JP4432195B2 - Temporary fixing structure for hanging bolt nut - Google Patents
Temporary fixing structure for hanging bolt nut Download PDFInfo
- Publication number
- JP4432195B2 JP4432195B2 JP2000079523A JP2000079523A JP4432195B2 JP 4432195 B2 JP4432195 B2 JP 4432195B2 JP 2000079523 A JP2000079523 A JP 2000079523A JP 2000079523 A JP2000079523 A JP 2000079523A JP 4432195 B2 JP4432195 B2 JP 4432195B2
- Authority
- JP
- Japan
- Prior art keywords
- suspension bolt
- nut
- eaves
- nuts
- screwed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は金属製の折版屋根材や波状をしたセメント系屋根材等の軒先に垂下して軒樋を係止する吊ボルト用ナットの仮止め構造に関する。
【0002】
【従来の技術】
従来より、図5に示すように金属製の折版屋根材11の軒先に軒樋を垂下するには特開平8−312078号に開示されており、吊ボルト本体1の下方に軒樋2の耳部3a,3bを係止するように板体4の両端を上方に屈曲して各々に耳係止部5a,5bを形成するとともに中央側に設けられた開口孔6を挿入して螺合した軒樋係止金具7と吊ボルト本体1の上方に屋根面8の固定孔9に固着するナット10a,10bを螺合して成る吊ボルトAがある。
【0003】
この吊ボルトAの軒樋係止金具7の耳係止部5a,5bを略角型軒樋の耳部3a,3bに挿入し、ばね片13a,13bで押圧固着する。したがって、吊ボルトAを折版屋根材11に固着しようとすると最初から吊ボルトAの吊ボルト本体1の上方にナット10a,10bを螺合しているので取付けの際に、ナット10a,10bを取外し、折版屋根材11の固定孔9に吊ボルト本体1を挿入し、再度ナット10a,10bを吊ボルト本体1に挿入固着している。
【0004】
そのために、吊ボルトAの吊ボルト本体1からナット10a,10bを取外し、再度挿入するという手間があり、さらに高所での上下の高さ調整の施工作業の悪いものであった。又、高所の作業のために吊ボルト本体1からナット10a,10bを取外しする作業があるとナット10a,10bを落として紛失してしまうという問題があった。
【0005】
本発明は、上記従来技術の問題点に鑑みて案出されたものであって、吊ボルトAの吊ボルト本体1からナット10a,10bを簡単に取外しや取付作業ができるとともに吊ボルト本体1の上下の高さ調整が簡便で且つナット10a,10bを作業中に紛失することもない吊ボルト用ナットの仮止め構造を提供することを目的としている。
【0006】
【課題を解決するための手段】
本発明の請求項1記載の吊ボルト用ナットの仮止め構造は、吊ボルト本体の下方に軒樋の耳部を係止するように板体の両端を上方に屈曲して各々に耳係止部を形成するとともに中央側に設けられた開口孔を挿入して螺合した軒樋係止金具と吊ボルト本体の上方に屋根面の固定孔に固着するナットを螺合して成る吊ボルトにおいて、吊ボルトの上端に有底の縦溝部を設け該縦溝部にナットを螺合して配設することを特徴とするものである。
【0007】
したがって、吊ボルトの上端に設けられた縦溝部によって、吊ボルト用ナットの取外しや高所での上下の高さ調整や取付けの簡単な構造であり、吊ボルト用ナットを紛失してしまうこともない。
【0012】
【発明の実施の形態】
図1は、本発明の一実施の形態に係る吊ボルトと軒樋係止金具と
の関係を示す正面図、図2の(a)、(b)、(c)は、吊ボルト本体の上端にナット
を固着する手順を示す斜視図である。図3及び図4は、本発明の参考例である吊ボルト
と軒樋係止金具との関係を示す正面図、以下、各図に従って、本発明について詳細に説
明する。
【0013】
本発明に係る吊ボルトBは金属製や樹脂製の吊ボルト本体1の下方に金属製や樹脂製の軒樋2の耳部3を係止するように板体4の両端を上方に屈曲して各々に耳係止部5a,5bを形成するとともに中央側に設けられた開口孔6を挿入して螺合した軒樋係止金具7と吊ボルト本体1の上方に屋根面8の固定孔9に固着するナット10a,10bを螺合して成り、この吊ボルト本体1の上端に有底の縦溝部14を設け該縦溝部14にナット10a,10bを螺合して配設したものである。
【0014】
したがって、吊ボルトBの上端を折版屋根材11に固着するには吊ボルト本体1の上端からナット10aを取外し、折版屋根材11の軒先部に設けられた開口孔15に上端を挿入し、ドライバー等で縦溝部14を拡開して仮止めし、上下の高さ調整を行って高さが決まったらペンチ等で吊ボルト本体1の上端をすぼめてナット10aを挿入し螺合する。
【0015】
このとき、吊ボルト本体1は折版屋根材11の固定孔9を介し、ナット10a,10bで挟持される。そのために、吊ボルトBの上端を折版屋根材11に螺合及び高さ位置調整が縦溝部14の拡狭により可能となるので折版屋根材11への吊ボルトBの取付け、取外しが簡便となり、施工作業の効率化が図れる。また、吊ボルト用ナット10a,10bを紛失してしまうこともない。
【0016】
さらに、図3及び図4は、本発明の参考例である吊ボルトと軒樋係止金具 であって、吊
ボルトCは金属製や樹脂製の吊ボルト本体1の下方に金属製や樹脂製の軒 樋2の耳部3
を係止するように板体4の両端を上方に屈曲して各々に耳係止部5a,5 bを形成する
とともに中央側に設けられた開口孔6を挿入して螺合した軒樋係止金具7 と吊ボルト本
体1の上方に屋根面8の固定孔9に固着するナット10a,10bを螺合 して成り、軒
樋係止金具7の外側面に設けられたナット仮止め部15a,15bが外方 に突出する切
起し片16を設けたものである。この軒樋係止金具7の外方に突出する切 起し片16に
ナット10a,10bをネジ固定や係止手段により係止される。
【0017】
したがって、軒樋係止金具7の外方に突出する切起し片16にナット10a,10bをネジ固定や係止手段により係止されようにすればナット10a,10bを紛失することもなく、簡単に作業ができる。特に、吊ボルト本体1の上方でナット10aを取外す作業も必要がなくなり、吊ボルトBの上端を折版屋根材11に固着するには軒樋係止金具7の切起し片16からナット10a,10bを外し屋根面8の固定孔9に固着する。
【0018】
したがって、軒樋係止金具7の外側面に外方に突出する切起し片16を設けてナット仮止め部15とすることにより、吊ボルト用ナット10a,10bの取外しや取付けの簡単な構造であり、吊ボルト用ナット10a,10bを紛失してしまうこともないものである。又、軒樋係止金具7の折曲により切起し片16を形成するので経済的である。
【0019】
このとき、軒樋係止金具7のナット仮止め部15a,15bは切起し片16だけではなく溶接や接着、係止手段により係止するようにしても良いものであり、要するに吊ボルト用ナット10a,10bを紛失してしまうこともないように仮止めされれば良いものである。
【0020】
【発明の効果】
本発明の請求項1記載の吊ボルト用ナットの仮止め構造は、吊ボルト本体の下方に軒樋の耳部を係止するように板体の両端を上方に屈曲して各々に耳係止部を形成するとともに中央側に設けられた開口孔を挿入して螺合した軒樋係止金具と吊ボルト本体の上方に屋根面の固定孔に固着するナットを螺合して成る吊ボルトにおいて、吊ボルトの上端に有底の縦溝部を設け該縦溝部にナットを螺合して配設しているから、吊ボルトの上端に設けられた縦溝部によって、吊ボルト用ナットの取外しや高所での上下の高さ調整や取付けの簡単な構造であり、吊ボルト用ナットを紛失してしまうこともない。
【図面の簡単な説明】
【図1】本発明の一実施の形態に係る吊ボルトと軒樋係止金具との関係を示す正面図である。
【図2】同上の(a)、(b)、(c)は吊ボルト本体の上端にナットを固着する手順を示す斜視図である。
【図3】本発明の参考例である吊ボルトと軒樋係止金具との関係を示す正面図である。
【図4】同上の吊ボルトの軒樋係止金具の切起し片を示す一部分解した斜視図である。
【図5】従来の吊ボルト用ナットの屋根面への取付け構造を示す断面図である。
【符号の説明】
A 従来の吊ボルト
B 本発明の吊ボルト
1 吊ボルト本体
2 軒樋
3 耳部
4 板体
5 耳係止部
6 開口孔
7 軒樋係止金具
8 屋根面
9 固定孔
10 ナット
11 折版屋根材
14 縦溝部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a temporary fastening structure for a nut for a suspension bolt that hangs down on an eaves tip such as a metal folded roofing material or a corrugated cement-type roofing material to lock an eaves rod.
[0002]
[Prior art]
Conventionally, as shown in FIG. 5, it is disclosed in Japanese Patent Application Laid-Open No. 8-312078 to suspend an eave ridge on the eaves of a metal folded roofing material 11. Both ends of the
[0003]
The
[0004]
Therefore, there is a trouble of removing the nuts 10a and 10b from the suspension bolt main body 1 of the suspension bolt A and reinserting them, and further, the construction work for adjusting the vertical height at a high place is poor. In addition, there is a problem that the nuts 10a and 10b are dropped and lost when there is an operation of removing the nuts 10a and 10b from the suspension bolt body 1 for work at a high place.
[0005]
The present invention has been devised in view of the above-described problems of the prior art. The nuts 10a and 10b can be easily removed from and attached to the suspension bolt body 1 of the suspension bolt A. An object of the present invention is to provide a suspension bolt nut temporary fixing structure in which the vertical height adjustment is simple and the nuts 10a and 10b are not lost during operation.
[0006]
[Means for Solving the Problems]
The suspension bolt temporary fixing structure according to claim 1 of the present invention is such that the both ends of the plate body are bent upward so as to lock the ear portion of the eaves hook below the suspension bolt main body, and the ear locking is performed on each. In the suspension bolt formed by screwing the eaves hook locking metal fitting formed by inserting the opening hole provided in the center side and screwed into the fixing bolt on the roof surface and the nut fixed to the fixing hole on the roof surface In addition, a bottomed vertical groove portion is provided at the upper end of the suspension bolt, and a nut is screwed into the vertical groove portion.
[0007]
Therefore, the vertical groove provided on the upper end of the suspension bolt makes it easy to remove the suspension bolt nut, adjust the height at the top and bottom, and install it. Absent.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
FIG. 1 is a front view showing a relationship between a suspension bolt and an eaves-holding metal fitting according to an embodiment of the present invention, and FIGS. 2 (a), (b), and (c) are upper ends of a suspension bolt main body. It is a perspective view which shows the procedure which fixes a nut to. 3 and 4 are front views showing the relationship between the suspension bolt and the eaves hook locking metal fitting, which is a reference example of the present invention, and the present invention will be described in detail with reference to the drawings.
[0013]
The suspension bolt B according to the present invention bends both ends of the
[0014]
Therefore, in order to fix the upper end of the suspension bolt B to the folding roof material 11, the nut 10 a is removed from the upper end of the suspension bolt body 1 and the upper end is inserted into the
[0015]
At this time, the suspension bolt main body 1 is sandwiched between the nuts 10 a and 10 b through the fixing hole 9 of the folded roof material 11. Therefore, the upper end of the suspension bolt B can be screwed to the folding roof material 11 and the height position can be adjusted by the expansion and contraction of the
[0016]
3 and FIG. 4 are suspension bolts and eaves anchors which are reference examples of the present invention. The suspension bolt C is made of metal or resin below the suspension bolt body 1 made of metal or resin. No
The both ends of the
[0017]
Therefore, if the nuts 10a and 10b are locked to the cut and raised
[0018]
Therefore, by providing a cut-and-raised
[0019]
At this time, the nut temporary fixing portions 15a and 15b of the eaves anchor locking
[0020]
【The invention's effect】
The suspension bolt temporary fixing structure according to claim 1 of the present invention is such that the both ends of the plate body are bent upward so as to lock the ear portion of the eaves hook below the suspension bolt main body, and the ear locking is performed on each. In the suspension bolt formed by screwing the eaves hook locking metal fitting formed by inserting the opening hole provided in the center side and screwed into the fixing bolt on the roof surface and the nut fixed to the fixing hole on the roof surface Since the bottomed vertical groove portion is provided at the upper end of the suspension bolt and the nut is screwed into the vertical groove portion, the vertical groove portion provided at the upper end of the suspension bolt can be used to remove and increase the height of the suspension bolt nut. The vertical height adjustment and installation are simple, and the suspension bolt nut is not lost.
[Brief description of the drawings]
FIG. 1 is a front view showing a relationship between a suspension bolt and an eaves hook locking metal fitting according to an embodiment of the present invention.
FIGS. 2A, 2B, and 2C are perspective views showing a procedure for fixing a nut to an upper end of a suspension bolt main body.
FIG. 3 is a front view showing a relationship between a suspension bolt and an eaves hook locking metal fitting, which is a reference example of the present invention.
FIG. 4 is a partially exploded perspective view showing a cut-and-raised piece of the eaves hook locking metal fitting of the suspension bolt.
FIG. 5 is a cross-sectional view showing a conventional structure for attaching a suspension bolt nut to a roof surface.
[Explanation of symbols]
A Conventional Suspension Bolt B Suspension Bolt of the Present Invention 1
Claims (1)
曲して各々に耳係止部を形成するとともに中央側に設けられた開口孔を挿入して螺合し
た軒樋係止金具と吊ボルト本体の上方に屋根面の固定孔に固着するナットを螺合して成
る吊ボルトにおいて、吊ボルトの上端に有底の縦溝部を設け該縦溝部にナットを螺合し
て配設することを特徴とする吊ボルト用ナットの仮止め構造。Bend both ends of the plate upward to lock the eaves ears below the suspension bolt body to form the ear locks in each, and insert the opening provided in the center side In a suspension bolt formed by screwing a screwed eave anchor locking metal and a nut fixed to a fixing hole on the roof surface above the suspension bolt body, a bottomed vertical groove is provided at the upper end of the suspension bolt. A temporary fixing structure for a suspension bolt nut, wherein the nut is screwed into the groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000079523A JP4432195B2 (en) | 2000-03-22 | 2000-03-22 | Temporary fixing structure for hanging bolt nut |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000079523A JP4432195B2 (en) | 2000-03-22 | 2000-03-22 | Temporary fixing structure for hanging bolt nut |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001262796A JP2001262796A (en) | 2001-09-26 |
JP4432195B2 true JP4432195B2 (en) | 2010-03-17 |
Family
ID=18596763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000079523A Expired - Fee Related JP4432195B2 (en) | 2000-03-22 | 2000-03-22 | Temporary fixing structure for hanging bolt nut |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4432195B2 (en) |
-
2000
- 2000-03-22 JP JP2000079523A patent/JP4432195B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2001262796A (en) | 2001-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2008118251A1 (en) | Mounting coupling for sprinkler support system | |
JP4432195B2 (en) | Temporary fixing structure for hanging bolt nut | |
JP2001003526A (en) | Snow removing and stopping device for roof eaves | |
JPS624110Y2 (en) | ||
US6631601B1 (en) | Channel member stabilizer apparatus | |
JPH0989163A (en) | Long body support | |
JPS608011Y2 (en) | rain gutter bracket | |
JPH0218172Y2 (en) | ||
JPH10105U (en) | Piping support | |
JP2570749Y2 (en) | Gutter suspension mounting structure | |
JP3018936U (en) | Half-maru gutter support hanging bracket | |
JP2001132183A (en) | Fitting structure of gutter hanger for flap roof | |
JPS6036667Y2 (en) | rain gutter mounting device | |
JPS6127383Y2 (en) | ||
JPH0342188Y2 (en) | ||
JPS6237871Y2 (en) | ||
JP5210977B2 (en) | Eaves-hanging structure reinforcement support and eaves-hanging tool | |
JP2012112130A (en) | Gutter hanger and method for manufacturing the same | |
JPH0527616Y2 (en) | ||
JP4004602B2 (en) | 樋 | |
JP3964072B2 (en) | Fences for folding plate roof | |
JPH0419143Y2 (en) | ||
JPH0612102Y2 (en) | Rain gutter equipment | |
JP2536723Y2 (en) | Eave gutter fixture | |
JPH0715948Y2 (en) | Door |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061124 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20090220 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090303 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090507 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090618 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20091201 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20091214 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130108 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130108 Year of fee payment: 3 |
|
LAPS | Cancellation because of no payment of annual fees |