JPH0692641B2 - Road widening method - Google Patents
Road widening methodInfo
- Publication number
- JPH0692641B2 JPH0692641B2 JP2077242A JP7724290A JPH0692641B2 JP H0692641 B2 JPH0692641 B2 JP H0692641B2 JP 2077242 A JP2077242 A JP 2077242A JP 7724290 A JP7724290 A JP 7724290A JP H0692641 B2 JPH0692641 B2 JP H0692641B2
- Authority
- JP
- Japan
- Prior art keywords
- road
- retaining wall
- slope
- anchor
- floor slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 12
- 239000004567 concrete Substances 0.000 claims description 8
- 239000011178 precast concrete Substances 0.000 claims description 7
- 239000000463 material Substances 0.000 description 11
- 238000010276 construction Methods 0.000 description 8
- 238000009412 basement excavation Methods 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000010426 asphalt Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000011362 coarse particle Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Retaining Walls (AREA)
- Road Paving Structures (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は山腹道路のように傾斜面を段状に掘削して構築
した道路や、嵩上げされた盛土上に構築された道路等、
路肩下が傾斜面となっている道路の拡幅方法に関する。DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a road constructed by excavating an inclined surface stepwise like a hillside road, a road constructed on a raised embankment, and the like.
The present invention relates to a method for widening a road in which the road under the shoulder is an inclined surface.
(従来の技術) 近年、交通量の増加に伴い、旧来からの道路の車道の幅
員拡張や、歩道あるいは自動車道の付設が要求されるに
至っており、既設の山腹道路等、一方側が山に、他方側
が谷に面し、路肩下が急な傾斜面となっているような道
路においても例外ではない。(Prior Art) In recent years, along with the increase in traffic volume, it has become necessary to expand the width of roads from the old roads and to attach sidewalks or motorways. It is no exception on roads where the other side faces the valley and the road shoulders have a steep slope.
山腹道路等の道路の拡幅に際し、道路の山側を拡幅する
工法としては、山側の法面を掘削し、その掘削面に法枠
や吹き付けコンクリートを地中アンカーにて固定した
り、重力式のコンクリートブロックを積み上げて擁壁を
構築したりして法面の崩落を防止するようにした工法が
ある。一方、道路の谷側を拡幅する工法としては、第5
図に示すように既設道路1の路肩下の法面の下部の適宜
位置に基礎2を構築し、その基礎上に重力式のブロック
3を積み上げて擁壁4を構築し、このブロック3を適宜
間隔毎にタイロッド5にて固定し、このタイロッド5を
埋め込んで法面6と擁壁4間に土砂を詰め、その上面を
道路とする工法や、第6図に示すように既設道路上に先
端を谷側の空中させたプレキャストコンクリート構造材
7を道路1の全幅にわたって設置し、該構造材7上に路
面を形成するとともに、道路1下に地中アンカー8を構
築して構造材7の基端側に定着させ、先端側にかかる垂
直加重によるモーメントに対抗させるようにした工法が
ある。When widening a road such as a hillside road, the method of expanding the mountain side of the road is to excavate the slope on the mountain side and fix the frame or sprayed concrete to the excavated surface with an underground anchor or use a gravity-type concrete. There is a construction method that prevents collapse of the slope by stacking blocks to construct a retaining wall. On the other hand, the fifth method is to widen the valley side of the road.
As shown in the figure, a foundation 2 is constructed at an appropriate position below the slope of the existing road 1 and a gravity type block 3 is piled up on the foundation to construct a retaining wall 4, and the block 3 is appropriately constructed. Fix with tie rods 5 at intervals, fill the tie rods 5 and fill the space between the slope 6 and the retaining wall 4 with earth and sand, and use the top surface as a road, or a tip on an existing road as shown in Fig. 6. A precast concrete structural material 7 in the air on the valley side is installed over the entire width of the road 1, a road surface is formed on the structural material 7, and an underground anchor 8 is constructed under the road 1 to form the base of the structural material 7. There is a construction method in which it is fixed on the end side and counteracts the moment due to vertical load applied to the tip side.
(発明が解決しようとする課題) 上述の如き従来の方法の内、道路の山側の法面を掘削す
る方法は、山側の方面の傾斜が緩い場合には掘削が可能
であるが、傾斜が急な場合には掘削後の方面の崩落防止
が困難になり施工できないという問題がある。(Problems to be Solved by the Invention) Among the conventional methods described above, the method of excavating the slope on the mountain side of a road can excavate when the slope on the mountain side is gentle, but the slope is steep. In such a case, there is a problem that it is difficult to prevent the collapse of the area after the excavation because it is difficult to prevent the collapse.
また、第5図に示すように谷側の法面に擁壁を立設し、
土砂を埋める方法においても急斜面である場合には大き
く拡幅することが困難であり、しかも小さな拡幅では不
経済になるという問題がある。Moreover, as shown in FIG. 5, a retaining wall is erected on the slope on the valley side,
Even in the method of burying earth and sand, it is difficult to widen a wide area when it is a steep slope, and there is a problem that a small widening becomes uneconomical.
更に、第6図に示すように既設道路上に構造材を固定
し、先端を空中へ張り出す方法では、その施工に際し、
既設道路全幅を使用する必要があるため、道路を閉鎖し
なければならないという問題がある。Furthermore, as shown in FIG. 6, by fixing the structural material on the existing road and projecting the tip into the air, when constructing it,
Since it is necessary to use the entire width of the existing road, there is a problem that the road must be closed.
本発明は上述の如く従来工法の問題にかんがみ、既設道
路を閉鎖しないで施工が可能であり、しかも道路の谷側
の法面の傾斜が急であっても経済的に施工できる道路拡
幅方法の提供を目的としたものである。In view of the problems of the conventional construction method as described above, the present invention is a road widening method that can be constructed without closing an existing road and can be economically constructed even if the slope of the slope on the valley side of the road is steep. It is intended to be provided.
(課題を解決するための手段) 上述の如き従来の問題を解決し、所期の目的を達成する
ための本発明の道路拡幅方法の特徴は、路肩下の法面よ
り道路下の地盤内に成形した地中アンカーに支持させ
て、前記法面を覆う法面保護擁壁を場所打コンクリート
によって成形し、該法面保護擁壁の前面に支柱支持部を
形成し、該支柱支持部に立設した支柱の上端と、前記法
面保護擁壁の上端面間にプレキャストコンクリート版を
掛け渡して拡幅床版を成形し、該拡幅床版上を舗装して
路面となすことにある。(Means for Solving the Problem) A feature of the road widening method of the present invention for solving the above-mentioned conventional problems and achieving the intended purpose is that the road is located below the road surface below the road surface. A slope protection retaining wall that covers the slope is formed by cast-in-place concrete while being supported by the molded underground anchor, and a support column is formed on the front surface of the slope protection retaining wall. A precast concrete slab is laid between the upper ends of the installed columns and the upper surface of the slope protection retaining wall to form a widened floor slab, and the widened floor slab is paved to form a road surface.
(作用) この方法によれば、法面保護擁壁の構築に要する深さの
み掘削すればよく、しかも、その掘削部内にて作業が可
能であり、急斜面であっても足場等の構築が不要であ
る。(Operation) According to this method, it is only necessary to excavate to the depth required to construct the slope protection retaining wall, and it is possible to work within the excavation part, and there is no need to construct scaffolding even on steep slopes. Is.
法面保護擁壁には水平方向の土圧を支持させ、これによ
って生じる擁壁下端を回転軸とする回転モーメントに対
し、地中アンカーにて対抗する。The slope protection retaining wall supports horizontal earth pressure, and the underground anchor is used to counter the rotational moment generated by the lower end of the retaining wall as the axis of rotation.
また、拡幅床版にかかる垂直荷重は、擁壁上端及び支柱
によって受けられ、支柱にかかる荷重が擁壁前面の支柱
支持部にて受けられる。Further, the vertical load applied to the widened floor slab is received by the upper end of the retaining wall and the support pillar, and the load applied to the support pillar is received by the support pillar portion on the front surface of the retaining wall.
(実施例) 次に本発明の実施の一例を第1図〜第4図について説明
する。(Embodiment) An embodiment of the present invention will be described with reference to FIGS.
まず、第1図に示すように既設の道路10の路肩下の法面
を擁壁構築に必要な分だけ掘削する。First, as shown in FIG. 1, the slope below the shoulder of the existing road 10 is excavated by the amount necessary for constructing the retaining wall.
その掘削面11に対してほぼ垂直にアンカー孔12を水平方
向に一定間隔毎に形成する。このアンカー孔12はそれぞ
れ地山の安定な岩盤に達する深さが好ましい。次いでア
ンカー孔12内にセメントミルクを注入するとともに、ア
ンカー引張材14を挿入し、アンカー孔12内にアンカーコ
ンクリート15を打設すると同時にアンカー引張材14をこ
れに埋設し、アンカー引張材14を岩盤に定着させる。Anchor holes 12 are formed in the horizontal direction at a constant interval substantially perpendicular to the excavation surface 11. It is preferable that each of the anchor holes 12 has a depth to reach a stable rock mass in the ground. Next, while injecting cement milk into the anchor hole 12, inserting the anchor tension material 14 and placing the anchor concrete 15 in the anchor hole 12 and at the same time embedding the anchor tension material 14 therein, the anchor tension material 14 is rock bed. Fix it on.
次に、第2図に示すように掘削面11に沿って場所打コン
クリートによって法面保護擁壁16を構築し、これにアン
カー引張材14を貫通させる。Next, as shown in FIG. 2, a slope protection retaining wall 16 is constructed along the excavated surface 11 by cast-in-place concrete, and an anchor tension member 14 is penetrated through this.
この擁壁16の構築に際し、その上部の厚みを小さくし
て、前面に水平の段部17を一体成形するとともに、その
段部17の上面に支柱受穴18を一定間隔毎に開口させて支
柱支持部19を形成させる。また、擁壁16の頂面にはアン
カー鋼材20を突出させる。When constructing this retaining wall 16, the upper part of the retaining wall 16 is made thin to integrally form a horizontal step portion 17 on the front surface, and support posts 18 are opened at regular intervals on the upper surface of the support portion 17 to support the support pillar. The support portion 19 is formed. An anchor steel material 20 is projected on the top surface of the retaining wall 16.
このようにして擁壁16を構築し、そのコンクリートの固
化後、必要な裏込をなした後、アンカー引張材14を擁壁
表面側より緊張し、端部を定着金具21にて擁壁16を定着
させる。After constructing the retaining wall 16 in this way, after solidifying the concrete and making necessary backfilling, the anchor tension member 14 is tensioned from the retaining wall surface side, and the end portion is fixed to the retaining wall 16 by the fixing metal fitting 21. Fix it.
次に、第3図に示すように支柱支持部19の各支柱受穴18
にプレキャストコンクリート製の支柱22を嵌め込んで自
立させ、その支柱22の天端及び擁壁頂面上にまたがらせ
てプレキャストコンクリート製の梁23を掛け渡し、アン
カー鋼材20にて固定する。Next, as shown in FIG. 3, each strut receiving hole 18 of the strut support 19
A column 22 made of precast concrete is fitted into the above to make it self-supporting, and a beam 23 made of precast concrete is spanned over the top end and the top surface of the retaining wall of the column 22 and fixed by an anchor steel material 20.
このようにして一定間隔毎に掛け渡した梁23間にプレキ
ャストコンクリート版24を掛け渡して拡幅床版25とな
す。In this way, the precast concrete slab 24 is spanned between the beams 23 spanned at regular intervals to form the widened floor slab 25.
このようにして拡幅床版25を道路10の側部に張り出さ
せ、その上面に歩道用の粗粒材を敷き、その上面をアス
ファルト舗装して歩道26となす。In this way, the widened floor slab 25 is extended to the side of the road 10, coarse particles for a sidewalk are laid on the upper surface, and the upper surface is paved with asphalt to form a sidewalk 26.
なお、歩道の他、道路10の表面舗装に連続した舗装を設
け、車道としてもよい。In addition to the sidewalk, a continuous pavement may be provided on the surface of the road 10 to form a roadway.
(発明の効果) 上述したように本発明の道路拡幅方法は、路肩下の法面
の擁壁を場所打コンクリートをもって構築し、地中アン
カーにて土圧に対抗させるようにするとともに、この擁
壁の上端部に拡幅床版を支持させ、これによって道路を
拡幅させるようにしたことにより、法面の掘削が擁壁構
築のための深さのみでよく、掘削量が少なくなり、この
ため既設の道路の部分の破壊が少なく、安定した路盤を
そのまま残した状態で施工でき、施工後の路面の安定度
が高くなる。(Effects of the Invention) As described above, the road widening method of the present invention constructs the retaining wall on the slope below the road shoulder with cast-in-place concrete, and the underground anchor is used to counteract the earth pressure. By supporting the widened floor slab on the upper end of the wall and widening the road by this, the excavation of the slope only requires the depth for constructing the retaining wall, and the amount of excavation is reduced. There is little destruction of the road part, and construction can be performed with the stable roadbed left as it is, and the stability of the road surface after construction will be high.
また、拡幅床版は一端が擁壁頂面に固着されるととも
に、他端が擁壁前面に下端が固定された支柱によって他
端が支持されるため、それ自体が安定な構造になり、安
全度が高い拡幅部が得られる。In addition, one end of the widened floor slab is fixed to the top surface of the retaining wall, and the other end is supported by a column whose lower end is fixed to the front surface of the retaining wall. A widened portion with a high degree can be obtained.
更に、施工時には道路の半分は通行が可能となり、道路
の完全閉鎖が回避される。また、大掛りな掘削や土盛り
を行わず、かつ、プレキャス部材を使用するため、工期
が短く、経済的に低コストにて拡幅工事ができる等の効
果がある。In addition, half of the road can be passed during construction, avoiding complete closure of the road. In addition, since the pre-cass member is used without performing large-scale excavation or embankment, there is an effect that the construction period is short and the widening work can be economically performed at low cost.
第1図〜第3図は本発明の実施例の施工工程を示す断面
図、第4図は完成後の正面図、第5図,第6図は従来例
の断面図である。 10……道路、11……掘削面、12……アンカー孔、 14……アンカー引張材、15……アンカーコンクリート、
16……擁壁、 17……段部、18……支柱受穴、19……支柱支持部、 20……アンカー鋼材、21……定着金具、22……支柱、23
……梁、 24……プレキャスコンクリート版、25……拡幅床版、26
……歩道。1 to 3 are sectional views showing construction steps of an embodiment of the present invention, FIG. 4 is a front view after completion, and FIGS. 5 and 6 are sectional views of a conventional example. 10 …… Road, 11 …… Excavation surface, 12 …… Anchor hole, 14 …… Anchor tension material, 15 …… Anchor concrete,
16 …… Retaining wall, 17 …… Step, 18 …… Support hole, 19… Support support, 20… Anchor steel material, 21… Fixing bracket, 22… Support, 23
…… Beam, 24 …… Precast concrete slab, 25 …… Widening floor slab, 26
...... Sidewalk.
Claims (1)
た地中アンカーに支持させて、前記法面を覆う法面保護
擁壁を場所打コンクリートによって成形し、該法面保護
擁壁の前面に支柱支持部を形成し、該支柱支持部に立設
した支柱の上端と、前記法面保護擁壁の上端面間にプレ
キャストコンクリート版を掛け渡して拡幅床版を成形
し、該拡幅床版上を舗装して路面となすことを特徴とし
てなる道路拡幅方法。1. A slope protection retaining wall that covers the slope is supported by a ground anchor formed in the ground below the road from the slope below the road shoulder, and is molded by cast-in-place concrete. A strut support is formed on the front surface of the wall, and a precast concrete slab is laid between the upper end of the strut erected on the strut support and the upper end surface of the slope protection retaining wall to form a widened floor slab, Widening method A road widening method characterized by paving the floor slab to form a road surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2077242A JPH0692641B2 (en) | 1990-03-27 | 1990-03-27 | Road widening method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2077242A JPH0692641B2 (en) | 1990-03-27 | 1990-03-27 | Road widening method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH03279501A JPH03279501A (en) | 1991-12-10 |
JPH0692641B2 true JPH0692641B2 (en) | 1994-11-16 |
Family
ID=13628395
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2077242A Expired - Fee Related JPH0692641B2 (en) | 1990-03-27 | 1990-03-27 | Road widening method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0692641B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619150A (en) * | 2012-04-26 | 2012-08-01 | 石家庄铁道大学 | Anchored roadbed widening method |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522037B (en) * | 2016-12-26 | 2018-09-25 | 中铁第四勘察设计院集团有限公司 | Side broad way based structures based on existing railway roadbed and its construction method |
CN111764215A (en) * | 2020-07-16 | 2020-10-13 | 四川省交通勘察设计研究院有限公司 | Mountain road overhanging roadbed and using method thereof |
CN114775352A (en) * | 2022-05-05 | 2022-07-22 | 中交路桥建设有限公司 | A kind of widening structure and construction method of existing roadbed and embankment section near the river |
CN116591190B (en) * | 2023-05-12 | 2024-08-20 | 中信建设有限责任公司 | Tunnel portal side slope protection structure and construction method thereof |
-
1990
- 1990-03-27 JP JP2077242A patent/JPH0692641B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102619150A (en) * | 2012-04-26 | 2012-08-01 | 石家庄铁道大学 | Anchored roadbed widening method |
Also Published As
Publication number | Publication date |
---|---|
JPH03279501A (en) | 1991-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5588786A (en) | Combination retaining wall and method of construction | |
US5471811A (en) | Combination traffic barrier and retaining wall and method of construction | |
US4964750A (en) | Traffic barrier and method of construction | |
US5356242A (en) | System and method for adjustably connecting wall facing panels to the soldier beams of a tie-back or anchored wall | |
CN111304988B (en) | Light embankment structure built on steep hillside and construction method | |
US20100272509A1 (en) | Traffic barrier section | |
JPH0692641B2 (en) | Road widening method | |
US9951493B2 (en) | Precast integral post and retaining wall and method for installing same | |
US5558470A (en) | System and method for adjustably anchoring traffic barriers and wall facing panels to the soldier beams of a wall | |
JP3244324B2 (en) | Mountain retaining method | |
JP2000297403A (en) | Passage and construction method therefor | |
JP2010168845A (en) | Road widening structure | |
JP3593752B2 (en) | Retaining wall structure and built flat land structure or built road structure on steep slopes | |
JP2802909B2 (en) | Roadway widening block and roadway widening method | |
JP3486771B2 (en) | Precast basic blocks such as protective fences and signs | |
KR102272494B1 (en) | Slope reinforcement structure using support and tension and Its Construction method | |
KR940009455B1 (en) | Retaining wall for widening road side of concrete pavement and construction method | |
JP4700987B2 (en) | Overhangway block and method for constructing overhangway using the block | |
JP2824217B2 (en) | Construction method of retaining wall and retaining material for retaining wall | |
CN217352526U (en) | Slope reinforcement equipment for geotechnical engineering | |
JPS6250601B2 (en) | ||
JP2691353B2 (en) | Road widening block | |
KR100478994B1 (en) | The freeway using a steel pile and sheet pile, and it's construction method | |
JPH0734471A (en) | Suspended wall type retaining wall construction method in lightweight filling construction method | |
JPS6319642B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081116 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081116 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091116 Year of fee payment: 15 |
|
LAPS | Cancellation because of no payment of annual fees |