[go: up one dir, main page]

JPH0450795Y2 - - Google Patents

Info

Publication number
JPH0450795Y2
JPH0450795Y2 JP1986079738U JP7973886U JPH0450795Y2 JP H0450795 Y2 JPH0450795 Y2 JP H0450795Y2 JP 1986079738 U JP1986079738 U JP 1986079738U JP 7973886 U JP7973886 U JP 7973886U JP H0450795 Y2 JPH0450795 Y2 JP H0450795Y2
Authority
JP
Japan
Prior art keywords
operating
shoji
cord
gearbox
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1986079738U
Other languages
Japanese (ja)
Other versions
JPS62190094U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1986079738U priority Critical patent/JPH0450795Y2/ja
Publication of JPS62190094U publication Critical patent/JPS62190094U/ja
Application granted granted Critical
Publication of JPH0450795Y2 publication Critical patent/JPH0450795Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Blinds (AREA)

Description

【考案の詳細な説明】 〔考案の目的〕 「産業上の利用分野」 この考案は内外に障子を備え、該障子が一体化
されて二重ガラスとなつている窓であつて、二重
ガラスの間にブラインドを配した窓に関するもの
である。
[Detailed explanation of the invention] [Purpose of the invention] "Field of industrial application" This invention is a window that is equipped with shoji inside and outside, and the shoji is integrated to form double glass. It concerns windows with blinds placed between them.

「従来の技術」 第5図は従来例の窓の内部側より見る正面図、
第6図は第5図の平面図である。この窓は開口枠
1の枠内に四方組みした框2にガラス3を嵌め込
んだ外障子4にヒンジ5により、四方組みした框
6にガラス7を嵌め込んだ内障子8が枢着されて
おり、常時は外障子4、内障子8は重ねて固定し
てある。内外障子4,8間に吊下げ式にブライン
ド9が設けてある。
"Prior art" Figure 5 is a front view of a conventional window seen from the inside.
FIG. 6 is a plan view of FIG. 5. In this window, an inner shoji 8, in which a glass 7 is fitted into a stile 6, is pivoted by a hinge 5 to an outer shoji 4, in which a glass 3 is fitted into a stile 2, which is assembled on all four sides within the frame of an opening frame 1. At all times, the outer shoji 4 and the inner shoji 8 are stacked and fixed. A hanging blind 9 is provided between the inner and outer shoji 4 and 8.

内障子8はヒンジ5を中心に内部側に回動でき
外障子4との間が開いて内外障子のガラス3,7
の対向面の清掃ができるようになつている。内外
障子4,8を重ねたまゝ、ハンドル10を90度回
転して内部側へ引くと内開きとなり、ハンドル1
0を180度回転して上向きにして引くと内外障子
4,8を重ねたまゝ内倒しできる連結装置によ
り、内障子8と開口枠1が結合されている(連結
装置は図示されない)。
The inner shoji 8 can be rotated inward around the hinge 5, and the space between the inner shoji 8 and the outer shoji 4 is opened, and the glasses 3 and 7 of the inner and outer shoji are opened.
The opposite surface can be cleaned. With the inner and outer shoji 4 and 8 stacked, rotate the handle 10 90 degrees and pull it toward the inside to open inward, and handle 1
The inner and outer shoji 8 and the opening frame 1 are connected to each other by a connecting device that allows the inner and outer shoji 4 and 8 to be folded inward while stacked on top of each other by rotating the shoji 0 by 180 degrees and pulling it upward (the connecting device is not shown).

第7図、第8図は従来例のブラインドの平面図
と正面図、第9図は第3図の一部断面で示す側面
図である。ヘツドボツクス11は左右に長く、断
面は上部の開放された溝形である。ヘツドボツク
ス11内の一端側にはヘツドボツクス11の長手
方向に平行にリードねじ12が固定され、リード
ねじ12にはナツト13がねじ込まれており、ナ
ツト13にはヘツドボツクス11の長手方向に平
行なコード巻取ドラム14の一端が固定されてい
る。コード巻取ドラム14の他端は内部に一対の
ねじ歯車が軸承されているギヤボツクス15の出
力軸端に回転を伝え得るように回転方向には剛で
軸方向に移動自在に嵌合されている。ギヤボツク
ス15はヘツドボツクス11に収容され、ヘツド
ボツクス11に固定されている。ギヤボツクス1
5の出力軸はコード巻取ドラム14と同軸上にあ
り、入力軸16は窓の内部方向を向いている。
7 and 8 are a plan view and a front view of a conventional blind, and FIG. 9 is a partially sectional side view of FIG. 3. The head box 11 is long from side to side, and has a groove-shaped cross section with an open top. A lead screw 12 is fixed to one end of the head box 11 parallel to the longitudinal direction of the head box 11, a nut 13 is screwed into the lead screw 12, and a cord wound parallel to the longitudinal direction of the head box 11 is attached to the nut 13. One end of the take-up drum 14 is fixed. The other end of the cord winding drum 14 is rigid in the rotational direction and movable in the axial direction so that rotation can be transmitted to the output shaft end of a gearbox 15 in which a pair of screw gears are supported. . The gearbox 15 is housed in the headbox 11 and is fixed to the headbox 11. gearbox 1
The output shaft of 5 is coaxial with the cord winding drum 14, and the input shaft 16 faces toward the inside of the window.

コード巻取ドラム14に端部が固定されて巻付
けられているコード17の巻出した側はヘツドボ
ツクス11の底部の幅方向の中央にある幅方向の
長孔18を挿通し、多数の並列するスラツト19
の幅方向の中心の長孔をゆるく挿通してボトムレ
ール21に固定されている。各スラツト19の幅
方向の両端を伸長時等間隔で結合しているラダー
コード22は、コード巻取ドラム14の上側にほ
ぼ180度巻掛けてある。
The unwound side of the cord 17, which is wound around the cord winding drum 14 with its end fixed, is inserted through the long hole 18 in the width direction at the widthwise center of the bottom of the head box 11, and is inserted into a large number of parallel cords. Slut 19
It is fixed to the bottom rail 21 by being loosely inserted through a long hole at the center in the width direction. A ladder cord 22, which connects both ends of each slat 19 in the width direction at equal intervals when stretched, is wound approximately 180 degrees above the cord winding drum 14.

ヘツドボツクス11の長さはスラツト19の長
さよりも短かく、スラツト19の長さは内外障子
4,8の堅框間に両端が入るようになつている。
The length of the head box 11 is shorter than the length of the slats 19, and the lengths of the slats 19 are such that both ends thereof fit between the frames of the inner and outer shoji 4 and 8.

ギヤボツクス15の入力軸16は第6図に示し
たガラス3,7面の上方位置で内障子8の上框を
挿通して室内に突出し、その端部のプーリ23に
操作コード30が巻掛けてある。
The input shaft 16 of the gearbox 15 extends into the room by passing through the upper stile of the inner sash 8 at a position above the glass surfaces 3 and 7 shown in FIG. be.

操作コード30の何れかの側を引くことによ
り、ギヤボツクスの入力軸16は回転し、その出
力軸はコード巻取ドラム14を回転する。コード
17はコード巻取りドラム14に巻取られるとボ
トムレール21が上昇することによりスラツト1
9は下側から順次たたまれる。又コード17がコ
ード巻取ドラム14から巻出されるとボトムレー
ル21は降下し、スラツト19は上側から順次間
隔が開く。そして上下動時にはラダーコード22
はコード巻取ドラム14との摩擦力により移動
し、スラツト19の幅方向の両側に結合してある
ラダーコード22の一方が引上げられ、他方が降
下するのでスラツト19は傾く。従つてスラツト
19を昇降した際はスラツト19は互に幅方向の
端部が重なつている。従つて、全部最上位まで折
りたたむ場合を除いて、操作コード30の何れか
一方を引いて上下動の操作をした後に今まで引い
て来た側に対して他方をわずかの距離引くことに
より、コード巻取ドラム14はわずかに逆転し、
ラダーコード22は今まで引上げられていた側が
下り、今まで降下していた側が引上げられ、或は
逆に下降時は下側の縁が上り、上側の縁が下るこ
とにより、スラツト19は水平でスラツト19間
が開いた状態となる。スラツト19全部を最上位
まで折りたたむ場合は、最上位のスラツト19が
ボトムレール21により持上げられると、最上位
のスラツト19からコード巻取ドラム14に巻掛
けてある部分のラダーコード22は弛んでコード
巻取ドラム14との摩擦摺動は解除されボトムレ
ール21により押上げられるスラツト19はヘツ
ドボツクス11の水平な下面に衝接して重ねられ
たまゝ水平となる。
By pulling either side of the operating cord 30, the input shaft 16 of the gearbox rotates and its output shaft rotates the cord winding drum 14. When the cord 17 is wound around the cord winding drum 14, the bottom rail 21 rises and the slat 1
9 are folded sequentially from the bottom. When the cord 17 is unwound from the cord winding drum 14, the bottom rail 21 is lowered and the slats 19 are gradually spaced apart from each other from above. And when moving up and down, the ladder cord 22
is moved by the frictional force with the cord winding drum 14, and one of the ladder cords 22 connected to both sides of the slat 19 in the width direction is pulled up and the other is lowered, so that the slat 19 is tilted. Therefore, when the slats 19 are moved up and down, the ends of the slats 19 in the width direction overlap each other. Therefore, unless you want to fold the whole thing up to the top, after pulling either one of the operating cords 30 to move it up and down, pull the other one a small distance from the side you have been pulling until now. The winding drum 14 is slightly reversed,
The side of the ladder cord 22 that has been pulled up until now is lowered, and the side that was lowered until now is pulled up, or conversely, when descending, the lower edge rises and the upper edge descends, so that the slat 19 is level. The slats 19 are now in an open state. When all of the slats 19 are folded to the highest level, when the highest slat 19 is lifted by the bottom rail 21, the portion of the ladder cord 22 that is wound around the cord winding drum 14 from the highest slat 19 becomes loose and the cord becomes loose. Frictional sliding with the winding drum 14 is released, and the slat 19 pushed up by the bottom rail 21 collides with the horizontal lower surface of the head box 11 and remains horizontal.

尚コード巻取ドラム14にコード17が巻取ら
れる際、コード巻取ドラム14は回転と同時にナ
ツト13とリードねじ12により長手方向に移動
するのでコード17はスパイラル状にコード巻取
ドラム14に巻取られるようになつている。
When the cord 17 is wound around the cord winding drum 14, the cord 17 is rotated and simultaneously moved in the longitudinal direction by the nut 13 and the lead screw 12, so the cord 17 is wound around the cord winding drum 14 in a spiral shape. It is starting to be taken.

上記ブラインドの他の従来例としてはヘツドボ
ツクス11の長さがスラツト19と同長のものが
あるが、ギヤボツクス15の位置は上記で説明し
た位置にあり、ギヤボツクス15の入力軸16か
らスラツト19の長手方向端部までの距離は上述
した処と同じである。
In another conventional example of the above blind, the length of the headbox 11 is the same as the length of the slat 19, but the position of the gearbox 15 is as explained above, and the length of the slat 19 from the input shaft 16 of the gearbox 15 is the same. The distance to the end in the direction is the same as described above.

「考案が解決しようとする問題点」 このような二重ガラス間にブラインドを備えた
窓ではギヤボツクスの入力軸からスラツトの長手
方向端部までの距離が長いため、操作用のコード
の吊下げ位置が内外障子のガラス3,7の面に
かゝり美観上好ましくない。
``Problem that the invention aims to solve'' In such windows with blinds between the double panes, the distance from the input shaft of the gearbox to the longitudinal end of the slat is long, so the hanging position of the operating cord is difficult. However, the surface of the glass 3 and 7 of the inner and outer shoji is not aesthetically pleasing.

この考案はガラス面外に操作用コードを吊り下
げることにより二重に障子を重ねて備えた二重ガ
ラス間にブラインドを備えた窓における上記問題
点を解消し、美観にすぐれたブラインド操作プー
リの装置を提供することを目的とする。
This invention solves the above-mentioned problems in windows with blinds between double-paned glass by hanging operating cords outside the glass surface, and creates an aesthetically pleasing blind operating pulley. The purpose is to provide equipment.

〔考案の構成〕[Structure of the idea]

「問題点を解決するための手段」 この考案は夫々ガラスを嵌めた内障子と外障子
を重ね合せて二重ガラスを備えた一つの障子と
し、内障子と外障子間の空間にブラインドを配し
た窓のブラインド操作装置において、該ブライン
ド操作装置はギヤボツクスと、操作軸と、操作プ
ーリ及び操作コードを備え、ギヤボツクスは上記
内障子と外障子間の空間上部に配設され、操作軸
は内障子の框を内外部方向に貫通して一端はギヤ
ボツクスと連結されると共に他端は操作プーリに
連結され、操作プーリには操作コードが掛けら
れ、操作プーリに掛けられた操作コードの垂下位
置が室内から外部側へ向つて見て堅框と一致する
位置になるようにギヤボツクス、操作軸、操作プ
ーリが配設されていることを特徴とするブライン
ド操作装置である。
``Means to solve the problem'' This idea was to stack inner and outer shoji, each with a glass inlay, to form a single shoji with double glass, and place blinds in the space between the inner and outer shoji. The blind operating device includes a gear box, an operating shaft, an operating pulley, and an operating cord, the gear box is disposed above the space between the inner shoji and the outer shoji, and the operating shaft is connected to the inner shoji. One end is connected to the gear box and the other end is connected to the operating pulley, and the operating cord is hung on the operating pulley, and the hanging position of the operating cord hung on the operating pulley is This blind operating device is characterized in that a gearbox, an operating shaft, and an operating pulley are arranged so as to be aligned with the rigid frame when viewed from the outside.

「実施例」 以下、この考案の実施例を図面に従つて説明す
る。第1図は窓の内部側より見る正面図、第2図
は第1図の平面図である。窓の機能は従来例の第
5図、第6図において説明した処と同じであり、
その説明は省略する。ブラインドの操作プーリ2
3は内障子8の堅框6bの上方に配されている。
操作コード30は第1図において窓に向つて内障
子の堅框6bの範囲内にある。
"Example" Hereinafter, an example of this invention will be described with reference to the drawings. FIG. 1 is a front view seen from the inside of the window, and FIG. 2 is a plan view of FIG. 1. The function of the window is the same as that explained in FIGS. 5 and 6 of the conventional example,
The explanation will be omitted. Blind operation pulley 2
3 is arranged above the solid frame 6b of the inner shoji 8.
The operating cord 30 is within the sill 6b of the sash facing the window in FIG.

第3図は第1図のA−A拡大断面図、第4図は
第1図のB−B拡大断面図である。開口枠1の内
周に囲繞して嵌め込まれたパツキン24は内障子
の框6の外側面に接している。開口枠1の外側材
の内周側で室内側に向つて開口する条溝に嵌め込
まれて囲繞するパツキン25は外障子の框2の外
側の縁に接しており、内外間の気密が保たれてい
る。内障子4の框6の室内側には額縁状に外フラ
ンジが設けられ、該フランジに外部側へ向つて開
口して設けられた条溝には開口枠1の内側材に接
するパツキン36が囲繞して嵌め込まれている。
3 is an enlarged sectional view taken along the line AA in FIG. 1, and FIG. 4 is an enlarged sectional view taken along the line BB in FIG. A gasket 24 that is fitted around the inner periphery of the opening frame 1 is in contact with the outer surface of the stile 6 of the inner shoji screen. A gasket 25 that is fitted into and surrounds a groove that opens toward the indoor side on the inner peripheral side of the outer material of the opening frame 1 is in contact with the outer edge of the frame 2 of the outer shoji, thereby maintaining airtightness between the inside and outside. ing. A frame-shaped outer flange is provided on the indoor side of the stile 6 of the inner shoji 4, and a gasket 36 in contact with the inner material of the opening frame 1 surrounds the groove provided in the flange to open toward the outside. It is embedded.

外障子の框2と内障子の框6の対向面の外周側
には夫々囲繞して条溝を設け、相手框に接するパ
ツキン26,27が設けられている。内外障子の
框2,6の該対向面の内周側はブラインド9が納
まる幅の空間となつている。この空間の上部で外
障子の上框2a、内障子の上框6a間にはブライ
ンドのヘツドボツクス11が配される。ヘツドボ
ツクス11は小ねじ37により内障子の上框6a
に固定されたブラケツト38により内障子の上框
6aに固定されている。ブラケツト38は軸38
aによりブラケツト本体38bに枢着されたバイ
ンダ38cが該本体38bにスナツプアクシヨン
で嵌め合せられることによりヘツドボツクス11
を抱くようにした公知のものである。ヘツドボツ
クス11内及びスラツトの吊下げ構造は既に従来
例で述べたブラインドと内部構造は同一であるの
でその説明は省略する。
A groove is provided surrounding the outer periphery of the opposing surfaces of the stile 2 of the outer shoji and the stile 6 of the inner shoji, and gaskets 26 and 27 are provided in contact with the mating stile. The inner periphery of the opposing surfaces of the frames 2 and 6 of the inner and outer shoji screens is a space with a width in which a blind 9 can be accommodated. In the upper part of this space, a blind headbox 11 is arranged between the upper stile 2a of the outer shoji and the upper stile 6a of the inner shoji. The head box 11 is attached to the upper stile 6a of the inner shoji using machine screws 37.
It is fixed to the upper stile 6a of the inner shoji by a bracket 38 fixed to. The bracket 38 is the shaft 38
The binder 38c, which is pivotally attached to the bracket main body 38b by a, is fitted onto the main body 38b by a snap action, thereby opening the head box 11.
This is a well-known method designed to hold the . The suspension structure within the head box 11 and the slats is the same as the internal structure of the blind already described in the conventional example, so a description thereof will be omitted.

ギヤボツクス15は内外障子の堅框2b,6b
間の空間の上方の空間にある。従つてヘツドボツ
クス11のギヤボツクス15のある側は内外障子
の上框2a,6aと堅框2b,6bが仕口となつ
ている近くの内外障子の框2,6の対向面間の空
間にある。ヘツドボツクス11はギヤボツクス1
5のない側は同様の位置で他の内外障子の堅框2
b,6bの上方空間にあるが短かくてもよい。
Gearbox 15 is the rigid frame of the inner and outer shoji screens 2b and 6b.
It is in the space above the space between. Therefore, the side of the headbox 11 with the gearbox 15 is located in the space between the opposing surfaces of the frames 2 and 6 of the inner and outer shoji near which the upper stile 2a, 6a and the hard frame 2b, 6b of the inner and outer shoji serve as a joint. Headbox 11 is gearbox 1
The side without 5 is the other outside and outside shoji frame 2 in the same position.
Although it is in the space above b and 6b, it may be short.

スラツト19の長さは内外障子のガラス3,7
の透光可能範囲の幅よりも大きく、スラツト19
の端部は内外障子の框2,6間に入り得るように
なつている。
The length of the slat 19 is the glass 3 and 7 of the inner and outer shoji.
The width of the slat 19 is larger than the width of the translucent range.
The ends of the shoji are adapted to fit between the frames 2 and 6 of the inner and outer shoji.

ギヤボツクス15の入力軸16に固定された操
作軸28は内障子の上框6aを貫通して内部側に
突出している。操作軸28は内障子の上框6aの
内部側面に小ねじ29により固定された軸受31
に軸承されており、軸端部に操作プーリ32が固
定されている。操作プーリ32には操作コード3
0が約180度巻掛けてある。操作コード30は内
障子の堅框6bの内側面に沿つて下り、堅框6b
の下方において、框6に小ねじ33により固定さ
れたふさ掛け34に巻付けてある。35は操作プ
ーリ32を蔽うことにより操作コード30がプー
リ32から脱落するのを防止するプーリカバーで
内障子の框6の内側面に固定してある。
An operating shaft 28 fixed to the input shaft 16 of the gearbox 15 penetrates the upper stile 6a of the inner shoji screen and projects inward. The operating shaft 28 has a bearing 31 fixed to the inner side surface of the upper stile 6a of the inner shoji with a machine screw 29.
The operating pulley 32 is fixed to the shaft end. Operation pulley 32 has operation code 3
0 is wrapped around 180 degrees. The operation cord 30 goes down along the inside surface of the hard frame 6b of the internal shoji, and
It is wrapped around a tassel 34 fixed to the stile 6 with machine screws 33 below. Reference numeral 35 is a pulley cover that prevents the operating cord 30 from falling off the pulley 32 by covering the operating pulley 32, and is fixed to the inner surface of the stile 6 of the internal shoji screen.

操作コード30をふさ掛け34から外して、何
れか一方を引くことにより、プーリ32が回転
し、操作軸28がその回転を入力軸16に伝え
る。既に従来例と同様の作用でスラツト19は上
下すると共に両方向に傾動する。
By removing the operating cord 30 from the locking hook 34 and pulling either one, the pulley 32 rotates, and the operating shaft 28 transmits the rotation to the input shaft 16. The slat 19 moves up and down and tilts in both directions in the same manner as in the conventional example.

