[go: up one dir, main page]

JP6356939B1 - Semi-underground shelter construction method - Google Patents

Semi-underground shelter construction method Download PDF

Info

Publication number
JP6356939B1
JP6356939B1 JP2018511172A JP2018511172A JP6356939B1 JP 6356939 B1 JP6356939 B1 JP 6356939B1 JP 2018511172 A JP2018511172 A JP 2018511172A JP 2018511172 A JP2018511172 A JP 2018511172A JP 6356939 B1 JP6356939 B1 JP 6356939B1
Authority
JP
Japan
Prior art keywords
main body
concrete
shelter
side plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018511172A
Other languages
Japanese (ja)
Other versions
JPWO2018047696A1 (en
Inventor
矢野 昭彦
昭彦 矢野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shelter Japan Corp
Original Assignee
Shelter Japan Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shelter Japan Corp filed Critical Shelter Japan Corp
Application granted granted Critical
Publication of JP6356939B1 publication Critical patent/JP6356939B1/en
Publication of JPWO2018047696A1 publication Critical patent/JPWO2018047696A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

施工が簡単でコストが削減された高強度なシェルターを提供する。
シェルター1は、基礎10に据え付けられた本体100と、本体100の外周部に設けられたコンクリート層4を備え、本体100は、天井板22、および円筒形の側板21を含む鉄製の筐体2と、筐体2の地上部Fに設けられた扉5と、筐体2の内径に対し直径が所定範囲に設定され、側板21の外表面に円周方向に設けられた複数の円環形状の中空管3を有し、シェルター築造工法は、本体100を工場で製作し、穴Hを形成し、穴Hの底部に基礎10を構築し、基礎10に本体100を据え付け、側板21の周囲に型枠Tを築造し、コンクリートを打設・養生し、型枠Tを撤去し、隙間を土又はコンクリートで埋める。
Providing a high-strength shelter that is easy to install and has reduced costs.
The shelter 1 includes a main body 100 installed on a foundation 10 and a concrete layer 4 provided on the outer periphery of the main body 100, and the main body 100 includes an iron casing 2 including a ceiling plate 22 and a cylindrical side plate 21. And a plurality of annular shapes provided in the circumferential direction on the outer surface of the side plate 21 with a diameter set to a predetermined range with respect to the inner diameter of the housing 2 and the door 5 provided on the ground portion F of the housing 2 In the construction method of the shelter, the main body 100 is manufactured at the factory, the hole H is formed, the base 10 is constructed at the bottom of the hole H, the main body 100 is installed on the base 10, and the side plate 21 A formwork T is built around, concrete is placed and cured, the formwork T is removed, and the gap is filled with soil or concrete.

Description

本発明は、津波等の災害想定地域でのシェルターに関する。   The present invention relates to a shelter in a disaster-predicted area such as a tsunami.

平成23年3月11日に発生した東日本大震災と、それに伴って発生した大津波により亡くなった死者と行方不明者の合計は2万人以上にも及んでおり、今後も、南海トラフ大地震等の発生が予想されている。一例を挙げると、内閣府の発表では、津波による愛知県内の死亡予想者約6,400人、火災による死亡者約1,800人となっており、近隣の静岡県においては95,000人を上回る死亡予想者数である。地震・津波対策に対する意識は近年益々高まっている。   The total number of dead and missing people who died due to the Great East Japan Earthquake that occurred on March 11, 2011 and the accompanying great tsunami reached more than 20,000 people. Is expected to occur. For example, according to the announcement by the Cabinet Office, there were about 6,400 deaths in Aichi Prefecture due to tsunami and about 1,800 deaths due to fire, and 95,000 people in nearby Shizuoka Prefecture. Expected death to exceed. In recent years, awareness of earthquake and tsunami countermeasures has increased.

今後発生が予想されている南海トラフ大地震に備えるため、自ら救命するための対策として、個人の家でもシェルターの需要が高まってきている。地震及び津波発生時に避難するためのシェルターとして、基礎に固定する方式や浮遊式のものなど様々な発明が提案されてきている。   In order to prepare for the Nankai Trough Earthquake, which is expected to occur in the future, as a measure to save lives by itself, demand for shelters is increasing in private homes. Various inventions have been proposed as shelters for evacuating in the event of an earthquake and tsunami, such as a method of fixing to a foundation and a floating type.

基礎に固定するシェルターとして、鉄板とコンクリートで構成される複合構造体をシェルター本体に用いるものが知られている。   As a shelter to be fixed to a foundation, one using a composite structure composed of an iron plate and concrete for a shelter body is known.

特許文献1では、耐震性及び防水性に優れた地下シェルターを提供するため、 地中に打ち込んだ複数の杭に支持された耐圧盤上に、高強度コンクリートよりなるボックス状のシェルター本体を一体に設け、このシェルター本体の外表面を鉄板で覆ったものが開示されている。   In Patent Document 1, in order to provide an underground shelter excellent in earthquake resistance and waterproofness, a box-shaped shelter body made of high-strength concrete is integrated on a pressure plate supported by a plurality of piles driven into the ground. There is disclosed a structure in which the outer surface of the shelter body is covered with an iron plate.

特開2005-240452号公報Japanese Patent Laid-Open No. 2005-240452

しかしながら、特許文献1で開示されている地下シェルターは、コンクリートの外表面を覆っている鉄板が水分と酸素を多量に含む土と常に接する状態であり、腐食が促進されやすい環境に常にさらされている。鉄板の腐食を抑制するためには、鉄板の外表面に防水塗装等を施す必要があり、コスト高の要因となる。また、天井を構成する鉄板と型枠との隙間にコンクリートを打設するとき、コンクリートの重量を直接受ける型枠を支持するために、支保工を床から立ち上げる必要があることから、施工期間が長くなり、工程が複雑となるとともに、施工コストが高くなる。このような施工期間が長くコストが高いシェルターでは、一般家庭への普及は困難である。   However, the underground shelter disclosed in Patent Document 1 is in a state where the iron plate covering the outer surface of concrete is always in contact with soil containing a large amount of moisture and oxygen, and is always exposed to an environment where corrosion is likely to be promoted. Yes. In order to suppress the corrosion of the iron plate, it is necessary to apply a waterproof coating or the like to the outer surface of the iron plate, which causes a high cost. Also, when placing concrete in the gap between the steel plate and the formwork that forms the ceiling, it is necessary to start up the support work from the floor in order to support the formwork that directly receives the weight of the concrete. Becomes longer, the process becomes complicated, and the construction cost increases. In such a shelter with a long construction period and high cost, it is difficult to spread it to general households.

本発明の課題は、施工が簡単でコストが低減された高強度なシェルターを提供することである。   An object of the present invention is to provide a high-strength shelter that is easy to construct and has a reduced cost.

請求項1に係る発明は、半地下式シェルター築造工法において、本体を組み立てるステップと、中空管の内部空間に充填材を充填するステップと、穴を形成するステップと、穴の底部に基礎を構築するステップと、本体を基礎に据え付けるステップと、本体の側板の周囲に型枠を築造するステップと、型枠と、本体の隙間に形成された空間にコンクリートを打設し養生するステップと、型枠を撤去し、コンクリート層と穴の間に形成された空間を土又はコンクリートで埋めるステップを備え、中空管が、本体の側板の外表面に設けられ、コンクリート層に埋設されることを特徴とする。
The invention according to claim 1 is a semi-underground shelter construction method, comprising assembling a main body, filling an internal space of a hollow tube with a filler, forming a hole, and a bottom of the hole. A step of constructing, a step of installing the main body on the foundation, a step of building a mold around the side plate of the main body, a step of placing concrete and curing in a space formed in the gap between the mold and the main body, and removing the mold comprises the step of filling the space formed between the concrete layer and the hole with soil or concrete, hollow tubes, provided on the outer surface of the side plate of the main body, the Rukoto are embedded in the concrete layer Features.

この構成によれば、穴を形成するステップと、本体を組み立てるステップと、中空管の内部空間に充填材を充填するステップと、穴の底部に基礎を構築するステップと、本体を基礎に据え付けるステップと、本体の側板の周囲に型枠を築造するステップと、型枠と、本体の隙間に形成された空間にコンクリートを打設し養生するステップと、型枠を撤去し、コンクリート層と穴の間に形成された空間を土又はコンクリートで埋めるステップを備えているので、現場施工が容易であり、工期を短縮することが出来る。 According to this configuration, the step of forming the hole, the step of assembling the main body, the step of filling the inner space of the hollow tube with the filler, the step of constructing the foundation at the bottom of the hole, and the main body being installed on the base A step, a step of building a mold around the side plate of the main body, a step of placing and curing concrete in a space formed in the gap between the mold and the main body, a removal of the mold, a concrete layer and a hole Since the step of filling the space formed between the two with soil or concrete is provided, construction at the site is easy and the construction period can be shortened.

本発明実施形態のシェルターの断面図である。It is sectional drawing of the shelter of embodiment of this invention. 本発明実施形態のシェルターの扉の固定構造を示す平面説明図である。It is plane explanatory drawing which shows the fixing structure of the door of the shelter of this invention embodiment. 本発明実施形態のシェルターの最上部の中空管と、最下部の中空管の側面図及び断面図である。It is the side view and sectional drawing of the uppermost hollow tube of the shelter of this invention embodiment, and the lowest hollow tube. 本発明実施形態の型枠が設けられた状態を示す本体の正面図である。It is a front view of the main body which shows the state in which the formwork of this invention embodiment was provided.

本発明実施形態のシェルター1を説明する。このシェルター1は、基礎10と、基礎10に据え付けられた本体100と、本体100の外周部に設けられたコンクリート層4を備えている。以下、詳細に説明する。 A shelter 1 according to an embodiment of the present invention will be described. The shelter 1 includes a foundation 10, a main body 100 installed on the foundation 10, and a concrete layer 4 provided on an outer peripheral portion of the main body 100. Details will be described below.

図1に示す通り、基礎10は、地中に設けられ、基礎10に据え付けられた本体100は地上部Fと地下部Sで構成されている。地面を所定の深さまで掘削し、穴Hを形成し、その穴Hの底面にコンクリートを打設することによって基礎10を地中に設けることが出来る。基礎10は、平坦かつ水平に仕上げることが好ましい。これにより、本体100の据え付け作業が容易となる。 As shown in FIG. 1, the foundation 10 is provided in the ground, and the main body 100 installed on the foundation 10 includes an above-ground part F and an underground part S. The foundation 10 can be provided in the ground by excavating the ground to a predetermined depth, forming a hole H, and placing concrete on the bottom surface of the hole H. The foundation 10 is preferably finished flat and horizontal. Thereby, the installation work of the main body 100 becomes easy.

本体100は、地震力、津波による波力、津波の漂流物の衝突による衝撃力等に対して耐え得る強度を兼ね備えるものであり、鉄製の筐体2と、地上部Fに設けられた扉5と、側板21の外表面に円周方向に設けられた複数の円環形状の中空管3を有している。 The main body 100 has strength that can withstand earthquake force, tsunami wave force, impact force caused by a tsunami drifting object, etc. And a plurality of annular hollow tubes 3 provided in the circumferential direction on the outer surface of the side plate 21.

筐体2は、底板23、天井板22、及び円筒形の側板21で構成されている。筐体2の内径Aは1.4m〜3mであることが好ましい。また、地上部Fの高さ140cm、地下部Sの高さ140cmが例示される。小規模のシェルターとすることによって、小型建設機械のみを用いて短期間で狭小な敷地内に設置することが可能となる。その結果、一般家庭への普及を促進することが出来る。   The housing 2 includes a bottom plate 23, a ceiling plate 22, and a cylindrical side plate 21. The inner diameter A of the housing 2 is preferably 1.4 m to 3 m. Further, the height of the ground portion F is 140 cm and the height of the underground portion S is 140 cm. By using a small shelter, it is possible to install it in a small site in a short period of time using only small construction machines. As a result, the spread to general households can be promoted.

筐体2の板厚は2.0mm〜6.0mmが好ましく、例えば2.7mm、3mm、4mmが例示される。後述するように中空管3及び支持材6U、6Lを適切に配設することで板厚9mm相当の強度を得ることが出来る。   The plate thickness of the housing 2 is preferably 2.0 mm to 6.0 mm, and examples thereof include 2.7 mm, 3 mm, and 4 mm. As will be described later, a strength equivalent to a plate thickness of 9 mm can be obtained by appropriately arranging the hollow tube 3 and the supporting members 6U and 6L.

複数の中空管3が、側板21の外表面の円周方向に、円環形状に嵌合した状態で設けられている。また、側板21と中空管3は、適宜間隔で溶接されることによって固定されている。これにより、側板21と、中空管3は協働し強度及び剛性を高めることが出来る。中空管3の直径Bは、精度よく円環形状に曲げ加工可能で、かつ筐体2の外表面に嵌合することが可能な寸法、すなわち、筐体2の内径Aの1000分の16から1000分の35までの範囲であることが好ましい。図2に示す通り、筐体2の内径Aは、中空管3を曲げ加工した円環の内径Cよりも筐体2の厚み分だけ小さくなっている。   A plurality of hollow tubes 3 are provided in a state of being fitted in an annular shape in the circumferential direction of the outer surface of the side plate 21. Further, the side plate 21 and the hollow tube 3 are fixed by being welded at appropriate intervals. Thereby, the side plate 21 and the hollow tube 3 can cooperate and can raise intensity | strength and rigidity. The diameter B of the hollow tube 3 can be accurately bent into an annular shape and can be fitted to the outer surface of the housing 2, that is, 16/1000 of the inner diameter A of the housing 2. To 35/1000 is preferred. As shown in FIG. 2, the inner diameter A of the housing 2 is smaller by the thickness of the housing 2 than the inner diameter C of the annular ring formed by bending the hollow tube 3.

中空管3は一般構造用炭素鋼鋼管であり、例えば、JIS G3444 STK500、直径48.6mm、厚さ2.40mm、先メッキ仕様溶融亜鉛メッキ仕様(JIS H−8641,JIS H−9124)であることが好ましい。また、断面は、円形に限らず角形であってもよい。   The hollow tube 3 is a general carbon steel pipe for structural use. For example, in JIS G3444 STK500, diameter 48.6 mm, thickness 2.40 mm, pre-plating specification hot dip galvanization specification (JIS H-8641, JIS H-9124) Preferably there is. The cross section is not limited to a circle but may be a square.

地上部Fの中空管3の間隔は、地下部Sの中空管3の間隔より狭く設定されている。シェルター1に作用する荷重として、地震力、津波による波力、津波の漂流物の衝突による衝撃力が考えられる。地震力は、地中では小さく地表面に近づくに従い増大する。津波による波力を直接受けるのは地上部Fのみであり、地中部に作用するものではない。津波の漂流物の衝突による衝撃力についても同様である。すなわち、地上部Fは地下部Sに比べて大きな荷重が作用する。地下部Sに比べて大きな荷重が作用する地上部Fの中空管3の間隔を、地下部Sの中空管3の間隔より狭くすることで側板21の厚さを薄く保つことが出来る。このように中空管3の間隔を適切に設定することで、より一層のコストダウンを図ることが出来る。   The interval between the hollow tubes 3 in the ground portion F is set to be narrower than the interval between the hollow tubes 3 in the underground portion S. Possible loads acting on the shelter 1 include seismic forces, tsunami wave forces, and impact forces caused by tsunami drifting objects. The seismic force is small in the ground and increases as it approaches the ground surface. Only the ground part F receives the wave force directly from the tsunami and does not act on the underground part. The same applies to the impact force caused by tsunami drifting objects. In other words, the ground portion F is subjected to a larger load than the underground portion S. The thickness of the side plate 21 can be kept thin by making the interval between the hollow tubes 3 in the ground portion F to which a larger load acts than the underground portion S smaller than the interval between the hollow tubes 3 in the underground portion S. Thus, the cost can be further reduced by appropriately setting the interval between the hollow tubes 3.

中空管3の内部空間3aにはモルタル3b(充填材)が充填され、内部空間3aの空気が排出された状態となっている。中空管3の内部空間3aに空気が充満している場合、火炎熱等により充填している空気がコンクリート層4に向かって噴出する可能性がある。この場合、コンクリート層4はこの噴出した空気により破損する。また、内部空間3aに充填している空気が外気温度の変化により圧縮、膨張を繰り返すと、中空管3も同時に圧縮、膨張を繰り返す。この繰り返しによりコンクリート層4が劣化する。従って、コンクリート層4は中空管3の内部空間3aにモルタル3bが充填されることによって噴出した空気による損傷を防止出来るとともに、劣化を抑制することが出来る。また、中空管3とモルタル3bが協働することで中空管3の強度及び剛性が増大する。なお、本発明実施形態では充填材はモルタルとしているが、セメントミルクであってもよい。 The internal space 3a of the hollow tube 3 is filled with mortar 3b (filler), and the air in the internal space 3a is discharged. When air is filled in the internal space 3 a of the hollow tube 3, there is a possibility that the air filled by flame heat or the like is ejected toward the concrete layer 4. In this case, the concrete layer 4 is damaged by the jetted air. Further, when the air filled in the internal space 3a is repeatedly compressed and expanded due to changes in the outside air temperature, the hollow tube 3 also repeats compression and expansion at the same time. By repeating this, the concrete layer 4 deteriorates. Therefore, the concrete layer 4 can prevent damage caused by the air blown by filling the internal space 3a of the hollow tube 3 with the mortar 3b, and can suppress deterioration. In addition, the hollow tube 3 and the mortar 3b cooperate to increase the strength and rigidity of the hollow tube 3. In the embodiment of the present invention, the filler is mortar, but may be cement milk.

支持材6Uは、天井板22を補強するものであり、図3に示す通り、6本の支持材6Uが最上部の中空管3Uの周方向に均等に配設され固定されるとともに、径中心方向に水平に延び中空管3Uの中心部で相互に固定している。また、天井板22と適宜間隔で溶接することによって固定している。すなわち、天井板22は支持材6Uと協働することにより、所定の強度及び剛性を獲得している。これにより、コンクリート打設時の天井板22の変形を抑制することが可能となり、特別な補強を施すことなく天井板22の上面にコンクリートを直接打設することが出来る。 The support member 6U reinforces the ceiling plate 22, and as shown in FIG. 3, the six support members 6U are equally disposed and fixed in the circumferential direction of the uppermost hollow tube 3U, and have a diameter. They extend horizontally in the center direction and are fixed to each other at the center of the hollow tube 3U. Moreover, it fixes by welding with the ceiling board 22 with a suitable space | interval. That is, the ceiling board 22 has acquired the predetermined | prescribed intensity | strength and rigidity by cooperating with the support material 6U. Thereby, it becomes possible to suppress the deformation | transformation of the ceiling board 22 at the time of concrete placement, and concrete can be directly placed on the upper surface of the ceiling board 22 without giving special reinforcement.

支持材6Lは、本体100の変形を抑制するためのものである。これにより、基礎10への据え付けが容易になる。支持材6Uとほぼ同様の構造であるため説明は省略する。 The support material 6L is for suppressing deformation of the main body 100. Thereby, the installation to the foundation 10 becomes easy. Since the structure is substantially the same as that of the support member 6U, description thereof is omitted.

支持材6U、6Lは汎用の形鋼であることが好ましい。 The support members 6U and 6L are preferably general-purpose shape steel.

コンクリート層4は、火炎熱、腐食環境、及び津波の漂流物による衝突等から本体100を保護するためのものであり、本体100の外周部に設けられている。コンクリート層4の厚さは15cm〜30cmであることが好ましい。 The concrete layer 4 is for protecting the main body 100 from flame heat, a corrosive environment, a collision caused by a tsunami drifting material, and the like, and is provided on the outer peripheral portion of the main body 100. The thickness of the concrete layer 4 is preferably 15 cm to 30 cm.

本体100の外周部にコンクリート層4が設けられていない状態では、火炎熱により本体100が所定の温度以上となったとき、本体100を構成する鉄板等の剛性が低下し大きく変形する。コンクリート層4を設けると、筐体2の温度上昇を抑制出来るとともに、コンクリート層4で本体100を拘束する。その結果、本体100の変形を抑制することが出来る。 In a state where the concrete layer 4 is not provided on the outer peripheral portion of the main body 100, when the main body 100 reaches a predetermined temperature or more due to flame heat, the rigidity of the iron plate or the like constituting the main body 100 is lowered and greatly deformed. When the concrete layer 4 is provided, the temperature rise of the housing 2 can be suppressed and the main body 100 is restrained by the concrete layer 4. As a result, deformation of the main body 100 can be suppressed.

地中は土粒子の表面及び空隙部に水分及び酸素を含んでおり、鉄板の腐食が極めて促進しやすい環境下となっている。また、海岸に近い場所にシェルター1を設置する場合、海水の飛沫の影響を受け、鉄板の腐食は促進される。しかし、外周部にコンクリート層4が設けられていると、コンクリート層4のアルカリにより鉄板の表面に不働態被膜が形成され、水分、酸素、及び塩素が存在する環境下でも鉄板の腐食を抑制することが出来る。 In the ground, the surface and voids of the soil particles contain moisture and oxygen, and the environment is such that the corrosion of the iron plate is very easy to promote. Moreover, when the shelter 1 is installed in a place close to the coast, it is affected by the splash of seawater, and the corrosion of the iron plate is promoted. However, when the concrete layer 4 is provided on the outer periphery, a passive film is formed on the surface of the iron plate due to the alkali of the concrete layer 4, and the corrosion of the iron plate is suppressed even in an environment where moisture, oxygen, and chlorine are present. I can do it.

また、コンクリート層4は津波の漂流物を直接コンクリート層4が受けることにより、コンクリート層4の内部側に設けられている本体100は、その衝撃の影響が緩和される。 Moreover, the concrete layer 4 receives the tsunami drifting material directly, so that the main body 100 provided on the inner side of the concrete layer 4 is less affected by the impact.

コンクリート層4は無筋コンクリートであることが好ましい。これにより、現場施工における配筋作業を省略することが可能となり、工期の短縮を図ることが出来る。 The concrete layer 4 is preferably unreinforced concrete. Thereby, it is possible to omit the bar arrangement work in the field construction, and the construction period can be shortened.

扉5は、地上部Fに設けられ、図2に示す通り、筐体2及び中空管3の開口8に溶接されている。扉5は1重又は2重の扉構造であり、水密性と耐衝撃性能を兼ね備えたものである。 The door 5 is provided in the ground part F, and is welded to the housing 2 and the opening 8 of the hollow tube 3 as shown in FIG. The door 5 has a single or double door structure, and has both watertightness and impact resistance.

シェルター1の築造方法について説明する。 A method for building the shelter 1 will be described.

本体100は、設備の整った工場で作成する。製作工程を以下に示す。 The main body 100 is created in a well-equipped factory. The manufacturing process is shown below.

側板21に複数の中空管3を外篏し所定の位置に配設した後、側板21に溶接することで位置を固定する。なお、最上部及び最下部の中空管3U、3Lに設けられた支持材6U、6Lは、側板21の上端部及び下端部に形成された凹部(図示略)に挿入する。 After the plurality of hollow tubes 3 are placed on the side plate 21 and disposed at a predetermined position, the position is fixed by welding to the side plate 21. The support members 6U and 6L provided in the uppermost and lowermost hollow tubes 3U and 3L are inserted into recesses (not shown) formed in the upper and lower ends of the side plate 21, respectively.

底板23及び天井板22を側板21の上端部及び下端部に取り付け、側板21並びに支持材6U、及び6Lに溶接することで位置を固定する。 The bottom plate 23 and the ceiling plate 22 are attached to the upper end portion and the lower end portion of the side plate 21, and the positions are fixed by welding to the side plate 21 and the supporting members 6U and 6L.

なお、本発明実施形態では中空管3U、3Lの外側に天井板22、底板23を設けているが、天井板22、底板23の外側に中空管3U、3Lを設けてもよい。また、底板23は省略してもよい。 In the embodiment of the present invention, the ceiling plate 22 and the bottom plate 23 are provided outside the hollow tubes 3U and 3L. However, the hollow tubes 3U and 3L may be provided outside the ceiling plate 22 and the bottom plate 23. Further, the bottom plate 23 may be omitted.

筐体2と中空管3に開口8を設け、図2に示す通り、開口8に扉5を溶接することで固定する。なお、開口8はあらかじめ成形しておいてもよい。 An opening 8 is provided in the casing 2 and the hollow tube 3, and the door 5 is fixed to the opening 8 by welding as shown in FIG. The opening 8 may be formed in advance.

中空管3にモルタル3bを注入する注入孔(図示略)と、内部空間3aに充填している空気を抜くとともにモルタル3bの充填状況を確認するための確認孔(図示略)を形成する。確認孔は所定の間隔で複数設ける。注入孔からモルタル3bを注入し、確認孔からモルタル3bが排出されることで、モルタル3bの充填を確認する。なお、モルタル3bの充填は施工現場で行ってもよい。 An injection hole (not shown) for injecting the mortar 3b into the hollow tube 3 and a confirmation hole (not shown) for removing the air filling the internal space 3a and confirming the filling state of the mortar 3b are formed. A plurality of confirmation holes are provided at predetermined intervals. The filling of the mortar 3b is confirmed by injecting the mortar 3b from the injection hole and discharging the mortar 3b from the confirmation hole. In addition, you may perform filling of the mortar 3b at a construction site.

現場施工工程を以下に示す。 The on-site construction process is shown below.

人力掘削及び小型の掘削機を使用して所定の深さまで掘削し、穴Hを形成する(図4参照)。のり面の安定を確認しながら慎重に掘削作業を進める。掘削完了後、底部の転圧を行い底面の不陸を整正し、平坦化を図る。なお、湧水等が認められる場合は、底部に砕石を敷き均し転圧する作業を追加してもよい。 Drilling to a predetermined depth using manual excavation and a small excavator to form a hole H (see FIG. 4). Excavate carefully while confirming the stability of the slope. After excavation is completed, the bottom is rolled to correct the bottom unevenness and flatten. In addition, when spring water etc. are recognized, you may add the operation | work which spreads a crushed stone on the bottom part, and is equalized and rolled.

底部にコンクリートを打設・養生することによって基礎10を構築する。基礎10は後工程を容易にすることを考慮して上面の水平を極力確保して仕上げることがよい。 The foundation 10 is constructed by placing and curing concrete on the bottom. In consideration of facilitating the post-process, the foundation 10 is preferably finished with the upper surface kept horizontal as much as possible.

工場で製作した本体100を据え付け現場へ搬入し、小型クレーンによって吊り下げ、基礎10に仮固定することで据え付ける。 The main body 100 manufactured at the factory is brought into the installation site, suspended by a small crane, and temporarily fixed to the foundation 10 for installation.

セパレータ(図示略)を用い側板21と所定の間隔を確保した状態で、側板21の周囲のみに型枠Tを築造する。側板21及び天井板22は、コンクリート打設のときの内側の型枠として機能するため、型枠Tの内側に新たに型枠を設ける必要はない。また、天井板22は支持材6Uで補強されているため打設時のコンクリートの重量を直接受けても変形は抑制され、所定の強度を確保することが出来る。すなわち、コンクリート打設時において、型枠として機能する天井板22を支持するために、本体100の内部に新たに支保工を設ける必要はない。このように、内側の型枠及び本体100の内部に設ける天井板22を補強するための支保工は不要となることから、コストの削減及び現場工期の短縮を図ることが出来る。 A mold T is built only around the side plate 21 in a state where a predetermined distance from the side plate 21 is secured using a separator (not shown). Since the side plate 21 and the ceiling plate 22 function as an inner formwork at the time of placing concrete, it is not necessary to newly provide a formwork inside the formwork T. Moreover, since the ceiling board 22 is reinforced with the support material 6U, even if it receives the weight of the concrete at the time of placement directly, a deformation | transformation will be suppressed and predetermined | prescribed intensity | strength can be ensured. That is, it is not necessary to newly provide a support in the main body 100 in order to support the ceiling plate 22 that functions as a mold when placing concrete. In this way, support work for reinforcing the inner formwork and the ceiling plate 22 provided inside the main body 100 is not necessary, so that the cost can be reduced and the site construction period can be shortened.

型枠Tと本体100の間に形成された空間にコンクリートを打設する。なお、天井板22から所定の高さまでコンクリートを打設する。コンクリートの打設後、天井板22上のコンクリート打設面を養生シートで覆い養生する。 Concrete is placed in a space formed between the formwork T and the main body 100. In addition, concrete is laid from the ceiling board 22 to a predetermined height. After the concrete is placed, the concrete placement surface on the ceiling board 22 is covered with a curing sheet and cured.

型枠Tを撤去し、コンクリート層4と穴Hの間に形成された空間を土又はコンクリートで埋める。埋め戻しに使用する土は、施工現場で発生したものを用いてもよい。 The formwork T is removed, and the space formed between the concrete layer 4 and the hole H is filled with soil or concrete. The soil used for backfilling may be generated at the construction site.

本発明は、シェルター等の避難施設に適用可能であり、産業上の利用価値が高い。 The present invention is applicable to an evacuation facility such as a shelter and has high industrial utility value.

1 :シェルター
100 :本体
2 :筐体
3、3L、3U :中空管
3a :内部空間
3b :モルタル(充填材)
4 :コンクリート層
5 :扉
6L、6U :支持材
8 :開口
10 :基礎
21 :側板
22 :天井板
23 :底板
A :筐体の内径
C :中空管の内径
F :地上部
S :地下部
T :型枠
H :穴
1: Shelter 100: Main body 2: Housing 3, 3L, 3U: Hollow tube 3a: Internal space 3b: Mortar (filler)
4: Concrete layer 5: Doors 6L and 6U: Support material 8: Opening 10: Foundation 21: Side plate 22: Ceiling plate 23: Bottom plate A: Inner diameter C: Hollow tube inner diameter F: Above-ground part S: Underground part T: Formwork H: Hole

Claims (1)

本体を組み立てるステップと、
中空管の内部空間に充填材を充填するステップと、
穴を形成するステップと、
前記穴の底部に基礎を構築するステップと
前記本体を前記基礎に据え付けるステップと、
前記本体の側板の周囲に型枠を築造するステップと、
前記型枠と、前記本体の間に形成された空間にコンクリートを打設し養生するステップと、
前記型枠を撤去し、コンクリート層と前記穴の間に形成された空間を土又はコンクリートで埋めるステップと、
を備え
前記中空管が、前記本体の側板の外表面に設けられ、前記コンクリート層に埋設されることを特徴とする半地下式シェルター築造工法。
Assembling the body,
Filling the interior space of the hollow tube with a filler;
Forming a hole;
Building a foundation at the bottom of the hole; installing the body on the foundation;
Building a formwork around the side plate of the body;
Placing and curing concrete in a space formed between the mold and the body; and
Removing the formwork and filling the space formed between the concrete layer and the hole with soil or concrete;
Equipped with a,
It said hollow tube is provided on the outer surface of the side plate of the main body, the semi-underground shelter construction method, wherein Rukoto embedded in the concrete layer.
JP2018511172A 2016-09-06 2017-08-30 Semi-underground shelter construction method Active JP6356939B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2016173305 2016-09-06
JP2016173305 2016-09-06
PCT/JP2017/031177 WO2018047696A1 (en) 2016-09-06 2017-08-30 Shelter and construction method therefor

Publications (2)

Publication Number Publication Date
JP6356939B1 true JP6356939B1 (en) 2018-07-11
JPWO2018047696A1 JPWO2018047696A1 (en) 2018-09-06

Family

ID=61562289

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018511172A Active JP6356939B1 (en) 2016-09-06 2017-08-30 Semi-underground shelter construction method

Country Status (3)

Country Link
JP (1) JP6356939B1 (en)
TW (1) TWI658193B (en)
WO (1) WO2018047696A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7057582B1 (en) * 2021-10-21 2022-04-20 株式会社九建総合開発 Underground construction method for large pipes and bottomed buried pipes

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7595244B2 (en) 2020-11-19 2024-12-06 株式会社九建総合開発 Method for installing large bottomed pipe and large bottomed pipe
JP7590283B2 (en) 2021-07-16 2024-11-26 日鉄神鋼建材株式会社 Design and manufacturing methods for spill prevention fences

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5397297A (en) * 1977-02-05 1978-08-25 Tetsuo Sawada Disaster preventing device
JP2005232845A (en) * 2004-02-20 2005-09-02 Fusao Sakano Evacuation facility
JP2007297898A (en) * 2006-05-01 2007-11-15 Nihon Shelter System Co Ltd Underground shelter and method for forming bearing partition wall of underground shelter
JP2014111873A (en) * 2012-10-31 2014-06-19 Kazutaka Kojima Tsunami evacuation underground shelter

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5397297A (en) * 1977-02-05 1978-08-25 Tetsuo Sawada Disaster preventing device
JP2005232845A (en) * 2004-02-20 2005-09-02 Fusao Sakano Evacuation facility
JP2007297898A (en) * 2006-05-01 2007-11-15 Nihon Shelter System Co Ltd Underground shelter and method for forming bearing partition wall of underground shelter
JP2014111873A (en) * 2012-10-31 2014-06-19 Kazutaka Kojima Tsunami evacuation underground shelter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7057582B1 (en) * 2021-10-21 2022-04-20 株式会社九建総合開発 Underground construction method for large pipes and bottomed buried pipes

Also Published As

Publication number Publication date
TWI658193B (en) 2019-05-01
TW201812150A (en) 2018-04-01
WO2018047696A1 (en) 2018-03-15
JPWO2018047696A1 (en) 2018-09-06

Similar Documents

Publication Publication Date Title
JP6356939B1 (en) Semi-underground shelter construction method
CN1662712A (en) foundation wall system
US9719269B2 (en) Prefabricated pool
KR101082995B1 (en) Landfill type PC banding for basement exterior wall construction and embedding method
JP5342078B1 (en) Tsunami evacuation underground shelter
JP2015078499A (en) Retaining wall structure and retaining wall construction method
JP5769104B2 (en) Foundation structure of buildings in soft ground
JP5725592B2 (en) Buildings that deal with natural disasters (tsunamis, tornadoes, etc.)
JP2014080745A (en) Tsunami evacuation underground shelter
KR20130100878A (en) Architecture using a complex steel pile and a constructing method thereof
JP5432814B2 (en) Construction method of concrete body for septic tank protection
KR200450899Y1 (en) Earthquake Evacuation Facility
JP4475116B2 (en) Vertical shaft structure and its construction method
WO2010085178A1 (en) House capable of floating during flooding
JP6804736B2 (en) Method of constructing horizontal resistance structure of existing building and horizontal resistance structure of existing building
JP4853430B2 (en) Construction method of underground tank, underground tank constructed by the construction method, and formwork apparatus
KR20200054504A (en) A Set of Assemble-able Bricks
JP5332508B2 (en) Building, building construction method
KR101318301B1 (en) Frame structure for underground structure and method of constructing underground structure using the same
JP5826100B2 (en) Thermal insulation foundation structure
JP5239634B2 (en) Construction method of underground tank structure
JP4964032B2 (en) Side wall and method for constructing side wall
JP5769103B2 (en) Basement installation structure
JP5102578B2 (en) Building unit, unit type building and method of constructing unit type building
JPH02308013A (en) Constructing cellar and cellar-constructing panel therefor

Legal Events

Date Code Title Description
A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20180501

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180510

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180517

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180529

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180614

R150 Certificate of patent or registration of utility model

Ref document number: 6356939

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150