JP6405486B1 - 風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 - Google Patents
風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 Download PDFInfo
- Publication number
- JP6405486B1 JP6405486B1 JP2018072174A JP2018072174A JP6405486B1 JP 6405486 B1 JP6405486 B1 JP 6405486B1 JP 2018072174 A JP2018072174 A JP 2018072174A JP 2018072174 A JP2018072174 A JP 2018072174A JP 6405486 B1 JP6405486 B1 JP 6405486B1
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- main shaft
- wind power
- abnormality
- generation facility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005856 abnormality Effects 0.000 title claims abstract description 84
- 238000003745 diagnosis Methods 0.000 title claims abstract description 79
- 238000010248 power generation Methods 0.000 title claims abstract description 71
- 238000000034 method Methods 0.000 title claims description 15
- 239000004519 grease Substances 0.000 claims abstract description 35
- 230000002159 abnormal effect Effects 0.000 claims abstract description 20
- 230000001186 cumulative effect Effects 0.000 claims description 13
- 238000003384 imaging method Methods 0.000 claims description 12
- 238000011109 contamination Methods 0.000 claims description 10
- 238000012545 processing Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 2
- 230000007704 transition Effects 0.000 claims 1
- 230000001050 lubricating effect Effects 0.000 description 10
- 238000005461 lubrication Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 230000000737 periodic effect Effects 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 2
- 230000001932 seasonal effect Effects 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000007774 longterm Effects 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002243 precursor Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Wind Motors (AREA)
Abstract
Description
図1は、実施形態に係る風力発電設備10(風車)であり、(a)は風車外観図であり、(b)はナセル3内部の拡大図である。本実施形態では、ダイレクトドライブ型風力発電装置(直接駆動型風力発電装置)を例に説明する。風力発電設備10は、ハブ1に装着されたブレード2と、ナセル3(筐体)と、ナセル3を支持するタワー4(支柱)を含んで構成されている。ナセル3の内部には、タワー4の支持部19に支持された中空である固定側の主軸11、主軸11の外周には、発電機5が配置されている。
(異常度)=A×N^(C)+初期値 ・・・(1)
A:定数1
C:定数2
N:モード切替え点からの主軸ベアリングの累積回転数
なお、N^(C)は、NのC乗(べき乗)を意味する。異常度は、主軸ベアリングの振動値であり、単位は(dB)である。また、定数A及びCは、風力発電システムの型式、立地条件等により変動する数値であり、これまでの運用実績により予め設定する。
2 ブレード
3 ナセル
4 タワー
5 発電機
6 ステータ
7 発電機ロータ
8 ロータプレート
9 ステータケーシング
10 風力発電設備
11 主軸(第1の主軸)
12 主軸(第2の主軸)
13 主軸ベアリング(主軸受、第1の主軸ベアリング)
14 主軸ベアリング(主軸受、第2の主軸ベアリング)
15 第3の主軸ベアリング
16 突出部
19 ステータケーシング
20 処理部
21 センサデータ取得部
22 運転データ取得部
23 現在診断モード部(第1診断モード部)
24 予測診断モード部
30 記憶部
31 潤滑グリス画像
32 潤滑グリス判定結果
33 センサデータ
34 運転データ
35 各月基準回転数
36 交換時期予測結果
41 入力部
42 表示部(表示装置)
43 撮像部(撮像装置)
44 通信部
50 センサ
51 増幅器
52 データ収集装置
100 管理装置
NW ネットワーク
Claims (9)
- 風力発電設備と、管理装置と、を備え、
前記管理装置は、
前記風力発電設備の主軸ベアリングのグリスの状態により、その時点における該主軸ベアリングの異常予兆を診断する現在診断モード部と、
前記主軸ベアリングの振動値を取得して振動初期値とし、前記振動初期値と前記風力発電設備の運用開始から所定の時間が経過した時点から推定する前記風力発電設備の主軸の累積回転数とに基づき将来における前記主軸ベアリングの異常予兆を診断し、前記主軸ベアリングの交換時期を予測する予測診断モード部と、を有し、
前記管理装置は、
前記現在診断モード部において、撮像装置により取得した前記主軸ベアリング内のグリスの画像情報に所定の画像処理を施して前記グリス内への異物の混入度合を算出し、該混入度合に応じて算出した第1異常度合に基づき前記主軸ベアリングの異常予兆を診断し、
前記現在診断モード部の前記第1異常度合が第1基準異常度合に到達したときに前記主軸ベアリングの異常予兆があると診断し、前記予測診断モード部に移行する
ことを特徴とする風力発電設備の異常予兆診断システム。 - 風力発電設備と、管理装置と、を備え、
前記管理装置は、
前記風力発電設備の主軸ベアリングのグリスの状態により、その時点における該主軸ベアリングの異常予兆を診断する現在診断モード部と、
前記主軸ベアリングの振動値を取得して振動初期値とし、前記振動初期値と前記風力発電設備の運用開始から所定の時間が経過した時点から推定する前記風力発電設備の主軸の累積回転数とに基づき将来における前記主軸ベアリングの異常予兆を診断し、前記主軸ベアリングの交換時期を予測する予測診断モード部と、を有し、
前記風力発電設備の運用開始から所定の時間が経過した時点は、前記現在診断モード部から前記予測診断モード部に移行する切替え点である
ことを特徴とする風力発電設備の異常予兆診断システム。 - 前記管理装置は、
前記予測診断モード部において、前記切替え点から経過する各月に対応する各月基準回転数を積算した累計回転数に所定の演算を施して求める演算結果を前記振動初期値に加算して算出する将来の異常度合に基づき前記主軸ベアリングの異常予兆を診断する
ことを特徴とする請求項2に記載の風力発電設備の異常予兆診断システム。 - 前記管理装置は、
前記将来の異常度合が第2基準異常度合に到達したときに前記主軸ベアリングの交換時期であると診断する
ことを特徴とする請求項3に記載の風力発電設備の異常予兆診断システム。 - 前記各月基準回転数は、前記風力発電設備の過去の所定期間の運転年(不稼働の年を除く)における、最後に記憶された各月の主軸ベアリングの回転数の合計値とする
ことを特徴とする請求項3に記載の風力発電設備の異常予兆診断システム。 - 前記管理装置は、表示装置を備え、
前記管理装置は、前記主軸ベアリングの交換時期であると診断した際に、前記切替え点からの経過月数を前記表示装置に表示する
ことを特徴とする請求項4に記載の風力発電設備の異常予兆診断システム。 - 風力発電設備の管理装置であって、
風力発電設備の主軸ベアリングのグリスの状態により、その時点における該主軸ベアリングの異常予兆を診断する現在診断モード部と、
前記主軸ベアリングの振動値を取得して振動初期値とし、前記振動初期値と前記風力発電設備の運用開始から所定の時間が経過した時点から推定する前記風力発電設備の主軸の累積回転数とに基づき将来における前記主軸ベアリングの異常予兆を診断し、前記主軸ベアリングの交換時期を予測する予測診断モード部と、を有し、
前記管理装置は、
前記現在診断モード部において、撮像装置により取得した前記主軸ベアリング内のグリスの画像情報に所定の画像処理を施して前記グリス内への異物の混入度合を算出し、該混入度合に応じて算出した第1異常度合に基づき前記主軸ベアリングの異常予兆を診断し、
前記現在診断モード部の前記第1異常度合が第1基準異常度合に到達したときに前記主軸ベアリングの異常予兆があると診断し、前記予測診断モード部に移行する
ことを特徴とする管理装置。 - 風力発電設備の管理装置であって、
風力発電設備の主軸ベアリングのグリスの状態により、その時点における該主軸ベアリングの異常予兆を診断する現在診断モード部と、
前記主軸ベアリングの振動値を取得して振動初期値とし、前記振動初期値と前記風力発電設備の運用開始から所定の時間が経過した時点から推定する前記風力発電設備の主軸の累積回転数とに基づき将来における前記主軸ベアリングの異常予兆を診断し、前記主軸ベアリングの交換時期を予測する予測診断モード部と、を有し、
前記風力発電設備の運用開始から所定の時間が経過した時点は、前記現在診断モード部から前記予測診断モード部に移行する切替え点である
ことを特徴とする管理装置。 - 風力発電設備の管理装置の異常予兆診断方法であって、
前記管理装置は、
風力発電設備の主軸ベアリングのグリスの状態により、その時点における該主軸ベアリングの異常予兆を診断する現在診断ステップと、
前記主軸ベアリングの振動値を取得して振動初期値とし、前記振動初期値と前記風力発電設備の運用開始から所定の時間が経過した時点から推定する前記風力発電設備の主軸の累積回転数とに基づき将来における前記主軸ベアリングの異常予兆を診断し、前記主軸ベアリングの交換時期を予測する予測診断ステップと、を実行する
ことを特徴とする異常予兆診断方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018072174A JP6405486B1 (ja) | 2018-04-04 | 2018-04-04 | 風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018072174A JP6405486B1 (ja) | 2018-04-04 | 2018-04-04 | 風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6405486B1 true JP6405486B1 (ja) | 2018-10-17 |
JP2019183686A JP2019183686A (ja) | 2019-10-24 |
Family
ID=63855125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018072174A Active JP6405486B1 (ja) | 2018-04-04 | 2018-04-04 | 風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6405486B1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020170215A (ja) * | 2019-04-01 | 2020-10-15 | Ntn株式会社 | 状態監視システム及びそれを備える風力発電システム |
CN113915078A (zh) * | 2021-11-26 | 2022-01-11 | 龙源(北京)风电工程技术有限公司 | 光纤光栅式风电机组叶片工况智能识别方法及系统 |
CN116221038A (zh) * | 2023-05-10 | 2023-06-06 | 山东金帝精密机械科技股份有限公司 | 一种基于风电轴承保持架的轴承运行监测方法及设备 |
CN117390573A (zh) * | 2023-12-12 | 2024-01-12 | 深圳前海慧联科技发展有限公司 | 基于时序预测的风电机组运行异常预警方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111520295A (zh) * | 2020-05-20 | 2020-08-11 | 许东滇 | 一种风力发电风车不易断裂的转轴 |
KR102456262B1 (ko) * | 2021-03-24 | 2022-10-20 | 한국에너지기술연구원 | 진동기반 풍력터빈 하중 및 수명 예측방법 및 시스템 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5552927A (en) * | 1978-10-16 | 1980-04-17 | Mitsubishi Electric Corp | Malfunction monitor of bearing |
WO2011099132A1 (ja) * | 2010-02-10 | 2011-08-18 | 三菱重工業株式会社 | 風力発電装置 |
JP2012154472A (ja) * | 2011-01-28 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 軸受の保守装置 |
WO2013133002A1 (ja) * | 2012-03-08 | 2013-09-12 | Ntn株式会社 | 状態監視システム |
-
2018
- 2018-04-04 JP JP2018072174A patent/JP6405486B1/ja active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5552927A (en) * | 1978-10-16 | 1980-04-17 | Mitsubishi Electric Corp | Malfunction monitor of bearing |
WO2011099132A1 (ja) * | 2010-02-10 | 2011-08-18 | 三菱重工業株式会社 | 風力発電装置 |
JP2012154472A (ja) * | 2011-01-28 | 2012-08-16 | Mitsubishi Heavy Ind Ltd | 軸受の保守装置 |
WO2013133002A1 (ja) * | 2012-03-08 | 2013-09-12 | Ntn株式会社 | 状態監視システム |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020170215A (ja) * | 2019-04-01 | 2020-10-15 | Ntn株式会社 | 状態監視システム及びそれを備える風力発電システム |
EP3951532A4 (en) * | 2019-04-01 | 2022-11-30 | NTN Corporation | CONDITION MONITORING SYSTEM AND WIND POWER GENERATION SYSTEM INCLUDING THE SAME |
JP7191759B2 (ja) | 2019-04-01 | 2022-12-19 | Ntn株式会社 | 状態監視システム及びそれを備える風力発電システム |
US12071928B2 (en) | 2019-04-01 | 2024-08-27 | Ntn Corporation | Condition monitoring system and wind power generation system including the same |
CN113915078A (zh) * | 2021-11-26 | 2022-01-11 | 龙源(北京)风电工程技术有限公司 | 光纤光栅式风电机组叶片工况智能识别方法及系统 |
CN116221038A (zh) * | 2023-05-10 | 2023-06-06 | 山东金帝精密机械科技股份有限公司 | 一种基于风电轴承保持架的轴承运行监测方法及设备 |
CN117390573A (zh) * | 2023-12-12 | 2024-01-12 | 深圳前海慧联科技发展有限公司 | 基于时序预测的风电机组运行异常预警方法 |
CN117390573B (zh) * | 2023-12-12 | 2024-02-23 | 深圳前海慧联科技发展有限公司 | 基于时序预测的风电机组运行异常预警方法 |
Also Published As
Publication number | Publication date |
---|---|
JP2019183686A (ja) | 2019-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6405486B1 (ja) | 風力発電設備の異常予兆診断システム、管理装置および異常予兆診断方法 | |
Bangalore et al. | Analysis of SCADA data for early fault detection, with application to the maintenance management of wind turbines | |
EP3431952B1 (en) | Condition monitoring system and wind turbine generation apparatus | |
CN102434388B (zh) | 风力发电机组健康状态在线监测装置及其监测方法 | |
KR100715252B1 (ko) | 구름 베어링의 잔여수명 진단방법 및 그 잔여수명 진단장치 | |
JP4504065B2 (ja) | 転がり軸受の余寿命診断方法 | |
JP6397330B2 (ja) | ドライブトレイン、ギアボックス、発電機などの回転機械の残存耐用年数を測定 | |
EP2267305B1 (en) | A method and a system for controlling operation of a wind turbine | |
US20120203704A1 (en) | Servicing-timing selecting apparatus and servicing-timing selecting method | |
US20100030492A1 (en) | Apparatus and method for identifying health indicators for rolling element bearings | |
JP7603776B2 (ja) | 状態監視システム | |
JP6958068B2 (ja) | 回転機械設備の異常診断システム及び異常診断方法 | |
EP2290488B1 (en) | A method and a system for adjusting alarm level of a component in a wind turbine | |
JP6885833B2 (ja) | 状態監視システムおよびデータ処理装置 | |
US20200158562A1 (en) | Condition monitoring apparatus, condition monitoring system, and condition monitoring method | |
WO2017159784A1 (ja) | 状態監視システムおよび風力発電装置 | |
JP2010190901A (ja) | 転がり軸受の余寿命診断方法 | |
KR102068643B1 (ko) | 풍력발전기 예지방법 | |
JP7113668B2 (ja) | 状態監視システム | |
JP6824076B2 (ja) | 状態監視システムおよび風力発電装置 | |
JP7419094B2 (ja) | 状態監視システム | |
JP6243940B2 (ja) | 風力発電システムの異常予兆診断システム | |
JP7211861B2 (ja) | 状態監視システムおよび状態監視方法 | |
CN111075661B (zh) | 基于温度变化趋势判断风电机组主轴轴承健康状况的方法 | |
JP2004152336A (ja) | 回転体記憶装置の寿命予測・管理装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180404 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20180404 |
|
A975 | Report on accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A971005 Effective date: 20180531 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180605 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180725 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180904 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180914 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6405486 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |