[go: up one dir, main page]

JP3871549B2 - Hole down position adjustment hardware - Google Patents

Hole down position adjustment hardware Download PDF

Info

Publication number
JP3871549B2
JP3871549B2 JP2001331125A JP2001331125A JP3871549B2 JP 3871549 B2 JP3871549 B2 JP 3871549B2 JP 2001331125 A JP2001331125 A JP 2001331125A JP 2001331125 A JP2001331125 A JP 2001331125A JP 3871549 B2 JP3871549 B2 JP 3871549B2
Authority
JP
Japan
Prior art keywords
hardware
anchor bolt
hole
eccentric
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001331125A
Other languages
Japanese (ja)
Other versions
JP2003129567A (en
JP2003129567A5 (en
Inventor
秀男 小野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AIM CO., LTD.
Original Assignee
AIM CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AIM CO., LTD. filed Critical AIM CO., LTD.
Priority to JP2001331125A priority Critical patent/JP3871549B2/en
Publication of JP2003129567A publication Critical patent/JP2003129567A/en
Publication of JP2003129567A5 publication Critical patent/JP2003129567A5/ja
Application granted granted Critical
Publication of JP3871549B2 publication Critical patent/JP3871549B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、木造建築用接合金物に係り、特に二階建て以上の木造建築物において、柱と基礎とを、土台を介して簡単かつ確実に緊結できるようにしたホールダウン位置調整金物に関する。
【0002】
【従来の技術】
従来、木造住宅においては、地震や台風のような水平荷重が作用すると、耐震壁等の剛性の強い壁を支持する枠材としての柱の柱脚部の一方に大きな引き抜き力(軸引張力)が生じる(ロッキング現象等)。また、縦揺れ地震では垂直力が生じ、柱脚部に引き抜き力が生じる。この為、柱が浮き上がり抜けてしまう現象が起き、それを防止するために、L字型鋼板添え板(平成12年建設省告示第1460号、表3(ろ))、V字型鋼板添え板(平成12年建設省告示第1460号、表3(は))、引き寄せ金物(平成12年建設省告示第1460号、表3(へ)(と)(ち))等が使用されている。
【0003】
また、本発明と同様の金物として実用新案登録第3022169号が出願されている。
【0004】
一例として、引き寄せ金物を使用した場合を図を用いて説明する。
【0005】
図6は、引き寄せ金物24を付設した引き抜き防止の一例を示した部分斜視図である。土台21は基礎22上に載設され埋設アンカーボルト23が所定の位置に穿たれている。柱脚20は土台上に固着されており土台21と柱脚20の固着部に柱脚20及び土台21に沿って引き寄せ金具24が沿設されている。引き寄せ金具24は柱脚20に対してボルト28により固着され、土台21及び基礎22に対しては埋設アンカーボルト23を介して、ナット26を用いて固着された構造となっている。
【0006】
これによって、土台21、基礎22、柱脚20を引き寄せ金具24を介して補強することにより土台21から柱脚20が引き抜けるのを防止している。
【0007】
実用新案登録3022169号の場合は、土台は基礎上に載設されており埋設アンカーボルトが所定の位置に穿たれている。また、柱脚は土台上に固着されている。柱脚の側面部にはホールダウン金物が設置されており埋設アンカーボルトとホールダウン金物の間に本考案に係る木造建築用接合金物を介設して接続されている。埋設アンカーボルトは柱の面から31mmの位置に正確に埋め込まねばならず、高い施工精度が求められている。その為、埋設アンカーボルトがずれる事があり、それを2本の引き寄せアンカーボルトを用いて位置補正を行っている。
【0008】
【発明が解決しようとする課題】
上述のような、L字型鋼板添え板やV字型鋼板添え板は基礎に埋設された埋設アンカーボルトと設置されておらず、柱脚・土台のみが固着されているだけにとどまる為、強い引き抜き力が柱脚に対して加わった時、約1tの力が引き抜き力が加わると(1.5t以上の強度のある添え板またはホールダウン金物を使用した場合)、基礎に土台を固着している他の埋設アンカーボルトとの関係で土台がせん断してしまう危険がある。
【0009】
引き寄せ金物を使用した場合は、せん断の危険は無くなるが、埋設アンカーボルトは基礎工事の際に埋設されるものであり、その基礎上に土台が載設されることから上述したようにずれが生じてしまう事がある。その場合にはすでに孔が穿たれている引き寄せ金物の場合、埋設アンカーボルトとの接続の際に、埋設アンカーボルトに合わせた引き寄せ金物を作る等(アセチレンガスを使用して変形させる等)の不便が生じる。
【0010】
実用新案登録3022169号にある木造建築用接合金物の場合は、埋設アンカーボルトのずれに対する位置補正が利くように設計されている。また、前述の金物に比べ、強度も非常に強いものが期待できるが、引き寄せアンカーボルトを2本使用している点で、その他の金物に比べて非常にコストがかかり、輸送時の重量、設置時の容積が増大(内壁容量が増えてる)してしまう。
【0011】
本発明は上述のような事情よりなされたものであり、本発明の目的は、土台から柱脚を引き抜こうとする引き抜き力に対抗すべく、柱脚に設置されたホールダウン金物と基礎に固着された埋設アンカーボルトとを介設する金物に関し、埋設アンカーボルトとホールダウン金物の設置部分の位置補正ができ、よりコスト、重量及び容積を減じたホールダウン位置調整金物を提供することにある。
【0012】
本発明は、ホールダウン位置調整金物に関し、建物基礎に直接アンカーされ、上端が土台を貫通して土台上に突出した埋設アンカーボルトと、前記土台の所定位置に立設された柱脚に固着されたホールダウン金物とに介設される木造建築用接合金物であって、
該木造建築用接合金物は、所定の度合いで偏心し、上端を前記ホールダウン金物に嵌合する引き寄せアンカーボルトと、前記埋設アンカーボルトを遊嵌する手段である円環状の偏心調整金物と、前記引き寄せアンカーボルトを遊嵌する手段である円環状の偏心調整金物から成り、また、前記2つの円環状の偏心調整金物の側面同士が溶接接合された並列2連構造を有し、
前記2つの円環状の偏心調整金物の各中心点間の距離と、前記引き寄せアンカーボルトの偏心距離とが同一であり、
平面上偏心位置にある前記埋設アンカーボルトと、前記ホールダウン金物のブラケットとの間に介設、連結することにより前記アンカーボルトと前記ホールダウン金物との間に軸引張力を伝達させるようにしたことによって達成される。
【0014】
【発明の実施の形態】
本発明は、土台を介して基礎に設置されている埋設アンカーボルトと柱脚を介設するホールダウン位置調整金物を提供する。基礎に設置されている埋設アンカーボルトは、土台の中心に、なおかつ柱から31mmの位置に正確に埋め込まねばならず、高い施工精度が要求されている。しかしながら基礎完成後に土台が載設される事から、上記の条件を満たす埋設アンカーボルトがずれてしまう事が多い。その際、その埋設アンカーボルトを使用し、容易に柱脚と固定するために平面上偏心位置にある両者の位置補正が行え、安価かつ容積、重量を少なくしたホールダウン位置調整金物を提供する。
【0015】
以下に、本発明に係るホールダウン位置調整金物を図面を参照して説明する。
【0016】
図1及び2は、本発明に係るホールダウン位置調整金物の実施の一形態を示した斜視図及び側面図である。
【0017】
このホールダウン位置調整金物4は、基礎5に埋設された公知の埋設アンカーボルト11と柱脚1に固着されたホールダウン金物2と、ホールダウン金物2に取付けられた引き寄せアンカーボルト6と埋設アンカーボルト11とを自在に連結する偏心調整金物7,8とから構成されている。
【0018】
このうち、埋設アンカーボルト11は、図1に示したように下端にU字フックが形成された通常直径がφ16mmの鋼棒アンカーで、上端の所定範囲にはねじ加工が施されている。本実施例の形態では、(財)日本住宅・木材技術センターの認定規格品として公知の寸法、材質のものが使用されている。埋設部分の形状は、公知の種々の形状にできることは言うまでもない。ホールダウン金物2も、公知形状からなり、前述の規格同等品としての寸法、材質を満たすものが採用されている。
【0019】
ホールダウン位置調整金物4は、図5a,5bに示すように偏心調整金物7,8と引き寄せアンカーボルトからなる。偏心調整金物7,8は所定の長さ肉厚鋼管パイプの側面同士を溶接接合した並列2連構造から成る。さらに偏心調整金物7,8の一方の孔に引き寄せアンカーボルト6が遊嵌され、この引き寄せアンカーボルト6を回転中心として偏心調整金物7,8は自在に回転できる。引き寄せアンカーボルト6は、水平方向に偏心しており、回転する事により埋設アンカーボルト11とホールダウン金物2との接合部の位置補正を行い、ホールダウン金物2と埋設アンカーボルト11とを介設する。
【0020】
また、このホールダウン位置調整金物4は、偏心調整金物7,8の各肉厚鋼管パイプの中心間の距離と、引き寄せアンカーボルト6の偏心距離とを同一にし、なるべく強度を保ちながら埋設アンカーボルト11のずれに対してある一定範囲以内であれば確実に位置補正できるように工夫されている。すなわち、偏心調整金物7,8のパイプ中心間距離をPとすると、最大半径2Pの円の範囲内の位置ずれであれば確実に位置補正できるように工夫されている。ロッド端にはねじ切りされた引き寄せアンカーボルト6を使用し、ナット10a、10bの締め込み具合を調整する事により偏心調整金物の離れを任意に調整すれば良い。その為に、偏心調整金物7、8のパイプ内径はΦ17mmあり、Φ16mmの埋設アンカーボルト11を僅かな隙間で挿通でき、挿通した際のガタもほとんど生じない。また、引き寄せアンカーボルト6の直径もΦ16mmとすることにより、偏心調整金物7,8の部品の単一化を図る事ができ、部品のコストダウンを実現できる。
【0021】
偏心調整金物7,8の肉厚鋼管パイプ部分には、引き寄せアンカーボルト6が遊嵌されており、この引き寄せアンカーボルト6は、上端がホールダウン金物2のブラケットのボルト孔にナット9により定着される。また、柱脚土台接合部には、筋かいが筋交いプレートを介して取付けられるようになっている。ホールダウン位置調整金物4の容積が小さい事から、埋設アンカーボルト11と引き寄せアンカーボルト6とが偏心位置にある場合でも、所定の偏心距離以内であれば、筋かいとホールダウン位置調整金物4とを同時に付設する事ができ、基礎5と柱脚1を一体的に緊結することができる。
【0022】
図3は、埋設アンカーボルト11と引き寄せアンカーボルト6とが異なる偏心状態にある例を示している。埋設アンカーボルト11と引き寄せアンカーボルト6とは偏心位置調整金物7,8を用いて連結され、これにより、柱脚1を基礎5に直接緊結するようになっている。筋かいとホールダウン金物2の取り付け位置とが干渉しないようにホールダウン金物2の取付け位置を設定する事が好ましい。ホールダウン金物2が高い位置にある場合には、必要に応じて引き寄せアンカーボルト6や埋設アンカーボルト11を遊嵌する偏心位置調整金物7,8の位置を適当に変更する事が好ましい。
【0023】
図4は、埋設アンカーボルト11及び引き寄せアンカーボルト6の位置関係を模式的に示した説明図である。同図に示したように偏心調整金物7,8のパイプ中心間距離をPとすると、埋設アンカーボルト11とホールダウン金物2との偏心距離は最大2Pまでの範囲をカバーできる。例えば、ハッチングを伏した部分は柱脚1と干渉する位置であるため、この範囲に埋設アンカーボルト11が位置するような場合には、実際のアンカー取付けは行えないので、埋設アンカーボルト11の再取付け等により対処する必要がある。
【0024】
図5a,5bは、ホールダウン位置調整金物の部分拡大図である。図5bは肉厚2mmの鋼管パイプ(内径φ23.2mm)を用いて偏心調整金物7,8が製造されている。鋼管パイプの一方には偏心されている引き寄せアンカーボルト6が遊嵌されている。引き寄せアンカーボルト6の上下端部はねじきりされており、一方をホールダウン金物2へ嵌合し、一方は柔軟性を持たせるべく調整可能で偏心調整金物7へと遊嵌されている。これは直径16mmの埋設アンカーボルト11がボルト孔内に遊嵌された際に、孔内面との隙間を塞ぎ、遊びを取り除く役割を果たす。
【0025】
なお、コスト面、強度、粘性から考察し、鉄(SS400,JIS−G3101)を鋼材として使用した所、最大偏心状態でも約58.9kN(約6t)の強度が得られた。これは実用新案登録3022169号に記載の木造建築用接合金物と同等の強度を表わしており、省コスト、減容積、減荷重に成功している。
【0026】
なお、本実施例に記載の数値は一般的に使用される指標であり、同様の効果を奏する物であれば限定されない。
【0027】
【発明の効果】
以上のように、本発明に係るホールダウン位置調整金物によれば、基礎に埋設されたアンカーボルトの施工精度が低い場合でも、簡単かつ確実にホールダウン金物に連結して、基礎と柱脚とを緊結する事ができる。また、筋かいの取付け位置を確保でき、筋かい取付けを容易に行える。
【0028】
さらには、従来に比べて部品数を減らす事により、省コスト化、減容量化、減重量に成功しており、施工後の壁が厚くなってしまう等の不具合が解消されている。しかしながら強度は以前のままを保っており、従来よりも優れたホールダウン位置調整金物を提供する。
【図面の簡単な説明】
【図1】本発明に係るホールダウン位置調整金物の実施の一例を示した斜視図である。
【図2】本発明に係るホールダウン位置調整金物の実施の一例を示した側面図である。
【図3】本発明に係るホールダウン位置調整金物による位置補正の一例を示した概略平面図である。
【図4】本発明に係るホールダウン位置調整金物による位置補正を模式的に示した模式平面図である。
【図5】本発明に係るホールダウン位置調整金物の側面図及び正面図である。
【図6】従来の引き寄せ金物の実施の一例を示した斜視図である。
【符号の説明】
1 柱脚
2 ホールダウン金物
3 土台
4 ホールダウン位置調整金物
5 基礎
6 引き寄せアンカーボルト
7 偏心調整金物
8 偏心調整金物
9 ナット
10 ナット
11 埋設アンカーボルト
12 ビス
20 柱脚
21 土台
22 基礎
23 埋設アンカーボルト
24 引き寄せ金物
26 ナット
28 ビス
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a joint for a wooden building, and more particularly, to a hall down position adjusting hardware that allows a pillar and a foundation to be easily and securely connected via a base in a wooden building having two or more stories.
[0002]
[Prior art]
Conventionally, in wooden houses, when a horizontal load such as an earthquake or typhoon acts, a large pulling force (axial tensile force) is applied to one of the column bases of the column as a frame material that supports a rigid wall such as a seismic wall. Occurs (rocking phenomenon, etc.). In addition, a vertical force is generated in a pitching earthquake, and a pulling force is generated in the column base. For this reason, in order to prevent the phenomenon that the pillars are lifted and pulled out, an L-shaped steel plate attached plate (2000 Ministry of Construction Notification No. 1460, Table 3 (RO)), a V-shaped steel plate attached plate (2000 Ministry of Construction Notification No. 1460, Table 3 (ha)), attracted hardware (2000 Ministry of Construction Notification No. 1460, Table 3 (he) (and) (chi)), etc. are used.
[0003]
In addition, utility model registration No. 3022169 has been filed as a hardware similar to the present invention.
[0004]
As an example, the case where an attracting hardware is used will be described with reference to the drawings.
[0005]
FIG. 6 is a partial perspective view showing an example of pull-out prevention provided with the attracting metal 24. The base 21 is placed on a foundation 22 and an embedded anchor bolt 23 is drilled at a predetermined position. The column base 20 is fixed on the base, and a pulling metal fitting 24 is provided along the column base 20 and the base 21 at a fixed portion between the base 21 and the column base 20. The pulling metal fitting 24 is fixed to the column base 20 with a bolt 28, and is fixed to the base 21 and the foundation 22 using a nut 26 via an embedded anchor bolt 23.
[0006]
Accordingly, the base 21, the foundation 22, and the column base 20 are reinforced by the drawing metal fitting 24 to prevent the column base 20 from being pulled out from the base 21.
[0007]
In the case of utility model registration No. 3022169, the foundation is placed on the foundation, and the buried anchor bolt is drilled at a predetermined position. The column base is fixed on the base. A hole-down hardware is installed on the side surface of the column base, and the wooden building joint hardware according to the present invention is connected between the buried anchor bolt and the hole-down hardware. The embedded anchor bolt must be accurately embedded at a position 31 mm from the surface of the column, and high construction accuracy is required. For this reason, the buried anchor bolt may be displaced, and the position is corrected by using two pulling anchor bolts.
[0008]
[Problems to be solved by the invention]
As mentioned above, the L-shaped steel plate and V-shaped steel plate are not installed with the embedded anchor bolts embedded in the foundation, and only the column base and base are fixed, so they are strong. When a pulling force is applied to the column base, if a pulling force of about 1 ton is applied (when using an attachment plate or hole down hardware with a strength of 1.5 t or more), the base is fixed to the foundation. There is a risk that the foundation will shear in relation to other buried anchor bolts.
[0009]
When using an attracting metal, there is no risk of shearing, but the embedded anchor bolt is embedded during foundation work, and the base is placed on the foundation, causing a shift as described above. May end up. In that case, in the case of an attracting metal that has already been perforated, it is inconvenient to make an attracting object that matches the embedded anchor bolt (deformation using acetylene gas, etc.) when connecting to the embedded anchor bolt. Occurs.
[0010]
In the case of a wooden construction joint metal in utility model registration No. 3022169, it is designed so that the position correction with respect to the displacement of the buried anchor bolt is effective. In addition, it can be expected to be very strong compared to the above-mentioned hardware, but it is very expensive compared to other hardware because it uses two pulling anchor bolts, and the weight and installation during transportation. The volume of time increases (the inner wall capacity increases).
[0011]
The present invention has been made under the circumstances as described above, and the object of the present invention is to be fixed to a hole-down hardware and a base installed on the column base in order to counter the pulling force to extract the column base from the base. An object of the present invention is to provide a hole-down position adjusting hardware that can correct the position of the installation portion of the embedded anchor bolt and the hole-down hardware, and further reduce the cost, weight, and volume.
[0012]
The present invention relates to a hole down position adjusting hardware, and is fixed to a buried anchor bolt that is directly anchored to a building foundation, and whose upper end penetrates the base and protrudes on the base, and a column base that is erected at a predetermined position of the base. A metal fitting for wooden construction, which is interposed between
The wooden building joint metal is eccentric at a predetermined degree, and an upper end is attached to the hole-down hardware, a pulling anchor bolt, an annular eccentric adjustment hardware that is a means for loosely fitting the embedded anchor bolt, and attracted consists eccentric adjustment hardware annular is means for loosely anchor bolts, also has a parallel twin structure side surfaces are welded eccentric adjustment hardware of the two annular,
The distance between the center points of the two annular eccentric adjustment hardware and the eccentric distance of the pulling anchor bolt are the same;
An axial tension force is transmitted between the anchor bolt and the hole-down hardware by interposing and connecting between the embedded anchor bolt in an eccentric position on the plane and the bracket of the hole-down hardware. Is achieved.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
The present invention provides a hole-down position adjusting hardware in which an embedded anchor bolt and a column base are installed on a foundation via a base. The embedded anchor bolt installed on the foundation must be accurately embedded in the center of the base and at a position 31 mm from the pillar, and high construction accuracy is required. However, since the foundation is placed after the foundation is completed, the buried anchor bolt that satisfies the above conditions often shifts. At that time, using the embedded anchor bolt, it is possible to correct the position of both the eccentric positions on the plane in order to easily fix them to the column base, and to provide a hole-down position adjusting hardware which is inexpensive and has a small volume and weight.
[0015]
Hereinafter, a hole down position adjusting hardware according to the present invention will be described with reference to the drawings.
[0016]
1 and 2 are a perspective view and a side view showing an embodiment of a hole-down position adjusting hardware according to the present invention.
[0017]
The hole down position adjusting hardware 4 includes a known embedded anchor bolt 11 embedded in the foundation 5, a hole down hardware 2 fixed to the column base 1, a pulling anchor bolt 6 attached to the hole down hardware 2, and an embedded anchor. It is comprised from the eccentric adjustment metal fittings 7 and 8 which connect the volt | bolt 11 freely.
[0018]
Among these, the embedded anchor bolt 11 is a steel bar anchor having a diameter of φ16 mm and having a U-shaped hook formed at the lower end as shown in FIG. 1, and is threaded in a predetermined range at the upper end. In the form of the present embodiment, known dimensions and materials are used as certified standard products of the Japan Housing and Wood Technology Center. It goes without saying that the shape of the embedded portion can be any of various known shapes. The hole-down hardware 2 is also made of a known shape and satisfies the dimensions and materials as the above-mentioned standard equivalent products.
[0019]
As shown in FIGS. 5a and 5b, the hole down position adjusting hardware 4 includes eccentricity adjusting hardware 7 and 8 and a pulling anchor bolt. The eccentricity adjusting hardwares 7 and 8 have a parallel double structure in which the side surfaces of a thick steel pipe pipe having a predetermined length are welded together. Further, the pulling anchor bolt 6 is loosely fitted in one hole of the eccentric adjustment metal fittings 7 and 8, and the eccentric adjustment metal fittings 7 and 8 can be freely rotated around the pulling anchor bolt 6. The pulling anchor bolt 6 is eccentric in the horizontal direction, and rotates to correct the position of the joint portion between the buried anchor bolt 11 and the hole-down hardware 2, and the hole-down hardware 2 and the buried anchor bolt 11 are interposed. .
[0020]
Further, the hold-down position adjustment hardware 4, and the distance between the centers of the respective thickness steel pipe of the eccentric adjustment hardware 7,8, the same and an eccentric distance of the anchor bolt 6 drawn, embedded anchor bolt while maintaining as much as possible strength It is devised so that the position can be reliably corrected within a certain range with respect to 11 deviations. That is, when the distance between the pipe centers of the eccentricity adjusting hardware 7 and 8 is P, it is devised so that the position can be reliably corrected as long as it is a positional deviation within a circle having a maximum radius of 2P. A threaded pulling anchor bolt 6 is used at the rod end, and the separation of the eccentricity adjusting hardware can be arbitrarily adjusted by adjusting the tightening degree of the nuts 10a and 10b. Therefore, the inner diameters of the pipes of the eccentric adjustment hardware 7 and 8 are Φ17 mm, and the embedded anchor bolts 11 of Φ16 mm can be inserted with a slight gap, and there is almost no play when inserted. Further, by setting the diameter of the pulling anchor bolt 6 to Φ16 mm, it is possible to unify the parts of the eccentricity adjusting hardware 7 and 8 and to realize cost reduction of the parts.
[0021]
A pulling anchor bolt 6 is loosely fitted to the thick steel pipe pipe portions of the eccentric adjustment hardware 7 and 8, and the upper end of the pulling anchor bolt 6 is fixed to the bolt hole of the bracket of the hole-down hardware 2 by a nut 9. The In addition, a brace is attached to the column base foundation joint through a bracing plate. Since the volume of the hole-down position adjusting hardware 4 is small, even if the embedded anchor bolt 11 and the pulling anchor bolt 6 are in the eccentric position, as long as they are within a predetermined eccentric distance, the strut and the hole-down position adjusting hardware 4 Can be attached at the same time, and the foundation 5 and the column base 1 can be tightly coupled together.
[0022]
FIG. 3 shows an example in which the embedded anchor bolt 11 and the pulling anchor bolt 6 are in different eccentric states. The embedded anchor bolt 11 and the pulling anchor bolt 6 are connected by using eccentric position adjusting hardware 7 and 8, whereby the column base 1 is directly coupled to the foundation 5. It is preferable to set the mounting position of the hole-down hardware 2 so that the streak and the mounting position of the hole-down hardware 2 do not interfere with each other. When the hole-down hardware 2 is at a high position, it is preferable to appropriately change the positions of the eccentric position adjusting hardware 7 and 8 in which the pulling anchor bolt 6 and the embedded anchor bolt 11 are loosely fitted as necessary.
[0023]
FIG. 4 is an explanatory view schematically showing the positional relationship between the embedded anchor bolt 11 and the pulling anchor bolt 6. As shown in the figure, when the distance between the pipe centers of the eccentricity adjusting hardware 7 and 8 is P, the eccentric distance between the embedded anchor bolt 11 and the hole-down hardware 2 can cover a range up to 2P. For example, since the hatched portion is a position where it interferes with the column base 1, when the embedded anchor bolt 11 is located in this range, the actual anchor cannot be attached. It is necessary to deal with it by mounting.
[0024]
5a and 5b are partially enlarged views of the hole down position adjusting hardware. In FIG. 5b, eccentricity adjusting hardware 7 and 8 are manufactured using a steel pipe pipe (inner diameter φ23.2 mm) having a thickness of 2 mm. One of the steel pipes is loosely fitted with an eccentric pulling anchor bolt 6. The upper and lower ends of the pulling anchor bolt 6 are threaded, one is fitted to the hole-down hardware 2, and the other is adjustable to give flexibility and is loosely fitted to the eccentric adjustment hardware 7. When the embedded anchor bolt 11 having a diameter of 16 mm is loosely fitted in the bolt hole, the gap between the hole inner surface and the play is removed.
[0025]
In consideration of cost, strength, and viscosity, when iron (SS400, JIS-G3101) was used as a steel material, a strength of about 58.9 kN (about 6 t) was obtained even in the maximum eccentric state. This represents the same strength as the wooden building joint described in Utility Model Registration No. 3022169, and succeeded in cost saving, volume reduction, and load reduction.
[0026]
In addition, the numerical value described in a present Example is an index generally used, and will not be limited if it has the same effect.
[0027]
【The invention's effect】
As described above, according to the hole down position adjusting hardware according to the present invention, even when the construction accuracy of the anchor bolt embedded in the foundation is low, it is easily and securely connected to the hole down hardware, Can be tied. Further, the brace mounting position can be secured and the brace mounting can be easily performed.
[0028]
Furthermore, by reducing the number of parts compared to the conventional case, it has succeeded in cost saving, capacity reduction, and weight reduction, and problems such as thickening the wall after construction have been solved. However, the strength remains the same as before, and a hole down position adjustment hardware superior to the conventional one is provided.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an example of implementation of a hole-down position adjusting hardware according to the present invention.
FIG. 2 is a side view showing an example of implementation of a hole-down position adjusting hardware according to the present invention.
FIG. 3 is a schematic plan view showing an example of position correction by a hole-down position adjusting hardware according to the present invention.
FIG. 4 is a schematic plan view schematically showing position correction by a hole down position adjusting hardware according to the present invention.
FIGS. 5A and 5B are a side view and a front view of a hole down position adjusting hardware according to the present invention. FIGS.
FIG. 6 is a perspective view showing an example of implementation of a conventional attracting hardware.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Column base 2 Hole down hardware 3 Base 4 Hole down position adjustment metal 5 Foundation 6 Pulling anchor bolt 7 Eccentric adjustment hardware 8 Eccentric adjustment hardware 9 Nut 10 Nut 11 Embedded anchor bolt 12 Screw 20 Column base 21 Base 22 Foundation 23 Embedded anchor bolt 24 Withdrawal hardware 26 Nut 28 Screw

Claims (1)

建物基礎に直接アンカーされ、上端が土台を貫通して土台上に突出した埋設アンカーボルトと、前記土台の所定位置に立設された柱脚に固着されたホールダウン金物とに介設される木造建築用接合金物であって、
該木造建築用接合金物は、所定の度合いで偏心し、上端を前記ホールダウン金物に嵌合する引き寄せアンカーボルトと、前記埋設アンカーボルトを遊嵌する手段である円環状の偏心調整金物と、前記引き寄せアンカーボルトを遊嵌する手段である円環状の偏心調整金物から成り、また、前記2つの円環状の偏心調整金物の側面同士が溶接接合された並列2連構造を有し、
前記2つの円環状の偏心調整金物の各中心点間の距離と、前記引き寄せアンカーボルトの偏心距離とが同一であり、
平面上偏心位置にある前記埋設アンカーボルトと、前記ホールダウン金物のブラケットとの間に介設、連結することにより前記アンカーボルトと前記ホールダウン金物との間に軸引張力を伝達させるようにしたことを特徴とするホールダウン位置調整金物。
A wooden structure that is anchored directly to the foundation of the building and has an upper end penetrating the base and protruding above the base, and a hole-down hardware fixed to a column base that is erected at a predetermined position on the base. A joint fitting for construction,
The wooden building joint metal is eccentric at a predetermined degree, and an upper end is attached to the hole-down hardware, a pulling anchor bolt, an annular eccentric adjustment hardware that is a means for loosely fitting the embedded anchor bolt, and attracted consists eccentric adjustment hardware annular is means for loosely anchor bolts, also has a parallel twin structure side surfaces are welded eccentric adjustment hardware of the two annular,
The distance between the center points of the two annular eccentric adjustment hardware and the eccentric distance of the pulling anchor bolt are the same;
An axial tension force is transmitted between the anchor bolt and the hole-down hardware by interposing and connecting between the embedded anchor bolt in an eccentric position on the plane and the bracket of the hole-down hardware. Hole down position adjustment hardware characterized by that.
JP2001331125A 2001-10-29 2001-10-29 Hole down position adjustment hardware Expired - Lifetime JP3871549B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001331125A JP3871549B2 (en) 2001-10-29 2001-10-29 Hole down position adjustment hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001331125A JP3871549B2 (en) 2001-10-29 2001-10-29 Hole down position adjustment hardware

Publications (3)

Publication Number Publication Date
JP2003129567A JP2003129567A (en) 2003-05-08
JP2003129567A5 JP2003129567A5 (en) 2005-06-30
JP3871549B2 true JP3871549B2 (en) 2007-01-24

Family

ID=19146750

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001331125A Expired - Lifetime JP3871549B2 (en) 2001-10-29 2001-10-29 Hole down position adjustment hardware

Country Status (1)

Country Link
JP (1) JP3871549B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5133302B2 (en) * 2009-07-17 2013-01-30 株式会社カネシン Hole down hardware
JP5323616B2 (en) * 2009-08-31 2013-10-23 株式会社カネシン Position adjustment hardware for hole down hardware

Also Published As

Publication number Publication date
JP2003129567A (en) 2003-05-08

Similar Documents

Publication Publication Date Title
US6634150B1 (en) Foundation with lateral brace for manufactured home
JP2010084515A (en) Aseismatic reinforcement structure of wooden house, and aseismatic reinforcing method of wooden house
JP3762689B2 (en) Connection structure of wall frame panel and floor slab foundation
JP3871549B2 (en) Hole down position adjustment hardware
JP2013104198A (en) L-shaped fitting and height position adjusting device using the same
JP3336367B2 (en) Steel column base structure and construction method of steel column base
JP4970873B2 (en) Vertical member
JP3409137B2 (en) Bearing wall structure of wooden frame
JP3233260B2 (en) Anchoring structure of anchor material on steel column base
JP2006132313A (en) Joint structure of foundation and frame
JPH10311045A (en) Surface plate construction method and apparatus for erection of pillars
JPH0561232U (en) Steel column base structure
JP3169887B2 (en) Column base structure of steel pipe column and its construction method
RU210507U1 (en) PIPE CONCRETE COLUMN
JP2694431B2 (en) Construction method of anchor bolt
JP2005344492A (en) Earthquake resistance reinforcing method for wooden house, metal fitting used for the same and device for preventing pillar from falling out
JP3472192B2 (en) Bracing structure using connecting metal fittings
JP4038086B2 (en) Bracing unit mounting structure
JPH0130482Y2 (en)
JP3261526B2 (en) Anchor frame for steel pier and footing using the same
JPH1025838A (en) Brace reinforcing fitting
JPH09125520A (en) Connection structure of beam and pillar and connection method
JPH0343286Y2 (en)
JPH07292690A (en) Seismic isolation coupling structure between foundation pile and foundation structure
JPS63121Y2 (en)

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041025

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041025

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060629

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060711

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060908

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061010

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061017

R150 Certificate of patent or registration of utility model

Ref document number: 3871549

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101027

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101027

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111027

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121027

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131027

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term