JP6893980B2 - Energy management equipment and methods, energy management systems and operation planning methods for energy management systems - Google Patents
Energy management equipment and methods, energy management systems and operation planning methods for energy management systems Download PDFInfo
- Publication number
- JP6893980B2 JP6893980B2 JP2019524622A JP2019524622A JP6893980B2 JP 6893980 B2 JP6893980 B2 JP 6893980B2 JP 2019524622 A JP2019524622 A JP 2019524622A JP 2019524622 A JP2019524622 A JP 2019524622A JP 6893980 B2 JP6893980 B2 JP 6893980B2
- Authority
- JP
- Japan
- Prior art keywords
- schedule
- power
- demand
- establishment
- energy management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、複数の発電事業所と複数の受電事業所で構成された事業体内で電力供給を行うためのエネルギー管理装置および方法、エネルギー管理システム並びにエネルギー管理システムの運転計画方法に係り、特に受電事業所の電力を消費する工程のスケジュールを管理するシステムと連携して、事業体内で電力融通を行うことができるエネルギー管理装置および方法、エネルギー管理システム並びにエネルギー管理システムの運転計画方法に関する。 The present invention relates to an energy management device and method for supplying electric power in a business entity composed of a plurality of power generation establishments and a plurality of power receiving establishments, an energy management system, and an operation planning method of the energy management system, and particularly to receive power. The present invention relates to an energy management device and method capable of performing power interchange within a business establishment, an energy management system, and an operation planning method of the energy management system in cooperation with a system that manages a schedule of processes that consume electric power in a business establishment.
近年、エネルギーコスト低減およびCO2排出削減を目的として、再生可能エネルギー、コージェネレーション、蓄電池等の分散型エネルギーを組み合わせ、地域内で電力を相互融通するニーズが増大している。In recent years, there has been an increasing need for mutual interchange of electric power in a region by combining distributed energies such as renewable energy, cogeneration, and storage batteries for the purpose of reducing energy costs and CO 2 emissions.
具体的には、例えば、複数の事業所を所有する事業体では、自家発電設備を所有している事業所(発電事業所)で発電余力があり、外部電力を購入している事業所(受電事業所)で電力が不足する場合、発電事業所から受電事業所に電力を融通する。この際、電力系統を経由して電力融通する場合に、事業体は託送料金を支払う必要があるが、託送料金を含めた発電単価が、外部電力の単価より安い場合は事業体にとってコストメリットがある。この点に関し、国内では、2014年に電力システム改革の一環で電力自己託送制度が開始され、同一事業体内の電力融通の場合、低い託送料金が適用されることになった。そのため、今後、複数事業所を所有する事業体、特に複数の製造工場を所有する企業で普及すると予想される。 Specifically, for example, in an entity that owns multiple establishments, the establishment that owns its own power generation facility (power generation establishment) has surplus power generation capacity and the establishment that purchases external power (power receiving). If there is a shortage of power at the business establishment), the power will be transferred from the power generation business establishment to the power receiving business establishment. At this time, when power is interchanged via the power system, the business entity must pay a consignment fee, but if the power generation unit price including the consignment fee is lower than the unit price of external power, there is a cost advantage for the business entity. is there. In this regard, in Japan, the self-consignment system for electric power was started as part of the reform of the electric power system in 2014, and a low consignment fee will be applied in the case of power interchange within the same business. Therefore, it is expected that it will be widely used in businesses that own multiple business establishments, especially companies that own multiple manufacturing plants.
然るに、電力系統を経由した自己託送を行う場合、例えば前日に計画値を提出し、当日は計画値を守るように電力を供給する計画値同時同量の義務があり、差異(インバランス)が生じた場合にはインバランス料金を支払う必要がある。そのため、計画を作成するときには、受電事業所の電力需要を高精度で予測することが重要である。 However, when self-consignment via the power system is performed, for example, the planned value must be submitted the day before, and the same amount of power is supplied at the same time as the planned value to keep the planned value on the day, and there is a difference (imbalance). If it does occur, you will have to pay an imbalance fee. Therefore, when making a plan, it is important to predict the power demand of the power receiving establishment with high accuracy.
従来の電力融通に関する技術として、特許文献1では、実績データに基づき受電事業所(需要家)の電力量の予測を行い、発電事業所の発電機の燃料消費特性、送電損失率、託送料金を考慮して自己託送電力量を決定する方法を提案している。
As a conventional technology related to electric power interchange,
しかし、受電事業所が製造工場の場合、多数の生産工程のなかにはスケジュールの未確定なものが複数存在するため、電力需要予測の誤差は大きくなり、自己託送計画は不確実なものとなり、結果的にインバランスが発生する可能性がある。また、受電事業所では外部からの購入電力が契約電力を超過するリスクも生じるという課題がある。 However, if the power receiving office is a manufacturing factory, there are multiple production processes with uncertain schedules, so the error in power demand forecast becomes large, and the self-consignment plan becomes uncertain, resulting in Imbalance may occur. In addition, there is a problem that there is a risk that the power purchased from the outside exceeds the contract power at the power receiving business.
本発明は、係る問題に鑑みてなされたものであって、その目的とするところは、製造工場を含む複数の受電事業所と複数の発電事業所から構成される事業体において、製造工場の複数の生産スケジュールの不確実性を考慮することにより自己託送計画を立案し、さらに生産スケジュールの調整により、電力需要を変更して計画値同時同量を守るエネルギー管理装置および方法、エネルギー管理システム並びにエネルギー管理システムの運転計画方法を提供することにある。 The present invention has been made in view of the above problems, and an object of the present invention is to have a plurality of manufacturing plants in an entity composed of a plurality of power receiving establishments including a manufacturing plant and a plurality of power generation establishments. Self-consignment plan is made by considering the uncertainty of the production schedule, and energy management equipment and method, energy management system and energy that change the power demand and keep the same amount as the planned value by adjusting the production schedule. The purpose is to provide an operation planning method for the management system.
以上のことから本発明においては、「電力系統に接続された発電事業所と受電事業所を備えた事業体におけるエネルギー管理装置であって、
前記発電事業所と前記受電事業所にはEMS(エネルギー管理装置:Energy Management System)が、前記事業体にはAEMS(地域エネルギー管理装置:Area Energy Management System)が設置され、
前記受電事業所のEMSは、予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
前記AEMSは、前記受電事業所のEMSから報告された、予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所全体の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所のEMSは、前記AEMSが定めた自己託送計画出力に従い発電することを特徴とするエネルギー管理装置。」としたものである。From the above, in the present invention, "an energy management device in an enterprise having a power generation establishment and a power receiving establishment connected to an electric power system.
An EMS (energy management device: Energy Management System) is installed in the power generation establishment and the power receiving establishment, and an AEMS (regional energy management device: Area Energy Management System) is installed in the business entity.
The EMS of the power receiving establishment predicts the power transition for each production line on the scheduled date, classifies the operation schedule of the production line on the scheduled date into a fixed schedule, an unfixed schedule, and an adjustable schedule.
The AEMS determines the classified operation schedule on the scheduled date, the fixed demand on the scheduled date from the power transition, and the maximum demand in consideration of the undetermined schedule reported from the EMS of the power receiving establishment, and the maximum demand. And the minimum self-consignment amount obtained as the difference of the contracted power of the entire power receiving establishment and the self-consignment plan output to the power receiving establishment within the range of the fixed demand are determined.
The EMS of the power generation establishment is an energy management device characterized in that power is generated in accordance with the self-consignment planned output defined by the AEMS. ".
また本発明においては「電力系統に接続された発電事業所と受電事業所を備えた事業体におけるエネルギー管理方法であって、
前記受電事業所について、予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所全体の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所は、前記自己託送計画出力に従い発電することを特徴とするエネルギー管理方法。」としたものである。Further, in the present invention, "an energy management method in an entity having a power generation establishment and a power receiving establishment connected to an electric power system.
For the power receiving establishment, the power transition for each production line on the scheduled date is predicted, and the operation schedule of the production line on the scheduled date is classified into a fixed schedule, an unfixed schedule, and an adjustable schedule.
From the classified operation schedule and the power transition on the scheduled date, the fixed demand on the scheduled date and the maximum demand in consideration of the undetermined schedule are determined, and the minimum calculated as the difference between the maximum demand and the contracted power of the entire power receiving establishment. Determine the self-consignment plan output to the power receiving establishment within the range of the self-consignment amount and the fixed demand.
The energy management method, wherein the power generation establishment generates power according to the self-consignment plan output. ".
また本発明においては「電力系統に接続された発電事業所と受電事業所を備えた事業体におけるエネルギー管理システムであって、
予定日における前記受電事業所全体のエネルギー需要予測において需要変動要因を定める需要変動要因決定手段と、前記需要変動要因に基づき予定日における需要変動量を評価して、前記受電事業所全体のエネルギー生産・購入・取引計画を作成する作成手段、前記作成手段により作成したエネルギー生産・購入・取引計画についての複数のプランを提示する提示手段を備えることを特徴とするエネルギー管理システム。」としたものである。Further, in the present invention, "an energy management system in an entity having a power generation establishment and a power receiving establishment connected to an electric power system.
Energy production of the entire power receiving establishment by evaluating the demand fluctuation amount on the scheduled date based on the demand fluctuation factor determining means that determines the demand fluctuation factor in the energy demand forecast of the entire power receiving establishment on the scheduled date. -An energy management system characterized in that it is provided with a means for creating a purchase / transaction plan and a means for presenting a plurality of plans for energy production / purchase / transaction plans created by the means for creating an energy production / purchase / transaction plan. ".
また本発明においては「電力系統に接続された発電事業所と受電事業所を備えた事業体におけるエネルギー管理の運転計画方法であって、
予定日における前記受電事業所全体のエネルギー需要予測において、エネルギー需要に起因するスケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、未確定スケジュールに基づき需要の最大誤差を評価し、エネルギー生産・購入・取引計画を作成する場合、計画値に合うように調整可能スケジュールを変更することを特徴とするエネルギー管理システムの運転計画方法。」としたものである。Further, in the present invention, "an operation planning method for energy management in an entity having a power generation establishment and a power receiving establishment connected to an electric power system.
In the energy demand forecast for the entire power receiving facility on the scheduled date, the schedules caused by energy demand are classified into fixed schedules, unfixed schedules, and adjustable schedules, the maximum error of demand is evaluated based on the unfixed schedules, and energy production is performed. -When creating a purchase / transaction plan, an operation planning method for an energy management system characterized by changing an adjustable schedule to match the planned value. ".
本発明によれば、計画値同時同量を守りながら自己託送量を最大化することにより、事業体全体のエネルギーコストを低減できる。 According to the present invention, the energy cost of the entire business entity can be reduced by maximizing the self-consignment amount while maintaining the same planned value at the same time.
以下、本発明の実施形態について、図面を参照して説明する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings.
図1は、本発明の実施例に係る事業体の構成の一例を示している。事業体3は、電力系統1に接続された複数の発電事業所4(4aから4n)と複数の受電事業所5(5Aから5M)により構成されている。
FIG. 1 shows an example of the configuration of an entity according to an embodiment of the present invention. The
ここで、発電事業所4は、発電設備9、負荷10、エネルギーマネジメントシステム(以下EMSと称する)6から構成されており、発電事業所の負荷10および事業体3内の他の受電事業所5に電力を供給することができる。また電力が不足する場合は、電力会社などの外部電力を購入する。
Here, the
他方、受電事業所5には、発電設備9が設置されておらず、負荷10とEMS22から構成されており、受電事業所の負荷10に対して、他の発電事業所5および電力会社2等の外部電力から電力が供給される。なお、受電事業所5が製造工場の場合に、受電事業所5内の生産工程を管理する製造実行システム(以下MESという)8を備えている。MES8について後述する。
On the other hand, the
また事業体3には、地域エネルギーマネジメントシステム(以下AEMSという)7が設置され、事業体3内の発電事業所4と受電事業所5の間の自己託送の管理を実施する。AEMS7については、発電事業所4の中に設置されたEMS6と、受電事業所5の中に設置されたEMS22との間で、通信線を用いた信号伝送が行われる。
In addition, a regional energy management system (hereinafter referred to as AEMS) 7 is installed in the
図2は、本発明の実施例に係る事業体3内のシステム構成の一例を示している。なお、事業体3内には、複数の発電事業所4(4aから4n)と複数の受電事業所5(5Aから5M)を備えているが、これらは基本的に同じ構成とされているので、以下においては発電事業所4aと受電事業所5Aを代表事例として具体的な構成について説明する。
FIG. 2 shows an example of a system configuration in the
発電事業所4aにはEMS6aが設置され、AEMS7からの自己託送計画信号100に基づいて発電設備9の運転を行う。
The EMS 6a is installed in the
他方、受電事業所5Aについて、本実施例では、受電事業所5Aが製造工場である場合を示している。受電事業所5Aが製造工場の場合に、受電事業所5A内のエネルギー管理はEMS22Aが行うが、それ以外に生産工程を管理する製造実行システム(以下MESという)8A、生産工程のスケジュールを管理する生産スケジュール管理機能11A、生産・自己託送計画の候補を表示する生産・自己託送計画候補表示機能12Aが設置されている。
On the other hand, regarding the
AEMS7は、事業体3全体の電力需要を評価する需要予測機能13、各受電事業所5の生産スケジュールを調整する生産スケジュール調整機能14、事業体全体の自己託送計画を生成する自己託送計画機能15、自己託送の結果を出力する結果出力機能16から構成されている。
以下に、自己託送の計画生成フローの一例を示した図4を用いて、自己託送の計画生成手順を説明する。自己託送の計画生成手順は、複数の受電事業所5(5Aから5M)と複数の発電事業所4(4aから4n)とAEMS7の間で実行され、受電事業所5(5Aから5M)と発電事業所4(4aから4n)側が提示する電力需要予測情報に基づいて、AEMS7側で自己託送計画を作成し、受電事業所5(5Aから5M)で自己託送計画受け入れの可否を判断していくという流れのものである。 The procedure for generating a plan for self-consignment will be described below with reference to FIG. 4, which shows an example of the plan generation flow for self-consignment. The self-consignment plan generation procedure is executed between a plurality of power receiving establishments 5 (5A to 5M), a plurality of power generation establishments 4 (4a to 4n), and AEMS7, and power generation with the power receiving establishment 5 (5A to 5M). Based on the power demand forecast information presented by the business establishment 4 (4a to 4n), the AEMS7 side creates a self-consignment plan, and the power receiving establishment 5 (5A to 5M) decides whether or not to accept the self-consignment plan. It is a flow of.
最初に受電事業所5(5Aから5M)側において、処理ステップS1から処理ステップS4を実行し、AEMS7側に提示する電力需要予測情報を定める。 First, the power receiving establishment 5 (5A to 5M) side executes the processing steps S1 to S4, and determines the power demand forecast information to be presented to the AEMS7 side.
具体的には、まず図4の処理ステップS1において、各受電事業所5のMES8で、従来実績または計算により生産ライン毎の電力消費を予測する。処理ステップS2では、各受電事業所5において生産スケジュール管理機能11により、生産ライン毎の電力消費を、MES8で入力された情報に基づき、図5に示すように、確定スケジュール、未確定スケジュール、調整可能スケジュールに分類する。
Specifically, first, in the processing step S1 of FIG. 4, the MES8 of each
ここで図5は、受電事業所5Aが有する生産ライン5AL1、5AL2、・・・5ALPに関して、明日(予定日)の生産ラインのスケジュール5AL1S、5AL2S、・・・5ALPSと、その電力需要5AL1P、5AL2P、・・・5ALPPの時間変化を模式的に示している。
Here, FIG. 5 shows the schedule 5AL1S, 5AL2S, ... 5ALPS of the production line tomorrow (scheduled date) and the power demand 5AL1P, 5AL2P for the production lines 5AL1, 5AL2, ... 5ALP owned by the
このうち、受電事業所5Aが有する生産ライン5AL1の生産ラインスケジュール5AL1Sについて、これは明日(予定日)の操業予定時刻が8時から20時であることが確定し、各種の材料、機材、人員、搬出手順の予定などが準備完了しており、明日(予定日)は予定通りに稼働すべき生産ラインである。この場合の電力需要は5AL1Pのようであり、10時から15時の間でピークとなる。この場合に、生産ラインスケジュール5AL1Sは、確定スケジュールと定義される。
Of these, regarding the production line schedule 5AL1S of the production line 5AL1 owned by the
受電事業所5Aが有する生産ライン5AL2の生産ラインスケジュール5AL2Sについて、これは当初の明日(予定日)の操業予定時刻が実線で示すように10時から18時であるが、予定開始時刻Tsについて、10時よりも早まる可能性があり、明日(予定日)にならないと予定開始時刻Tsを特定できない状態である。今日現在の計画段階において、例えば8時から10時までの時間幅dTuは未確定時間幅であり、この場合に、生産ラインスケジュール5AL2Sは未確定スケジュールと定義される。未確定スケジュールの場合、明日(予定日)の電力需要5AL2Pは、操業が前倒しされる可能性があることに応じて、点線で示すように電力需要変動パターンの開始および終了時刻が変動することになる。
Regarding the production line schedule 5AL2S of the production line 5AL2 owned by the
受電事業所5Aが有する生産ライン5ALPの生産ラインスケジュール5ALPSについて、これは明日(予定日)の操業予定が9時から18時であるが、例えば明日(予定日)中に終了すればよいので操業予定を11時から20時に移行して運用することが可能な状態にある。後者の時間帯を選択した場合に、予定開始時刻Tsを調整可能時間幅dTcだけ移動させて運用することになる。この場合に、生産ラインスケジュール5ALPSは調整可能スケジュールと定義される。
Regarding the production line schedule 5ALPS of the production line 5ALP owned by the
このように処理ステップS2では、生産スケジュール管理機能11により、生産ライン毎の電力消費を、MES8で入力された情報に基づき、確定スケジュール、未確定スケジュール、調整可能スケジュールのいずれかに定義、分類する。
In this way, in the processing step S2, the production
さらに処理ステップS3では、生産スケジュール管理機能11は、未確定スケジュールについて、未確定時間幅dTuを予測する。例えば未確定スケジュールとされた生産ラインスケジュール5AL2Sについて、先の説明では10時の予定を8時に前倒しすることについて説明したが、8時以外の時刻を予定開始時刻Tsとして想定する。ここで、生産スケジュール管理機能11は、図3に示すようにオペレータ入力機能17、または機械学習機能18を備えている。オペレータ入力機能17は、製造工場のサプライチェーン情報および過去の未確定スケジュールに関するデータベース19を参照して、オペレータが未確定時間幅dTuを見積もり入力した結果をEMS22に出力する。または、機械学習機能18は、データベース19を参照して機械学習により未確定時間幅dTuを計算し、EMS22に入力する。
Further, in the processing step S3, the production
図4の処理ステップS4において、各受電事業所5におけるEMS22は、未確定時間幅dTuをパラメータとして各受電事業所における誤差を含んだ電力需要予測を行う。このことを、図5の受電事業所5Aの例で示すと、生産ラインのスケジュール5AL1S、5AL2S、・・・5ALPSごとに定まる電力需要5AL1P、5AL2P、・・・5ALPPについて、各時刻の合計の電力需要を求めたものである。この場合に、時刻毎に確定している電力と未確定の電力があるので、確定電力の合計と未確定電力の合計に分けて把握される。かつ未確定時間幅dTuをパラメータとしているので、複数のパターンの電力需要予測を行うことになる。なお、未確定電力の合計に相当する部分が、受電事業所における誤差ということになる。
In the processing step S4 of FIG. 4, the EMS 22 at each
図4の処理ステップS5において、AEMS7では、各受電事業所5(5Aから5M)が報告してきた当該受電事業所5の電力需要予測情報に基づき、受電事業所全体の電力需要を計算する。
In the processing step S5 of FIG. 4, the
図6は、AEMS7で予定日の前日に作成した自己託送計画の一例を示している。図6を用いて本発明の考え方を説明しておく。自己託送計画は明日(予定日)の24時間における時刻ごとの電力(電力の推移)を示しているが、ここに示された電力の特性の内、P1は各受電事業所5(5Aから5M)が報告してきた電力需要予測情報に基づき計算した、受電事業所全体の電力需要の中の確定需要部分である。確定需要部分P1には、全受電事業所(5Aから5M)において、確定スケジュール、未確定スケジュールのうちで確定しているスケジュールのときの電力、調整可能スケジュールのうちで当初操業を予定しているスケジュールのときの電力に基づき、確定需要を評価し、全受電事業所で合計して確定需要として計算したものである。なお、この段階では、まだ発電事業所の電力需要は含んでいないものとしている。図5でいうと、背景色を付した部分の時刻ごとの合計が確定需要P1に相当する。
FIG. 6 shows an example of a self-consignment plan created by
確定需要P1に対して未確定需要の時間ごとの変動分をさらに追加して求めたのが、図6の未確定スケジュールを考慮した最大需要P2である。未確定スケジュールを考慮した最大需要は、全受電事業所において未確定時間幅dTuをパラメータとして変化させた全てのケースを含む電力需要予測の結果である。 The maximum demand P2 in consideration of the undetermined schedule of FIG. 6 is obtained by further adding the hourly fluctuation amount of the undetermined demand to the fixed demand P1. The maximum demand considering the undetermined schedule is the result of the power demand forecast including all cases in which the undetermined time width dTu is changed as a parameter at all power receiving establishments.
ところで、図1の事業体3は未確定スケジュールを考慮した最大需要P2を、発電事業所4(4aから4n)からの発電量と電力会社2等の外部電力により賄う必要があり、この場合に電力会社2等の外部電力は契約電力P3(受電事業所の契約電力の合計)により制限され、契約電力P3以上の電力を電力会社2から得ることができない。図6には、未確定スケジュールを考慮した最大需要P2(未確定需要最大値)と契約電力P3の差分である最小自己託送量P4を記載している。なお、発電は発電事業所の電力需要の消費分を含んでいるので、ここでは、受電事業所の需要をまかなう発電量を「自己託送量」として区別している。
By the way, the
図6に示す最小自己託送量P4は、受電事業所5が受電事業所の契約電力P3と同量の外部電力を受け入れることを前提とし、残りを自家発電で自己託送するという考えの時の最小の自己託送量を意味している。本発明では、時間帯ごとに確定需要P1と最小自己託送量P4の範囲内に入るように発電事業所4からの自己託送計画値を定めるように自己託送計画を立案する。このとき、処理ステップS7での発電事業所の発電機運転計画は、図6における受電事業所全体の電力需要に発電事業所全体の電力需要を含めて、発電コストを低減するように運転計画の最適化を実施する。最適化においては、買電量と自家発電量の割合を、発電コストなどを勘案して定める。
The minimum self-consignment amount P4 shown in FIG. 6 is the minimum when the
図4の処理ステップS14では、処理ステップS5で求めた受電事業所全体の電力需要に発電事業所4のEMS6で評価した発電事業所の電力需要予測結果の合計を加えて、事業体全体の電力需要を求める。
In the processing step S14 of FIG. 4, the total of the power demand forecast results of the power generation establishments evaluated by the
図4の処理ステップS6では、AEMS7における生産スケジュール調整機能14を用いて、各受電事業所からの調整可能スケジュールの調整可能時間dTcに基づき、受電事業所全体の電力需要部分を修正する。なお調整可能スケジュールの調整可能時間dTcを変更した結果として、図6に示した各電力の関係が変更される。
In the process step S6 of FIG. 4, the production
図4の処理ステップS7では、AEMS7における自己託送計画機能15において、修正された受電事業所全体の電力需要と発電事業所全体の電力需要を合計した事業体全体の電力需要に対して、発電事業所全体の発電設備の複数の運転計画を行う。
In the processing step S7 of FIG. 4, in the self-
図4の処理ステップS8における発電設備の運転計画では、各発電事業所および受電事業所が外部から購入する電力が契約電力以下になる制約条件の下で複数の運転計画を作成する。制約条件を満たさない場合は、処理ステップS6に示す調整可能スケジュールの再調整を行う。 In the operation plan of the power generation facility in the processing step S8 of FIG. 4, a plurality of operation plans are created under the constraint condition that the electric power purchased from the outside by each power generation establishment and the power receiving establishment is equal to or less than the contracted electric power. If the constraint condition is not satisfied, the adjustable schedule shown in process step S6 is readjusted.
図4の処理ステップS9では、AEMS7から複数の自己託送計画を、各受電事業所5のEMS22に出力する。
In the processing step S9 of FIG. 4, a plurality of self-consignment plans are output from the
図4の処理ステップS10では、AEMS7から受信した自己託送計画について、各受電事業所5のEMS22およびMES8は、オペレータに自己託送計画と生産スケジュール案を複数提示する。
In the processing step S10 of FIG. 4, with respect to the self-consignment plan received from the
図4の処理ステップS11では、各受電事業所5のオペレータは、複数案から1案を選定する。条件を満たさない場合、AEMS7の処理ステップS6に戻り、再度、調整可能スケジュールの再調整を行い、受電事業所全体の電力需要を修正する。
In the processing step S11 of FIG. 4, the operator of each
図4の処理ステップS12では、全受電事業所のオペレータが、自己託送計画と生産スケジュール案を承認した後、MES8は生産スケジュールを出力する。 In the processing step S12 of FIG. 4, the MES8 outputs the production schedule after the operators of all the power receiving establishments approve the self-consignment plan and the draft production schedule.
さらに図4の処理ステップS13では、AEMS7は、全発電事業所に発電計画を出力する。
Further, in the processing step S13 of FIG. 4, the
図7にAEMS7で作成した当日の全受電事業所への自己託送計画および実績の一例を示す。当日の自己託送の運転計画は、図4に示す手順に基づき、例えば30分間隔で繰り返す。基本的には、発電事業所4から受電事業所5への自己託送量は、受電事業所の需要量以下であり、差分は外部電力の購入で賄われる。しかし、受電事業所5での生産計画の急な変更等により、需要が自己託送計画値を下回る場合がある。その場合、インバランスが生じるため、インバランス料金が高額なケースでは運転コストが増大することが懸念される。そこで、本実施例では、計画時間毎(例えば30分)に当日の需要と自己託送計画値を比較し、インバランスが発生する可能性がある場合、図5に示す調整可能スケジュールの調整可能時間幅dTcをパラメータとして、インバランスを回避するような運転計画を立案する。
FIG. 7 shows an example of the self-consignment plan and actual results created by AEMS7 to all power receiving offices on the day. The self-consignment operation plan for the day is repeated, for example, at 30-minute intervals based on the procedure shown in FIG. Basically, the self-consignment amount from the
なお、上記実施例の説明において、調整可能スケジュールに区分される代表的な調整可能な需要家設備は空調設備であるが、この場合であっても空調設備の全容量が調整可能スケジュールに区分されるということではなく、最低限居住者の快適性が確保されることを前提とし、そのうえで余剰となる空調設備の容量が調整可能スケジュールに区分されるという利用をされるのが望ましい。 In the description of the above embodiment, the typical adjustable consumer equipment classified into the adjustable schedule is the air-conditioning equipment, but even in this case, the entire capacity of the air-conditioning equipment is classified into the adjustable schedule. It is desirable that the capacity of the surplus air-conditioning equipment be divided into adjustable schedules on the premise that the comfort of the occupants is ensured at a minimum.
以上により、本発明の手法によれば、製造工場を含む複数の受電事業所と複数の発電事業所から構成される事業体において、製造工場の複数の生産スケジュールの不確実性を考慮することにより自己託送計画を立案し、さらに生産スケジュールの調整により、電力需要を変更して計画値同時同量を守りながら自己託送量を最大化することにより、エネルギーコストを低減する運転計画装置および方法を提供することができる。 Based on the above, according to the method of the present invention, in an entity composed of a plurality of power receiving establishments including a manufacturing plant and a plurality of power generation establishments, the uncertainty of a plurality of production schedules of the manufacturing plant is taken into consideration. Providing operation planning equipment and methods that reduce energy costs by formulating a self-consignment plan and adjusting the production schedule to change the power demand and maximize the self-consignment amount while maintaining the same planned value at the same time. can do.
以上説明したように本発明においては、予定日の前日の自己託送計画において、オペレータ、またはサプライチェーンの実績情報に基づいた機械学習機能、または生産ラインや労働者の作業を監視・管理する製造実行システム(MES:Manufacturing Execution System)で評価した生産スケジュールの変動情報に基づき、受電事業所の各生産スケジュールを、確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、未確定スケジュールに基づき電力需要の最大誤差を考慮して契約電力を超過しないように自己託送計画を作成する。当日の自己託送実行時、自己託送計画値と電力需要の実績を比較し、インバランスが発生しないように調整可能スケジュールを変更し、計画周期毎に生産スケジュールと自己託送計画の複数候補をオペレータに提示する地域エネルギー管理装置(AEMS:Area Energy Management System)を提供するものである。 As described above, in the present invention, in the self-consignment plan on the day before the scheduled date, the machine learning function based on the actual information of the operator or the supply chain, or the manufacturing execution that monitors and manages the work of the production line or the worker. Based on the fluctuation information of the production schedule evaluated by the system (MES: Manufacturing Execution System), each production schedule of the power receiving office is classified into a fixed schedule, an undetermined schedule, and an adjustable schedule, and the power demand is calculated based on the undetermined schedule. Create a self-consignment plan so as not to exceed the contracted power in consideration of the maximum error. At the time of self-consignment execution on the day, the self-consignment plan value and the actual power demand are compared, the adjustable schedule is changed so that imbalance does not occur, and multiple candidates for the production schedule and self-consignment plan are given to the operator for each planning cycle. It provides a regional energy management device (AEMS: Area Energy Management System) to be presented.
本発明は、ビル、工場、大学等で構成される複数事業所から構成される事業体の地域エネルギーマネジメントに適用することができる。 The present invention can be applied to regional energy management of a business entity composed of a plurality of business establishments including buildings, factories, universities and the like.
1:電力系統、2:電力会社、3:事業体、4:発電事業所、5:受電事業所、6:発電事業所のエネルギーマネジメントシステム(EMS)、7:地域エネルギーマネジメントシステム(AEMS)、8:製造実行システム(MES)、9:発電設備、10:負荷、11:生産スケジュール管理機能、12:生産・自己託送計画候補表示機能、13:需要予測機能、14:生産スケジュール調整機能、15:自己託送計画機能、16…結果出力機能、17:オペレータ入力機能、18:機械学習機能、19:データベース、22:受電事業所のエネルギーマネジメントシステム(EMS) 1: Electric power system, 2: Electric power company, 3: Business entity, 4: Power generation establishment, 5: Power receiving establishment, 6: Energy management system (EMS) of power generation establishment, 7: Regional energy management system (AEMS), 8: Manufacturing Execution System (MES), 9: Power Generation Equipment, 10: Load, 11: Production Schedule Management Function, 12: Production / Self-Consignment Plan Candidate Display Function, 13: Demand Forecast Function, 14: Production Schedule Adjustment Function, 15 : Self-consignment planning function, 16 ... Result output function, 17: Operator input function, 18: Machine learning function, 19: Database, 22: Energy management system (EMS) of power receiving office
Claims (15)
前記発電事業所と前記受電事業所にはEMSが、前記事業体にはAEMSが設置され、
前記受電事業所のEMSは、予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
前記AEMSは、前記受電事業所のEMSから報告された、予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所のEMSは、前記AEMSが定めた自己託送計画出力に従い発電することを特徴とするエネルギー管理装置。 It is an energy management device in a business entity equipped with a power generation business and a power receiving business connected to the power system.
EMS is installed in the power generation establishment and the power receiving establishment, and AEMS is installed in the entity.
The EMS of the power receiving establishment predicts the power transition for each production line on the scheduled date, classifies the operation schedule of the production line on the scheduled date into a fixed schedule, an unfixed schedule, and an adjustable schedule.
The AEMS determines the classified operation schedule on the scheduled date, the fixed demand on the scheduled date from the power transition, and the maximum demand in consideration of the undetermined schedule reported from the EMS of the power receiving establishment, and the maximum demand. And the minimum self-consignment amount obtained as the difference between the contracted power of the power receiving establishment and the self-consignment plan output to the power receiving establishment within the range of the fixed demand.
The EMS of the power generation establishment is an energy management device characterized in that power is generated in accordance with the self-consignment planned output defined by the AEMS.
前記AEMSは、前記最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送量を定めることができない場合に、前記調整可能スケジュールに分類された生産ラインの運転時期を調整することを特徴とするエネルギー管理装置。 The energy management device according to claim 1.
The AEMS adjusts the operation time of the production line classified in the adjustable schedule when the self-consignment amount to the power receiving establishment cannot be determined within the range of the minimum self-consignment amount and the fixed demand. An energy management device characterized by that.
前記AEMSは、前記未確定スケジュールを用いて複数の自己託送計画出力を作成し、
前記受電事業所のEMSは、前記AEMSから提示された複数の自己託送計画出力のうち、承認した自己託送計画出力に従い受電事業所の生産スケジュールとし、
前記AEMSは、前記受電事業所のEMSが承認した自己託送計画出力を前記AEMSが定めた自己託送計画出力として前記発電事業所のEMSに与えることを特徴とするエネルギー管理装置。 The energy management device according to claim 1 or 2.
The AEMS uses the undetermined schedule to create multiple self-consignment plan outputs.
The EMS of the power receiving establishment is set as the production schedule of the power receiving establishment according to the approved self-consignment plan output among the plurality of self-consignment plan outputs presented by the AEMS.
The AEMS is an energy management device characterized in that a self-consignment plan output approved by the EMS of the power receiving establishment is given to the EMS of the power generation establishment as a self-consignment plan output defined by the AEMS.
前記AEMSは、前記予定日に計画時間毎(例えば30分)に当日の需要と自己託送計画出力を比較し、インバランスが発生する可能性がある場合に、前記調整可能スケジュールの調整可能時間幅をパラメータとして、インバランスを回避するような運転計画を立案することを特徴とするエネルギー管理装置。 The energy management device according to any one of claims 1 to 3.
The AEMS compares the demand of the day with the self-consignment planned output for each planned time (for example, 30 minutes) on the scheduled date, and when imbalance may occur, the adjustable time width of the adjustable schedule. An energy management device characterized by formulating an operation plan that avoids imbalance by using the above as a parameter.
前記受電事業所について、予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所は、前記自己託送計画出力に従い発電することを特徴とするエネルギー管理方法。 It is an energy management method in an entity that has a power generation establishment and a power receiving establishment connected to the power system.
For the power receiving establishment, the power transition for each production line on the scheduled date is predicted, and the operation schedule of the production line on the scheduled date is classified into a fixed schedule, an unfixed schedule, and an adjustable schedule.
The minimum self obtained as the difference between the maximum demand and the contracted power of the power receiving establishment by determining the fixed demand on the scheduled date and the maximum demand in consideration of the undetermined schedule from the classified operation schedule and the power transition on the scheduled date. Determine the self-consignment plan output to the power receiving establishment within the range of the consignment amount and the fixed demand.
The energy management method, wherein the power generation establishment generates power according to the self-consignment plan output.
前記最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送量を定めることができない場合に、前記調整可能スケジュールに分類された生産ラインの運転時期を調整することを特徴とするエネルギー管理方法。 The energy management method according to claim 5.
When the self-consignment amount to the power receiving establishment cannot be determined within the range of the minimum self-consignment amount and the fixed demand, the operation time of the production line classified in the adjustable schedule is adjusted. Energy management method to do.
前記未確定スケジュールを用いて複数の前記自己託送計画出力を作成し、
前記複数の自己託送計画出力から選択した自己託送計画出力を前記受電事業所の生産スケジュールとし、
選択した前記自己託送計画出力に従い前記発電事業所の発電電力を定めることを特徴とするエネルギー管理方法。 The energy management method according to claim 5 or 6.
Using the unconfirmed schedule, a plurality of the self-consignment plan outputs are created.
The self-consignment plan output selected from the plurality of self-consignment plan outputs is used as the production schedule of the power receiving establishment.
An energy management method characterized in that the generated power of the power generation establishment is determined according to the selected self-consignment plan output.
前記予定日に計画時間毎(例えば30分)に当日の需要と自己託送計画出力を比較し、インバランスが発生する可能性がある場合に、前記調整可能スケジュールの調整可能時間幅をパラメータとして、インバランスを回避するような運転計画を立案することを特徴とするエネルギー管理方法。 The energy management method according to any one of claims 5 to 7.
The demand on the day and the self-consignment plan output are compared for each planned time (for example, 30 minutes) on the scheduled date, and when imbalance may occur, the adjustable time width of the adjustable schedule is used as a parameter. An energy management method characterized by formulating an operation plan that avoids imbalance.
予定日における前記事業体のエネルギー需要予測において需要変動要因を定める需要変動要因決定手段と、前記需要変動要因に基づき予定日における需要変動量を評価して、前記事業体のエネルギー生産・購入・取引計画を作成する作成手段、前記作成手段により作成したエネルギー生産・購入・取引計画についての複数のプランを提示する提示手段を備え、
前記事業体のエネルギー需要を予測するに際し、エネルギー需要に起因するスケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、未確定スケジュールに基づき需要の最大誤差を評価するとともに、
前記需要の最大誤差は、前記確定スケジュール及び前記調整可能スケジュールから確定需要を定め、前記未確定スケジュールを考慮して最大需要を求める場合における、最大需要と確定需要の差であることを特徴とするエネルギー管理システム。 It is an energy management system in an entity that has a power generation establishment and a power receiving establishment connected to the power system.
Energy production / purchase / transaction of the business entity by evaluating the demand fluctuation amount on the scheduled date based on the demand fluctuation factor determining means that determines the demand fluctuation factor in the energy demand forecast of the business entity on the scheduled date and the demand fluctuation factor. It is equipped with a creation means for creating a plan and a presentation means for presenting a plurality of plans for energy production / purchase / transaction plans created by the preparation means.
When forecasting the energy demand of the business entity, the schedules caused by the energy demand are classified into fixed schedule, unfixed schedule, and adjustable schedule, and the maximum error of demand is evaluated based on the unfixed schedule.
The maximum error of the demand is the difference between the maximum demand and the fixed demand when the fixed demand is determined from the fixed schedule and the adjustable schedule and the maximum demand is obtained in consideration of the unfixed schedule. Energy management system.
前記エネルギー生産・購入・取引計画を作成する場合に、計画値に合うように前記調整可能スケジュールを変更することを特徴とするエネルギー管理システム。 The energy management system according to claim 9.
An energy management system characterized in that when the energy production / purchase / transaction plan is created, the adjustable schedule is changed to match the planned value.
前記調整可能スケジュールとして、事前に調整可能な需要家設備およびスケジュールを登録することを特徴とするエネルギー管理システム。 The energy management system according to claim 9 or 10.
An energy management system characterized in that pre-adjustable consumer equipment and schedules are registered as the adjustable schedule.
事前に調整可能な需要家設備は空調設備であり、快適性の範囲内で調整することを特徴とするエネルギー管理システム。 The energy management system according to claim 11.
The pre-adjustable consumer equipment is an air conditioner, an energy management system characterized by adjustment within the comfort range.
予定日における前記事業体のエネルギー需要予測において、エネルギー需要に起因するスケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、未確定スケジュールに基づき需要の最大誤差を評価し、エネルギー生産・購入・取引計画を作成する場合、計画値に合うように調整可能スケジュールを変更するとともに、
前記需要の最大誤差は、前記確定スケジュール及び前記調整可能スケジュールから確定需要を定め、前記未確定スケジュールを考慮して最大需要を求める場合における、最大需要と確定需要の差であることを特徴とするエネルギー管理システムの運転計画方法。 It is an operation planning method of the energy management system in the business entity equipped with the power generation business and the power receiving business connected to the power system.
In the energy demand forecast of the business entity on the scheduled date, the schedules caused by energy demand are classified into fixed schedule, unfixed schedule, and adjustable schedule, the maximum error of demand is evaluated based on the unfixed schedule, and energy production / purchase. • If you want to create a trading plan, along with the changes the adjustment can be scheduled to fit the planned value,
The maximum error of the demand is the difference between the maximum demand and the fixed demand when the fixed demand is determined from the fixed schedule and the adjustable schedule and the maximum demand is obtained in consideration of the unfixed schedule. How to plan the operation of the energy management system.
前記受電事業所は、生産スケジュール管理機能からの情報を用いて予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
前記事業体は、前記受電事業所から報告された、予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所は、前記事業体が定めた自己託送計画出力に従い発電するとともに、
前記生産スケジュール管理機能は、オペレータ入力機能または機械学習機能を備え、オペレータ入力機能は、製造工場のサプライチェーン情報および過去の未確定スケジュールに関するデータベースを参照して、オペレータが未確定時間幅を見積もり入力した結果を前記生産スケジュール管理機能からの情報とし、または、機械学習機能は、データベースを参照して機械学習により未確定時間幅を計算し、前記生産スケジュール管理機能からの情報とすることを特徴とするエネルギー管理システム。 It is an energy management system in an entity that has a power generation establishment and a power receiving establishment connected to the power system.
The power receiving establishment predicts the power transition of each production line on the scheduled date using the information from the production schedule management function, and adjusts the operation schedule of the own production line on the scheduled date as a fixed schedule, an unfixed schedule, and an adjustment. Classify into possible schedules
The business entity determines the fixed demand on the scheduled date from the classified operation schedule on the scheduled date and the power transition reported from the power receiving business establishment, and the maximum demand in consideration of the undetermined schedule, and sets the maximum demand as the maximum demand. The self-consignment plan output to the power receiving business is determined within the range of the minimum self-consignment amount obtained as the difference of the contracted power of the power receiving business and the fixed demand.
The power generation establishment generates power in accordance with the self-consignment plan output determined by the entity, and
The production schedule management function includes an operator input function or a machine learning function, and the operator input function estimates and inputs an undetermined time width by referring to supply chain information of a manufacturing plant and a database of past undetermined schedules. The result is the information from the production schedule management function, or the machine learning function is characterized by calculating the undetermined time width by machine learning with reference to the database and using the information from the production schedule management function. Energy management system.
前記受電事業所は、生産スケジュール管理機能からの情報を用いて予定日における自己の生産ラインごとの電力推移を予測し、予定日における自己の生産ラインの運転スケジュールを確定スケジュール、未確定スケジュール、調整可能スケジュールに分類し、
前記事業体は、前記受電事業所から報告された、予定日における分類された運転スケジュールと前記電力推移から予定日における確定需要と、前記未確定スケジュールを考慮した最大需要を定め、前記最大需要と前記受電事業所の契約電力の差分として求めた最小自己託送量と前記確定需要の範囲内で前記受電事業所への自己託送計画出力を定め、
前記発電事業所は、前記事業体が定めた自己託送計画出力に従い発電するとともに、
前記生産スケジュール管理機能は、製造工場のサプライチェーン情報および過去の未確定スケジュールに関するデータを参照して、オペレータが見積もった未確定時間幅を与え、または、過去の未確定スケジュールに関するデータベースを参照して計算した未確定時間幅を与えることを特徴とするエネルギー管理システムの運転計画方法。 It is an operation planning method of the energy management system in the business entity equipped with the power generation business and the power receiving business connected to the power system.
The power receiving establishment predicts the power transition of each production line on the scheduled date by using the information from the production schedule management function, and adjusts the operation schedule of the own production line on the scheduled date by the fixed schedule, the unfixed schedule, and the adjustment. Classify into possible schedules
The business entity determines the fixed demand on the scheduled date from the classified operation schedule on the scheduled date and the power transition reported from the power receiving business establishment, and the maximum demand in consideration of the undetermined schedule, and sets the maximum demand as the maximum demand. The self-consignment plan output to the power receiving business is determined within the range of the minimum self-consignment amount obtained as the difference of the contracted power of the power receiving business and the fixed demand.
The power generation establishment generates power in accordance with the self-consignment plan output determined by the business entity, and at the same time,
The production schedule management function refers to the supply chain information of the manufacturing plant and data on the past undetermined schedule, gives the undetermined time width estimated by the operator, or refers to the database on the past undetermined schedule. An operation planning method for an energy management system, characterized by giving a calculated undetermined time width.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2017/021953 WO2018229895A1 (en) | 2017-06-14 | 2017-06-14 | Energy management device and method, energy management system, and energy management system operation planning method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPWO2018229895A1 JPWO2018229895A1 (en) | 2019-12-19 |
JP6893980B2 true JP6893980B2 (en) | 2021-06-23 |
Family
ID=64660587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019524622A Active JP6893980B2 (en) | 2017-06-14 | 2017-06-14 | Energy management equipment and methods, energy management systems and operation planning methods for energy management systems |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP6893980B2 (en) |
CN (1) | CN110546842B (en) |
WO (1) | WO2018229895A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020256056A1 (en) * | 2019-06-19 | 2020-12-24 | 京セラ株式会社 | Self-consignment system, and self-consignment method |
JP7229901B2 (en) * | 2019-11-27 | 2023-02-28 | 京セラ株式会社 | Self-consignment system and self-consignment method |
CN112270458A (en) * | 2020-09-15 | 2021-01-26 | 广东韶钢松山股份有限公司 | Energy refined management and control method and device, computer equipment and storage medium |
CN113346555B (en) * | 2021-05-25 | 2023-06-09 | 西安交通大学 | An Intraday Rolling Scheduling Method Considering Power Coordination |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4220007B2 (en) * | 1998-02-06 | 2009-02-04 | 東京電力株式会社 | Production scheduling device |
JP2002123578A (en) * | 2000-08-10 | 2002-04-26 | Osaka Gas Co Ltd | Electric power retail system |
JP3631967B2 (en) * | 2001-03-14 | 2005-03-23 | 株式会社エネット | Surplus power management system and control method thereof |
JP2002345154A (en) * | 2001-05-18 | 2002-11-29 | Hitachi Ltd | Power supply and demand method and display device |
JP4050021B2 (en) * | 2001-07-21 | 2008-02-20 | 株式会社東芝 | Power consignment control system and power transaction method |
JP2005210833A (en) * | 2004-01-22 | 2005-08-04 | Hitachi Ltd | Concurrent power control method |
JP2005229657A (en) * | 2004-02-10 | 2005-08-25 | Fuji Electric Systems Co Ltd | How to determine the amount of power for consignment |
JP2005261056A (en) * | 2004-03-10 | 2005-09-22 | Toshiba Corp | Self-conveying system generated power control device |
JP2005278335A (en) * | 2004-03-25 | 2005-10-06 | Toshiba Corp | Power consignment operation plan creation support system and power consignment operation plan creation support program |
JP2006081256A (en) * | 2004-09-08 | 2006-03-23 | Hitachi Ltd | Electric energy sorting system and method |
JP6160705B2 (en) * | 2014-05-19 | 2017-07-12 | Jfeスチール株式会社 | Electric power supply / demand guidance apparatus and electric power supply / demand guidance method |
JP6322588B2 (en) * | 2015-01-14 | 2018-05-09 | 株式会社日立製作所 | Community management system |
CN105633949B (en) * | 2015-12-14 | 2018-07-24 | 云南电网有限责任公司电力科学研究院 | A kind of real-time power generation dispatching of economical operation and control method |
CN105761109A (en) * | 2016-02-19 | 2016-07-13 | 刘隽琦 | Smart management system for energy management and electricity transaction in virtual power plant and method for optimizing operation thereof |
-
2017
- 2017-06-14 WO PCT/JP2017/021953 patent/WO2018229895A1/en active Application Filing
- 2017-06-14 JP JP2019524622A patent/JP6893980B2/en active Active
- 2017-06-14 CN CN201780089900.XA patent/CN110546842B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN110546842B (en) | 2023-01-03 |
WO2018229895A1 (en) | 2018-12-20 |
JPWO2018229895A1 (en) | 2019-12-19 |
CN110546842A (en) | 2019-12-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11681264B2 (en) | Building energy storage system with planning tool | |
EP3413421B1 (en) | Building energy optimization system with economic load demand response (eldr) optimization | |
US11036249B2 (en) | Building energy storage system with peak load contribution cost optimization | |
US11068821B2 (en) | Building energy optimization system with capacity market program (CMP) participation | |
EP3358426B1 (en) | Building energy cost optimization system with asset sizing | |
US11061424B2 (en) | Building energy storage system with peak load contribution and stochastic cost optimization | |
US11238547B2 (en) | Building energy cost optimization system with asset sizing | |
US10282796B2 (en) | Building energy storage system with multiple demand charge cost optimization | |
US11663541B2 (en) | Building energy system with load-following-block resource allocation | |
US11288754B2 (en) | Cost optimization of a central energy facility with block-and-index rate structure | |
EP3547234A1 (en) | Building energy optimization system with capacity market program (cmp) participation | |
JP6893980B2 (en) | Energy management equipment and methods, energy management systems and operation planning methods for energy management systems | |
Keller et al. | Enabling energy-flexibility of manufacturing systems through new approaches within production planning and control | |
US20070032911A1 (en) | Method and system for forecasting an amount of energy needed by an, in particular, industrial consumer from an energy supplier or energy vendor, and device for forecasting energy demand and its use for forecasting | |
Mohagheghi et al. | Intelligent demand response scheme for energy management of industrial systems | |
US20200193345A1 (en) | Cost optimization of a central energy facility with load-following-block rate structure | |
Schultz et al. | Method for an energy-oriented production control | |
Aghamohamadi et al. | A block-coordinate-descent robust approach to incentive-based integrated demand response in managing multienergy hubs with must-run processes | |
Tran et al. | Distributed energy resource management system | |
Heimgaertner et al. | A distributed control architecture for a loosely coupled virtual power plant | |
Sakamoto et al. | Energy Management of a Workplace with EVs by Mixed-Integer Linear Programming | |
Bahageel et al. | Optimization of Direct Load Control Demand Response for Industrial Micro-Grid Using Smart Meter | |
EP3671609A1 (en) | Cost optimization of a central energy facility with block-and-index and load-following-block rate structure | |
de Sttau Monteiro | Collective self-consumption energy management | |
Rodrigo et al. | A Mixed Integer Nonlinear Programming Model and Heuristic Solutions for an Automated Demand Response System for Large Facilities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190821 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20201104 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20201126 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210511 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210602 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6893980 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |