JP6282855B2 - Suspended ceiling periphery structure - Google Patents
Suspended ceiling periphery structure Download PDFInfo
- Publication number
- JP6282855B2 JP6282855B2 JP2013251425A JP2013251425A JP6282855B2 JP 6282855 B2 JP6282855 B2 JP 6282855B2 JP 2013251425 A JP2013251425 A JP 2013251425A JP 2013251425 A JP2013251425 A JP 2013251425A JP 6282855 B2 JP6282855 B2 JP 6282855B2
- Authority
- JP
- Japan
- Prior art keywords
- ceiling
- side wall
- parting
- parting material
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000000463 material Substances 0.000 claims description 86
- 230000002093 peripheral effect Effects 0.000 claims description 12
- 239000000725 suspension Substances 0.000 claims description 7
- 238000000926 separation method Methods 0.000 claims description 3
- 238000012216 screening Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 8
- 229920003002 synthetic resin Polymers 0.000 description 4
- 239000000057 synthetic resin Substances 0.000 description 4
- 210000000078 claw Anatomy 0.000 description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 1
Images
Landscapes
- Building Environments (AREA)
Description
本発明は、建造物の吊り天井における回り縁構造の改良に関するものである。 The present invention relates to an improvement in a peripheral structure in a suspended ceiling of a building.
地震によって吊り天井が上下に揺れたり横に揺れたとき、天井下地材と天井板が当該建造物の側壁に衝突して落下するのを防止するため、建築基準法の趣旨に沿って様々な対策が講じられている。その一例として、下記の特許文献1においては、図3に示したように、建造物の側壁Wから間隔L1を隔てて吊下部材50に吊下げ支持された天井下地材10と、同天井下地材に支持された天井板20と、前記天井下地材に固定されて前記側壁に対向する天井下地材の側端部と天井板の側端部を被覆する見切材30と、前記側壁と見切材との隙間よりも上方において前記側壁Wから水平に突出する目隠部材40とにより構成した吊り天井の回り縁構造が提案されている。この回り縁構造においては、見切材30が天井下地材10に固定されているので、見切材用吊下部材が必要なくなり、目隠部材40を天井下地材10の上方に配置することが可能となり、見切材30と側壁Wとの隙間から天井裏が露出することを防ぎつつ、当該隙間を天井裏空間に向かって開口させることができる利点があるとされている。
Various measures are taken in accordance with the purpose of the Building Standards Act to prevent the ceiling base material and ceiling board from colliding with the side walls of the building and falling when the suspended ceiling swings up or down due to an earthquake. Has been taken. As an example, in the following Patent Document 1, as shown in FIG. 3, the
本発明の目的は、上述した先行技術の解決課題と同様な課題に対処するため、特に側壁の出隅部において側壁に対向する吊り天井の横揺れと上下の揺れを的確に許容すると共に出隅部における施工が容易であって美麗に仕上げることができる吊り天井の回り縁構造を提供することにある。 The object of the present invention is to allow for the horizontal and vertical swings of the suspended ceiling facing the side wall, particularly at the protruding corner of the side wall, in order to cope with the same problems as the above-mentioned prior art solution. An object of the present invention is to provide a peripheral structure of a suspended ceiling that is easy to construct and can be finished beautifully.
本発明は、上記の目的を達成するため、その一実施形態において、建造物の上層から垂下された吊下部材により水平に支持した天井下地材(野縁受け)に固定されてその左右周側端が当該建造物の側壁から所定の間隔を隔てて配置される天井板を備えた吊り天井において、前記天井板の一側端部と他側端部にその下端部をそれぞれ固定して前記側壁に対向して前後方向へ傾倒可能に直立し前記側壁に対向する前記天井下地材の各側端部と天井板の各側端部をそれぞれ被覆する長尺の平板部材からなる左右一対の第1見切材と、前記側壁にその基端部を固定して上下方向へ傾倒可能に配置され前記第1見切材の各上端との係合により水平に支持されて前記側壁と前記天井板の各側端部の間の空間を覆って前記側壁に沿って延在する長尺の平板部材からなる左右一対の第1目隠部材と、前記側壁の出隅部に対応する前記天井板の隅角部にその下端部を固定して前記側壁に対向して直立し前記第1見切材の各端末部に分離可能に接合されて前記側壁の出隅部に対向する前記天井下地材の隅角側端部と天井板の隅角側端部を被覆する隅角形状の第2見切材と、前記側壁の出隅部にその基端部を固定して上下方向へ傾倒可能に配置され前記第2見切材の上端との係合により水平に支持され一方の端末部を上下方向へ屈曲可能にして同端末部を他方の端末部を分離可能に重ね合わせると共に前記第1目隠部材の各端末部に接合して前記側壁の出隅部と前記天井板の隅角部の間の空間を覆う左右一対の平板部材からなる第2目隠部材とを備え、当該吊り天井が横揺れして前記天井板が後方(側壁から離れる方向)に動いたとき前記第1見切材の上端が前記第1目隠部材の先端に設けた鈎部に係合して同第1見切材の下端が後方に引っ張られて傾斜すると共に前記第2見切材が前記第2目隠部材の下面に沿って後方に移動し、同吊り天井が上下に揺れて前記天井板が上方に動いたとき前記第1目隠部材が前記第1見切材の上端により押し上げられると共に前記一対の第2目隠部材が前記第2見切材の上端により押し上げられてその端末部の重合部分にて分離するようにした吊り天井の回り縁構造を提供するものである。 上記のように構成した吊り天井の回り縁構造においては、当該吊り天井が横揺れして前記天井板が前方(前記側壁に向かう方向)に動いたとき前記第1見切材と第2見切材がそれぞれ前記第1目隠部材と第2目隠部材の下面に沿って前記側壁に向けて移動し、同吊り天井が上下に揺れて前記天井板が下方に動いたとき前記第1見切材と第2見切材が下方に移動して前記第1目隠部材と第2目隠部材が共に下方に傾く。 In order to achieve the above object, the present invention, in one embodiment thereof, is fixed to a ceiling base material (field edge support) horizontally supported by a suspension member suspended from the upper layer of a building, and its left and right peripheral sides in suspended ceiling comprising a ceiling plate having one end disposed at a predetermined distance from the side wall of the building, with its lower end at one end and the other end portion of the ceiling plate to secure each of the side walls A pair of left and right first members each composed of a long flat plate member covering each side end of the ceiling base material and each side end of the ceiling plate that stand upright so as to be tiltable in the front-rear direction. The base material is fixed to the side wall and fixed at the base end thereof so as to be tiltable in the vertical direction, and is supported horizontally by engagement with the upper ends of the first parting material, and the side wall and each side of the ceiling plate A long flat plate portion covering the space between the end portions and extending along the side wall A pair of left and right first screening member made of, its lower end is fixed to the corner portion of the ceiling plate corresponding to the external corner portion of the side wall upstanding opposite to the side wall of the first parting member second parting material corner shape for covering the corner side end portion of the corner side end of the top plate of the ceiling base material which faces the external corner portion of the side wall is separation it can joined to each terminal section The base end of the side wall is fixed to the projecting corner of the side wall so that it can be tilted in the vertical direction, and is horizontally supported by the engagement with the upper end of the second parting material, and one terminal portion is bent in the vertical direction. The terminal portion is overlapped with the other terminal portion in a separable manner, and is joined to each terminal portion of the first blindfold member, and a space between the protruding corner portion of the side wall and the corner portion of the ceiling plate And a second blindfold member made of a pair of left and right flat plate members covering the wall, the suspended ceiling rolls sideways and the ceiling plate The upper end of the first parting material engages with a flange provided at the tip of the first blindfold member and the lower end of the first parting material is pulled rearward and tilted. When the second parting material moves rearward along the lower surface of the second blindfold member, the first blindfold member becomes the first parting material when the suspended ceiling moves up and down and the ceiling plate moves upward. And a pair of second blindfold members that are pushed up by the upper end of the second parting material and separated at the overlapped portion of the end portion thereof. . In the surrounding structure of the suspended ceiling configured as described above, when the suspended ceiling rolls and the ceiling plate moves forward (in the direction toward the side wall), the first parting material and the second parting material are respectively When the first ceiling member and the second blind member move toward the side wall along the lower surfaces of the first and second blind members, the suspension ceiling swings up and down and the ceiling plate moves downward . The parting material moves downward, and both the first blind member and the second blind member are inclined downward.
本発明の上記実施形態において、前記第1目隠部材と第2目隠部材の各横幅は地震発生時における最大震度を考慮して定めた当該建造物の側壁と前記第1見切材の間の間隔及び同側壁と前記第2見切材の間の間隔よりも大きく定め、同第1目隠部材と第2目隠部材の長さはそれぞれ側壁の長さに応じて適宜な長さにすればよい。また、側壁の出隅部にて互いに分離可能に接合される前記第2目隠部材の各端末部の角度は同出隅部の角度に応じて定めればよい。 In the above-described embodiment of the present invention, each width of the first blindfold member and the second blindfold member is determined between the side wall of the building and the first parting material determined in consideration of the maximum seismic intensity at the time of occurrence of the earthquake. If the distance and the distance between the side wall and the second parting material are set larger than each other, and the lengths of the first blind member and the second blind member are appropriately set according to the length of the side wall, respectively. Good. Moreover, what is necessary is just to determine the angle of each terminal part of the said 2nd blind member joined so that it can mutually isolate | separate in the protruding corner part of a side wall according to the angle of the protruding corner part.
本発明の上記実施形態における吊り天井の回り縁構造の施工においては、天井の高さと前記第1見切材及び第2見切材の高さを考慮して定めた墨出し位置を当該建造物の側壁に表記して、同墨出し位置に沿って前記第1目隠部材と第2目隠部材をその端末部分にて互いに重ね合わせた状態にてその各基端部を前記側壁に固定し、一方前記第1見切材と第2見切材の各基端部を当該天井板の側端部に固定した状態にて天井下地材を同建造物の上方躯体に吊り下げて固定すれば、前記第1目隠部材と第2目隠部材が天井板の側端部にて直立した前記第1見切材と第2見切材の各上端との係合により水平に支持されて側壁と両見切材との間の空間を覆う。これにより、吊り天井の回り縁が側壁から所定の間隔(地震の最大震度を考慮して定めた間隔)を隔てて的確に施工され、地震によって吊り天井が激しく横揺れしたり上下に揺れても天井板が側壁との衝突により破損して落下する恐れがなくなる。 In the construction of the peripheral structure of the suspended ceiling in the above embodiment of the present invention, the ink marking position determined in consideration of the height of the ceiling and the height of the first and second parting materials is set on the side wall of the building. In the state where the first blindfold member and the second blindfold member are overlapped with each other at the terminal portion along the marking position, the base ends thereof are fixed to the side wall, If the ceiling base material is suspended and fixed to the upper casing of the building in a state where the base ends of the first parting material and the second parting material are fixed to the side ends of the ceiling board, the first eye The hidden member and the second blind member are supported horizontally by the engagement of the upper ends of the first parting material and the second parting material upright at the side edge of the ceiling plate, and between the side wall and the two parting materials. Cover the space. As a result, the ceiling of the suspended ceiling is accurately constructed with a predetermined distance from the side wall (an interval determined in consideration of the maximum seismic intensity of the earthquake). There is no risk of the plate being damaged and falling due to a collision with the side wall.
以下に、本発明の一実施形態を添付図面を参照して説明する。図1は建造物の上層躯体から垂下された吊り下げボルト11によって水平に支持される吊り天井の側壁に沿って施工した回り縁構造の縦断面図、図2Aは前記吊り天井の出隅部における第2見切材の平面図、図2Bは図2Aに示した第2見切材の正面図、図2Cは前記吊り天井の出隅部における第2目隠部材の平面図、図2Dは図2Cに示した第2目隠部材の正面図である。
Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings. FIG. 1 is a longitudinal sectional view of a peripheral structure constructed along a side wall of a suspended ceiling supported horizontally by a
図1に示した吊り天井10は、建造物の上層躯体に上端部を固定して垂下する吊りボルト11に上下に調節可能に連結したハンガー12によって水平に支持された天井下地材(野縁受け)13と。野縁14を介してビス15により天井下地材13に水平に固定した天井仕上げ材である天井板16とにより構成されている。天井板16は当該建造物の左右の側壁Wの長さに対応する側端部と同側壁の出隅部にそれぞれ対応する側端部を有している。
The suspended
本発明による吊り天井の回り縁構造は、左右の側壁Wに対向して位置する天井板16の各側端部にその下端部を固定して前後方向(図示左右方向)へ傾倒可能に直立する第1見切材21と側壁Wにその基端部を固定して上下方向へ傾倒可能に張り出し第1見切材21の上端との係合により水平に支持される第1目隠部材31を備えている。
The peripheral structure of the suspended ceiling according to the present invention is such that the lower end portion is fixed to each side end portion of the
第1見切材21は、天井板16の一方の側端部と他方の側端部にそれぞれ固定して使用される左右一対の部材である。これらの各第1見切材21は、天井板16の各側端部に沿って延在する長さと天井下地材13の側端面と天井板16の側端面を被覆する縦幅を有する合成樹脂製(或いはアルミニウム製)の長尺の平板部材であって、その下端部に天井板16の各側端部に嵌合して固定される断面コ字状のリブ21aが一体に形成されその上端部に第1目隠部材31の下面に移動可能に当接して同目隠部材31を水平に支持する爪部21bが一体に形成されている。なお、各第1見切材21はリブ21aの肩部にて前後方向(図示左右方向)へ屈曲可能に形成されており、同肩部には天井板16の上面に固定される平板状の支持部21cが一体に形成されている。
The first parting
第1目隠部材31は、天井板16の左右両側に位置する側壁Wにその基端部31bをビス止め固定して使用される左右一対の部材である。これらの各第1目隠部材31は、左右の各側壁Wに沿って延在する所定の長さと同側壁Wと第1見切材21の間の間隔(地震発生時における最大震度を考慮して定めた間隔)よりも大きい横幅を有する断面L字形状の合成樹脂製(或いはアルミニウム製)の長尺の平板部材であって、その先端に鉤部31aが一体に形成されている。この鉤部31aは、地震発生時に吊り天井が横揺れして天井板16が側壁Wから離れる方向に動いたときいずれか一方の第1見切材21の爪部21bに係合する。
The first
図2Aと図2Bに示したように、側壁Wの出隅部に用いる第2見切材22は、側壁Wの出隅部に対応する天井板16の隅角部分の上面に固定される平面視L字形状の基板部22aと同基板部の両側端から垂直に立ち上がる見切部22bを合成樹脂により一体に形成した隅角部材である。見切部22bの図示左側の端末部分と右側の端末部分は図1に示した第1見切材21の端末部分とそれぞれ分離可能に接合される。(図2A参照)
一方、天井板16の隅角部に固定した第2見切材22の各内側面と側壁Wの出隅部外面との間の空間を覆う第2目隠部材32は、図2Cと図2Dに示したように、側壁Wの出隅部に固定される基端部32aと同基端部の下端にて上下方向へ傾倒可能に張り出して上記のように天井板16の隅角部分の上面に立設した第2見切材22の上端との当接により水平に支持され互いに分離可能に接合した合成樹脂製の一対の平板部材32bにより構成されている。この実施形態においては、一方の平板部材32bの端末部分を斜めに切断して形成した三角形の接合部分32b1の上面に他方の平板部材32bの端末に上下方向へ屈曲可能に形成した三角形の接合部分32b2を重ね合わせて、一対の平板部材32bが押し上げられたとき分離するようにしてある。なお、第2目隠部材32は側壁Wの出隅部にその基端部32aにて固定されたときその両端末部分にて側壁Wに沿って延在する第1目隠部材31の端末部分に接合される。
As shown in FIGS. 2A and 2B, the second
On the other hand, the second
上記の構成部材から成る吊り天井の回り縁構造の施工においては、天井の高さと第1見切材21及び第2見切材22の高さを考慮して定めた墨出し位置を当該建造物の左右の側壁に表記して、同墨出し位置に沿って第1目隠部材31と第2目隠部材32をその端末部分にて互いに接合した状態にてその各基端部を前記側壁Wに固定し、一方第1見切材21と第2見切材22の各基端部を当該天井板の側端部に固定した状態にて天井下地材13を同建造物の上方躯体に吊り下げて固定すれば、第1目隠部材31と第2目隠部材32が天井板16の側端部にて直立した第1見切材21と第2見切材22の各上端との係合により水平に支持されて側壁Wと両見切材21、22との間の空間を覆う。これにより、吊り天井の回り縁が側壁Wから所定の間隔(地震の最大震度を考慮して定めた間隔)を隔てて的確に施工され、地震によって吊り天井が激しく横揺れしたり上下に揺れても天井板16が側壁Wとの衝突により破損して落下する恐れがなくなる。
In the construction of the peripheral structure of the suspended ceiling composed of the above-described components, the ink marking positions determined in consideration of the height of the ceiling and the height of the
仮に、巨大地震が発生して、吊り天井が横揺れして天井板16が前方(側壁Wに向かう方向)に動いたときには、図1(a)に示したように、第1見切材21と第2見切材22が共に第1目隠部材31と第2目隠部材32の下面に沿って側壁Wに向けて移動し、天井板16が後方(側壁Wから離れる方向)に動いたときには、図1(b)に示したように、第1見切材21の上端に設けた爪部21bが第1目隠部材31の先端に設けた鉤部31aに係合して同第1見切材21の下端が後方に引っ張られて同第1見切材21が傾斜すると共に第2見切材22が図2(b)に示したように第2目隠部材32の下面に沿って後方に移動する。また、吊り天井が上下に揺れて天井板16が上方に動いたときには、図1(c)に示したように、第1目隠部材31が第1見切材21の上端により押し上げられると共に一対の第2目隠部材32が第2見切材22の上端により押し上げられて図2(c)に示したように分離する。また、天井板16が下方に動いたときには、図1(d)に示したように、第1見切材21と第2見切材22が共に第1目隠部材31と第2目隠部材32から下方に移動して同第1目隠部材31と第2目隠部材32が共に下方に傾く。
If a huge earthquake occurs and the suspended ceiling rolls and the
本発明の実施にあたって、第1目隠部材21の横幅は地震発生時における最大震度を考慮して定めた当該建造物の側壁Wと第1見切材21の間の間隔よりも大きく定め、同第1目隠部材21の長さは側壁Wの長さに応じて適宜な長さにすればよい。また、側壁Wの出隅部にて互いに接合される第2目隠部材32の重合部分の大きさと角度は同出隅部の角度に応じて定めればよい。
In carrying out the present invention, the width of the first
13・・天井下地材、16・・天井板、W・・側壁、21・・第1見切材、22・・第2見切材、31・・第1目隠部材、32・・第2目隠部材 13 .. Ceiling base material, 16 .... Ceiling board, W ... Side wall, 21 ... First parting material, 22 ... Second parting material, 31 ... First blind member, 32 ... Second blinding Element
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013251425A JP6282855B2 (en) | 2013-12-04 | 2013-12-04 | Suspended ceiling periphery structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013251425A JP6282855B2 (en) | 2013-12-04 | 2013-12-04 | Suspended ceiling periphery structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015108249A JP2015108249A (en) | 2015-06-11 |
JP6282855B2 true JP6282855B2 (en) | 2018-02-21 |
Family
ID=53438791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013251425A Active JP6282855B2 (en) | 2013-12-04 | 2013-12-04 | Suspended ceiling periphery structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6282855B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6489996B2 (en) * | 2015-03-23 | 2019-03-27 | 三協立山株式会社 | Ceiling structure |
JP2018141322A (en) * | 2017-02-28 | 2018-09-13 | 株式会社飯澤工務店 | Suspended ceiling support apparatus and suspended ceiling using the same |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS585793Y2 (en) * | 1978-05-29 | 1983-02-01 | 大建工業株式会社 | Connection fittings around the ceiling |
US5619833A (en) * | 1995-01-26 | 1997-04-15 | Neff; Eric S. | Suspended ceiling system |
JP4540793B2 (en) * | 2000-03-31 | 2010-09-08 | 大和ハウス工業株式会社 | End processing structure of the ceiling board parting runner in the ceiling corner |
US7578106B2 (en) * | 2004-07-08 | 2009-08-25 | Usg Interiors, Inc. | Wall molding for suspended ceiling |
JP2008095353A (en) * | 2006-10-11 | 2008-04-24 | Top Rise Kk | Ceiling structure and its construction method |
-
2013
- 2013-12-04 JP JP2013251425A patent/JP6282855B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
JP2015108249A (en) | 2015-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102290620B1 (en) | Display apparatus | |
KR101580642B1 (en) | A fixing device for a out side panel of building | |
JP6377420B2 (en) | Fence and safety fence | |
JP6282855B2 (en) | Suspended ceiling periphery structure | |
JP6282833B2 (en) | Suspended ceiling periphery structure | |
JP6029368B2 (en) | Seismic ceiling mounting structure | |
JP7171399B2 (en) | Strut installation structure and its construction method | |
JP5758607B2 (en) | Handrail wall and construction method of handrail wall | |
JP5793687B2 (en) | Sleeve wall structure | |
KR200472243Y1 (en) | Picture frame packing box | |
JP6636726B2 (en) | Terrace enclosure | |
JP2016037750A (en) | Door device of earthquake-resistant partition device | |
JP6423318B2 (en) | Terrace fence | |
KR20150003307U (en) | Apparatus for connecting of wood block | |
JP6961533B2 (en) | Partition structure | |
JP6045271B2 (en) | Outdoor structure | |
JP2016044441A (en) | Modesty panel fitting structure on deck | |
KR200478778Y1 (en) | The support for the fence | |
JP5721201B1 (en) | Floor panel | |
KR101173413B1 (en) | Angle Connector Of Frame Members For Advertisement Frame | |
JP6571329B2 (en) | Building structure | |
JP5886593B2 (en) | Lattice panel mounting structure | |
JP4752820B2 (en) | Door frame structure | |
JP3190935U (en) | Table structure and connector | |
JP2015135007A (en) | Waterproof member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160923 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170622 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170711 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170831 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180123 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180125 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6282855 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |