JP4259724B2 - Tunnel lining wall structure for branch pipe branching - Google Patents
Tunnel lining wall structure for branch pipe branching Download PDFInfo
- Publication number
- JP4259724B2 JP4259724B2 JP2000137051A JP2000137051A JP4259724B2 JP 4259724 B2 JP4259724 B2 JP 4259724B2 JP 2000137051 A JP2000137051 A JP 2000137051A JP 2000137051 A JP2000137051 A JP 2000137051A JP 4259724 B2 JP4259724 B2 JP 4259724B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- pipe
- main
- branch
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は下水道管渠などの本管のトンネル覆工時において、該本管の一部に枝管を接続させるために設けられた枝管分岐用トンネル覆工壁構造に関するものである。
【0002】
【従来の技術】
シールド工事によって下水道管渠の本管を敷設する場合、この本管に雨水等を流入させるための枝管の接続部となる枝管分岐用覆工壁を形成する必要がある。本管は通常、トンネル掘削壁面にコンクリート製セグメントによる一次覆工を施したのち、内面を平滑な仕上げ面に形成したり一次覆工の蛇行修正等の目的のために二次覆工を施すことによって形成されているが、この本管の一部を枝管分岐用覆工壁に使用して該枝管分岐用覆工壁の一部を切断することにより枝管を合流させるための分岐口を形成すると、枝管分岐用覆工壁の剛性が低下して周囲の土圧や水圧に耐えることができない。そのため、従来から、一次覆工に二次覆工を加えた厚みの範囲内で鋼材等により補強を行っている。即ち、上記枝管分岐用覆工壁における二次覆工の内面が下水管として使用する本管のトンネル部分であるから、この覆工全体の厚みの中で補強している。
【0003】
図15、図16はその補強構造を示すもので、枝管分岐用覆工壁Aに開口すべき枝管Bの計画分岐口bを挟んで一次覆工A1の内周面に接してH形鋼からなるリング状の前後主桁C、Cを設置し、この前後の主桁C、C間に上記計画分岐口bの部分を除いてH形鋼からなる複数本の梁部材Dを周方向に所定間隔毎に介在させてこれらの梁部材Dの前後両端面を上記前後主桁C、Cのリング状対向面に固着させてなり、この補強構造によって枝管分岐用覆工壁全体の剛性を高めて周囲の土圧や水圧に対抗させている。
【0004】
【発明が解決しようとする課題】
しかしながら、近年、下水道管渠を対象としたシールド工事においては、二次覆工を省略することによってシールド掘削機による掘削断面を減少させ、覆工面積と共に掘削土砂量を減少させて工期の短縮とコストダウンを図ることが行われている。この場合、コンクリート製セグメントを使用して二次覆工を省略し、一次覆工のみで下水道管渠の本管を施工するものであるが、上記枝管分岐用覆工壁の施工部分においては、コンクリート製セグメントに代えて鋼製セグメントを使用し、該鋼製セグメントを複数個、トンネル周方向に連結してリング状の覆工壁を形成すると共にこの覆工壁をトンネル長さ方向に連結して枝管分岐用覆工壁を形成している。
【0005】
この枝管分岐用覆工壁の一部を切除することにより枝管を合流させるための分岐口を形成すると、枝管分岐用覆工壁全体の剛性が低下して土圧や水圧に耐えることができなくなるので、枝管分岐用覆工壁を鋼材等によって補強しておく必要があるが、補強構造としては上記従来構造のものを採用しようとしても、リング状の前後主桁C、Cや梁部材Dがトンネル覆工の内周面からトンネル内に突出した構造となって一部覆工のみからなる下水道管渠の本管の枝管分岐用覆工壁に採用することができないという問題点がある。
【0006】
本発明はこのような問題点に鑑みてなされたもので、一次覆工のみで施工される下水道管渠等の本管の一部に鋼製セグメントによって所定の強度を発揮し得る枝管分岐用覆工壁を正確且つ能率よく施工し得る枝管分岐用トンネル覆工壁の構造を提供することを目的とするものである。
【0007】
【課題を解決するための手段】
上記目的を達成するために、本発明の枝管分岐用トンネル覆工壁構造は、請求項1に記載したように、シールド掘削機によって掘削されるトンネルの内周面にコンクリートセグメントによる一次覆工のみで施工される本管の一部に、該本管から分岐させる枝管の分岐口を形成するために施工された枝管分岐用トンネル覆工壁であって、スキンプレートの前後両端縁に主桁を固着すると共にこれらの主桁の両端間に継手板を固着し且つ上記前後主桁の対向面間に複数本の補強リブを固着することによって形成されたトンネル周方向に円弧状に湾曲してなる矩形状の鋼製セグメントを複数個、外周面を上記本管の外周面と面一に連続させた状態にしてトンネル周方向に組み立てることにより本管よりも薄肉のリング状のトンネル覆工体を形成し、このトンネル覆工体を複数リング、トンネル長さ方向に隣接する鋼製セグメントの継手板及び補強リブをトンネル長さ方向に一直線状に配した状態にして連結することにより枝管の計画分岐口の径よりも長いトンネル覆工壁に形成してあり、さらに、一直線状に配した隣接する鋼製セグメントの継手板間と補強リブ間の少なくとも一方を添接板によって一体に連結、固着していると共に上記枝管の計画分岐口を挟むようにして配設されている鋼製セグメントの主桁を、これらの主桁間に設けられている鋼製セグメントの主桁よりも肉厚に形成してあり、枝管の分岐口形成後には該分岐口以外の上記トンネル覆工壁の内周面に、本管の内周面と面一状に連続するように短管形状の鋼管ライニングを施工するように構成している。
【0008】
【作用】
シールド掘削機によって掘削されるトンネルの内周面にコンクリート製セグメントを組み立てることによって下水道管渠等の本管を施工し、枝管の計画分岐口を形成すべき本管の一部には、上記コンクリート製セグメントに代えて鋼製セグメントを用いて枝管分岐用覆工壁を施工する。この際、複数個の鋼製セグメントによってリング状のトンネル覆工体を形成すると共にこのトンネル覆工体をトンネル長さ方向に連結することによって枝管の上記計画分岐口の径よりも長い枝管分岐用トンネル覆工壁を形成する。この覆工壁の形成時においては、前後に隣接する鋼製セグメント同士がその継手板及び補強リブを互いにトンネル長さ方向に一直線状に配設されるように組み立てておき、組立後に、前後に隣接する鋼製セグメントにおけるトンネル長さ方向に対向した継手板間又は補強リブ間、或いはこれらの継手板間と補強リブ間とを一体に連結、固着する。
【0009】
このように、前後の鋼製セグメントの継手板間と補強リブ間との少なくとも一方を一体に連結、固着すると、複数本の継手板又は補強リブがトンネル長さ方向に連続した一本の長い梁状構造となって、計画分岐口を挟んでその両側に設けられた鋼製セグメントの主桁を支点とする該梁状に形成された継手板又は補強リブの曲げ剛性が増大し、スキンプレートに作用する土圧や水圧に十分に対抗し得る枝管分岐用トンネル覆工壁を構築することができる。
【0010】
この枝管分岐用トンネル覆工壁において、枝管の計画分岐口を挟むようにして配設されている上記鋼製セグメントの主桁を、これらの主桁間に設けられている鋼製セグメントの主桁よりも肉厚に形成しておくことによって上記一本の梁状に形成された継手板又は補強リブの両端部をその肉厚の主桁によって強固に支持させることができる。
【0011】
さらに、鋼製セグメントに設けている上記補強リブを、ウエブ部と該ウエブ部の先端面に一定幅と厚みを有するフランジ部を一体に設けてなる断面T字形状に形成しておくことによって上記剛性をさらに高めることができ、その上、この補強リブの高さを主桁の高さに略等しく形成しておくことによって、隣接する鋼製セグメントの互いに接合した主桁を乗り越えてこれらの鋼製セグメントの補強リブにおけるフランジ部間を添接板により簡単且つ確実に固着することができ、本管を構成しているコンクリート製セグメントの厚み範囲内において、耐圧性に優れた枝管分岐用トンネル覆工壁を能率よく築造することができる。
【0012】
【発明の実施の形態】
次に、本発明の具体的な実施の形態を図面について説明すると、図1〜図3において、1は下水道管渠の本管2において、該本管2から分岐させる枝管3の分岐口を形成すべき部分(以下、計画分岐口4とする)に築造している枝管分岐用トンネル覆工壁であって、トンネル周方向に円弧状に湾曲してなる矩形状の鋼製セグメント10を複数個、トンネル周方向に組み立てることによってリング状のトンネル覆工体1Aを形成すると共にこのトンネル覆工体1Aを複数リング、トンネル長さ方向に連結することによって形成されているものであり、その覆工長は計画分岐口4の径よりも長く形成されている。
【0013】
上記鋼製セグメント10は、図4に示すようにトンネルTの周方向に湾曲した矩形状のスキンプレート11と、このスキンプレート11におけるトンネル内側に面した円弧面の前後両端縁に全長に亘って立設、固着している円弧状に湾曲した一定高さを有する主桁12、13と、スキンプレート11における互いに平行な直状の両側端縁に立設、固着し且つその両端を上記前後主桁12、13の両端にそれぞれ固着してなる継手板14、15と、これらの継手板14、15間におけるスキンプレート11の上記円弧面上に継手板14、15と平行にして円弧方向に一定間隔毎に立設、固着してなる複数枚の鋼板製補強リブ16とからなり、これらの補強リブ16は上記主桁12、13と同一高さに形成されていると共にその長さ方向をトンネル長さ方向に向けて両端面を主桁12、13の対向面に溶接によって一体に固着している。なお、主桁12、13と継手板14、15には長さ方向に一定間隔毎にボルト挿通孔17、18がそれぞれ設けられている。
【0014】
補強リブ16の形状としては、断面I字状の横長長方形板より形成しておいてもよいが、図に示すように、スキンプレート11に固着した一定厚みと高さを有するウエブ部16a とこのウエブ部16a の先端面、即ち、トンネル内側に向けて突出した突出端面に一定幅と厚みを有するフランジ部16b を一体に形成してなる断面T字形状に形成されてあり、トンネル側に面したフランジ部16b の天面を主桁12、13や補強リブ16の先端面と面一にしている。さらに、これらの補強リブ16におけるフランジ部16b の長さ方向の両端部、即ち、前後端部に複数個のボルト取付孔19を設けている。
【0015】
また、上記継手板14、15においても、その先端部に上記補強リブ16におけるフランジ部16b の1/2の幅を有するフランジ部14a 、15a をスキンプレート11の端部上に向けてそれぞれ一体に固着して断面L字状に形成してあり、これらのフランジ部14a 、15a の天面、即ち、トンネル内側に向けた面を主桁12、13の先端面に面一に形成していると共にその長さ方向の両端部に複数個のボルト取付孔20を設けている。
【0016】
さらに、鋼製セグメントを複数個、トンネル周方向に組み合わせて上記リング状のトンネル覆工体1Aを形成する場合、最後に組み合わせる鋼製のキーセグメント10A は図5、図6に示すように、そのスキンプレート11' 及び主桁12' 、13' の円弧長を上記鋼製セグメント10のスキンプレート11及び主桁12、13よりも短く形成されている共にその両側継手板14’、15’はスキンプレート11A 側から先端に向かって互いにこれらの継手板14’、15’の間隔が拡がる方向に傾斜させている。従って、このキーセグメント10A のトンネル周方向の両側に組み立てられる鋼製セグメント10B 、10B は、キーセグメント10A の上記継手板14’、15’と接合する継手板14、15を図7、図8に示すようにこれらの継手板14’、15’と同一傾斜角度でもってスキンプレート11側から先端に向かって内方に傾斜させているものである。
【0017】
なお、互いに接合させるこれらの継手板14、14’、15、15’の先端に一体に設けているフランジ部14a 、14a'、15a 、15a'は、継手板に対して直角に連設させておいてもよいが、図9に示すように、主桁12、12' 、13、13' の先端面に対して略面一となるように継手板14、14’、15、15に対してそれぞれ所定の角度でもって屈折させた断面形状に形成しておいてもよい。また、上記キーセグメント10A は、他の鋼製セグメント10と異なってそのスキンプレート11’の中央部にのみ1本の補強リブ16を立設、固着した構造としている。その他の構造については上記鋼製セグメント10と同じであるので、同一部分には同一符号を付してその説明を省略する。
【0018】
このように構成した鋼製セグメント10、10B とキーセグメント10A を用いて上記リング状のトンネル覆工体1Aを組み立てるには、シールド掘削機によって掘削されたトンネル壁面にコンクリート製セグメント2Aの組立てによる一次覆工のみによって本管2を築造していく途上において、本管2が枝管3の計画分岐口4に達した時に、コンクリート製セグメント2Aによる一次覆工に引き続いてトンネル掘削壁面に複数個の鋼製セグメント10、10B及びキーセグメント10A を順次接合、連結することによって行われる。
【0019】
即ち、図1に示すようにまず、トンネル掘削壁面の下部に鋼製セグメント10、10を互いにその対向する継手板14、15を接合すると共にこれらの継手板14、15に設けられているボルト挿通孔18、18間を図10に示すようにボルト21、ナット22によって固着することによりトンネル周方向に一体に連結したのち、これらの鋼製セグメント10、10に次の鋼製セグメント10、10を上記同様にして対向する継手板14、15を接合させてボルト21、ナット22により一体に連結し、さらに、鋼製セグメント10B 、10B をトンネル周方向に連結したのち、最後に、キーセグメント10A をこれらの鋼製セグメント10B 、10B 間に挿入して互いに接合した継手板14、14’、15、15’を図8に示すようにボルト21とナット22で連結することによりトンネル覆工体1Aを形成する。
【0020】
この1リング分のトンネル覆工体1Aの形成後、再び、同様にして該トンネル覆工体1Aに隣接して次のトンネル覆工体1Aを形成し、互いに接合した前後主桁12、13に設けているボルト挿通孔17、17間をボルト、ナット(図示せず)で固着することによってこれらのトンネル覆工体1A、1Aを一体に連結する。この際、トンネル覆工体1A、1Aにおける前後に隣接して連結した鋼製セグメント10、10は、互いに周方向にずらして配設されることなく図2に示すように、トンネル長さ方向に並列した状態、即ち、継手板14、15や補強リブ16がトンネル長さ方向に一直線状に配した所謂、いも継ぎ状態に連結する。以下、同様にして複数リングのトンネル覆工体1Aをトンネル長さ方向に順次連結することによって枝管3の計画分岐口4の径よりも長い枝管分岐用トンネル覆工壁1を築造するものである。
【0021】
さらに、この枝管分岐用トンネル覆工壁1を築造する際に、前後に連結した鋼製セグメント10、10における互いに一直線状に対向した一方の鋼製セグメント10の継手板14、15と他方の鋼製セグメント10の継手板14、15の端部間、及び、補強リブ16の対向端部間を一体に連結、固着する。この固着手段としては、図11、図12に示すように補強リブ16のフランジ部16b の幅に略等しい幅を有し且つ長さが対向する補強リブ16、16の端部を被覆し得る適宜な長さに形成された長方形状の添接板5を使用する。添接板には図8、図10、図13に示すように、継手板14、15や補強リブ16のフランジ部14a 、15a 、16b に設けている複数個のボルト取付孔19、20に合致する複数個のボルト取付孔6が設けられている。
【0022】
この添接板5を前後に隣接した鋼製セグメント10、10における互いにトンネル長さ方向に対向した補強リブ16、16の端部間上に前後鋼製セグメント10、10の接合した主桁12、13の先端面上を介して当てがい、そのボルト取付孔6と補強リブ16、16に設けているボルト取付孔19とにボルト21を挿通し、ナット22を螺締することによって前後の補強リブ16、16間を一体に連結、固着する。この際、鋼製セグメント10の前後主桁12、13と補強リブ16のフランジ部16b の高さを等しくしているので、添接板5を主桁12、13の先端面から前後の補強リブ16、16のフランジ部16b 、16b 上に亘って当接させることができ、主桁12、13によって分断されている前後に隣接する鋼製セグメント10、10の補強リブ16、16をこの添接板5によって1本の長い梁状に連結、一体化する。
【0023】
さらに、前後に隣接するキーセグメント10A 、10A 及び鋼製セグメント10B 、10B における一直線状に対向した補強リブ16、16の端部間も添接板5によって一体に連結する。同様に、隣接する鋼製セグメント10、10B 及びキーセグメント10A における継手板14、14'、15、15' 間を添接板5によって一体に連結する。この継手板同士の連結は、トンネル周方向及び長さ方向に隣接した4方のセグメントの隅角部における継手板の対向端部間を添接板5によって一体に連結、固着される。
【0024】
即ち、添接板5の前半部両側面をトンネル長さ方向に隣接した鋼製セグメントの互いに接合した継手板におけるフランジ部上にそれぞれ当接させると共に該添接板5の後半部両側面を上記鋼製セグメントに周方向に隣接した前後の鋼製セグメントの互いに接合した継手板におけるフランジ部上にそれぞれ当接させ、フランジ部に設けているボルト取付孔20と添接板5のボルト取付孔6間をボルト21とナット22で連結することにより隣接する継手板14、14' 、15、15' を1本の長い梁状に連結、一体化するものである。
【0025】
なお、添接板5による前後に隣接した鋼製セグメントにおける補強リブ同士の連結と継手板同士の連結は、少なくともいずれか一方のみに行っておいてもよいが、この場合には、本数の多い補強リブ同士を連結、一体化しておくことが望ましい。また、添接板5による前後に隣接した鋼製セグメントの補強リブ間、継手板間の連結作業は、枝管3の計画分岐口4の径よりも長い枝管分岐用トンネル覆工壁1を築造したのちに行ってもよく、或いは、1リング分のトンネル覆工体1Aを形成する毎に、このトンネル覆工体1Aと先に形成したトンネル覆工体1Aとに順次、行ってもよい。
【0026】
さらに、添接板5によって補強リブ16、16を順次、トンネル長さ方向に一直線状に連結することによって形成してなる一本の梁状部材の全長は、枝管3の計画分岐口4の径よりも長く、この梁状部材の両端部、即ち、計画分岐口4の径よりも外側(トンネル長さ方向の前後側)に突出する鋼製セグメント(キーセグメントを含む)10、10A 、10B における補強リブ16、16の端部は、枝管3の計画分岐口4を前後から挟むようにして配設されているトンネル周方向にリング状に連なったこれらの鋼製セグメントの主桁12' 、13' に一体に固着してあり、この主桁12' 、13' は、図2に示すようにこれらの主桁12、13間に配設されている他の鋼製セグメントの主桁12、13よりも肉厚に形成されている。
【0027】
従って、トンネル長さ方向に連結してなる複数本の補強リブ16により構成した上記梁状部材の両端は、前後に間隔を存して枝管3の計画分岐口4を前後から挟むようにして配設されている上記鋼製セグメントのリング状に連なった肉厚の主桁12' 、13' によって強固に支持され、且つこの梁状部材を構成している長さ方向に連結した補強リブ16、16の対向端部間が添接板5によって一体に連結しているので、梁状部材が全長に亘って大きな耐曲げ力を発揮してスキンプレート11に作用する土圧や水圧を確実に支持することができるものである。即ち、補強リブ16が断面T字状に形成しているので大きな曲げ剛性を発揮し、補強リブ16、16間を連結、一体化させている添接板5は大きな耐引張力を奏してスキンプレートに作用する土圧や水圧に十分に対抗し得る枝管分岐用トンネル覆工壁1を構築することができる。
【0028】
この枝管分岐用トンネル覆工壁1を所定部位に設けている本管2は、シールド掘削機によって掘削されたトンネルの掘削壁面に、図3に示すように亀甲形状のコンクリートセグメント2Aを組み立てることによって形成されてあり、この本管2と上記枝管分岐用トンネル覆工壁1との連設部には、主桁間の補強リブとしてフランジ部を設けていない通常の鋼製セグメント7をリング状に組み合わせてなるトンネル覆工体1Bが介在してあり、このトンネル覆工体1Bの前後端面を枝管分岐用トンネル覆工壁1と本管2との対向端面に一体に連結、固着している。なお、鋼製セグメントからなるトンネル覆工体1A、1Bの厚みは本管2よりも薄肉に形成されてあり、本管2とその外周面を面一に連続させて施工されている。
【0029】
枝管3は地上から或いは立坑内から上記枝管分岐用トンネル覆工壁1に向かって推進工法により地中に推進、埋設され、その先端に装着している刃口8(図1に示す)によって地盤を掘削しながら枝管分岐用トンネル覆工壁1に到達すると、この枝管3の開口端面に対向した枝管分岐用トンネル覆工壁1の一部、即ち、計画分岐口4をトンネル内からガスバーナ等によって切断して分岐口4Aを開口させ、この分岐口4Aに枝管2の先端部を連結、連通させることによって本管2から枝管3を分岐させた下水道管渠を構成するものである。
【0030】
枝管分岐用トンネル覆工壁1に分岐口4Aを開設しても、該分岐口4A以外の壁部分は、上述したように該分岐口4Aを挟んでリング状に形成している肉厚の主桁12、13に両端を一体に連結、固着され、且つ対向端部を添接板5によって一体に連結、固着されている補強リブ16により、土圧や水圧に耐える覆工壁を維持することができる。なお、枝管3が枝管分岐用トンネル覆工壁1に達する前に、予め、計画分岐口4部分の地盤中に薬液等を注入して止水処理を施しておく。
【0031】
こうして、枝管分岐用トンネル覆工壁1に枝管3を連通させた分岐口4Aを形成したのち、分岐口4A以外の枝管分岐用トンネル覆工壁1の内周側に、図14に示すように本管2の内周面と面一状に連続するように短管形状の鋼管ライニング8を組み込む。この鋼管ライニング8はその内径が本管2の内径と同径に形成されていると共に外周面の複数箇所に先端が枝管分岐用トンネル覆工壁1を構成している鋼製セグメント10、10A 、10B のスキンプレート11の内面に達する長さを有する連結部材8aを突設してあり、これらの連結部材8aの先端をスキンプレート11の内面に溶接によって固着することにより施工されている。
【0032】
なお、この鋼管ラインニング8は、予め長さ方向に複数分割されてあり、上記分岐口4Aに対応した部分が切除された複数の分割ライニング部を互いに接合端面を溶接しながら組み立てることによって分岐口4Aと同一大きさで該分岐口4Aと対向状態で連通した開口部を形成するように構成していると共に、他のリング状に分割された鋼管ライニング部を枝管分岐用トンネル覆工壁1の内周面の前後部に対向させて互いに溶接によって一体に連接しながら組み込むことにより本管2の内周面に連続した鋼管ライニング8を形成している。
【0033】
この鋼管ライニング8の施工後、枝管分岐用トンネル覆工壁1を構成している鋼製セグメントのスキンプレート10の内面と、該鋼管ライニング8の外周面との間の空間部に上記分岐口4Aと開口部との間を残してモルタル9を充填、固化させることにより、分岐口4Aを本管2内に連通させたトンネル覆工壁を形成し、さらに、鋼管ライニング8の内周面にポリウレア樹脂を吹きつけることによって耐防食、耐磨耗層を形成している。このように、本管2はコンクリート製セグメント2aによる一次覆工のみによって構成され、枝管2を分岐、合流させる部分は一次覆工としての鋼製セグメントと、二次覆工としての鋼管ライニング8、モルタル9及びポリウレア樹脂の吹付層とによって構成している。
【0034】
【発明の効果】
以上のように本発明の枝管分岐用トンネル覆工壁構造によれば、シールド掘削機によって掘削されるトンネルの内周面にコンクリートセグメントによる一次覆工のみで施工される本管の一部に、該本管から分岐させる枝管の分岐口を形成するために施工された枝管分岐用トンネル覆工壁であって、複数個の鋼製セグメントによってリング状のトンネル覆工体を形成すると共にこのトンネル覆工体をトンネル長さ方向に連結することによって枝管の上記計画分岐口の径よりも長い枝管分岐用トンネル覆工壁を形成する際に、前後に隣接する鋼製セグメント同士がその継手板及び補強リブを互いにトンネル長さ方向に一直線状に配設されるように組み立てると共に、トンネル長さ方向に対向した隣接する鋼製セグメントの継手板間又は補強リブ間、或いはこれらの継手板間と補強リブ間とを一体に連結、固着してなる構造としているので、複数本の継手板又は補強リブがトンネル長さ方向に連続した一本の長い梁状構造となって、計画分岐口を挟んでその両側に設けられた鋼製セグメントの主桁を支点とする曲げ剛性が著しく増大し、一次覆工のみで施工される下水道管渠等の本管の厚み内で、スキンプレートに作用する土圧や水圧に十分に対抗し得る枝管分岐用トンネル覆工壁を正確且つ能率よく構築することができるものである。
【0035】
さらに、上記枝管の計画分岐口を挟むようにして配設されている上記鋼製セグメントの主桁を、これらの主桁間に設けられている鋼製セグメントの主桁よりも肉厚に形成しているので、上記一本の梁状に形成された継手板又は補強リブの両端部をその肉厚の主桁によって強固に支持させることができ、強度の大なる枝管分岐用トンネル覆工壁を形成することができる。
【0036】
また、鋼製セグメントに設けている上記補強リブを、ウエブ部と該ウエブ部の先端面に一定幅と厚みを有するフランジ部を一体に設けてなる断面T字形状に形成しておくことによって、上記剛性をさらに高めることができ、その上、この補強リブの高さを主桁の高さに略等しく形成しておくことによって、隣接する鋼製セグメントの互いに接合した主桁を乗り越えてこれらの鋼製セグメントの補強リブにおけるフランジ部間を添接板により簡単且つ確実に固着することができ、本管を構成しているコンクリート製セグメントの厚み範囲内において、耐圧性に優れた枝管分岐用トンネル覆工壁を能率よく築造することができるものである。
【図面の簡単な説明】
【図1】 枝管分岐用トンネル覆工壁の簡略縦断正面図、
【図2】 その一部切欠簡略側面図、
【図3】 本管と枝管分岐用トンネル覆工壁と枝管との連結状態を示す簡略平面図、
【図4】 鋼製セグメントの斜視図、
【図5】 キーセグメントの縦断正面図、
【図6】 その下面図、
【図7】 鋼製セグメントの縦断側面図、
【図8】 キーセグメントと鋼製セグメントとの連結部分の拡大縦断正面図、
【図9】 その別な構造を示す拡大縦断正面図、
【図10】 鋼製セグメント同士の連結部分の拡大縦断正面図、
【図11】 周方向及び長さ方向に連結した鋼製セグメントの簡略平面図、
【図12】 その縦断正面図、
【図13】 その一部分の拡大縦断正面図、
【図14】 枝管分岐用トンネル覆工壁の内側に鋼管ライニングを施工した状態を示す縦断側面図、
【図15】 従来例を示す簡略縦断正面図、
【図16】 その簡略縦断側面図。
【符号の説明】
1 枝管分岐用トンネル覆工壁
2 本管
3 枝管
4 計画分岐口
5 添接板
10 鋼製セグメント
11 スキンプレート
12、13 主桁
14、15 継手板
16 補強リブ
16a フランジ部[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a tunnel lining wall structure for branch pipe branching provided to connect a branch pipe to a part of the main pipe when lining the main pipe such as a sewer pipe.
[0002]
[Prior art]
When laying a main pipe of a sewer pipe by shield construction, it is necessary to form a branch pipe branching lining wall that serves as a branch pipe connection part for allowing rainwater or the like to flow into the main pipe. The main pipe is usually subjected to primary lining with concrete segments on the tunnel excavation wall, and then a secondary lining for purposes such as forming a smooth inner surface or correcting the meandering of the primary lining. The branch port for joining the branch pipes by using a part of the main pipe as a lining wall for branch pipe branching and cutting a part of the lining wall for branch pipe branching. If it is formed, the rigidity of the lining wall for branch pipe branching decreases, and it cannot withstand surrounding earth pressure and water pressure. Therefore, conventionally, reinforcement is performed with a steel material or the like within a thickness range obtained by adding a secondary lining to the primary lining. That is, since the inner surface of the secondary lining on the branch pipe branching lining wall is a tunnel portion of the main pipe used as a sewer pipe, it is reinforced within the thickness of the entire lining.
[0003]
FIG. 15 and FIG. 16 show the reinforcement structure, and it is in the shape of an H in contact with the inner peripheral surface of the primary lining A1 across the planned branch port b of the branch pipe B to be opened to the branch pipe branching lining wall A. Ring-shaped front and rear main girders C and C made of steel are installed, and a plurality of beam members D made of H-section steel are circumferentially removed between the front and rear main girders C and C except for the planned branch port b. The front and rear end surfaces of these beam members D are fixed to the ring-shaped opposing surfaces of the front and rear main girders C and C with a predetermined interval therebetween, and this reinforcing structure provides rigidity of the entire branch pipe branching lining wall. Is raised to counter the surrounding earth pressure and water pressure.
[0004]
[Problems to be solved by the invention]
However, in recent years, in shield construction for sewer pipes, the secondary excavation has been omitted to reduce the excavation cross section by the shield excavator, and the excavation sediment volume has been reduced along with the lining area. Costs are being reduced. In this case, the secondary lining is omitted using the concrete segment, and the main pipe of the sewer pipe is constructed only by the primary lining. The steel segment is used instead of the concrete segment, and a plurality of the steel segments are connected in the circumferential direction of the tunnel to form a ring-shaped lining wall and the lining wall is connected in the tunnel length direction. Thus, a lining wall for branch pipe branching is formed.
[0005]
If a branch port for joining the branch pipes is formed by cutting out a part of the branch pipe branching lining wall, the rigidity of the entire branch pipe branching lining wall is reduced to withstand earth pressure and water pressure. Therefore, it is necessary to reinforce the lining wall for branch pipe branching with a steel material or the like. However, even if the conventional structure is used as the reinforcing structure, the ring-shaped front and rear main girders C, C and The problem that the beam member D has a structure projecting from the inner peripheral surface of the tunnel lining into the tunnel and cannot be used as a lining wall for branch branch of a main pipe of a sewer pipe made only of a partial lining. There is a point.
[0006]
The present invention has been made in view of such problems, and for branch pipe branching that can exhibit a predetermined strength by a steel segment in a part of a main pipe such as a sewer pipe constructed only by a primary lining. It is an object of the present invention to provide a structure of a tunnel lining wall for branch pipe branching which can construct a lining wall accurately and efficiently.
[0007]
[Means for Solving the Problems]
In order to achieve the above object, a branch lining wall structure for branch pipe branching according to the present invention is as described in
[0008]
[Action]
A main pipe such as a sewer pipe is constructed by assembling a concrete segment on the inner peripheral surface of a tunnel excavated by a shield excavator. A lining wall for branch pipe branching is constructed using steel segments instead of concrete segments. At this time, a ring-shaped tunnel lining body is formed by a plurality of steel segments, and this tunnel lining body is connected in the tunnel length direction, thereby making the branch pipe longer than the diameter of the planned branch port of the branch pipe. Form a tunnel lining wall for branching. When forming this lining wall, the steel segments adjacent to each other in the front and back are assembled so that the joint plates and the reinforcing ribs are arranged in a straight line in the tunnel length direction. The adjacent steel segments are integrally connected and fixed between joint plates or reinforcing ribs facing each other in the tunnel length direction, or between these joint plates and reinforcing ribs.
[0009]
In this way, when at least one of the joint plates and the reinforcing ribs of the front and rear steel segments is integrally connected and fixed, a single long beam in which a plurality of joint plates or reinforcing ribs are continuous in the tunnel length direction. The bending rigidity of the joint plate or the reinforcing rib formed in the beam shape with the main girder of the steel segment provided on both sides of the planned branch port as the fulcrum increases, and the skin plate It is possible to construct a tunnel lining wall for branch pipe branching that can sufficiently resist the earth pressure and water pressure acting.
[0010]
In this tunnel lining wall for branch pipe branching, Branch pipe By forming the main girder of the steel segment arranged so as to sandwich the planned branch port, it is thicker than the main girder of the steel segment provided between these main girders. Both ends of the joint plate or the reinforcing rib formed in a beam shape can be firmly supported by the main girder having a large thickness.
[0011]
further, Steel segment The rigidity can be further enhanced by forming the reinforcing rib provided in a T-shaped cross section in which a web portion and a flange portion having a certain width and thickness are integrally provided on the front end surface of the web portion. In addition, by forming the height of the reinforcing ribs to be approximately equal to the height of the main girders, the adjacent ribs of the steel segments can be moved over the joined main girders in the reinforcing ribs of these steel segments. A flange lining wall for branch pipe branching with excellent pressure resistance can be efficiently installed within the thickness range of the concrete segment that constitutes the main pipe, allowing the flanges to be easily and reliably fixed between the flanges. Can be built.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Next, a specific embodiment of the present invention will be described with reference to the drawings. In FIGS. 1 to 3, 1 is a
[0013]
As shown in FIG. 4, the
[0014]
The shape of the reinforcing
[0015]
Further, the
[0016]
Furthermore, when the ring-shaped
[0017]
The
[0018]
In order to assemble the ring-shaped
[0019]
That is, as shown in FIG. 1, first, the
[0020]
After the formation of the
[0021]
Further, when constructing the
[0022]
A
[0023]
Further, the end portions of the reinforcing
[0024]
That is, the both sides of the front half of the
[0025]
In addition, although the connection of the reinforcing ribs and the connection of the joint plates in the steel segments adjacent to each other by the
[0026]
Further, the total length of one beam-like member formed by sequentially connecting the reinforcing
[0027]
Therefore, both ends of the above-mentioned beam-like member constituted by a plurality of reinforcing
[0028]
The
[0029]
The branch pipe 3 is propelled and buried in the ground by a propulsion method from the ground or from the inside of the shaft toward the
[0030]
Even if the
[0031]
After forming the
[0032]
In addition, this steel pipe lined 8 is divided into a plurality of parts in the length direction in advance, and a plurality of divided lining parts from which portions corresponding to the above-mentioned
[0033]
After the construction of the steel pipe lining 8, the branch port is formed in the space between the inner surface of the
[0034]
【The invention's effect】
As described above, according to the tunnel lining wall structure for branch pipe branching of the present invention, It was constructed to form a branch port of a branch pipe branched from the main pipe in a part of the main pipe constructed only by primary lining with a concrete segment on the inner peripheral surface of the tunnel excavated by the shield excavator. A tunnel lining wall for branch pipe branching, A tunnel for branch pipe branching longer than the diameter of the planned branch port of the branch pipe is formed by forming a ring-shaped tunnel cover body by a plurality of steel segments and connecting the tunnel cover body in the tunnel length direction. When forming the lining wall, the steel segments adjacent to each other in the front and rear are assembled so that the joint plates and the reinforcing ribs are arranged in a straight line in the tunnel length direction, and opposed to the tunnel length direction. Since it has a structure in which adjacent steel segment joint plates or reinforcement ribs, or between these joint plates and reinforcement ribs, are connected and secured together, a plurality of joint plates or reinforcement ribs are provided for the tunnel length. It becomes a long beam-like structure continuous in the vertical direction, and the bending rigidity with the main girder of the steel segment provided on both sides of the planned branch port as a fulcrum is remarkably increased. A tunnel lining wall for branch pipe branching that can sufficiently resist the earth pressure and water pressure acting on the skin plate can be constructed accurately and efficiently within the thickness of the main pipe such as a sewer pipe constructed only by Is.
[0035]
In addition, the above Since the main girder of the steel segment arranged so as to sandwich the planned branch port of the branch pipe is formed thicker than the main girder of the steel segment provided between these main girder, The both ends of the joint plate or the reinforcing rib formed in the shape of one beam can be firmly supported by the main girder of the wall thickness, and a strong tunnel lining wall for branch pipe branching is formed. Can do.
[0036]
Also in the steel segment The reinforcing rib provided is formed into a T-shaped cross section in which a web portion and a flange portion having a certain width and thickness are integrally provided on the front end surface of the web portion. By putting on The rigidity can be further increased, and the height of the reinforcing rib is formed to be approximately equal to the height of the main girder. By leaving The concrete that constitutes the main pipe can be easily and surely secured between the flange portions of the reinforcing ribs of these steel segments by connecting the main girders of the adjacent steel segments by means of the attachment plate. Within the thickness range of the manufactured segment, the tunnel lining wall for branch pipe branching excellent in pressure resistance can be efficiently built.
[Brief description of the drawings]
FIG. 1 is a simplified longitudinal front view of a tunnel lining wall for branch pipe branching,
FIG. 2 is a partially cutaway simplified side view thereof,
FIG. 3 is a simplified plan view showing a connection state between a main pipe, a tunnel lining wall for branch pipe branching, and a branch pipe;
FIG. 4 is a perspective view of a steel segment,
FIG. 5 is a longitudinal front view of a key segment,
FIG. 6 is a bottom view thereof.
FIG. 7 is a longitudinal side view of a steel segment,
FIG. 8 is an enlarged vertical front view of a connecting portion between a key segment and a steel segment,
FIG. 9 is an enlarged longitudinal front view showing another structure,
FIG. 10 is an enlarged longitudinal front view of a connecting portion between steel segments,
FIG. 11 is a simplified plan view of steel segments connected in a circumferential direction and a length direction;
FIG. 12 is a longitudinal front view thereof,
FIG. 13 is an enlarged longitudinal front view of a part of the same,
FIG. 14 is a longitudinal side view showing a state in which a steel pipe lining is constructed inside a tunnel lining wall for branch pipe branching,
FIG. 15 is a simplified longitudinal front view showing a conventional example,
FIG. 16 is a simplified vertical sectional side view thereof.
[Explanation of symbols]
1 Tunnel lining wall for branch pipe branching
2 main
3 Branch pipe
4 Plan branch
5 Attachment plate
10 Steel segment
11 Skin plate
12, 13 Main digits
14, 15 Fitting plate
16 Reinforcement rib
16a Flange
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000137051A JP4259724B2 (en) | 2000-05-10 | 2000-05-10 | Tunnel lining wall structure for branch pipe branching |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000137051A JP4259724B2 (en) | 2000-05-10 | 2000-05-10 | Tunnel lining wall structure for branch pipe branching |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001317286A JP2001317286A (en) | 2001-11-16 |
JP4259724B2 true JP4259724B2 (en) | 2009-04-30 |
Family
ID=18644894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000137051A Expired - Lifetime JP4259724B2 (en) | 2000-05-10 | 2000-05-10 | Tunnel lining wall structure for branch pipe branching |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4259724B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953363A (en) * | 2014-04-13 | 2014-07-30 | 北京工业大学 | Method for connecting shield tunnel pipe sheet and transverse passage structure |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4494674B2 (en) * | 2001-07-13 | 2010-06-30 | 新日本製鐵株式会社 | Synthetic segment |
JP4719056B2 (en) * | 2006-04-05 | 2011-07-06 | 新日本製鐵株式会社 | Synthetic segment |
JP5142808B2 (en) * | 2008-05-07 | 2013-02-13 | 新日鐵住金株式会社 | Heterogeneous tunnel junction structure and method |
CN102278131B (en) * | 2011-08-31 | 2013-06-05 | 大连华锐重工集团股份有限公司 | Duct piece conveying device for shield construction of tunnel with diameter of less than 6 meters and operation method |
CN113417661A (en) * | 2021-06-10 | 2021-09-21 | 福州大学 | High-strength yielding anti-seismic lining of tunnel and method thereof |
-
2000
- 2000-05-10 JP JP2000137051A patent/JP4259724B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953363A (en) * | 2014-04-13 | 2014-07-30 | 北京工业大学 | Method for connecting shield tunnel pipe sheet and transverse passage structure |
Also Published As
Publication number | Publication date |
---|---|
JP2001317286A (en) | 2001-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102122675B1 (en) | Underground structure construction method with internal joint ring on thrust tube for continuous steel joint structure | |
JP4746602B2 (en) | Segment connection structure | |
JP2007182696A (en) | Method of constructing rejoined segments and connected tunnels | |
JP4259724B2 (en) | Tunnel lining wall structure for branch pipe branching | |
JP4625796B2 (en) | Multiple arc tunnel connection structure and construction method | |
JP2011157755A (en) | Steel segment and composite segment | |
JP4299455B2 (en) | Junction structure and joining method for large-section tunnel segments | |
JP4750568B2 (en) | Tunnel junction construction method and tunnel junction structure | |
JP2018168561A (en) | Underground structure and method of constructing underground structure | |
JP4143430B2 (en) | Assembly steel shell and tunnel expansion section lining | |
JP3804440B2 (en) | Shield tunnel connection construction method | |
JP3908978B2 (en) | Junction structure and junction construction method for large-section tunnel segments | |
JPH10227199A (en) | Construction method of large sectional tunnel | |
JP4945294B2 (en) | segment | |
JP3900683B2 (en) | Construction method of branch / merge part of main line tunnel and rampway | |
JP3765048B2 (en) | How to build a tunnel | |
JP3257501B2 (en) | Tunnel lining | |
JPH077438Y2 (en) | Cylindrical wall for lining drill holes | |
JP3673508B2 (en) | Intermediate shaft construction method and intermediate shaft | |
JP3608140B2 (en) | Large section tunnel and its construction method | |
JP3900684B2 (en) | Construction method for underground structures | |
JP2019127728A (en) | Temporary structure for shield tunnel and timbering | |
KR102151496B1 (en) | Underground continuous wall structure of concrete steel composite and construction method there of | |
JP7403390B2 (en) | Synthetic structure and method of constructing the synthetic structure | |
JP7633891B2 (en) | Method for constructing underground structure, underground structure, and precast concrete side or intermediate wall/column therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060908 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080303 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080318 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080515 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090106 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090203 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120220 Year of fee payment: 3 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4259724 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120220 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150220 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |