JP3763767B2 - Operation planning system for energy supply equipment - Google Patents
Operation planning system for energy supply equipment Download PDFInfo
- Publication number
- JP3763767B2 JP3763767B2 JP2001306660A JP2001306660A JP3763767B2 JP 3763767 B2 JP3763767 B2 JP 3763767B2 JP 2001306660 A JP2001306660 A JP 2001306660A JP 2001306660 A JP2001306660 A JP 2001306660A JP 3763767 B2 JP3763767 B2 JP 3763767B2
- Authority
- JP
- Japan
- Prior art keywords
- heat storage
- heat
- energy supply
- energy
- energy consumption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005338 heat storage Methods 0.000 claims description 131
- 238000006243 chemical reaction Methods 0.000 claims description 78
- 238000005265 energy consumption Methods 0.000 claims description 72
- 238000000034 method Methods 0.000 claims description 30
- 238000005457 optimization Methods 0.000 claims description 30
- 230000008569 process Effects 0.000 claims description 19
- 230000017525 heat dissipation Effects 0.000 claims description 10
- 230000005855 radiation Effects 0.000 claims description 8
- 238000012937 correction Methods 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 claims 1
- 239000000446 fuel Substances 0.000 description 19
- 238000010521 absorption reaction Methods 0.000 description 14
- 238000012545 processing Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 12
- 230000014509 gene expression Effects 0.000 description 12
- 230000006870 function Effects 0.000 description 10
- 238000001816 cooling Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 2
- 238000005057 refrigeration Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000013256 coordination polymer Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/12—Improving ICE efficiencies
Landscapes
- Air Conditioning Control Device (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は蓄熱槽を有するエネルギ供給設備の運用の最適化を図ったエネルギ供給設備の運転計画システムに関するものである。
【0002】
【従来の技術】
近年、環境保存、省エネルギや省コストの要請により、エネルギ需要家側に蒸気熱と電力を同時に発生できるコジェネレーションレーション設備および蓄熱槽を導入したエネルギ供給設備が開発されている。
【0003】
図10は、このようなエネルギ供給設備の機器構成の一例を示す系統図である。この図10に示すエネルギ供給設備Aにおいては、変電設備1により、電力系統2から受電された電力101が負荷設備3および電動冷凍機(MR)4へ供給されるようになっている。コジェネレーション設備5は燃料設備6から燃料102の供給を受け、電力103と蒸気熱104とを発生する。ボイラ7は燃料設備6から燃料102の供給を受け、蒸気熱104を発生する。コジェネレーション設備5により発生された電力103は、負荷設備3に供給される。コジェネレーション設備5とボイラ7とにより発生された蒸気熱104は、負荷設備3と吸収式冷凍機(ABR)8とに供給される。
【0004】
吸収式冷凍機(ABR)8は、コジェネレーション設備5から供給される蒸気熱104により、冷熱105を発生する。吸収式冷凍機(ABR)8により発生される冷熱105は、負荷設備3に供給される。電動冷凍機(MR)4は、変電設備1から供給される電力101を動力原として、冷熱106を発生する。電動冷凍機(MR)4により発生された冷熱106は蓄熱槽9に蓄熱される。蓄熱槽9は、蓄熱された冷熱105を負荷設備3に供給する。
【0005】
負荷設備3は電力負荷設備10および熱負荷設備11により構成され、熱負荷設備11はさらに蒸気熱負荷設備12と冷熱負荷設備13とにより構成される。電力負荷設備10は、例えば、電動機、事務照明などである。また、蒸気熱負荷設備12は、例えば半導体基板の洗浄、暖房などであり、冷熱負荷負荷設備13は例えば冷房である。
【0006】
このような図10に示したエネルギ供給設備Aに対する従来の運転計画装置の構成を図11によって説明する。図11に示したように、従来の運転計画装置Bは、需要入力手段14と、運転最適化手段15により構成される。運転最適化手段15は、下記の式(1a)〜(1zb)により与えられる最適化問題を解くことにより、重みづけされたコスト、CO2換算発生量およびエネルギ消費換算量の合計値が最小となるように、図10に示したエネルギ供給設備Aに対する運転計画を決定する。
【0007】
【数1】
【0008】
上述した式(1a)〜(1zb)の記号について(図10を参照して)説明すると、以下の通りである。
【0009】
添字{z}は第z時点を表し、例えば、F{z}は時点zにおける燃料設備6より供給される燃料流量(102)を表す。Eは現時点(z=1)から第n時点(z=n)までの重みづけされたコスト、CO2換算排出流量およびエネルギ消費換算量の合計値を表す。M{z}は時点zのコスト、C{z}は時点zのCO2換算排出流量、O{z}は時点zのエネルギ消費換算量をそれぞれ表す。
【0010】
Pは変電設備1を流れる電力、Prlは電力系統2から電力負荷10に供給される電力、Pclはコジェネレーション設備5の発生電力を表す。Hclはコジェネレーション設備5の発生熱、Hblはボイラ7の発生熱、Fcはコジェネレーション燃料流量、Fbはボイラ燃料流量を表す。
【0011】
α,β,γは重み付けパラメータ、θMFは燃料Fのコスト換算パラメータ、σMPは変電設備1を流れる系統電力のコスト換算変数を表す。θCFは燃料FのCO2換算パラメータ、σCPは電力系統2からの供給電力のCO2換算変数、θOFは燃料Fの石油換算パラメータ、σOPは電力系統2からの供給電力の石油換算変数を表す。
【0012】
aC,…,fCはコジェネレーション設備5の発生電力Pclと発生熱Hclの燃料Fc換算パラメータを表す。ab,…,cbはボイラ7の発生熱Hblの燃料Fb換算パラメータ、Plは電力負荷設備10の電力負荷、Hsは蒸気熱負荷設備の蒸気熱負荷を表す。
【0013】
Hcaは吸収式冷凍機(ABR)8への供給蒸気熱、Hacは吸収式冷凍機(ABR)8の発生冷熱、aca,bca,ccaは吸収式冷凍機(ABR)8の発生冷熱Hacの供給蒸気熱Hca換算パラメータを表す。
【0014】
Pmは電動冷凍機(MR)4への供給電力、Hsiは電動冷凍機(MR)4の発生冷熱、すなわち蓄熱槽9の入熱を表す。am,bm,cmは電動冷凍機(MR)4の発生冷熱Hsiの供給電力Pm換算パラメータ、aam,bam,camは電動冷凍機(MR)4の発生冷熱Hsiの供給冷却熱Ham換算パラメータを表す。
【0015】
Hscは蓄熱槽9に蓄積される冷熱、Hsoは蓄熱槽9から冷熱負荷設備13へ供給される冷熱、Hslは蓄熱槽9の放熱損失、aslは蓄熱槽9の放熱損失近似パラメータ、Hcは冷熱負荷を表す。
【0016】
PminおよびPmaxは、それぞれ変電設備1を流れる電力の下限値および上限値を表す。Pcl minおよびPcl maxは、それぞれコジェネレーション設備5の発生電力下限値および上限値を表す。Hcl minおよびHcl maxは、それぞれコジェネレーション設備5の発生熱下限値および上限値を表し、Hbl minおよびHbl maxは、それぞれボイラ7の発生熱下限値および上限値を表す。
【0017】
Hac minおよびHac maxは、それぞれ吸収式冷凍機(ABR)8の発生冷熱の下限値および上限値を表し、Hsi minおよびHsi maxはそれぞれ電動冷凍機(MR)4の発生冷熱の下限値および上限値を表す。Hso minおよびHso maxはそれぞれ蓄熱槽9から冷熱負荷設備13への供給冷熱の下限値および上限値を表し、Hsc minおよびHsc maxはそれぞれ蓄熱槽9に蓄積される冷熱の下限値および上限値を表す。
【0018】
上述の式(1a)は、目的関数に関する式であり、式(1b)〜式(1zb)は制約条件に関する式である。このうち、式(1b),(1c),(1d)は、燃料設備6から供給される燃料流量F(102)と変電設備1を流れる電力P(101)とをそれぞれコストM,CO2換算排出流量C,石油換算燃料流量Oに換算するものである。
【0019】
また、式(1e)は、コジェネレーション設備5の発生電力Pclおよび発生熱Hclと、コジェネレーション設備5の燃料Fcとの関係を近似したものである。式(1f)は、ボイラ7の発生熱Hblと燃料Fbとの関係を近似したものである。
【0020】
式(1h)は、吸収式冷凍機(ABR)8の発生冷熱Hacと供給蒸気熱Hcaとの関係を近似したものである。式(1i)は、電動冷凍機(MR)4が冷熱Hsiを発生するために必要とする消費電力Pmを表す。
【0021】
式(1j)および(1k)は、それぞれ蓄熱槽9の熱バランスおよび蓄熱損失を表す。式(1l)〜式(1o)は負荷需給バランスに関する制約条件式であり、式(1p)は最大契約電力を表す。式(1r)〜(1zb)はコジェネレーション設備5、ボイラ7、吸収式冷凍機(ABR)8、電動冷凍機(MR)4、蓄熱槽9および蓄熱槽ポンプの運転範囲を表す。
【0022】
以上の説明では、時点zをz=1,…,n(n=24)とし、現時点から24時間先までの負荷予測を対象としたが、これは一般的に蓄熱槽の運転サイクルが24時間周期であることに基づいている。ここで、dを時点zから時点z+1までの時間幅とすると、以上の例では、d=1時間、n×d=24時間である。時間区間[z,z+1]において、予測負荷は一定であることとする。ここで、時間幅dが小さければ、小さいほど、きめこまかい時間幅で負荷予測可能となり、nが大きければ、大きいほど、長期間にわたっての負荷予測可能となるが、時点z=1からz=nまでの繰り返し計算回数が多くなる。逆に、時間幅dが大きければ大きいほど、大まかな時間幅で負荷予測可能となり、nが小さければ小さいほど、短期間に亘っての負荷予測可能となり、その場合には上記計算回数が少なくなる。
【0023】
電力負荷Pl{z}、蒸気熱負荷Hs{z}および冷熱負荷Hc{z}は、図11に示した需要入力手段14から需要予測入力201として与えられるデータである。運転最適化手段15はこれらの需要予測入力201により、式(1a)〜(1zb)に示される最適化問題を解く。これにより、与えられる目的関数(式(1a))が最小となるように、最適運転計画、すなわち、コジェネレーション設備5、ボイラ7、吸収式冷凍機8、電動冷凍機(MR)4および蓄熱槽9の運転出力Pcl{z},Hcl{z},Hbl{z},Hac{z},Hsi{z}(1a)〜(1zb)Hso{z},z=1,…,24が決定される。
【0024】
式(1a)〜(1zb)に示した非線形問題を解く手段として公知のコンピュータ言語、例えば線形計画問題を解く場合等に適用されるNUOPT−モデリング言語を使用することができる。このNUOPT−モデリング言語を用いて式(1a)〜(1zb)に与えられる非線形問題を解く場合、式の微分(傾斜)情報を使用して計算するので、式(1a)〜(1zb)に与えられるように、機器の運転停止を表すような不連続変数(1または0)δc{z},δb{z},δac{z},δm{z}を取り扱うことができない。このような不連続変数を含む場合、従来の運転最適化手段15は、図12に示される手順で処理する必要がある。
【0025】
図12において、従来の運転最適化手段15の処理手順を説明すると、開始の後、i=1の設定(S101)をして、運転パターンiに対応する運転最適化処理(S102)、i=i+1の設定(S103)およびMax回の繰り返し処理によりMaxセットの運転パターンに対応する運転計画を計算し、計算されたMaxセットの運転パターンの中で目的関数値(式(1a))による最も小さい運転計画Pcl{z},Hcl{z},Hbl{z},Hac{z},Hsi{z},Hso{z},z=1,…,24を、最適計画として決定する(S105)。運転パターンは、不連続変数(1または0)δc{z},δb{z},δac{z},δm{z}の組み合わせに対応するものであり、この場合の運転パターン数は不連続変数の数の2のべき乗、すなわち時点zの数のべき乗となり、Max=(24)24=7.928通りの運転パターンがある。
【0026】
【発明が解決しようとする課題】
以上のように、従来技術による処理では、繰り返し計算回数が膨大(例えば7.928通り)になり、最適解が求められるまでに、長時間を要するという問題がある。
【0027】
本発明は、このような事情に鑑みてなされたものであり、より短時間で好適な運転計画を行うことができるエネルギ供給設備の運転計画システムを提供することを目的とする。
【0028】
【課題を解決するための手段】
前記の目的を達成するため、請求項1に係る発明では、蓄熱槽を有するエネルギ供給設備の運転計画システムであって、エネルギ需要を入力する需要入力手段と、蓄熱槽の蓄熱レベルに対応する入放熱段階を記憶する蓄熱槽入放熱段階記憶手段と、前記エネルギ供給設備の運転計画を決定する運転最適化手段とを備え、前記蓄熱槽入放熱段階記憶手段は、前記蓄熱槽の蓄熱量を複数の蓄熱レベルに分割し、かつ蓄熱槽入放熱量を1ないし複数の放熱段階に分割して記憶し、前記運転最適化手段は、各時点における各蓄熱レベルに対応するエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となる運転点を求めることにより、入力されたエネルギ需要を満足させながら、所定期間における前記エネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となるように、前記エネルギ供給設備の運転計画を決定することを特徴とするエネルギ供給設備の運転計画システムを提供する。
【0029】
請求項2に係る発明では、請求項1記載のエネルギ供給設備の運転計画システムにおいて、各時点における各蓄熱レベルに対応するエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となる運転点を求める各時点入出力熱対応運転最適化手段を備え、前記運転点を求める過程において、蓄熱槽への入熱または各放熱段階に対応するエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となる運転点を求めることにより、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となるように、前記エネルギ供給設備の運転計画を高速に決定するエネルギ供給設備の運転計画システムを提供する。
【0030】
請求項3に係る発明では、請求項1から2までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、運転可能な蓄熱槽の上下限蓄熱レベルを予め設定する蓄熱レベル上下限設定手段を備え、各時点における設定された上下限蓄熱レベル内の各蓄熱レベルに対応するエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となる運転点を求めることにより、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となるように、前記エネルギ供給設備の運転計画をより高速に決定するエネルギ供給設備の運転計画システムを提供する。
【0031】
請求項4に係る発明では、請求項1から3までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、放熱過程の各時点における蓄熱槽の熱損失だけ、各段階での前記蓄熱槽の蓄放熱量を減少させるように、各段階での前記蓄熱槽の蓄放熱量を補正する熱損失補正手段を備え、前記蓄放熱量を補正することにより、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となるように、前記エネルギ供給設備の運転計画値を前記蓄熱槽の熱損失を含めて決定するエネルギ供給設備の運転計画システムを提供する。
【0032】
請求項5に係る発明では、請求項1から3までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、放熱過程の各時点における蓄熱槽の熱損失をエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上に換算する熱損失換算手段を備え、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が準最小となるように、前記エネルギ供給設備の運転計画値を前記蓄熱槽の熱損失を含めて決定するエネルギ供給設備の運転計画システムを提供する。
【0033】
請求項6に係る発明では、請求項1から5までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、エネルギ消費コスト、CO2換算発生量またはエネルギ消費換算量の一つ以上を制約する制約手段を備え、その制約条件を満足させながら、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の残りが最小となるように、前記エネルギ供給設備の運転計画値を蓄熱槽の熱損失を含めて決定するエネルギ供給設備の運転計画システムを提供する。
【0034】
請求項7に係る発明では、請求項1から6までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、任意に設定されたエネルギ発生装置の運転状態を設定する運転状態設定手段を備え、前記運転状態を制約条件に入れることにより、所定期間におけるエネルギ供給設備のエネルギ消費コストが最小となるように前記エネルギ供給設備の運転計画を決定し、運転計画の評価または手動運転の介入を可能とするエネルギ供給設備の運転計画システムを提供する。
【0035】
請求項8に係る発明では、請求項1から7までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、運転可能な蓄熱レベル曲線と所定期間におけるエネルギ供給設備のエネルギ消費コストが最小となるように決定された蓄熱レベル曲線を表示する蓄熱レベル表示手段を備え、蓄熱槽の蓄放熱過程を確認可能とするエネルギ供給設備の運転計画システムを提供する。
【0036】
請求項9に係る発明では、請求項1から8までのいずれかに記載のエネルギ供給設備の運転計画システムにおいて、エネルギ需要を予測する需要予測手段を備え、予測された需要を入力することにより、予測されたエネルギ需要を満足しながら、所定期間におけるエネルギ供給設備のエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が最小となるように、前記エネルギ供給設備の運転計画を決定するエネルギ供給設備の運転計画システムを提供する。
【0037】
請求項10に係る発明では、請求項1から9までのいずれかに記載のシステムによりエネルギ供給設備を駆動するプログラムを格納した記憶媒体を提供する。
【0038】
【発明の実施の形態】
以下、本発明に係るエネルギ供給設備の運転計画システムの実施形態について、図1〜図9を参照して説明する。なお、運転対象とするエネルギ供給設備については、図10に示した設備構成と同一のものとし、図10もそのまま参照して説明する。
【0039】
第1実施形態(図1〜図8、図10)
図1は、本発明の第1実施形態によるエネルギ供給設備の運転計画システムの構成を示す系統図である。
【0040】
この図1に示すように、本実施形態のシステムは、エネルギ需要を予測するための需要予測手段21と、予測した需要に基づいて需要スケジュールを入力するための需要入力手段22と、蓄熱槽9の入放熱段階を記憶する蓄熱槽入放熱段階記憶手段23と、これらの手段から情報を取り込んで運転計画を決定する運転最適化手段24とを備える。また、運転最適化手段24に運転最適化のための種々の情報を入力する手段、すなわち各時点入出熱対応運転最適化手段25、蓄熱レベル上下限設定手段26、熱損失補正手段27、制約手段28および運転状態設定手段29を備える。さらに、運転最適化手段24によって決定された出力表示用の蓄熱レベル表示手段30を備え、この蓄熱レベル表示手段30により、運転可能な蓄熱レベル曲線と所定期間におけるエネルギ供給設備Aのエネルギ消費コストが最小となるように決定された蓄熱レベル曲線が表示される。
【0041】
運転最適化手段24は、下記の式(2a)〜(2zg)により与えられる最適化問題を解くことにより、重みづけされたコスト、CO2換算発生量およびエネルギ消費換算量の合計値が最小となるように、蓄熱槽9を有するエネルギ供給設備Aの運転計画を決定する。
【0042】
【数2】
【0043】
以上の式のうち、式(2a)〜(2zb)は、前述の従来技術説明において示した式(1a)〜(1zb)に対応しているが、本実施形態においては、式(2z)に示したように、蓄熱の下限値Hsc min {z}および上限値Hsc max {z}は、時点zに対応して設定されている。また、式(2zc)および式(2zd)は入放熱段階に関する式であり、これらの式において、δLは段階インデクス、L{z}は最大段階である。式(2ze),式(2zf)および式(2zg)は、それぞれCO2換算発生量,エネルギ消費換算量およびエネルギ消費コストに対応する制約条件式である。
【0044】
本実施形態においては、式(2zc)および式(2zd)に示したように、蓄熱槽9の放熱量を1ないし複数の入放熱段階に分割する。そして、運転最適化手段24においては、ダイナミックプログラミング手法を使用して、運転計画を決定する。すなわち、需要予測手段21から需要予測結果120が需要入力手段22に入力され、需要入力手段22から需要予測入力|z|として、電力負荷Pl{z},蒸気熱負荷Hs{z},冷熱負荷Hc{z}が運転最適化手段24に入力される。また、運転最適化手段24には、蓄熱レベル上下限設定手段26から各時点zにおける蓄熱レベル上下限値124として、Hsc min {z},Hsc max {z}が入力され、熱損失補正手段27から熱損失による放熱減少熱量127として、Hslが入力され、制約手段28から式(2ze)〜式(2zg)に対応する制約条件128が入力される。さらに、運転最適化手段24には、運転設定手段29から運転状態設定結果129として、δc{z},δb{z},δac{z},δm{z}が入力され、蓄熱槽入放熱段階記憶手段23から蓄熱槽入放熱最大段階130として、L{z}が入力される。
【0045】
また、運転最適化手段24と各時点入出力熱対応運転最適化手段25との間では、入出力熱対応最適化結果122としてのD(z−1,δL{z−1},j{z−1})と、各蓄熱レベル対応最適化結果123としてのV(z,δA,j)との入出力が行われる。
【0046】
図2は、運転最適化手段24において運転計画を実行する処理手順を示すフローチャートである。
【0047】
この図2に示すように、開始(S301)のあと、初期処理(S320)として、上記の各入力が行われ、S303〜S305において、z=1,δL=1,j=1の設定が行われる。
【0048】
次に、対象機器パターンの判定(S305a)が行われ、yesであると、目的関数値最大処理(S305b)が行われ、noであると、運転最適化処理(S306)が行われる。そして、このS306およびS307〜S312において、時点z、入放熱段階δLおよび機器パターンjに対応する運転最適化処理が行われ、NUOPT−モデリング言語の使用により、式(3)に与えられる最適化問題が解かれる。これにより、目的関数(式(3a))が最小となるように、コジェネレーション設備5、ボイラ7、吸収式冷凍機(ABR)8、電機冷凍機(MR)4および蓄熱槽9の各運転出力Pcl{z},Hcl{z},Hbl{z},Hac{z},Hsi{z},Hso{z},z=1,…,24が決定される。
【0049】
この場合の機器パターンjとは不連続変数(1または0)δc{z},δb{z},δac{z},δm{z}の組み合わせに対応し、この場合の機器パターン数K(S308)は不連続変数の数の2のべき乗となる。すなわち、K=24=16通りの運転パターンがある。
【0050】
【数3】
【0051】
S305aにおいては、運転状態設定手段29により設定された機器運転パターンの判定が行われる。運転状態設定手段29は例えば、CRT画面において、手動により図3に示したような運転状態を、運転状態設定部29aで「0,1またはブランク」として設定する。この図3に示すように、z=1,…,nは時点1,…,nに対応している。運転状態設定部29aにおいては、下記の設定が行われる。
【0052】
1:対応する機器(δc{z},δb{z},δac{z}またはδm{z})は時点zで運転中指定。
【0053】
0:対応する機器(δc{z},δb{z},δac{z}またはδm{z})は時点zで停止中指定。
【0054】
ブランク部分:対応する機器(δc{z},δb{z},δac{z}またはδm{z})は時点zで運転停止指定無し。
【0055】
機器パターンj(j=1,…,16)と機器の状態δc,δb,δac,δmとの対応については、図4に対応表として示してある。この図4に示した対応表は、運転最適化手段24のメモリ部に記憶されている。例えばj=2の場合、S306において、δc=0,δb=0,δac=0,δm=1として、式(3)により与えられる問題が解かれる。
【0056】
ここで、図2に示した対象外機器パターン(S305a)における処理の詳細を図5によって説明する。
【0057】
図5に示したように、対象外機器パターンS305aは、S601〜S605のステップからなる。S601では、運転状態設定手段29により与えられる図3に示したような手動で設定される機器パターンと、運転最適化手段24に記憶されている図4に示した機器パターンとが入力される。
【0058】
次に、S602でi=1の設定が行われた後、S603では、入力されたパターンの照合が行われる。ここで、δi{z}(i=1,…,4)はそれぞれδc {z},δb{z},δac{z},δm{z}に対応しているとすると、照合した結果、「δi{z}(図3)=1かつδi{z}(図4)=0」または「δi{z}(図3)=0かつδi{z}(図4)=1」の場合、対応する「時点z,入放熱段階δL,機器パターンj」は運転状態設定手段29により与えられる手動設定と異なるので、最適化の対象外であり、対応する目的関数値(式(3a))を最大の値(例えば無限大)とし、S305bの処理を実行する。
【0059】
このような照合の結果、すべてのi(i=1,…,4)に対しても「δi{z}(図3)=1かつδi{z}(図4)=0」または「δi{z}(図3)=0かつδi{z}(図4)=1」でない場合には、対応する「時点z,入放熱段階δL,機器パターンj」は運転状態設定手段29により与えられる手動設定と異なることがないので、S306の処理を実行する。
【0060】
すなわち、NUOPT−モデリング言語を使用して、式(3)に与えられる最適化問題を解くことにより、目的関数(式(3a))が最小となるように、コジェネレーション設備5、ボイラ7、吸収式冷凍機(ABR)8、電動冷凍機(MR)4および蓄熱槽9の運転出力Pcl{z},Hcl{z},Hbl{z},Hac{z},Hsi{z},Hso{z},z=1,…,24が決定される。
【0061】
次に、図6により、蓄熱槽入放熱段階と蓄熱槽レベルとの関係について説明する。本実施形態では、変電設備1を離れる系統電力のコスト換算変数σMP{z}は時点zにより変動するものとする。ここで、夜間時間帯の電力料金が昼間より安いとすると、一般に蓄熱槽9では夜間に蓄熱する一方、昼間には蓄熱した熱を使うことが多い。
【0062】
図6において、横軸に時点zを表している。z=1,…,4は夜間低額料金時間帯、z=5,…,n(=24)を昼間の高額料金時間帯とすると、σMP{z1}<σMP{z2}となる。但し、z1=1,…,4、z2=5,…,24である。
【0063】
また、図6の縦軸には蓄熱レベルの段階インデクスを表している。この図6に示したように、蓄熱レベルの段階インデクスをδA=0,…,4とし、蓄熱の場合(z=1,…,4)の蓄熱段階インデクスをδL=0,1とし、放熱の場合(z=5,…,24)の放熱段階インデクスをδL=0,1,2とし、放熱終了時点をz=12とすると、各時点(z=1,…,24)における蓄熱槽レベルの可能な遷移は図6に太線で示したように、階層的に表される。そこで、蓄熱レベルの段階インデクスδAに対する各時点の段階インデクスの上下限値をAmax {z}およびAmix {z}とすると、蓄熱レベル上下限設定手段26では以下のような設定が行われる。
【0064】
【数4】
【0065】
図7は、各時点入出熱対応運転最適化手段25の処理を詳細に示している。この図7に示したように、各時点入出熱対応運転最適化手段25はS801およびS802の2ステップの処理を行う構成とされている。
【0066】
S801のステップにおいては、時点z−1、入放熱段階δL{z - 1}と機器パターンj{z - 1}に対応する目的関数値D(z−1,δL{z - 1},j{z - 1})(式(3a))を下記の式(5a)〜(5d)により、時点z、蓄熱レベルδAおよび機器パターンjに対応する目的関数値G(z,δA{z},j)に変換する処理が行われる。
【0067】
【数5】
【0068】
また、S802のステップにおいては、各時点z、蓄熱レベルδAおよび機器パターンjに対応する価値関数値V(z,δA{z},j{z})をダイナミックプログラミング手法により、下記の式(6a),(6b)にて計算する処理が行われる。
【0069】
【数6】
【0070】
次に、図2に示したS313のステップにおいては、上記の式(6a),(6b)により与えられるV(z,δA{z},j{z})により、下記の式(7a)〜(7d)でz=n,…1までの運転計画の決定が行われる。
【0071】
【数7】
【0072】
ただし、式(7a)および式(7b)の意味は(V(z,δA{z},j{z}))が最小となるようなδA{z},j{z}をそれぞれδA{z} *とj{z} *とし、式(7c)と式(7d)の意味は(G(z,δA{z} *,j{z} *)+V(z-1,δA{z - 1},j{z - 1}))が最小となるようなδA{z - 1},j{z - 1}をそれぞれδA{z - 1} *とj{z - 1} *とすることである。
【0073】
ここで、j{z} *とδA{z} *(z=1,…,24)に対応する式(3a),(3b)の最適解、すなわちコジェネレーション設備5、ボイラ7、吸収式冷凍機(ABR)8、電動冷凍機(MR)4および蓄熱槽9の運転出力Pcl{z} *,Hcl{z} *,Hbl{z} *,Hac{z} *,Hsi{z} *,Hso{z} *,z=1,…,24は、最適な運転計画である。
【0074】
図2に示したS314のステップにおいては、以上で求めた最適解j{z} *,δA{z} *,Pcl{z} *,Hcl{z} *,Hbl{z} *,Hac{z} *,Hsi{z} *,Hso{z} *,z=1,…,24を運転員への表示や制御装置に出力するものである。本実施形態では、運転員への表示のための出力として、蓄熱レベル表示手段30への出力が行われる。
【0075】
図8は、蓄熱レベル表示手段30がCRT表示器によって実現されている場合の蓄熱レベル表示の一例を示している。この図8に示すように、細線は、図6に対応する可能な運転レベル(式(4))を表示し、太線は式(7)により求められた最適計画の蓄熱レベルの例を表している。
【0076】
そして、需要予測手段21では、熱需要と電力需要の予測が行われる。需要対象が事務所であるような場合、需要は一般的に大気温度と相関するので、本実施形態では、天気予報などにより予測される大気温度に基づいて、電力負荷Pl{z}、蒸気熱負荷Hs{z}および冷熱負荷Hc{z}(z=1,…,n)の需要予測が行われる。大気温度と需要との関係を回帰モデルで表現すると、これらの関係は以下の式(8a),(8b),(8c)により与えられる。
【0077】
【数8】
【0078】
ここで、Ta{z}は予測される時点の大気温度、APl0〜APlyは電力熱需要予測パラメータ、AHs0〜AHsyは蒸気熱需要予測パラメータ、AHc0〜AHcyは冷熱需要予測パラメータ、yは回帰モデルの次数を表す。
【0079】
これらの予測パラメータAPl0〜APly,AHs0〜AHsyとAHc0〜AHcyは、例えば、過去の大気温度とそれぞれの需要Pl{z},Hs{z},Hc{z}の実績データを使用して、最小二乗法によって予め計算することが可能である。例えば、最近までの数週間ないし数年間の実績データを使って、パラメータAPl0〜APly,AHs0〜AHsy,AHc0〜AHcyを計算しておき、計算されたパラメータAPl0〜APly,AHs0〜AHsy,AHc0〜AHcyと、翌日の天気予報で予測された大気温度データTa{z}を使用して、翌日の需要予測(Pl{z},Hs{z},Hc{z})を行うことである。yは回帰モデルの次数であるが、一般的に3次に設定されることが多い。
【0080】
需要予測手段21は以上により大気温度から需要を予測し、予測された需要予測結果120を需要入力手段22に出力する。需要入力手段22は、需要予測手段21より需要予測結果120を入力し、この需要予測結果120を需要予測入力121(Pl{z},Hs{z},Hc{z})として運転最適化手段24に出力する。この需要予測に基づく運転最適化手段24の上記処理により、運転計画の出力が行われ、終了(図2のS315)となる。
【0081】
以上の本実施形態によれば、蓄熱槽9の蓄熱レベルを分割することにより、ダイナミックプログラミング手法を使って、最適運転計画を決定することができる。また、最適運転計画計算においては、図2に示したS306の処理に最も計算時間がかかる。ここで、入放熱に対応して、S306の処理を実施することにより、このS306の処理回数は最大で、機器パターン数×入放熱レベル数×時点数=24×3×24=1152となり、従来技術による計算回数に比べて大幅な減少が図れる。
【0082】
また、蓄熱レベル上下限設定手段26によって運転可能な蓄熱槽レベルを設定することにより、以上の計算回数をさらに減少することができる。
【0083】
放熱過程の各時点における蓄熱槽の熱損失だけ、各段階の蓄熱槽9の蓄放熱量を減少させるように、各段階の蓄熱槽9の蓄放熱量を補正することにより、蓄熱損失を含めた最適計画の決定が可能となる。
【0084】
さらに、エネルギ消費コスト、CO2換算発生量またはエネルギ消費換算量の一つ以上を制約条件として導入することにより、エネルギ消費コスト、CO2換算発生量またはエネルギ消費換算量の一つ以上を所定の制約条件に満足しながら、所定期間におけるエネルギ供給設備エネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の残りが最小となるように、運転計画を決定することができる。
【0085】
また、任意に設定されたエネルギ発生装置の運転状態を制約条件に入れることにより、運転計画の評価または手動運転の介入が可能な運転計画を実現することができる。また、運転可能な蓄熱レベル曲線と最適な蓄熱レベル曲線を表示することにより、最適運転計画により決定される蓄熱槽の蓄放熱過程を容易に確認することができる。
【0086】
さらにまた、エネルギ需要を予測する需要予測手段21とを組合せることにより、予測されたエネルギ需要を満足しながら、エネルギ供給設備の運転計画を決定することができる。
【0087】
第2実施形態(図9)
図9は本発明の第2実施形態の構成を示す系統図である。本実施形態では、第1実施形態で示した熱損失補正手段27に代えて、熱損失換算手段31を設けた構成としている。他の手段については、第1実施形態と同様である。
【0088】
このような構成の本実施形態においては、運最適化手段24により、式(3a),(3b)の代えて下記の式(9a)〜(9c)を解くことにより、運転計画を決定する。
【0089】
【数9】
【0090】
ここで、pHsl{z}は熱損失をエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上に換算するペナルティパラメータであり、式(9a)のpHsl{z}×Hsl{z}の計算処理は熱損失換算手段31により処理され、その計算結果は熱損失換算結果131として、運転最適化手段24に出力される。
【0091】
本実施形態によれば、熱損失をエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上に換算することにより、放熱過程の各時点における蓄熱槽9の熱損失だけ、各段階の蓄熱槽9の蓄放熱量を減少させることなく、エネルギ供給設備Aのエネルギ消費コスト、CO2換算発生量およびエネルギ消費換算量の一つ以上が準最小となるように、運転計画値を決定することができる。
【0092】
他の実施形態
本発明のシステムは上述した各実施形態で示したように、各手段に直接組み込む構成に限られるものではなく、各ステップによる駆動プログラムをフロッピーディスク、光ディスクその他の各種記憶媒体に格納し、機器に着脱して実施することができる。
【0093】
【発明の効果】
以上で詳述したように、本発明によれば、蓄熱レベルを分割することにより、ダイナミックプログラミング手法を使用して、非線形な特性をもつエネルギ供給設備の運転計画を高速に決定することができる。
【図面の簡単な説明】
【図1】本発明の第1実施形態によるシステム構成を示す系統図。
【図2】本発明の第1実施形態によるシステムを実行する手順を示すフローチャート。
【図3】図1に示した運転状態設定手段の説明図。
【図4】前記実施形態における機器パターンと運転状態との対応を示す説明図。
【図5】前記実施形態における対象外機器パターン処理手段の手順を示す詳細図。
【図6】前記実施形態における蓄熱槽入放熱段階と蓄熱レベルとの関係を示す作用説明図。
【図7】前記実施形態における各時点入出熱対応運転最適化手段の手順を示す詳細図。
【図8】前記実施形態における蓄熱レベル表示手段を示す説明図。
【図9】本発明の第2実施形態によるシステム構成を示す系統図。
【図10】エネルギシステムの設備機器構成例を示す系統図。
【図11】従来のシステムを示す系統図。
【図12】従来のシステムによる作用を示すフローチャート。
【符号の説明】
1 変電設備
2 電力系統
3 負荷設備
4 電動冷凍機(MR)
5 コジェネレーション設備
6 燃料設備
7 ボイラ
8 吸収式冷凍機(ABR)
9 蓄熱槽
10 電力負荷設備
11 熱負荷設備
12 蒸気熱負荷設備
13 冷熱負荷設備
14 需要入力手段
15 運転最適化手段
21 需要予測手段
22 需要入力手段
23 蓄熱槽入放熱段階記憶手段
24 運転最適化手段
25 時点入出熱対応運転最適化手段
26 蓄熱レベル上下限設定手段
27 熱損失補正手段
28 制約手段
29 運転状態設定手段
30 蓄熱レベル表示手段
31 熱損失換算手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an operation plan system for an energy supply facility that optimizes the operation of the energy supply facility having a heat storage tank.
[0002]
[Prior art]
In recent years, in response to demands for environmental preservation, energy saving, and cost saving, cogeneration facilities capable of generating steam heat and electric power at the same time on the energy consumer side and energy supply facilities incorporating heat storage tanks have been developed.
[0003]
FIG. 10 is a system diagram showing an example of the device configuration of such an energy supply facility. In the energy supply facility A shown in FIG. 10, the
[0004]
The absorption refrigeration machine (ABR) 8 generates
[0005]
The
[0006]
The configuration of the conventional operation planning apparatus for the energy supply facility A shown in FIG. 10 will be described with reference to FIG. As shown in FIG. 11, the conventional operation planning apparatus B includes a
[0007]
[Expression 1]
[0008]
The symbols (1a) to (1zb) described above will be described as follows (with reference to FIG. 10).
[0009]
The subscript {z} represents the z-th time point, for example, F{Z}Represents the fuel flow rate (102) supplied from the
[0010]
P is the power flowing through the
[0011]
α, β, γ are weighting parameters, θMFIs the cost conversion parameter of fuel F, σMPRepresents a cost conversion variable of the system power flowing through the
[0012]
aC, ..., fCIs the generated power P of the
[0013]
HcaIs the supply steam heat to the absorption refrigerator (ABR) 8, HacIs the cold generated by the absorption refrigerator (ABR) 8, aca, Bca, CcaIs the cold H generated by the absorption refrigerator (ABR) 8acSupply steam heat HcaRepresents a conversion parameter.
[0014]
PmIs the power supplied to the electric refrigerator (MR) 4, HsiRepresents the generated cold heat of the electric refrigerator (MR) 4, that is, the heat input of the
[0015]
HscIs the cold energy accumulated in the
[0016]
PminAnd PmaxRepresents a lower limit value and an upper limit value of the electric power flowing through the
[0017]
Hac minAnd Hac maxRepresents the lower limit value and the upper limit value of the generated cold heat of the absorption refrigerator (ABR) 8, respectively.si minAnd Hsi maxRepresents the lower limit value and the upper limit value of the generated cold energy of the electric refrigerator (MR) 4, respectively. Hso minAnd Hso maxRepresents the lower limit value and the upper limit value of the supply cold heat from the
[0018]
The above equation (1a) is an equation related to the objective function, and equations (1b) to (1zb) are equations related to the constraint conditions. Among these, the formulas (1b), (1c), and (1d) are calculated based on the fuel flow F (102) supplied from the
[0019]
Moreover, Formula (1e) is the generated electric power P of the cogeneration facility 5.clAnd generated heat HclAnd fuel F of
[0020]
Formula (1h) is the generated cold heat H of the absorption refrigerator (ABR) 8acAnd supply steam heat HcaIs an approximation of the relationship. Equation (1i) indicates that the electric refrigerator (MR) 4 is cold HsiPower consumption P required to generatemRepresents.
[0021]
Expressions (1j) and (1k) represent the heat balance and heat storage loss of the
[0022]
In the above description, the time point z is set to z = 1,..., N (n = 24), and the load prediction from the current time point to 24 hours ahead is targeted, but this is generally a heat storage tank operating cycle of 24 hours. Based on being a period. Here, if d is a time width from the time point z to the time point z + 1, in the above example, d = 1 hour and n × d = 24 hours. In the time interval [z, z + 1], the predicted load is assumed to be constant. Here, if the time width d is small, the load can be predicted with a fine time width, and if n is large, the load can be predicted over a long period of time. However, from time z = 1 to z = n The number of repeated calculations increases. Conversely, the larger the time width d is, the more predictable the load can be with a rough time width, and the smaller n is, the more predictable the load can be over a short period of time, in which case the number of calculations is reduced. .
[0023]
Electric power load Pl {z}Steam heat load Hs {z}And cooling load Hc {z}These are data given as the
[0024]
As a means for solving the nonlinear problem shown in the equations (1a) to (1zb), a known computer language, for example, a NUOPT-modeling language applied when solving a linear programming problem or the like can be used. When solving the nonlinear problem given to the equations (1a) to (1zb) using this NUOPT-modeling language, the calculation is performed using the differential (slope) information of the equations, so the equations (1a) to (1zb) are given. As can be seen, a discontinuous variable (1 or 0) δ representing the shutdown of the equipmentc {z}, Δb {z}, Δac {z}, Δm {z}Cannot be handled. When such a discontinuous variable is included, the conventional operation optimizing means 15 needs to perform processing according to the procedure shown in FIG.
[0025]
In FIG. 12, the processing procedure of the conventional driving optimization means 15 will be described. After the start, i = 1 is set (S101), and the driving optimization process corresponding to the driving pattern i (S102), i = The operation plan corresponding to the operation pattern of the Max set is calculated by the setting of i + 1 (S103) and the repetition processing of Max times, and the smallest operation function value (formula (1a)) among the operation patterns of the calculated Max set. Operation plan Pcl {z}, Hcl {z}, Hbl {z}, Hac {z}, Hsi {z}, Hso {z}, Z = 1,..., 24 are determined as optimum plans (S105). The driving pattern is a discontinuous variable (1 or 0) δc {z}, Δb {z}, Δac {z}, Δm {z}The number of operation patterns in this case is a power of 2 of the number of discontinuous variables, that is, a power of the number of time points z, and Max = (24)24= 7.928There are street driving patterns.
[0026]
[Problems to be solved by the invention]
As described above, in the process according to the conventional technique, the number of repeated calculations is enormous (for example, 7.928There is a problem that it takes a long time until the optimum solution is obtained.
[0027]
This invention is made | formed in view of such a situation, and it aims at providing the operation plan system of the energy supply equipment which can perform a suitable operation plan in a shorter time.
[0028]
[Means for Solving the Problems]
In order to achieve the above object, the invention according to
[0029]
In the invention according to
[0030]
In the invention which concerns on
[0031]
In the invention which concerns on
[0032]
In the invention which concerns on
[0033]
In the invention which concerns on
[0034]
In the invention which concerns on
[0035]
In the invention which concerns on
[0036]
In the invention which concerns on
[0037]
The invention according to
[0038]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of an operation plan system for an energy supply facility according to the present invention will be described with reference to FIGS. The energy supply equipment to be operated is the same as the equipment configuration shown in FIG. 10, and will be described with reference to FIG. 10 as it is.
[0039]
1st Embodiment (FIGS. 1-8, FIG. 10)
FIG. 1 is a system diagram showing a configuration of an operation plan system for an energy supply facility according to a first embodiment of the present invention.
[0040]
As shown in FIG. 1, the system of the present embodiment includes a demand prediction unit 21 for predicting energy demand, a demand input unit 22 for inputting a demand schedule based on the predicted demand, and a
[0041]
The
[0042]
[Expression 2]
[0043]
Among the above formulas, the formulas (2a) to (2zb) correspond to the formulas (1a) to (1zb) shown in the above description of the prior art, but in the present embodiment, the formulas (2z) As shown, lower limit of heat storage Hsc min {Z}And upper limit Hsc max {Z}Is set corresponding to the time point z. Further, the equations (2zc) and (2zd) are equations relating to the heat input / heat release stage, and in these equations, δLIs the stage index, L{Z}Is the maximum stage. Equations (2ze), (2zf), and (2zg) are expressed as CO2It is a constraint condition expression corresponding to the amount of generated conversion, the amount of energy consumption conversion, and the energy consumption cost.
[0044]
In the present embodiment, as shown in the formula (2zc) and the formula (2zd), the heat release amount of the
[0045]
In addition, between the
[0046]
FIG. 2 is a flowchart showing a processing procedure for executing an operation plan in the operation optimization means 24.
[0047]
As shown in FIG. 2, after the start (S301), the above inputs are performed as initial processing (S320). In S303 to S305, z = 1, δL= 1 and j = 1 are set.
[0048]
Next, the target device pattern is determined (S305a). If yes, the objective function value maximum processing (S305b) is performed. If no, the operation optimization processing (S306) is performed. In S306 and S307 to S312, the time point z, the input / output heat release stage δLThen, the operation optimization process corresponding to the device pattern j is performed, and the optimization problem given in the equation (3) is solved by using the NUPOT-modeling language. Thereby, each operation output of the
[0049]
The device pattern j in this case is a discontinuous variable (1 or 0) δc {z}, Δb {z}, Δac {z}, Δm {z}In this case, the device pattern number K (S308) is a power of two of the number of discontinuous variables. That is, K = 24There are 16 driving patterns.
[0050]
[Equation 3]
[0051]
In S305a, the device operation pattern set by the operation state setting means 29 is determined. For example, on the CRT screen, the operation state setting means 29 manually sets the operation state as shown in FIG. 3 as “0, 1 or blank” by the operation
[0052]
1: Corresponding device (δc {z}, Δb {z}, Δac {z}Or δm {z}) Is specified during operation at time z.
[0053]
0: Corresponding device (δc {z}, Δb {z}, Δac {z}Or δm {z}) Is specified as stopping at time z.
[0054]
Blank part: corresponding equipment (δc {z}, Δb {z}, Δac {z}Or δm {z}) No operation stop specified at time z.
[0055]
Device pattern j (j = 1,..., 16) and device state δc, Δb, Δac,
[0056]
Details of processing in the non-target device pattern (S305a) shown in FIG. 2 will be described with reference to FIG.
[0057]
As shown in FIG. 5, the non-target device pattern S305a includes steps S601 to S605. In S <b> 601, the device pattern manually set as shown in FIG. 3 given by the operation
[0058]
Next, after setting i = 1 in S602, in S603, the input pattern is collated. Where δi {z}(I = 1,..., 4) are each δc {Z}, Δb {z}, Δac {z}, Δm {z}As a result of matching, “δi {z}(FIG. 3) = 1 and δi {z}(FIG. 4) = 0 or “δ”i {z}(FIG. 3) = 0 and δi {z}(FIG. 4) = 1, the corresponding “time point z, input / output heat release stage δL, Device pattern j ”is different from the manual setting given by the operating state setting means 29, and is not subject to optimization, and the corresponding objective function value (formula (3a)) is set to the maximum value (for example, infinity), The process of S305b is executed.
[0059]
As a result of such collation, for all i (i = 1,..., 4), “δi {z}(FIG. 3) = 1 and δi {z}(FIG. 4) = 0 or “δ”i {z}(FIG. 3) = 0 and δi {z}If (FIG. 4) is not “1”, the corresponding “time z, input / output heat release stage δ”L, Device pattern j ”does not differ from the manual setting given by the operating state setting means 29, so the process of S306 is executed.
[0060]
That is, by using the NUOPT-modeling language to solve the optimization problem given in Equation (3), the
[0061]
Next, with reference to FIG. 6, the relationship between the heat storage tank heat release and heat release stage and the heat storage tank level will be described. In this embodiment, the cost conversion variable σ of the grid power leaving the
[0062]
In FIG. 6, time z is shown on the horizontal axis. If z = 1,..., 4 is a nighttime low charge time zone and z = 5,..., n (= 24) is a daytime high charge time zone, then σMP {z1}<ΣMP {z2}It becomes. However, z1 = 1,..., 4 and z2 = 5,.
[0063]
In addition, the vertical axis of FIG. 6 represents the stage index of the heat storage level. As shown in FIG. 6, the stage index of the heat storage level is expressed as δ.A= 0,..., 4 and the heat storage stage index in the case of heat storage (z = 1,..., 4) is δ.L= 0, 1 and the heat release index in the case of heat release (z = 5,..., 24) is δL= 0, 1, 2 and z = 12, the possible transition of the heat storage tank level at each time (z = 1,..., 24) is hierarchical as shown by the thick line in FIG. It is expressed in Therefore, the stage index δ of the heat storage levelAThe upper and lower limits of the stage index at each pointmax {Z}And Amix {Z}Then, in the heat storage level upper / lower limit setting means 26, the following setting is performed.
[0064]
[Expression 4]
[0065]
FIG. 7 shows in detail the processing of the operation optimization means 25 corresponding to each time input / output heat. As shown in FIG. 7, each point-in / out heat corresponding
[0066]
In step S801, the time point z-1, the heat input / output stage δL {z - 1}And equipment pattern j{Z - 1}The objective function value D (z−1, δ) corresponding toL {z - 1}, J{Z - 1}) (Formula (3a)) by the following formulas (5a) to (5d), the time point z, the heat storage level δAAnd an objective function value G (z, δ) corresponding to the device pattern jA {z}, J).
[0067]
[Equation 5]
[0068]
In step S802, each time point z, the heat storage level δAAnd the value function value V (z, δ) corresponding to the device pattern jA {z}, J{Z}) Is calculated by the following equations (6a) and (6b) by a dynamic programming technique.
[0069]
[Formula 6]
[0070]
Next, in step S313 shown in FIG. 2, V (z, δ) given by the above equations (6a) and (6b).A {z}, J{Z}), The operation plan up to z = n,... 1 is determined by the following formulas (7a) to (7d).
[0071]
[Expression 7]
[0072]
However, the meanings of the expressions (7a) and (7b) are (V (z, δA {z}, J{Z}) That minimizes))A {z}, J{Z}RespectivelyA {z} *And j{Z} *And the meanings of equations (7c) and (7d) are (G (z, δA {z} *, J{Z} *) + V (z-1, δA {z - 1}, J{Z - 1}) That minimizes))A {z - 1}, J{Z - 1}RespectivelyA {z - 1} *And j{Z - 1} *It is to do.
[0073]
Where j{Z} *And δA {z} *Optimal solutions of equations (3a), (3b) corresponding to (z = 1,..., 24), that is,
[0074]
In step S314 shown in FIG. 2, the optimum solution j obtained above is obtained.{Z} *, ΔA {z} *, Pcl {z} *, Hcl {z} *, Hbl {z} *, Hac {z} *, Hsi {z} *, Hso {z} *, Z = 1,..., 24 are output to the operator and output to the control device. In this embodiment, the output to the heat storage level display means 30 is performed as an output for a display to an operator.
[0075]
FIG. 8 shows an example of the heat storage level display when the heat storage level display means 30 is realized by a CRT display. As shown in FIG. 8, the thin line represents the possible operation level (equation (4)) corresponding to FIG. 6, and the thick line represents an example of the heat storage level of the optimum plan obtained by equation (7). Yes.
[0076]
And in the demand prediction means 21, prediction of heat demand and electric power demand is performed. When the demand target is an office, the demand generally correlates with the atmospheric temperature. Therefore, in the present embodiment, the power load P is based on the atmospheric temperature predicted by a weather forecast or the like.l {z}Steam heat load Hs {z}And cooling load Hc {z}A demand prediction of (z = 1,..., N) is performed. When the relationship between the atmospheric temperature and demand is expressed by a regression model, these relationships are given by the following equations (8a), (8b), and (8c).
[0077]
[Equation 8]
[0078]
Where Ta {z}Is the predicted atmospheric temperature, APl0~ APlyIs the electricity heat demand forecast parameter, AHs0~ AHsyIs the steam heat demand prediction parameter, AHc0~ AHcyRepresents a cold demand prediction parameter, and y represents the order of the regression model.
[0079]
These prediction parameters APl0~ APly, AHs0~ AHsyAnd AHc0~ AHcyFor example, the past atmospheric temperature and the respective demand Pl {z}, Hs {z}, Hc {z}Can be calculated in advance by the least squares method. For example, parameter A can be used by using actual data for several weeks to several years.Pl0~ APly, AHs0~ AHsy, AHc0~ AHcyAnd calculate the calculated parameter APl0~ APly, AHs0~ AHsy, AHc0~ AHcyAnd atmospheric temperature data T predicted by the weather forecast for the next daya {z}To predict the next day's demand (Pl {z}, Hs {z}, Hc {z}). y is the order of the regression model, but is generally set to the third order.
[0080]
The demand prediction unit 21 predicts the demand from the atmospheric temperature as described above, and outputs the predicted
[0081]
According to the above embodiment, by dividing the heat storage level of the
[0082]
In addition, by setting the heat storage tank level that can be operated by the heat storage level upper and lower limit setting means 26, the number of calculations described above can be further reduced.
[0083]
The heat storage loss was included by correcting the heat storage heat dissipation amount of each stage of the
[0084]
In addition, energy consumption costs, CO2By introducing one or more of the conversion generation amount or the energy consumption conversion amount as a constraint, the energy consumption cost, CO2While satisfying a predetermined constraint condition with one or more of the converted generation amount or the energy consumption conversion amount, the energy supply equipment energy consumption cost in a predetermined period, CO2The operation plan can be determined so that the conversion generation amount and the remaining energy consumption conversion amount are minimized.
[0085]
In addition, an operation plan capable of evaluating the operation plan or intervention of manual operation can be realized by putting the operation state of the energy generator set arbitrarily in the constraint condition. In addition, by displaying the operable heat storage level curve and the optimum heat storage level curve, it is possible to easily confirm the heat storage and heat dissipation process of the heat storage tank determined by the optimum operation plan.
[0086]
Furthermore, by combining with the demand prediction means 21 that predicts the energy demand, it is possible to determine the operation plan of the energy supply facility while satisfying the predicted energy demand.
[0087]
Second Embodiment (FIG. 9)
FIG. 9 is a system diagram showing the configuration of the second embodiment of the present invention. In the present embodiment, a heat loss conversion means 31 is provided instead of the heat loss correction means 27 shown in the first embodiment. Other means are the same as in the first embodiment.
[0088]
In the present embodiment having such a configuration, the operation plan is determined by solving the following equations (9a) to (9c) by the
[0089]
[Equation 9]
[0090]
Where pHsl {z}Is heat loss, energy consumption cost, CO2This is a penalty parameter that is converted into one or more of the conversion generation amount and the energy consumption conversion amount, and p in equation (9a)Hsl {z}× Hsl {z}Is calculated by the heat loss conversion means 31, and the calculation result is output to the operation optimization means 24 as the heat
[0091]
According to this embodiment, heat loss is reduced by energy consumption cost, CO2By converting to one or more of the conversion generation amount and the energy consumption conversion amount, energy supply without reducing the heat storage heat dissipation amount of the
[0092]
Other embodiments
As described in the above embodiments, the system of the present invention is not limited to the configuration that is directly incorporated in each means, but the drive program according to each step is stored in a floppy disk, an optical disk or other various storage media, and is stored in the device. It can be carried out by attaching and detaching.
[0093]
【The invention's effect】
As described in detail above, according to the present invention, by dividing the heat storage level, an operation plan of an energy supply facility having nonlinear characteristics can be determined at high speed by using a dynamic programming technique.
[Brief description of the drawings]
FIG. 1 is a system diagram showing a system configuration according to a first embodiment of the present invention.
FIG. 2 is a flowchart showing a procedure for executing the system according to the first embodiment of the present invention;
FIG. 3 is an explanatory diagram of the operation state setting means shown in FIG.
FIG. 4 is an explanatory diagram showing a correspondence between a device pattern and an operation state in the embodiment.
FIG. 5 is a detailed diagram illustrating a procedure of a non-target device pattern processing unit in the embodiment.
FIG. 6 is an operation explanatory diagram showing the relationship between a heat storage tank heat release / radiation stage and a heat storage level in the embodiment.
FIG. 7 is a detailed view showing the procedure of each time input / output heat corresponding operation optimization means in the embodiment.
FIG. 8 is an explanatory diagram showing heat storage level display means in the embodiment.
FIG. 9 is a system diagram showing a system configuration according to a second embodiment of the present invention.
FIG. 10 is a system diagram showing an example of equipment configuration of the energy system.
FIG. 11 is a system diagram showing a conventional system.
FIG. 12 is a flowchart showing the operation of the conventional system.
[Explanation of symbols]
1 Substation equipment
2 Power system
3 Load facilities
4 Electric refrigerator (MR)
5 Cogeneration facilities
6 Fuel facilities
7 Boiler
8 Absorption type refrigerator (ABR)
9 Thermal storage tank
10 Power load equipment
11 Heat load equipment
12 Steam heat load equipment
13 Cold load equipment
14 Demand input means
15 Driving optimization means
21 Demand forecasting means
22 Demand input means
23 Heat storage tank heat release heat storage stage storage means
24 Operation optimization means
25 Operation optimization means for heat input / output
26 Heat storage level upper and lower limit setting means
27 Heat loss correction means
28 Restriction means
29 Operation state setting means
30 Heat storage level display means
31 Heat loss conversion means
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001306660A JP3763767B2 (en) | 2001-10-02 | 2001-10-02 | Operation planning system for energy supply equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001306660A JP3763767B2 (en) | 2001-10-02 | 2001-10-02 | Operation planning system for energy supply equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2003113739A JP2003113739A (en) | 2003-04-18 |
JP3763767B2 true JP3763767B2 (en) | 2006-04-05 |
Family
ID=19126260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001306660A Expired - Fee Related JP3763767B2 (en) | 2001-10-02 | 2001-10-02 | Operation planning system for energy supply equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3763767B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013128953A1 (en) | 2012-02-27 | 2013-09-06 | 株式会社 東芝 | Optimization apparatus, optimization method, and optimization program for storing electricity and heat. |
WO2014073556A1 (en) | 2012-11-09 | 2014-05-15 | 株式会社 東芝 | Power conserving electricity and heat storage optimization device, optimization method and optimization program |
US9037307B2 (en) | 2010-01-12 | 2015-05-19 | Panasonic Intellectual Property Management Co., Ltd. | Supply-and-demand control apparatus, supply-and-demand control method, and supply-and-demand control system |
JP2016042748A (en) * | 2014-08-14 | 2016-03-31 | 株式会社Ihi | Energy management system and power demand plan optimization method |
JP2017049756A (en) * | 2015-09-01 | 2017-03-09 | 中国電力株式会社 | Method and system for optimizing operation plan of heat source device network, and program |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4984107B2 (en) * | 2005-07-08 | 2012-07-25 | 株式会社Ihi | Cogeneration plant operation planning method, apparatus and program |
CN100422886C (en) * | 2006-11-03 | 2008-10-01 | 冯江华 | Central optimum control method for cold, heat and electricity three-way energy supply system |
CN101813941B (en) * | 2010-04-15 | 2014-12-03 | 上海齐耀动力技术有限公司 | Energy efficiency optimizing and dispatching system for cold, heat and electricity triple supply equipment |
JP5636297B2 (en) | 2011-01-24 | 2014-12-03 | ヤンマー株式会社 | Cogeneration system |
US20130060667A1 (en) * | 2011-09-01 | 2013-03-07 | Robert James Burke | Energy management modeling language |
US9429924B2 (en) | 2012-06-26 | 2016-08-30 | International Business Machines Corporation | Controlling power generators and chillers |
-
2001
- 2001-10-02 JP JP2001306660A patent/JP3763767B2/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9037307B2 (en) | 2010-01-12 | 2015-05-19 | Panasonic Intellectual Property Management Co., Ltd. | Supply-and-demand control apparatus, supply-and-demand control method, and supply-and-demand control system |
WO2013128953A1 (en) | 2012-02-27 | 2013-09-06 | 株式会社 東芝 | Optimization apparatus, optimization method, and optimization program for storing electricity and heat. |
US10042332B2 (en) | 2012-02-27 | 2018-08-07 | Kabushiki Kaisha Toshiba | Electric/thermal energy storage schedule optimizing device, optimizing method and optimizing program |
WO2014073556A1 (en) | 2012-11-09 | 2014-05-15 | 株式会社 東芝 | Power conserving electricity and heat storage optimization device, optimization method and optimization program |
US9916630B2 (en) | 2012-11-09 | 2018-03-13 | Kabushiki Kaisha Toshiba | Electricity suppressing type electricity and heat optimizing control device, optimizing method, and optimizing program |
JP2016042748A (en) * | 2014-08-14 | 2016-03-31 | 株式会社Ihi | Energy management system and power demand plan optimization method |
JP2017049756A (en) * | 2015-09-01 | 2017-03-09 | 中国電力株式会社 | Method and system for optimizing operation plan of heat source device network, and program |
Also Published As
Publication number | Publication date |
---|---|
JP2003113739A (en) | 2003-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4347602B2 (en) | Heat source operation support control method, system and program | |
EP2821724B1 (en) | Optimization apparatus, optimization method, and optimization program for storing electricity and heat. | |
JPH06236202A (en) | Method and apparatus for operating plant | |
JP3763767B2 (en) | Operation planning system for energy supply equipment | |
JP2006304402A (en) | Control device for dispersed energy system, control method, program, and recording medium | |
JPH09179604A (en) | System and method for controlling operation of plant | |
CN104898422A (en) | Hierarchical optimization method for united cold supply system | |
Abdulaal et al. | A linear optimization based controller method for real-time load shifting in industrial and commercial buildings | |
US12038189B2 (en) | Optimization engine for energy sustainability | |
JP4275259B2 (en) | Control method and apparatus for building energy system and recording medium recording control processing program | |
JP3215279B2 (en) | Method and apparatus for operating energy equipment | |
JP4496587B2 (en) | Cogeneration plant operation method and apparatus | |
Sarkar et al. | Concurrent carbon footprint reduction (c2fr) reinforcement learning approach for sustainable data center digital twin | |
Pertzborn | Using distributed agents to optimize thermal energy storage | |
JP2015198523A (en) | Facility apparatus operation system and facility apparatus operation method | |
JP2010136557A (en) | Cogeneration energy system | |
JP2007028739A (en) | Adaptive generator start / stop plan creation method corresponding to load demand change | |
JP3969141B2 (en) | Generator start / stop plan preparation device and method | |
JP2007104775A (en) | Energy demanding/supplying method in combined power supply, and energy demanding/supplying apparatus | |
Wolfrum et al. | Optimal control of combined heat and power units under varying thermal loads | |
JP3170393B2 (en) | Driving method and apparatus for district heating and cooling system | |
Liu et al. | Home energy management with clothing integrated thermal comfort and ev soc concern | |
CN113098073A (en) | Day-ahead scheduling optimization method considering source-load bilateral elastic space | |
KR20220090202A (en) | System for performing optimal managing of complex equipments based thermal energy demanding forcasting | |
CN113112095A (en) | Multi-mode multi-heat supply unit load real-time optimization scheduling method and management system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040625 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050930 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20060110 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20060117 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100127 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110127 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120127 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130127 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130127 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140127 Year of fee payment: 8 |
|
LAPS | Cancellation because of no payment of annual fees |