[go: up one dir, main page]

JPH10267208A - Installation method of boiler - Google Patents

Installation method of boiler

Info

Publication number
JPH10267208A
JPH10267208A JP6956297A JP6956297A JPH10267208A JP H10267208 A JPH10267208 A JP H10267208A JP 6956297 A JP6956297 A JP 6956297A JP 6956297 A JP6956297 A JP 6956297A JP H10267208 A JPH10267208 A JP H10267208A
Authority
JP
Japan
Prior art keywords
boiler
steel frame
section
boiler body
boiler steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP6956297A
Other languages
Japanese (ja)
Inventor
Jiro Hama
次郎 濱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP6956297A priority Critical patent/JPH10267208A/en
Publication of JPH10267208A publication Critical patent/JPH10267208A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To achieve a shortening of the term of work and a higher safety by a method wherein a boiler steel frame is built section by section from the bottom to top and a boiler body is assembled being supported by each section with the building of the section. SOLUTION: A block 5 of a boiler body is fabricated on the ground from back stays 3 and a fire furnace wall panel 4 and the like and the building of lower one section of a boiler steel frame. The block 5 is hoisted and carried in by a crane or the like to be fixed through the back stays 3 and a support metal 6. After the completion of the first section, an upper second section of the boiler steel frame is built. After the completion of the building of the second section of the boiler steel frame, the blocks 5 of the boiler body are hoisted sequentially by a crane or the like to be fixed in the second section of the boiler steel frame through the back stays 3 and the support metal 6. Then, the boiler body is suspended in the first and second sections of the boiler steel frame from a major beam 1 through suspension rods 2 to complete the boiler body. Such an installation of the boiler body in the boiler steel frame enables simultaneous working in construction thereby achieving a shortening of the term of work.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、火力発電所におけ
るボイラの据付け工事などに適用されるボイラの据付け
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a boiler installation method applied to boiler installation work in a thermal power plant.

【0002】[0002]

【従来の技術】図2は火力発電所におけるボイラの据付
け工事などに使用されている従来のボイラ本体の据付け
工法の説明図である。図において、ボイラ本体はボイラ
鉄骨最上部の大梁1から吊棒2を介して吊下げられる構
造になっているため、ボイラ本体を据付ける際は大梁1
を含むボイラ鉄骨最上部の建設が完了した後にボイラ本
体を上部から順次据付けていく。同図(a)はボイラ鉄
骨1節の建設、同図(b)はボイラ鉄骨2節の建設およ
び大梁1の設置、同図(c)は大梁1への吊棒2の取付
け、および吊棒2への地上で組立てたボイラ本体のブロ
ック5の据付け、同図(d)はボイラ本体の据付け完成
をそれぞれ示す。
2. Description of the Related Art FIG. 2 is an explanatory view of a conventional boiler body installation method used for boiler installation work in a thermal power plant. In the figure, the boiler main body is configured to be suspended from the girders 1 at the top of the boiler steel frame via the hanging rods 2.
After the construction of the top of the boiler steel frame, including the above, is completed, the boiler bodies will be installed sequentially from the top. FIG. 2A shows the construction of a boiler steel frame 1 section, FIG. 2B shows the construction of a boiler steel frame 2 section and installation of a girder 1, and FIG. 2 shows the installation of the block 5 of the boiler body assembled on the ground, and FIG. 2D shows the completion of the installation of the boiler body.

【0003】[0003]

【発明が解決しようとする課題】上記のように、従来の
ボイラ本体の据付け工法においてはボイラ鉄骨の建設が
完了した後にボイラ本体を上部から順次据付けていくた
め、ボイラ本体をボイラ鉄骨内に取込む際にボイラ鉄骨
がボイラ本体に干渉してボイラ本体の取り込み作業が煩
雑で高度な技能を要している。また、工期も長く必要に
なっている。
As described above, in the conventional boiler body installation method, the boiler body is installed in the boiler steel frame in order to sequentially install the boiler body from the top after the construction of the boiler steel frame is completed. When inserting, the boiler steel frame interferes with the boiler main body, and the work of taking in the boiler main body is complicated and requires advanced skills. In addition, a long construction period is required.

【0004】[0004]

【課題を解決するための手段】本発明に係るボイラの据
付け方法は上記課題の解決を目的にしており、ボイラ鉄
骨を順次下方から上方へ各節づつ建設し、上記各節を建
設する毎にそれぞれの上記各節に見合うボイラ本体をそ
れぞれの上記各節内にそれぞれの上記各節により支持し
ながら組込むようにしている。このように、本ボイラの
据付け方法においては火炉壁パネルとバックスティなど
とからなるボイラ本体をボイラ鉄骨の各節の建設毎に順
次取込み、下方から上方へ順次積上げて据付ける。ボイ
ラ本体をボイラ鉄骨の各節の建設毎に下方から上方へ順
次積上げて据付けることにより、ボイラ本体をボイラ鉄
骨内に取込む際にボイラ本体がボイラ鉄骨と干渉しなく
なってボイラ本体の取込み作業をクレーンなどの揚重機
でスムーズに行うことが可能になる。また、ボイラ本体
をボイラ鉄骨の各節の建設毎に順次取込み据付けること
により、ボイラ鉄骨の建設工事とボイラ本体の据付け工
事とを同時に平行して行うことが可能になる。
SUMMARY OF THE INVENTION An object of the present invention is to provide a method for installing a boiler, in which boiler steel frames are successively constructed from below to above, and each time the above-described sections are constructed. A boiler body corresponding to each of the above sections is incorporated into each of the above sections while being supported by each of the above sections. As described above, in the boiler installation method, the boiler main body including the furnace wall panel and the back stay is sequentially taken in at each construction of each section of the boiler steel frame, and is sequentially piled up from below and installed. By stacking and installing the boiler body from bottom to top each time each section of the boiler steel frame is constructed, the boiler body no longer interferes with the boiler steel frame when the boiler body is taken into the boiler steel frame. Can be carried out smoothly by a crane or other lifting machine. Further, by sequentially taking in and installing the boiler main body at each construction of each section of the boiler steel frame, the construction work of the boiler steel frame and the installation work of the boiler main body can be performed at the same time.

【0005】[0005]

【発明の実施の形態】図1は本発明の実施の一形態に係
るボイラ本体の据付け工法の説明図である。図におい
て、本実施の形態に係るボイラ本体の据付け工法は火力
発電所におけるボイラの据付け工事などに使用されるも
ので、図における符号1はボイラ鉄骨の最上部に位置す
る大梁、2はボイラ本体を大梁1から吊下げる吊棒、3
はボイラ本体に組み込まれてボイラ本体を支えるバック
スティ、4はボイラ本体を構成する火炉壁パネル、5は
バックスティ3と火炉壁パネル4とを地上で組立てて形
成したボイラ本体のブロック、6はボイラ鉄骨に組み込
まれてボイラ本体のブロック5をボイラ鉄骨に固定する
サポート金物である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is an explanatory view of a method for installing a boiler body according to an embodiment of the present invention. In the figure, the boiler body installation method according to the present embodiment is used for boiler installation work in a thermal power plant, and the reference numeral 1 in the figure is a girder positioned at the top of the boiler steel frame, and 2 is the boiler body Hanging rod from the beam 1
Is a back stay incorporated in the boiler body to support the boiler body, 4 is a furnace wall panel constituting the boiler body, 5 is a boiler body block formed by assembling the back stay 3 and the furnace wall panel 4 on the ground, 6 is It is a support hardware incorporated into the boiler steel frame to fix the block 5 of the boiler body to the boiler steel frame.

【0006】従来はボイラ本体をボイラ鉄骨内に上部か
ら下部へ吊下げながら据付けているが、本ボイラ本体の
据付け工法は図に示すように、ボイラ本体の火炉壁パネ
ル4とボイラ本体を支えるバックスティ3とを予め地上
で一体に組立ててブロック5を形成しておき、またボイ
ラ鉄骨には予めサポート金物6を取付けておき、ボイラ
鉄骨を下部から各節づつ建設してボイラ鉄骨の各節毎に
この地上で組立てたボイラ本体のブロック5を順次取込
み、下部から上部へ積上げて据付ける。即ち、図1
(a)に示すように地上でバックスティ3と火炉壁パネ
ル4などとによりボイラ本体のブロック5を組立て、同
図(b)に示すようにボイラ鉄骨の下部1節の建設が完
了した後にボイラ本体のブロック5をボイラ鉄骨の下部
1節内にクレーンなどの揚重機で吊込んでバックスティ
3およびサポート金物6を介して固定し、同図(c)に
示すようにボイラ鉄骨の下部1節内にこの1節に見合う
ボイラ本体の据付けが完了した後にボイラ鉄骨の上部2
節の建設を行い、同図(d)に示すようにボイラ鉄骨の
2節の建設が完了した後にボイラ鉄骨の2節内にこの2
節に見合うボイラ本体のブロック5を順次クレーンなど
の揚重機で吊込んでボイラ鉄骨の2節内にバックスティ
3およびサポート金物6を介して固定し、同図(e)に
示すようにボイラ鉄骨の1節、2節内に大梁1から吊棒
2を介してボイラ本体を吊下げてボイラ本体を完成す
る。なお、ボイラ本体のブロック5をボイラ鉄骨内に固
定する場合は、ボイラ本体のブロック5をボイラ鉄骨内
に取込み後に予めボイラ鉄骨に取付けられているサポー
ト金物6に予めボイラ本体のブロック5に組み込まれて
いるバックスティ3をボルトで取付けて固定する。
Conventionally, the boiler main body is installed while being suspended from the upper part to the lower part in the boiler steel frame. However, as shown in the drawing, the boiler main body is installed by a furnace wall panel 4 of the boiler main body and a back supporting the boiler main body. The stay 3 is previously assembled integrally on the ground to form a block 5, and a support hardware 6 is attached to the boiler steel frame in advance. Then, the blocks 5 of the boiler main body assembled on the ground are sequentially taken in, and are piled up from the lower part to the upper part for installation. That is, FIG.
As shown in (a), the block 5 of the boiler main body is assembled on the ground with the back stay 3 and the furnace wall panel 4 and the like, and after the construction of the lower section of the boiler steel frame is completed as shown in FIG. The block 5 of the main body is suspended in a lower section of the boiler steel frame by a lifting machine such as a crane and fixed via the back stay 3 and the support hardware 6, and as shown in FIG. After the installation of the boiler body corresponding to this section is completed, the upper part of the boiler steel frame 2
After the construction of the knots is completed, as shown in FIG. 4 (d), after the construction of the two knots of the boiler steel frame is completed,
Blocks 5 of the boiler body corresponding to the knots are sequentially suspended by a lifting machine such as a crane and fixed in the two knots of the boiler steel frame via the back stay 3 and the support hardware 6, and as shown in FIG. The boiler main body is suspended from the girders 1 via the suspension rods 2 in the first and second sections of the first embodiment, thereby completing the boiler main body. In the case where the block 5 of the boiler body is fixed in the boiler steel frame, the block 5 of the boiler body is taken into the boiler steel frame, and then incorporated into the support hardware 6 previously attached to the boiler steel frame in advance. The backstay 3 is fixed with bolts.

【0007】このようにしてボイラ本体をボイラ鉄骨内
に据付けることにより、ボイラ鉄骨の建設工事とボイラ
本体の据付け工事との同時作業が可能になって工期の短
縮が計られる。また、ボイラ本体の据付けがボイラ鉄骨
の各節の建設毎に下方から上方へ積上げる方式とするこ
とにより、ボイラ本体のブロック5をボイラ鉄骨内へ取
込む際にボイラ鉄骨との干渉も少なく、クレーンなどの
揚重機でスムーズにボイラ本体を取込むことが可能にな
って高度な技能を必要としなくなる。
[0007] By installing the boiler main body in the boiler steel frame in this way, the construction work of the boiler steel frame and the installation work of the boiler main body can be performed at the same time, thereby shortening the construction period. In addition, by installing the boiler body in a manner that the boiler body is piled up from below for each construction of each section of the boiler steel frame, there is little interference with the boiler steel frame when taking in the block 5 of the boiler body into the boiler steel frame. It becomes possible to smoothly take in the boiler body with a lifting machine such as a crane, which eliminates the need for advanced skills.

【0008】従来のボイラ本体の据付け工法において
は、ボイラ鉄骨の建設が完了した後にボイラ本体を上部
から順次据付けていくため、ボイラ本体をボイラ鉄骨内
に取込む際にボイラ鉄骨がボイラ本体に干渉してボイラ
本体の取り込み作業が煩雑で高度な技能を要している。
また、工期も長く必要になっている。これに対し、本ボ
イラ本体の据付け工法においては、地上で予めボイラ本
体の火炉壁パネル4とバックスティ3とを一体に組立て
てブロック化し、ボイラ鉄骨の建設工事と同時にボイラ
本体の据付け工事も施工するようにしており、ボイラ鉄
骨の建設作業中にボイラ本体の据付けを同時に施工する
ことによりボイラ本体の据付け工期の短縮を計ることが
できる。また、ボイラ本体の据付け時におけるボイラ本
体のボイラ鉄骨内への取込み作業がボイラ鉄骨の各節の
建設毎に下方から上方へ積上げる方式となり、従来の吊
下げ方式に比べて作業性が良くなって工期の短縮と安全
性の向上を計ることができる。
In the conventional boiler main body installation method, the boiler main body is sequentially installed from the top after the construction of the boiler steel frame is completed. Therefore, when the boiler main body is taken into the boiler steel frame, the boiler steel frame interferes with the boiler main body. In addition, the work of taking in the boiler body is complicated and requires advanced skills.
In addition, a long construction period is required. On the other hand, in this boiler body installation method, the furnace wall panel 4 and the back stay 3 of the boiler body are previously assembled integrally on the ground to form a block, and the boiler body installation work is performed simultaneously with the boiler steel frame construction work. By simultaneously installing the boiler body during the construction of the boiler steel frame, it is possible to reduce the boiler body installation work period. In addition, when installing the boiler body, the work of taking in the boiler body into the boiler steel frame is a system that is piled up from the bottom every time each section of the boiler steel frame is constructed, which improves workability compared to the conventional suspension system. This can shorten the construction period and improve safety.

【0009】[0009]

【発明の効果】本発明に係るボイラの据付け方法は前記
のようになっており、ボイラ本体をボイラ鉄骨の各節の
建設毎に下方から上方へ順次積上げて据付けることによ
り、ボイラ本体をボイラ鉄骨内に取込む際にボイラ本体
がボイラ鉄骨と干渉しなくなってボイラ本体の取込み作
業をクレーンなどの揚重機でスムーズに行うことが可能
になるので、作業性が良くなってボイラ本体の取込み作
業に高度な技能を必要とせず、安全性が向上する。ま
た、ボイラ本体をボイラ鉄骨の各節の建設毎に順次取込
み据付けることにより、ボイラ鉄骨の建設工事とボイラ
本体の据付け工事とを同時に平行して行うことが可能に
なるので、工期が短縮される。
The method of installing a boiler according to the present invention is as described above. The boiler main body is sequentially piled up from the lower side to the upper side for each construction of each section of the boiler steel frame. The boiler body does not interfere with the boiler steel frame when it is taken into the steel frame, and the work of taking in the boiler body can be performed smoothly by a crane or other lifting machine. It does not require advanced skills and improves safety. In addition, since the boiler body is taken in and installed sequentially for each section of the boiler steel frame, the construction of the boiler steel frame and the installation of the boiler body can be performed at the same time, shortening the construction period. You.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は本発明の実施の一形態に係るボイラ本体
の据付け工法の説明図である。
FIG. 1 is an explanatory view of a boiler main body installation method according to an embodiment of the present invention.

【図2】図2は従来のボイラ本体の据付け工法の説明図
である。
FIG. 2 is an explanatory diagram of a conventional boiler main body installation method.

【符号の説明】[Explanation of symbols]

1 大梁 2 吊棒 3 バックスティ 4 火炉壁パネル 5 ボイラ本体のブロック 6 サポート金物 DESCRIPTION OF SYMBOLS 1 Giant beam 2 Hanging rod 3 Backstay 4 Furnace wall panel 5 Boiler body block 6 Support hardware

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 ボイラ鉄骨を順次下方から上方へ各節づ
つ建設し、上記各節を建設する毎にそれぞれの上記各節
に見合うボイラ本体をそれぞれの上記各節内にそれぞれ
の上記各節により支持しながら組込むことを特徴とする
ボイラの据付け方法。
1. A boiler steel frame is sequentially constructed from bottom to top by each node, and each time each of the nodes is constructed, a boiler body corresponding to each of the nodes is provided in each of the nodes by the respective nodes. A boiler installation method characterized by being incorporated while supporting.
JP6956297A 1997-03-24 1997-03-24 Installation method of boiler Withdrawn JPH10267208A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6956297A JPH10267208A (en) 1997-03-24 1997-03-24 Installation method of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6956297A JPH10267208A (en) 1997-03-24 1997-03-24 Installation method of boiler

Publications (1)

Publication Number Publication Date
JPH10267208A true JPH10267208A (en) 1998-10-09

Family

ID=13406334

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6956297A Withdrawn JPH10267208A (en) 1997-03-24 1997-03-24 Installation method of boiler

Country Status (1)

Country Link
JP (1) JPH10267208A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235484A (en) * 2018-10-11 2019-01-18 中国电建集团四川工程有限公司 Boiler steel frame mounting process
CN112146078A (en) * 2020-08-31 2020-12-29 鞍山三冶建筑工程有限公司 Ultrahigh-temperature ultrahigh-pressure gas boiler and method for installing auxiliary equipment thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235484A (en) * 2018-10-11 2019-01-18 中国电建集团四川工程有限公司 Boiler steel frame mounting process
CN112146078A (en) * 2020-08-31 2020-12-29 鞍山三冶建筑工程有限公司 Ultrahigh-temperature ultrahigh-pressure gas boiler and method for installing auxiliary equipment thereof
CN112146078B (en) * 2020-08-31 2022-05-13 鞍山三冶建筑工程有限公司 A kind of ultra-high temperature and ultra-high pressure gas boiler and its auxiliary equipment installation method

Similar Documents

Publication Publication Date Title
JP5169549B2 (en) Large beam block lifting method and jack-up stage used for it
US7296349B2 (en) Method to assemble a steam generator
CN212534508U (en) Beam column connected node structure of trompil punching formula
JPH10267208A (en) Installation method of boiler
JPH06323503A (en) How to assemble a large hanging boiler
JP2950726B2 (en) Construction method of multi-layer suspension structure
CN209082323U (en) A kind of super-span steel truss continuous bridge having initial curvature
JP2000352116A (en) Building unit constructing method and unit building
JP2761792B2 (en) Construction method of large space building
JPH04231509A (en) Laying method for cable
JPH08114302A (en) Boiler installing method and boiler installation structural body
JP2517211B2 (en) Construction method of bridge girder in concrete bridge
JPH05311760A (en) Panel mounting method
JP2927423B2 (en) Rear transmission block construction method for a suspended boiler
JPS60205288A (en) Method of executing steam-generator chamber wall in nuclear power plant
JPH09256457A (en) Building assembly method
JP2888913B2 (en) External wall panel mounting method
JPH0213112B2 (en)
JPH0791603A (en) Assembly and parallel construction method for large-scale hanging boiler
JPH04228772A (en) Method of building movable suspended scaffold for working at ceiling of large space structure
SU945332A1 (en) Large-span production building
SU1470919A1 (en) Chimney and method of constructing same
JPH1046838A (en) Demolition method of building
JPS626063A (en) Beam construction method for steel reinforced concrete structures
JP2536347B2 (en) Building construction method using traveling crane

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20040601