectional view showing another embodiment in which an end portion of the floor-mounted cloth frame 8 made of a light alloy is placed on 10b. Figure
As shown in FIG. 10, it is desirable to provide a claw 81 for holding the parent pipe from the back side at the end of the floor-attached cloth frame 8 so as to be able to move in and out in the horizontal direction in order to prevent blow-up.

【0022】以上の説明から明らかなように、本発明の
空中拡張式吊り足場は、足場全体に先行して既設部分を
利用しながら例えば 3.6mという大きな単位で親パイプ
を延長し、安全に拡張作業を行うことができるから、高
所作業における安全性ならびに能率が著しく向上する。
As is clear from the above description, the aerial expansion type suspended scaffold of the present invention extends the parent pipe in a large unit of, for example, 3.6 m while using the existing portion prior to the entire scaffold, and safely expands. Since work can be performed, safety and efficiency in work at a high place are significantly improved.

【0023】[0023]

【発明の効果】本発明によれば、吊り足場の拡張作業が
安全にかつ高い能率で行えるという、すぐれた効果を奏
する。
According to the present invention, there is an excellent effect that the work for extending the suspended scaffold can be performed safely and efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の空中拡張式吊り足場の構築手順を示す
正面図である。
FIG. 1 is a front view showing a construction procedure of an aerial expansion type suspended scaffold of the present invention.

【図2】本発明における親パイプの接続状況を示す斜視
図である。
FIG. 2 is a perspective view showing a connection state of a parent pipe in the present invention.

【図3】本発明における親パイプの接続状況を示す正面
図である。
FIG. 3 is a front view showing a connection state of a parent pipe in the present invention.

【図4】本発明の変形例における親パイプの接続状況を
示す斜視図である。
FIG. 4 is a perspective view showing a connection state of a parent pipe in a modified example of the present invention.

【図5】図4のAA矢視による側面図である。FIG. 5 is a side view as viewed in the direction of arrows AA in FIG. 4;

【図6】本発明における吊りチェーン周辺を示す側面図
である。
FIG. 6 is a side view showing the vicinity of the suspension chain according to the present invention.

【図7】本発明における吊りチェーン周辺を示す正面図
である。
FIG. 7 is a front view showing the vicinity of the suspension chain according to the present invention.

【図8】本発明におけるターンバックル付きワイヤロー
プを示す斜視図である。
FIG. 8 is a perspective view showing a wire rope with a turnbuckle according to the present invention.

【図9】本発明の変形例を示す部分断面図である。FIG. 9 is a partial sectional view showing a modification of the present invention.

【図10】同じく本発明の変形例を示す部分断面図であ
る。
FIG. 10 is a partial sectional view showing a modification of the present invention.

【図11】従来の技術の第1の例を示す全体斜視図であ
る。
FIG. 11 is an overall perspective view showing a first example of a conventional technique.

【図12】図11のXX矢視による断面図である。FIG. 12 is a sectional view taken along the line XX of FIG. 11;

【図13】従来の技術の第2の例における構築手順を示す
斜視図である。
FIG. 13 is a perspective view showing a construction procedure in a second example of the related art.

【図14】同じく従来の技術の第2の例の完成状態を示す
斜視図である。
FIG. 14 is a perspective view showing a completed state of the second example of the related art.

【図15】従来の技術の第3の例を示す斜視図である。FIG. 15 is a perspective view showing a third example of the related art.

【図16】従来の技術の第4の例におけるパネルを示す斜
視図である。
FIG. 16 is a perspective view showing a panel in a fourth example of the related art.

【図17】従来の技術の第4の例における構築手順を示す
斜視図である。
FIG. 17 is a perspective view showing a construction procedure in a fourth example of the related art.

【符号の説明】 1 親パイプ 2 連結ボルト 3 ワイヤガイド付き吊り金具 4 吊りチェーン 5 ターンバックル付きワイヤロープ 6 ころばし 7 合板パネル 8 床付き布枠 10 パイプ本体 11 連結ピン 12 先端フックプレート 13 孔 14 孔 15 孔 16 後端フックプレート 17 孔 18 孔 31 固着部 32 リング金物 33 ワイヤガイド 51 シャックル 52 ワイヤロープ 53 ターンバックル 60 アンカー金具 61 メインケーブル 62 ころばし(足場パイプ) 63 はな止めパイプ 64 手すり 65 足場板(床材) 66 安全ネット 67 吊りチェーン 68 親パイプ 69 作業床 70 梁材 71 桁材 72 かんざし取り付け金具 73 やらず 74 防護工 75 パネル 76 布フレーム 77 親フレームパイプ 78 連結ジョイント 79 スタートブラケット 81 爪 82 ボルト G 主桁 P 橋脚[Description of Signs] 1 Parent pipe 2 Connecting bolt 3 Hanging fitting with wire guide 4 Hanging chain 5 Wire rope with turnbuckle 6 Roller 7 Plywood panel 8 Floor frame 10 Pipe body 11 Connecting pin 12 Tip hook plate 13 Hole 14 Hole 15 hole 16 rear end hook plate 17 hole 18 hole 31 fixing part 32 ring hardware 33 wire guide 51 shackle 52 wire rope 53 turnbuckle 60 anchor bracket 61 main cable 62 rolling (scaffolding pipe) 63 hooking pipe 64 handrail 65 scaffolding plate (Floor material) 66 Safety net 67 Hanging chain 68 Parent pipe 69 Work floor 70 Beam material 71 Girder material 72 Hairpin mounting bracket 73 Do not do 74 Protector 75 Panel 76 Fabric frame 77 Parent frame pipe 78 Connection joint 79 Start bracket 81 Claw 82 Bolt G Main girder P Pier

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 上部構造物(G)に所定間隔で取り付け
た吊りチェーン(4)により水平方向に吊り下げられる
親パイプ(1)を順次長手方向に接続し、この親パイプ
(1)に、これと直角方向のころばし(6)を取り付
け、このころばしの上部に合板パネル(7)を載置して
なる空中拡張式吊り足場において、前記吊りチェーン
(4)は、ワイヤロープ(52)を側面に滑動可能に係止
するワイヤガイド(33)を有するワイヤガイド付き吊り
金具(3)を介して上部構造物(G)に吊り下げられ、
また前記親パイプ(1)は鋼管製のパイプ本体の先端に
ワイヤロープを係止する孔(13)と、連結ボルト(2)
が挿入されるボルト用の孔(15)と、前記吊りチェーン
(4)を係止する孔(14)とを設けた先端フックプレー
ト(12)と、後端にワイヤロープを係止する孔(18)
と、前記先端フックプレートに接続して重なり合った状
態で連結ボルト(2)が挿入されるボルト用の孔(17)
とを設けた後端フックプレート(16)とをそれぞれパイ
プ本体(10)上方に取り付けるとともに、パイプ本体
(10)の両端にこのパイプ本体(10)を軸方向に順次接
続する継手部(11)を有することを特徴とする空中拡張
式吊り足場。
1. A main pipe (1) suspended in a horizontal direction by a suspension chain (4) attached to a superstructure (G) at a predetermined interval is sequentially connected in a longitudinal direction. In the aerial-expandable suspension scaffold having a roller (6) mounted at right angles thereto and a plywood panel (7) placed on top of the roller, the suspension chain (4) has a wire rope (52) on its side. Suspended on the upper structure (G) via a wire fitting (3) having a wire guide having a wire guide (33) slidably engaged with the upper structure (G),
The parent pipe (1) has a hole (13) for locking a wire rope at the tip of a steel pipe body, and a connecting bolt (2).
A hook plate (12) provided with a hole (15) for a bolt into which a cable is inserted, a hole (14) for locking the suspension chain (4), and a hole (15) for locking a wire rope at the rear end. 18)
And a hole (17) for a bolt into which the connecting bolt (2) is inserted in an overlapping state while being connected to the tip hook plate.
A joint part (11) for attaching the rear end hook plate (16) provided with the above to the upper part of the pipe body (10) and connecting the pipe body (10) to both ends of the pipe body (10) in the axial direction. An aerial expansion type suspended scaffold characterized by having:
【請求項2】 上部構造物に所定間隔で取り付けた吊り
チェーンにより水平方向に吊り下げられる親パイプを順
次長手方向に接続し、この親パイプに、これと直角方向
のころばしを取り付け、このころばしの上部に合板パネ
ルを載置してなる請求項1に記載の空中拡張式吊り足場
の構築方法において、既設の吊り足場の先端部分にある
親パイプの後端フックプレートにターンバックル付きワ
イヤロープの一端を係止し、この親パイプの先端を吊っ
ている吊りチェーン上方のワイヤガイド付き吊り金具の
ワイヤガイドを経由して他端を次に接続する親パイプの
先端フックプレートに係止し、次に接続する親パイプの
後端部分を継手部を介して既設の吊り足場の先端部分に
ある親パイプの先端部分に接続したのち、新たに接続し
た親パイプの先端部分を前記のターンバックル付きワイ
ヤロープで吊り上げ支持しながらこの新たに接続した親
パイプに直角方向のころばしを取り付け、さらにその上
部に合板パネルを載置してから、この新たに接続した親
パイプの先端部分に吊りチェーンを取り付けてこれをワ
イヤガイド付き吊り金具を介して上部構造物に接続し、
しかる後前記ターンバックル付きワイヤロープのターン
バックルをゆるめて新たに接続した親パイプの先端を吊
りチェーンに預けることを特徴とする空中拡張式吊り足
場の構築方法。
2. A main pipe suspended in a horizontal direction by a suspending chain attached to the upper structure at a predetermined interval is connected in the longitudinal direction sequentially, and a roller in a direction perpendicular to the main pipe is attached to the main pipe. 2. The method according to claim 1, wherein a plywood panel is mounted on an upper part of the suspension pipe, and one end of a wire rope with a turnbuckle is attached to a rear end hook plate of a parent pipe at a tip of the existing suspension scaffold. And the other end is hooked up to the hook plate of the parent pipe to be connected to the other end via the wire guide of the hanging metal fitting with a wire guide above the hanging chain hanging the tip of this parent pipe, and then After connecting the rear end of the main pipe to be connected to the front end of the main pipe at the front end of the existing suspension scaffold via the joint, the front end of the newly connected main pipe Attach a right angle roller to this newly connected parent pipe while lifting and supporting the minutes with the above-mentioned wire rope with turnbuckle, further place a plywood panel on top of this, and then attach the newly connected parent pipe. Attach a hanging chain to the tip and connect it to the upper structure via a wire-guided hanging bracket,
Thereafter, the turnbuckle of the wire rope with a turnbuckle is loosened, and the tip of the newly connected parent pipe is deposited in a suspension chain.
JP17135197A 1997-06-27 1997-06-27 Aerial expansion type suspended scaffold and its construction Pending JPH1113275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17135197A JPH1113275A (en) 1997-06-27 1997-06-27 Aerial expansion type suspended scaffold and its construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17135197A JPH1113275A (en) 1997-06-27 1997-06-27 Aerial expansion type suspended scaffold and its construction

Publications (1)

Publication Number Publication Date
JPH1113275A true JPH1113275A (en) 1999-01-19

Family

ID=15921600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17135197A Pending JPH1113275A (en) 1997-06-27 1997-06-27 Aerial expansion type suspended scaffold and its construction

Country Status (1)

Country Link
JP (1) JPH1113275A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007531836A (en) * 2004-03-31 2007-11-08 サーフウェイ サービス,インコーポレイティド Articulated work platform support system, work platform system, and method using the same
JP5022524B1 (en) * 2012-04-17 2012-09-12 株式会社Osk Hanging scaffold construction method
KR101457578B1 (en) * 2013-01-16 2014-11-12 한국남부발전(주) Scaffold for hanging the boiler and assembly method the same
JP2015004213A (en) * 2013-06-20 2015-01-08 株式会社ウインド19 Panel for suspension scaffold and construction method of panel for suspension scaffold and panel unit for suspension scaffold
JP2016017329A (en) * 2014-07-09 2016-02-01 信和株式会社 Construction method of suspended scaffolding
JP5860187B1 (en) * 2015-07-07 2016-02-16 株式会社Osk Method for extending a suspended scaffold and extended suspended scaffold
JP5860186B1 (en) * 2015-07-07 2016-02-16 株式会社Osk Single pipe connection mechanism in suspension scaffold and suspension scaffold provided with the same
JP6152465B1 (en) * 2016-11-14 2017-06-21 株式会社Osk Slide mechanism that feeds a single tube forward to form a scaffold in a structure
JP2017119972A (en) * 2015-12-28 2017-07-06 株式会社Osk Single pipe connection mechanism in scaffold and scaffold comprising the same
CN111101448A (en) * 2020-01-08 2020-05-05 中铁大桥(郑州)缆索有限公司 Quick traction equipment and traction method for stay cable beam end winch
JP2020128679A (en) * 2019-02-12 2020-08-27 ヒロセ株式会社 How to construct a simple temporary bridge
JP2021134559A (en) * 2020-02-27 2021-09-13 株式会社Ihiインフラシステム Permanent scaffold installation method and back panel
CN114109015A (en) * 2021-11-17 2022-03-01 昆山市经协建筑装璜有限责任公司 Basket bolt scaffold connecting structure and application method thereof
KR20220027432A (en) * 2020-08-27 2022-03-08 백상화 Safe scaffold and its suspending method
JP2022057099A (en) * 2020-09-30 2022-04-11 株式会社日本コンポジット工業 Panel-like structure and suspended scaffolding
JP2023021601A (en) * 2021-08-02 2023-02-14 株式会社Osk Scaffold member, scaffold and scaffold extension method
JP2023046240A (en) * 2021-09-22 2023-04-03 大 小野 scaffolding equipment
JP2023181900A (en) * 2022-06-13 2023-12-25 大 小野 Suspended scaffold device and method for assembling suspended scaffold device

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9783939B2 (en) 2004-03-31 2017-10-10 Safway Services, Llc Articulating work platform support system, work platform system, and methods of use thereof
JP2013256861A (en) * 2004-03-31 2013-12-26 Safeway Services Llc Joint-movable type work platform support system, work platform system, and method for using the same
JP2007531836A (en) * 2004-03-31 2007-11-08 サーフウェイ サービス,インコーポレイティド Articulated work platform support system, work platform system, and method using the same
US10563365B2 (en) 2004-03-31 2020-02-18 Brandsafway Services Llc Articulating work platform support system, work platform system, and methods of use thereof
JP5022524B1 (en) * 2012-04-17 2012-09-12 株式会社Osk Hanging scaffold construction method
KR101457578B1 (en) * 2013-01-16 2014-11-12 한국남부발전(주) Scaffold for hanging the boiler and assembly method the same
JP2015004213A (en) * 2013-06-20 2015-01-08 株式会社ウインド19 Panel for suspension scaffold and construction method of panel for suspension scaffold and panel unit for suspension scaffold
JP2016017329A (en) * 2014-07-09 2016-02-01 信和株式会社 Construction method of suspended scaffolding
JP5860187B1 (en) * 2015-07-07 2016-02-16 株式会社Osk Method for extending a suspended scaffold and extended suspended scaffold
JP2017020181A (en) * 2015-07-07 2017-01-26 株式会社Osk Suspending foothold extension method and extended suspending foothold
JP2017020180A (en) * 2015-07-07 2017-01-26 株式会社Osk Unit pipe connection mechanism on suspending foothold and suspending foothold equipped with the same
JP5860186B1 (en) * 2015-07-07 2016-02-16 株式会社Osk Single pipe connection mechanism in suspension scaffold and suspension scaffold provided with the same
JP2017119972A (en) * 2015-12-28 2017-07-06 株式会社Osk Single pipe connection mechanism in scaffold and scaffold comprising the same
JP6152465B1 (en) * 2016-11-14 2017-06-21 株式会社Osk Slide mechanism that feeds a single tube forward to form a scaffold in a structure
WO2018088572A1 (en) * 2016-11-14 2018-05-17 株式会社Osk Slide mechanism to send single pipe forward for forming scaffolding on structures
JP2018080470A (en) * 2016-11-14 2018-05-24 株式会社Osk Slide mechanism for sending single pipe forward for forming scaffold to structure
JP2020128679A (en) * 2019-02-12 2020-08-27 ヒロセ株式会社 How to construct a simple temporary bridge
CN111101448A (en) * 2020-01-08 2020-05-05 中铁大桥(郑州)缆索有限公司 Quick traction equipment and traction method for stay cable beam end winch
JP2021134559A (en) * 2020-02-27 2021-09-13 株式会社Ihiインフラシステム Permanent scaffold installation method and back panel
KR20220027432A (en) * 2020-08-27 2022-03-08 백상화 Safe scaffold and its suspending method
JP2022057099A (en) * 2020-09-30 2022-04-11 株式会社日本コンポジット工業 Panel-like structure and suspended scaffolding
JP2023021601A (en) * 2021-08-02 2023-02-14 株式会社Osk Scaffold member, scaffold and scaffold extension method
JP2023046240A (en) * 2021-09-22 2023-04-03 大 小野 scaffolding equipment
CN114109015A (en) * 2021-11-17 2022-03-01 昆山市经协建筑装璜有限责任公司 Basket bolt scaffold connecting structure and application method thereof
JP2023181900A (en) * 2022-06-13 2023-12-25 大 小野 Suspended scaffold device and method for assembling suspended scaffold device

Similar Documents

Publication Publication Date Title
JPH1113275A (en) Aerial expansion type suspended scaffold and its construction
JP5097313B2 (en) Suspended scaffold and its installation method
CN110952763A (en) Construction method of externally-hung type externally-hung overhanging scaffold
CN105189889B (en) Girder truss for weather protection roof and the weather protection roof with some girder trusses
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN213268827U (en) Operating platform is decorated to suspension type socket joint type under large-span high altitude steel construction vestibule
KR100483898B1 (en) Rail handrail clamping device of construction site
JP6783011B1 (en) Suspended scaffolding
JP3021192B2 (en) Mobile hanging scaffolding equipment
JPH05178561A (en) Installation method for guide rail for elevator
JP6339986B2 (en) How to assemble a suspended scaffold using a slide frame
JP5773469B1 (en) Suspended scaffolding
JP5807883B1 (en) Suspended scaffolding
JPH09195228A (en) Build-up trestle for bridge pier reinforcing work and its using method
JP3027130B2 (en) Assembly structure of hanging scaffold
JP6661142B1 (en) Hanging scaffold
JPH11107218A (en) Suspended scaffold and method of assembly construction thereof
JP3084009B2 (en) How to attach panels to the back of a girder of an elevated structure
JPH10292619A (en) Self-climbing hanging scaffold unit for use in hanging scaffold constructing system corresponding to large space
JP2004232366A (en) Hanging scaffold
JP2006265899A (en) Scaffolding construction method
JP2913341B2 (en) Method of erection of hanging scaffold for mobile ceiling work of large space structure
JP4148631B2 (en) Suspension scaffold for steel construction
JP7444751B2 (en) Wall material unit and wall construction method
JP7393814B2 (en) How to build a suspended scaffold