JPH05302328A - Open type shield method and open type shield machine - Google Patents

Open type shield method and open type shield machine

Info

Publication number
JPH05302328A
JPH05302328A JP13195992A JP13195992A JPH05302328A JP H05302328 A JPH05302328 A JP H05302328A JP 13195992 A JP13195992 A JP 13195992A JP 13195992 A JP13195992 A JP 13195992A JP H05302328 A JPH05302328 A JP H05302328A
Authority
JP
Japan
Prior art keywords
shield machine
open shield
open
side wall
wall plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13195992A
Other languages
Japanese (ja)
Other versions
JP2657733B2 (en
Inventor
Koichi Uemura
厚一 植村
Makoto Uemura
誠 植村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13195992A priority Critical patent/JP2657733B2/en
Publication of JPH05302328A publication Critical patent/JPH05302328A/en
Application granted granted Critical
Publication of JP2657733B2 publication Critical patent/JP2657733B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PURPOSE:To prevent such a trouble that backfilling soil flows into the inside of the title machine when the part of overexcavation is backfilled, in the case wherein execution in a gravel layer or at a curved part is done in the title method. CONSTITUTION:Vertically engaging grooves 9, each of which is opened at least above and outside, are respectively provided at the top end parts of side wall plates 1a, 1b, left and right, for the title machine 1. Partition plates 10, each of which is projected beyond the side part of the title machine 1, are separately dropped into these grooves 9 and are set, and backfilling 8 is done at the rear sides of the partion plates 10 and at the outsides of the side wall plates 1a, 1b therefor.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、市街地に上下水道、共
同溝、電信、電話等の布設地下道等の地下構造物を施工
するオープンシールド工法及びそれに使用するオープン
シールド機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an open shield construction method for constructing underground structures such as water supply and sewerage, common ditches, telegraphs, telephones, and other underground passages, and an open shield machine used therefor.

【0002】[0002]

【従来の技術】オープンシールド工法は、開削工法(オ
ープン工法)とシールド工法の長所を生かした合理性に
富む工法である。
2. Description of the Related Art The open shield construction method is a rational construction method that takes advantage of the advantages of the open-cut construction method (open construction method) and the shield construction method.

【0003】図3〜図6にその概略を示すと、図中1は
オープンシールド機で、これは左右の側壁板1a,1b
とこれら側壁板1a,1bと同程度の長さでその間を連
結する底板1cとからなる前面、後面及び上面を開口し
たシールド機である。該オープンシールド機1は前記側
壁1a,1bと底板1cの先端を刃口2として形成し、
また側壁板1a,1bの中央又は後端近くに推進ジャッ
キ3を後方に向け上下に並べて配設する。
The outline is shown in FIGS. 3 to 6, in which 1 is an open shield machine, which is a left and right side wall plate 1a, 1b.
And a side plate 1a, 1b and a bottom plate 1c having the same length and connecting the side plates 1a and 1b. The open shield machine 1 has the side walls 1a, 1b and the bottom plate 1c formed with the tips as blade openings 2.
Further, the propulsion jacks 3 are arranged vertically side by side near the center or near the rear ends of the side wall plates 1a and 1b.

【0004】図中7は、推進ジャッキ3の後端に設けた
押圧部材で、ボックス鋼材又は型鋼を用いた枠体よりな
る。
Reference numeral 7 in the drawing denotes a pressing member provided at the rear end of the propulsion jack 3, which is a frame body made of box steel or shaped steel.

【0005】シールド機1の推進ジャッキ3を伸長して
発進坑6内の反力壁に反力をとってシールド機1を前進
させ、地下構造物を形成する第1番目のコンクリート函
体4を上方から吊り降し、シールド機1のテール部1d
内で縮めた推進ジャッキ3の後方にセットする。推進ジ
ャッキ3と反力壁の間にはストラットを配設して適宜間
隔調整をする。また、発進坑6はシートパイル等の土留
壁で構成し、オープンシールド機1を発進させるにはこ
の土留壁を一部鏡切りするが、必要に応じて薬液注入等
で発進坑6の前方部分に地盤改良を施しておくこともあ
る。
The propulsion jack 3 of the shield machine 1 is extended and a reaction force is applied to the reaction force wall in the start pit 6 to advance the shield machine 1 to move the first concrete box 4 forming an underground structure. Suspended from above, the tail part 1d of the shield machine 1
Set it behind the propelling jack 3 that has been contracted inside. Struts are arranged between the propulsion jack 3 and the reaction wall to adjust the distance as appropriate. Further, the start pit 6 is composed of a retaining wall such as a sheet pile. To start the open shield machine 1, a part of this retaining wall is cut into a mirror. The ground may be improved on the ground.

【0006】次いで、同様にシールド機1の前面又は上
面から土砂を掘削しかつ排土してシールド機1を前進さ
せ、前記第1番目の地中構造物4の前に第2番目の地中
構造物4をシールド機1のテール部1d内に吊り降す。
以下、同様の掘進及び地中構造物4のセット工程を繰返
して、順次地中構造物4を縦列に地中に埋設し、図6に
示すように後方の地中構造物4上に埋戻し5を施し、図
示は省略するがオープンシールド機1が到達坑まで達し
たならばこれを撤去して工事を完了する。
Then, similarly, the earth and sand are excavated from the front surface or the upper surface of the shield machine 1 and the soil is discharged to move the shield machine 1 forward, so that the second underground structure is placed in front of the first underground structure 4. The structure 4 is suspended in the tail portion 1d of the shield machine 1.
Hereinafter, the same excavation and setting process of the underground structure 4 is repeated to sequentially embed the underground structure 4 in the column, and back-fill it on the rear underground structure 4 as shown in FIG. Although not shown in the figure, if the open shield machine 1 reaches the reaching pit, it is removed and the construction is completed.

【0007】このようにして、地中構造物4はオープン
シールド機1の掘進にともない順次シールド機1のテー
ル部1dから後方に残置され地中に埋設されるものであ
るが、このテール部1d内で地中構造物4とオープンシ
ールド機1の間の隙間には水ガラス系のグラウト材20を
充填し、地中構造物4は上面を除いて外周がグラウト材
20で包まれたものとして地中に残置される。
In this way, the underground structure 4 is sequentially left behind from the tail portion 1d of the shield machine 1 and buried in the ground as the open shield machine 1 is dug. The space between the underground structure 4 and the open shield machine 1 is filled with water glass-based grout material 20, and the underground structure 4 has a grout material on the outer periphery except for the upper surface.
It is left in the ground as wrapped in 20.

【0008】[0008]

【発明が解決しようとする課題】このようなオープンシ
ールド機1で、掘削は地表面から刃口2の内部と前部と
で行うために刃口前部の土砂が緩み、地盤に変位を生じ
る。そして、砂礫層を掘進する場合は刃口2の外周部の
土砂が余掘りされ、その分だけ掘削孔幅が広がり掘削孔
壁とオープンシールド機1の側壁1a,1bとの間に隙
間を生じてしまう。
With such an open shield machine 1, excavation is performed from the ground surface between the inside of the blade mouth 2 and the front portion, so the earth and sand at the blade front portion loosen and the ground is displaced. .. Then, when excavating the gravel layer, the earth and sand in the outer peripheral portion of the blade 2 is overexcavated, and the width of the excavation hole widens by that amount, and a gap is created between the excavation hole wall and the side walls 1a and 1b of the open shield machine 1. Will end up.

【0009】この隙間には地上部から土砂を補充するい
わゆる埋戻し8を行う。しかし、オープンシールド機1
の前進時にその埋戻し土砂が引きずられ刃口2を迂回し
てオープンシールド機1の内側に流れ込み、せっかく埋
戻ししたのが無駄になってしまう。
A so-called backfilling 8 for replenishing earth and sand from the above-ground portion is performed in this gap. However, open shield machine 1
At the time of advancing, the backfill earth and sand is dragged, bypasses the blade opening 2 and flows into the inside of the open shield machine 1, and it is useless to backfill.

【0010】前記余掘りの現象は砂礫層でなくとも、カ
ーブ施工でオープンシールド機1を曲げて掘進させる場
合にも生じる。ちなみに、カーブ施工は、シールド機1
の内側で左右に配置した推進ジャッキ3のストロークを
相違させてシールド機1を曲げて前進させる。
The above-mentioned phenomenon of over-excavation occurs even when the open shield machine 1 is bent and excavated by curve construction even if it is not a gravel layer. By the way, for curve construction, shield machine 1
The strokes of the propulsion jacks 3 arranged on the left and right inside are different and the shield machine 1 is bent and moved forward.

【0011】本発明の目的は前記従来例の不都合を解消
し、余掘の部分に埋戻しを行う場合に、この埋戻し土砂
がオープンシールド機1の内側に流れ込まないようにす
ることができるオープンシールド工法およびオープンシ
ールド機を提供することにある。
The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example and to prevent the backfilled earth and sand from flowing into the inside of the open shield machine 1 when backfilling the overburden portion. To provide a shield method and an open shield machine.

【0012】[0012]

【課題を解決するための手段】本発明は前記目的を達成
するため、左右側壁板の内側に推進ジャッキを配設し、
前面、後面及び上面を開口したオープンシールド機の前
面又は上面開口より前方の土砂を掘削排土する工程と、
推進ジャッキを伸長してコンクリート函体を反力にして
シールド機を前進させる工程と、シールド機のテール部
内で縮めた推進ジャッキの後方に新たなコンクリート函
体を上方から吊り降してセットする工程とを適宜繰り返
して順次コンクリート函体を縦列に埋設するオープンシ
ールド工法において、オープンシールド機の左右側壁板
の先端部にすくなくとも上方および外側方に開口する上
下方向の係合溝を設け、この係合溝にシールド機側方へ
突出する仕切板を上方から落とし込みセットし、この仕
切板より後方にオープンシールド機の左右側壁板の外側
を埋戻すことを要旨とするものである。
In order to achieve the above-mentioned object, the present invention provides a propulsion jack inside the left and right side wall plates,
A step of excavating and discharging earth and sand in front of the front or upper surface opening of the open shield machine having the front, rear surface and upper surface opened,
The process of extending the propulsion jack and making the concrete box a reaction force to move the shield machine forward, and the step of suspending and setting a new concrete box from above behind the propulsion jack contracted in the tail part of the shield machine. In the open shield construction method in which the concrete boxes are sequentially buried in a vertical line by repeating and, the vertical engagement grooves that open at least upward and outward are provided at the tip of the left and right side wall plates of the open shield machine. The gist of the present invention is to set a partition plate projecting to the side of the shield machine into the groove by dropping it from above, and to backfill the outside of the left and right side wall plates of the open shield machine behind this partition plate.

【0013】[0013]

【作用】本発明によれば、前進時には係合溝にシールド
機側方へ突出する仕切板を上方から落とし込みセットし
て側端を掘削孔壁に近接させ、埋戻し部とオープンシー
ルド機前方とを該仕切板で区画するので、オープンシー
ルド機の左右側壁板の外側の埋戻し土砂はこの仕切板で
遮られて左右側壁板先端を迂回してオープンシールド機
の内側に流れ込むことはない。
According to the present invention, at the time of advancing, a partition plate projecting to the side of the shield machine is dropped from the upper side in the engaging groove and set so that the side end is close to the wall of the borehole, and the backfill portion and the front side of the open shield machine are connected. Is partitioned by the partition plate, the backfill soil on the outside of the left and right side wall plates of the open shield machine is not blocked by the partition plate and bypasses the tips of the left and right side wall plates to flow into the inside of the open shield machine.

【0014】[0014]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明のオープンシールド工法および
オープンシールド機の1実施例を示す横断平面図、図2
は同上縦断側面図で、前記従来例を示す図3〜図6と同
一構成要素には同一参照符号を付したものである。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 is a cross-sectional plan view showing an embodiment of an open shield construction method and an open shield machine of the present invention, FIG.
3 is a vertical side view of the same, in which the same components as those in FIGS. 3 to 6 showing the conventional example are designated by the same reference numerals.

【0015】オープンシールド機1は、左右の側壁板1
a,1bとこれら側壁板1a,1bの間を連結する底板
1cとからなる前面、後面及び上面を開口したU型シー
ルド機で、側壁板1a,1bの中央又は後端近くに推進
ジャッキ3を後方に向け上下に並べて配設し、その後端
に押圧部材7を設けることは前記従来例と同じである。
The open shield machine 1 includes left and right side wall plates 1.
a propulsion jack 3 near the center or the rear end of the side wall plates 1a, 1b with a U-shaped shield machine having front, rear, and upper faces formed by a and 1b and a bottom plate 1c connecting the side wall plates 1a, 1b. It is the same as the above-mentioned conventional example in that they are arranged vertically in the rearward direction and the pressing member 7 is provided at the rear end thereof.

【0016】本発明は、左右側壁板1a,1bの先端部
にすくなくとも上方および外側方に開口する上下方向の
係合溝9を設け、この係合溝9にシールド機側方へ突出
する仕切板10を上方から落とし込みセット可能とした。
According to the present invention, the left and right side wall plates 1a and 1b are provided with vertical engaging grooves 9 which are open at least upward and outward at the tips thereof, and the partition plates projecting to the side of the shield machine in the engaging grooves 9. 10 can be dropped from above to set.

【0017】該仕切板10には鋼板が好適であり、係合溝
9の溝幅はこの仕切板10の厚さよりもわずかに大きいも
のとした。
A steel plate is suitable for the partition plate 10, and the groove width of the engaging groove 9 is slightly larger than the thickness of the partition plate 10.

【0018】次に、このオープンシールド機1を使用す
るオープンシールド工法について説明する。全体の概略
については前記従来例と同様であり、シールド機1を発
進坑から発進させ、シールド機1の前面又は上面から土
砂を掘削しかつ排土して第1番目の地中構造物4の前に
第2番目の地中構造物4をシールド機1のテール部1d
内に吊り降す。以下、同様の掘進及び地中構造物4のセ
ット工程を繰返して、順次地中構造物4を縦列に地中に
埋設し、後方の地中構造物4上に埋戻しを施しオープン
シールド機1が到達坑まで達したならばこれを撤去して
工事を完了する。
Next, an open shield construction method using the open shield machine 1 will be described. The overall outline is the same as in the conventional example, the shield machine 1 is started from the start pit, the earth and sand are excavated from the front surface or the upper surface of the shield machine 1, and the soil is discharged to remove the first underground structure 4 The tail part 1d of the shield machine 1 is attached to the second underground structure 4 before.
Suspend inside. Hereinafter, the same excavation and setting process of the underground structure 4 are repeated to sequentially bury the underground structures 4 in a column, and backfill the rear underground structure 4 to open the open shield machine 1. When reaches the reach pit, remove this and complete the construction.

【0019】このようなオープンシールド機1で、先に
述べたように掘削壁と左右側壁1a,1bとの間の隙間
には、埋戻し8を行うが、この埋戻し8の前または後
で、係合溝9に仕切板10を上方から落とし込みセットし
て、この仕切板10をオープンシールド機1の左右側方の
突出させる。
In the open shield machine 1 as described above, backfilling 8 is performed in the gap between the excavation wall and the left and right side walls 1a and 1b as described above, but before or after the backfilling 8. , The partition plate 10 is dropped into the engaging groove 9 from above and set, and the partition plate 10 is projected to the left and right sides of the open shield machine 1.

【0020】これにより、仕切板10は係合溝9から一部
がシールド機1の側方へ突出し、その側端が掘削孔壁に
近接または当接する。その結果、仕切板10が前記埋戻し
8を行う部分とオープンシールド機1の前方とを区画す
る。
As a result, the partition plate 10 partially projects from the engagement groove 9 to the side of the shield machine 1, and the side end of the partition plate 10 approaches or abuts against the wall of the excavation hole. As a result, the partition plate 10 separates the portion where the backfilling 8 is performed and the front of the open shield machine 1.

【0021】この状態でオープンシールド機1を前進さ
せても前記仕切板10があるので、埋戻し8の土砂はこの
仕切板10で遮られて左右側壁板1a,1bの先端を迂回
してオープンシールド機1の内側に流れ込むことはな
い。
Even when the open shield machine 1 is moved forward in this state, since the partition plate 10 is present, the earth and sand of the backfill 8 is blocked by this partition plate 10 and bypasses the tips of the left and right side wall plates 1a, 1b to open. It does not flow inside the shield machine 1.

【0022】なお、砂礫層でない地盤になった場合や、
通常地盤でもカーブ施工を行わない場合には、余掘りが
なく埋戻し8も必要ないので、仕切板10を係合溝9から
引き抜き、仕切板10がない状態で進行させる。
When the ground is not a gravel layer,
When curve construction is not performed even on normal ground, since there is no overburden and backfilling 8 is not necessary, the partition plate 10 is pulled out from the engaging groove 9 and is advanced without the partition plate 10.

【0023】[0023]

【発明の効果】以上述べたような本発明のオープンシー
ルド工法およびオープンシールド機は、砂礫層での施工
やカーブ施工を行う場合に、余掘の部分に埋戻しを行う
場合に、この埋戻し土砂がオープンシールド機の内側に
流れ込まないようにすることができるものである。
The open shield construction method and the open shield machine of the present invention as described above, when performing backfilling in the overburden portion when performing construction in a gravel layer or curve construction, perform this backfilling. It is possible to prevent sediment from flowing inside the open shield machine.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のオープンシールド工法およびオープン
シールド機の1実施例を示す横断平面図である。
FIG. 1 is a cross-sectional plan view showing an embodiment of an open shield construction method and an open shield machine of the present invention.

【図2】本発明のオープンシールド工法およびオープン
シールド機の1実施例を示す縦断側面図である。
FIG. 2 is a vertical sectional side view showing an embodiment of an open shield construction method and an open shield machine of the present invention.

【図3】従来のオープンシールド機の縦断側面図であ
る。
FIG. 3 is a vertical sectional side view of a conventional open shield machine.

【図4】従来のオープンシールド機の横断平面図であ
る。
FIG. 4 is a cross-sectional plan view of a conventional open shield machine.

【図5】オープンシールド工法の概要を示す縦断側面図
である。
FIG. 5 is a vertical sectional side view showing an outline of an open shield construction method.

【図6】オープンシールド工法の概要を示す横断平面図
である。
FIG. 6 is a cross-sectional plan view showing an outline of an open shield construction method.

【符号の説明】[Explanation of symbols]

1…オープンシールド機 1a,1b…側壁板 1c…底板 1d…テール部 2…刃口 3…推進ジャッキ 4…地中構造物 5…埋戻し 6…発進坑 7…押圧部材 8…埋戻し 9…係合溝 10…仕切板 20…グラウト材 1 ... Open shield machine 1a, 1b ... Side wall plate 1c ... Bottom plate 1d ... Tail part 2 ... Blade part 3 ... Propulsion jack 4 ... Underground structure 5 ... Backfilling 6 ... Start pit 7 ... Pressing member 8 ... Backfilling 9 ... Engagement groove 10 ... Partition plate 20 ... Grout material

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
の前面又は上面開口より前方の土砂を掘削排土する工程
と、推進ジャッキを伸長してコンクリート函体を反力に
してシールド機を前進させる工程と、シールド機のテー
ル部内で縮めた推進ジャッキの後方に新たなコンクリー
ト函体を上方から吊り降してセットする工程とを適宜繰
り返して順次コンクリート函体を縦列に埋設するオープ
ンシールド工法において、オープンシールド機の左右側
壁板の先端部にすくなくとも上方および外側方に開口す
る上下方向の係合溝を設け、この係合溝にシールド機側
方へ突出する仕切板を上方から落とし込みセットし、こ
の仕切板より後方にオープンシールド機の左右側壁板の
外側を埋戻すことを特徴としたオープンシールド工法。
1. A step of digging and discharging earth and sand in front of an opening or a front surface of an open shield machine having front, rear and upper surfaces provided with propulsion jacks inside right and left side wall plates, and extending the propulsion jack. Repeat the process of moving the shield machine forward using the concrete box as a reaction force and the step of suspending and setting a new concrete box from the top behind the propulsion jack that has been compressed in the tail part of the shield machine. In the open shield construction method of sequentially burying concrete boxes in vertical rows, vertical engagement grooves that open at least upward and outward are provided at the tips of the left and right side wall plates of the open shield machine, and the shield machine is installed in these engagement grooves. Set the partition plate projecting to the side by dropping it from above and backfilling the outside of the left and right side wall plates of the open shield machine behind this partition plate. The characteristic open shield construction method.
【請求項2】 左右側壁板の内側に推進ジャッキを配設
し、前面、後面及び上面を開口したオープンシールド機
において、オープンシールド機の左右側壁板の先端部に
すくなくとも上方および外側方に開口する上下方向の係
合溝を設け、この係合溝にシールド機側方へ突出する仕
切板を上方から落とし込みセット可能としたことを特徴
とするオープンシールド機。
2. In an open shield machine in which propulsion jacks are arranged inside the left and right side wall plates and the front, rear and upper surfaces are opened, the open shield machine is opened upward and outward at least at the tip of the left and right side wall plates. An open shield machine characterized in that a vertical engaging groove is provided, and a partition plate projecting to the side of the shield machine can be dropped into the engaging groove from above to set.
JP13195992A 1992-04-23 1992-04-23 Open shield method and open shield machine Expired - Lifetime JP2657733B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13195992A JP2657733B2 (en) 1992-04-23 1992-04-23 Open shield method and open shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13195992A JP2657733B2 (en) 1992-04-23 1992-04-23 Open shield method and open shield machine

Publications (2)

Publication Number Publication Date
JPH05302328A true JPH05302328A (en) 1993-11-16
JP2657733B2 JP2657733B2 (en) 1997-09-24

Family

ID=15070220

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13195992A Expired - Lifetime JP2657733B2 (en) 1992-04-23 1992-04-23 Open shield method and open shield machine

Country Status (1)

Country Link
JP (1) JP2657733B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114640A (en) * 2007-11-02 2009-05-28 Makoto Uemura Open shield machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114640A (en) * 2007-11-02 2009-05-28 Makoto Uemura Open shield machine

Also Published As

Publication number Publication date
JP2657733B2 (en) 1997-09-24

Similar Documents

Publication Publication Date Title
JP2587312B2 (en) Underground structure installation method
JP2657731B2 (en) Open shield method and open shield machine
JPH05302328A (en) Open type shield method and open type shield machine
JP4148047B2 (en) Open shield machine
JPH05132941A (en) Open shield method and concrete segment used therefor
JPH0249896A (en) Open shield method and machine thereof
JPH0574677B2 (en)
JP3766423B2 (en) Retaining wall construction method
JP2657732B2 (en) Open shield method and open shield machine
JPH0765469B2 (en) Open shield method
JP4279441B2 (en) Open shield machine and open shield method using this open shield machine
JP4279818B2 (en) Open shield method
JP4484068B2 (en) Open shield method
JPH0428044B2 (en)
JPH02248521A (en) Open shield method
JP2587311B2 (en) Underground structure installation method
JP3926818B2 (en) Installation method of concrete box
JPH0581719B2 (en)
JP2024092472A (en) Method of entering an open shield machine into a vertical shaft in an open shield construction method and a vertical shaft of an open shield machine
JPH0811919B2 (en) Open shield method and open shield machine
JPH0428047B2 (en)
JP3566236B2 (en) Open shield method
JPH03180614A (en) Construction of retaining wall for underground structure
JP2005213799A (en) Method for constructing water channel
JPH02209593A (en) Construction method of open shield and concrete box body used therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080606

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090606

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20100606

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20100606

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110606

EXPY Cancellation because of completion of term