JPH02153168A - On-site welding method for steel beams - Google Patents
On-site welding method for steel beamsInfo
- Publication number
- JPH02153168A JPH02153168A JP30823588A JP30823588A JPH02153168A JP H02153168 A JPH02153168 A JP H02153168A JP 30823588 A JP30823588 A JP 30823588A JP 30823588 A JP30823588 A JP 30823588A JP H02153168 A JPH02153168 A JP H02153168A
- Authority
- JP
- Japan
- Prior art keywords
- steel
- connections
- welded
- joints
- steel beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【発明の詳細な説明】
[産業上の利用分野]
この発明は、鉄骨柱の側部に突設されている梁仕口と鉄
骨梁とを現場にて溶接する方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a method of welding a beam joint protruding from the side of a steel column and a steel beam on site.
[従来の技術]
一般的に、鉄骨梁の現場溶接は、鉄骨柱の梁仕口部の梁
上に作業者が待機していて、鉄骨柱の梁仕口間に鉄骨梁
を吊り上げ梁の高さと巾方向(7ランジ)を合わせるに
は、クレーンの運転手に合図を送りながら、上下または
左右にクレーンを操作しつつ微調整を行なった上、鉄骨
梁のウェブ部に明けである孔と、鉄骨梁側に取付けであ
るスプライスプレートの孔に、ドリフトビン(ポルシン
)等を差し込み、ボルト孔の位置を合わせることで、梁
仕口と鉄骨梁を固定し、その後、ウェブ部の本締めボル
トを行った侵、上下のフランシブ部の溶接を行っている
。[Conventional technology] Generally, in on-site welding of steel beams, a worker waits on the beam at the beam joint of the steel column, and then lifts the steel beam between the beam joints of the steel column and adjusts the height of the beam. To match the height and width direction (7 lunges), while sending a signal to the crane driver, we made fine adjustments while operating the crane up and down or left and right, and then drilled holes in the web of the steel beam. Insert a drift bottle (Porusin) etc. into the hole of the splice plate attached to the steel beam side and align the bolt holes to fix the beam joint and the steel beam. Then, tighten the bolts on the web part. The welding of the upper and lower flank parts is being carried out.
[発明が解決しようとする課題1
上記方法では、鉄骨柱の梁仕口と鉄骨梁を溶接するため
の前工程である梁の高さ合わせと、鉄骨梁の巾方向の合
わせに時間を要する等の問題を有する。[Problem to be solved by the invention 1] In the above method, it takes time to adjust the height of the beam and the width direction of the steel beam, which are the pre-processes for welding the beam joint of the steel column and the steel beam. have a problem.
この発明はそのような問題を解決するために考えられた
ものであって、その目的は梁仕口と鉄骨梁相互の梁の^
さ維持ができ、かつ鉄骨梁の11方向の通り合わせが容
易にでき、鉄骨梁相互の溶接を行なうことができる新た
な鉄骨梁の現場溶接方法を提供することにある。This invention was devised to solve such problems, and its purpose is to improve the relationship between beam joints and steel beams.
To provide a new on-site welding method for steel beams, which can maintain the same height, easily align the steel beams in 11 directions, and weld the steel beams together.
[課題を解決するための手段]
上記目的によるこの発明の特徴は、鉄骨梁の接続端上に
、下辺が水平で一側面に吊具取付は孔を貫設した金具を
、接!端より一端を突出して溶接し、その金具を介し鉄
骨梁を吊り上げて、鉄骨柱の梁仕口の間に吊り込み、梁
仕口の上に係着した上記金具により鉄骨梁を支持し、梁
仕口と鉄骨梁の溶接を行なうことにある。[Means for Solving the Problems] A feature of the present invention according to the above object is that a metal fitting with a horizontal lower side and a hole through which a hanging device is attached is connected to the connecting end of a steel beam! One end is welded to protrude from the other end, and the steel beam is lifted up through the metal fittings, suspended between the beam joints of the steel column, and the steel beam is supported by the metal fittings fixed above the beam joints. The purpose is to weld joints and steel beams.
〔作 用]
上記方法では、梁仕口上の金具により鉄骨梁が梁仕口と
同一高さに支持され、かつ巾方向の通り合わせが容易で
き、また梁仕口の上から溶接を手際よく行なうことがで
きる。[Function] In the above method, the steel beam is supported at the same height as the beam joint by the metal fittings on the beam joint, and alignment in the width direction is easy, and welding can be performed efficiently from above the beam joint. be able to.
以下一実施例として、鉄骨ウェア部がボルト接合で、上
下のフランジ部を現場溶接で実施する場合について図面
により説明する。As an example, a case will be described below with reference to drawings in which the steel frame wear part is bolted and the upper and lower flange parts are welded on site.
[実施例]
図中1は鉄骨柱、2は鉄骨柱1の側部に突設した梁仕口
、3は鉄骨梁である。[Example] In the figure, 1 is a steel column, 2 is a beam joint protruding from the side of the steel column 1, and 3 is a steel beam.
上記梁仕口2及び鉄骨梁3は同−費丈からなり、また双
方の接続端のウェブ2a、3aにはボルト孔が位置を同
じ(して穿設しである。The beam joint 2 and the steel beam 3 have the same length, and bolt holes are drilled at the same position in the webs 2a and 3a at the connecting ends of both.
また上記鉄骨梁3の接続端の上フランジ3bの上には、
金具4が一端を水平に突出させて溶接により取付けであ
る。、この金具4は水平な下辺の中央に凹所を有する厚
手の長方形の金属片からなり、また鉄骨梁3に溶接した
側の側面には吊具取付は孔5が貫設しである。Moreover, on the upper flange 3b of the connection end of the steel beam 3,
The metal fitting 4 is attached by welding with one end protruding horizontally. The metal fitting 4 is made of a thick rectangular metal piece with a recess in the center of the horizontal lower side, and a hole 5 is provided through the side surface welded to the steel beam 3 for attaching a hanging device.
この吊具取付は孔5にはシャックル6が取付けられ、そ
のシャックル6に取付けた玉掛はワイヤー7とともに、
鉄骨梁3はクレーンなどにより吊り揚げられ、更に梁仕
口2の間に吊り込まれる。To attach this hanging tool, a shackle 6 is attached to the hole 5, and the sling attached to the shackle 6 is attached to the wire 7.
The steel beam 3 is hoisted up by a crane or the like, and further suspended between the beam joints 2.
梁仕口間の鉄骨梁3は梁仕口2の上フランジ2bの上に
乗った上記金具4の突出部分により支持される。The steel beam 3 between the beam joints is supported by the protruding portion of the metal fitting 4 mounted on the upper flange 2b of the beam joint 2.
この金具4による支持により、鉄骨梁3と鉄骨仕口2と
の高さに狂いはなく、ポル]・位置にもずれが生じない
ので、直に継手板8とボルト9とによる両ウェアの接続
を行なうことができる。By supporting this metal fitting 4, there is no deviation in the height of the steel beam 3 and the steel joint 2, and there is no deviation in the position of the steel beam 3, so the joint plates 8 and bolts 9 directly connect the two pieces. can be done.
このウェア接続後に玉掛はワイヤー7を外し上7ランジ
2b、3b及び下フランジ2c、3cの相互の溶接を梁
仕口2の上から行なう。After this wear connection, the sling wire 7 is removed and the upper 7 flanges 2b, 3b and the lower flanges 2c, 3c are welded together from above the beam joint 2.
なお、この発明による鉄骨梁の現場溶接方法は、本実施
例に限定されるものではなく、鉄骨梁の上下7ランジ部
歯及びウェブ部のぬてが現場溶接によるものにも適用で
きるものである。The on-site welding method for steel beams according to the present invention is not limited to this embodiment, but can also be applied to cases in which the upper and lower seven flange teeth and web portions of the steel beam are welded on-site. .
し発明の効果]
この発明は上述のように、鉄骨梁の接続端上に、下辺が
水平で一側面に吊具取付は孔を貫設した金具を、接続端
より一端を突出して溶接し、その金具を介して鉄骨梁を
鉄骨柱の梁仕口の間に吊り込むとともに、梁仕口の上に
係着した上記金具により鉄骨梁を支持し、梁仕口と鉄骨
梁の溶接を行なうことから、従来方法に比べて作業工程
が少なく、また高さ保持も容易で位置合せも簡単に済み
、玉掛はワイヤー等の吊り上げワイヤーを金具に取付け
るのでワイヤーの着脱も容易となり、梁仕口の上から簡
単に外せるなど作業の安全性を確保でき、これまでの方
法よりも能率が一段と向上するなどの利点を有する。[Effects of the Invention] As described above, the present invention welds a metal fitting whose lower side is horizontal and has a hole for attaching a hanger on one side, with one end protruding from the connection end, on the connection end of a steel beam. Suspending the steel beam between the beam joints of the steel columns via the metal fittings, supporting the steel beams with the metal fittings attached above the beam joints, and welding the beam joints and the steel beams. Therefore, compared to the conventional method, there are fewer work steps, and the height can be easily maintained and positioning can be done easily.As the sling is attached to the metal fittings, the lifting wire such as wire is attached to the metal fittings, so it is easy to attach and detach the wire. It has the advantage of being able to ensure work safety, such as being easily removed from the body, and being much more efficient than previous methods.
図面はこの発明に係る鉄骨梁7ランジの現場溶接方法を
例示するもので、第1図は鉄骨柱と鉄骨梁との正面図、
第2図は梁端部の斜視図、第3図は接続時の部分正面図
である。
1・・・・・・鉄骨柱
3・・・・・・鉄骨梁
5・・・・・・吊具取付は孔
7・・・・・・ワイヤー
9・・・・・・ボルト
2a、3a・・・・・・ウェブ
2b、3b・・・・・・上フランジ
2G、3C・・・・・・下フランジ
2・・・・・・梁仕口
4・・・・・・金具
6・・・・・・シャックル
8・・・・・・継手板The drawings illustrate an on-site welding method for a seven-lunge steel beam according to the present invention, and FIG. 1 is a front view of a steel column and a steel beam;
FIG. 2 is a perspective view of the end of the beam, and FIG. 3 is a partial front view when connected. 1... Steel column 3... Steel beam 5... Hole 7... Wire 9... Bolts 2a, 3a. ... Webs 2b, 3b ... Upper flanges 2G, 3C ... Lower flange 2 ... Beam joint 4 ... Metal fittings 6 ... ...Shackle 8...Joint plate
Claims (1)
孔を貫設した金具を、接続端より一端を突出して溶接し
、その金具を介し鉄骨梁を吊り上げて、鉄骨柱の梁仕口
の間に吊り込み、梁仕口の上に係着した上記金具により
鉄骨梁を支持し、梁仕口と鉄骨梁の溶接を行なうことを
特徴とする鉄骨梁の現場溶接方法Weld a metal fitting with a horizontal lower side and a hanging tool installation hole on one side on the connection end of the steel beam, with one end protruding from the connection end, and lift the steel beam through the metal fitting to attach it to the steel beam. A method for on-site welding of steel beams, characterized in that the steel beams are supported by the metal fittings suspended between the joints and attached to the beam joints, and the beam joints and the steel beams are welded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30823588A JP2648801B2 (en) | 1988-12-06 | 1988-12-06 | Field welding method for steel beams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30823588A JP2648801B2 (en) | 1988-12-06 | 1988-12-06 | Field welding method for steel beams |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH02153168A true JPH02153168A (en) | 1990-06-12 |
JP2648801B2 JP2648801B2 (en) | 1997-09-03 |
Family
ID=17978562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP30823588A Expired - Fee Related JP2648801B2 (en) | 1988-12-06 | 1988-12-06 | Field welding method for steel beams |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2648801B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0626236A (en) * | 1992-07-08 | 1994-02-01 | Kajima Corp | High damping frame structuring method |
CN106285015A (en) * | 2015-05-28 | 2017-01-04 | 五冶集团上海有限公司 | Steel structural roof beam method for rapidly mounting based on location-plate |
CN106499061A (en) * | 2016-10-21 | 2017-03-15 | 刘振华 | A kind of aerial laterally para-position attachment means of steel construction |
CN106869508A (en) * | 2017-03-02 | 2017-06-20 | 浙江中南建设集团钢结构有限公司 | A kind of assembled architecture steel box column rotates lifting and is welded and fixed mounting process in place |
-
1988
- 1988-12-06 JP JP30823588A patent/JP2648801B2/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0626236A (en) * | 1992-07-08 | 1994-02-01 | Kajima Corp | High damping frame structuring method |
CN106285015A (en) * | 2015-05-28 | 2017-01-04 | 五冶集团上海有限公司 | Steel structural roof beam method for rapidly mounting based on location-plate |
CN106499061A (en) * | 2016-10-21 | 2017-03-15 | 刘振华 | A kind of aerial laterally para-position attachment means of steel construction |
CN106869508A (en) * | 2017-03-02 | 2017-06-20 | 浙江中南建设集团钢结构有限公司 | A kind of assembled architecture steel box column rotates lifting and is welded and fixed mounting process in place |
CN106869508B (en) * | 2017-03-02 | 2018-09-14 | 浙江中南建设集团钢结构有限公司 | A kind of rotation lifting of assembled architecture steel box column is welded and fixed mounting process in place |
Also Published As
Publication number | Publication date |
---|---|
JP2648801B2 (en) | 1997-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211173170U (en) | A appurtenance for girder steel installation | |
JPH02153168A (en) | On-site welding method for steel beams | |
JP2000291262A (en) | Erection piece for column construction and column construction method | |
JPH06117019A (en) | Beam steel frame positioning connection method | |
JP2833430B2 (en) | Beam holding structure in column-beam installation structure | |
JP2631604B2 (en) | Steel frame positioning connection method | |
CN211283402U (en) | Hoisting device for hoisting by using I-beam | |
CN220449533U (en) | Adjustable I-shaped section steel beam lifting appliance | |
JPH08114302A (en) | Boiler installing method and boiler installation structural body | |
JPS6243080Y2 (en) | ||
JP2001032370A (en) | Joint structure of steel pipe column and steel frame beam, and its connection method | |
JPH07310369A (en) | Joining structure of steel column and steel beam and joining method | |
CN217711648U (en) | Suspension post assembled node under H shaped steel roof beam | |
JPS6010796Y2 (en) | Hanging pipe beveling jig | |
JPH0762885A (en) | Steel post alignment jig device | |
JP2022044312A (en) | Assembling method of suspension device and suspension device | |
JPH0516283Y2 (en) | ||
JPH0978840A (en) | Hanging metal tool for building | |
JP2524883Y2 (en) | Corner piece mounting jig | |
JPS6234083Y2 (en) | ||
JPH0630967Y2 (en) | Connection structure of columns and beams | |
CN110697559A (en) | Hoisting device for hoisting by using I-beam | |
JP2569898Y2 (en) | Jig for building long steel | |
JPS6316401Y2 (en) | ||
JP2024139184A (en) | Beam replacement tool and beam replacement method using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |