JP6333528B2 - Structural design support system - Google Patents
Structural design support system Download PDFInfo
- Publication number
- JP6333528B2 JP6333528B2 JP2013193714A JP2013193714A JP6333528B2 JP 6333528 B2 JP6333528 B2 JP 6333528B2 JP 2013193714 A JP2013193714 A JP 2013193714A JP 2013193714 A JP2013193714 A JP 2013193714A JP 6333528 B2 JP6333528 B2 JP 6333528B2
- Authority
- JP
- Japan
- Prior art keywords
- building
- unit
- standard
- horizontal
- calculation table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000013461 design Methods 0.000 title claims description 64
- 238000012360 testing method Methods 0.000 claims description 49
- 238000004364 calculation method Methods 0.000 claims description 47
- 238000000605 extraction Methods 0.000 claims description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 239000000284 extract Substances 0.000 claims description 4
- 230000000717 retained effect Effects 0.000 description 10
- 239000000463 material Substances 0.000 description 8
- 238000012795 verification Methods 0.000 description 8
- 239000000470 constituent Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 238000012937 correction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000010008 shearing Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 230000001174 ascending effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000013102 re-test Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Description
本発明は、複数の建物ユニットを連結させて構築されるユニット建物の水平力に対する構造設計支援システムに関するものである。 The present invention relates to a structural design support system for horizontal force of unit buildings constructed by connecting a plurality of building units.
地震や風などによって建物が受ける水平力(水平荷重)に対して、建物の保有水平耐力がそれを上回るように構造設計を行う必要がある。そして、その保有水平耐力を検定するための構造設計支援システムが知られている(特許文献1−4参照)。 It is necessary to design the structure so that the horizontal proof strength of the building exceeds the horizontal force (horizontal load) received by the building due to an earthquake or wind. A structural design support system for testing the retained horizontal proof stress is known (see Patent Documents 1-4).
特許文献1には、建物ユニットどうしを連結部材で連結させることで水平方向に生じる剪断力(水平剪断力)を伝達可能にしたユニット建物と、その保有水平耐力の構造計算方法が開示されている。 Patent Document 1 discloses a unit building that can transmit a shearing force (horizontal shearing force) generated in the horizontal direction by connecting building units with a connecting member, and a structural calculation method for the retained horizontal strength. .
また、特許文献2には、柱と梁と耐力フレームによって形成される1スパンフレームに、水平荷重の作用位置を変化させて柱に発生する軸力を応力解析で求め、単位水平荷重と軸力との関係を示す表にして設計に利用する方法が開示されている。 Further, in Patent Document 2, an axial force generated in a column is obtained by stress analysis by changing the acting position of a horizontal load on a one-span frame formed by a column, a beam, and a load-bearing frame. A method of making a table showing the relationship between and for use in design is disclosed.
さらに、特許文献3にも、建物ユニットごとの個別設計条件の下で予め構造計算を行って結果表をデータベースに記憶させておき、その後の構造設計を迅速に行えるようにしたシステムが開示されている。 Further, Patent Document 3 discloses a system in which structural calculation is performed in advance under individual design conditions for each building unit and a result table is stored in a database so that subsequent structural design can be performed quickly. Yes.
一方、特許文献4には、ユニット建物の構造設計支援システムであって、建物の方向毎に必要壁量を算定して、水平力に対する耐力を検定するシステムが開示されている。 On the other hand, Patent Document 4 discloses a structural design support system for unit buildings, in which a required wall amount is calculated for each direction of a building and a proof against a horizontal force is verified.
ところで構造設計支援システムは、設定された構造に対して検定が行えるだけでなく、検定結果により構造の変更が必要になった場合に、容易に変更と再検定が行えるシステムが望まれる。 By the way, it is desired that the structural design support system not only can perform verification on the set structure, but also can easily change and re-verify the structure when it is necessary to change the structure according to the verification result.
また、構造設計者は、単に耐力が基準を満たす建物が選定されれば満足できるのではなく、経済性や材料使用量や設計にかかる時間なども考慮していずれの構造設計支援システムが良いかを判断する。 In addition, structural designers cannot be satisfied simply by selecting a building that meets the standard of proof stress. Which structural design support system is better considering economics, material usage, and design time? Judging.
そこで、本発明は、設計者が望む結果を容易に得ることが可能な構造設計支援システムを提供することを目的としている。 Therefore, an object of the present invention is to provide a structural design support system that can easily obtain a result desired by a designer.
前記目的を達成するために、本発明の構造設計支援システムは、鋼製の梁材及び柱材によって骨組みが形成される複数の建物ユニットを連結させて構築されるユニット建物の水平力に対する構造設計支援システムであって、複数種類の梁材と柱材との組み合わせによって特定される建物ユニット毎に予め許容剪断耐力が計算された結果が表形式で記憶された計算表データベースと、前記計算表データベースに記憶された建物ユニットを組み合わせてユニット建物の構成を設定する建物構成設定手段と、前記建物構成設定手段で設定された前記ユニット建物が前記水平力に対して基準を満たしているか否かの検定を行う水平耐力検定手段と、前記水平耐力検定手段で基準を満たさないと判定された場合に、前記設定されたユニット建物を構成する複数の建物ユニットの中から前記基準の達成度が最も低い部分を含む建物ユニットを抽出する交換ユニット抽出手段と、前記交換ユニット抽出手段で抽出された建物ユニットを、前記計算表データベースに記憶された別の建物ユニットに置き換えて新たなユニット建物の構成を設定する一部変更手段とを備えたことを特徴とする。 In order to achieve the above object, the structural design support system of the present invention is a structural design for horizontal force of a unit building constructed by connecting a plurality of building units formed of a frame by steel beams and pillars. A calculation system database that is a support system and stores a table of results of calculation of allowable shear strength in advance for each building unit specified by a combination of a plurality of types of beams and columns, and the calculation table database A building configuration setting means for setting a unit building configuration by combining the building units stored in the memory, and a test whether the unit building set by the building configuration setting means satisfies a standard for the horizontal force If the horizontal proof test means and the horizontal proof test means determine that the standard is not satisfied, the set unit building is configured. A replacement unit extracting means for extracting a building unit including a portion having the lowest achievement level of the standard from a plurality of building units, and the building unit extracted by the replacement unit extracting means are stored in the calculation table database. And a partial change means for setting a new unit building configuration by replacing with another building unit.
ここで、前記計算表データベースには、所定の優先順位に従って建物ユニットが並べられた許容剪断耐力表が記憶されており、前記一部変更手段では、その優先順位に基づいて置き換える建物ユニットを選定することができる。 Here, the calculation table database stores an allowable shear strength table in which building units are arranged according to a predetermined priority order, and the partial changing means selects a building unit to be replaced based on the priority order. be able to.
また、前記計算表データベースに記憶された建物ユニットでは置き換えができない場合に、前記基準の達成度が次に低い部分を含む建物ユニットを抽出する再抽出手段を備えた構成とすることが好ましい。 In addition, it is preferable to include a re-extraction unit that extracts a building unit including a portion having the next lowest achievement level of the reference when the building unit stored in the calculation table database cannot be replaced.
さらに、前記交換ユニット抽出手段で複数の建物ユニットが一度に抽出された場合に、剛心からの距離を基準にいずれか一つの建物ユニットを抽出する剛心距離判定手段を備えた構成とすることもできる。 Furthermore, when a plurality of building units are extracted at a time by the replacement unit extracting means, it may be configured to include a rigid distance determining means for extracting any one building unit based on the distance from the rigid center. it can.
また、前記建物構成設定手段及び一部変更手段は、選択不能に設定された建物ユニットを除いて前記計算表データベースから建物ユニットを選定することができる。 Further, the building configuration setting means and the partial changing means can select a building unit from the calculation table database except for building units that are set to be unselectable.
このように構成された本発明の構造設計支援システムは、複数種類の梁材と柱材との組み合わせによって特定される建物ユニット毎に予め許容剪断耐力が計算された結果を表形式にして計算表データベースに記憶させておく。 The structural design support system of the present invention configured as described above is a calculation table in the form of a table in which the allowable shear strength is calculated in advance for each building unit specified by a combination of a plurality of types of beams and columns. Store it in the database.
そして、計算表データベースに記憶された建物ユニットを組み合わせて構成が設定されたユニット建物に対して、水平耐力検定手段で検定を行い、基準を満たさなかった場合には、基準の達成度が最も低い建物ユニットのみを交換して、再度検定を行う。 The unit building that is configured by combining the building units stored in the calculation table database is tested by the horizontal strength test means, and if the standard is not met, the achievement of the standard is the lowest Replace only the building unit and retest.
このため、最初に設定したユニット建物の構成を大きく変えることなく、再検定を行うことで、設計者が望むユニット建物の構成を容易に得ることができる。 For this reason, the configuration of the unit building desired by the designer can be easily obtained by performing the re-verification without greatly changing the configuration of the unit building set first.
また、計算表データベースを設計者が望む優先順位で作成しておくことで、設計者が望むユニット建物に迅速にたどり着くことができる。さらに、基準の達成度が最も低い建物ユニットの置き換えができない場合でも、再抽出手段を設けることで、自動的に基準を満たすユニット建物の構成を決定させることができる。 In addition, by creating the calculation table database in the priority order desired by the designer, the unit building desired by the designer can be quickly reached. Furthermore, even when the building unit having the lowest degree of achievement of the standard cannot be replaced, it is possible to automatically determine the configuration of the unit building that satisfies the standard by providing the re-extraction means.
また、基準の達成度が最も低い建物ユニットが複数、抽出された場合であっても、剛心からの距離を基準にした剛心距離判定手段によって一つの建物ユニットを抽出することができ、変更による捩じれの影響を最小限に抑えることができる。 In addition, even if multiple building units with the lowest standard achievement are extracted, one building unit can be extracted by the rigid distance determination means based on the distance from the rigid, The effect of twisting can be minimized.
さらに、建物ユニットの配置関係などの制限によって選択不能な建物ユニットが存在する場合でも、それらを除いて計算表データベースから建物ユニットを選定させることができる。 Furthermore, even when there are building units that cannot be selected due to restrictions such as the arrangement relationship of the building units, the building units can be selected from the calculation table database except for those.
以下、本発明の実施の形態について図面を参照して説明する。図1は、本実施の形態の構造設計支援システムの構成を示したブロック図である。また、図2は、本実施の形態の構造設計支援システムを使って設計が行われるユニット建物10の構成を説明する斜視図である。さらに、図3は、本実施の形態の構造設計支援システムが組み込まれる設計の流れを説明するフローチャートである。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram showing the configuration of the structural design support system of the present embodiment. FIG. 2 is a perspective view for explaining the configuration of the unit building 10 that is designed using the structural design support system of the present embodiment. FIG. 3 is a flowchart for explaining a design flow in which the structural design support system of this embodiment is incorporated.
まず、ユニット建物10の構成から説明すると、ユニット建物10は、直方体状(箱形)の建物ユニット1を、上下左右に複数、隣接設置して構築される戸建て住宅などの建物である。 First, the structure of the unit building 10 will be described. The unit building 10 is a building such as a detached house constructed by installing a plurality of rectangular parallelepiped (box-shaped) building units 1 vertically and horizontally.
また、建物ユニット1は、図4に示すように、柱材としての4本の柱11と、長辺方向(桁方向)の柱11,11間に架け渡される梁材としての桁梁12と、短辺方向(妻方向)の柱11,11間に架け渡される梁材としての妻梁13とによって、構造部材となる骨組構造体が構成される。この骨組構造体は、柱11と梁材(12,13)とがジョイントピースを介して溶接によって剛接合されたラーメン構造体となっている。 Further, as shown in FIG. 4, the building unit 1 includes four columns 11 as column members, and a beam 12 as a beam member spanned between the columns 11 and 11 in the long side direction (girder direction). A frame structure as a structural member is configured by the beam 13 as a beam material spanned between the pillars 11 in the short side direction (wife direction). This frame structure is a rigid frame structure in which the column 11 and the beam members (12, 13) are rigidly joined by welding via a joint piece.
ここで、柱11は、角形鋼管などの閉断面の材料によって形成されている。また、梁材(12,13)は、C形鋼などの開放断面の材料によって形成されている。なお、桁梁12及び妻梁13には、それぞれ屋根梁(天井梁)と床梁とがある。 Here, the column 11 is formed of a closed cross-section material such as a square steel pipe. The beam members (12, 13) are made of an open cross-section material such as C-shaped steel. The girder beam 12 and the end beam 13 each have a roof beam (ceiling beam) and a floor beam.
このような鋼製材料によって骨組みが形成される建物ユニット1には、外形の大きさだけでなく複数の種類がある。すなわち、異なる断面の柱11及び梁材(12,13)を組み合わせることによって、外形が同じであっても許容剪断耐力が異なる建物ユニット1が形成されることになる。 In the building unit 1 in which a framework is formed of such a steel material, there are a plurality of types as well as the size of the outer shape. That is, by combining the columns 11 and the beam members (12, 13) having different cross sections, the building unit 1 having different allowable shear strength even if the outer shape is the same is formed.
そして、図2に示すように、複数の建物ユニット1,・・・が隣接して設置されて連結部材15(図16参照)の位置で連結されると、建物ユニット1,1間で水平剪断力の伝達が行われるユニット建物10が形成される。この連結部材15には、厚い鋼板や箱状の鋼製部材が使用できる。 As shown in FIG. 2, when a plurality of building units 1,... Are installed adjacent to each other and connected at the position of the connecting member 15 (see FIG. 16), horizontal shearing occurs between the building units 1, 1. A unit building 10 where force transmission is performed is formed. The connecting member 15 can be a thick steel plate or a box-shaped steel member.
このようにして構築されるユニット建物10には、上階がある場合は上階の建物ユニット1の床構面が、また最上階や平屋の場合は建物ユニット1の天井構面が水平構面101として形成されることになる。そして、並べられた建物ユニット1,・・・を覆う形状の水平構面101によって、捩じれを考慮しながらも建物全体で水平力に抵抗する構造として扱うことができるようになる。 In the unit building 10 constructed in this way, if there is an upper floor, the floor structure of the upper floor building unit 1 is horizontal, and if it is the top floor or one floor, the ceiling structure of the building unit 1 is a horizontal structure. 101 will be formed. The horizontal building surface 101 having a shape covering the arranged building units 1... Can be handled as a structure that resists horizontal force in the entire building while considering twisting.
図1は、本実施の形態の構造設計支援システムの主要な構成を示している。まず、計算表データベース2には、図9に示すような、複数種類の梁材(12,13)と柱材(11)との組み合わせによって特定される建物ユニット(1,・・・)毎に、予め許容剪断耐力(Pa')が計算された結果が表形式で記憶されている。 FIG. 1 shows a main configuration of the structural design support system of the present embodiment. First, in the calculation table database 2, for each building unit (1,...) Specified by a combination of a plurality of types of beam members (12, 13) and column members (11) as shown in FIG. The results of calculating the allowable shear strength (Pa ′) in advance are stored in a table format.
ここで、許容剪断耐力(Pa')とは、建物ユニットの各部材(柱11、桁梁12、妻梁13)のいずれかが許容応力度に達する時、又は層間変形角が規定値に達する時の水平力を指す。 Here, the allowable shear strength (Pa ′) means that when any of the members of the building unit (column 11, girder beam 12 and end beam 13) reaches the allowable stress level, or the interlayer deformation angle reaches the specified value. It refers to the horizontal force of time.
この図9に例示した表を、以下では許容剪断耐力表(Pa'表)と呼ぶ。この許容剪断耐力表には、所定の優先順位に従って複数種類の建物ユニットが並べられている。ここで、表の1行が1種類の建物ユニットに関するデータとなっている。 The table illustrated in FIG. 9 is hereinafter referred to as an allowable shear strength table (Pa ′ table). In this allowable shear strength table, a plurality of types of building units are arranged according to a predetermined priority. Here, one row of the table is data relating to one type of building unit.
この優先順位は、任意に設定することができる。例えば図9に示すように、各階ごとに桁梁12の許容剪断耐力(表の右から3列目)が低い順に建物ユニットを並べることができる。この場合、許容剪断耐力表の上から順番に建物ユニットを選んでいくと、基準に近い経済設計が行えることになる。 This priority order can be arbitrarily set. For example, as shown in FIG. 9, the building units can be arranged in order from the lowest allowable shear strength (third column from the right in the table) of the beam 12 for each floor. In this case, if building units are selected in order from the allowable shear strength table, economic design close to the standard can be performed.
この優先順位はこれに限定されるものではない。例えば鋼材使用量を減らしたい場合は、建物ユニット1に使用される鋼材量の少ない順に並べることができる。また、鋼材使用量と単価とは必ずしも連動しないため、材料費を抑えたい場合は価格の低い順に並べることができる。さらに、検定の繰り返しを避けて短時間で設計を終了させたい場合は、許容剪断耐力が高い順に並べることもできる。 This priority order is not limited to this. For example, when it is desired to reduce the amount of steel used, the steel units used in the building unit 1 can be arranged in ascending order. Moreover, since the amount of steel used and the unit price are not necessarily linked, when it is desired to reduce the material cost, they can be arranged in ascending order of price. Furthermore, when it is desired to finish the design in a short time while avoiding repeated testing, the tests can be arranged in descending order of allowable shear strength.
そして、建物構成設定手段31では、計算表データベース2に記憶された建物ユニットを読み込んで、それらを組み合わせることで検定用の一つのユニット建物10の構成(以下、「構成メンバー」という場合もある。)を設定する。 The building configuration setting means 31 reads the building units stored in the calculation table database 2 and combines them to form the configuration of one unit building 10 for verification (hereinafter referred to as “component member”). ) Is set.
水平耐力検定手段4では、建物構成設定手段31で設定されたユニット建物10が水平力(設計地震力、設計風圧力)に対して基準を満たしているか否かの検定を行う。 The horizontal strength test means 4 tests whether or not the unit building 10 set by the building configuration setting means 31 satisfies the standard with respect to the horizontal force (design seismic force, design wind pressure).
ここで、「基準」とは、検定の判定基準を指す。例えば、設計値/許容値で検定を行う場合は1が検定値の最低基準であり、「設計値/許容値≦1」となることが「基準を満たす」ことになる。なお、設計者の判断によって余裕率を高く設定する場合は、検定値は1よりも小さくなる。反対に、許容値/設計値で検定を行う場合は、「許容値/設計値≧1」となることが「基準を満たす」ことになる。 Here, the “standard” refers to a determination criterion for the test. For example, when the test is performed using the design value / allowable value, 1 is the minimum standard of the test value, and “design value / allowable value ≦ 1” satisfies “the standard”. Note that if the margin ratio is set high by the designer's judgment, the test value is smaller than 1. On the other hand, when the test is performed with an allowable value / design value, “acceptable value / design value ≧ 1” satisfies “the standard”.
そして、交換ユニット抽出手段51では、水平耐力検定手段4で基準を満たさないと判定された場合に、設定されたユニット建物10を構成する複数の建物ユニット1,・・・の中から、基準の達成度が最も低い建物ユニットを抽出する。 Then, in the replacement unit extraction means 51, when it is determined by the horizontal strength test means 4 that the standard is not satisfied, the standard unit is selected from the plurality of building units 1,. The building unit with the lowest achievement is extracted.
ここで、「基準の達成度が最も低い」とは、他との比較で最も基準から下回る方向で離れていることを指す。例えば、設計値/許容値で検定を行う場合は、数値が大きいほど基準の達成度が低いことになる。反対に、許容値/設計値で検定を行う場合は、数値が小さいほど基準の達成度が低いことになる。 Here, “the degree of achievement of the standard is the lowest” means that the standard is farther away from the standard in comparison with others. For example, when the test is performed with the design value / allowable value, the achievement level of the standard is lower as the numerical value is larger. On the contrary, when the test is performed with the allowable value / design value, the achievement of the standard is lower as the numerical value is smaller.
基準の達成度が最も低い建物ユニット1が一つしか抽出されなかった場合は抽出処理をその時点で終了させることができるが、複数の建物ユニット1,1が一度に抽出された場合には、剛心距離判定手段53によりさらに抽出処理を続ける。 If only one building unit 1 with the lowest degree of achievement of the standard has been extracted, the extraction process can be terminated at that time, but if a plurality of building units 1, 1 are extracted at once, The extraction process is further continued by the rigid distance determination means 53.
剛心距離判定手段53では、ユニット建物10の剛心からの距離に基づいて建物ユニット1を一つに絞り込む。詳細は後述するが、基準の達成度が最も低い部分が2箇所で選ばれた場合(図14のユニットフレーム721,722参照)、距離が遠い方の部分を含む建物ユニット(図14の建物ユニット72E参照)が抽出される。 The rigid distance determination means 53 narrows down the building units 1 to one based on the distance from the rigid center of the unit building 10. Although details will be described later, when two portions having the lowest degree of achievement of the standard are selected (see unit frames 721 and 722 in FIG. 14), a building unit including a portion with a longer distance (the building unit in FIG. 14). 72E) is extracted.
また、一方向(X方向)の距離が同じとなる基準の達成度が最も低い部分が3箇所で選ばれた場合(図15のユニットフレーム731,732,733参照)、直交する他方向(Y方向)の距離が遠い方の部分を含む建物ユニット(図15の建物ユニット73C参照)が抽出される。 In addition, when three portions having the lowest degree of achievement of the standard in which the distance in one direction (X direction) is the same are selected (see unit frames 731, 732, and 733 in FIG. 15), the other directions that are orthogonal (Y A building unit (see building unit 73 </ b> C in FIG. 15) including a portion having a far direction is extracted.
一部変更手段32では、交換ユニット抽出手段51又は剛心距離判定手段53で抽出された建物ユニット1を、計算表データベース2に記憶された別の建物ユニットに置き換えて新たなユニット建物10の構成を設定する。 The partial change unit 32 replaces the building unit 1 extracted by the replacement unit extraction unit 51 or the rigid distance determination unit 53 with another building unit stored in the calculation table database 2, thereby configuring a new unit building 10. Set.
すなわち計算表データベース2の許容剪断耐力表(図9)が、桁梁12の許容剪断耐力の低い順に並べられている場合、一番上の建物ユニットでは基準を満たさなかったときに、表の次の行に記憶されている建物ユニットを選んで置き換える。なお、表の順番に従って建物ユニットを選定しない場合もあるが、そのような例外ルールについては実施例で説明する。 In other words, when the allowable shear strength table (FIG. 9) of the calculation table database 2 is arranged in the order of the allowable shear strength of the girder beam 12, when the uppermost building unit does not satisfy the standard, Select and replace the building unit stored in the row. In some cases, building units are not selected according to the order in the table. Such an exception rule will be described in the embodiment.
ここで、交換ユニット抽出手段51で抽出された建物ユニット1が許容剪断耐力表(Pa'表)の最下位にあり、置き換えが可能な建物ユニットが存在しない場合がある。そのような場合は、再抽出手段52によって、基準の達成度が次に低い部分を含む建物ユニットを抽出して、一部変更手段32に送る。 Here, there is a case where the building unit 1 extracted by the replacement unit extracting means 51 is at the lowest level of the allowable shear strength table (Pa ′ table) and there is no replaceable building unit. In such a case, the re-extracting means 52 extracts a building unit including a part having the next lowest level of achievement of the standard, and sends it to the partial changing means 32.
そして、一部変更手段32で別の建物ユニットに置き換えることで新たに構成が設定されたユニット建物10に対して、水平耐力検定手段4で検定を行う。水平耐力検定手段4で検定を行った結果、基準を満たしていると判定されたユニット建物10は、決定された構成として出力手段6に出力される。 Then, the horizontal strength test means 4 performs a test on the unit building 10 that has been newly configured by replacing it with another building unit by the partial change means 32. As a result of the test performed by the horizontal strength test means 4, the unit building 10 determined to satisfy the standard is output to the output means 6 as the determined configuration.
次に、図3を参照しながら、ユニット建物10の構造設計の流れについて説明する。 Next, the flow of the structural design of the unit building 10 will be described with reference to FIG.
まず、ステップS1でプランの決定を行う。ここでいう「プラン」とは、使用する建物ユニット1の外形(平面形状及び立面形状)、組み合わせ及び配置、並びに使用する外壁14及び間仕切りの種類及び配置などを決めることで、ユニット建物10の全体構成を決めることを言う。 First, a plan is determined in step S1. Here, the “plan” refers to the outline of the building unit 1 to be used (planar shape and elevation shape), combination and arrangement, and the type and arrangement of the outer wall 14 and partition to be used. Say to decide the overall structure.
続いてステップS2では、プランで決めた建物ユニット1の外形と固定荷重に合った許容剪断耐力表(Pa'表)を、計算表データベース2の中から選択して読み込む。 Subsequently, in step S2, an allowable shear strength table (Pa 'table) that matches the external shape and fixed load of the building unit 1 determined in the plan is selected from the calculation table database 2 and read.
例えば図4に示したユニット建物10は、すべて同じ平面形状(図示されていないが立面形状も同じ)であるため、固定荷重も同じ場合は同じ許容剪断耐力表(Pa'表)を使用することができる。これに対して図16に示すような平面形状の小さなSユニット1Aには、Lユニット1Bと同じ許容剪断耐力表(Pa'表)を使用することはできない。 For example, all the unit buildings 10 shown in FIG. 4 have the same planar shape (not shown, but the elevation shape is the same), so the same allowable shear strength table (Pa ′ table) is used when the fixed load is the same. be able to. On the other hand, the same allowable shear strength table (Pa ′ table) as that of the L unit 1B cannot be used for the S unit 1A having a small planar shape as shown in FIG.
また、固定荷重の違いによっても、使用する許容剪断耐力表(Pa'表)が変わることになる。この固定荷重は、付加メニュー(建物ユニットの付加物)の有無、外壁の種類、屋根の種類、積雪荷重などによって変わる。このため、計算表データベース2には、複数の許容剪断耐力表(Pa'表)が記憶されている。 Moreover, the allowable shear strength table (Pa 'table) to be used also changes depending on the difference in the fixed load. This fixed load varies depending on the presence / absence of an additional menu (additional building unit), the type of outer wall, the type of roof, the snow load, and the like. For this reason, the calculation table database 2 stores a plurality of allowable shear strength tables (Pa ′ tables).
許容剪断耐力表(Pa'表)に記憶された複数の建物ユニットの種類の中から、最初に建物ユニットを選定する場合は、基本的には表の一番上に記憶されている建物ユニットを選ぶ。なお、実施例で説明するように配置関係によっては選定できない建物ユニットもあるため、その場合はそれを除いて最も一番上にある建物ユニットを選定する。 When selecting a building unit for the first time from the types of building units stored in the allowable shear strength table (Pa 'table), basically, the building unit stored at the top of the table is selected. Choose. Since some building units cannot be selected depending on the arrangement relationship as described in the embodiment, the topmost building unit is selected except for that.
そしてユニット建物10を構成するすべての建物ユニット1,・・・を計算表データベース2から選ぶことによって、ユニット建物10の最初の内部構成(構成メンバー)が選定されたことになる(ステップS3)。以下で説明するように、この初期設定されたユニット建物10の検定結果がすべて基準を満たしていれば、そのままユニット建物10の構成として決定されることになる。 Then, by selecting all the building units 1,... Constituting the unit building 10 from the calculation table database 2, the first internal configuration (component member) of the unit building 10 is selected (step S3). As will be described below, if all of the initially set test results of the unit building 10 satisfy the criteria, the configuration of the unit building 10 is determined as it is.
続いてステップS4では、ユニット建物10の通り毎に、設計水平力(設計地震力、設計風圧力)、ねじれ補正係数、偏心率、剛性率などを算出する。本実施の形態では、図2を使って説明したように、ユニット建物10は水平構面101によって建物ユニット1,1間で水平剪断力が伝達されるようになっている。 Subsequently, in step S4, for each unit building 10, a design horizontal force (design seismic force, design wind pressure), a torsion correction coefficient, an eccentricity rate, a rigidity rate and the like are calculated. In the present embodiment, as described with reference to FIG. 2, the unit building 10 is configured such that the horizontal shearing force is transmitted between the building units 1 and 1 by the horizontal surface 101.
そこで、図4に示すように桁梁12及び妻梁13の位置に合わせた通り毎に1次設計の検討を行う。X方向には、2つの建物ユニット1,1の妻梁13,13が並ぶX1列からX4列までの通りがある。また、Y方向には、2つの建物ユニット1,1の桁梁12,12が並ぶY1列からY4列までの通りがある。 Therefore, as shown in FIG. 4, the primary design is examined for each street in accordance with the positions of the beam 12 and the beam 13. In the X direction, there are streets from the X1 row to the X4 row in which the end beams 13, 13 of the two building units 1, 1 are arranged. Further, in the Y direction, there are streets from the Y1 row to the Y4 row in which the beam beams 12, 12 of the two building units 1, 1 are arranged.
この通り毎に、以下の式1を使って設計地震力Pkを算出する。
一方、設計風圧力Pwは、図5のY1列に例示したように、見附面積Anに対して以下の式2を使って算出する。
ここで、式2は3階建てのユニット建物10の計算式を例示している。なお、1F,2F,3Fは、それぞれ1階、2階、3階を示す。
For each street, the design seismic force Pk is calculated using Equation 1 below.
On the other hand, the design wind pressure Pw is calculated using the following formula 2 with respect to the found area An as illustrated in the Y1 column of FIG.
Here, Formula 2 illustrates the calculation formula of the three-story unit building 10. 1F, 2F, and 3F indicate the first floor, the second floor, and the third floor, respectively.
図6には、設計地震力Pk及び設計風圧力Pwの計算結果を、階毎、通り毎にまとめて表にした一例を示した。なお、この図6の表は、図4,5に基づいて計算した結果ではなく、単なる例示である。 FIG. 6 shows an example in which the calculation results of the design seismic force Pk and the design wind pressure Pw are tabulated for each floor and each street. The table of FIG. 6 is merely an example, not the result of calculation based on FIGS.
そして、図7の表には、設計地震力Pkと設計風圧力Pwに加えて、各通りのねじれ補正係数α、ユニット建物10の各階の偏心率や剛性率などを示した。なお、この図7の表についても、図4−6とは関係なく単なる例示である。 In the table of FIG. 7, in addition to the design seismic force Pk and the design wind pressure Pw, various torsion correction coefficients α, eccentricity and rigidity of each floor of the unit building 10 are shown. The table in FIG. 7 is also merely an example regardless of FIGS. 4-6.
続いてステップS5では、ユニット建物10全体で、ねじれ補正係数を考慮した各通りにかかる負担水平力Bd(負担地震力Bk,負担風圧力Bw)の算出を行う。 Subsequently, in step S5, the horizontal load Bd (burden seismic force Bk, burden wind pressure Bw) applied to each unit building 10 in consideration of the torsion correction coefficient is calculated.
負担地震力Bkと負担風圧力Bwは、図8に示すように、Y方向をn列とし、X方向をm番目として、以下の式3,4によって算出できる。
ここで、各建物ユニットの桁梁12又は妻梁13で表現できる部分をユニットフレーム(n列m番目)としている。
As shown in FIG. 8, the burden seismic force Bk and the burden wind pressure Bw can be calculated by the following equations 3 and 4, where the Y direction is the nth column and the X direction is the mth.
Here, the part that can be expressed by the beam 12 or the end beam 13 of each building unit is defined as a unit frame (n-th column m-th).
そして、図9に示した計算表データベース2の許容剪断耐力表のPa'の値を使って、通り毎に負担地震力Bkと負担風圧力Bwとの検定を行う(ステップS6)。 Then, using the Pa ′ value in the allowable shear strength table of the calculation table database 2 shown in FIG. 9, the burden seismic force Bk and the burden wind pressure Bw are verified for each street (step S6).
ここで、図9の構成部材の欄には板厚のみを示している。それ以外の寸法については、例えばC形鋼で形成される屋根梁は、梁の高さを200mm、フランジの幅を75mmとすることができる。また、床梁の場合は、梁の高さを150mm、フランジの幅を75mmとすることができる。さらに、柱11には、一辺100mmの角形鋼管を使用することができる。 Here, only the plate thickness is shown in the column of constituent members in FIG. As for other dimensions, for example, a roof beam formed of C-shaped steel can have a beam height of 200 mm and a flange width of 75 mm. In the case of floor beams, the beam height can be 150 mm and the flange width can be 75 mm. Further, a square steel pipe having a side of 100 mm can be used for the column 11.
ステップS6の検定では、「設計値/許容値≦1」の検定を行う。すなわち、負担地震力Bk/許容剪断耐力Pa'≦1、かつ、負担風圧力Bw/許容剪断耐力Pa'≦1の両方の基準を満たしているか否かを通り毎に検定する。 In the test of step S6, a test of “design value / allowable value ≦ 1” is performed. In other words, whether or not both of the burden seismic force Bk / allowable shear strength Pa ′ ≦ 1 and the burden wind pressure Bw / allowable shear strength Pa ′ ≦ 1 are satisfied is verified for each pass.
ここまでのステップが1次設計となる。以下のステップでは、2次設計について説明する。 The steps so far are the primary design. In the following steps, the secondary design will be described.
ステップS7では、ユニット建物10全体の構造特性係数Ds'と、保有水平耐力ΣQeyを算出する。保有水平耐力ΣQey及び構造特性係数Ds'は、図10Aを参照しながら次の式5,6により算出することができる。
ここで、各建物ユニットのユニットフレームnの保有水平耐力Qeynの合計が同一平面内の保有水平耐力ΣQeynとなる。
In step S7, the structural characteristic coefficient Ds ′ of the entire unit building 10 and the retained horizontal strength ΣQey are calculated. The retained horizontal yield strength ΣQey and the structural characteristic coefficient Ds ′ can be calculated by the following equations 5 and 6 with reference to FIG. 10A.
Here, total holdings lateral strength Qey n of the unit frame n of each building unit is held horizontal strength ShigumaQey n in the same plane.
なお、図10Bに示すように、保有水平耐力ΣQey及び構造特性係数Ds'を予め計算しておき、その計算結果を表形式で計算表データベース2に記憶させておくことができる。こうすることによって、許容剪断耐力(Pa')と同様に必要な時に計算データベース表2から読み込むことができる。 As shown in FIG. 10B, the retained horizontal proof stress ΣQey and the structural characteristic coefficient Ds ′ can be calculated in advance, and the calculation results can be stored in the calculation table database 2 in a tabular format. By doing so, it is possible to read from the calculation database table 2 when necessary as well as the allowable shear strength (Pa ′).
続いてステップS8では、保有水平耐力ΣQeyが必要保有水平耐力ΣQunを上回っているかの検定を行う。すなわち、ΣQey/ΣQun≧1であれば、基準を満たしていることになる。 Subsequently, in step S8, it is verified whether the retained horizontal strength ΣQey exceeds the required retained horizontal strength ΣQun. That is, if ΣQey / ΣQun ≧ 1, the criterion is satisfied.
ここで、必要保有水平耐力ΣQunは、次の式7により算出することができる。
図11に、検定結果の一例を示す。ここで、2次設計の保有水平耐力の検定では、「許容値/設計値≧1」となることが「基準を満たす」ことになるため、数値が小さいほど基準の達成度が低いことになる。なお、図11の表の「ユニットF」は、各建物ユニットの桁梁12又は妻梁13で表現できるユニットフレームを指す。
Here, the required retained horizontal strength ΣQun can be calculated by the following equation 7.
FIG. 11 shows an example of the test result. Here, in the test of the retained horizontal proof stress of the secondary design, since “allowable value / design value ≧ 1” means “satisfy standard”, the smaller the numerical value, the lower the standard achievement level. . Note that “unit F” in the table of FIG. 11 indicates a unit frame that can be expressed by the girder beam 12 or the end beam 13 of each building unit.
次に、上述してきた検定によって、最初に設定された構成メンバーが基準を満たさなかった場合について説明する。すなわち、図12のステップS11及びステップS12が、図3のフローチャートで説明したステップS3−S8に該当する。そして、最初の構成メンバーで検定を通過した場合は、そのまま最初に設定された構成メンバーに決定される(ステップS13)。 Next, a description will be given of a case where the constituent member initially set does not satisfy the standard by the above-described test. That is, step S11 and step S12 in FIG. 12 correspond to steps S3-S8 described in the flowchart in FIG. Then, when the first constituent member passes the test, it is determined as the first constituent member as it is (step S13).
これに対して、最初の構成メンバーの検定結果が、1次設計又は2次設計の少なくともいずれか一方で基準を満たさなかった場合は、ステップS14に移行する。ここでは、交換ユニット抽出手段51によって、最初に設定されたユニット建物10の構成メンバーの中から、一つだけ交換する建物ユニット1を抽出する。 On the other hand, when the test result of the first constituent member does not satisfy the standard in at least one of the primary design and the secondary design, the process proceeds to step S14. Here, the replacement unit extraction means 51 extracts only one building unit 1 to be replaced from among the constituent members of the unit building 10 set first.
図13は、交換ユニット抽出手段51を説明するための具体例を示した図である。この図に示されたユニット建物70Aは、5つの建物ユニット71A−71Eを連結することで構成されている。なお、7Aはユニット建物70Aの剛心の位置を示している。 FIG. 13 is a diagram showing a specific example for explaining the replacement unit extraction means 51. The unit building 70A shown in this figure is configured by connecting five building units 71A-71E. 7A shows the position of the rigid center of the unit building 70A.
そして、各建物ユニット71A−71Eの妻梁を含むユニットフレームの横には、1次設計の検定値((負担地震力Bk又は負担風圧力Bw)/許容剪断耐力Pa'))が記載されている。この検定値は1以下であれば基準を満たしていることになるので、図13の右上の建物ユニット71Aの右側のユニットフレーム711のみが、検定値を満たしていないことになる。 Then, the verification value of the primary design ((burden seismic force Bk or burdened wind pressure Bw) / allowable shear strength Pa ′) is described beside the unit frame including the end beam of each building unit 71A-71E. Yes. If this test value is 1 or less, the standard is satisfied, so only the right unit frame 711 of the building unit 71A on the upper right in FIG. 13 does not satisfy the test value.
このように基準の達成度が最も低い検定値を含む建物ユニット71Aが一つしかない場合は、次のステップS15に移行することができる。ステップS15では、許容剪断耐力表(Pa'表)の現在選ばれている建物ユニット71Aの構成の次の行の建物ユニットを選んで、建物ユニット71Aと交換する。 As described above, when there is only one building unit 71A including the test value with the lowest achievement level of the standard, the process can proceed to the next step S15. In step S15, the building unit in the next row in the configuration of the currently selected building unit 71A in the allowable shear strength table (Pa ′ table) is selected and replaced with the building unit 71A.
ここで許容剪断耐力表(Pa'表)に、現在選ばれている建物ユニット71Aの構成の次の行に建物ユニットが存在しない場合は、再抽出手段52によって基準の達成度が次に低い検定値を探すことになる(ステップS16)。なお、図13に示した例では、「基準の達成度が次に低い検定値」が複数存在することになるので、そのような場合は以下のステップS17と同様の処理が行われる。 Here, in the allowable shear strength table (Pa ′ table), when there is no building unit in the next row of the configuration of the currently selected building unit 71A, the re-extracting means 52 has the next lowest level of achievement of the standard. A value is searched for (step S16). In the example shown in FIG. 13, there are a plurality of “test values with the next lowest standard achievement level”. In such a case, processing similar to the following step S <b> 17 is performed.
ステップS14で複数の建物ユニット1,1が選定される場合は、ステップS17に移行して剛心距離判定手段53により処理を行うことになる。図14は、剛心距離判定手段53を説明するための具体例を示した図である。この図に示されたユニット建物70Bは、5つの建物ユニット72A−72Eを連結することで構成されている。 When a plurality of building units 1 and 1 are selected in step S14, the process moves to step S17 and processing is performed by the rigid distance determination means 53. FIG. 14 is a diagram showing a specific example for explaining the rigid distance determination means 53. The unit building 70B shown in this figure is configured by connecting five building units 72A to 72E.
このユニット建物70Bでは、右上の建物ユニット72Aの右側のユニットフレーム722の検定値と、左中の建物ユニット72Eの左側のユニットフレーム721の検定値とが同じ値(1.03)で、基準の達成度が最も低い検定値となっている。 In this unit building 70B, the test value of the right unit frame 722 of the upper right building unit 72A and the test value of the left unit frame 721 of the left middle building unit 72E are the same value (1.03), and the standard achievement level Is the lowest test value.
このような場合は、剛心距離判定手段53で剛心7Bからのユニットフレーム721,722の距離(新座標r)を判定する。そして、剛心7BからのX方向の距離(新座標r)が遠いユニットフレーム721を含む建物ユニット72Eを、交換するための建物ユニットとして抽出する。 In such a case, the distance (new coordinate r) of the unit frames 721 and 722 from the rigid core 7B is determined by the rigid distance determination means 53. Then, the building unit 72E including the unit frame 721 having a far X-direction distance (new coordinate r) from the rigid core 7B is extracted as a building unit for replacement.
このように剛心7Bからの距離が離れている建物ユニット72Eを補強しても、ユニット建物70B全体の捩じれが大きくなって他の建物ユニット72A−72Dの負担が意図せずに増加するという事態の発生を防ぐことができる。すなわち捩じれの変化が最も少なくなるような変更にすることで、検定の繰り返しを最小限に抑えることができる。 In this way, even if the building unit 72E that is far from the rigid core 7B is reinforced, the torsion of the entire unit building 70B increases and the burden on the other building units 72A-72D increases unintentionally. Can be prevented. In other words, by making a change that minimizes the change in twist, it is possible to minimize the repetition of the test.
一方、一方向の距離だけでは交換する建物ユニットを一つに絞れない場合があるため、ステップS18で処理を続ける。図15に示されたユニット建物70Cは、5つの建物ユニット73A−73Eを連結することで構成されている。 On the other hand, since there may be a case where the number of building units to be replaced cannot be narrowed down to only one distance, the processing is continued in step S18. The unit building 70C shown in FIG. 15 is configured by connecting five building units 73A to 73E.
このユニット建物70Cでは、右側の建物ユニット72A,72B,72Cの右側のユニットフレーム731,732,733の検定値がすべて同じ値(1.03)で、基準の達成度が最も低い検定値となっている。また、これらのユニットフレーム731,732,733の剛心7CからのX方向の距離(新座標r)も同じである。 In the unit building 70C, the test values of the right unit frames 731, 732, and 733 of the right building units 72A, 72B, and 72C are all the same value (1.03), and the standard achievement level is the lowest. . The distances (new coordinates r) in the X direction from the rigid cores 7C of these unit frames 731, 732, and 733 are also the same.
そこで、X方向に直交する方向となるY方向の距離で比較する。その結果、右下の建物ユニット73Cの距離が最も剛心7Cから遠くなるため、ユニットフレーム733を含む建物ユニット73Cを、交換するための建物ユニットとして抽出する。 Therefore, the distance in the Y direction, which is the direction orthogonal to the X direction, is compared. As a result, since the distance of the lower right building unit 73C is farthest from the rigid core 7C, the building unit 73C including the unit frame 733 is extracted as a building unit for replacement.
以上のようにして図3のステップS6及びステップS8の両方の基準を満たす構成メンバーが決定した後に、ユニット建物10の水平構面101の検定を行う(ステップS9)。この水平構面101の検定で基準が満たされなかった場合は、水平構面101の補強仕様を変更して、再度検定を行うことになる。 After the constituent members satisfying the criteria of both step S6 and step S8 in FIG. 3 are determined as described above, the horizontal construction surface 101 of the unit building 10 is verified (step S9). If the standard is not satisfied in the verification of the horizontal surface 101, the reinforcement specification of the horizontal surface 101 is changed and the verification is performed again.
次に、本実施の形態の構造設計支援システムの作用について説明する。 Next, the operation of the structural design support system of this embodiment will be described.
このように構成された本実施の形態の構造設計支援システムは、複数種類の梁材(12,13)と柱11との組み合わせによって特定される建物ユニット1毎に予め許容剪断耐力(Pa')が計算された結果を、許容剪断耐力表(Pa'表)として計算表データベース2に記憶させておく。 The structural design support system of the present embodiment configured as described above has an allowable shear strength (Pa ′) in advance for each building unit 1 specified by a combination of a plurality of types of beam members (12, 13) and columns 11. The calculation result is stored in the calculation table database 2 as an allowable shear strength table (Pa ′ table).
そして、計算表データベース2に記憶された建物ユニットを組み合わせて構成が設定されたユニット建物10に対して、水平耐力検定手段4で検定を行い、基準を満たさなかった場合には、基準の達成度が最も低い建物ユニット1のみを交換して、再度検定を行う。 Then, the unit building 10 configured by combining the building units stored in the calculation table database 2 is tested by the horizontal strength test means 4, and if the standard is not satisfied, the achievement level of the standard Only the building unit 1 with the lowest is exchanged and the test is performed again.
このため、最初に設定したユニット建物10の構成を大きく変えることなく、再検定を行うことで、設計者が望むユニット建物10の構成を容易に得ることができる。 For this reason, the configuration of the unit building 10 desired by the designer can be easily obtained by performing the re-verification without greatly changing the configuration of the unit building 10 set at the beginning.
また、許容剪断耐力表(Pa'表)を設計者が望む優先順位で作成しておくことで、設計者が望むユニット建物10に迅速にたどり着くことができる。さらに、基準の達成度が最も低い建物ユニット1の置き換えができない場合でも、再抽出手段52を設けることで、自動的に基準を満たすユニット建物10の構成を決定させることができる。 In addition, by creating the allowable shear strength table (Pa ′ table) in the priority order desired by the designer, the unit building 10 desired by the designer can be quickly reached. Furthermore, even when the building unit 1 having the lowest degree of achievement of the standard cannot be replaced, the configuration of the unit building 10 that satisfies the standard can be automatically determined by providing the re-extraction means 52.
また、基準の達成度が最も低い建物ユニット1,1が複数、抽出された場合であっても、剛心からの距離を基準にした剛心距離判定手段53によって一つの建物ユニットを抽出することができ、変更による捩じれの影響を最小限に抑えることができる。 Even if a plurality of building units 1 and 1 having the lowest achievement level of the standard are extracted, one building unit can be extracted by the rigid distance determination means 53 based on the distance from the rigid center. It is possible to minimize the influence of twist due to the change.
以下、前記した実施の形態とは別の形態の実施例について、図16を参照しながら説明する。なお、前記実施の形態で説明した内容と同一乃至均等な部分の説明については、同一符号又は同一用語を使って説明する。 Hereinafter, an example of a form different from the above-described embodiment will be described with reference to FIG. Note that the description of the same or equivalent parts as the contents described in the above embodiment will be described using the same reference numerals or the same terms.
前記実施の形態では、許容剪断耐力表(Pa'表)の上から順番に建物ユニットを抽出していく場合について説明した。これに対して本実施例では、建物ユニット1,・・・の配置関係などの制限によって選択不能な建物ユニットが存在する場合について説明する。 In the above-described embodiment, a case has been described in which building units are extracted sequentially from the top of the allowable shear strength table (Pa ′ table). On the other hand, a present Example demonstrates the case where the building unit which cannot be selected exists by restrictions, such as arrangement | positioning relationship of building unit 1, ....
図16に示したユニット建物10Aは、右側が桁サイズの長い建物ユニットであるLユニット1Bと、桁サイズの短い建物ユニットであるSユニット1Aとによって構成されている。 The unit building 10A shown in FIG. 16 includes an L unit 1B which is a building unit having a long girder size on the right side and an S unit 1A which is a building unit having a short girder size.
このような場合は、Sユニット1Aとの連結部材15がLユニット1Bの桁梁12の途中に接続されることになるため、補強梁16が必要になるだけでなく、Lユニット1Bの部材に最低断面寸法という制限ができる。 In such a case, since the connecting member 15 with the S unit 1A is connected in the middle of the beam 12 of the L unit 1B, not only the reinforcing beam 16 is required but also the member of the L unit 1B. The minimum cross-sectional dimension can be limited.
この最低断面寸法は、Lユニット1Bの桁サイズによっても異なるが、一辺100mmの角形鋼管の柱11と組み合わせる場合は、例えば桁サイズが5514mmのときに、屋根梁の最低断面寸法は梁の高さが200mm、フランジの幅が75mm,板厚が3.2mmとなる。 This minimum cross-sectional dimension varies depending on the girder size of the L unit 1B, but when combined with a square steel pipe column 11 having a side of 100 mm, for example, when the girder size is 5514 mm, the minimum cross-sectional dimension of the roof beam is the height of the beam. 200mm, flange width 75mm, plate thickness 3.2mm.
このため、許容剪断耐力表(Pa'表)の上位に、この最低断面寸法よりも小さい断面の屋根梁が組み込まれた建物ユニットがあったとしても、それを選定することはできない。許容剪断耐力表(Pa'表)を下がっていき、この最低断面寸法を満たす屋根梁が組み込まれた建物ユニットを選定することになる。 For this reason, even if there is a building unit in which a roof beam having a cross section smaller than the minimum cross sectional dimension is incorporated above the allowable shear strength table (Pa ′ table), it cannot be selected. The allowable shear strength table (Pa 'table) is lowered, and a building unit incorporating a roof beam that satisfies this minimum cross-sectional dimension is selected.
このような特殊な配置は、図16に示した例だけでなく、様々な例がある。このように建物ユニットの配置関係などの制限によって選択不能となる建物ユニットが許容剪断耐力表(Pa'表)に存在する場合であっても、それらを除く例外ルールを設定しておくことで、許容剪断耐力表(Pa'表)から建物ユニットを適切に選定させることができる。 Such a special arrangement includes not only the example shown in FIG. 16 but also various examples. Even if there are building units that cannot be selected due to restrictions such as the arrangement relationship of building units in the allowable shear strength table (Pa 'table), by setting exception rules excluding them, The building unit can be appropriately selected from the allowable shear strength table (Pa 'table).
なお、他の構成及び作用効果については、前記実施の形態と略同様であるので説明を省略する。 Other configurations and functions and effects are substantially the same as those in the above-described embodiment, and thus description thereof is omitted.
以上、図面を参照して、本発明の実施の形態を詳述してきたが、具体的な構成は、この実施の形態及び実施例に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。 The embodiment of the present invention has been described in detail above with reference to the drawings. However, the specific configuration is not limited to the embodiment and the example, and the design change is within a range not departing from the gist of the present invention. Are included in the present invention.
10,10A ユニット建物
1 建物ユニット
1A Sユニット(建物ユニット)
1B Lユニット(建物ユニット)
11 柱(柱材)
12 桁梁(梁材)
13 妻梁(梁材)
2 計算表データベース
31 建物構成設定手段
32 一部変更手段
4 水平耐力検定手段
51 交換ユニット抽出手段
52 再抽出手段
53 剛心距離判定手段
10,10A unit building 1 building unit 1A S unit (building unit)
1B L unit (building unit)
11 Pillar (column material)
12 Girder (beam)
13 Tsumara (beam material)
2 Calculation table database 31 Building configuration setting means 32 Partial change means 4 Horizontal strength test means 51 Replacement unit extraction means 52 Re-extraction means 53 Rigid distance determination means
Claims (3)
複数種類の梁材と柱材との組み合わせによって特定される建物ユニット毎に予め許容剪断耐力が計算された結果が表形式で記憶された計算表データベースと、
前記計算表データベースに記憶された建物ユニットを組み合わせてユニット建物の構成を設定する建物構成設定手段と、
前記建物構成設定手段で設定された前記ユニット建物が前記水平力に対して基準を満たしているか否かの検定を行う水平耐力検定手段と、
前記水平耐力検定手段で基準を満たさないと判定された場合に、前記設定されたユニット建物を構成する複数の建物ユニットの中から前記基準の達成度が最も低い部分を含む建物ユニットを抽出する交換ユニット抽出手段と、
前記交換ユニット抽出手段で抽出された建物ユニットを、前記計算表データベースに記憶された別の建物ユニットに置き換えて新たなユニット建物の構成を設定する一部変更手段とを備え、
前記計算表データベースに記憶された建物ユニットでは置き換えができない場合に、前記基準の達成度が次に低い部分を含む建物ユニットを抽出する再抽出手段を備えたことを特徴とする構造設計支援システム。 A structural design support system for horizontal force of a unit building constructed by connecting a plurality of building units formed of a frame by steel beams and pillars,
A calculation table database in which the result of calculating the allowable shear strength in advance for each building unit specified by a combination of a plurality of types of beams and pillars is stored in a tabular format;
Building configuration setting means for setting the configuration of a unit building by combining the building units stored in the calculation table database;
Horizontal strength test means for testing whether or not the unit building set by the building configuration setting means satisfies a standard for the horizontal force;
When the horizontal proof test means determines that the standard is not satisfied, the replacement is performed to extract a building unit including a portion having the lowest degree of achievement of the standard from a plurality of building units constituting the set unit building. Unit extraction means;
A partial change unit that sets the configuration of a new unit building by replacing the building unit extracted by the replacement unit extraction unit with another building unit stored in the calculation table database;
A structural design support system, comprising: a re-extraction unit that extracts a building unit including a portion having the next lowest achievement level of the reference when the building unit stored in the calculation table database cannot be replaced.
複数種類の梁材と柱材との組み合わせによって特定される建物ユニット毎に予め許容剪断耐力が計算された結果が表形式で記憶された計算表データベースと、
前記計算表データベースに記憶された建物ユニットを組み合わせてユニット建物の構成を設定する建物構成設定手段と、
前記建物構成設定手段で設定された前記ユニット建物が前記水平力に対して基準を満たしているか否かの検定を行う水平耐力検定手段と、
前記水平耐力検定手段で基準を満たさないと判定された場合に、前記設定されたユニット建物を構成する複数の建物ユニットの中から前記基準の達成度が最も低い部分を含む建物ユニットを抽出する交換ユニット抽出手段と、
前記交換ユニット抽出手段で抽出された建物ユニットを、前記計算表データベースに記憶された別の建物ユニットに置き換えて新たなユニット建物の構成を設定する一部変更手段とを備え、
前記交換ユニット抽出手段で複数の建物ユニットが一度に抽出された場合に、剛心からの距離を基準にいずれか一つの建物ユニットを抽出する剛心距離判定手段を備えたことを特徴とする構造設計支援システム。 A structural design support system for horizontal force of a unit building constructed by connecting a plurality of building units formed of a frame by steel beams and pillars,
A calculation table database in which the result of calculating the allowable shear strength in advance for each building unit specified by a combination of a plurality of types of beams and pillars is stored in a tabular format;
Building configuration setting means for setting the configuration of a unit building by combining the building units stored in the calculation table database;
Horizontal strength test means for testing whether or not the unit building set by the building configuration setting means satisfies a standard for the horizontal force;
When the horizontal proof test means determines that the standard is not satisfied, the replacement is performed to extract a building unit including a portion having the lowest degree of achievement of the standard from a plurality of building units constituting the set unit building. Unit extraction means;
A partial change unit that sets the configuration of a new unit building by replacing the building unit extracted by the replacement unit extraction unit with another building unit stored in the calculation table database;
A structural design comprising a rigid distance determination means for extracting any one building unit based on a distance from a rigid center when a plurality of building units are extracted at a time by the replacement unit extracting means. Support system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013193714A JP6333528B2 (en) | 2013-09-19 | 2013-09-19 | Structural design support system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013193714A JP6333528B2 (en) | 2013-09-19 | 2013-09-19 | Structural design support system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018017974A Division JP6572332B2 (en) | 2018-02-05 | 2018-02-05 | Structural design support system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015060415A JP2015060415A (en) | 2015-03-30 |
JP6333528B2 true JP6333528B2 (en) | 2018-05-30 |
Family
ID=52817881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013193714A Active JP6333528B2 (en) | 2013-09-19 | 2013-09-19 | Structural design support system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6333528B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6758235B2 (en) * | 2017-03-30 | 2020-09-23 | トヨタホーム株式会社 | Stress or deflection calculation system |
CN116305413B (en) * | 2023-01-19 | 2024-05-31 | 安徽省交通控股集团有限公司 | Wedge-shaped section combined shear design method and device |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11238069A (en) * | 1998-02-20 | 1999-08-31 | Fuji Electric Co Ltd | Parts selection device |
JP4040180B2 (en) * | 1998-08-03 | 2008-01-30 | ミサワホーム株式会社 | Structural analysis equipment for buildings |
JP2002163302A (en) * | 2000-11-24 | 2002-06-07 | Alfa Prime Japan:Kk | System and method for supporting preparation of house blueprint, and recording medium |
JP2004070500A (en) * | 2002-08-02 | 2004-03-04 | Sekisui Chem Co Ltd | Device for structural design of building, and method for structural design using the device for structural design |
JP5082784B2 (en) * | 2007-11-09 | 2012-11-28 | 富士通株式会社 | CAD system and program |
JP5529453B2 (en) * | 2009-07-23 | 2014-06-25 | トヨタホーム株式会社 | Building structural margin display device and building structural margin display method |
JP2011094377A (en) * | 2009-10-29 | 2011-05-12 | Toyota Home Kk | Building, method for arranging vibration control device of building, unit building, and program for arranging vibration control device of building |
-
2013
- 2013-09-19 JP JP2013193714A patent/JP6333528B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2015060415A (en) | 2015-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6333528B2 (en) | Structural design support system | |
Hsiao et al. | A pushover seismic analysis and retrofitting method applied to low-rise RC school buildings | |
JP2008115567A (en) | Seismic-control reinforcing method for building, and building with seismic-control reinforcing structure | |
JP6572332B2 (en) | Structural design support system | |
JP6243238B2 (en) | Ramen frames with wide flat beams and buildings using them | |
JP2017214771A (en) | Connection load bearing capacity evaluation method for column-beam connection structure, design method for column-beam connection structure, and column-beam connection structure | |
JP6400000B2 (en) | Roll forming square steel pipe | |
CN103530443A (en) | Method for rapidly judging continuous collapse resistance of steel-frame structure based on substructures | |
CN107700654B (en) | Reinforced concrete frame joint | |
JP2017095986A (en) | Reinforcement structure of steel concrete frame | |
JP6186624B2 (en) | Pillar head column beam jointed square steel pipe column with core and manufacturing method thereof | |
JP5939707B2 (en) | Reinforcement structure for beam-column joints | |
KR20140041121A (en) | Performance based structural analysis method of large structure | |
JP2014173223A (en) | Reinforcement structure | |
JP4990312B2 (en) | Design method of non-diaphragm construction method | |
JP2014070436A (en) | Frame determination method and steel construction building | |
KR102330717B1 (en) | Improved Standardization Method of Welded Built-up H Beam and Improved Standardized Welded Built-up H Beam Using the Improved Method | |
JP7107781B2 (en) | Design support system | |
US20230349156A1 (en) | Retrofitting method for a beam with an opening | |
JP6210768B2 (en) | Structure | |
JP7326118B2 (en) | Design support device | |
JP7210354B2 (en) | Reinforced concrete beam structure | |
JP2001207522A (en) | Structure design method for building | |
JP6677510B2 (en) | Building method | |
Gürbüz et al. | A Numerical Investigation on the Limitations of Design Equations for Steel Plate Shear Walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160412 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170411 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170418 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170606 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20170606 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20171107 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180205 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20180214 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180403 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180425 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 6333528 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |