[go: up one dir, main page]

JP5827898B2 - Duct suspension structure - Google Patents

Duct suspension structure Download PDF

Info

Publication number
JP5827898B2
JP5827898B2 JP2012014644A JP2012014644A JP5827898B2 JP 5827898 B2 JP5827898 B2 JP 5827898B2 JP 2012014644 A JP2012014644 A JP 2012014644A JP 2012014644 A JP2012014644 A JP 2012014644A JP 5827898 B2 JP5827898 B2 JP 5827898B2
Authority
JP
Japan
Prior art keywords
duct
hook body
suspension
suspension bolt
holding member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012014644A
Other languages
Japanese (ja)
Other versions
JP2013155886A (en
Inventor
梶野 勇
勇 梶野
Original Assignee
株式会社新富士空調
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社新富士空調 filed Critical 株式会社新富士空調
Priority to JP2012014644A priority Critical patent/JP5827898B2/en
Publication of JP2013155886A publication Critical patent/JP2013155886A/en
Application granted granted Critical
Publication of JP5827898B2 publication Critical patent/JP5827898B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Duct Arrangements (AREA)

Description

この発明は、建物の天井スラブなどの上部構造体に固定されて下方に延びる一対の吊りボルトを用いて、空調用あるいは吸排気用などのダクトを吊り込み式に支持して吊り下げるダクト吊り構造に関する。   The present invention relates to a duct suspension structure that supports and suspends a duct for air conditioning or intake / exhaust in a suspended manner by using a pair of suspension bolts fixed to an upper structure such as a ceiling slab of a building and extending downward. About.

従来、ダクト吊り構造では、建物における天井スラブなどの上部構造体に吊り込み式に設置されるダクト吊り工事において、ダクト(鋼板などの4つの板材で筒状に構成されるダクト)の幅や形状が変化する毎に、それに見合った吊り金具を各種製造して準備しておく必要があった。この従来のダクト吊り構造としては、例えば、建物の天井スラブなどの上部構造体に固定されて下方に延びる一対の吊りボルトを備え、この一対の吊りボルト間の幅をダクト幅に合わせてダクトの両側に設置し、かつ、このダクト底面の幅に合わせて切断されたアングル鋼材により一対の吊ボルトの下端を連結することで、当該アングル鋼材にダクトの底面を載置させて支持する吊り下げ式のダクト吊り構造がよく知られている(例えば、特許文献1または2参照。)。   Conventionally, in a duct suspension structure, the width and shape of a duct (a duct configured by four plates such as a steel plate) in a duct suspension work that is suspended from an upper structure such as a ceiling slab in a building Each time there was a change, it was necessary to prepare and prepare various types of suspension fittings. The conventional duct suspension structure includes, for example, a pair of suspension bolts that are fixed to an upper structure such as a ceiling slab of a building and extend downward, and the width of the pair of suspension bolts is adjusted to the width of the duct. A suspension type that is installed on both sides and supports the lower surface of the duct placed on the angle steel material by connecting the lower ends of a pair of suspension bolts with an angle steel material cut according to the width of the bottom surface of the duct. The duct suspension structure is well known (see, for example, Patent Document 1 or 2).

特開2007−162910号公報JP 2007-162910 A 特開2010−175137号公報JP 2010-175137 A

しかしながら、従来のダクト吊り構造では、吊りボルトを、天井スラブ等の上部構造体から下方のダクトの底面位置まで長く延ばした構造により、吊るした状態のダクトの安定性が悪く、かつ、ダクトが延びる方向に複数配置させるため、材料費や部品代が高くなるという不具合があった。   However, in the conventional duct suspension structure, the suspension bolt is not stable due to the structure in which the suspension bolt is extended from the upper structure such as the ceiling slab to the bottom surface of the lower duct, and the duct extends. Since there are a plurality of components arranged in the direction, there is a problem that the material cost and the part cost are high.

そこで、この発明は、吊りボルトを短く設定でき、ダクトを安定して吊るすことができるダクト吊り構造を提供することを目的としている。   Accordingly, an object of the present invention is to provide a duct suspension structure in which the suspension bolt can be set short and the duct can be stably suspended.

前記の課題を解決するために、請求項1の発明は、建物の天井スラブ等の上部構造体に固定されて下方に延びる吊りボルトによって、ダクトを吊り下げるためのダクト吊り構造であって、前記ダクトの両外側面の中央部に設けられ、前記ダクトの軸心方向に延びるフック体と、前記フック体の長手方向にスライド自在に前記フック体に係合し、前記吊りボルトを接続可能なダクト保持部材と、を備え、前記フック体は、前記ダクトの側面から外側に延びて端部を垂直下方に曲げたL字状に形成され、前記ダクト保持部材は、前記ダクトの外側面に面接触される接触面と、当該接触面の外周から前記ダクトの外側方向に延びるリブと、により一面が開口された凹状の箱体に形成されるとともに、当該箱体の外周リブ下端に前記フック体に係合させるJ字状のフック部と、この外周リブ上端に前記吊りボルトを挿入させて固定させる挿入部と、を備える、ことを特徴とする。 In order to solve the above problems, the invention of claim 1 is a duct suspension structure for suspending a duct by a suspension bolt fixed to an upper structure such as a ceiling slab of a building and extending downward, A hook body provided at the center of both outer side surfaces of the duct and extending in the axial direction of the duct, and a duct capable of engaging the hook body slidably in the longitudinal direction of the hook body and connecting the suspension bolt e Bei a holding member, wherein the hook body, the formed from the side of the duct to the L-shaped bent end portions extending outwardly vertically downward, said duct holding member, the surface on the outer surface of the duct The hook body is formed at a lower end of the outer peripheral rib of the box body, and is formed in a concave box body having one surface opened by a contact surface to be contacted and a rib extending from the outer periphery of the contact surface toward the outer side of the duct. Engaged with A J-shaped hook portion that includes an insertion portion for fixing by inserting the hanger bolts to the outer peripheral rib upper end, and wherein the.

この発明によれば、ダクトの両側面のフック体に、ダクト保持部材を係合させて装着し、このダクト保持部材を吊りボルトに接続させることで、ダクトを吊りボルトにより吊るすとともに、この吊り状態で、ダクトの軸心方向に延びるフック体に沿ってダクト保持部材をスライドさせてダクトの最適な吊り位置に位置調整して保持される。   According to the present invention, the duct holding member is engaged and attached to the hook bodies on both side surfaces of the duct, and the duct holding member is connected to the hanging bolt, so that the duct is suspended by the hanging bolt and the suspended state. Thus, the duct holding member is slid along the hook body extending in the axial direction of the duct, and the position is adjusted and held at the optimum hanging position of the duct.

また、この発明によれば、ダクトのフック体にダクト保持部材のフック部を係合させて装着し、このダクト保持部材のリブの挿入部に吊りボルトを挿入させてナットの締結により固定させることで、ダクトを吊りボルトに保持させて吊るすとともに、この吊り状態で、ダクトの両側面にダクト保持部材の接触面を面接触させることで安定して保持される。 According to the present invention, the hook portion of the duct holding member is engaged with the hook body of the duct and attached, and the suspension bolt is inserted into the rib insertion portion of the duct holding member and fixed by fastening the nut. Thus, the duct is held by the suspension bolts and suspended, and in this suspended state, the contact surfaces of the duct holding member are brought into surface contact with both side surfaces of the duct, thereby being stably held.

請求項の発明は、請求項に記載のダクト吊り構造において、前記挿入部は、スリット状に切り欠かれた切欠き部となっており、前記吊りボルトが挿入される挿入口にバネにより出没自在の突部が突出状態に配置され、当該突部に、前記吊りボルトの挿入時に当接して指圧により後退させる後退面と、前記吊りボルトの排出時に当接して抜けを防止する平坦面と、が形成された出没部材を備える、ことを特徴とする。 The invention of claim 2 is the duct Suspended structure according to claim 1, wherein the insertion portion has a notch portion which is cut in a slit shape by a spring into the insertion opening of the hanging bolts are inserted A retractable protrusion is disposed in a protruding state, and a receding surface that contacts the protrusion when the suspension bolt is inserted and retreats by finger pressure, and a flat surface that contacts when the suspension bolt is discharged and prevents the suspension bolt from coming off. , Comprising an in / out member formed.

この発明によれば、ダクト保持部材の切欠き部に出没部材を設置させ、吊りボルトの挿入時に突部の後退面に当接させて指圧により突部を後退させて挿入し、吊りボルトの排出時に突部の平坦面に当接して抜けが防止されることで、ダクトの吊り状態でダクト保持部材の切欠き部から吊りボルトが外れることを防止する。   According to this invention, the projecting member is installed in the notch portion of the duct holding member, and when the suspension bolt is inserted, it is brought into contact with the receding surface of the projection, the projection is retracted by finger pressure, and the suspension bolt is discharged. Occasionally, it comes into contact with the flat surface of the protrusion to prevent it from coming off, thereby preventing the suspension bolt from coming off from the notch of the duct holding member in the suspended state of the duct.

請求項の発明は、請求項1または2のいずれか1項に記載のダクト吊り構造において、前記フック体は、前記ダクトの側面板を折り曲げて一体に形成されている、ことを特徴とする。 According to a third aspect of the present invention, in the duct suspension structure according to the first or second aspect, the hook body is integrally formed by bending a side plate of the duct. .

請求項1に記載の発明によれば、ダクトのフック体に装着されるダクト保持部材によりダクト側面の中央より少なくとも上方で吊りボルトが取り付けられるため、従来技術に比べて吊りボルトの長さを短く設定でき、この結果、ダクトを安定して保持して吊るすことが可能になる。また、吊りボルトに接続されるダクト保持部材を、ダクトのフック体に係合させて吊るす構造であり、このフック体の延びる長手方向にダクト保持部材をダクト両側面でスライドさせて位置調整できるため、この吊りボルトに吊るす最適な吊り位置にダクトを保持すことができる。また、フック体がダクト両側面の軸心方向に延びて形成されるため、このダクト両側面をフック体により補強でき、より安定してダクトを保持できる。   According to the first aspect of the present invention, since the suspension bolt is attached at least above the center of the duct side surface by the duct holding member attached to the hook body of the duct, the length of the suspension bolt is shorter than that of the prior art. As a result, the duct can be stably held and suspended. In addition, the duct holding member connected to the suspension bolt is suspended by being engaged with the hook body of the duct, and the position can be adjusted by sliding the duct holding member on both sides of the duct in the longitudinal direction of the hook body. The duct can be held at an optimum hanging position to be hung on the hanging bolt. Further, since the hook body is formed to extend in the axial direction on both side surfaces of the duct, both side surfaces of the duct can be reinforced by the hook body, and the duct can be held more stably.

また、ダクト保持部材の接触面でダクトの両側面が保持されるため、ダクトをより安定して保持して吊るすことが可能になる。また、ダクトのフック体にダクト保持部材のフック部を係合するだけでダクトにダクト保持部材が簡単に装着され、このダクト保持部材の挿入部に吊りボルトを挿入させてナット締めするだけで、吊りボルトにダクトが簡単に保持されて吊るすことができるため、作業性が向上しタクトの取り付け作業の時間短縮が可能になる。また、ダクト保持部材の接触面にリブを形成させて挿入部とフック部とを備えただけの簡単な構造により、ダクトを安定させ、かつ安価に吊るすことができる。 In addition, since both sides of the duct are held by the contact surface of the duct holding member, the duct can be more stably held and suspended. In addition, simply by engaging the hook portion of the duct holding member with the hook body of the duct, the duct holding member can be easily attached to the duct, and by simply inserting the suspension bolt into the insertion portion of this duct holding member and tightening the nut, Since the duct can be easily held by the suspension bolt and can be suspended, the workability is improved and the time for attaching the tact can be shortened. In addition, the duct can be stably and inexpensively suspended by a simple structure in which a rib is formed on the contact surface of the duct holding member and the insertion portion and the hook portion are provided.

請求項に記載の発明によれば、ダクト保持部材の切欠き部に設置された出没部材により、吊りボルトを突部の後退面に当接させて切欠き部に挿入した後、この吊りボルトの排出時に突部の平坦面に当接して抜けが防止されるため、ダクトの吊り状態でダクト保持部材の切欠き部から吊りボルトが外れることを確実に防止することができる。 According to the second aspect of the present invention, after the hanging bolt is brought into contact with the receding surface of the projecting portion and inserted into the notched portion by the projecting and retracting member installed in the notched portion of the duct holding member, this hanging bolt Since the contact with the flat surface of the protrusion is prevented during the discharge, the suspension bolt is reliably prevented from being detached from the notch of the duct holding member in the suspended state of the duct.

請求項に記載の発明によれば、ダクトの側面板を折り曲げてフック体が一体に形成されているため、ダクトの強度・剛性を高めることができるとともに、部品点数および部品コストを削減することができる。
According to the invention described in claim 3 , since the hook body is integrally formed by bending the side plate of the duct, the strength and rigidity of the duct can be increased, and the number of parts and the part cost can be reduced. Can do.

この発明の実施の形態に係るダクト吊り構造を示す外観斜視図である。It is an external appearance perspective view which shows the duct suspension structure which concerns on embodiment of this invention. 図1のX−X線断面を示す断面図である。It is sectional drawing which shows the XX sectional view of FIG. 図2の側面板の構造を示す斜視図である。It is a perspective view which shows the structure of the side plate of FIG. 図1のダクト保持部材を詳細に示す斜視図である。It is a perspective view which shows the duct holding member of FIG. 1 in detail. 図4の出没部材に吊りボルトを挿入させる動作を示す動作説明図であり、(a)は挿入前の状態を、(b)は挿入途中の状態を、(c)は挿入後の状態を、各々示している。It is operation | movement explanatory drawing which shows the operation | movement which inserts a suspending bolt in the intruding member of FIG. 4, (a) is the state before insertion, (b) is in the middle of insertion, (c) is the state after insertion, Each is shown. 図1のダクト吊り金具によりダクトを吊るす動作を示す図であり、(a)はダクトにダクト保持部材を装着する状態を、(b)はダクトに装着したダクト保持部材を吊りボルトに固定する状態を、各々示している。It is a figure which shows the operation | movement which hangs | hangs a duct with the duct suspension metal fitting of FIG. 1, (a) is the state which attaches a duct holding member to a duct, (b) is the state which fixes the duct holding member attached to the duct to a suspension bolt. Are shown respectively. カーブさせたダクトを示す外観斜視図である。It is an external appearance perspective view which shows the curved duct.

以下、この発明を図示の実施の形態に基づいて説明する。   The present invention will be described below based on the illustrated embodiments.

図1は、この発明の実施の形態に係るダクト吊り構造を示す外観斜視図である。また、図2は、図1のX−X線断面を示す断面図である。また、図3は、図2の側面板1Bの構造を示す斜視図である。また、図4は、図1のダクト保持部材13を詳細に示す斜視図である。図1に示すように、このダクト吊り構造10は、主として、吊りボルト11、フック体12、ダクト保持部材13により構成されている。   FIG. 1 is an external perspective view showing a duct suspension structure according to an embodiment of the present invention. 2 is a cross-sectional view showing a cross section taken along line XX of FIG. FIG. 3 is a perspective view showing the structure of the side plate 1B of FIG. 4 is a perspective view showing the duct holding member 13 of FIG. 1 in detail. As shown in FIG. 1, the duct suspension structure 10 is mainly composed of a suspension bolt 11, a hook body 12, and a duct holding member 13.

吊りボルト11は、建物の天井スラブ等の上部構造体に固定(図示せず)されて下方に延びてダクト1の両側を保持させて吊り下げるため、ダクト1の幅に合わせた間隔に平行して一対に配置されている。この吊りボルト11は、天井から下方に延びる下端にネジ部11aが形成されており、後術するダクト保持部材13にナット14の締結により固定できる構造になっている。   The suspension bolts 11 are fixed to an upper structure such as a ceiling slab of the building (not shown) and extend downward to hold both sides of the duct 1 so as to be suspended. Are arranged in a pair. This suspension bolt 11 has a threaded portion 11a formed at the lower end extending downward from the ceiling, and has a structure that can be fixed to a duct holding member 13 to be subsequently operated by fastening a nut 14.

フック体12は、ダクト1を形成する鋼板などの金属材により形成され、このダクト1の側面板1B(図2および3参照)を折り曲げてダクト1と一体に形成されている。また、フック体12は、図1に示した筒状ダクト1の両外側面のほぼ中央に各々設けられて、当該ダクト1を保持するために、ダクト1の軸心方向に延びて形成されている。   The hook body 12 is formed of a metal material such as a steel plate forming the duct 1, and is formed integrally with the duct 1 by bending a side plate 1 </ b> B (see FIGS. 2 and 3) of the duct 1. Further, the hook bodies 12 are respectively provided at substantially the center of both outer side surfaces of the cylindrical duct 1 shown in FIG. 1, and are formed to extend in the axial direction of the duct 1 in order to hold the duct 1. Yes.

ここで、ダクト1は、図2に示すように、鋼板などの板材を四方に配設した角ダクトであり、上下の水平板1Aと左右の側面板1Bとにより筒状とし、この各板材が隣接する側縁部にハゼ部1aが配設され、このハゼ部1aにより各側縁部が接合されている。また、ダクト1は、図1に示した筒状両端の開口端部の四辺(水平板1Aと側面板1bとの端部)を各々外方へ直角に折曲することで、この筒状開口端部の四辺に接続用のフランジ部1bを形成している。そして、ダクト1は、各フランジ部1bの四隅に、L字形のコーナーピース16を装着することで、筒状に固定されている。   Here, as shown in FIG. 2, the duct 1 is a rectangular duct in which plate materials such as steel plates are arranged in four directions, and is formed into a cylindrical shape by upper and lower horizontal plates 1A and left and right side plates 1B. The goby part 1a is arrange | positioned in the adjacent side edge part, and each side edge part is joined by this goze part 1a. In addition, the duct 1 is formed by bending the four sides (ends of the horizontal plate 1A and the side plate 1b) of the opening ends at both ends of the tube shown in FIG. Connecting flange portions 1b are formed on the four sides of the end portion. The duct 1 is fixed in a cylindrical shape by mounting L-shaped corner pieces 16 at the four corners of each flange portion 1b.

そして、このようなダクト1の筒状両側面すなわち側面板1Bに、前述したフック体12が一体に形成されている。具体的に側面板1Bは、図3に示すように、水平板1Aと隣接させる側縁部にハゼ部1aが折り曲げられて形成され、このハゼ部1aと直交する両端部がさらに折り曲げられてフランジ部1bが形成されている。そして、フック体12を形成する場合、側面板1B両端のフランジ部1b中央を二分するように、側面板1Bの両側に切り欠いた切欠きCを形成し、この側面板1B両側の切欠きC間の中央に一部残された部位を折り曲げることでフック体12が形成されている。   And the hook body 12 mentioned above is integrally formed in the cylindrical both sides | surfaces of such a duct 1, ie, the side plate 1B. Specifically, as shown in FIG. 3, the side plate 1B is formed by bending a goby portion 1a at a side edge portion adjacent to the horizontal plate 1A, and both end portions orthogonal to the goze portion 1a are further bent to form a flange. Part 1b is formed. When the hook body 12 is formed, notches C are formed on both sides of the side plate 1B so as to bisect the center of the flange portion 1b at both ends of the side plate 1B, and the notches C on both sides of the side plate 1B are formed. The hook body 12 is formed by bending a part left in the middle between the two.

この際、フック体12は、ダクト1の両側面(側面板1B)から外側に水平に延びて端部を垂直下方に折り曲げることでL字状になるように形成される。また、フック体12を折り曲げた後、切欠きCにより二分されたフランジ部1bを結合(接着)させることで、図1に示したダクト1側面にフック体12が形成されている。   At this time, the hook body 12 is formed to be L-shaped by extending horizontally from both side surfaces (side plate 1B) of the duct 1 and bending the end portion vertically downward. Further, after the hook body 12 is bent, the hook body 12 is formed on the side surface of the duct 1 shown in FIG.

このフック体12は、図3に示した側面板1B両側から切り欠いた切欠きCの深さによって、ダクト1側面で筒状軸心方向に延びる長さが調整されている。すなわち、フック体12は、図1に示したダクト1の筒状軸心方向に延びる長さを調整することで、ダクト1の両側面(側面板1B)を補強するとともに、ダクト1の側面における最良の吊り位置に、後術するダクト保持部材13を係合させた後でもスライドさせて位置調節可能に形成されている。   The length of the hook body 12 extending in the cylindrical axial direction on the side surface of the duct 1 is adjusted by the depth of the notch C cut out from both sides of the side plate 1B shown in FIG. That is, the hook body 12 reinforces both side surfaces (side plate 1B) of the duct 1 by adjusting the length extending in the cylindrical axial direction of the duct 1 shown in FIG. It is formed so that the position can be adjusted by sliding it even after engaging the duct holding member 13 to be operated later in the best hanging position.

一方、ダクト保持部材13は、図4に示すように、ダクト1の筒状両側面(側面板1B)に面接触される接触面13aと、この接触面13aの外周からダクト1の外側方向に延びるリブ13cと、により一面が開口された凹状の箱体に形成されている。また、ダクト保持部材13は、箱体の外周リブ13c下端にフック体12に係合させるJ字状のフック部13bと、この外周リブ13c上端に中央を切欠いて吊りボルト11を挿入させて固定させる切欠き部13dと、を各々備えている。   On the other hand, as shown in FIG. 4, the duct holding member 13 includes a contact surface 13 a that is in surface contact with both cylindrical side surfaces (side plate 1 </ b> B) of the duct 1, and an outer periphery of the contact surface 13 a in the outward direction of the duct 1. It is formed in the concave box body by which one surface was opened by the rib 13c extended. Also, the duct holding member 13 is fixed by inserting a J-shaped hook portion 13b to be engaged with the hook body 12 at the lower end of the outer peripheral rib 13c of the box, and inserting the suspension bolt 11 with the center notched at the upper end of the outer peripheral rib 13c. And a notch portion 13d to be provided.

このダクト保持部材13は、図1に示したように、フック部13bをフック体12の長手方向にスライド自在に係合し、切欠き部13dに吊りボルト11を挿入してナット14の締結により固定(接続)させることで、吊りボルト11とフック体12とを各々接続してダクト1を吊り状態に保持するように配置されている。すなわち、フック部13b側が固定され、切欠き部13d側に引っ張られる吊り構造になり、この吊り状態でフック部13bを支点として接触面13aがダクト1の側面方向に傾いて当該側面を押圧して面接触するようになっている。   As shown in FIG. 1, the duct holding member 13 engages the hook portion 13 b slidably in the longitudinal direction of the hook body 12, inserts the suspension bolt 11 into the notch portion 13 d, and fastens the nut 14. By fixing (connecting), the suspension bolt 11 and the hook body 12 are connected to each other so as to hold the duct 1 in a suspended state. That is, the hook portion 13b side is fixed and the suspension structure is pulled toward the notch portion 13d side. In this suspended state, the contact surface 13a is inclined toward the side surface of the duct 1 with the hook portion 13b serving as a fulcrum to press the side surface. It comes in surface contact.

また、接触面13aには、図3に示した外周を囲むようにリブ13cが設けられ、凹状の箱体になるように形成されている。このリブ13cは、前述した吊り状態で切欠き部13d側が引っ張られる際、ダクト保持部材13自体が変形して、吊り位置や接触面13aの面接触圧にバラ付きが生じないように補強する役割をしている。すなわち、リブ13cは、接触面13aの外周に沿って囲むように補強することで、吊りボルト11を固定する切欠き部13dで吊り状態の引っ張りによる変形(バラ付き)が生じないように形成されている。   Further, the contact surface 13a is provided with ribs 13c so as to surround the outer periphery shown in FIG. 3 so as to form a concave box. The rib 13c serves to reinforce so that the duct holding member 13 itself is deformed when the notched portion 13d side is pulled in the suspended state and the surface contact pressure of the suspended position and the contact surface 13a does not vary. I am doing. In other words, the rib 13c is reinforced so as to surround the outer periphery of the contact surface 13a, so that the notched portion 13d for fixing the suspension bolt 11 is not deformed (separated) by pulling in the suspended state. ing.

ここで、ダクト保持部材13の切欠き部13dには、図5に示したように、吊りボルト11(図1参照)が挿入される挿入口に、バネにより出没自在の突部15bを突出状態に配置させる出没部材15(図1に図示せず)が装着されている。この出没部材15について、図5を参照して詳細に説明する。図5は、図4の出没部材15に吊りボルト11を挿入させる動作を示す動作説明図であり、(a)は挿入前の状態を、(b)は挿入途中の状態を、(c)は挿入後の状態を、各々示している。まず、出没部材15は、図5(a)に示すように、本体15a内に収納されるバネ15cと、このバネ15cにより本体15aの外側に一部突出させた突部15bと、を各々備えており、この突部15bをダクト保持部材13の切欠き部13dに突出させた状態に配置されている。   Here, as shown in FIG. 5, in the notch portion 13d of the duct holding member 13, a protruding portion 15b that can be protruded and retracted by a spring is inserted into an insertion port into which the suspension bolt 11 (see FIG. 1) is inserted. A retractable member 15 (not shown in FIG. 1) is mounted. The retracting member 15 will be described in detail with reference to FIG. FIGS. 5A and 5B are operation explanatory views showing the operation of inserting the suspension bolt 11 into the retracting member 15 of FIG. 4. FIG. 5A shows a state before insertion, FIG. 5B shows a state during insertion, and FIG. Each state after insertion is shown. First, as shown in FIG. 5A, the projecting / retracting member 15 includes a spring 15c accommodated in the main body 15a, and a protrusion 15b partially protruding outside the main body 15a by the spring 15c. The projecting portion 15b is disposed in a state where the projecting portion 15b is projected from the notched portion 13d of the duct holding member 13.

突部15bには、吊りボルト11の挿入時に当接して指圧により後退させる後退面Aと、吊りボルト11の排出時に当接して抜けを防止する平坦面Bと、が各々形成されている(図3(c)参照)。後退面Aは、突部15bの先端に向かって窄まる傾斜面若しくは半円弧状曲面(図3では半円弧状曲面)に形成されている。また、平坦面Bは、後退面Aに対する裏側の背面に配置されて、突部15bの先端に向かって平坦に形成されている。   The protrusion 15b is formed with a receding surface A that abuts when the suspension bolt 11 is inserted and retreats by finger pressure, and a flat surface B that abuts when the suspension bolt 11 is discharged and prevents the suspension bolt 11 from being pulled out (see FIG. 3 (c)). The receding surface A is formed as an inclined surface or a semicircular arc curved surface (in FIG. 3, a semicircular arc curved surface) that narrows toward the tip of the protrusion 15b. Further, the flat surface B is disposed on the back surface on the back side with respect to the receding surface A, and is formed flat toward the tip of the protrusion 15b.

このような突部15bは、図3(a)に示した切欠き部13dに吊りボルト11を挿入する方向に対向させて後退面Aが配置され、その背面に平坦面Bが配置されている。そして突部15bは、図3(b)に示すように、後退面Aに吊りボルト11を挿入させて当接させることで、吊りボルト11により後退面Aが押圧されてバネ15cで付勢されながら本体15aの内部に後退される。このように吊りボルト11は、突部15bに当接させながら挿入され、バネ15cの付勢により突出する突部15bを押圧して後退させながら切欠き部13d内に挿入される。   In such a protrusion 15b, a receding surface A is arranged facing the notch 13d shown in FIG. 3A in the direction in which the suspension bolt 11 is inserted, and a flat surface B is arranged on the back surface thereof. . As shown in FIG. 3 (b), the protrusion 15b is inserted and brought into contact with the retreating surface A so that the retreating surface A is pressed by the suspension bolt 11 and biased by the spring 15c. However, it is retracted into the main body 15a. In this way, the suspension bolt 11 is inserted while being in contact with the protrusion 15b, and is inserted into the notch 13d while pressing and retracting the protrusion 15b protruding by the bias of the spring 15c.

そして、突部15bは、図3(c)に示すように、吊りボルト11を切欠き部13dの終端まで挿入すると、吊りボルト11による押圧が解除されてバネ15cにより付勢されて、再び、切欠き部13dに突出させた状態に戻される。このように突部15bが突出した状態では、切欠き部13d内に挿入された吊りボルト11を切欠き部13dから排出しようとしても、突部15bの後退面A裏側が平坦面Bになっているため、吊りボルト11の排出を止めて抜けを防止する構造になっている。   Then, as shown in FIG. 3 (c), when the suspension bolt 11 is inserted to the end of the notch 13d, the protrusion 15b is released from the pressure by the suspension bolt 11 and is urged by the spring 15c. It is returned to the state of protruding into the notch 13d. Thus, in the state where the protrusion 15b protrudes, even if the suspension bolt 11 inserted into the notch 13d is to be discharged from the notch 13d, the back surface A of the protrusion 15b is a flat surface B. Therefore, the suspension bolt 11 is prevented from being removed by stopping the discharge of the suspension bolt 11.

このように出没部材15は、突部15bの出没動作により吊りボルト11をダクト保持部材13の切欠き部13dに簡単に挿入でき、かつ吊りボルト11の挿入後はダクト保持部材13から容易に外れないように抜けを防止することができる。   In this manner, the projecting / retracting member 15 can easily insert the suspension bolt 11 into the notch 13d of the duct holding member 13 by the projecting / retracting operation of the protrusion 15b, and can be easily detached from the duct holding member 13 after the suspension bolt 11 is inserted. It is possible to prevent omissions.

次に、このような構成のダクト吊り構造10によりダクト1を吊るす動作について、図6を参照して詳しく説明する。図6は、図1のダクト吊り構造10によりダクト1を吊るす動作を示す図であり、(a)はダクト1にダクト保持部材13を装着する状態を、(b)はダクト1に装着したダクト保持部材13を吊りボルト11に固定する状態を、各々示している。まず、ダクト1を吊りボルト11により吊るす場合、図6(a)に示すように、ダクト1の両側面に形成されたフック体12にダクト保持部材13のフック部13bを傾けながら押し込むように装着し、フック体12から外れないように取り付ける。   Next, the operation | movement which suspends the duct 1 by the duct suspension structure 10 of such a structure is demonstrated in detail with reference to FIG. 6A and 6B are diagrams illustrating an operation of suspending the duct 1 by the duct suspending structure 10 of FIG. 1, in which FIG. 6A illustrates a state in which the duct holding member 13 is mounted on the duct 1, and FIG. The state in which the holding member 13 is fixed to the suspension bolt 11 is shown. First, when the duct 1 is suspended by the suspension bolt 11, as shown in FIG. 6 (a), the hook portion 13b of the duct holding member 13 is inclined and pushed into the hook body 12 formed on both side surfaces of the duct 1. Then, it is attached so as not to be detached from the hook body 12.

その後、図6(b)に示すように、ダクト保持部材13を装着したダクト1を、建物の天井スラブ等の上部構造体(図示せず)に固定されて下方に延びる一対の吊りボルト11の位置まで押し上げることで、ダクト保持部材13に吊りボルト11の先端を固定させる。この際、ダクト1を吊りボルト11の位置まで押し上げる場合、ダクト1に装着されたダクト保持部材13が吊りボルト11に当接して外れないように、吊りボルト11を若干外側に傾斜させてダクト1を押し上げる。また、吊りボルト11は、ダクト1を吊り下げ位置まで押し上げた後、ダクト保持部材13の切欠き部13dに、前述した外側に傾けた状態から、図5に示した出没部材13の突部15bに当接させながら挿入され、この切欠き部13d内に抜けを防止した状態に装着させる。   Thereafter, as shown in FIG. 6B, the duct 1 fitted with the duct holding member 13 is fixed to an upper structure (not shown) such as a ceiling slab of the building and a pair of suspension bolts 11 extending downward. By pushing up to the position, the end of the suspension bolt 11 is fixed to the duct holding member 13. At this time, when the duct 1 is pushed up to the position of the suspension bolt 11, the suspension bolt 11 is slightly inclined outward so that the duct holding member 13 attached to the duct 1 does not come into contact with the suspension bolt 11 and is removed. Push up. Further, the suspension bolt 11 pushes the duct 1 up to the suspension position, and then the protrusion 15b of the projecting member 13 shown in FIG. It is inserted while being brought into contact with the lens, and is mounted in a state in which it is prevented from coming out in the notch 13d.

最後に、ダクト保持部材13の切欠き部13dに吊りボルト11が装着されると、図6(b)に示したように、吊りボルト11先端のネジ部11aにナット14を締結させることで、吊りボルト11にダクト1が吊るされた状態に保持され、全ての吊り作業が完了する。この際、ダクト保持部材13は、図1に示したフック体12の延びる長手方向に沿ってダクト1の両側面でスライドさせて位置調整し、吊りボルト11に吊るす最適な吊り位置にダクト1を保持させる。   Finally, when the suspension bolt 11 is attached to the notch 13d of the duct holding member 13, as shown in FIG. 6B, the nut 14 is fastened to the screw portion 11a at the tip of the suspension bolt 11, The duct 1 is held in a state of being suspended from the suspension bolt 11, and all suspension operations are completed. At this time, the duct holding member 13 is slid and adjusted on both sides of the duct 1 along the longitudinal direction of the hook body 12 shown in FIG. Hold.

以上のように、このダクト吊り構造10によれば、ダクト1のフック体12に装着されるダクト保持部材13によりダクト1側面の少なくとも中央より上方に吊りボルト11が取り付けられるため、この吊りボルト11の長さを短く設定でき、かつ、この短い吊りボルト11に加えてダクト保持部材13の接触面13aでダクト1の両側面を保持することにより、ダクト1の吊り状態で短い吊りボルト11と接触面13aとにより安定して保持して吊るすことが可能になる。また、吊りボルト11に接続されるダクト保持部材13を、ダクト1のフック体12に係合させて吊るす構造であり、このフック体12の延びる長手方向にダクト保持部材13をダクト1両側面でスライドさせて位置調整できるため、この吊りボルト11に吊るす最適な吊り位置にダクト1を保持すことができる。また、フック体13がダクト1両側面の軸心方向に延びて形成されるため、このダクト1両側面をフック体13により補強でき、より安定してダクトを保持できる。   As described above, according to this duct suspension structure 10, the suspension bolt 11 is attached above at least the center of the side surface of the duct 1 by the duct holding member 13 attached to the hook body 12 of the duct 1. In addition to the short suspension bolt 11, the both sides of the duct 1 are held by the contact surface 13 a of the duct holding member 13, thereby making contact with the short suspension bolt 11 in the suspended state of the duct 1. The surface 13a can be stably held and hung. Further, the duct holding member 13 connected to the suspension bolt 11 is suspended by being engaged with the hook body 12 of the duct 1, and the duct holding member 13 is disposed on both sides of the duct 1 in the longitudinal direction in which the hook body 12 extends. Since the position can be adjusted by sliding, the duct 1 can be held at the optimum hanging position to be hung on the hanging bolt 11. Further, since the hook body 13 is formed to extend in the axial direction on both side surfaces of the duct 1, both side surfaces of the duct 1 can be reinforced by the hook body 13 and the duct can be held more stably.

また、ダクト吊り構造10によれば、ダクト1のフック体12にダクト保持部材13のフック部13bを係合するだけでダクト1にダクト保持部材13を容易に装着できるとともに、このダクト保持部材13の切欠き部13dに吊りボルト11を挿入させてナット14締めするだけで、吊りボルト11にダクト1を簡単に保持させて吊るすことができるため、作業性が向上しタクト1の取り付け作業の時間短縮が可能になる。また、ダクト保持部材13のように、接触面13aにリブ13cを形成させて切欠き部13dとフック部13bとを備えただけの簡単な構造により、ダクト1を安定させ、かつ安価に吊るすことができる。   Further, according to the duct suspension structure 10, the duct holding member 13 can be easily attached to the duct 1 simply by engaging the hook portion 13 b of the duct holding member 13 with the hook body 12 of the duct 1, and the duct holding member 13. By simply inserting the suspension bolt 11 into the notch 13d and tightening the nut 14, the duct 1 can be easily held and suspended by the suspension bolt 11, so that the workability is improved and the time for attaching the tact 1 is improved. Shortening becomes possible. Further, like the duct holding member 13, the duct 1 can be stably and inexpensively suspended by a simple structure in which the rib 13 c is formed on the contact surface 13 a and the notched portion 13 d and the hook portion 13 b are provided. Can do.

また、ダクト吊り金具10によれば、ダクト保持部材13の切欠き部13dに設置された出没部材15により、吊りボルト11を突部15bの後退面Aに当接させて切欠き部13dに挿入した後、この吊りボルト11の排出時に突部15bの平坦面Bに当接して抜けが防止されるため、ダクト1の吊り状態でダクト保持部材13の切欠き部13dから吊りボルト11が外れることを確実に防止できる。   Further, according to the duct hanging bracket 10, the hanging bolt 11 is brought into contact with the receding surface A of the projecting portion 15 b and inserted into the notched portion 13 d by the projecting member 15 installed in the notched portion 13 d of the duct holding member 13. Then, when the suspension bolt 11 is discharged, the suspension bolt 11 comes into contact with the flat surface B of the projection 15b to prevent the suspension bolt 11 from coming off, so that the suspension bolt 11 is detached from the notch 13d of the duct holding member 13 in the suspended state of the duct 1. Can be reliably prevented.

さらに、ダクト吊り構造10によれば、ダクト1の側面板1Bを折り曲げてフック体12が一体的に形成されているため、ダクト1の強度・剛性を高めることができるとともに、部品点数および部品コストを削減することができる。   Furthermore, according to the duct suspension structure 10, the hook body 12 is integrally formed by bending the side plate 1 </ b> B of the duct 1, so that the strength and rigidity of the duct 1 can be increased, and the number of parts and the part cost are increased. Can be reduced.

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、上記の実施の形態では、側面板1Bを折り曲げてフック体12を一体的に設けているが、断面がL字状のアングル材をフック体12として、側面板1Bに接合するようにしてもよい。これにより、例えば、カーブさせたダクト構造においても、対応させて吊るすことが可能となる。   Although the embodiment of the present invention has been described above, the specific configuration is not limited to the above embodiment, and even if there is a design change or the like without departing from the gist of the present invention, Included in the invention. For example, in the above embodiment, the side plate 1B is bent and the hook body 12 is integrally provided. However, an angle member having an L-shaped cross section is used as the hook body 12 and is joined to the side plate 1B. Also good. Thereby, for example, even in a curved duct structure, it is possible to suspend the corresponding duct structure.

すなわち、図7は、カーブさせたダクト2を示す外観斜視図である。このカーブさせたダクト2は、図7に示すように、カーブして延びる軸心方向に対して所定の間隔で分割(図7では3等分に形成)されている。このように分割されたダクト2の両側面の所定位置(図7に示した点線位置)に、各々別体のフック体(図示せず)を配設することで、ダクト保持部材13を装着することができる。このようにカーブさせたダクト2の場合などで、図1に示したフック体12を、ダクト2と別体の構造にすることで、図1と同様にダクト保持部材13を装着して吊るすことが可能となる。   That is, FIG. 7 is an external perspective view showing the curved duct 2. As shown in FIG. 7, the curved duct 2 is divided (formed into three equal parts in FIG. 7) at a predetermined interval with respect to the axial direction extending in a curve. The duct holding member 13 is mounted by disposing separate hook bodies (not shown) at predetermined positions (dotted line positions shown in FIG. 7) on both side surfaces of the duct 2 thus divided. be able to. In the case of the duct 2 curved in this way, the hook body 12 shown in FIG. 1 is separated from the duct 2 so that the duct holding member 13 is attached and hung as in FIG. Is possible.

1、2 ダクト
1A 側面板
1B 水平板
1a ハゼ部
1b フランジ部
10 ダクト吊り金具
11 吊りボルト
11a ネジ部
12 フック体
13 ダクト保持部材
13a 接触面
13b フック部
13c リブ
13d 切欠き部(挿入部)
14 ナット
15 出没部材
15a 本体
15b 突部
15c バネ
A 後退面
B 平坦面
C 切欠き
DESCRIPTION OF SYMBOLS 1, 2 Duct 1A Side plate 1B Horizontal plate 1a Haze part 1b Flange part 10 Duct hanging bracket 11 Hanging bolt 11a Screw part 12 Hook body 13 Duct holding member 13a Contact surface 13b Hook part 13c Rib 13d Notch part (insertion part)
14 Nut 15 Extruding member 15a Body 15b Protruding portion 15c Spring A Retreating surface B Flat surface C Notch

Claims (3)

建物の天井スラブ等の上部構造体に固定されて下方に延びる吊りボルトによって、ダクトを吊り下げるためのダクト吊り構造であって、
前記ダクトの両外側面の中央部に設けられ、前記ダクトの軸心方向に延びるフック体と、
前記フック体の長手方向にスライド自在に前記フック体に係合し、前記吊りボルトを接続可能なダクト保持部材と、を備え、
前記フック体は、前記ダクトの側面から外側に延びて端部を垂直下方に曲げたL字状に形成され、
前記ダクト保持部材は、前記ダクトの外側面に面接触される接触面と、当該接触面の外周から前記ダクトの外側方向に延びるリブと、により一面が開口された凹状の箱体に形成されるとともに、当該箱体の外周リブ下端に前記フック体に係合させるJ字状のフック部と、この外周リブ上端に前記吊りボルトを挿入させて固定させる挿入部と、を備える、
ことを特徴とするダクト吊り構造。
A duct suspension structure for suspending a duct by a suspension bolt fixed to an upper structure such as a ceiling slab of a building and extending downward,
A hook body provided at the center of both outer side surfaces of the duct and extending in the axial direction of the duct;
E Bei and a duct holding member connectable longitudinally engages slidably said hook body, said hanger rod of the hook body,
The hook body is formed in an L shape that extends outward from a side surface of the duct and bends an end portion vertically downward;
The duct holding member is formed in a concave box having one surface opened by a contact surface that is in surface contact with the outer surface of the duct and a rib that extends from the outer periphery of the contact surface toward the outer side of the duct. And a J-shaped hook portion engaged with the hook body at the lower end of the outer peripheral rib of the box, and an insertion portion for inserting and fixing the suspension bolt at the upper end of the outer peripheral rib.
A duct suspension structure characterized by that.
前記挿入部は、スリット状に切り欠かれた切欠き部となっており、前記吊りボルトが挿入される挿入口にバネにより出没自在の突部が突出状態に配置され、当該突部に、前記吊りボルトの挿入時に当接して指圧により後退させる後退面と、前記吊りボルトの排出時に当接して抜けを防止する平坦面と、が形成された出没部材を備える、
ことを特徴とする請求項に記載のダクト吊り構造。
The insertion part is a notch part that is cut out in a slit shape, and a protrusion that can be protruded and retracted by a spring is arranged in a protruding state at an insertion port into which the suspension bolt is inserted. A retractable surface formed with a receding surface that contacts when the suspension bolt is inserted and retreats with finger pressure, and a flat surface that contacts when the suspension bolt is discharged to prevent it from coming off,
The duct suspension structure according to claim 1 .
前記フック体は、前記ダクトの側面板を折り曲げて一体に形成されている、ことを特徴とする請求項1または2のいずれか1項に記載のダクト吊り構造。 The hook body, the duct Suspended structure according to any one of claims 1 or 2, characterized in that, are integrally formed by bending a side plate of the duct.
JP2012014644A 2012-01-26 2012-01-26 Duct suspension structure Active JP5827898B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012014644A JP5827898B2 (en) 2012-01-26 2012-01-26 Duct suspension structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012014644A JP5827898B2 (en) 2012-01-26 2012-01-26 Duct suspension structure

Publications (2)

Publication Number Publication Date
JP2013155886A JP2013155886A (en) 2013-08-15
JP5827898B2 true JP5827898B2 (en) 2015-12-02

Family

ID=49051262

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012014644A Active JP5827898B2 (en) 2012-01-26 2012-01-26 Duct suspension structure

Country Status (1)

Country Link
JP (1) JP5827898B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113669507B (en) * 2021-07-28 2022-08-12 深圳大学 A ventilation duct hanging and fixing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3625801B2 (en) * 2002-01-23 2005-03-02 株式会社フカガワ Goby structure for duct assembly

Also Published As

Publication number Publication date
JP2013155886A (en) 2013-08-15

Similar Documents

Publication Publication Date Title
JP5484182B2 (en) clip
JP5244221B2 (en) Attachment for long objects
JP2007232063A (en) Vibration-proof holder for pipe and the like
US20090191025A1 (en) Fastener
US20120292938A1 (en) Fastening of a longitudinal beam lining on a longitudinal beam of a motor vechicle
JP5836066B2 (en) Panel body mounting member and panel body mounting structure
JP5827898B2 (en) Duct suspension structure
WO2011013195A1 (en) Bumper mounting structure
JP2010269078A (en) Upper part fixing metal fitting for mirror plate
WO2011043355A1 (en) Bumper mounting structure
JP5798080B2 (en) Wiring fixture mounting body and installation method of wiring fixture mounting body
KR200448863Y1 (en) Cover fastener for lighting
CN105346352A (en) Detachable holder
JP2010048339A5 (en)
JP2008126712A (en) Bumper mounting structure for vehicle
TWI442215B (en) Electronic device having the function of fixing a keyboard mechanism
JP3160073U (en) Hanger rail fixing bracket
JP2017179941A (en) handrail
JP2009058101A (en) Bracket and fixing device
JP5354285B2 (en) Bumper holder mounting structure
JP2007055496A (en) Part fitting structure
KR20190096615A (en) Window wheel having screwless combination structure
JP2011043185A (en) Cover for refrigerant pipe
JP6010471B2 (en) Exterior material mounting bracket
CN102655287B (en) The installation constitution of terminal part and terminal part

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140708

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150318

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150324

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150407

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151006

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20151019

R150 Certificate of patent or registration of utility model

Ref document number: 5827898

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250