[go: up one dir, main page]

JP3401153B2 - Roof unit - Google Patents

Roof unit

Info

Publication number
JP3401153B2
JP3401153B2 JP00740197A JP740197A JP3401153B2 JP 3401153 B2 JP3401153 B2 JP 3401153B2 JP 00740197 A JP00740197 A JP 00740197A JP 740197 A JP740197 A JP 740197A JP 3401153 B2 JP3401153 B2 JP 3401153B2
Authority
JP
Japan
Prior art keywords
ceiling
roof
panel
roof unit
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP00740197A
Other languages
Japanese (ja)
Other versions
JPH10205049A (en
Inventor
清 竹内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP00740197A priority Critical patent/JP3401153B2/en
Publication of JPH10205049A publication Critical patent/JPH10205049A/en
Application granted granted Critical
Publication of JP3401153B2 publication Critical patent/JP3401153B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、工場にて生産さ
れ、建築現場に輸送されて、建物の屋根部分を構成する
屋根ユニットに係り、詳しくは、天井野縁パネルを備え
る屋根ユニットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roof unit produced in a factory and transported to a construction site to form a roof portion of a building, and more particularly to a roof unit having a ceiling field panel.

【0002】[0002]

【従来の技術】近年、建物の工業生産化率を高める一方
式として、ユニット建物が広く普及している。このユニ
ット建物は、一棟の建物を、予めいくつかのユニットに
分けて工場生産し、これらを建築現場において施工・組
立する方式の建物である。ユニット建物を構成するユニ
ットとしては、図16に示すように、建物の居間、食
堂、寝室、子供部屋等の各部屋部分を構成する建物ユニ
ットA1,A2と、建物の軒先側、棟側等の屋根部分を
構成する屋根ユニットB1,B2とがある。これらのユ
ニットA1,B1,…は、予め工場で生産され、建築現
場に輸送されて、予め準備した基礎の上で施工・組立さ
れる。組立は、同図に示すように、まず、建物ユニット
A1,A2,…を基礎の上に据え付けて相互に連結し、
次に、据え付けられた各建物ユニットA1,A2,…の
上部に屋根ユニットB1,B2,…を据え付け相互に連
結して行われる。
2. Description of the Related Art In recent years, unit buildings have become widespread as one method for increasing the industrial production rate of buildings. This unit building is a building in which one building is divided into several units in advance and produced in a factory, and these are constructed / assembled at a construction site. As shown in FIG. 16, the units constituting the unit building include building units A1 and A2 constituting each room portion such as a living room, a dining room, a bedroom, and a child room, and an eaves side and a ridge side of the building. There are roof units B1 and B2 that form a roof portion. These units A1, B1, ... Are produced in a factory in advance, transported to a construction site, and constructed and assembled on a previously prepared foundation. As shown in the figure, first, the building units A1, A2, ... Are installed on the foundation and connected to each other,
Next, roof units B1, B2, ... Are installed and connected to each other on top of the installed building units A1, A2 ,.

【0003】ところで、上記屋根ユニットB1,B2
は、通常、図17に示すように、たる木11,11,…
等によって方形に組み立てられた屋根枠組の上面に構造
用合板等の野地板12を取り付けることによって屋根構
面として構成された屋根パネル1a,1bと、この屋根
パネル1a,1bをその妻側(短辺側)両側縁にて支持
する垂直面状の構造体たる一対の妻小壁パネル2a,2
bとから構成されるが(例えば、特公昭61−1583
号公報等参照)、現場施工負担の一層の軽減化を企図し
て、図18に示すように、工場段階から、天井野縁3
1,31,…によって長方形に組まれた天井野縁パネル
3a,3bを下面に備える屋根ユニットB3,B4も存
在する(例えば、特開平6−146393号公報等参
照)。
By the way, the above roof units B1 and B2
Is usually a rafter tree 11, 11, ... As shown in FIG.
Roof panels 1a and 1b configured as roof structuring by attaching a base plate 12 such as structural plywood to the upper surface of a roof frame assembled in a square shape by the like, and the roof panels 1a and 1b on the end side (short side). Side side) A pair of gable small wall panels 2a, 2 that are vertical plane structures supported by both side edges
b (see, for example, Japanese Examined Patent Publication 61-1583).
In order to further reduce the on-site construction load, as shown in FIG. 18, from the factory stage, the ceiling field 3
There are also roof units B3 and B4 provided on the lower surface with ceiling edge panels 3a and 3b assembled in a rectangular shape by 1, 31, ... (See, for example, JP-A-6-146393).

【0004】また、上記建物ユニットA1,A2は、枠
組壁工法が適用される場合を例に挙げるなら、壁、床の
各枠組に構造用の面材を打ち付けて床パネル4、壁パネ
ル5a,5bとし、図16に示すように、床パネル4の
2つ又は3つの側縁に沿って壁パネル5a,5b,…を
立設してなり、通常は、これら複数の建物ユニットA
1,A2によって1つの部屋が構成される。つまり、個
々の建物ユニットA1,A2は、通常、任意の1つの部
屋の部分(1つの部屋部分)である。
In the building units A1 and A2, if the frame wall construction method is applied as an example, the floor panel 4, the wall panel 5a 5b, as shown in FIG. 16, wall panels 5a, 5b, ... Are erected along two or three side edges of the floor panel 4, and normally, a plurality of these building units A are used.
One room is composed of 1, A2. That is, the individual building units A1 and A2 are usually arbitrary one room parts (one room part).

【0005】[0005]

【発明が解決しようとする課題】しかしながら、建物ユ
ニットの中には、図19に示すように、床パネルの中央
部にも間仕切用の中壁パネル5cが立設された建物ユニ
ットA3,A4もあり、これらの建物ユニットA3,A
4は、中壁パネル5cによって仕切られる2つの部屋の
各部分(2つの部屋部分)を有している。しかして、こ
のような建物ユニットA3,A4の上部に、天井野縁パ
ネル3a,3b付きの屋根ユニットB3,B4を据付連
結する場合には、次のような問題があった。すなわち、
互いに隣接する2つの部屋を仕切る中壁パネル5c,5
cの上面が、天井枠材たる天井野縁31から外れる虞が
あり、このような場合には、中壁パネル5cの固定が不
充分となり不安定となる。加えて、ユニット建物の施工
・組立時に、屋根ユニットB3,B4間で天井段差が生
じた場合、天井野縁パネル3a,3bの屋根ユニットB
3,B4本体への仮固定を外して、天井段差を修正する
ことは、中壁パネル5c,5cが障害となって、不可能
である。
However, in the building units, as shown in FIG. 19, there are also building units A3 and A4 in which the middle wall panel 5c for partitioning is erected in the center of the floor panel. Yes, these building units A3, A
4 has each part of two rooms (two room parts) partitioned by the inner wall panel 5c. However, when the roof units B3 and B4 with the ceiling edge panels 3a and 3b are installed and connected to the upper portions of the building units A3 and A4, the following problems occur. That is,
Middle wall panels 5c, 5 that partition two rooms adjacent to each other
There is a possibility that the upper surface of c will come off from the ceiling field 31 which is the ceiling frame material. In such a case, the inner wall panel 5c is not fixed sufficiently and becomes unstable. In addition, when a ceiling step is generated between the roof units B3 and B4 during the construction / assembly of the unit building, the roof unit B of the ceiling rim panels 3a and 3b.
It is impossible to remove the temporary fixing to the main body of B3 or B4 and correct the ceiling step, because the inner wall panels 5c and 5c become an obstacle.

【0006】この発明は、上述の事情に鑑みてなされた
もので、ユニット建物を施工・組立する際、建物ユニッ
トの中壁パネル(間仕切壁)を天井部に確実かつ強固に
固定できると共に、ユニット間に生じた天井段差の修正
も確実かつ容易に行うことのできる天井野縁パネル付き
の屋根ユニットを提供することを目的としている。
The present invention has been made in view of the above circumstances, and when constructing and assembling a unit building, the middle wall panel (partition wall) of the building unit can be securely and firmly fixed to the ceiling portion, and the unit It is an object of the present invention to provide a roof unit with a ceiling edge panel that can reliably and easily correct a ceiling step that has occurred between.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
に、請求項1記載の発明は、屋根枠組の上面に野地板が
取り付けられた屋根パネルと、該屋根パネルを支持する
支持構造部とから構成される屋根ユニット本体の下面
に、天井野縁によって方形に組まれた天井野縁パネルが
取り付けられてなる屋根ユニットに係り、上記天井野縁
パネルが、当該屋根ユニットの下に配置されることとな
る複数の居室部分に対応して複数に分割されていること
を特徴としている。
In order to solve the above-mentioned problems, the invention according to claim 1 is a roof panel having a roof plate attached to the upper surface of a roof frame, and a support structure portion for supporting the roof panel. A roof unit in which a ceiling ceiling panel assembled in a rectangular shape by a ceiling ceiling is attached to a lower surface of a roof unit main body composed of, and the ceiling ceiling panel is arranged under the roof unit. It is characterized by being divided into a plurality of parts corresponding to a plurality of different living room parts.

【0008】また、請求項2記載の発明は、請求項1記
載の屋根ユニットに係り、互いに分割されて複数となっ
た上記天井野縁パネル間の接続部には、上記天井野縁パ
ネル同士をつなぐと共に、間仕切壁を受けるための継な
ぎ受材が設けられていることを特徴としている。
The invention according to claim 2 relates to the roof unit according to claim 1, wherein the ceiling field panels are connected to each other at a connecting portion between the plurality of ceiling field panels which are divided from each other. Along with the connection, it is characterized by the provision of a joint receiving material for receiving the partition wall.

【0009】また、請求項3記載の発明は、請求項2記
載の屋根ユニットに係り、上記継なぎ受材と上記天井野
縁パネルとの間には緩衝材が介挿されていることを特徴
としている。
Further, the invention according to claim 3 relates to the roof unit according to claim 2, characterized in that a cushioning material is interposed between the joint receiving material and the ceiling field panel. I am trying.

【0010】また、請求項4記載の発明は、請求項2記
載の屋根ユニットに係り、上記各天井野縁パネルが、上
記屋根ユニット本体及び上記継なぎ受材にねじ部材を用
いて仮止めされていることを特徴としている。
The invention according to claim 4 relates to the roof unit according to claim 2, wherein each of the ceiling edge panels is temporarily fixed to the roof unit main body and the joint receiving material by using a screw member. It is characterized by

【0011】また、請求項5記載の発明は、請求項1,
2,3又は4記載の屋根ユニットに係り、上記各天井野
縁パネルの下面の全部又は一部には、天井用の面材が取
り付けられていることを特徴としている。
Further, the invention according to claim 5 is based on claim 1,
The roof unit according to 2, 3, or 4 is characterized in that a surface material for a ceiling is attached to all or part of the lower surface of each ceiling field panel.

【0012】[0012]

【作用】この発明の構成によれば、天井野縁パネルが、
当該屋根ユニットの下に配置されることとなる複数の居
室部分に対応して複数に分割されているので、互いに隣
接する2つの居室部分を仕切る間仕切壁を、天井野縁
(端野縁)又は継なぎ受材(請求項2記載の構成)にで
きる。それゆえ、間仕切壁の固定が強固となる。なお、
上記継なぎ受材と上記天井野縁パネル(端野縁)との間
に緩衝材を介挿させれば、間仕切壁の遮音性能を一段と
高めることができる。また、請求項2記載の構成では、
予め工場にて、各天井野縁パネルを屋根ユニット本体及
び継なぎ受材にねじ部材で仮固定しておけば、ユニット
建物の施工・組立時、隣接する屋根ユニット間に天井段
差が生じた場合、間仕切壁が障害とならず、分割された
各天井野縁パネル毎に仮固定を解くことができるので、
天井段差を容易に修正できる。この場合、天井段差修正
後に釘等で本固定を行うのが望ましい。
According to the structure of the present invention, the ceiling field panel is
Since it is divided into a plurality of parts corresponding to a plurality of living room parts to be arranged under the roof unit, a partition wall for partitioning two adjacent living room parts is used as a ceiling edge (end edge) or a joint. It can be used as a limp receiving material (structure according to claim 2). Therefore, the partition wall is firmly fixed. In addition,
If a cushioning material is inserted between the joint receiving material and the ceiling edge panel (edge edge), the sound insulation performance of the partition wall can be further enhanced. Further, in the configuration according to claim 2,
If each ceiling panel is temporarily fixed to the roof unit main body and splice support material with screws in advance at the factory, when a ceiling step occurs between adjacent roof units during construction and assembly of the unit building Since the partition walls do not become an obstacle and the temporary fixing can be released for each divided ceiling field panel,
The ceiling step can be easily corrected. In this case, it is desirable that the nails or the like be used for final fixing after the ceiling step is corrected.

【0013】[0013]

【発明の実施の形態】以下、図面を参照して、この発明
の実施の形態について説明する。説明は、実施例を用い
て具体的に行う。図1は、この発明の一実施例である軒
先側屋根ユニットB5の構成を分解して示す分解斜視
図、図2は、同実施例である棟側屋根ユニットB6の構
成を分解して示す分解斜視図、図3は、同実施例に係る
建物ユニットA3,A4の構成を概略示す斜視図、図4
は、同実施例に係るユニット建物の構成を分解して示す
分解斜視図、図5は、同ユニット建物の要部構成(2つ
の部屋部分を有する建物ユニットと2つの天井部分を有
する屋根ユニットとの接合)を分解して示す分解斜視
図、また、図6は、同ユニット建物の要部構成(中壁
(間仕切壁)と天井部との接合)を示す断面図である。ま
た、図7は、同軒先側屋根ユニットB5の構成を示す断
面図、図8は、図7の要部Cを拡大して示す要部拡大断
面図、図9は、図7の要部Dを拡大して示す要部拡大断
面図、図10は、同各種屋根ユニットB5,B6の要部
を示す要部斜視図、図11は、同各種屋根ユニットB
5,B6における妻小壁パネル2a(2b)と天井野縁
パネル3c,3d(3e,3f)との接合部の構造を示
す断面図、図12は、同天井野縁パネル3c,3d(3
e,3f)間の接続部の構成を示す断面図、図13は、
同天井野縁パネル3c,3d(3e,3f)間の接続部
の構成を分解して示す分解斜視図、また、図14は、こ
の例の動作を説明するための断面図である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. The description will be specifically made using the embodiments. FIG. 1 is an exploded perspective view showing the structure of an eaves side roof unit B5 which is one embodiment of the present invention in an exploded manner, and FIG. 2 is an exploded view showing the structure of a ridge side roof unit B6 which is the same embodiment in an exploded manner. 4 is a perspective view, and FIG. 3 is a perspective view schematically showing the configuration of building units A3 and A4 according to the embodiment.
FIG. 5 is an exploded perspective view showing the structure of the unit building according to the embodiment in an exploded manner, and FIG. 5 is a main part structure of the unit building (a building unit having two room parts and a roof unit having two ceiling parts; Fig. 6 is an exploded perspective view showing the disassembly of (joining of the
It is sectional drawing which shows (joining of a partition wall) and a ceiling part. 7 is a cross-sectional view showing the structure of the roof side roof unit B5 of the same eaves, FIG. 8 is an enlarged cross-sectional view of an essential part showing an enlarged essential part C of FIG. 7, and FIG. 9 is an essential part D of FIG. FIG. 10 is an enlarged cross-sectional view of an essential part of the various roof units B5 and B6, and FIG.
5, B6 is a cross-sectional view showing the structure of the joint between the gable small wall panel 2a (2b) and the ceiling edge panel 3c, 3d (3e, 3f), and FIG. 12 is the same ceiling edge panel 3c, 3d (3
e, 3f) is a cross-sectional view showing the structure of the connecting portion between FIG.
FIG. 14 is an exploded perspective view showing the configuration of the connection portion between the ceiling field panels 3c, 3d (3e, 3f) in an exploded manner, and FIG. 14 is a sectional view for explaining the operation of this example.

【0014】この例の屋根ユニットB5(B6)は、図
3に示すように、2つの部屋部分R1,R2を有する建
物ユニットA3(A4)の上に載置して好適な天井野縁
付きの屋根ユニットに係り、図1(図2)に示すよう
に、屋根ユニット本体の底面に、2つの天井野縁パネル
3c,3d(3e,3f)を備える点で、従来における
天井野縁付3a(3b)きの屋根ユニットB3(B4)
と大きく異なっている(図18参照)。つまり、この例
の屋根ユニットB5(B6)にあっては、図3に示すよ
うに、建物ユニットA3(A4)の2つの部屋部分R
1,R2の境界に対応する部位にて、従来の天井野縁パ
ネル3a(3b)が、2つの天井野縁パネル3c,3d
(3e,3f)に分割された構造となっている。
The roof unit B5 (B6) of this example is mounted on a building unit A3 (A4) having two room portions R1 and R2 as shown in FIG. With respect to the unit, as shown in FIG. 1 (FIG. 2), the roof unit main body is provided with two ceiling edge panels 3c, 3d (3e, 3f) on the bottom surface thereof. ) Mushroom roof unit B3 (B4)
(See FIG. 18). That is, in the roof unit B5 (B6) of this example, as shown in FIG. 3, two room portions R of the building unit A3 (A4) are included.
At the portion corresponding to the boundary between 1 and R2, the conventional ceiling edge panel 3a (3b) is replaced by the two ceiling edge panels 3c and 3d.
The structure is divided into (3e, 3f).

【0015】◇建物ユニットA3,A4の構成 そこで、まず、図3を参照して、この例に係る建物ユニ
ットA3,A4の構成から説明する。建物ユニットA3
は、同図に示すように、根太によって方形に組まれた床
枠組の上面にパーティクルボード等の面材を取り付ける
ことで床構面として構成された床パネル4と、この床パ
ネル4の三方の側縁に立設された妻壁パネル5a,5
a、桁壁パネル5b,5bと、床パネル4の略中央部に
て妻壁パネル5aと平行に立設され、2つの部屋部分R
1,R2を間仕切る中壁パネル5cとからEの字壁状に
構成されている。また、建物ユニットA4は、床パネル
4と、この床パネル4の相対向する妻側(短辺側)側縁
に立設された一対の妻壁パネル5a,5aと、床パネル
4の略中央部にて妻壁パネルと平行に立設され、2つの
部屋部分R1,R2を間仕切る中壁パネル5cとから三
の字壁状に構成されている。各壁パネル5a,5b,5
cは、上枠、下枠、縦枠によって長方形に組み立てられ
た壁枠組の内外両側に、石膏ボードや木片セメント板等
の面材を取り付けることで、耐力壁とされている。これ
らの壁パネルには、必要に応じ出入口や窓等の開口部が
形成され、内部には断熱材が充填されている。上記構成
の2種類の建物ユニットA3,A4は、図4に示すよう
に、ユニット建物の建築現場において互いに連結され
て、2つの部屋R1+R1,R2+R2を構成する。
Configuration of Building Units A3 and A4 First, the configuration of the building units A3 and A4 according to this example will be described with reference to FIG. Building unit A3
As shown in the figure, a floor panel 4 configured as a floor structure by attaching a face material such as a particle board to the upper surface of a floor frame assembled in a square shape by joists, and three floor panels 4 Gable wall panels 5a, 5 erected on the side edges
a, the girder wall panels 5b and 5b, and the two room portions R, which are erected in parallel with the gable wall panel 5a at approximately the center of the floor panel 4.
An E-shaped wall is formed by an inner wall panel 5c that partitions 1 and R2. Further, the building unit A4 includes a floor panel 4, a pair of end wall panels 5a, 5a that are erected on opposite end sides (short side sides) of the floor panel 4, and substantially the center of the floor panel 4. And a middle wall panel 5c that partitions the two room portions R1 and R2 from each other, and is formed in a three-wall shape. Each wall panel 5a, 5b, 5
c is a bearing wall by attaching face materials such as gypsum board and wood chip cement board to both inside and outside of a wall frame assembly that is assembled in a rectangular shape by an upper frame, a lower frame, and a vertical frame. These wall panels are provided with openings such as entrances and exits and windows as necessary, and are filled with a heat insulating material. As shown in FIG. 4, the two types of building units A3 and A4 having the above configuration are connected to each other at a construction site of a unit building to form two rooms R1 + R1 and R2 + R2.

【0016】◇軒先側屋根ユニットB5の構成 次に、図1、図5乃至図11を参照して、この例の軒先
側屋根ユニットB5の構成について説明する。軒先側屋
根ユニットB5は、図1に示すように、長方形の屋根パ
ネル1aと、この屋根パネル1aをその妻側(短辺側)
両側縁にて支持する三角形構造体である一対の妻小壁パ
ネル2a,2aとから屋根ユニット本体が構成され、さ
らに、この屋根ユニット本体の底面に、予め工場段階か
ら、2つの方形の天井野縁パネル3c,3dが取着され
てなっている。上記屋根パネル1aは、たる木11,1
1,…、鼻隠し13、桁梁14及び頭つなぎ15によっ
て長方形に組まれた屋根枠組の上面に構造用合板やパー
ティクルボード等の野地板12が取り付けられること
で、屋根構面として構成されている。ここで、鼻隠し1
3は、たる木11,11,…に直交して、かつ、たる木
11,11,…の軒先側木口と突付けの状態で釘打ちさ
れて、屋根枠組の軒先側側縁部を構成する。また、桁梁
14は、たる木11,11,…に直交して、かつ、たる
木11,11,…の棟側木口と突付けの状態で釘打ちさ
れて、屋根枠組の棟側側縁部を構成する。また、頭つな
ぎ15は、たる木11,11,…に直交する状態で、た
る木11,11,…の下面に緊結金物により固定され、
軒先側屋根ユニットB5を設置する際、建物ユニットA
3の桁壁パネル5b,5bの上枠上面に当接固定され
る。また、上記妻小壁パネル2aは、下枠21と上枠2
2と縦枠23とによって組まれた三角形状の小壁枠組の
内外両面に石膏ボードや硬質木片セメント板等の壁面材
24,24が取着されることで、耐力壁とされている。
Configuration of the eaves side roof unit B5 Next, the configuration of the eaves side roof unit B5 of this example will be described with reference to FIGS. 1 and 5 to 11. As shown in FIG. 1, the eaves-side roof unit B5 has a rectangular roof panel 1a and the roof panel 1a on the end side (short side) thereof.
A roof unit main body is composed of a pair of gable small wall panels 2a, 2a, which are triangular structures supported on both side edges, and two square ceiling fields are formed on the bottom surface of the roof unit main body from the factory stage in advance. The edge panels 3c and 3d are attached. The roof panel 1a is composed of rafters 11 and 1
1, ..., Nose cover 13, girder beams 14, and head joints 15 are attached to the upper surface of a rectangular roof frame to form a roof structure by attaching field plates 12 such as structural plywood and particle boards. There is. Where the nose cover 1
3 is orthogonal to the rafters 11, 11, ... And is nailed in a state of abutment with the eaves-side mouth of the rafters 11, 11, ..., and constitutes the eaves-side side edge portion of the roof frame. Further, the girder beam 14 is nailed at right angles to the rafters 11, 11, ... And in a projecting state with the ridge-side opening of the rafters 11, 11 ,. Constitute. Further, the head tie 15 is fixed to the lower surface of the rafters 11, 11, ... In a state orthogonal to the rafters 11, 11 ,.
When installing the eaves side roof unit B5, the building unit A
The three girder wall panels 5b, 5b are abutted and fixed on the upper surface of the upper frame. In addition, the gable small wall panel 2a includes a lower frame 21 and an upper frame 2.
Wall surfaces 24, 24 such as gypsum board and hard wood chip cement board are attached to both inner and outer surfaces of a triangular small wall frame composed of 2 and a vertical frame 23 to form a bearing wall.

【0017】また、上記天井野縁パネル3c,3dは、
同図に示すように、互いに平行に配設された一対の側野
縁32a,32b間に、複数本の短野縁33,33,3
3a,…がさし渡され、かつ、それぞれの両側の木口を
突付けの状態で釘打ちされて、方形の天井枠組として構
成されている。ここで、天井野縁パネル3cは、図5に
示すように、建物ユニットA3の部屋部分R1の天井部
分C1を構成し、また、天井野縁パネル3dは、建物ユ
ニットA3の部屋部分R2の天井部分C2を構成する。
両天井野縁パネル3c,3d間の接続部には、図6に示
すように、建物ユニットA3の2つの部屋部分R1,R
2を間仕切る幅略118mmの中壁パネル5cの上枠5
1を直接又は合板等のスペーサを介して受けるための高
さ38mm×幅118mmの間仕切受木桟(継なぎ受
材)34が介挿されている。ここで、天井野縁パネル3
c,3dと間仕切受木桟34とは、下面が、互いに略面
一となるように設定されている。
Further, the ceiling field panels 3c and 3d are
As shown in the figure, a plurality of short field edges 33, 33, 3 are provided between the pair of side field edges 32a, 32b arranged in parallel with each other.
3a, ... Are laid out and nailed in a state in which the wood mouths on both sides are abutted to form a rectangular ceiling frame. Here, as shown in FIG. 5, the ceiling margin panel 3c constitutes the ceiling portion C1 of the room portion R1 of the building unit A3, and the ceiling margin panel 3d is the ceiling of the room portion R2 of the building unit A3. It constitutes the part C2.
As shown in FIG. 6, the two room portions R1 and R of the building unit A3 are connected to the connecting portions between the ceiling field panels 3c and 3d.
Upper frame 5 of the middle wall panel 5c with a width of 118 mm that divides the two
A partition wood crosspiece (joint receiving material) 34 for receiving 1 directly or via a spacer such as plywood is inserted. Here, the ceiling field panel 3
The lower surfaces of the c and 3d and the partition receiving bar 34 are set to be substantially flush with each other.

【0018】上記各天井野縁パネル3c,3dは、工場
段階では、4方の側縁が、屋根ユニット本体と間仕切受
木桟34とに仮固定されている。すなわち、各天井野縁
パネル3c,3dでは、図7及び図8に示すように、軒
先側の側野縁32aが頭つなぎ15の側面に、また、図
9及び図10に示すように、棟側の側野縁32bが桁梁
14の内側面から垂下する吊木6a,6a,…に、ま
た、図11に示すように、外側の端野縁33a,33a
が妻小壁パネル2a,2aの下枠21の内側面に、ま
た、図12に示すように、内側の端野縁33a,33a
が間仕切壁受木桟34の側面に、それぞれ、木ねじM,
M,…をねじ込まれて仮固定されている。なお、吊木6
a,6a,…は、図9及び図10に示すように、吊木受
け61,61,…を介して、桁梁14の内側面に、か
つ、垂下状態で釘K,K,…打ちされて固定されてい
る。また、棟側の側野縁32bには、幅38mm×高さ
89mmの204材が用いられるが、軒先側の側野縁3
2aは、斜材であるたる木111,111,…との干渉
を避けるために、幅38mm×高さ64mmの203材
が用いられる(図7参照)。
At the factory stage, the ceiling edge panels 3c and 3d have four side edges temporarily fixed to the roof unit main body and the partition receiving bar 34. That is, in each ceiling field panel 3c, 3d, as shown in FIGS. 7 and 8, the side field edge 32a on the eaves side is on the side surface of the head tie 15, and as shown in FIGS. The side field edge 32b on the side is attached to the hanging trees 6a, 6a, ... Hanging from the inner surface of the girder 14, and, as shown in FIG. 11, the outer edge fields 33a, 33a.
Is on the inner surface of the lower frame 21 of the gable small wall panels 2a, 2a, and as shown in FIG. 12, the inner end edges 33a, 33a.
On the side surface of the partition wall receiving bar 34, wood screws M,
M, ... are screwed in and temporarily fixed. In addition, hanging tree 6
As shown in FIGS. 9 and 10, the a, 6a, ... Are nailed to the inner surface of the girder beam 14 through the hanging tree receivers 61, 61 ,. It is fixed. In addition, 204 materials with a width of 38 mm and a height of 89 mm are used for the side margin 32b on the ridge side, but the side margin 3 on the eaves side is used.
As the material 2a, 203 materials having a width of 38 mm and a height of 64 mm are used to avoid interference with the rafters 111, 111, ... (See FIG. 7).

【0019】◇棟側屋根ユニットB6の構成 次に、図2等を参照して、棟側屋根ユニットB6につい
て説明する。軒先側屋根ユニットB6は、図2に示すよ
うに、長方形の屋根パネル1bと、この屋根パネル1b
をその妻側(短辺側)両側縁にて支持する台形構造体で
ある一対の妻小壁パネル2b,2bとから屋根ユニット
本体が構成され、さらに、この屋根ユニット本体の底面
に、予め工場段階から、2つの方形の天井野縁パネル3
e,3fが取着されてなっている。上記屋根パネル1b
は、たる木11,11,…と軒側桁梁16と棟側桁梁1
7とによって長方形に組まれた屋根枠組の上面に構造用
合板やパーティクルボード等の野地板12が取り付けら
れることで、屋根構面として構成されている。また、上
記妻小壁パネル2bは、下枠21と上枠22と縦枠23
とによって組まれた台形状の小壁枠組の内外両面に石膏
ボードや硬質木片セメント板等の壁面材24,24が取
着されることで、耐力壁とされている。
Construction of the ridge-side roof unit B6 Next, the ridge-side roof unit B6 will be described with reference to FIG. As shown in FIG. 2, the eaves side roof unit B6 includes a rectangular roof panel 1b and the roof panel 1b.
A roof unit main body is composed of a pair of gable small wall panels 2b, 2b that are trapezoidal structures that support both ends of the roof side (short side) on both side edges. From the stage, two rectangular ceiling field panels 3
e and 3f are attached. Roof panel 1b
Is a rafter 11, 11, ..., Eaves side girder 16 and ridge side girder 1
A roof framing surface is formed by attaching a base plate 12 such as structural plywood or particle board to the upper surface of the roof frame structure assembled in a rectangular shape by 7. Further, the above-mentioned gable small wall panel 2b includes a lower frame 21, an upper frame 22, and a vertical frame 23.
Wall surfaces 24, 24 such as gypsum board and hard wood chip cement boards are attached to both the inner and outer surfaces of the trapezoidal small wall frame assembled by and to form a bearing wall.

【0020】また、上記天井野縁パネル3e,3fは、
同図に示すように、互いに平行に配設された一対の側野
縁35a,35b間に、複数本の短野縁36,36,3
6a,…がさし渡され、かつ、それぞれの両側の木口を
突付けの状態で釘打ちされて、方形の天井枠組として構
成されている。ここで、天井野縁パネル3eは、図5に
示すように、建物ユニットA4の部屋部分R1の天井部
分C1を構成し、また、天井野縁パネル3fは、建物ユ
ニットA4の部屋部分R2の天井部分C2を構成する。
両天井野縁パネル3e,3f間の接続部には、図6に示
すように、建物ユニットA3の2つの部屋部分R1,R
2を間仕切る幅略118mmの中壁パネル5cの上枠5
1を直接又は合板等のスペーサを介して受けるための高
さ38mm×幅118mmの間仕切受木桟(継なぎ受
材)34が介挿されている。ここで、天井野縁パネル3
e,3fと間仕切受木桟34とは、下面が、互いに略面
一となるように設定されている。
Also, the ceiling field panels 3e and 3f are
As shown in the figure, a plurality of short field edges 36, 36, 3 are provided between a pair of side field edges 35a, 35b arranged in parallel with each other.
6a, ... Are laid out and nailed in a state in which the wooden mouths on both sides are abutted to form a rectangular ceiling frame. Here, as shown in FIG. 5, the ceiling edge panel 3e constitutes the ceiling portion C1 of the room portion R1 of the building unit A4, and the ceiling edge panel 3f is the ceiling of the room portion R2 of the building unit A4. It constitutes the part C2.
As shown in FIG. 6, the two room portions R1 and R of the building unit A3 are connected to the connecting portion between the ceiling ceiling panels 3e and 3f.
Upper frame 5 of the middle wall panel 5c with a width of 118 mm that divides the two
A partition wood crosspiece (joint receiving material) 34 for receiving 1 directly or via a spacer such as plywood is inserted. Here, the ceiling field panel 3
The e, 3f and the partition receiving bar 34 are set so that their lower surfaces are substantially flush with each other.

【0021】上記各天井野縁パネル3e,3fは、工場
段階では、4方の側縁が、屋根ユニット本体と間仕切受
木桟34とに仮固定されている。すなわち、各天井野縁
パネル3e,3fでは、図2に示すように、軒先側の側
野縁35aが軒側桁梁16の内側面から垂下する吊木6
b,6b,…に、また、棟側の側野縁35bが棟側桁梁
17の内側面から垂下する吊木6c,6c,…に、ま
た、図11に示すように、外側の端野縁36a,36a
が妻小壁パネル2b,2bの下枠21の内側面に、ま
た、図12に示すように、内側の端野縁36a,36a
が間仕切壁受木桟34の側面に、それぞれ、木ねじM,
M,…をねじ込まれて仮固定されている。なお、吊木6
b,6c,…は、図10に示すように、吊木受け61,
61,…を介して、軒側桁梁16、棟側桁梁17の内側
面に、かつ、垂下状態で釘K,K,…打ちされて固定さ
れている。
At the factory stage, the ceiling edge panels 3e and 3f have four side edges temporarily fixed to the roof unit main body and the partition receiving bar 34. That is, in each of the ceiling field edge panels 3e and 3f, as shown in FIG. 2, the side field edge 35a on the eaves side hangs from the inner surface of the eaves side girder 16 for the hanging tree 6.
b, 6b, ..., and the side edge 35b on the ridge side to the hanging trees 6c, 6c, ... Hanging from the inner side surface of the ridge side girder 17, and as shown in FIG. 36a, 36a
Is on the inner surface of the lower frame 21 of the gable small wall panels 2b, 2b, and as shown in FIG. 12, the inner end edges 36a, 36a.
On the side surface of the partition wall receiving bar 34, wood screws M,
M, ... are screwed in and temporarily fixed. In addition, hanging tree 6
As shown in FIG. 10, b, 6c, ...
, 61 are fixed to the inner side surfaces of the eaves-side girder beam 16 and the ridge-side girder beam 17 with nails K, K, ...

【0022】◇建物ユニットA3,A4上への屋根ユニ
ットB5,B6の据付 2つの天井部分を有する屋根ユニットB5,B6、及び
2つの部屋部分を有する建物ユニットA3,A4は、通
常の建物ユニットA1,A2や、通常の天井野縁付きの
屋根ユニットB3,B4等と共に、予め工場にて生産さ
れ、ユニット建物の建築現場において、予め準備した基
礎の上で施工・組立される。なお、上記したように、各
天井野縁パネル3c,3d,3e,3fは、工場段階で
は、4方の側縁が、屋根ユニットB5,B6の本体と間
仕切受木桟34とに木ねじM,M,…で仮止めとされ
る。組立は、図4に示すように、まず、建物ユニットA
1,A2,A3,A4,…を基礎の上に据え付けて相互
に連結し、次に、据え付けられた各建物ユニットA1,
A2,A3,A4,…の上部に屋根ユニットB3,B
4,B5,B6,…を据え付け相互に連結して行われ
る。この場合において、建物ユニットA3,A4は、図
4及び図5に示すように、互いに連結されて、2つの部
屋R1+R1,R2+R2を構成する。
Roof uni on building units A3 and A4
Installation of units B5 and B6 Roof units B5 and B6 having two ceiling portions, and building units A3 and A4 having two room portions are ordinary building units A1 and A2, and ordinary roof units with ceiling rims. Along with B3, B4, etc., it is produced in a factory in advance, and is constructed and assembled on a prefabricated foundation at a construction site of a unit building. As described above, each ceiling edge panel 3c, 3d, 3e, 3f has four side edges on the main body of the roof units B5, B6 and the partition wood sprue 34 at the factory stage. It is temporarily fixed with M ... Assembling is as shown in FIG.
1, A2, A3, A4, ... are installed on the foundation and interconnected, and then each installed building unit A1,
Roof units B3, B on top of A2, A3, A4, ...
4, B5, B6, ... Are installed and connected to each other. In this case, the building units A3 and A4 are connected to each other to form two rooms R1 + R1 and R2 + R2, as shown in FIGS. 4 and 5.

【0023】また、軒先側屋根ユニットB5は建物ユニ
ットA3の上部に据え付けられ、一方、棟側屋根ユニッ
トB6は建物ユニットA4の上部に据え付けられる。建
物ユニットA3,A4の据付位置が正確なら、両天井野
縁パネル3c,3d(3e,3f)間の接続部にある間
仕切受木桟34,34は、図6に示すように、建物ユニ
ットA3の中壁パネル5cの上枠51の上面に載置され
る。そこで、中壁パネル5cの上枠51を間仕切受木桟
34の上面側から釘打ちすることで、中壁パネル5cを
天井部に確実に固定する。こうして、天井野縁パネル3
c,3eによって、建物ユニットA3,A4の部屋部分
R1の天井部分C1が構成され、天井野縁パネル3d,
3fによって、建物ユニットA3,A4の部屋部分R2
の天井部分C2が構成される。
The eaves side roof unit B5 is installed on the upper part of the building unit A3, while the ridge side roof unit B6 is installed on the upper part of the building unit A4. If the installation positions of the building units A3 and A4 are correct, the partition stiles 34 and 34 at the connection between the ceiling ceiling edge panels 3c and 3d (3e and 3f) will be the building unit A3 as shown in FIG. It is placed on the upper surface of the upper frame 51 of the inner wall panel 5c. Therefore, by nailing the upper frame 51 of the middle wall panel 5c from the upper surface side of the partition receiving bar 34, the middle wall panel 5c is securely fixed to the ceiling portion. Thus, the ceiling field panel 3
The ceiling portions C1 of the room portions R1 of the building units A3 and A4 are configured by the c and 3e, and the ceiling margin panel 3d,
Room part R2 of building units A3 and A4 by 3f
The ceiling portion C2 of the

【0024】◇天井段差の調整 全ての屋根ユニットB3,B4,B5,B6の据付が完
了した後、天井工事を開始する。天井工事では、まず、
屋根ユニットB3,B4,B5,B6間の天井段差(天
井野縁パネル間段差)を修正する。この例の屋根ユニッ
トB5,B6間における天井野縁パネル3c,3e(又
は3d,3f)間に段差が生じていれば、木ねじM,
M,…を外すことで、吊木6a,6bや妻小壁パネル2
a,2bや間仕切受木桟34への仮止めを解いて、天井
高さを調整する。この場合、中壁パネル5cの両側に天
井野縁パネル3c,3e(又は3d,3f)が分割され
ているので、中壁パネル5cが、障害とならず、各天井
野縁パネル3c,3d,3e,3f毎に段差を修正でき
る。そして、段差修正後に釘等で本固定を行う。なお、
天井段差が生じていない場合でも、釘等で本固定を行う
のが好ましい。天井野縁パネル3c,3d,3e,3f
の本固定が完了すると、図5及び図14に示すように、
屋根ユニットB5,B6間における天井野縁パネル3
c,3e(又は3d,3f)間にパネル継ぎ材(つなぎ
野縁)35,35,…を取り付けた後、石膏ボード等の
天井面材7を取り付ける。
Adjustment of Ceiling Steps After the installation of all roof units B3, B4, B5, B6 is completed, the ceiling work is started. In the ceiling work, first
Correct the ceiling step between the roof units B3, B4, B5, B6 (the step between the ceiling edge panels). If there is a step between the ceiling field panels 3c, 3e (or 3d, 3f) between the roof units B5, B6 of this example, wood screws M,
By removing M, ..., hanging trees 6a, 6b and gable small wall panel 2
The ceiling height is adjusted by releasing the temporary fixing to the a and 2b and the partition receiving bar 34. In this case, since the ceiling wall panels 3c, 3e (or 3d, 3f) are divided on both sides of the inner wall panel 5c, the inner wall panel 5c does not become an obstacle and each ceiling wall panel 3c, 3d, The step can be corrected for each of 3e and 3f. Then, after the step is corrected, the main fixing is performed with nails or the like. In addition,
Even when there is no ceiling step, it is preferable to perform the main fixing with nails or the like. Ceiling field panels 3c, 3d, 3e, 3f
When the main fixation of is completed, as shown in FIG. 5 and FIG.
Ceiling edge panel 3 between roof units B5 and B6
After attaching the panel joint material (connecting edge) 35, 35, ... Between c and 3e (or 3d and 3f), the ceiling surface material 7 such as a gypsum board is attached.

【0025】このように、この例の屋根ユニットB5
(B6)の構成によれば、天井野縁パネル3c,3d
(3e,3f)が、当該屋根ユニットB5(B6)の下
に配置されることとなる2つの部屋部分R1,R2に対
応して2つに分割され、かつ、両天井野縁パネル3c,
3d(3e,3f)間には間仕切受木桟34が介挿され
ているので、2つの部屋部分R1,R2を仕切る中壁パ
ネル5cを、間仕切受木桟34に確実に固定できる。そ
れゆえ、中壁パネル5cの天井部への固定が強固とな
る。また、工場段階では、各天井野縁パネル3c,3d
(3e,3f)を屋根ユニット本体及び間仕切受木桟3
4に木ねじM,M,…で仮止めとしたので、ユニット建
物の施工・組立時、隣接する屋根ユニットB5,B6間
に天井段差が生じた場合、中壁パネル5cが障害となら
ず、分割された各天井野縁パネル3c,3d,3e,3
f毎に仮固定を解くことができるので、天井段差を確実
かつ容易に修正できる。
Thus, the roof unit B5 of this example
According to the configuration of (B6), the ceiling field panels 3c and 3d
(3e, 3f) is divided into two corresponding to the two room portions R1 and R2 to be arranged under the roof unit B5 (B6), and both ceiling field panels 3c,
Since the partition receiving tree bar 34 is interposed between 3d (3e, 3f), the inner wall panel 5c that partitions the two room portions R1 and R2 can be securely fixed to the partition receiving bar 34. Therefore, the inner wall panel 5c is firmly fixed to the ceiling. Also, at the factory stage, each ceiling field panel 3c, 3d
(3e, 3f) roof unit main body and partition receiving bar 3
Since the wooden screws M, M, ... are temporarily fixed to 4, the middle wall panel 5c does not become an obstacle when a ceiling step is generated between the adjacent roof units B5, B6 during the construction / assembly of the unit building, and the division is performed. Ceiling field panels 3c, 3d, 3e, 3
Since the temporary fixing can be released for each f, the ceiling step can be corrected reliably and easily.

【0026】以上、この発明の実施例を図面により詳述
してきたが、具体的な構成はこの実施例に限られるもの
ではなく、この発明の要旨を逸脱しない範囲の設計の変
更等があってもこの発明に含まれる。例えば、仮止め用
の固定具は、木ねじに限らず、ビスやボルトや釘等でも
良い。また、間仕切壁は、耐力壁に限らず、非耐力壁で
も良い。また、屋根ユニットは、木質系に限らず、鉄骨
系でも良い。同様に、壁式工法による屋根ユニットに限
らず、軸組工法による屋根ユニットにも適用できる。ま
た、天井野縁パネルの固定は、吊木等に限らず、トラス
梁や桁小壁パネル等でも良い。また、上述の実施例にお
いては、屋根ユニットが、2つの天井野縁パネルを備え
る場合について述べたが、これに限定せず、3つの部屋
部分を有する建物ユニットがあれば、これに対応して、
屋根ユニットにも、3つの天井野縁パネルを取り付ける
ようにしても良い。また、間仕切受木桟に代えて、中壁
パネルの上枠を、分割された2つの天井野縁パネル間に
挿入して固定するようにしても良い。また、各天井野縁
パネルの下面の全部又は一部に、予め工場段階から、天
井用の面材を取り付けておくようにしても良い。また、
間仕切壁が、遮音間仕切壁であるなら、図15に示すよ
うに、間仕切受木桟と天井野縁パネルの端野縁との間に
発泡体やゴム弾性体等の緩衝材8を介挿させるようにす
れば、天井を介して伝わる振動が軽減されるので、部屋
間の遮音性能を一段と高めることができる。
Although the embodiment of the present invention has been described in detail above with reference to the drawings, the specific structure is not limited to this embodiment, and there are design changes and the like within the scope not departing from the gist of the present invention. Also included in the present invention. For example, the fixing tool for temporary fixing is not limited to wood screws, but may be screws, bolts, nails, or the like. Further, the partition wall is not limited to the bearing wall, but may be a non-bearing wall. Further, the roof unit is not limited to the wood type, but may be a steel frame type. Similarly, the invention is not limited to the roof unit by the wall construction method, but can be applied to the roof unit by the frame construction method. Further, the fixing of the ceiling edge panel is not limited to a hanging tree or the like, but may be a truss beam or a girder small wall panel. Further, in the above-mentioned embodiment, the case where the roof unit is provided with two ceiling rim panels is described, but the present invention is not limited to this, and if there is a building unit having three room parts, corresponding to this ,
You may make it attach three ceiling field panels also to a roof unit. Further, instead of the partition receiving bar, the upper frame of the middle wall panel may be inserted and fixed between the two divided ceiling edge panels. Further, a ceiling face material may be attached to all or part of the lower surface of each ceiling field panel from the factory stage in advance. Also,
If the partition wall is a sound insulation partition wall, as shown in FIG. 15, a cushioning material 8 such as a foam or a rubber elastic body should be inserted between the partition receiving bar and the end edge of the ceiling field edge panel. In this case, the vibration transmitted through the ceiling is reduced, so that the sound insulation performance between the rooms can be further enhanced.

【0027】[0027]

【発明の効果】以上説明したように、この発明の屋根ユ
ニットによれば、天井野縁パネルが、当該屋根ユニット
の下に配置されることとなる複数の居室部分に対応して
複数に分割されているので、互いに隣接する2つの居室
部分を仕切る間仕切壁を、天井野縁(端野縁)又は継な
ぎ受材(請求項2記載の構成)に確実に固定できる。そ
れゆえ、間仕切壁の固定が強固となる。なお、上記継な
ぎ受材と上記天井野縁パネル(端野縁)との間に緩衝材
を介挿させれば、間仕切壁の遮音性能を一段と高めるこ
とができる。また、請求項2記載の構成では、予め工場
にて、各天井野縁パネルを屋根ユニット本体及び継なぎ
受材にねじ部材で仮固定しておけば、ユニット建物の施
工・組立時、隣接する屋根ユニット間に天井段差が生じ
た場合、間仕切壁が障害とならず、分割された各天井野
縁パネル毎に仮固定を解くことができるので、天井段差
を容易に修正できる。
As described above, according to the roof unit of the present invention, the ceiling rim panel is divided into a plurality of parts corresponding to a plurality of living room parts to be arranged under the roof unit. Therefore, the partition wall for partitioning the two adjacent living room portions can be reliably fixed to the ceiling edge (end edge) or the joint receiving material (configuration according to claim 2). Therefore, the partition wall is firmly fixed. It should be noted that if a cushioning material is inserted between the joint receiving material and the ceiling field panel (edge field), the sound insulation performance of the partition wall can be further enhanced. Further, in the configuration according to claim 2, if each ceiling field panel is temporarily fixed to the roof unit main body and the joint support member with a screw member in advance at the factory, they are adjacent to each other during construction and assembly of the unit building. When a ceiling step occurs between the roof units, the partition wall does not become an obstacle and the temporary fixing can be released for each of the divided ceiling field edge panels, so that the ceiling step can be easily corrected.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の一実施例である軒先側屋根ユニット
の構成を分解して示す分解斜視図である。
FIG. 1 is an exploded perspective view showing an exploded configuration of an eaves side roof unit that is an embodiment of the present invention.

【図2】同実施例である棟側屋根ユニットの構成を分解
して示す分解斜視図である。
FIG. 2 is an exploded perspective view showing an exploded configuration of a ridge-side roof unit of the embodiment.

【図3】同実施例に係る建物ユニットの構成を概略示す
斜視図である。
FIG. 3 is a perspective view schematically showing a configuration of a building unit according to the embodiment.

【図4】同実施例に係るユニット建物の構成を分解して
示す分解斜視図である。
FIG. 4 is an exploded perspective view showing an exploded configuration of the unit building according to the embodiment.

【図5】同ユニット建物の要部構成(2つの部屋部分を
有する建物ユニットと2つの天井部分を有する屋根ユニ
ットとの接合)を分解して示す分解斜視図である。
FIG. 5 is an exploded perspective view showing an exploded configuration of a main part of the same unit building (joint between a building unit having two room portions and a roof unit having two ceiling portions).

【図6】同ユニット建物の要部構成(中壁(間仕切壁)と
天井部との接合)を示す断面図である。
FIG. 6 is a cross-sectional view showing a configuration of a main part (joining of a middle wall (partition wall) and a ceiling part) of the unit building.

【図7】同軒先側屋根ユニットの構成を示す断面図であ
る。
FIG. 7 is a cross-sectional view showing the configuration of the roof side roof unit of the same eaves.

【図8】図7の要部Cを拡大して示す要部拡大断面図で
ある。
8 is an enlarged cross-sectional view of a main part showing a main part C of FIG. 7 in an enlarged manner.

【図9】図7の要部Dを拡大して示す要部拡大断面図で
ある。
9 is an enlarged cross-sectional view of a main part showing a main part D of FIG. 7 in an enlarged manner.

【図10】同各種屋根ユニットの要部を示す要部斜視図
である。
FIG. 10 is a main part perspective view showing a main part of the various roof units.

【図11】同各種屋根ユニットにおける妻小壁パネルと
天井野縁パネルとの接合部の構造を示す断面図である。
FIG. 11 is a cross-sectional view showing a structure of a joint between a gable small wall panel and a ceiling field panel in the various roof units.

【図12】同天井野縁パネル間の接続部の構成を示す断
面図である。
FIG. 12 is a cross-sectional view showing a configuration of a connecting portion between the ceiling field panels.

【図13】同天井野縁パネル間の接続部の構成を分解し
て示す分解斜視図である。
FIG. 13 is an exploded perspective view showing an exploded configuration of a connecting portion between the ceiling field panels.

【図14】この例の動作を説明するための断面図であ
る。
FIG. 14 is a cross-sectional view for explaining the operation of this example.

【図15】同実施例の変形例に係る天井野縁パネル間の
接続部の構成を示す図である。
FIG. 15 is a view showing a configuration of a connecting portion between ceiling field edge panels according to a modified example of the embodiment.

【図16】従来技術を説明するために、ユニット建物の
構成を各ユニットに分解して示す分解斜視図である。
FIG. 16 is an exploded perspective view showing the configuration of a unit building by disassembling it into units for explaining the conventional technique.

【図17】従来技術を説明するために、屋根ユニット
(軒先側屋根ユニット及び棟側屋根ユニット)の構成を
分解して示す分解斜視図である。
FIG. 17 is an exploded perspective view showing the configuration of roof units (eave side roof unit and ridge side roof unit) in an exploded manner for explaining the conventional technique.

【図18】従来における天井野縁付きの屋根ユニット
(軒先側屋根ユニット及び棟側屋根ユニット)の構成を
分解して示す分解斜視図である。
FIG. 18 is an exploded perspective view showing an exploded configuration of a conventional roof unit with a roof edge (eave side roof unit and ridge side roof unit).

【図19】従来技術を説明するために、ユニット建物の
構成を各ユニットに分解して示す分解斜視図である。
FIG. 19 is an exploded perspective view showing the configuration of a unit building by disassembling it into units for explaining the conventional technique.

【符号の説明】[Explanation of symbols]

1a,1b 屋根パネル 11 たる木(屋根枠組の構成部材) 12 野地板 14 桁梁(屋根枠組の構成部材) 2a,2b 妻小壁パネル(支持構造部) 3c,3d,3e,3f 天井野縁パネル 32a,32b,35a,35b 側野縁(天井野
縁) 33,36 短野縁 33a,36a 端野縁 34 間仕切受木桟(継なぎ受材) 5c 中壁パネル(間仕切壁) 6a,6b,6c 吊木 B5 軒先側屋根ユニット(屋根ユニット) B6 棟側屋根ユニット(屋根ユニット) A3,A4 建物ユニット R1,R2 居室部分 M 木ねじ(ねじ部材) 7 天井面材 8 緩衝材
1a, 1b Roof panel 11 Tarpaulin (component of roof frame) 12 Field plate 14 Girder beam (component of roof frame) 2a, 2b Tsumakobe wall panel (support structure part) 3c, 3d, 3e, 3f Ceiling field panel 32a, 32b, 35a, 35b Side edge (ceiling edge) 33, 36 Short edge edge 33a, 36a End edge 34 Partition receiving wood beam (joining receiving material) 5c Middle wall panel (partition wall) 6a, 6b, 6c Hanging tree B5 Roof side roof unit (roof unit) B6 Building side roof unit (roof unit) A3, A4 Building unit R1, R2 Living room part M Wood screw (screw member) 7 Ceiling surface material 8 Cushioning material

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 屋根枠組の上面に野地板が取り付けられ
た屋根パネルと、該屋根パネルを支持する支持構造部と
から構成される屋根ユニット本体の下面に、天井野縁に
よって方形に組まれた天井野縁パネルが取り付けられて
なる屋根ユニットであって、 前記天井野縁パネルは、当該屋根ユニットの下に配置さ
れることとなる複数の居室部分に対応して複数に分割さ
れていることを特徴とする屋根ユニット。
1. A square frame formed by a ceiling edge on a lower surface of a roof unit main body composed of a roof panel having a roof plate attached to an upper surface of a roof frame and a support structure portion supporting the roof panel. A roof unit to which a ceiling field panel is attached, wherein the ceiling field panel is divided into a plurality of parts corresponding to a plurality of living room parts to be arranged under the roof unit. A characteristic roof unit.
【請求項2】 互いに分割されて複数となった前記天井
野縁パネル間の接続部には、前記天井野縁パネル同士を
つなぐと共に、間仕切壁を受けるための継なぎ受材が設
けられていることを特徴とする請求項1記載の屋根ユニ
ット。
2. A connection receiving member for connecting the ceiling field panels to each other and for receiving a partition wall is provided at a connecting portion between the ceiling field panels which are divided into a plurality of parts. The roof unit according to claim 1, wherein:
【請求項3】 前記継なぎ受材と前記天井野縁パネルと
の間には緩衝材が介挿されていることを特徴とする請求
項2記載の屋根ユニット。
3. The roof unit according to claim 2, wherein a cushioning material is inserted between the splice receiving material and the ceiling field panel.
【請求項4】 前記各天井野縁パネルは、前記屋根ユニ
ット本体及び前記継なぎ受材にねじ部材を用いて仮止め
されていることを特徴とする請求項2記載の屋根ユニッ
ト。
4. The roof unit according to claim 2, wherein each of the ceiling field panels is temporarily fixed to the roof unit body and the joint receiving member by using a screw member.
【請求項5】 前記各天井野縁パネルの下面の全部又は
一部には、天井用の面材が取り付けられていることを特
徴とする請求項1,2,3又は4記載の屋根ユニット。
5. The roof unit according to claim 1, 2, 3 or 4, wherein a ceiling surface material is attached to all or part of the lower surface of each ceiling field panel.
JP00740197A 1997-01-20 1997-01-20 Roof unit Expired - Lifetime JP3401153B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP00740197A JP3401153B2 (en) 1997-01-20 1997-01-20 Roof unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP00740197A JP3401153B2 (en) 1997-01-20 1997-01-20 Roof unit

Publications (2)

Publication Number Publication Date
JPH10205049A JPH10205049A (en) 1998-08-04
JP3401153B2 true JP3401153B2 (en) 2003-04-28

Family

ID=11664872

Family Applications (1)

Application Number Title Priority Date Filing Date
JP00740197A Expired - Lifetime JP3401153B2 (en) 1997-01-20 1997-01-20 Roof unit

Country Status (1)

Country Link
JP (1) JP3401153B2 (en)

Also Published As

Publication number Publication date
JPH10205049A (en) 1998-08-04

Similar Documents

Publication Publication Date Title
US4124964A (en) Buildings
US11021866B2 (en) Building and construction method for same
JP3401153B2 (en) Roof unit
JPH1082097A (en) Building having wall ventilating construction and building unit
JP3759816B2 (en) Building roof structure
JP3930084B2 (en) Roof unit
JP3876507B2 (en) Hut structure and its construction method
JPH1018495A (en) Roof unit
JP3696932B2 (en) Ceiling roof unit
JPH06136833A (en) Floor panel with ceiling, and room unit equipped with the panel
JP2008223358A (en) Building construction method
JPH11336242A (en) Roof truss structure of small roof and execution method thereof
JPH06294172A (en) Wooden building
JP3241124B2 (en) Room unit with ceiling
JP4018000B2 (en) Construction method of unit type building
JPS6217527Y2 (en)
JP2519384B2 (en) Auxiliary surface of wooden prefabricated building
JPH11264191A (en) Building
JP2879039B1 (en) Construction method of concrete panel multi-layer wall and concrete panel multi-layer wall
JP2021080644A (en) Fixing method of ceiling hanger and roof unit
JP2002047751A (en) Planar strength structure of building
JPH06173351A (en) Room unit
JPH06257213A (en) Joint structure between roof panel and wall panel
JPH1096264A (en) Building unit with ceiling
JPH06146424A (en) Room unit with ceiling

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080221

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090221

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100221

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100221

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110221

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120221

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130221

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140221

Year of fee payment: 11

EXPY Cancellation because of completion of term