[go: up one dir, main page]

JPH10197563A - Maximum demand cutting energy calculating device by demand control - Google Patents

Maximum demand cutting energy calculating device by demand control

Info

Publication number
JPH10197563A
JPH10197563A JP9035443A JP3544397A JPH10197563A JP H10197563 A JPH10197563 A JP H10197563A JP 9035443 A JP9035443 A JP 9035443A JP 3544397 A JP3544397 A JP 3544397A JP H10197563 A JPH10197563 A JP H10197563A
Authority
JP
Japan
Prior art keywords
demand
maximum
power
control
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP9035443A
Other languages
Japanese (ja)
Other versions
JP3292981B2 (en
Inventor
Kiyoaki Matsuoka
清明 松岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAKIII KK
Original Assignee
YAKIII KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAKIII KK filed Critical YAKIII KK
Priority to JP03544397A priority Critical patent/JP3292981B2/en
Publication of JPH10197563A publication Critical patent/JPH10197563A/en
Application granted granted Critical
Publication of JP3292981B2 publication Critical patent/JP3292981B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To enhance calculating accuracy of a maximum demand cutting energy, and present an accurate electricity rate cutback amount to a consumer by finding the maximum demand cutback quantity from a maximum demand found by an operation by demand control instead of an umeasurable maximum demand value. SOLUTION: A demand before a demand control command is issued, a demand of an electric load cutoff period when the demand control command is issued, a demand on and after an electric load is inputted again by the completion of a control command and a maximum demand DE calculated by data on its issuing period, an non-issuing period, the issuing time or the like, are substituted with an unmeasurable maximum demand (a maximum demand value) RR, and a maximum demand cutting energy DS is calculated. An energy charge cutting amount MS by demand control is calculated from this cutting energy DS, and is presented and submitted to an electric power demand consumer where a demand controller is installed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【001】[0101]

【産業上の利用分野】 電力供給会社から電力の供給を
受け電力供給会社の設備する30分最大需要電力計によ
り計量された最大需要電力を基本に電気基本料金を決定
される制度により電気料金が徴収され、かつデマンドコ
ントロールを実施している若しくはしようとしている電
気需要家に利用出来る。
[Industrial applications] Electricity is supplied by a power supply company based on a system in which a basic electricity charge is determined based on the maximum demand power measured by a 30-minute maximum demand power meter that is supplied by the power supply company. It is available to electricity consumers who have been collected and are or willing to perform demand control.

【002】[0092]

【従来の技術】 デマンドコントローラはその値以下に
保持する様希望する前以て設定された一定の需要電力値
(以下 設定デマンド値と呼び Dで表わす)を最大
需要電力が超過しそうな場合デマンドコントロール命令
を発令し前以て選択しておいた一部の電気負荷を段階的
若しくは一括に遮断しその需要電力がDを超過しない
様制御する装置で、Dを計量する事は不可能であり、
従って従来どの程度のDを削減出来たかMを生み出
したか調査するにはそのデマンドコントローラが導入さ
れる以前の同時期の最大需要電力とDを比較するのが
一般的で、その比較方法だとデマンドコントローラが導
入される以前の最大需要電力と導入後のDは同じであ
る若しくはある一定の法則にて増減しているという仮定
のもとに於ての調査でしかなく正確さに欠け、そのため
電気需要家はデマンドコントロールの効果をデマンドコ
ントローラの導入後その作動中に明瞭に把握することが
出来ず、デマンドコントローラ導入業者もその効果の保
証を明確に出来なかった。
BACKGROUND ART demand controller if previously set predetermined power demand value (expressed by the following set demand value referred D d) likely to exceed the maximum demand power demand desired as to kept below the value in the apparatus the power demand issued to cut off the electrical load of the part that has been preselected to stepwise or simultaneously to control such that does not exceed a D d the control instructions, possible to weigh the D R is not And
Therefore To investigate whether produced or M S could reduce the extent of D S conventionally common that compares the maximum demand power and D C previous contemporaneous its demand controller is introduced, a method that compares I and after introduction with previous maximum demand power demand controller is introduced D R to study not only the accuracy of at a on the assumption that increases and decreases at a constant rule is or is the same As a result, electric consumers could not clearly grasp the effect of demand control during the operation of the demand controller after the introduction of the demand controller, and the demand controller introduction company could not clearly guarantee the effect.

【003】[0093]

【発明が解決しようとしている課題】 デマンドコント
ローラが設置された場合と設置されない場合のDをよ
り精度を高め算出しその値からMを計算し、必要に応
じ電話公衆回線を用いてそのデータを遠方の管理センタ
ーへ自動転送し記録管理し、それらのデータをデマンド
コントローラ設置電気需要家に提示提出出来る様にする
事が本発明が解決しようとしている課題である。
Calculate the M S a D S when THE INVENTION you are trying to solve problems] demand controller is not installed and when installed more calculated improve the accuracy of that value, its data using the public telephone line as required It is an object of the present invention to solve this problem by automatically transferring the data to a distant management center, recording and managing the data, and enabling the data to be presented and submitted to an electric customer with a demand controller.

【004】[0093]

【課題を解決するための手段】 Dを計量する事が出
来れば(式1)を利用し簡易にDをめる事が可能であ
るが、Dを計量により求める事が不可能なためD
の仮定に立ちDを演算により求めることによりD
を求め、電気供給会社の電気料金算定式にこのD
代入しMを算出し、また必要に応じて電話公衆回線を
利用しそれらのデータを遠方の管理センターに自動転送
し記録管理し、それらのデータをデマンドコントローラ
設置電気需要家に提示提出出来る様にする。
If it is possible to weigh the D R Means for Solving the Problems] easily using (Equation 1) it is possible D S Omeru but impossible be determined by measuring the D R D Rた め
D by obtaining by calculation D E standing on the assumption D E
Seek S, the electricity charge calculation formula of the electrical supply company by substituting this D S calculates M S, also utilizing the public telephone line as required to automatically forward these data to a remote management center of the recording management Then, the data can be presented and submitted to the demand controller installation electric customer.

【005】[0056]

【作用】 本発明装置によりデマンドコントローラ導入
によるMが明確に算出する事が可能で、電気需要家は
その削減額並びデマンドコントローラの投資金額に対す
る償却年数等をデマンドコントローラ導入作動後に明瞭
に確認出来、デマンドコントローラ導入業者もそのM
を保証することが出来る様になる。
[Action] is possible M S by the demand controller introduced by the device of the present invention is clearly calculated, electrical consumers are able to confirm clearly the amortization period for the investment amount of the savings line demand controller after demand controller introduced working , Demand controller introduction company also MS
Can be guaranteed.

【006】[0086]

【実施例】 本実施例はデマンドコントロールによる一
部の電気負荷の遮断投入は一括に行われる場合として記
述している。電力供給会社が設置する30分最大需要電
力計が需要電力を計量する各30分間のうち最大需要電
力が発生した30分間をT30、そのT30間のデマン
ドコントロール発令回数をn回、そのデマンドコントロ
ール発令による電気負荷遮断期間をTC,TC,T
,〜TC、そのそれぞれの期間の需要電力をDC
,DC,DC,〜DC、T30間のデマンドコ
ントロールが発令されず電気負荷が遮断されてない期間
をTR,TR,TR,〜TR、そのそれぞれの
期間の需要電力をDR,DR,DR,〜DR
するとそれらの関係は図1に示す通りであり、またそれ
らの関係式は次の(式3)(式4)(式5)で表され
る。 以上の(式3)(式4)(式5)を関係式を(式2)に
代入するとDが算出出来この値を電力供給会社の基本
料金換算式に代入すればMが計算出来る。
[Embodiment] In this embodiment, a description is given of a case where the cut-off and input of some electric loads by demand control are performed collectively. The 30-minute maximum demand power meter installed by the power supply company measures the demand power. In each of the 30 minutes, 30 minutes when the maximum demand power is generated is T 30 , and the number of demand control issuances during the T 30 is n times. The electric load interruption period by the control issuance is defined as TC 1 , TC 2 , T
C 3 , to TC n , and the power demand in each period is DC
1 , DC 2 , DC 3 , to DC n , and T 30 , the demand control is not issued and the electric load is not cut off is TR 1 , TR 2 , TR 3 , to TR n , the demand of each period Assuming that the power is DR 1 , DR 2 , DR 3 , to DR n , their relationships are as shown in FIG. 1, and their relational expressions are expressed by the following (Expression 3), (Expression 4), and (Expression 5). Is done. Or (Formula 3) (Formula 4) (Formula 5) the relationship (Equation 2) is substituted into D S is M S can be calculated by substituting this value can calculate the base charge conversion formula of the electric power supply company .

【007】007

【発明の効果】 以上の様に計算式にてDが計算出来
その結果からMが高精度で算出可能で、これにより電
気需要家はデマンドコントロールの導入後に明確なデマ
ンドコントローラ導入結果によるMが確認出来、デマ
ンドコントローラの導入の投資金額に対しての省エネル
ギー償却年数が予定通りであるか確認出来、またデマン
ドコントローラ導入業者もMの明言が可能でその値の
保証が正確に行える様になる。
M S D S is can be calculated from the results in the calculation formula as in the above, according to the present invention can be calculated with a high degree of accuracy, due to this by the electrical consumers is clear demand controller introduced the results after the introduction of the demand control M S can be checked, can be checked whether the energy-saving amortization period of relative to the investment of the introduction of the demand controller is on schedule, and the guarantee of the value stated is a possible demand controller introduction skilled in the art M S is such that enables accurate become.

【008】[0098]

【図面の簡単な説明】[Brief description of the drawings]

【図1】DC,DR,TR,TCの関係図であ
る。
FIG. 1 is a relationship diagram of DC n , DR n , TR n , and TC n .

【図2】実施例のブロック図である。FIG. 2 is a block diagram of an embodiment.

【009】[0099]

【符号の説明】[Explanation of symbols]

1 電気変電設備 2 30分最大需要電力計 3 デマンドコントローラ 4 本発明装置(デマンドコントロールによる最大需
要電力削減量計算装置) 5 データ通信ケーブル 6 電話公衆回線 7 管理センター 8 デマンドコントロールされる電気負荷 9 デマンドコントロール制御ケーブル 10 電気配線
DESCRIPTION OF SYMBOLS 1 Electric substation equipment 2 30-minute maximum demand electricity meter 3 Demand controller 4 The present invention device (Calculation device of maximum demand power reduction by demand control) 5 Data communication cable 6 Telephone public line 7 Management center 8 Demand controlled electric load 9 Demand Control control cable 10 Electric wiring

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 一定値以上のピーク電力(以下 一定ピ
ーク電力と呼ぶ)発生時に電気負荷の一部を段階的若し
くは一括に遮断しピーク電力を抑制する制御(以下 デ
マンドコントロールと呼ぶ)を実施すれば最大需要電力
(電気需要家が必要とする需要電力の最大値であって、
電力供給会社により設備される30分最大需要電力計に
より計量される値を言う)は、デマンドコントロールを
実施しなかった場合のそれと比較すると明らかに削減さ
れ、デマンドコントロールを実施し削減された後の最大
需要電力を『制御デマンド値』と呼び(以下 Dで表
わす)、その一定ピーク電力発生時期に於てデマンドコ
ントロールが一切実施されなかったと仮定した場合の最
大需要電力を『最大デマンド値』と呼び(以下 D
表わす)、一定ピーク電力発生時にデマンドコントロー
ルが実施されたことにより削減された最大需要電力の差
を『最大需要電力削減量』と呼び(以下 Dで表わ
す)それらの関係を式で示すと以下の様になる。 D=D−D・・・(式1) Dは電力供給会社の設備する30分最大需要電力計に
より計量出来るが、Dは実際デマンドコントロールに
より電力負荷が遮断されてしまうので計量が不可能であ
り、このためこのDをデマンドコントロール命令発令
以前の需要電力並びデマンドコントロール命令発令中の
電気負荷遮断期間の需要電力及びデマンドコントロール
命令完了によりその電気負荷が再度投入された以降の需
要電力,またその発令期間,非発令期間,発令時刻など
のデータにより算出する最大需要電力(以下 予想デマ
ンド値と呼び Dで表わす)に置き換え、つまりD
≒Dと仮定すると以下の関係式が成立する。 D=D−D・・・(式2) この(式2)を利用してDを算出し、またこのD
らどの程度デマンドコントロールによる電気料金の削減
(以下 電気料金削減額と呼び Mで表わす)が実践
されたか計算し、デマンドコントロールを実際に行う装
置(以下 デマンドコントローラと呼ぶ)を設置した電
気需要家に提示提出出来る様工夫されたデマンドコント
ロールによる最大需要電力削減量計算装置。
When a peak power equal to or more than a certain value (hereinafter, referred to as a certain peak power) is generated, a part of the electric load is stepwise or collectively shut off to control the peak power (hereinafter, demand control). The maximum demand (the maximum value of the demand for electricity
The value measured by the 30-minute maximum demand power meter installed by the power supply company) is clearly reduced as compared with that without the demand control, and after the demand control is performed and the demand is reduced. maximum demand power is referred to as "control demand value" (hereinafter represented by D C), the maximum demand power when demand control at a the constant peak power generation timing is assumed to have not been performed at all the "maximum demand value" call (hereinafter represented by D R), (represented by the following D S) constant during peak power generation the difference between the maximum demand power demand control is reduced by being performed is referred to as "maximum demand power reduction amount" their relationship Is given by the following equation. D S = D R -D C ··· ( Equation 1) D C can weighing by 30 minutes maximum demand power meter for equipment of the electric power supply company, since D R would be cut off the power load the actual demand control weighing is impossible, since this reason the electric load by electric power demand and demand control instruction completion of this D R demand control instruction issued earlier demand power line demand control instruction electrical load shedding period in issued is turned again demand power, and its issuance period, non-issued period, replacing the maximum demand power calculated by data such as the issuance time (represented by the following predicted demand value and call D E), i.e. D R
Assuming ≒ DE , the following relational expression holds. D S = D E -D C ··· ( Equation 2) to calculate the D S by using the (expression 2), also reduced (hereinafter electricity rate savings of electricity charge by how much demand control from the D S and called M represented by S) is calculated or not the practice, maximum power demand reductions by actually performing apparatus (hereinafter referred to as demand controller) installed electric consumers in the presentation submission can be as devised the demand control of the demand control Computing device.
【請求項2】 請求項1で記載した様にして計算された
並びにMのデータを電話公衆回線にて遠方の管理
センターへ自動転送し記録管理が出来る様工夫された機
能を付加的に設備されているデマンドコントロールによ
る最大需要電力削減量計算装置。
Wherein additional functions Forwards recording management to distant control center has been devised such that it at data telephone public line D S and M S that is calculated in the manner described in claim 1 The maximum demand power reduction calculation device by demand control installed in Japan.
JP03544397A 1997-01-14 1997-01-14 Maximum demand power reduction calculation device by demand control Expired - Fee Related JP3292981B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03544397A JP3292981B2 (en) 1997-01-14 1997-01-14 Maximum demand power reduction calculation device by demand control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03544397A JP3292981B2 (en) 1997-01-14 1997-01-14 Maximum demand power reduction calculation device by demand control

Publications (2)

Publication Number Publication Date
JPH10197563A true JPH10197563A (en) 1998-07-31
JP3292981B2 JP3292981B2 (en) 2002-06-17

Family

ID=12441984

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03544397A Expired - Fee Related JP3292981B2 (en) 1997-01-14 1997-01-14 Maximum demand power reduction calculation device by demand control

Country Status (1)

Country Link
JP (1) JP3292981B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001067578A1 (en) * 2000-03-10 2001-09-13 Mark.Tech Co., Ltd. Electricity bill control device and recording medium therefor
JP2001306134A (en) * 2000-02-15 2001-11-02 Mitsubishi Electric Corp Device and method for facility management

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001306134A (en) * 2000-02-15 2001-11-02 Mitsubishi Electric Corp Device and method for facility management
JP4488592B2 (en) * 2000-02-15 2010-06-23 三菱電機株式会社 Equipment management device, equipment management method
WO2001067578A1 (en) * 2000-03-10 2001-09-13 Mark.Tech Co., Ltd. Electricity bill control device and recording medium therefor

Also Published As

Publication number Publication date
JP3292981B2 (en) 2002-06-17

Similar Documents

Publication Publication Date Title
US3602703A (en) Power demand predicting control system
WO2019225834A1 (en) Power supply control system and method using energy storage device and photovoltaic power generation
Majumder et al. A unified Smith predictor approach for power system damping control design using remote signals
US10700524B2 (en) Management device and control method
US12132336B2 (en) Region energy management device and region energy management method
JPH11332099A (en) System and method for controlling service power and computer-readable recording medium with service power recorded therein
JP2006121853A (en) Control method and apparatus for distributed power generator
TWI492181B (en) Saving cost type power energy management apparatus and method
CN114186798A (en) Information processing method and system for improving demand response effectiveness of power consumer
CN109586272A (en) A kind of generation method and system of power grid continuous operation emulation section
JPH10197563A (en) Maximum demand cutting energy calculating device by demand control
Kiran et al. Day ahead market operation with agent based modeling
WO2021080169A2 (en) Building energy integrated-management apparatus, and method therefor
KR101983808B1 (en) Method and apparatus for providing transmission loss factor
US11734777B2 (en) Systems and methods for managing electricity supply from demand
JP2020048299A (en) Power generation control device, power generation control method, and program
JPH0295137A (en) Self-power supply method
JP2006047195A (en) Control system for annually used electrical energy
WO2017146243A1 (en) Power management server, power management system, and power management method
JP6991492B2 (en) Systems and methods to support transportation
WO2021133257A1 (en) Demand control method and system, and storage medium
JP2021100316A (en) Charging/discharging system for electric vehicle
JP6760734B2 (en) Charge calculation method, charge calculation device and charge calculation program
CN118554645B (en) Intelligent integrated power distribution system based on analysis model operation
JPH057928B2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees