JP4385007B2 - 高圧負荷演算制御方法及び装置 - Google Patents
高圧負荷演算制御方法及び装置 Download PDFInfo
- Publication number
- JP4385007B2 JP4385007B2 JP2005167774A JP2005167774A JP4385007B2 JP 4385007 B2 JP4385007 B2 JP 4385007B2 JP 2005167774 A JP2005167774 A JP 2005167774A JP 2005167774 A JP2005167774 A JP 2005167774A JP 4385007 B2 JP4385007 B2 JP 4385007B2
- Authority
- JP
- Japan
- Prior art keywords
- value
- load
- resistor bank
- resistor
- control value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/34—Testing dynamo-electric machines
- G01R31/343—Testing dynamo-electric machines in operation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/20—Modifications of basic electric elements for use in electric measuring instruments; Structural combinations of such elements with such instruments
- G01R1/203—Resistors used for electric measuring, e.g. decade resistors standards, resistors for comparators, series resistors, shunts
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
- Control Of Voltage And Current In General (AREA)
Description
はじめに、本願発明における高圧負荷演算制御装置の原理を図1を用いて説明する。
次に、本方法例として、上記装置例で述べたNo1〜7までの抵抗体バンクに介設する開閉器、制御器を用いた各抵抗体バンクの電力容量と、負荷の目標値とする負荷制御値とを比較し、最も負荷制御値に近い値を算出することによりに自動的に各抵抗対バンクのON/OFFの制御を行う高圧負荷演算制御方法の一連の処理手順を説明する。
αL…低圧バンク群
αH…高圧バンク群
γ1、γ2、γ´…高圧負荷装置
G…電源装置
V…電圧計
A…電流計
P…電力計
PC…電力ケーブル
GR…地絡継電器
OCR…過電流継電器
CB…主遮断機
CBH…高圧用主遮断機
CL…低圧開閉器
CH…高圧開閉器
CV…制御器
OC…比較演算転送回路
MC…制御値記憶演算回路
MV…制御値計測器
SW…押しボタンスイッチ
Claims (12)
- 発電機の負荷特性試験に関して、抵抗体バンク群を複数に分割するに際し、全抵抗体の電力容量を比較演算より上位から下位等級に順次漸減算出された各抵抗体バンクに分割、割り当てし、設定目標とする値の近似値をとるため上位から下位等級に亙り順次前記各抵抗体バンクのON/OFFの組合せを自動的に調整して加減算することにより、負荷制御値を連続的に追従調整する高圧負荷演算制御方法であって、
まず、電源装置に電力ケーブルを介して並列接続された前記抵抗体バンク群を複数(2〜N[Nは自然数])に分割した後、当該抵抗体バンク群の全最大電力容量を2進法に基づき、2分の1から2n−1分の1に相当する電力容量の上位から下位等級に順次漸減算出された値を分割された第1から第Nの各抵抗体バンクに割り当て、
次に、前記各抵抗体バンクに接続された制御手段で、目標値とする負荷制御値を設定後、当該制御手段内の比較演算転送回路内の第1の演算手段にて、当該第1の演算手段に対応する第1の前記抵抗体バンクが保持する電力容量と、前記負荷制御値を比較し、当該負荷制御値が当該電力容量以上であれば、当該電力容量を当該負荷制御値から減算したものを残数値として、前記制御手段にて記憶保持するとともに第2の演算手段に当該残数値をアナログ転送し、前記第1の抵抗体バンクにON状態を示すディジタル信号を転送する一方、当該負荷制御値が当該電力容量以下であれば、当該負荷制御値を第2の演算手段にアナログ転送し、
以下、前記第2の演算から第Nの演算まで、次上位の演算手段より受け取った前記残数値又は前記負荷制御値と、次下位等級の抵抗体バンクの電力容量とを順次比較して行き、当該残数値又は当該負荷制御値が、各対応する当該抵抗体バンクの電力容量以上であれば、当該電力容量を当該残数値からその都度減算し、次下位等級残数値として記憶保持した後、次下位等級の演算手段に当該下位残数値をアナログ転送するとともに、当該各第2から第Nの演算手段に各対応した前記抵抗体バンクに対し、ON状態を示すディジタル信号を転送する一方、前記次上位等級から受け取った前記残数値又は前記負荷制御値が前記次下位等級の抵抗体バンクの電力容量以下であれば、当該次上位等級残数値を次下位等級残数値として次下位等級の演算手段にアナログ転送して逐次実施する、
ことを特徴とする、高圧負荷演算制御方法。 - 前記負荷制御値は、
前記制御手段に接続された押しボタンスイッチのUPボタンを押すと増加方向への変更値が前記制御手段の制御値記憶演算回路に転送され、当該制御値記憶演算回路に保持された値を更新増加させる一方、
当該押しボタンスイッチのDOWNボタンを押すと減少方向への変更値が前記制御値記憶演算回路に転送され、当該制御値記憶演算回路に保持された前記値を更新減少させることにより目標値設定される、
ことを特徴とする請求項1に記載の高圧負荷演算制御方法。 - 前記高圧負荷演算制御方法は、
高圧負荷状態において、前記抵抗体バンク群内の、開閉頻度の高い小容量の抵抗体バンクに対し、変圧手段を用いて低圧に変換し、
高圧抵抗体バンク群と、低圧抵抗体バンク群を共用利用することを可能とする、
ことを特徴とする、請求項1又は2に記載の高圧負荷演算制御方法。 - 前記分割した等級数Nは、
7等級であって、前記抵抗体バンク群の全最大電力容量を2進法に基づき2分の1から128分の1まで7等級に分割する、
ことを特徴とする、請求項1、2又は3に記載の高圧負荷演算制御方法。 - 前記抵抗体バンク群の前記全最大電力容量は、
前記分割した等級数Nのうち、必要な同等級の前記抵抗体バンクを複数並設して増加変更可能とする、
ことを特徴とする、請求項1、2、3又は4に記載の高圧負荷演算制御方法。 - 発電機の負荷特性試験に関して、抵抗体バンク群を複数に分割するに際し、全抵抗体の電力容量を比較演算で上位から下位等級に順次漸減算出された各抵抗体バンクに分割、割り当てし、設定目標とする負荷制御値の近似値をとるため上位から下位等級に亙り順次前記各抵抗体バンクのON/OFFの組合せを自動的に選択して加減算出することにより、負荷制御値を連続的に追従調整する高圧負荷演算制御装置であって、
電源装置に接続した電力ケーブル端に並列接続した抵抗体バンクを2以上(2〜N[Nは自然数])に分割するため、当該抵抗体バンク群の全電力容量を上位から下位等級に順次漸減算出して分割割り当てした複数の抵抗体バンクと、
当該抵抗体バンク群の各抵抗体バンクそれぞれに介接し、当該各抵抗体バンクのON/OFFの切換を行う開閉器と、
設定された前記負荷制御値を記憶してアナログ転送する制御値記憶演算回路と、当該制御値記憶演算回路より転送されてきた当該負荷制御値と前記各第1から第Nの抵抗体バンクに対応した当該各抵抗体バンクと前記電力容量との比較、減算を行う第1から第Nに亙る逐次演算を実行するとともに、当該演算にて算出されたディジタル信号を各対応する前記開閉器に転送して開閉実行する比較演算転送回路とを有する制御器と、
前記制御値記憶演算回路内に設定保持された負荷制御値に対して増加方向へ当該負荷制御値を変更させるアナログ値を発信するUPボタンと、減少方向へ当該負荷制御値を変更させるアナログ値を発信するDOWNボタンを有する押しボタンスイッチと、を具備する、
ことを特徴とする高圧負荷演算制御装置。 - 前記抵抗体バンク群の前記各第1から第Nの各抵抗体バンクは、
全最大電力容量を2進法に基づく2分の1から2 n−1 分の1[nは自然数]に相当する前記電力容量を保持する、
ことを特徴とする、請求項6に記載の高圧負荷演算制御装置。 - 前記制御器は、
前記押しボタンスイッチにより更新可能に加減調整された前記負荷制御値の値を検出可能なデジタル表示する制御値計測器を有する、
ことを特徴とする、請求項6に記載の高圧負荷演算制御装置。 - 前記高圧負荷演算制御装置は、
高圧負荷環境下において、前記抵抗体バンク群内の下位電力容量を保持する複数の各抵抗体バンクに変圧器を介設し、当該変圧器を介設した当該各抵抗体バンクを低圧抵抗体バンク群として利用可能とするとともに、
前記変圧器を介設しない高圧抵抗体バンク群と、前記変圧器を介設した低圧抵抗体バンク群とを併設利用可能とする、
ことを特徴とする請求項6に記載の高圧負荷演算制御装置。 - 前記分割した等級数Nは、
7等級であって、前記全最大電力容量の1/2、1/4、1/8、1/16、1/32、1/64、1/128の電力容量を各等級は分割保持する、
ことを特徴とする請求項7、8又は9に記載の高圧負荷演算制御装置。 - 前記抵抗体バンク群は、
前記分割した等級Nの内、必要な同等級の抵抗体バンクを複数並設する、
ことを特徴とする請求項6、7、8又は9に記載の高圧負荷演算制御装置。 - 前記電力ケーブルは、
途中に介接した主遮断機を挟んで負荷側に過電流継電器及び電流計を、かつ電源側に地絡継電器及び電圧計をさらに当該電流計と当該電圧計を跨いで電力計をそれぞれ接続する、
ことを特徴とする請求項6、7、8、9、10又は11に記載の高圧負荷演算制御装置。
Priority Applications (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005167774A JP4385007B2 (ja) | 2005-06-08 | 2005-06-08 | 高圧負荷演算制御方法及び装置 |
PCT/JP2006/310794 WO2006132113A1 (ja) | 2005-06-08 | 2006-05-30 | 負荷演算制御方法及び装置 |
US11/921,258 US8108162B2 (en) | 2005-06-08 | 2006-05-30 | Load calculation control method and apparatus |
CA2610426A CA2610426C (en) | 2005-06-08 | 2006-05-30 | Load calculation control method and apparatus |
AU2006256245A AU2006256245B2 (en) | 2005-06-08 | 2006-05-30 | Load calculation control method and apparatus |
KR1020077028437A KR101160965B1 (ko) | 2005-06-08 | 2006-05-30 | 부하 연산 제어 방법 및 장치 |
EP06747022.9A EP1895311B1 (en) | 2005-06-08 | 2006-05-30 | Load calculation control method and apparatus |
CN2006800204731A CN101194174B (zh) | 2005-06-08 | 2006-05-30 | 负载运算控制方法和装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005167774A JP4385007B2 (ja) | 2005-06-08 | 2005-06-08 | 高圧負荷演算制御方法及び装置 |
Related Child Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2006175011A Division JP2006343340A (ja) | 2006-06-26 | 2006-06-26 | 低圧負荷演算制御方法及び装置 |
JP2006175012A Division JP2006343341A (ja) | 2006-06-26 | 2006-06-26 | 高圧負荷演算制御方法及び装置 |
JP2006175010A Division JP2006343339A (ja) | 2006-06-26 | 2006-06-26 | 低圧負荷演算制御方法及び装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006343169A JP2006343169A (ja) | 2006-12-21 |
JP4385007B2 true JP4385007B2 (ja) | 2009-12-16 |
Family
ID=37498315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005167774A Active JP4385007B2 (ja) | 2005-06-08 | 2005-06-08 | 高圧負荷演算制御方法及び装置 |
Country Status (8)
Country | Link |
---|---|
US (1) | US8108162B2 (ja) |
EP (1) | EP1895311B1 (ja) |
JP (1) | JP4385007B2 (ja) |
KR (1) | KR101160965B1 (ja) |
CN (1) | CN101194174B (ja) |
AU (1) | AU2006256245B2 (ja) |
CA (1) | CA2610426C (ja) |
WO (1) | WO2006132113A1 (ja) |
Families Citing this family (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100488402C (zh) * | 2004-04-23 | 2009-05-20 | 松下电工株式会社 | 带有静电雾化器的加热送风装置 |
US8810354B2 (en) * | 2013-01-10 | 2014-08-19 | Eaton Corporation | Binary coded decimal resistive load and network |
US9385575B2 (en) | 2013-05-15 | 2016-07-05 | Kohler Co. | Cooling and control of a load bank used in a power generation system |
CA2931080C (en) * | 2014-02-24 | 2017-01-17 | Tatsumi Ryoki Co., Ltd | Load testing apparatus and coupling switch unit for load testing apparatus |
TWM506415U (zh) * | 2015-01-06 | 2015-08-01 | Digipower Mfg Inc | 適用於量測充電線阻抗的行動電源裝置 |
US9945909B2 (en) | 2015-02-25 | 2018-04-17 | Onesubsea Ip Uk Limited | Monitoring multiple subsea electric motors |
US10026537B2 (en) | 2015-02-25 | 2018-07-17 | Onesubsea Ip Uk Limited | Fault tolerant subsea transformer |
US20160247618A1 (en) * | 2015-02-25 | 2016-08-25 | Onesubsea Ip Uk Limited | Subsea transformer with integrated high resistance ground |
US10065714B2 (en) | 2015-02-25 | 2018-09-04 | Onesubsea Ip Uk Limited | In-situ testing of subsea power components |
US10185295B2 (en) * | 2015-09-30 | 2019-01-22 | Osram Sylvania Inc. | Dynamic control of switching frequency in a switch mode power converter |
CN105319504B (zh) * | 2015-11-11 | 2018-05-18 | 中国船舶重工集团公司第七〇三研究所无锡分部 | 干式负载装置的档位控制方法 |
EP3627165A4 (en) * | 2017-05-16 | 2020-12-02 | Tatsumi Ryoki Co., Ltd | CHARGING SYSTEM, CHARGING TEST DEVICE AND COMMUNICATION TERMINAL |
DE102018218785A1 (de) * | 2018-11-05 | 2020-05-07 | Volkswagen Aktiengesellschaft | Schaltungseinheit und Verfahren zur Steuerung von Lastströmen |
US10274542B1 (en) | 2018-11-27 | 2019-04-30 | Professional Generator Testers LLC | Electrical generator testing appliance |
CN109696629A (zh) * | 2018-12-21 | 2019-04-30 | 中广核研究院有限公司 | 核电厂柴油发电机组试验方法 |
KR102037791B1 (ko) * | 2019-02-08 | 2019-10-29 | 주식회사 코윈파워 | 고압 차단기의 동작 전압과 전류를 측정하여 동작상태 확인과 dc 축전지 전원의 임피던스를 산출하는 장치 |
KR102196879B1 (ko) * | 2019-03-20 | 2020-12-30 | 최철용 | 복수의 전력제어기기가 포함된 전력제어시스템 및 방법 |
CN114839561B (zh) * | 2022-04-24 | 2023-09-29 | 江苏新航电气有限公司 | 一种提高用于检测高压岸电电源的干式负载试验设备精度的方法 |
CN115792471B (zh) * | 2023-01-29 | 2023-04-28 | 深圳市创世富尔电子有限公司 | 电子变压器测试方法、装置、计算机设备和存储介质 |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4692686A (en) * | 1985-08-20 | 1987-09-08 | Thomas Charles E | Low-distortion line voltage regulator |
JPH077016B2 (ja) * | 1986-03-06 | 1995-01-30 | 理研電子株式会社 | 電圧測定器用分圧器 |
JPH0810774B2 (ja) | 1986-07-01 | 1996-01-31 | 三菱電機株式会社 | トランジスタ素子 |
JP2553768B2 (ja) | 1990-12-19 | 1996-11-13 | サンユー工業株式会社 | ディジタル可変抵抗器 |
JP2994144B2 (ja) | 1992-07-21 | 1999-12-27 | 株式会社辰巳菱機 | 切り替え型負荷器セット |
JPH0750204A (ja) | 1993-08-09 | 1995-02-21 | Hitachi Ltd | デジタル制御式可変抵抗器 |
US5521266A (en) | 1994-10-28 | 1996-05-28 | Rohm And Haas Company | Method for forming polymers |
US5747972A (en) * | 1995-01-11 | 1998-05-05 | Microplanet Ltd. | Method and apparatus for electronic power control |
JP4106471B2 (ja) * | 1998-11-24 | 2008-06-25 | 三井造船マシナリー・サービス株式会社 | 負荷試験装置 |
AU781869B2 (en) * | 1999-12-02 | 2005-06-16 | Tatsumi Corporation | Dry load test apparatus |
JP2001237249A (ja) * | 2000-02-21 | 2001-08-31 | Hitachi Ltd | 半導体装置およびその製造方法 |
JP3917853B2 (ja) | 2001-12-18 | 2007-05-23 | 日本バイリーン株式会社 | 回路基板用基材及びこれを用いた回路基板 |
JP4834248B2 (ja) | 2001-07-24 | 2011-12-14 | サクサプレシジョン株式会社 | 遊技機用安定化電源装置 |
US6987678B2 (en) * | 2002-10-23 | 2006-01-17 | International Rectifier Corporation | Switching voltage regulator for switch mode power supply with planar transformer |
US7049795B2 (en) * | 2003-06-13 | 2006-05-23 | Beckwith Robert W | Underload tapchanging voltage regulators for ease of field replacement and for improved operator safety |
JP3853307B2 (ja) * | 2003-07-08 | 2006-12-06 | 株式会社興研 | 乾式高圧負荷システム装置及び同装置の連鎖断線・アーク放電防止方法 |
-
2005
- 2005-06-08 JP JP2005167774A patent/JP4385007B2/ja active Active
-
2006
- 2006-05-30 CA CA2610426A patent/CA2610426C/en not_active Expired - Fee Related
- 2006-05-30 US US11/921,258 patent/US8108162B2/en not_active Expired - Fee Related
- 2006-05-30 EP EP06747022.9A patent/EP1895311B1/en not_active Not-in-force
- 2006-05-30 KR KR1020077028437A patent/KR101160965B1/ko active IP Right Grant
- 2006-05-30 WO PCT/JP2006/310794 patent/WO2006132113A1/ja active Application Filing
- 2006-05-30 CN CN2006800204731A patent/CN101194174B/zh not_active Expired - Fee Related
- 2006-05-30 AU AU2006256245A patent/AU2006256245B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
EP1895311B1 (en) | 2015-11-11 |
CA2610426C (en) | 2013-10-15 |
CN101194174B (zh) | 2012-11-21 |
JP2006343169A (ja) | 2006-12-21 |
AU2006256245B2 (en) | 2010-12-02 |
KR20080033162A (ko) | 2008-04-16 |
WO2006132113A1 (ja) | 2006-12-14 |
EP1895311A4 (en) | 2013-03-06 |
EP1895311A1 (en) | 2008-03-05 |
KR101160965B1 (ko) | 2012-07-03 |
AU2006256245A1 (en) | 2006-12-14 |
US8108162B2 (en) | 2012-01-31 |
US20090234600A1 (en) | 2009-09-17 |
CN101194174A (zh) | 2008-06-04 |
CA2610426A1 (en) | 2006-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4385007B2 (ja) | 高圧負荷演算制御方法及び装置 | |
US4677363A (en) | Method of and apparatus for monitoring the state of charge of a rechargeable battery | |
JP6382453B2 (ja) | 電池監視装置 | |
CN112182846B (zh) | 一种分接开关的在线监测和诊断方法、装置及存储介质 | |
US20150168478A1 (en) | Method and apparatus for measuring load tap changer characteristics | |
KR940701546A (ko) | 배터리를 충전하고 테스트하는 방법 및 장치 | |
RU174066U1 (ru) | Устройство для проверки реле | |
CN101782638B (zh) | 一次测多只电流互感器的校验装置及方法 | |
CN101769963A (zh) | 一种线间绝缘测试系统 | |
KR101286747B1 (ko) | 로드뱅크 병렬제어시스템의 부하투입 제어방법 | |
KR101761023B1 (ko) | 배터리 모의 장치, 모의 방법 및 이를 이용한 모의 시스템 | |
KR20180006264A (ko) | 배터리 모의 장치 및 배터리 모의 방법 | |
CN118131110B (zh) | 一种电压互感器误差特性模拟试验平台及其试验方法 | |
JP2006343341A (ja) | 高圧負荷演算制御方法及び装置 | |
JP2006343340A (ja) | 低圧負荷演算制御方法及び装置 | |
JP2006343339A (ja) | 低圧負荷演算制御方法及び装置 | |
US4152640A (en) | Two phase high voltage insulation testing of multiphase windings | |
GB2269019A (en) | Testing batteries | |
US2758275A (en) | Battery testing apparatus | |
DE1010161B (de) | Geraet zur wahlweisen Vornahme von Durchgangs- und Isolationsmessungen an elektrischen Leitungen und Geraeten | |
US2432068A (en) | Battery testing and charging system | |
KR101812610B1 (ko) | 고전압 배터리의 내부저항 측정방법 | |
JP2020010445A (ja) | シミュレーション装置 | |
RU2813345C1 (ru) | Способ проверки характеристик аккумуляторных батарей и устройство для его реализации | |
RU2284536C1 (ru) | Устройство для определения коэффициента трансформации трехфазных трансформаторов |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050608 |
|
RD13 | Notification of appointment of power of sub attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7433 Effective date: 20060515 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060516 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060626 Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060626 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060627 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080826 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20081024 |
|
A602 | Written permission of extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A602 Effective date: 20081029 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081125 |
|
RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20081212 |
|
RD14 | Notification of resignation of power of sub attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7434 Effective date: 20081212 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090106 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090309 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090901 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090928 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20251002 Year of fee payment: 16 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |