JPH06313304A - Structure of high balustrade in concrete structure having high balustrade and construction method for balustrade part - Google Patents

Structure of high balustrade in concrete structure having high balustrade and construction method for balustrade part

Info

Publication number
JPH06313304A
JPH06313304A JP12486193A JP12486193A JPH06313304A JP H06313304 A JPH06313304 A JP H06313304A JP 12486193 A JP12486193 A JP 12486193A JP 12486193 A JP12486193 A JP 12486193A JP H06313304 A JPH06313304 A JP H06313304A
Authority
JP
Japan
Prior art keywords
balustrade
concrete
concrete structure
formwork
metal fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12486193A
Other languages
Japanese (ja)
Other versions
JP3202101B2 (en
Inventor
Mitsuhiro Hasegawa
光弘 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KEIHAN CONCRETE KOGYO KK
Original Assignee
KEIHAN CONCRETE KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEIHAN CONCRETE KOGYO KK filed Critical KEIHAN CONCRETE KOGYO KK
Priority to JP12486193A priority Critical patent/JP3202101B2/en
Publication of JPH06313304A publication Critical patent/JPH06313304A/en
Application granted granted Critical
Publication of JP3202101B2 publication Critical patent/JP3202101B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To form the high balustrade of a bridge or the like in a short term without an external scaffold by forming a form material composed of glass fiber and reinforced concrete in one body with the high railing of the bridge or the like and making it survive as it is. CONSTITUTION:A reinforcement 13 for a high balustrade extending longitudinally is previously erected at the end of the floor face of a bridge. A form 14 which is composed of glass fiber, reinforced concrete and reinforced plastic and divided into two parts is arranged so that it may be enclosed before and behind the reinforcement 13 for forming the united form 14. Next, a pressing metal fitting against side pressure is installed on the form 14 to prevent the form member 14 from slipping longitudinally. A floating up preventing metal fitting is then attached to the form 14 to prevent the form member 14 from floating upward. Next concrete is cast through a hole formed on the upper face of the form member 14. After the curing of concrete, the pressing metal fitting against side pressure and the floating up preventing metal fitting are removed. The form member 14 is made to survive for protecting the high balustrade and preventing the occurrence of crack in the concrete.

Description

【発明の詳細な説明】Detailed Description of the Invention

【産業上の利用分野】本発明は、鉄筋コンクリート構造
物からなり、両端に背丈の高い欄干(以下、高欄干とい
う)を有する型式の高架橋や橋梁における該高欄干部分
の構造及びその施工方法の改良に関し、更に詳しくは欄
干を形成する部材として型枠材を残存させることにより
該高欄干部分の施工性を向上させた前記コンクリート構
造物の高欄干部分の構造及びその施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is to improve the structure of the elevated balustrade part of a type of viaduct or bridge which is composed of a reinforced concrete structure and has a tall balustrade at both ends (hereinafter referred to as elevated balustrade) and its construction method. More specifically, the present invention relates to the structure of the high balustrade part of the concrete structure in which the workability of the high balustrade part is improved by leaving a form material as a member forming the balustrade, and a construction method thereof.

【0002】[0002]

【従来の技術】高架橋や橋梁等のコンクリート構造物で
は、通行の安全を保障するために床版の両端に欄干を設
けている。この欄干は安全性の一層の保障のために比較
的背丈の高い、いわゆる高欄干となっているものが多
い。
2. Description of the Related Art In concrete structures such as viaducts and bridges, balustrades are provided at both ends of a floor slab to ensure the safety of traffic. Many of these balustrades are so-called high balustrades, which are relatively tall to further ensure safety.

【0003】これを図9で説明すると、高架橋や橋梁等
のコンクリート構造物1の両端には長手方向に延びる高
欄干2が床版3と一体的に形成されている。該高欄干2
の形状には種々のものがあり、この図例のものでは高欄
干2の基端部に段差4が形成されているが、図10に示
すように段差のない形状の高欄干2Aとすることもでき
るし、図11で示すように傾斜面5を有する高欄干2B
とすることもできる。
To explain this with reference to FIG. 9, a balustrade 2 extending in the longitudinal direction is integrally formed with a floor slab 3 at both ends of a concrete structure 1 such as a viaduct or a bridge. The high balustrade 2
There are various shapes, and in this example, a step 4 is formed at the base end portion of the balustrade 2. However, as shown in FIG. 10, the balustrade 2A having a stepless shape should be used. A balustrade 2B having an inclined surface 5 as shown in FIG.
Can also be

【0004】このような高欄干2、2A、2Bを床版3
の端部に施工する方式には大きく分けて2方式がある。
即ち、第1の方式は床版3に型枠を組み、これにコンク
リートを打設することによって高欄干を施工するもので
あり、第2の方式はプレキャストの高欄干ブロックを現
場で床版3に組み付けて設置する方式である。
Such a balustrade 2, 2A, 2B is attached to the floor slab 3
There are roughly two types of methods to be applied to the ends of the.
That is, the first method is to construct a balustrade by assembling a formwork on the floor slab 3 and placing concrete on it, and the second method is to construct a precast balustrade block on the floor slab 3 on site. It is a method of installing by assembling to.

【0005】プレキャストの高欄干ブロックを使用する
第2の方式は強度や安全性の点で好ましいものとはいえ
ないので、現在では型枠を設けて該型枠内にコンクリー
トを打設して高欄干を形成する第1の方式が多く採用さ
れている。
Since the second method using the precast balustrade block is not preferable in terms of strength and safety, at present, a mold is provided and concrete is placed in the mold to raise the height. The first method of forming the balustrade is often used.

【0006】従来、床版3の両端に高欄干2をコンクリ
ートを打設施工するには次のようになされていた。即
ち、図12を参照して、床版3の両端には鉄筋6が該床
版3を打設する際に予め設置されており、該鉄筋6を囲
んで型枠7を設置する。この型枠7の設置及び撤去はコ
ンクリート構造物1の床版3をコンクリ−ト打設する際
に使用される支保工や足場8(以下、これらを足場等と
いう)を利用して型枠を組立て、撤去している。
Conventionally, the balustrade 2 is placed on both ends of the floor slab 3 by placing concrete in the following manner. That is, referring to FIG. 12, reinforcing bars 6 are installed at both ends of the floor slab 3 in advance when the floor slab 3 is placed, and a form 7 is installed so as to surround the reinforcing bars 6. This formwork 7 is installed and removed by using scaffolding 8 and scaffolding 8 (hereinafter referred to as scaffolding etc.) used when concretely placing the floor slab 3 of the concrete structure 1. It is being assembled and removed.

【0007】このように、従来公知の施工方法では高欄
干を形成するコンクリ−トを養生した後、足場等8を利
用して型枠7を撤去、解体するので、型枠7の撤去作業
を行うまでの期間だけ、足場等8を残存させて置くのが
通常であり、かつその撤去作業は作業員の落下等の危険
のないように工夫されているものとなっている。
As described above, in the conventionally known construction method, after the concrete forming the balustrade is cured, the formwork 7 is removed and dismantled using the scaffolding 8 or the like. It is usual to leave the scaffolding 8 and the like left for only the period until it is carried out, and the removal work is devised so that there is no danger of the worker falling.

【0008】又、上記従来公知の高欄干2の現場施工に
おいては、図12に示すように型枠7が、木型材7A、
端太角7B、木コン7C、座金7D、セパレ−タ−7E
等により構成されており、これら多数の部材を撤去しな
ければならないために撤去作業に時間がかかるものとな
っている。
Further, in the construction of the above-mentioned conventionally known balustrade 2, on the site construction, as shown in FIG.
Edged corner 7B, wooden contact 7C, washer 7D, separator 7E
Since it is necessary to remove a large number of these members, the removal work takes time.

【発明が解決しようとする課題】[Problems to be Solved by the Invention]

【0009】上記のような従来公知の高欄干の施工方法
によると、以下のように問題点があった。先ず、施工の
工程上、足場等8の残っている間に施工しなければなら
ず、工期的に制約がある上、しかも高欄干のコンクリー
トの養生期間だけ足場等8を残存させなければならない
ので、その分期間が長くなって全体的に工期の期間が長
期間となったり、コストアップとなってしまう。
According to the above-mentioned conventional construction method of the balustrade, there are the following problems. First of all, due to the construction process, construction must be performed while the scaffolding 8 remains, because there are restrictions on the construction period, and moreover, the scaffolding 8 must remain for the curing period of the concrete of the balustrade. As a result, the period becomes longer and the construction period becomes longer as a whole, and the cost increases.

【0010】しかも、前記従来公知の高欄干の施工方法
では、足場等8の必要性がある上、型枠7を構成する木
型材7A、端太角7B、木コン7C、座金7D、セパレ
−タ−7E等の多くの部材を要することから、この面で
も型枠7の組立て、解体に多くの時間がかかっている。
Moreover, in the above-mentioned conventional method of constructing a balustrade, there is a need for scaffolding 8 and the like, and in addition, the wood shape material 7A, the thick corners 7B, the wooden corners 7C, the washers 7D, and the separator 7 which compose the formwork 7. Since many members such as the turret 7E are required, it takes a lot of time to assemble and disassemble the mold frame 7 also in this aspect.

【0011】又、コンクリートは外気に触れて時間の経
過と共に中性化し、埋設された鉄筋に錆びが生じてコン
クリート表面にクラックが生ずるおそれがある。
Further, the concrete is exposed to the outside air and becomes neutral with the passage of time, and there is a possibility that the buried reinforcing bar is rusted and a crack is generated on the concrete surface.

【0012】更に又、高欄干に着色や模様を施す場合、
高欄干をコンクリートで形成した後に着色作業や模様の
設置作業を行わなければならず、現場でこれらの作業を
行うには作業上の困難があり、施工期間が長くなってし
まう。
Furthermore, when coloring or designing the balustrade,
After forming the balustrade with concrete, it is necessary to perform coloring work and pattern installation work, and it is difficult to perform these works on site, and the construction period becomes long.

【0013】そこで、本発明の目的は前記欠点を改善
し、外部へ延びる足場等を不要とし、作業効率のよい高
欄干の構造及びその施工方法を提供するにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a structure of a high balustrade and a method of constructing the balustrade, which improves the above-mentioned drawbacks, eliminates the need for a scaffold extending to the outside, and has good working efficiency.

【0014】[0014]

【課題を解決するための手段】本発明の特徴とする高欄
干の構造は、以下の点にある。先ず、コンクリート構造
物の床版の端部に長手方向に延びる高欄干用の鉄筋を予
め立設し、該鉄筋を取り囲んで型枠材を設置してコンク
リートを打設し、高欄干を現場打ちで形成してなる高欄
干を有するコンクリート構造物において、型枠材がガラ
ス繊維製や強化コンクリート製あるいは強化プラスチッ
ク製からなり、該型枠材を残存させて高欄干と一体に形
成してなることを特徴とする高欄干を有するコンクリー
ト構造物における高欄干の構造。
The structure of a balustrade which is a feature of the present invention is as follows. First, a reinforcing bar for a balustrade that extends in the longitudinal direction is set up in advance at the end of a slab of a concrete structure, a form material is placed around the reinforcing bar, concrete is placed, and a balustrade is cast on site. In a concrete structure having a balustrade formed in 1., the formwork material is made of glass fiber, reinforced concrete or reinforced plastic, and the formwork material is left and formed integrally with the balustrade. Of a balustrade in a concrete structure having a balustrade characterized by.

【0015】次に、本発明の特徴とする高欄干の施工方
法は以下の点にある。コンクリート構造物の床版の端部
に長手方向に延びる高欄干用の鉄筋を予め立設し、該鉄
筋を取り囲んで型枠材を設置してコンクリートを打設し
て高欄干を形成する施工方法において、ガラス繊維製や
強化コンクリート製あるいは強化プラスチック製からな
る型枠材を鉄筋に被せて配置し、次に、設置された前記
型枠材にコンクリートの投入開口からコンクリートを打
設し、コンクリートの養生後に型枠材を残すことにより
該型枠材を高欄干の外面としてなることを特徴とする高
欄干を有するコンクリート構造物における高欄干部分の
施工方法。
Next, the method of constructing a balustrade, which is a feature of the present invention, is as follows. A construction method in which a reinforcing bar for a balustrade extending in the longitudinal direction is erected in advance at the end of the floor slab of a concrete structure, and a form material is placed around the reinforcing bar and concrete is cast to form a balustrade. In, in place the frame material made of glass fiber or reinforced concrete or reinforced plastic is placed over the rebar, and then place concrete from the concrete input opening to the installed form material, A method for constructing a balustrade part in a concrete structure having a balustrade, wherein the formwork material is left as an outer surface of the balustrade after curing.

【0016】[0016]

【実施例】以下、図によって本発明の一実施例について
説明する。図1は本発明の一実施例になる高欄干の断面
図である。図において、コンクリート構造物11の床版
12の端部には鉄筋13が立設されており、該鉄筋13
を埋設した状態で高欄干Kが形成されている。高欄干K
の外面には型枠14が残存しており、高欄干Kは型枠1
4と一体に形成されている。型枠14の内面には補強材
15が設けられ、型枠14の強度を向上させている。補
強材は必ずしも必要な構成ではない。型枠14の外面に
は必要に応じて、着色あるいは模様等が施されている。
この着色あるいは模様等は、型枠を工場で製造する際に
付されることが望ましい。
An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a sectional view of a balustrade according to an embodiment of the present invention. In the figure, a reinforcing bar 13 is erected at the end of the floor slab 12 of the concrete structure 11.
A balustrade K is formed in a state in which is embedded. Balustrade K
The formwork 14 remains on the outer surface of the
It is formed integrally with 4. A reinforcing material 15 is provided on the inner surface of the mold 14 to improve the strength of the mold 14. The reinforcing material is not always necessary. The outer surface of the mold 14 is colored or patterned as required.
It is desirable that this coloring, pattern, or the like be added when the mold is manufactured at the factory.

【0017】次に、上記本発明の高欄干の施工方法につ
いて説明する。図2は本発明に使用される型枠材の一実
施例を示す斜視図であり、図3は図2の型枠材の内部を
示す斜視図である。図4は床版の端部に組み付けられた
状態の本発明の一実施例になる型枠を示す斜視図であ
る。図5は、型枠材を組み付ける前の状態の床版の端部
を示す断面図である。
Next, a method for constructing the balustrade of the present invention will be described. 2 is a perspective view showing an embodiment of the mold material used in the present invention, and FIG. 3 is a perspective view showing the inside of the mold material of FIG. FIG. 4 is a perspective view showing a formwork according to an embodiment of the present invention in a state of being assembled to the end portion of the floor slab. FIG. 5: is sectional drawing which shows the edge part of the floor slab in the state before attaching a form material.

【0018】図5を参照して、コンクリート構造物11
の床版12の端部には鉄筋13が長手方向に延びて予め
立設されている。この鉄筋13は、床版12をコンクリ
ート打設する際に予め設置して置き、床版12のコンク
リート打設と同時に下端付近だけ埋設設置するものであ
る。
Referring to FIG. 5, the concrete structure 11
At the end of the floor slab 12, a reinforcing bar 13 extends in the longitudinal direction and is erected in advance. The reinforcing bars 13 are installed and placed in advance when the floor slab 12 is poured into concrete, and are embedded only near the lower end at the same time when the floor slab 12 is poured into concrete.

【0019】図2ないし図4を参照して、本発明の方法
に使用される型枠材14は向い合って結合される2枚の
型枠材片14A、14Bとからなっている。該型枠材片
14A、14Bの内面には補強材15が組み込まれてお
り、上面には設置後にコンクリートを投入するための投
入開口16が設置されている。
2 to 4, the mold material 14 used in the method of the present invention comprises two mold material pieces 14A, 14B which are joined face to face. A reinforcing material 15 is incorporated on the inner surfaces of the mold material pieces 14A and 14B, and a charging opening 16 for charging concrete after installation is installed on the upper surface.

【0020】型枠材14はガラス繊維や、強化コンクリ
ート、強化プラスチック、耐食性の金属等適宜の材料で
構成されており、予め工場で製造された後現場に搬入さ
れるものである。
The form material 14 is made of an appropriate material such as glass fiber, reinforced concrete, reinforced plastic, and corrosion-resistant metal, and is manufactured in advance in a factory and then carried into the site.

【0021】上記型枠材14を使用してコンクリ−トを
打設し、本発明の高欄干を施工する方法は以下のとおり
である。先ず、型枠材14A、14Bを鉄筋13の両側
に向かいあわせて設置し、これを仮結合する。この場
合、型枠材14A、14Bを結合しておいて該結合した
状態の型枠材14を鉄筋13の上に被せてもよいし、型
枠材14A、14Bを別個に鉄筋の前後に設置した後に
互いに結合してもよい。そして、型枠14の長手方向端
部を端板17で閉鎖する。
The method of placing a concrete using the above-mentioned mold 14 and constructing the balustrade of the present invention is as follows. First, the form members 14A and 14B are installed facing each other on both sides of the reinforcing bar 13 and are temporarily joined. In this case, the form members 14A and 14B may be joined and the joined form member 14 may be placed on the rebar 13, or the form members 14A and 14B may be separately installed before and after the rebar. After that, they may be bonded to each other. Then, the longitudinal end of the mold 14 is closed by the end plate 17.

【0022】型枠材14には該型枠材14に投入された
コンクリートの側圧が作用する。そこで、型枠材14が
前後方向にずれないように側圧対抗押さえ金具18を設
置する。側圧対抗押さえ金具18は型枠材14の外形と
略同形状(少し大きい程度)の金属板からなっており、
型枠材14の前面、上面、後面にそれぞれ接して設けら
れている。側圧対抗押さえ金具18を設置した後、該側
圧対抗押さえ金具18のがたつきを防止するためにクサ
ビ19を側圧対抗押さえ金具18と型枠材14の表面と
の間に打ち込む。
The side pressure of the concrete put into the mold material 14 acts on the mold material 14. Therefore, the side pressure counter pressing metal fitting 18 is installed so that the mold material 14 does not shift in the front-rear direction. The side pressure counter pressing metal fitting 18 is made of a metal plate having a shape (slightly larger) substantially the same as the outer shape of the mold material 14,
It is provided in contact with the front surface, the upper surface, and the rear surface of the mold member 14, respectively. After the side pressure counter pressing metal fitting 18 is installed, a wedge 19 is driven between the side pressure counter pressing metal fitting 18 and the surface of the mold member 14 in order to prevent rattling of the side pressure counter pressing metal fitting 18.

【0023】続いて、型枠材14が所定の線形(例え
ば、一直線や僅かに曲がった円形等)に配置されるよう
に長手方向に延びる角棒状の通り調整金具20を取り付
ける。通り調整金具20は、止め具21によって側圧対
抗押さえ金具18に止め付けられる。
Then, the adjustment fitting 20 is attached as a rectangular rod extending in the longitudinal direction so that the formwork material 14 is arranged in a predetermined linear shape (for example, a straight line or a slightly curved circle). The passage adjustment fitting 20 is fixed to the lateral pressure counter pressing fitting 18 by a stopper 21.

【0024】更に、図6に示すように、型枠材14の上
方への浮き上がり防止のために浮き上がり防止金具22
を取付ける。この浮き上がり防止金具22は、所定の材
料(金属や強化プラスチック、その他金属で補強した木
材でも良い)で製作された板状体からなっており、上下
に延びて床版12の下面と型枠材14の上面に接して設
置されるものである。
Further, as shown in FIG. 6, a floating prevention metal fitting 22 is provided to prevent the molding material 14 from floating upward.
Install. The floating prevention metal fitting 22 is made of a plate-like body made of a predetermined material (metal, reinforced plastic, or wood reinforced with metal), and extends vertically to form the bottom surface of the floor slab 12 and the formwork material. It is installed in contact with the upper surface of 14.

【0025】浮き上がり防止金具22の上面には微調整
ナット23が螺合されており、この微調整ナット23を
回転させて型枠材14の上面との間の隙間の微調整を行
う。又、通り調整金具20の位置調整を行うために通り
微調整部材24が設けられており、この通り微調整部材
24を回転させることにより通り調整金具20が所定の
線形状態で取り付けられるように微調整する。通り微調
整部材24は、この実施例では通り調整金具20に結合
されるねじ部分24Aと、床版12に埋設されたアンカ
ー25に連結されるねじ部分24Bと、該2本のねじ部
分24A、24Bと螺合する筒ねじ部材24Cとからな
っており、該筒ねじ部材24Cを回転させることにより
通り調整金具20の位置調整を行うものである。
A fine adjustment nut 23 is screwed onto the upper surface of the lifting prevention fitting 22, and the fine adjustment nut 23 is rotated to finely adjust the gap between the upper surface of the mold member 14 and the upper surface. A fine adjustment member 24 is provided to adjust the position of the passage adjustment fitting 20. By rotating the fine adjustment member 24, the passage adjustment fitting 20 is finely attached in a predetermined linear state. adjust. In this embodiment, the passage fine adjustment member 24 includes a screw portion 24A coupled to the passage adjustment fitting 20, a screw portion 24B connected to the anchor 25 embedded in the floor slab 12, and the two screw portions 24A, 24B and a cylindrical screw member 24C screwed together, and the position of the adjusting metal fitting 20 is adjusted by rotating the cylindrical screw member 24C.

【0026】上記作業が終了すると、次に、コンクリー
トの投入開口16からコンクリ−トを打設し、養成存置
期間経過後に型枠材14を残して側圧対抗押さえ金具1
8及び浮き上がり防止金具21等を撤去する。これら側
圧対抗押さえ金具18及び浮き上がり防止金具21等の
撤去作業は、足場がなくとも床版12の上で行うことが
できるので、簡単、安全、かつ迅速に行うことができる
ものである。
When the above-mentioned work is completed, a concrete is next placed from the concrete injection opening 16 and the mold material 14 is left after the elapse of the training storage period.
8 and lifting prevention metal fittings 21 etc. are removed. Since the removal work of the side pressure counter pressing metal fittings 18, the lifting prevention metal fittings 21 and the like can be performed on the floor slab 12 without a scaffold, it can be performed easily, safely and quickly.

【0027】上記実施例のものでは、高欄干に段差が形
成されていないが、図7に示すような型枠材14Cを使
用すると、該型枠材14Cの段差部14Dにより高欄干
の段差部分を残存形成できるものとなり、これも本発明
に含まれるものである。
In the above embodiment, no steps are formed on the balustrade, but when a mold frame material 14C as shown in FIG. 7 is used, the stepped portion 14D of the mold frame material 14C causes a stepped portion of the balustrade. Can be formed by residual formation, which is also included in the present invention.

【0028】又、図8に示す型枠材14Eを使用する
と、該型枠材14Eの斜面部14Fによって高欄干の斜
面部を残存形成できるものとなり、これも本発明に含ま
れるものである。
Further, when the mold frame member 14E shown in FIG. 8 is used, the slope part 14F of the mold frame member 14E allows the slope part of the balustrade to remain, which is also included in the present invention.

【0029】[0029]

【発明の効果】以上に説明したように本発明による以下
のような効果がある。作業が全て床版上でできるため、
外部足場が不用となり安全である。又、外部足場を残存
させる期間が短くなり、経済的である。そして作業工程
が単純であるため能率的で施工性が向上する。更に、コ
ンクリートの表面が型枠材によって覆われているので、
コンクリートが直接外部に露出することがなく、従って
コンクリートの中性化によるクラックが生じない。この
ため、長期にわたって美麗な外観が得られるものとな
る。
As described above, the following effects are provided by the present invention. Since all the work can be done on the floor slab,
External scaffolding is unnecessary and safe. Moreover, the period for which the external scaffold remains is shortened, which is economical. And since the work process is simple, it is efficient and the workability is improved. Furthermore, since the surface of the concrete is covered by the formwork material,
The concrete is not directly exposed to the outside, and therefore cracks due to carbonation of the concrete do not occur. Therefore, a beautiful appearance can be obtained for a long period of time.

【0030】型枠材の外面に予め着色や模様を付したも
のでは、該着色や模様を付す工程が簡単隣、この点にお
いても工期の短縮が得られると共に、高欄干の品質低下
がなくなる。
In the case where the outer surface of the form material is colored or patterned in advance, the step of coloring or patterning is adjacent, and in this respect as well, the construction period can be shortened and the quality of the high balustrade is eliminated.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明の一実施例になる高欄干の構造
を示す断面図である。
FIG. 1 is a sectional view showing a structure of a balustrade according to an embodiment of the present invention.

【図2】図2は、本発明の一実施例になる型枠材の斜視
図である。
FIG. 2 is a perspective view of a mold material according to an embodiment of the present invention.

【図3】図3は、図2の型枠材の内面を示す斜視図であ
る。
FIG. 3 is a perspective view showing an inner surface of the form material of FIG.

【図4】図4は、本発明の施工方法を説明する斜視図で
ある。
FIG. 4 is a perspective view illustrating a construction method of the present invention.

【図5】図5は、本発明の高欄干を施工する前の状態に
おける床版端部を示す断面図である。
FIG. 5 is a cross-sectional view showing an end portion of the floor slab in a state before the balustrade of the present invention is applied.

【図6】図6は、本発明の施工方法を示す断面図であ
る。
FIG. 6 is a cross-sectional view showing a construction method of the present invention.

【図7】図7は、本発明の他の実施例になる型枠材を示
す斜視図である。
FIG. 7 is a perspective view showing a mold material according to another embodiment of the present invention.

【図8】図8は、本発明の更に他の実施例になる型枠材
を示す斜視図である。
FIG. 8 is a perspective view showing a mold material according to still another embodiment of the present invention.

【図9】図9は、公知の高欄干を示す斜視図である。FIG. 9 is a perspective view showing a known balustrade.

【図10】図10は、他の公知の高欄干を示す斜視図で
ある。
FIG. 10 is a perspective view showing another known balustrade.

【図11】図11は、更に他の公知の高欄干を示す斜視
図である。
FIG. 11 is a perspective view showing still another known balustrade.

【図12】図12は、従来公知の高欄干の施工方法を説
明するための斜視図である。
FIG. 12 is a perspective view for explaining a conventionally known method of constructing a balustrade.

【符号の説明】 11 コンクリート構造物 12 床版 13 鉄筋 14 型枠材 15 補強材 16 コンクリート投入開口 17 端板 18 側圧対抗押さえ金具 19 くさび 20 通り調整金具 21 止め具 22 浮き上がり防止金具 23 微調整ナット 24 通り微調整部材 25 アンカー[Explanation of Codes] 11 Concrete Structure 12 Floor Slab 13 Reinforcing Bar 14 Formwork Material 15 Reinforcement Material 16 Concrete Input Aperture 17 End Plate 18 Side Pressure Counter Pressing Metal Fitting 19 Wedge 20 Adjusting Metal Fitting 21 Stopper Lifting Metal Fitting 23 Fine Adjustment Nut 24 ways Fine adjustment member 25 Anchor

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成6年3月16日[Submission date] March 16, 1994

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Name of item to be amended] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】発明の詳細な説明[Name of item to be amended] Detailed explanation of the invention

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート構造
物からなり、両端に背丈の高い欄干(以下、高欄干とい
う)を有する型式の高架橋や橋梁における該高欄干部分
の構造及びその施工方法の改良に関し、更に詳しくは欄
干を形成する部材として型枠材を残存させることにより
該高欄干部分の施工性を向上させた前記コンクリート構
造物の高欄干部分の構造及びその施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is to improve the structure of the elevated balustrade part of a type of viaduct or bridge which is composed of a reinforced concrete structure and has a tall balustrade at both ends (hereinafter referred to as elevated balustrade) and its construction method. More specifically, the present invention relates to the structure of the high balustrade part of the concrete structure in which the workability of the high balustrade part is improved by leaving a form material as a member forming the balustrade, and a construction method thereof.

【0002】[0002]

【従来の技術】高架橋や橋梁等のコンクリート構造物で
は、通行の安全を保障するために床版の両端に欄干を設
けている。この欄干は安全性の一層の保障のために比較
的背丈の高い、いわゆる高欄干となっているものが多
い。
2. Description of the Related Art In concrete structures such as viaducts and bridges, balustrades are provided at both ends of a floor slab to ensure the safety of traffic. Many of these balustrades are so-called high balustrades, which are relatively tall to further ensure safety.

【0003】これを図9で説明すると、高架橋や橋梁等
のコンクリート構造物1の両端には長手方向に延びる高
欄干2が床版3と一体的に形成されている。該高欄干2
の形状には種々のものがあり、この図例のものでは高欄
干2の基端部に段差4が形成されているが、図10に示
すように段差のない形状の高欄干2Aとすることもでき
るし、図11で示すように傾斜面5を有する高欄干2B
とすることもできる。
To explain this with reference to FIG. 9, a balustrade 2 extending in the longitudinal direction is integrally formed with a floor slab 3 at both ends of a concrete structure 1 such as a viaduct or a bridge. The high balustrade 2
There are various shapes, and in this example, a step 4 is formed at the base end portion of the balustrade 2. However, as shown in FIG. 10, the balustrade 2A having a stepless shape should be used. A balustrade 2B having an inclined surface 5 as shown in FIG.
Can also be

【0004】このような高欄干2、2A、2Bを床版3
の端部に施工する方式には大きく分けて2方式がある。
即ち、第1の方式は床版3に型枠を組み、これにコンク
リートを打設することによって高欄干を施工するもので
あり、第2の方式はプレキャストの高欄干ブロックを現
場で床版3に組み付けて設置する方式である。
Such a balustrade 2, 2A, 2B is attached to the floor slab 3
There are roughly two types of methods to be applied to the ends of the.
That is, the first method is to construct a balustrade by assembling a formwork on the floor slab 3 and placing concrete on it, and the second method is to construct a precast balustrade block on the floor slab 3 on site. It is a method of installing by assembling to.

【0005】プレキャストの高欄干ブロックを使用する
第2の方式は強度や安全性の点で好ましいものとはいえ
ないので、現在では型枠を設けて該型枠内にコンクリー
トを打設して高欄干を形成する第1の方式が多く採用さ
れている。
Since the second method using the precast balustrade block is not preferable in terms of strength and safety, at present, a mold is provided and concrete is placed in the mold to raise the height. The first method of forming the balustrade is often used.

【0006】従来、床版3の両端に高欄干2コンクリ
ートを打設施工するには次のようになされていた。即
ち、図12を参照して、床版3の両端には鉄筋6が該床
版3を打設する際に予め設置されており、該鉄筋6を囲
んで型枠7を設置する。この型枠7の設置及び撤去はコ
ンクリート構造物1の床版3をコンクリート打設する際
に使用される支保工や足場8(以下、これらを足場等と
いう)を利用して型枠を組立て、撤去している。
Conventionally, the construction of placing the concrete of the balustrade 2 on both ends of the floor slab 3 was carried out as follows. That is, referring to FIG. 12, reinforcing bars 6 are installed at both ends of the floor slab 3 in advance when the floor slab 3 is placed, and a form 7 is installed so as to surround the reinforcing bars 6. This form 7 is installed and removed by assembling the form using scaffolding 8 and scaffolds 8 (hereinafter referred to as scaffolds, etc.) that are used when placing the slab 3 of the concrete structure 1 in concrete. Has been removed.

【0007】このように、従来公知の施工方法では高欄
干を形成するコンクリートを養生した後、足場等8を利
用して型枠7を撤去、解体するので、型枠7の撤去作業
を行うまでの期間だけ、足場等8を残存させて置くのが
通常であり、かつその撤去作業は作業員の落下等の危険
のないように工夫されているものとなっている。
As described above, in the conventionally known construction method, after the concrete forming the balustrade is cured, the formwork 7 is removed and dismantled by using the scaffolding 8 or the like. Therefore, until the formwork 7 is removed. It is usual to leave the scaffolding 8 and the like left for only the period of 1), and the removal work is devised so that there is no danger of workers falling.

【0008】又、上記従来公知の高欄干2の現場施工に
おいては、図12に示すように型枠7が、木型材7A、
端太角7B、木コン7C、座金7D、セパレーター7E
等により構成されており、これら多数の部材を撤去しな
ければならないために撤去作業に時間がかかるものとな
っている。
Further, in the construction of the above-mentioned conventionally known balustrade 2, on the site construction, as shown in FIG.
Edged corner 7B, wooden contact 7C, washer 7D, separator 7E
Since it is necessary to remove a large number of these members, the removal work takes time.

【発明が解決しようとする課題】[Problems to be Solved by the Invention]

【0009】上記のような従来公知の高欄干の施工方法
によると、以下のように問題点があった。先ず、施工の
工程上、足場等8の残っている間に施工しなければなら
ず、工期的に制約がある上、しかも高欄干のコンクリー
トの養生期間だけ足場等8を残存させなければならない
ので、その分期間が長くなって全体的に工期の期間が長
期間となったり、コストアップとなってしまう。
According to the above-mentioned conventional construction method of the balustrade, there are the following problems. First of all, due to the construction process, construction must be performed while the scaffolding 8 remains, because there are restrictions on the construction period, and moreover, the scaffolding 8 must remain for the curing period of the concrete of the balustrade. As a result, the period becomes longer and the construction period becomes longer as a whole, and the cost increases.

【0010】しかも、前記従来公知の高欄干の施工方法
では、足場等8の必要性がある上、型枠7を構成する木
型材7A、端太角7B、木コン7C、座金7D、セパレ
ーター7E等の多くの部材を要することから、この面で
も型枠7の組立て、解体に多くの時間がかかっている。
In addition, in the above-mentioned conventional method of constructing a balustrade, there is a need for scaffolding 8 and the like, and in addition, a wood pattern material 7A, a corner corner 7B, a wooden corner 7C, a washer 7D, a separator 7E which form the formwork 7. Since many members such as the above are required, it takes much time to assemble and dismantle the mold frame 7 also in this aspect.

【0011】又、コンクリートは外気に触れて時間の経
過と共に中性化し、埋設された鉄筋に錆びが生じて膨張
コンクリート表面にクラックが生ずるおそれがある。
Further, the concrete is exposed to the outside air and becomes neutral with the lapse of time, causing rust on the buried reinforcing bars and expanding.
However, cracks may occur on the concrete surface.

【0012】更に又、高欄干に着色や模様を施す場合、
高欄干をコンクリートで形成した後に着色作業や模様の
設置作業を行わなければならず、現場でこれらの作業を
行うには作業上の困難があり、施工期間が長くなってし
まう。
Furthermore, when coloring or designing the balustrade,
After forming the balustrade with concrete, it is necessary to perform coloring work and pattern installation work, and it is difficult to perform these works on site, and the construction period becomes long.

【0013】そこで、本発明の目的は前記欠点を改善
し、外部へ延びる足場等を不要とし、作業効率のよい高
欄干の構造及びその施工方法を提供するにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a structure of a high balustrade and a method of constructing the balustrade, which improves the above-mentioned drawbacks, eliminates the need for a scaffold extending to the outside, and has good working efficiency.

【0014】[0014]

【課題を解決するための手段】本発明の特徴とする高欄
干の構造は、以下の点にある。先ず、コンクリート構造
物の床版の端部に長手方向に延びる高欄干用の鉄筋を予
め立設し、該鉄筋を取り囲んで型枠材を設置してコンク
リートを打設し、高欄干を現場打ちで形成してなる高欄
干を有するコンクリート構造物において、型枠材がガラ
ス繊維強化プラスチックからなり、該型枠材を残存させ
て高欄干と一体に形成してなることを特徴とする高欄干
を有するコンクリート構造物における高欄干の構造。
The structure of a balustrade which is a feature of the present invention is as follows. First, a reinforcing bar for a balustrade that extends in the longitudinal direction is set up in advance at the end of a slab of a concrete structure, a form material is placed around the reinforcing bar, concrete is placed, and a balustrade is cast on site. in concrete structure having a high balustrades in made by forming, mold material Gala
A structure of a balustrade in a concrete structure having a balustrade, which is made of fiber reinforced plastic and is formed integrally with the balustrade by leaving the formwork material.

【0015】次に、本発明の特徴とする高欄干の施工方
法は以下の点にある。コンクリート構造物の床版の端部
に長手方向に延びる高欄干用の鉄筋を予め立設し、該鉄
筋を取り囲んで型枠材を設置してコンクリートを打設し
て高欄干を形成する施工方法において、ガラス繊維強化
プラスチックからなる型枠材を鉄筋に被せて配置し、次
に、設置された前記型枠材にコンクリートの投入開口か
らコンクリートを打設し、コンクリートの養生後に型枠
材を残すことにより該型枠材を高欄干の外面としてなる
ことを特徴とする高欄干を有するコンクリート構造物に
おける高欄干部分の施工方法。
Next, the method of constructing a balustrade, which is a feature of the present invention, is as follows. A construction method in which a reinforcing bar for a balustrade extending in the longitudinal direction is erected in advance at the end of the floor slab of a concrete structure, and a form material is placed around the reinforcing bar and concrete is cast to form a balustrade. Fiberglass reinforced in
Placing a formwork material made of plastic on the reinforcing bar, then placing concrete from the concrete input opening into the installed formwork material, and leaving the formwork material after curing the concrete A method for constructing a balustrade part in a concrete structure having a balustrade, characterized in that the timber is used as the outer surface of the balustrade.

【0016】[0016]

【実施例】以下、図によって本発明の一実施例について
説明する。図1は本発明の一実施例になる高欄干の断面
図である。図において、コンクリート構造物11の床版
12の端部には鉄筋13が立設されており、該鉄筋13
を埋設した状態で高欄干Kが形成されている。ここでい
う、コンクリート構造物11には高架橋、橋梁、高架道
路、盛り上げて建設された高速道路、等の他、両端ある
いは中央に側壁を形成する形式の道路に使用されている
コンクリート構造物も含めて称するものである。そし
て、高欄干Kには側壁も含むものである。高欄干Kの外
面には型枠14が残存しており、高欄干Kは型枠14と
一体に形成されている。型枠14の内面には補強材15
が設けられ、型枠14の強度を向上させている。補強材
15は型枠14の内面に一体にリブを構成するものであ
っても良いし、別体の部材を型枠14の内面に付設ある
いは埋設する構造としても良い。尚、補強材15は必ず
しも必要不可欠なものではなく、型枠14の強度如何に
よっては省略することも可能であり、本発明には補強材
15を省略したものも含まれる。型枠14の外面には必
要に応じて、着色あるいは模様等が施されている。この
着色あるいは模様等は、型枠を工場で製造する際に付さ
れることが望ましい。
An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a sectional view of a balustrade according to an embodiment of the present invention. In the figure, a reinforcing bar 13 is erected at the end of the floor slab 12 of the concrete structure 11.
A balustrade K is formed in a state in which is embedded. Stay here
The concrete structure 11 has viaducts, bridges and elevated roads.
Roads, elevated expressways, etc., as well as both ends
Or used for the type of road that forms a side wall in the center
It also includes the concrete structure. That
The balustrade K also includes the side wall. The formwork 14 remains on the outer surface of the balustrade K, and the balustrade K is formed integrally with the formwork 14. Reinforcing material 15 is provided on the inner surface of the mold 14.
Is provided to improve the strength of the mold 14. Reinforcement material
Reference numeral 15 denotes a rib integrally formed on the inner surface of the mold 14.
Alternatively, a separate member may be attached to the inner surface of the formwork 14.
Alternatively, the structure may be buried. In addition, the reinforcing material 15 must be
However, the strength of the formwork 14 is not essential.
Therefore, it is possible to omit it.
Those in which 15 is omitted are also included. The outer surface of the mold 14 is colored or patterned as required. It is desirable that this coloring, pattern, or the like be added when the mold is manufactured at the factory.

【0017】次に、上記本発明の高欄干の施工方法につ
いて説明する。図2は本発明に使用される型枠材の一実
施例を示す斜視図であり、図3は図2の型枠材の内部を
示す斜視図である。図4は床版の端部に組み付けられた
状態の本発明の一実施例になる型枠を示す斜視図であ
る。図5は、型枠材を組み付ける前の状態の床版の端部
を示す断面図である。
Next, a method for constructing the balustrade of the present invention will be described. 2 is a perspective view showing an embodiment of the mold material used in the present invention, and FIG. 3 is a perspective view showing the inside of the mold material of FIG. FIG. 4 is a perspective view showing a formwork according to an embodiment of the present invention in a state of being assembled to the end portion of the floor slab. FIG. 5: is sectional drawing which shows the edge part of the floor slab in the state before attaching a form material.

【0018】図5を参照して、コンクリート構造物11
の床版12の端部には鉄筋13が長手方向に延びて予め
立設されている。この鉄筋13は、床版12をコンクリ
ート打設する際に予め設置して置き、床版12のコンク
リート打設と同時に下端付近だけ埋設設置するものであ
る。
Referring to FIG. 5, the concrete structure 11
At the end of the floor slab 12, a reinforcing bar 13 extends in the longitudinal direction and is erected in advance. The reinforcing bars 13 are installed and placed in advance when the floor slab 12 is poured into concrete, and are embedded only near the lower end at the same time when the floor slab 12 is poured into concrete.

【0019】図2ないし図4を参照して、本発明の方法
に使用される型枠材14は向い合って結合される2枚の
型枠材片14A、14Bとからなっている。該型枠材片
14A、14Bの内面には補強材15が設けられてお
り、上面には設置後にコンクリートを投入するための投
入開口16が設置されている。投入開口16の形状は図
示の形状に限定されるものではなく、型枠材14の上面
の略全面にわたってスリット状に開口する形状も含むも
のである。
2 to 4, the mold material 14 used in the method of the present invention comprises two mold material pieces 14A, 14B which are joined face to face. Reinforcing materials 15 are provided on the inner surfaces of the mold piece pieces 14A and 14B, and a charging opening 16 for charging concrete after installation is installed on the upper surface. The shape of the charging opening 16 is
The shape is not limited to the shape shown, but the upper surface of the mold member 14
Including a shape that opens like a slit over almost the entire surface of
Of.

【0020】型枠材14はガラス繊維強化プラスチック
や、強化コンクリート、強化プラスチック、耐食性の金
属等適宜の材料で構成されており、予め工場で製造され
た後現場に搬入されるものである。これらの材料の内、
ガラス繊維強化プラスチックが強度、弾力性、可搬性等
の面で好ましい材料である。
The form material 14 is made of an appropriate material such as glass fiber reinforced plastic, reinforced concrete, reinforced plastic, and corrosion resistant metal, and is manufactured in a factory in advance and then carried into the site. Of these materials,
Glass fiber reinforced plastic has strength, elasticity, portability, etc.
It is a preferable material in terms of.

【0021】上記型枠材14を使用してコンクリートを
打設し、本発明の高欄干を施工する方法は以下のとおり
である。先ず、型枠材14A、14Bを鉄筋13の両側
に向かいあわせて設置し、これを仮結合する。この場
合、型枠材14A、14Bを結合しておいて該結合した
状態の型枠材14を鉄筋13の上に被せてもよいし、型
枠材14A、14Bを別個に鉄筋の前後に設置した後に
互いに結合してもよい。そして、型枠14の長手方向端
部を端板17で閉鎖する。
The method of placing concrete using the formwork material 14 and constructing the balustrade of the present invention is as follows. First, the form members 14A and 14B are installed facing each other on both sides of the reinforcing bar 13 and are temporarily joined. In this case, the form members 14A and 14B may be joined and the joined form member 14 may be placed on the rebar 13, or the form members 14A and 14B may be separately installed before and after the rebar. After that, they may be bonded to each other. Then, the longitudinal end of the mold 14 is closed by the end plate 17.

【0022】型枠材14には該型枠材14に投入された
コンクリートの側圧が作用する。そこで、型枠材14が
前後方向にずれないように側圧対抗押さえ部材18を設
置する。側圧対抗押さえ部材18はその内形が型枠材1
4の外形と略同形状(少し大きい程度)の形状となって
おり、型枠材14の前面、上面、後面にそれぞれ接して
設けられている。側圧対抗押さえ部材18を設置した
後、該側圧対抗押さえ部18のがたつきを防止するた
めにクサビ等の固定部材19を側圧対抗押さえ部材18
と型枠材14の表面との間に設置する
The side pressure of the concrete put into the mold material 14 acts on the mold material 14. Therefore, the lateral pressure counter pressing member 18 is installed so that the frame material 14 does not shift in the front-rear direction. The lateral pressure counter pressing member 18 has an inner shape of the form material 1
4 profile substantially the same shape as a shape of the (degree slightly larger)
And is provided in contact with the front surface, the upper surface, and the rear surface of the mold member 14, respectively. After placing a lateral pressure against the pressing member 18, the lateral pressure against the pressing member 18 from rattling pressing the lateral pressure against the fixing member 19 such as a wedge to prevent the member 18
Placed between the mold member 14 surface.

【0023】続いて、型枠材14が所定の線形(例え
ば、一直線や僅かに曲がった円形等)に配置されるよう
に長手方向に延びる角棒、ベルト、パイプ等からなる通
り調整部材20を取り付ける。通り調整部材20は、止
め具21によって側圧対抗押さえ部材18に止め付けら
れる。
Subsequently, the passage adjusting member 20 including a rectangular bar, a belt, a pipe, etc. extending in the longitudinal direction is arranged so that the formwork material 14 is arranged in a predetermined linear shape (for example, a straight line or a slightly curved circle). Install. The passage adjusting member 20 is fixed to the lateral pressure counter pressing member 18 by a stopper 21.

【0024】更に、図6に示すように、型枠材14の上
方への浮き上がり防止のために浮き上がり防止金具22
を取付ける。この浮き上がり防止金具22は、所定の材
料(金属や強化プラスチック、その他金属で補強した木
材でも良い)で製作された板状体からなっており、上下
に延びて床版12の下面と型枠材14の上面に接して設
置されるものである。
Further, as shown in FIG. 6, a floating prevention metal fitting 22 is provided to prevent the molding material 14 from floating upward.
Install. The floating prevention metal fitting 22 is made of a plate-like body made of a predetermined material (metal, reinforced plastic, or wood reinforced with metal), and extends vertically to form the bottom surface of the floor slab 12 and the formwork material. It is installed in contact with the upper surface of 14.

【0025】浮き上がり防止部材22の上面には微調整
ナット23が螺合されており、この微調整ナット23を
回転させて型枠材14の上面との間の隙間の微調整を行
う。又、通り調整部材20の位置調整を行うために通り
微調整部材24が設けられており、この通り微調整部材
24を回転させることにより通り調整部材20が所定の
線形状態で取り付けられるように微調整する。通り微調
整部材24は、この実施例では通り調整部材20に結合
されるねじ部分24Aと、床版12に埋設されたアンカ
ー25に連結されるねじ部分24Bと、該2本のねじ部
分24A、24Bと螺合する筒ねじ部材24Cとからな
っており、該筒ねじ部材24Cを回転させることにより
通り調整部材20の位置調整を行うものである。
A fine adjustment nut 23 is screwed onto the upper surface of the lifting prevention member 22, and the fine adjustment nut 23 is rotated to finely adjust the gap between the upper surface of the mold member 14 and the upper surface. Further, as the adjustment member and the fine adjusting member 24 as to adjust the position of 20 is provided, as through adjustment member 20 by rotating the street fine adjustment member 24 is attached at a predetermined linear state fine adjust. In this embodiment, the passage fine adjustment member 24 includes a screw portion 24A connected to the passage adjustment member 20, a screw portion 24B connected to an anchor 25 embedded in the floor slab 12, and the two screw portions 24A, 24B and a cylindrical screw member 24C screwed together, and the position of the adjusting member 20 is adjusted by rotating the cylindrical screw member 24C.

【0026】上記作業が終了すると、次に、コンクリー
トの投入開口16からコンクリートを打設し、養生存置
期間経過後に型枠材14を残して側圧対抗押さえ部材
8及び浮き上がり防止部材21等を撤去する。これら側
圧対抗押さえ部材18及び浮き上がり防止部材21等の
撤去作業は、足場がなくとも床版12の上で行うことが
できるので、簡単、安全、かつ迅速に行うことができる
ものである。
When the above-mentioned work is completed, concrete is next poured from the concrete input opening 16 and the side pressure counter-pressing member 1 is left with the form material 14 left after the culturing and survival period.
8 and the lifting prevention member 21 are removed. Since the removal work of the side pressure counter pressing member 18, the floating prevention member 21 and the like can be performed on the floor slab 12 without a scaffold, it can be performed easily, safely and quickly.

【0027】上記実施例のものでは、高欄干に段差が形
成されていないが、図7に示すような型枠材14Cを使
用すると、該型枠材14Cの段差部14Dにより高欄干
の段差部分を残存形成できるものとなり、これも本発明
に含まれるものである。尚、段差部14Dは型枠材14
Cの前後面に設ける他、型枠材14Cの前面にのみ段差
部14Dを設ける構造も含むものである。
In the above embodiment, no steps are formed on the balustrade, but when a mold frame material 14C as shown in FIG. 7 is used, the stepped portion 14D of the mold frame material 14C causes a stepped portion of the balustrade. Can be formed by residual formation, which is also included in the present invention. In addition, the step portion 14D is formed by the frame member 14
In addition to the front and rear surfaces of C, only the front surface of the mold material 14C is stepped.
The structure including the portion 14D is also included.

【0028】又、図8に示す型枠材14Eを使用する
と、該型枠材14Eの斜面部14Fによって高欄干の斜
面部を残存形成できるものとなり、これも本発明に含ま
れるものである。尚、斜面部14Fは型枠材14Eの前
後面に設ける他、型枠材14Eの前面にのみ斜面部14
Fを設ける構造も含むものである。
Further, when the mold frame member 14E shown in FIG. 8 is used, the slope part 14F of the mold frame member 14E allows the slope part of the balustrade to remain, which is also included in the present invention. The slope 14F is in front of the mold member 14E.
In addition to being provided on the rear surface, the slope portion 14 is provided only on the front surface of the mold material 14E.
It also includes a structure in which F is provided.

【0029】[0029]

【発明の効果】以上に説明したように本発明による
下のような効果がある。作業が全て床版上でできるた
め、外部足場が不用となり安全である。又、外部足場を
残存させる期間が短くなり、経済的である。そして作業
工程が単純であるため能率的で施工性が向上する。更
に、コンクリートの表面が型枠材によって覆われている
ので、コンクリートが直接外部に露出することがなく、
従ってコンクリートの中性化によるクラックが生じな
い。このため、長期にわたって美麗な外観が得られるも
のとなる。
As described above, according to the present invention is effective as following <br/> under the present invention. Since all the work can be done on the floor slab, external scaffolding is unnecessary and it is safe. Moreover, the period for which the external scaffold remains is shortened, which is economical. And since the work process is simple, it is efficient and the workability is improved. Furthermore, since the surface of the concrete is covered with the formwork material, the concrete is not directly exposed to the outside,
Therefore, cracks due to carbonation of concrete do not occur. Therefore, a beautiful appearance can be obtained for a long period of time.

【0030】型枠材の外面に予め着色や模様を付したも
のでは、該着色や模様を付す工程が簡単となり、この点
においても工期の短縮が得られると共に、高欄干の品質
低下がなくなる。
If the outer surface of the form material is pre-colored or patterned, the process of applying the color or pattern is simplified , and in this respect as well, the construction period can be shortened and the quality of the high balustrade is eliminated.

【手続補正3】[Procedure 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Name of item to be corrected] Brief description of the drawing

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明の一実施例になる高欄干の構造
を示す断面図である。
FIG. 1 is a sectional view showing a structure of a balustrade according to an embodiment of the present invention.

【図2】図2は、本発明の一実施例になる型枠材の斜視
図である。
FIG. 2 is a perspective view of a mold material according to an embodiment of the present invention.

【図3】図3は、図2の型枠材の内面を示す斜視図であ
る。
FIG. 3 is a perspective view showing an inner surface of the form material of FIG.

【図4】図4は、本発明の施工方法を説明する斜視図で
ある。
FIG. 4 is a perspective view illustrating a construction method of the present invention.

【図5】図5は、本発明の高欄干を施工する前の状態に
おける床版端部を示す断面図である。
FIG. 5 is a cross-sectional view showing an end portion of the floor slab in a state before the balustrade of the present invention is applied.

【図6】図6は、本発明の施工方法を示す断面図であ
る。
FIG. 6 is a cross-sectional view showing a construction method of the present invention.

【図7】図7は、本発明の他の実施例になる型枠材を示
す斜視図である。
FIG. 7 is a perspective view showing a mold material according to another embodiment of the present invention.

【図8】図8は、本発明の更に他の実施例になる型枠材
を示す斜視図である。
FIG. 8 is a perspective view showing a mold material according to still another embodiment of the present invention.

【図9】図9は、公知の高欄干を示す斜視図である。FIG. 9 is a perspective view showing a known balustrade.

【図10】図10は、他の公知の高欄干を示す斜視図で
ある。
FIG. 10 is a perspective view showing another known balustrade.

【図11】図11は、更に他の公知の高欄干を示す斜視
図である。
FIG. 11 is a perspective view showing still another known balustrade.

【図12】図12は、従来公知の高欄干の施工方法を説
明するための斜視図である。
FIG. 12 is a perspective view for explaining a conventionally known method of constructing a balustrade.

【符号の説明】 11 コンクリート構造物 12 床版 13 鉄筋 14 型枠材 15 補強材 16 コンクリート投入開口 17 端板 18 側圧対抗押さえ部材 19 固定部材 20 通り調整部材 21 止め具 22 浮き上がり防止部材 23 微調整ナット 24 通り微調整部材 25 アンカー ─────────────────────────────────────────────────────
[Explanation of Codes] 11 Concrete Structure 12 Floor Slab 13 Reinforcing Bar 14 Formwork Material 15 Reinforcing Material 16 Concrete Input Aperture 17 End Plate 18 Side Pressure Counter Pressing Member 19 Fixing Member 20 Passage Adjusting Member 21 Stopper 22 Lifting Prevention Member 23 Fine Adjustment Nut 24 Fine adjustment member 25 Anchor ─────────────────────────────────────────── ───────────

【手続補正書】[Procedure amendment]

【提出日】平成6年3月25日[Submission date] March 25, 1994

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図1[Name of item to be corrected] Figure 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図1】 [Figure 1]

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図2[Name of item to be corrected] Figure 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図2】 [Fig. 2]

【手続補正3】[Procedure 3]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図3[Name of item to be corrected] Figure 3

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図3】 [Figure 3]

【手続補正4】[Procedure amendment 4]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図6[Name of item to be corrected] Figure 6

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図6】 [Figure 6]

【手続補正5】[Procedure Amendment 5]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図7[Name of item to be corrected] Figure 7

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図7】 [Figure 7]

【手続補正6】[Procedure correction 6]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図8[Correction target item name] Figure 8

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図8】 [Figure 8]

Claims (11)

【特許請求の範囲】[Claims] 【請求項1】コンクリート構造物の床版の端部に長手方
向に延びる高欄干用の鉄筋を予め立設し、該鉄筋を取り
囲んで型枠材を設置してコンクリートを打設し、高欄干
を現場打ちで形成してなる高欄干を有するコンクリート
構造物において、 型枠材がガラス繊維製や強化コンクリート製あるいは強
化プラスチック製、耐食性の金属からなり、該型枠材を
残存させて高欄干と一体に形成してなることを特徴とす
る高欄干を有するコンクリート構造物における高欄干の
構造。
1. A balustrade for a balustrade that extends in the longitudinal direction is preliminarily provided at an end of a floor slab of a concrete structure, and a frame material is installed to surround the rebar, and concrete is poured to the balustrade. In a concrete structure having a balustrade formed by in-situ casting, the formwork material is made of glass fiber, reinforced concrete or reinforced plastic, corrosion-resistant metal, and the formwork material is left and A structure of a balustrade in a concrete structure having a balustrade characterized by being integrally formed.
【請求項2】型枠材が、内面に補強材を有することを特
徴とする請求項1記載の高欄干を有するコンクリート構
造物における高欄干の構造。
2. The structure of a balustrade in a concrete structure having a balustrade according to claim 1, wherein the formwork material has a reinforcing material on its inner surface.
【請求項3】型枠材が、外面に着色あるいは模様を有す
ることを特徴とする請求項1又は請求項2記載の高欄干
を有するコンクリート構造物における高欄干の構造。
3. The structure of a balustrade in a concrete structure having a balustrade according to claim 1 or 2, wherein the form material has coloring or a pattern on the outer surface.
【請求項4】コンクリート構造物の床版の端部に長手方
向に延びる高欄干用の鉄筋を予め立設し、該鉄筋を取り
囲んで型枠材を設置してコンクリートを打設して高欄干
を形成する施工方法において、 ガラス繊維製や強化コンクリート製あるいは強化プラス
チック製、耐食性の金属からなる型枠材を鉄筋に被せて
配置し、 次に、設置された前記型枠材にコンクリートの投入開口
からコンクリートを打設し、 コンクリートの養生後に型枠材を残すことにより該型枠
材を高欄干の外面としてなることを特徴とする高欄干を
有するコンクリート構造物における高欄干部分の施工方
法。
4. A balustrade for a balustrade which extends in the longitudinal direction at the end of a floor slab of a concrete structure, is preliminarily erected, and a frame material is placed around the rebar to place concrete on the balustrade. In the construction method for forming the, a frame material made of glass fiber, reinforced concrete or reinforced plastic, and a corrosion-resistant metal is placed on the rebar, and then the concrete material is placed into the above-mentioned installed frame material. A method for constructing a high balustrade portion in a concrete structure having a high balustrade, characterized in that the concrete material is cast as an outer surface of the balustrade by leaving the formwork material after curing the concrete.
【請求項5】コンクリート構造物の床版の端部に長手方
向に延びる高欄干用の鉄筋を予め立設し、該鉄筋を取り
囲んで型枠材を設置してコンクリートを打設して高欄干
を形成する施工方法において、 前後に分割されたガラス繊維製や強化コンクリート製あ
るいは強化プラスチック製、耐食性の金属からなる型枠
材を鉄筋の前後に配置して結合し、 次に、設置された前記型枠材が前後方向にずれないよう
に側圧対抗押さえ金具を設置し、 続いて、型枠材が上方へ浮き上がるのを防止するための
浮き上がり防止金具を取付け、 その後、型枠材の上面に形成されているコンクリートの
投入開口からコンクリートを打設し、 コンクリートの養生後に前記側圧対抗押さえ金具及び浮
き上がり防止金具を取り外し、 型枠材を残すことにより該型枠材を高欄干の外面として
なることを特徴とする高欄干を有するコンクリート構造
物における高欄干部分の施工方法。
5. A balustrade for a balustrade which extends in the longitudinal direction at the end of a floor slab of a concrete structure, is preliminarily erected, and a frame material is installed around the rebar to place concrete on the balustrade. In the construction method of forming the, formwork material made of glass fiber or reinforced concrete or reinforced plastic, which is divided in the front and rear, is arranged in front of and behind the rebar and is joined, and then the installed Install a side pressure counter-press fitting so that the form material does not shift in the front-rear direction, then attach a floating prevention fitting to prevent the form material from floating upward, and then form it on the upper surface of the form material. The concrete is poured through the concrete input opening, and after the concrete is cured, the side pressure countermeasure pressing metal fittings and the floating prevention metal fittings are removed, and the mold material is left to leave the mold material. Method of constructing a high balustrade part in the concrete structure having a high balustrade characterized by comprising as an outer surface of the balustrade.
【請求項6】側圧対抗押さえ金具のがたつきを防止する
ためにクサビを側圧対抗押さえ金具と型枠材の表面との
間に打ち込んでなることを特徴とする請求項5記載の高
欄干を有するコンクリート構造物における高欄干部分の
施工方法。
6. The balustrade according to claim 5, wherein a wedge is driven between the side pressure counter pressing metal fitting and the surface of the form material in order to prevent rattling of the side pressure counter pressing metal fitting. Construction method of high balustrade in concrete structure.
【請求項7】型枠材が一直線に配置されるように長手方
向に延びる角棒状の通り調整金具が設けられてなること
を特徴とする請求項5または請求項6記載の高欄干を有
するコンクリート構造物における高欄干部分の施工方
法。
7. A concrete having a balustrade according to claim 5 or 6, characterized in that an adjusting metal fitting is provided as a rectangular rod extending in the longitudinal direction so that the formwork materials are arranged in a straight line. Construction method of high balustrade part of structure.
【請求項8】浮き上がり防止金具に微調整ナットを取り
付け、この微調整ナットを回転させて高さの微調整を行
うことを特徴とする請求項5ないし請求項7記載の高欄
干を有するコンクリート構造物における高欄干部分の施
工方法。
8. A concrete structure having a balustrade according to claim 5, wherein a fine adjustment nut is attached to the lifting prevention fitting and the fine adjustment nut is rotated to finely adjust the height. Construction method for the high balustrade part of the building.
【請求項9】通り調整金具の位置調整を行うために通り
微調整金具が設けられ、この通り微調整金具を回転させ
て通り調整金具が所定の線形状態で取り付けられるよう
に微調整してなることを特徴とする請求項5ないし請求
項8記載の高欄干を有するコンクリート構造物における
高欄干部分の施工方法。
9. A fine adjustment metal fitting is provided to adjust the position of the passage adjustment metal fitting, and the fine adjustment metal fitting is rotated and finely adjusted so that the passage adjustment metal fitting is attached in a predetermined linear state. A method of constructing a balustrade portion in a concrete structure having a balustrade according to claim 5 to claim 8.
【請求項10】型枠材の内面に補強材を設けてなること
を特徴とする請求項4ないし請求項9記載の高欄干を有
するコンクリート構造物における高欄干部分の施工方
法。
10. A method of constructing a balustrade portion in a concrete structure having a balustrade according to claim 4, wherein a reinforcing material is provided on the inner surface of the formwork material.
【請求項11】型枠材の外面が予め着色、模様等が付さ
れてなることを特徴とする請求項4ないし請求項10記
載の高欄干を有するコンクリート構造物における高欄干
部分の施工方法。 【0001】
11. The method for constructing a high balustrade portion in a concrete structure having a high balustrade according to claim 4, wherein the outer surface of the formwork material is colored or patterned in advance. [0001]
JP12486193A 1993-04-30 1993-04-30 Construction method of balustrade in concrete structure with balustrade Expired - Fee Related JP3202101B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12486193A JP3202101B2 (en) 1993-04-30 1993-04-30 Construction method of balustrade in concrete structure with balustrade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12486193A JP3202101B2 (en) 1993-04-30 1993-04-30 Construction method of balustrade in concrete structure with balustrade

Publications (2)

Publication Number Publication Date
JPH06313304A true JPH06313304A (en) 1994-11-08
JP3202101B2 JP3202101B2 (en) 2001-08-27

Family

ID=14895920

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12486193A Expired - Fee Related JP3202101B2 (en) 1993-04-30 1993-04-30 Construction method of balustrade in concrete structure with balustrade

Country Status (1)

Country Link
JP (1) JP3202101B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142877A (en) * 2017-07-07 2017-09-08 北京华路安交通科技有限公司 Vertical opening arrangement of reinforcement cage concrete guardrail and construction method
CN108265623A (en) * 2018-02-13 2018-07-10 高强 A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN108411780A (en) * 2018-05-08 2018-08-17 江苏森淼工程质量检测有限公司 A kind of full-automatic health preserving vehicle of bridge cement concrete wall fence
CN111827184A (en) * 2020-08-05 2020-10-27 江苏山水环境建设集团股份有限公司 Cast-in-place reinforced concrete ground burden stone railing and installation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142877A (en) * 2017-07-07 2017-09-08 北京华路安交通科技有限公司 Vertical opening arrangement of reinforcement cage concrete guardrail and construction method
CN108265623A (en) * 2018-02-13 2018-07-10 高强 A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN108411780A (en) * 2018-05-08 2018-08-17 江苏森淼工程质量检测有限公司 A kind of full-automatic health preserving vehicle of bridge cement concrete wall fence
CN111827184A (en) * 2020-08-05 2020-10-27 江苏山水环境建设集团股份有限公司 Cast-in-place reinforced concrete ground burden stone railing and installation method thereof

Also Published As

Publication number Publication date
JP3202101B2 (en) 2001-08-27

Similar Documents

Publication Publication Date Title
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
JPH07317029A (en) Structure of wall in wall structure and construction method thereof
KR100679570B1 (en) Precast cantilever bottom plate constituting the cantilever portion outside the bridge mold, bridge bottom plate provided with the same and construction method thereof
JPH06313304A (en) Structure of high balustrade in concrete structure having high balustrade and construction method for balustrade part
KR200196692Y1 (en) A stairway mould
KR100488189B1 (en) Five Segmental Bulb-Tee Girder for a Bridge and It&#39;s Constructional method
JP2912554B2 (en) Guard fence
KR100452977B1 (en) Joint structure and construction method of RC beam and slab for slim floor system
KR100612938B1 (en) Wall and slab construction system and construction method using the same
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
KR100200433B1 (en) Execution method of the slab in bridge
KR910007423B1 (en) PC-Beam Bridge Construction Method Using Adjustable Bracket
KR100717156B1 (en) Truss Wall with Finish Plate
KR102688522B1 (en) The manufacturing method of composite pc structure and composite pc structure manufactured by the method
TWI848841B (en) Beam structure and architecture system having the same
JPH0820915A (en) Precast floor slab
JPH0860614A (en) Expansion method of elevated road
KR100464594B1 (en) The method of constructing the prefabricated step on reinforced concrete building
KR101046020B1 (en) Formwork wedge joining structure for easy demoulding and reassembly
JPH05179618A (en) Repairing method of bridge floor slab
JPH05239810A (en) Constructing method for reinforced concrete arch bridge
JPH06146215A (en) Assembled bridge like arch bridge
KR19980024968U (en) Composite interior and exterior stucco wire mesh precast concrete panel formwork.
KR200319045Y1 (en) Concrete deck plate
JP2846426B2 (en) How to build concrete stairs

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees