JPH06173277A - Construction method for continuous footing - Google Patents
Construction method for continuous footingInfo
- Publication number
- JPH06173277A JPH06173277A JP35195492A JP35195492A JPH06173277A JP H06173277 A JPH06173277 A JP H06173277A JP 35195492 A JP35195492 A JP 35195492A JP 35195492 A JP35195492 A JP 35195492A JP H06173277 A JPH06173277 A JP H06173277A
- Authority
- JP
- Japan
- Prior art keywords
- base
- groove
- mortar
- cloth
- cloth beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、住宅建築に伴うコン
クリートの布基礎の施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete cloth foundation for housing construction.
【0002】[0002]
【従来の技術】住宅を建築する場合には、住宅の土台を
受ける布基礎がコンクリートにより構築される。その順
序を例示すれば、まず、地盤に溝を堀り(根切り)、溝
に玉石や砂利を敷き詰めてから(割栗地業)、その上に
コンクリートを打つ(捨コン工事)。この捨コンの上に
布梁の基礎としてのベースを形成する。2. Description of the Related Art When building a house, a cloth foundation for receiving the base of the house is constructed of concrete. To give an example of the sequence, first, a groove is dug in the ground (root cutting), cobblestone and gravel are spread in the groove (warikyu ware), and concrete is laid on it (discarding work). The base as the foundation of the cloth beam is formed on this waste container.
【0003】ベースの形成については、ベース筋を配設
してから、ベース型枠を組み、ベースコンクリート打ち
を行う。このベースコンクリートの養生を終えてから、
その上に布梁を形成する。Regarding the formation of the base, after disposing the base reinforcement, the base formwork is assembled and the base concrete is poured. After finishing curing this base concrete,
A cloth beam is formed on it.
【0004】布梁の工事については、布梁筋の配設をし
てから、布型枠を組み、布コンクリート打ちを行う。こ
の布コンクリートの養生が終わってから、型枠を外し、
後片付けがなされることになる。Regarding the construction of the cloth beam, after the cloth beam reinforcement is arranged, the cloth form is assembled and the cloth concrete is poured. After curing this concrete, remove the formwork,
It will be cleaned up.
【0005】[0005]
【発明が解決しようとする課題】上記のように従来の布
基礎の施工方法によれば、数多くの工程を経る必要があ
るばかりでなく、コンクリートの養生に日数が掛かる
し、天候に左右されるために、工事が完了するまでに
は、普通には少なくとも2週間が必要であり、また、作
業が困難であることもあって、これが工期が遅れる原因
となっている。As described above, according to the conventional cloth foundation construction method, not only many steps are required, but also it takes a lot of days to cure the concrete and it depends on the weather. Therefore, it usually takes at least two weeks to complete the construction, and the work is difficult, which causes the construction period to be delayed.
【0006】作業の内容については、鉄筋工事や型枠工
事がいずれも可なり熟練した技術を要し、また、コンク
リート打ちが言わば汚い仕事となる。これが、若年者に
嫌われることもあって、熟練した作業者の確保が非常に
難しくなっているのが現状である。Regarding the contents of the work, both reinforcing bar work and formwork work are required, and skillful techniques are required, and concrete pouring is a dirty work. This is the current situation in which it is very difficult to secure skilled workers because young people dislike this.
【0007】この発明は、上記のような実情に鑑みて、
工期短縮に適するだけでなく、熟練した職人を要しない
布基礎の施工方法を提供することを目的とした。The present invention has been made in view of the above circumstances.
The purpose of the present invention is not only to shorten the construction period, but also to provide a cloth foundation construction method that does not require a skilled craftsman.
【0008】[0008]
【課題を解決するための手段】上記の目的を達成するた
めの第一の発明は、幅広形であって上面の幅中央に組付
溝を設けたベースと、上面に配筋溝を設けた布梁とを、
工場においてそれぞれコンクリート成形し、現場に持ち
込んで、地盤に堀土した根切り溝の石固めの上に、ベー
スを据え付けてから、その組付溝にモルタルを詰め、下
端をそのモルタルに浸けてベースの上に布梁を立設して
組み立て、その際に、ベース端に対して布梁端がずれる
組立てをなし、さらに、配筋溝に通し筋を納めてその配
筋溝にもモルタルを詰めることを特徴とする。According to a first aspect of the invention for achieving the above object, a wide base having an assembling groove at the center of the width of the upper surface and a reinforcing bar groove at the upper surface is provided. Cloth beams,
The concrete is molded in each factory, brought to the site, and the base is installed on the stone solidification of the root cutting groove excavated in the ground. Assemble the fabric beam upright on top of it, and at that time, the fabric beam end is displaced from the base end.Furthermore, insert the through bars in the reinforcement grooves and fill the reinforcement grooves with mortar. It is characterized by
【0009】第二の発明は、幅広形であって上面の幅中
央に組付溝を設けたベースと、左右両端に上下横筋が突
出した上下連結筋を有する布梁とを、工場においてそれ
ぞれコンクリート成形し、現場に持ち込んで、地盤に堀
土した根切り溝の石固めの上に、ベースを据え付けてか
ら、その組付溝にモルタルを詰め、下端をそのモルタル
に浸けてベースの上に布梁を立設して組み立て、その際
に、ベース端に対して布梁端がずれる組立てをなすとと
もに、隣接する布梁間に間隔を設け、隣接布梁間におい
て、連結筋を緊結してから、コンクリート打ちにより補
完布梁を成形することを特徴とする。A second aspect of the present invention is to provide a wide base having an assembling groove at the center of the width of the upper surface, and a cloth beam having vertical connecting bars with horizontal lateral bars protruding at both left and right ends in concrete at a factory. Mold it, bring it to the site, install the base on the stone solidification of the root cutting groove dug in the ground, fill the assembly groove with mortar, immerse the lower end in the mortar and cloth on the base. Assembling the beam by standing it up, and at that time, the fabric beam end is displaced from the base end, and a space is provided between the adjacent fabric beams, and the connecting bar is tightly connected between the adjacent fabric beams, and then the concrete The feature is that a complementary cloth beam is formed by striking.
【0010】[0010]
【作用】布基礎の主なコンクリート部分としてのベース
と布梁とが工場において成形されるために、現場におい
ては、型枠を組んだりコンクリート打ちをしたりする作
業を全く省くことができるか、若しくは、その作業があ
っても僅かとなる。そして、根切り溝の石固めの均等化
を基礎として、ベースおよびその上の布梁を均等に配列
でき、また、組付溝の中のモルタルを介してベースと布
梁との結合を調整し(高さ、位置、起立状態等)、さら
には結合状態を安定化させることができる。[Operation] Since the base and the cloth beam, which are the main concrete parts of the cloth foundation, are molded in the factory, it is possible to completely omit the work of assembling the formwork and concrete casting at the site. Or, even if the work is done, it becomes a little. Then, based on the equalization of the stone hardening of the root cutting groove, the base and the cloth beam on it can be evenly arranged, and the connection between the base and the cloth beam can be adjusted through the mortar in the assembly groove. It is possible to stabilize (height, position, standing state, etc.) as well as the binding state.
【0011】均等化の保持について、第一発明では、配
筋溝における通し筋により、また、第二の発明では、連
結筋の緊結および補完布梁の成形により強化される。In the first aspect of the invention, the equalization is reinforced by the through-holes in the reinforcement groove, and in the second aspect of the invention, it is reinforced by the connection of the connecting bar and the forming of the complementary cloth beam.
【0012】[0012]
【実施例】次に、この発明の実施例を図面に基づいて説
明する。Embodiments of the present invention will now be described with reference to the drawings.
【0013】この発明においては、工場においてベース
1と布梁3とをそれぞれコンクリートにより別体に成形
し、それを現場に運搬し、現場で組み立てることによっ
て、布基礎Pを構築する。According to the present invention, the cloth foundation P is constructed by separately molding the base 1 and the cloth beam 3 from concrete in a factory, transporting them to the site, and assembling them on site.
【0014】図1ないし図3は、一実施例を示すもの
で、ベース1は、横幅が広い断面矩形であつて、上面の
幅中央に組付溝5が設けられ、内部には、経筋7と緯筋
9とが配設される。組付溝5は、布梁3の幅よりもやゝ
広い幅であって浅く形成される。FIGS. 1 to 3 show one embodiment, in which a base 1 has a rectangular cross section with a wide width, an assembling groove 5 is provided at the center of the width of the upper surface, and an internal warp is formed inside. 7 and wefts 9 are provided. The assembling groove 5 has a width slightly wider than the width of the cloth beam 3 and is formed shallowly.
【0015】布梁3は、高い断面矩形であって、上面の
幅中央に通し筋11を納める配筋溝13が設けられる。
また、内部には縦筋15および横筋17が配設される。
配筋溝13は、全長に設けたが、両端部にのみ設けても
良い。The cloth beam 3 has a rectangular shape with a high cross section, and is provided with a reinforcing bar groove 13 for accommodating the through bar 11 at the center of the width of the upper surface.
In addition, a vertical streak 15 and a horizontal streak 17 are provided inside.
Although the reinforcing bar grooves 13 are provided over the entire length, they may be provided only at both ends.
【0016】ベース1と布梁3との平面的形状について
は、長方形が最も多くなり、角部のL字形、間のT字
形、内部の十字形等が用いられる。また、布梁3のうち
には、床下換気穴19を設けたものも用意しておく。な
お、その床下換気穴19は、図示(図1)では、窓穴に
形成したが、上または横へ開口する切欠き状に形成して
も良い。Regarding the planar shape of the base 1 and the cloth beam 3, the most rectangular shape is used, and an L-shaped corner portion, a T-shaped portion between them, an internal cross shape, or the like is used. In addition, as the cloth beams 3, those provided with an underfloor ventilation hole 19 are also prepared. Although the underfloor ventilation hole 19 is formed in the window hole in the drawing (FIG. 1), it may be formed in a notch shape that opens upward or sideways.
【0017】現場における作業手順については、まず、
布基礎Pを構築する箇所に沿って、地盤に堀土工事とし
ての根切りを行い、その根切り溝21の底に栗石や玉
石、砂利等の石を敷き平均に押し固めて石固め22をな
し、それから、捨てコンクリート25を打ち、その上に
ベース1を配設する。Regarding the work procedure at the site, first,
Along the place where the cloth foundation P is constructed, root cutting is performed as excavation work on the ground, stones such as chestnut stones, boulders, and gravel are laid on the bottom of the root cutting groove 21, and the stones are solidified 22 by compacting them evenly. None, then pour the discarded concrete 25 and place the base 1 on it.
【0018】ベース1の配列には平均化が必要であるの
で、その手段としては、捨てコンクリート25を水平に
ならすことが肝要であるが、捨てコンクリート25が固
まらないうちにベース1を置けば、ベース1で高さ調整
も可能である。Since the arrangement of the base 1 requires averaging, it is essential to level the waste concrete 25 horizontally as a means for this, but if the base 1 is placed before the waste concrete 25 solidifies, The height can be adjusted with the base 1.
【0019】布基礎Pの強度は、建物の種類や用途、あ
るいは地盤の強弱等の条件によって異なってくるので、
条件によっては、上記とは違って、石固め22の上に直
接ベース1を置き、それから捨てコンクリートを打つよ
うにしても良い。また、工事現場の架設住宅の簡易なも
のでは、捨てコンクリートも省いても良い。Since the strength of the cloth foundation P varies depending on the type and use of the building, the strength of the ground, and the like,
Depending on the conditions, unlike the above, the base 1 may be placed directly on the stone slab 22 and then discarded concrete may be poured. In addition, in the case of a simple construction house on the construction site, the discarded concrete may be omitted.
【0020】ベース1を据え付けてからは、その上に布
梁3を立設するが、その際には、両方の端、つまりベー
ス1,1の接合部と、布梁3,3の接合部が一致しない
ように、何らかの手段で、図2に示す如く半ピッチずら
し、強度を持ち合うようにしてある。図示では、半ピッ
チずれるように、コーナ等の端のベース1と布梁3との
相互において、長さを異ならせて成形されている(図1
参照)。After the base 1 is installed, the cloth beam 3 is erected on the base 1. At this time, both ends, that is, the joint portion of the bases 1 and 1 and the joint portion of the cloth beams 3 and 3. In order that they do not coincide with each other, they are shifted by a half pitch as shown in FIG. In the drawing, the base 1 and the cloth beam 3 at the ends such as corners are formed with different lengths so that they are displaced by a half pitch (see FIG. 1).
reference).
【0021】ベース1には、布梁3を落とす組付溝5に
モルタル27を詰め、そのモルタル27によっても布梁
3の高さ、位置、起立状態の調整ができる。また、これ
により、ベース1と布梁3との結合が緊密となり安定す
る。The base 1 is filled with mortar 27 in the assembling groove 5 for dropping the cloth beam 3, and the height, position and standing state of the cloth beam 3 can be adjusted also by the mortar 27. Further, as a result, the connection between the base 1 and the cloth beam 3 becomes tight and stable.
【0022】布梁3を配列してから、その上の配筋溝1
3に通し筋11を納め、モルタル29を詰める。これに
より布梁3,3の横との連結が確保され安定する。この
モルタル29を配筋溝13よりも高く塗ることにより、
布基礎Pの上面の均一性をさらに正確になすようにもで
きる。After arranging the cloth beams 3, the reinforcing bar groove 1 above them is arranged.
Put the streaks 11 through 3, and stuff the mortar 29. As a result, the horizontal connection of the cloth beams 3 and 3 is ensured and stabilized. By coating this mortar 29 higher than the bar arrangement groove 13,
The uniformity of the upper surface of the cloth foundation P can be made more accurate.
【0023】図4および図5は、布梁3についての他の
実施例を示したもので、布梁3の両端に、上下横筋1
7,17が連結筋17a,17aとして突出されてい
る。この場合、隣接する布梁3,3との間には、連結筋
17a,17aの連結のために間が隔てられるととも
に、その間に補完布梁3aがコンクリート打ちにより形
成される。FIGS. 4 and 5 show another embodiment of the cloth beam 3, in which the upper and lower horizontal streaks 1 are provided at both ends of the cloth beam 3.
7, 17 are projected as connecting muscles 17a, 17a. In this case, a space is provided between the adjacent cloth beams 3 and 3 for connecting the connecting bars 17a and 17a, and the complementary cloth beam 3a is formed between them by concrete pouring.
【0024】補完布梁3aの成形箇所においては、予め
縦筋15aを配設すると共に、左右連結筋17a,17
aが番金等で緊結し、スターラップを施し、その後、コ
ンクリート打ちには、左右布梁3,3の間にコンクリー
ト型枠が組まれる。しかし、鉄筋工事は僅かな間であ
り、型枠組みについても、布梁3がその支えとなるため
に、普通の型枠組みに比して極めて簡単になる。At the forming position of the complementary cloth beam 3a, the vertical streaks 15a are arranged in advance, and the left and right connecting streaks 17a, 17 are formed.
"a" is tightly bound with metal bars and the like, and is subjected to star wrap. After that, a concrete form is assembled between the left and right cloth beams 3, 3 for concrete pouring. However, the reinforcing bar work is only a short period of time, and since the cloth beam 3 serves as a support for the formwork, it becomes extremely simple as compared with the ordinary formwork.
【0025】現場における作業について、最初の実施例
(図1ないし図3)では、1週間以上、また、他の実施
例(図4および図5)では、4〜5日程度の工期短縮が
可能である。Regarding the work at the site, it is possible to shorten the construction period by one week or more in the first embodiment (FIGS. 1 to 3) and about 4 to 5 days in the other embodiments (FIGS. 4 and 5). Is.
【0026】[0026]
【発明の効果】以上説明したように、この発明によれ
ば、次のような優れた効果がある。As described above, according to the present invention, there are the following excellent effects.
【0027】現場においては、型枠を組んだりコンクリ
ート打ちをしたりする作業を全く省くことができるか、
若しくは、その作業があっても僅かとなるから、そのよ
うな日数の掛かる作業が無くなるばかりでなく、工事が
ほとんど天候に左右されなくなるために、工期短縮を大
幅に図ることができる。また、省力化に適することはも
とより、必ずしも熟練した職人を要しないから、人手不
足を解消することができる。さらに、工場生産により布
基礎の品質や寸法の安定性を確保し得る。On the site, is it possible to completely omit the work of assembling the formwork and concrete casting?
Alternatively, since the amount of work is small, not only the work requiring such days is eliminated, but also the construction is hardly affected by the weather, so that the construction period can be greatly shortened. Moreover, not only is it suitable for labor saving, but also a skilled craftsman is not necessarily required, so that a labor shortage can be solved. Moreover, factory production can ensure the quality and dimensional stability of the fabric foundation.
【0027】組付溝の中のモルタルを介してベースと布
梁との結合が安定化され、また、このモルタルの介在が
布梁の均等且つ正確な配列に適し、その均等性および正
確性が鉄筋による結合により強化保持される。The connection between the base and the cloth beam is stabilized through the mortar in the assembling groove, and the interposition of the mortar is suitable for the uniform and accurate arrangement of the cloth beams, and the uniformity and accuracy thereof are It is reinforced and held by the connection by the reinforcing bar.
【図1】現場における作業手順を示す斜視断面の説明図
である。FIG. 1 is an explanatory view of a perspective cross section showing a work procedure at a site.
【図2】同実施例による布基礎の組立て状態を示す正面
から見た断面図である。FIG. 2 is a front sectional view showing an assembled state of the cloth foundation according to the embodiment.
【図3】図2のA−A線矢視の拡大断面図である。FIG. 3 is an enlarged sectional view taken along the line AA of FIG.
【図4】他の実施例による布梁の斜視図である。FIG. 4 is a perspective view of a cloth beam according to another embodiment.
【図5】同実施例による布基礎の組立て状態を示す正面
から見た断面図である。FIG. 5 is a front sectional view showing an assembled state of the cloth foundation according to the embodiment.
P 布基礎 1 ベース 3 布梁 3a 補完布梁 5 組付溝 11 通し筋 13 配筋溝 17 横筋 17a 連結筋 21 根切り溝 22 石固め 27 モルタル 29 モルタル P cloth foundation 1 base 3 cloth beam 3a complementary cloth beam 5 assembling groove 11 through bar 13 bar arrangement groove 17 lateral bar 17a connecting bar 21 root cutting groove 22 stone hardening 27 mortar 29 mortar
Claims (2)
設けたベースと、上面に配筋溝を設けた布梁とを、工場
においてそれぞれコンクリート成形し、現場に持ち込ん
で、地盤に堀土した根切り溝の石固めの上に、ベースを
据え付けてから、その組付溝にモルタルを詰め、下端を
そのモルタルに浸けてベースの上に布梁を立設して組み
立て、その際に、ベース端に対して布梁端がずれる組立
てをなし、さらに、配筋溝に通し筋を納めてその配筋溝
にもモルタルを詰めることを特徴とする布基礎の施工方
法。1. A wide base having a mounting groove at the center of the width of the upper surface and a cloth beam having a reinforcing groove on the upper surface are concrete-molded in a factory, respectively, and brought to the site to be ground. After installing the base on the stone solidification of the root cutting groove dug in, mortar is packed in the assembly groove, the lower end is immersed in the mortar and the cloth beam is erected on the base to assemble it, In this case, a method of constructing a cloth foundation is characterized in that the cloth beam end is displaced from the base end, and further, a through bar is inserted into the reinforcing bar groove and the mortar is filled in the reinforcing bar groove.
設けたベースと、左右両端に上下横筋が突出した上下連
結筋を有する布梁とを、工場においてそれぞれコンクリ
ート成形し、現場に持ち込んで、地盤に堀土した根切り
溝の石固めの上に、ベースを据え付けてから、その組付
溝にモルタルを詰め、下端をそのモルタルに浸けてベー
スの上に布梁を立設して組み立て、その際に、ベース端
に対して布梁端がずれる組立てをなすとともに、隣接す
る布梁間に間隔を設け、隣接布梁間において、連結筋を
緊結してから、コンクリート打ちにより補完布梁を成形
することを特徴とする布基礎の施工方法。2. A wide type base having an assembling groove at the center of the width of the upper surface and a cloth beam having vertical connecting bars with horizontal horizontal bars protruding at the left and right ends are concrete-molded at the factory, After installing the base on the stone solidification of the root cutting groove dug in the ground, stuff the mortar in the assembly groove, immerse the lower end in the mortar, and erect the cloth beam on the base. The fabric beam end is displaced from the base end at the same time, and a space is provided between the adjacent fabric beams. A method for constructing a cloth foundation, which comprises forming a beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35195492A JPH06173277A (en) | 1992-12-09 | 1992-12-09 | Construction method for continuous footing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35195492A JPH06173277A (en) | 1992-12-09 | 1992-12-09 | Construction method for continuous footing |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH06173277A true JPH06173277A (en) | 1994-06-21 |
Family
ID=18420766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP35195492A Pending JPH06173277A (en) | 1992-12-09 | 1992-12-09 | Construction method for continuous footing |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH06173277A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5987827A (en) * | 1996-05-29 | 1999-11-23 | Lord; Ray | Concrete building construction and method |
-
1992
- 1992-12-09 JP JP35195492A patent/JPH06173277A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5987827A (en) * | 1996-05-29 | 1999-11-23 | Lord; Ray | Concrete building construction and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5367845A (en) | System for building a structure | |
JPH06173277A (en) | Construction method for continuous footing | |
JP2023060617A (en) | U-shaped throwaway formwork for rising foundations of buildings | |
JPH04330119A (en) | Building foundation constructing method | |
JP3563128B2 (en) | Precast concrete foundation structure, precast concrete foundation and foundation construction method | |
JP3061724U (en) | Foundation blocks and building foundations | |
JPH0517956A (en) | Concrete form and building foundation execution method using this concrete form | |
JP2824374B2 (en) | Concrete block for foundation, manufacturing method thereof, and foundation construction method using the same | |
JPS6123092Y2 (en) | ||
JP3023266B2 (en) | Precast concrete foundation and foundation structure | |
JP2539736B2 (en) | Fabric foundation construction method and formwork support used for it | |
JPH01111923A (en) | Construction of concrete foundation | |
JPH06306874A (en) | Concrete block for footing | |
JP2905056B2 (en) | Foundation structure | |
JPH11343628A (en) | Footing/retaining wall construction material and construction method therefor | |
JPH07113321A (en) | Construction of continuous footing for house | |
JP3143338B2 (en) | Precast concrete foundation and foundation structure | |
JPH04111813A (en) | Retaining wall structure and its construction | |
JP3021249B2 (en) | Precast concrete entrance foundation structure | |
JPH0447248Y2 (en) | ||
JPS6138028A (en) | Construction of foundation | |
JPH04228725A (en) | Foundation of building | |
JPH10252076A (en) | Continuous footing for house, and form and method for constructing fence | |
JP3150535B2 (en) | Insulated precast concrete foundation and method of manufacturing the same | |
JPH0612010B2 (en) | Construction method of housing foundation structure |