〔考案の効果〕[Effect of idea]

この考案は夫々ガラスを嵌めた内障子と外障子
を重ね合せて二重ガラスを備えた一つの障子と
し、内障子と外障子間の空間にブラインドを配し
た窓のブラインド操作装置において、該ブライン
ド操作装置はギヤボツクスと、操作軸と、操作プ
ーリ及び操作コードを備え、ギヤボツクスは上記
内障子と外障子間の空間上部に配設され、操作軸
は内障子の框を内外部方向に貫通して一端はギヤ
ボツクスと連結されると共に他端は操作プーリに
連結され、操作プーリには操作コードが掛けら
れ、操作プーリに掛けられた操作コードの垂下位
置が室内から外部側へ向つて見て堅框と一致する
位置になるようにギヤボツクス、操作軸、操作プ
ーリが配設されていることを特徴とするブライン
ド操作装置としたから、操作コードが堅框と重な
り、ガラス面に出ないから美観にすぐれる。ブラ
インドのギヤボツクスの入力軸に操作プーリが直
結されているので操作は従来例と変ることなく軽
快である。
This invention is a window blind operation device in which an inner shoji and an outer shoji, each fitted with glass, are stacked to form a single shoji with double glass, and a blind is arranged in the space between the inner shoji and the outer shoji. The operating device includes a gearbox, an operating shaft, an operating pulley, and an operating cord. One end is connected to a gearbox, and the other end is connected to an operating pulley, an operating cord is hung on the operating pulley, and the hanging position of the operating cord hung on the operating pulley is a rigid frame when viewed from the indoor side to the outside. The blind operating device is characterized by having the gear box, operating shaft, and operating pulley located in the same position as the main frame, so the operating cord overlaps the frame and does not come out on the glass surface, which improves aesthetics. It can be done. Since the operating pulley is directly connected to the input shaft of the blind's gearbox, operation is as easy as conventional models.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの考案の実施例の内部側より見る正
面図、第2図は第1図の平面図、第3図は第1図
のA−A拡大断面図、第4図は第1図のB−B拡
大断面図、第5図は従来例の窓の内部側より見る
正面図、第6図は第5図の平面図、第7図乃至第
9図は従来のブラインドの三面図であつて、第7
図は平面図、第8図は正面図、第9図は一部断面
で示す側面図である。 1……開口枠、2……框、2a……上框、2b
……堅框、3……ガラス、4……外障子、5……
ヒンジ、6……框、6a……上框、6b……堅
框、7……ガラス、8……内障子、9……ブライ
ンド、10……ハンドル、11……ヘツドボツク
ス、12……リードねじ、13……ナツト、14
……コード巻取ドラム、15……ギヤボツクス、
16……入力軸、17……コード、18……長
孔、19……スラツト、21……ボトムレール、
22……ラダーコード、23……プーリ、24,
25,26,27……パツキン、28……操作
軸、29……小ねじ、30……操作コード、31
……軸受、32……操作プーリ、33……小ね
じ、34……ふさ掛け、35……プーリカバー、
36……パツキン、37……小ねじ、38……ブ
ラケツト。
Fig. 1 is a front view of the embodiment of this invention seen from the inside, Fig. 2 is a plan view of Fig. 1, Fig. 3 is an enlarged sectional view taken along line AA of Fig. 1, and Fig. 4 is a view of Fig. 1. Fig. 5 is a front view of the conventional window seen from the inside, Fig. 6 is a plan view of Fig. 5, and Figs. 7 to 9 are three-view views of the conventional blind. Atte, 7th
The figure is a plan view, FIG. 8 is a front view, and FIG. 9 is a partially sectional side view. 1...Opening frame, 2...Stile, 2a...Upper stile, 2b
...hard frame, 3...glass, 4...outer shoji, 5...
Hinge, 6...Stile, 6a...Top stile, 6b...Stile, 7...Glass, 8...Inner sash, 9...Blind, 10...Handle, 11...Head box, 12...Lead screw , 13...Natsuto, 14
...Cord winding drum, 15...Gearbox,
16...Input shaft, 17...Cord, 18...Elongated hole, 19...Slat, 21...Bottom rail,
22...Ladder cord, 23...Pulley, 24,
25, 26, 27...Packskin, 28...Operation shaft, 29...Machine screw, 30...Operation code, 31
... Bearing, 32 ... Operation pulley, 33 ... Machine screw, 34 ... Locking, 35 ... Pulley cover,
36...Packskin, 37...Machine screw, 38...Bracket.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 夫々ガラスを嵌めた内障子と外障子を重ね合せ
て二重ガラスを備えた一つの障子とし、内障子と
外障子間の空間にブラインドを配した窓のブライ
ンド操作装置において、該ブラインド操作装置は
ギヤボツクスと、操作軸と、操作プーリ及び操作
コードを備え、ギヤボツクスは上記内障子と外障
子間の空間上部に配設され、操作軸は内障子の框
を内外部方向に貫通して一端はギヤボツクスと連
結されると共に他端は操作プーリに連結され、操
作プーリには操作コードが掛けられ、操作プーリ
に掛けられた操作コードの垂下位置が室内から外
部側へ向つて見て竪框と一致する位置になるよう
にギヤボツクス、操作軸、操作プーリが配設され
ていることを特徴とするブラインド操作装置。
In a window blind operating device in which an inner shoji and an outer shoji each fitted with glass are stacked to form one shoji with double glass, and a blind is arranged in the space between the inner shoji and the outer shoji, the blind operating device is The gearbox is equipped with a gearbox, an operating shaft, an operating pulley, and an operating cord.The gearbox is disposed above the space between the inner shoji and the outer shoji, and the operating shaft passes through the stile of the inner shoji in the inner and outer directions, and one end is connected to the gearbox. and the other end is connected to an operating pulley, an operating cord is hung on the operating pulley, and the hanging position of the operating cord hung on the operating pulley matches the vertical stile when viewed from the indoor side to the outside. A blind operating device characterized in that a gearbox, an operating shaft, and an operating pulley are arranged so that the gearboxes, operating shafts, and operating pulleys are positioned at the same positions.
JP1986079738U 1986-05-27 1986-05-27 Expired JPH0450795Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986079738U JPH0450795Y2 (en) 1986-05-27 1986-05-27

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986079738U JPH0450795Y2 (en) 1986-05-27 1986-05-27

Publications (2)

Publication Number Publication Date
JPS62190094U JPS62190094U (en) 1987-12-03
JPH0450795Y2 true JPH0450795Y2 (en) 1992-11-30

Family

ID=30929887

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986079738U Expired JPH0450795Y2 (en) 1986-05-27 1986-05-27

Country Status (1)

Country Link
JP (1) JPH0450795Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3823850B2 (en) * 2002-03-01 2006-09-20 オイレスEco株式会社 Structure of blind device and window frame

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5738093B2 (en) * 1977-05-16 1982-08-13

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5451449U (en) * 1977-09-19 1979-04-10
JPS55143383U (en) * 1979-04-03 1980-10-14
JPS5738093U (en) * 1980-08-11 1982-03-01

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5738093B2 (en) * 1977-05-16 1982-08-13

Also Published As

Publication number Publication date
JPS62190094U (en) 1987-12-03

Similar Documents

Publication Publication Date Title
USRE35926E (en) Venetian- or pleated blinds, particularly for multiple pane insulating glass window
CN210768543U (en) Stay cord type hollow glass with built-in shutter
JPH0450795Y2 (en)
US10407980B2 (en) Cordless window covering system with bearings
WO1991014069A1 (en) Window blind or curtain, particularly for two-pane insulating glass window
JPH0671885U (en) Blind assembly shoji
CN209942687U (en) Shutter lifting adjusting device
JPH0354303Y2 (en)
JPH0328155Y2 (en)
JP2005282133A (en) Lifting limit stop device for solar radiation shielding device
JPH031987Y2 (en)
KR102347603B1 (en) Automated blind
JPS6329109Y2 (en)
JPH0211587Y2 (en)
JPS641636B2 (en)
JPH0543189Y2 (en)
JPH026231Y2 (en)
JPH0541198Y2 (en)
JP4079855B2 (en) Double-glazed glass with blinds
JPH0227120Y2 (en)
JPH0527675Y2 (en)
JPS642946Y2 (en)
JP3728559B2 (en) Glass panel with built-in blinds
TR2021002774U5 (en) JAUZZI MOVEMENT MECHANISM BETWEEN DOUBLE WINDOW
JPS6334957B2 (en)