JP3108893B2 - Anchoring method between reinforced cage and pile end plate in PRC pile - Google Patents

Anchoring method between reinforced cage and pile end plate in PRC pile

Info

Publication number
JP3108893B2
JP3108893B2 JP04177346A JP17734692A JP3108893B2 JP 3108893 B2 JP3108893 B2 JP 3108893B2 JP 04177346 A JP04177346 A JP 04177346A JP 17734692 A JP17734692 A JP 17734692A JP 3108893 B2 JP3108893 B2 JP 3108893B2
Authority
JP
Japan
Prior art keywords
hole
end plate
pile
reinforcing bar
daruma
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP04177346A
Other languages
Japanese (ja)
Other versions
JPH05339939A (en
Inventor
新治 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitani Sekisan Co Ltd
Original Assignee
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitani Sekisan Co Ltd filed Critical Mitani Sekisan Co Ltd
Priority to JP04177346A priority Critical patent/JP3108893B2/en
Publication of JPH05339939A publication Critical patent/JPH05339939A/en
Application granted granted Critical
Publication of JP3108893B2 publication Critical patent/JP3108893B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、異形鉄筋を配筋して
補強したPHC杭(以下、PRC杭)における鉄筋籠と
杭端板との定着方法に関する。
BACKGROUND OF THE INVENTION This invention, PHC pile (hereinafter, PRC piles) reinforced by Haisuji the deformed bar about the fixing how the reinforcing bar cage and pile end plate in.

【0002】[0002]

【従来の技術】従来、PRC杭では、ストレスを導入す
るPC鋼棒31(主鉄筋)と、このPC鋼棒に平行な補
助鉄筋(異形鉄筋からなる)32とを同一円周上に交互
に配筋し、PC鋼棒31及び補助鉄筋32の外側に螺旋
鉄筋33を纏設して鉄筋籠34を構成していた(図4
(a))。またこの鉄筋籠34に使用する杭端板35
は、PC鋼棒31に対応する位置に大孔と小孔とからな
るだるま孔36を穿設し、また補助鉄筋32に対応する
位置の下面に連結棒37を突設してあった(図4(a)
(d))。そして、上端に掛止部38を形成したPC鋼
棒31をだるま孔36の大径側に挿通し、杭端板35を
回転して掛止部38をだるま孔36の小孔縁に掛止して
いた(図4(c))。また、連結棒37を補助鉄筋32
及び螺旋鉄筋33に結束線で固定していた(図4
(d))。以上のようにして鉄筋籠34と杭端板35と
を定着していた。
2. Description of the Related Art Conventionally, in a PRC pile, a PC steel bar 31 (main reinforcing bar) for introducing stress and an auxiliary reinforcing bar (consisting of a deformed reinforcing bar) 32 parallel to the PC steel bar are alternately arranged on the same circumference. The reinforcing bars 34 were arranged by arranging the spiral bars 33 outside the PC steel bars 31 and the auxiliary bars 32 (FIG. 4).
(A)). Also, a pile end plate 35 used for the reinforcing cage 34
Has a drill hole 36 composed of a large hole and a small hole at a position corresponding to the PC steel rod 31 and a connecting rod 37 protruding from a lower surface at a position corresponding to the auxiliary reinforcing bar 32 (FIG. 4 (a)
(D)). Then, the PC steel rod 31 having the hook portion 38 formed at the upper end is inserted into the large-diameter side of the daruma hole 36, and the pile end plate 35 is rotated to hook the hook portion 38 to the small hole edge of the daruma hole 36. (FIG. 4C). Also, the connecting rod 37 is connected to the auxiliary reinforcing bar 32.
And fixed to the spiral reinforcing bar 33 with a binding wire (FIG. 4).
(D)). As described above, the reinforcing rod cage 34 and the pile end plate 35 were fixed.

【0003】また、以上のようにして杭端板35を定着
させた鉄筋籠34を所定の型枠に入れ、コンクリートを
型枠内に入れると共にPC鋼棒にストレスを導入し、遠
心成形して、杭を成形していた。
In addition, the reinforcing rod cage 34 with the pile end plate 35 fixed as described above is put into a predetermined formwork, concrete is put into the formwork, stress is applied to the PC steel bar, and centrifugal forming is performed. , Had formed a pile.

【0004】[0004]

【発明が解決しようとする課題】前記従来の技術では、
連結棒37と補助鉄筋32及び螺旋鉄筋33との結束作
業を必要とするので、鉄筋籠34と杭端板35との定着
作業が繁雑となる問題点があった。
In the above prior art,
Since the work of binding the connecting rod 37 to the auxiliary reinforcing bar 32 and the spiral reinforcing bar 33 is required, there is a problem that the fixing work between the reinforcing bar cage 34 and the pile end plate 35 becomes complicated.

【0005】[0005]

【課題を解決するための手段】然るにこの発明は、杭端
板の補助鉄筋に対応する位置にもだるま孔を穿設し、補
助鉄筋をだるま孔の小孔縁に掛止したので、前記問題点
を解決した。
According to the present invention, however, the above-described problem is caused by forming a burrow at a position corresponding to the auxiliary reinforcing bar of the pile end plate, and hooking the auxiliary reinforcing bar to the small hole edge of the burrow. Solved the point.

【0006】即ちこの発明は、軸方向のPC鋼棒、軸方
向の補助鉄筋及び螺旋鉄筋よりなる鉄筋籠の該PC鋼棒
及び補助鉄筋の端部を、杭端板に定着する方法におい
て、前記PC鋼棒に対応した小孔及び大孔とを有する第
一のだるま孔と、前記補助鉄筋に対応した小孔及び大孔
とを有する第二のだるま孔を夫々穿設して杭端板を構成
し、前記第一のだるま孔の大孔に前記PC鋼棒を、前記
第二のだるま孔の大孔に前記補助鉄筋を夫々挿通して、
前記補助鉄筋の掛止部を、前記PC鋼棒の掛止部よりP
C鋼棒の伸びに相当する長さ宛て外方に突出して配置
し、続いて、前記杭端板を回動し、前記PC鋼棒に所定
ストレスを掛けると共に前記PC鋼棒の掛止部を前記第
一だるま孔の小孔の掛止縁に、補助鉄筋の掛止部を前記
第二だるま孔の小孔の掛止縁に夫々掛止することを特徴
としたPRC杭における鉄筋籠と杭端板との定着方法で
ある。更に、PC鋼棒に対応するだるま孔の小孔と大孔
との距離と、補助鉄筋に対応するだるま孔の小孔と大孔
との距離とを同一としたPRC杭における鉄筋籠と杭端
板との定着方法である。
That is, the present invention relates to a method for fixing the ends of the PC steel rod and the auxiliary reinforcing bar of a reinforcing rod basket comprising an axial PC steel bar, an axial auxiliary reinforcing bar and a spiral reinforcing bar to a pile end plate. A first Daruma hole having a small hole and a large hole corresponding to a PC steel rod, and a second Daruma hole having a small hole and a large hole corresponding to the auxiliary reinforcing bar are respectively formed by drilling a pile end plate. The PC steel rod is inserted into the large hole of the first Daruma hole, and the auxiliary reinforcing bar is inserted through the large hole of the second Daruma hole,
The hook of the auxiliary rebar is set at P from the hook of the PC steel bar.
The steel bar is disposed so as to protrude outward to a length corresponding to the elongation of the steel bar. Subsequently, the pile end plate is rotated to apply a predetermined stress to the steel bar and to hang the hook of the steel bar. A reinforcing cage and a pile in a PRC pile, wherein a hook of an auxiliary reinforcing bar is hooked on a hooking edge of a small hole of the first Daruma hole, and a hooking portion of a small hole of the second Daruma hole. This is a fixing method with an end plate. In addition, the distance between the small hole and the large hole of the Daruma hole corresponding to the PC steel rod and the distance between the small hole and the large hole of the Daruma hole corresponding to the auxiliary reinforcing bar are the same, and the reinforcing rod cage and the pile end in the PRC pile are set. This is a fixing method with a plate.

【0007】[0007]

【作用】この発明の方法によれば補助鉄筋の端部を杭端
板のだるま孔にの小孔縁に掛止するので、結束作業を必
要とせずに補助鉄筋と杭端板とを定着することができ
る。また、この発明の杭端板によれば、第一のだるま孔
の小孔と大孔との距離と、第二のだるま孔の小孔と大孔
との距離とを同一に形成したので、杭端板を回動するこ
とによりPC鋼棒及び補助鉄筋と杭端板とを定着するこ
とができる。
According to the method of the present invention, since the end of the auxiliary reinforcing bar is hooked on the edge of the small hole in the burrow hole of the pile end plate, the auxiliary reinforcing bar and the pile end plate are fixed without the need for a binding operation. be able to. According to the pile end plate of the present invention, since the distance between the small hole and the large hole of the first Daruma hole and the distance between the small hole and the large hole of the second Daruma hole are formed to be the same, By rotating the pile end plate, the PC steel rod and the auxiliary rebar and the pile end plate can be fixed.

【0008】[0008]

【実施例】図1乃至図3に基づきこの考案の実施例を説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described with reference to FIGS.

【0009】PC鋼棒1と、前記PC鋼棒1に平行な補
助鉄筋2とを同一円周上に交互に配筋し、前記PC鋼棒
1及び補助鉄筋2の外側に螺旋鉄筋3を纏設して鉄筋籠
4を構成する。前記PC鋼棒1の上端部には環状太径と
した掛止部19が形成され、補助鉄筋2の上端部には環
状太径とした掛止部16が夫々形成されている。
A PC steel bar 1 and an auxiliary reinforcing bar 2 parallel to the PC steel bar 1 are alternately arranged on the same circumference, and a spiral reinforcing bar 3 is provided outside the PC steel bar 1 and the auxiliary reinforcing bar 2. To form the reinforcing bar cage 4. At the upper end of the PC steel bar 1 is formed a hook portion 19 having an annular large diameter, and at the upper end of the auxiliary reinforcing bar 2 is formed a hook portion 16 having an annular large diameter.

【0010】前記鉄筋籠4に取り付ける杭端板15は以
下のような構成である。即ち、ドーナツ状の杭端板本体
5で、前記PC鋼棒1に対応した位置に、第一のだるま
孔6、6を穿設する。前記第一のだるま孔6は前記PC
鋼棒1が挿通できる口径の小孔7が穿設され、前記小孔
7に隣接して連通する大孔8が穿設され、前記小孔7の
中心と大孔8の中心との距離はDで形成されている。ま
た、大孔8は前記PC鋼棒1の掛止部19が挿通できる
形状、大きさで形成されている。また、小孔7の上部に
掛止縁9が形成されている。
The pile end plate 15 attached to the reinforcing bar 4 has the following configuration. That is, in the donut-shaped pile end plate main body 5, first Daruma holes 6, 6 are formed at positions corresponding to the PC steel bars 1. The first Daruma hole 6 is the PC
A small hole 7 having a diameter through which the steel rod 1 can be inserted is drilled, a large hole 8 communicating with the small hole 7 is drilled, and the distance between the center of the small hole 7 and the center of the large hole 8 is D. The large hole 8 is formed in a shape and a size through which the hook 19 of the PC steel bar 1 can be inserted. Further, a latching edge 9 is formed above the small hole 7.

【0011】また、杭端板本体5に前記補助鉄筋2に対
応した位置に第二のだるま孔10、10を夫々穿設す
る。前記第二のだるま孔10は前記補助鉄筋2が挿通で
きる口径の小孔11が穿設され、前記小孔11に隣接し
て連通する大孔12が穿設され、前記小孔11の中心と
大孔12の中心との距離は、前記第一のだるま孔6と同
様に、Dで形成されている。また、大孔12は前記補助
鉄筋2の掛止部16が挿通できる形状、大きさで形成さ
れている。また、小孔7の上部に掛止縁13が形成され
ている。
Further, second pile holes 10 are formed in the pile end plate body 5 at positions corresponding to the auxiliary reinforcing bars 2, respectively. The second Daruma hole 10 is provided with a small hole 11 having a diameter through which the auxiliary reinforcing bar 2 can be inserted, and a large hole 12 communicating with the small hole 11 is formed. The distance from the center of the large hole 12 is D as in the case of the first Daruma hole 6. The large hole 12 is formed in a shape and a size that allows the hooking portion 16 of the auxiliary reinforcing bar 2 to be inserted. A latching edge 13 is formed above the small hole 7.

【0012】また、前記杭端板本体5の外周下部に補強
筒14の上端部を取り付けて杭端板15を構成する(図
2)。前記において、大穴8及び大穴12の側壁は、ス
トレス導入用の緊張板(図示していない)を取り付ける
為のボルトを螺合できる螺糸を形成してある。
The pile end plate 15 is constructed by attaching the upper end of the reinforcing cylinder 14 to the lower part of the outer periphery of the pile end plate body 5 (FIG. 2). In the above, the side wall of the large hole 8 and the large hole 12 is formed with a screw thread to which a bolt for attaching a tension plate (not shown) for introducing stress can be screwed.

【0013】前記鉄筋籠4の補助鉄筋2の上端部は前記
掛止縁13に掛止できる環状太径とした掛止部16が形
成され、補助鉄筋2の掛止部16の位置(補助鉄筋2の
上端部の位置)はPC鋼棒1にストレスを導入した際の
PC鋼棒1の伸びLを考慮した位置に設けてある。
An upper end portion of the auxiliary reinforcing bar 2 of the reinforcing bar cage 4 is formed with a large-diameter hooking portion 16 which can be hooked on the hooking edge 13, and the position of the hooking portion 16 of the auxiliary reinforcing bar 2 (auxiliary reinforcing bar). 2 is provided at a position in consideration of the elongation L of the PC steel bar 1 when stress is applied to the PC steel bar 1.

【0014】次に、前記杭端板15を前記鉄筋籠4に嵌
装する。この際、前記第一のだるま孔6の大孔12にP
C鋼棒1の上端部を挿通し、前記第二のだるま孔10の
大孔12に補助鉄筋2を挿通する(図1(b))。次
に、杭端板15を矢示18方向に、だるま孔の中心位置
で距離Dだけ、回動してPC鋼棒1の掛止部19を第一
のだるま孔6の小孔7の掛止縁9に掛止する。この状態
で、補助鉄筋2は第二のだるま孔10の小孔11内に挿
通されている(図1(c))。
Next, the pile end plate 15 is fitted into the reinforcing bar cage 4. At this time, the large hole 12 of the first
The upper end of the C steel bar 1 is inserted, and the auxiliary reinforcing bar 2 is inserted into the large hole 12 of the second Daruma hole 10 (FIG. 1B). Next, the pile end plate 15 is rotated in the direction indicated by the arrow 18 by the distance D at the center position of the daruma hole, and the hook 19 of the PC steel bar 1 is hooked into the small hole 7 of the first daruma hole 6. Hook on the toe 9. In this state, the auxiliary reinforcing bar 2 is inserted into the small hole 11 of the second Daruma hole 10 (FIG. 1C).

【0015】次に、杭端板15とストレス導入用の緊張
板(図示していない)とをボルト(図示していない)を
介して連結する。この際、前記ボルトは大孔6及び大孔
10に螺合する(図示していない)。
Next, the pile end plate 15 and a tension plate (not shown) for introducing stress are connected via bolts (not shown). At this time, the bolt is screwed into the large holes 6 and 10 (not shown).

【0016】また、杭端板15を取り付けた鉄筋籠4を
所定の杭成形用型枠(図示していない)に設置し、コン
クリートを打設し、前記杭端板15及び緊張板を介し
て、前記PC鋼棒1に、矢示17方向に所定量のストレ
スを導入する。ストレスの導入に伴いPC鋼棒は長さL
だけ伸び、杭端板15も長さLだけ矢示17方向に移動
し、補助鉄筋2の掛止部16は杭端板15の掛止縁13
に掛止され(図1(c))、鉄筋籠4と杭端板15との
定着は完了する。
Further, the reinforcing rod cage 4 to which the pile end plate 15 is attached is installed on a predetermined pile forming form (not shown), concrete is poured, and the pile end plate 15 and the tension plate are interposed. A predetermined amount of stress is applied to the PC steel bar 1 in the direction indicated by arrow 17. Due to the introduction of stress, the length of PC steel rod is L
And the pile end plate 15 also moves in the direction of the arrow 17 by the length L, and the hook 16 of the auxiliary reinforcing bar 2
(FIG. 1 (c)), and the fixing of the reinforcing bar 4 and the pile end plate 15 is completed.

【0017】次に遠心成形を行い、コンクリートの硬化
後にストレスを解除し、杭を形成する(図示していな
い)。
Next, centrifugal molding is performed, and after the concrete is hardened, the stress is released to form a pile (not shown).

【0018】前記実施例において、掛止部16は環状太
径としたが、図3に示すように、補助鉄筋2の上端部外
周に螺糸部20を形成し、該螺糸部20に下部外周をテ
ーパー状に形成したナット21を螺合して掛止部とする
こともできる。この場合には杭端板15の第二のだるま
孔10の小孔11の掛止縁13も前記ナット21のテー
パー状に合わせて、テーパー状に形成する(図3(a)
(b))。
In the above embodiment, the hooking portion 16 has an annular large diameter, but as shown in FIG. 3, a thread portion 20 is formed on the outer periphery of the upper end portion of the auxiliary reinforcing bar 2, and a lower portion is formed on the thread portion 20. A nut 21 whose outer periphery is formed in a tapered shape may be screwed together to form a hook. In this case, the engaging edge 13 of the small hole 11 of the second round hole 10 of the pile end plate 15 is also formed in a tapered shape in accordance with the tapered shape of the nut 21 (FIG. 3A).
(B)).

【0019】[0019]

【発明の効果】この発明は、結束作業を不要にできるの
で、PRC杭を効率良く生産できる効果がある。また補
助鉄筋は直接端板に定着されるので、補強鉄筋と端板と
の一体化が図られ、同一補助鉄筋では強度を増強でき、
同一強度とすれば、補助鉄筋の削減、補強筒の小形化等
をはかることができる効果がある。
According to the present invention, since the bundling operation can be eliminated, the PRC pile can be efficiently produced. In addition, since the auxiliary reinforcing bar is directly fixed to the end plate, the reinforcing reinforcing bar and the end plate are integrated, and the strength can be increased with the same auxiliary reinforcing bar.
If the strength is the same, there is an effect that the number of auxiliary reinforcing bars can be reduced, the size of the reinforcing cylinder can be reduced, and the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)はこの発明の実施例に使用する杭端板の
一部拡大平面図、(b)乃至(d)は定着方法を説明す
るだるま孔の中心における一部拡大縦断面図である。
1A is a partially enlarged plan view of a pile end plate used in an embodiment of the present invention, and FIGS. 1B to 1D are partially enlarged longitudinal sectional views at the center of a daruma hole for explaining a fixing method. It is.

【図2】この発明の実施例に使用する杭端板で(a)は
平面図、(b)は図2(a)のA−A線における断面図
である。
2 (a) is a plan view of a pile end plate used in an embodiment of the present invention, and FIG. 2 (b) is a sectional view taken along line AA of FIG. 2 (a).

【図3】同じく他の杭端板で、(a)は杭端板の一部拡
大平面図、(b)だるま孔の中心における一部拡大縦断
面図である。
[3] Also in another pile end plate is a partially enlarged longitudinal sectional view at the center of (a) is partially enlarged plan view of a pile end plate, (b) potbelly hole.

【図4】(a)乃至(c)は従来例の方法を説明する斜
視図で、(d)は杭端板と補助鉄筋の連結を説明する一
部拡大縦端面図である。
4 (a) to 4 (c) are perspective views illustrating a conventional method, and FIG. 4 (d) is a partially enlarged vertical end view illustrating a connection between a pile end plate and an auxiliary reinforcing bar.

【符号の説明】[Explanation of symbols]

1 PC鋼棒 2 補助鉄筋 3 螺旋鉄筋 4 鉄筋籠 6 第一のだるま孔 10 第二のだるま孔 11 小孔(第二のだるま孔) 12 大孔(第二のだるま孔) 13 掛止縁(第二のだるま孔) 15 杭端板 16 (補助鉄筋の)掛止部 DESCRIPTION OF SYMBOLS 1 PC steel bar 2 Auxiliary rebar 3 Spiral rebar 4 Rebar cage 6 First Daruma hole 10 Second Daruma hole 11 Small hole (Second Daruma hole) 12 Large hole (Second Daruma hole) 13 Hanging edge ( (Second Daruma hole) 15 Pile end plate 16 Hook (for auxiliary reinforcing bar)

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 5/22 - 5/72 ──────────────────────────────────────────────────続 き Continuation of front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 5/22-5/72

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 軸方向のPC鋼棒、軸方向の補助鉄筋及
び螺旋鉄筋よりなる鉄筋籠の該PC鋼棒及び補助鉄筋の
端部を、杭端板に定着する方法において、前記PC鋼棒
に対応した小孔及び大孔とを有する第一のだるま孔と、
前記補助鉄筋に対応した小孔及び大孔とを有する第二の
だるま孔を夫々穿設して杭端板を構成し、前記第一のだ
るま孔の大孔に前記PC鋼棒を、前記第二のだるま孔の
大孔に前記補助鉄筋を夫々挿通して、前記補助鉄筋の掛
止部を、前記PC鋼棒の掛止部よりPC鋼棒の伸びに相
当する長さ宛て外方に突出して配置し、続いて、前記杭
端板を回動し、前記PC鋼棒に所定ストレスを掛けると
共に前記PC鋼棒の掛止部を前記第一だるま孔の小孔の
掛止縁に、補助鉄筋の掛止部を前記第二だるま孔の小孔
の掛止縁に夫々掛止することを特徴としたPRC杭にお
ける鉄筋籠と杭端板との定着方法。
1. A method of fixing the ends of PC steel bars and auxiliary reinforcing bars of a reinforcing rod basket comprising an axial PC steel bar, an axial auxiliary reinforcing bar, and a spiral reinforcing bar to a pile end plate. A first Daruma hole having a small hole and a large hole corresponding to
Second pile holes each having a small hole and a large hole corresponding to the auxiliary reinforcing bar are drilled to form a pile end plate, and the PC steel rod is inserted into the large hole of the first round hole. The auxiliary reinforcing bars are inserted into the large holes of the two daruma holes, respectively, and the engaging portions of the auxiliary reinforcing bars are projected outward from the engaging portions of the PC steel bars to a length corresponding to the extension of the PC steel bars. Then, the pile end plate is rotated, a predetermined stress is applied to the PC steel bar, and the retaining portion of the PC steel bar is assisted with the retaining edge of the small hole of the first Daruma hole. A method for fixing a reinforcing rod cage and a pile end plate in a PRC pile, wherein a retaining portion of a reinforcing bar is retained on a retaining edge of a small hole of the second Daruma hole, respectively.
【請求項2】 PC鋼棒に対応するだるま孔の小孔と大
孔との距離と、補助鉄筋に対応するだるま孔の小孔と大
孔との距離とを同一とした請求項1記載のPRC杭にお
ける鉄筋籠と杭端板との定着方法。
2. The method according to claim 1, wherein the distance between the small hole and the large hole of the Daruma hole corresponding to the PC steel rod is the same as the distance between the small hole and the large hole of the Daruma hole corresponding to the auxiliary reinforcing bar. A method of fixing a reinforcing bar and a pile end plate in a PRC pile.
JP04177346A 1992-06-11 1992-06-11 Anchoring method between reinforced cage and pile end plate in PRC pile Expired - Lifetime JP3108893B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04177346A JP3108893B2 (en) 1992-06-11 1992-06-11 Anchoring method between reinforced cage and pile end plate in PRC pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04177346A JP3108893B2 (en) 1992-06-11 1992-06-11 Anchoring method between reinforced cage and pile end plate in PRC pile

Publications (2)

Publication Number Publication Date
JPH05339939A JPH05339939A (en) 1993-12-21
JP3108893B2 true JP3108893B2 (en) 2000-11-13

Family

ID=16029365

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04177346A Expired - Lifetime JP3108893B2 (en) 1992-06-11 1992-06-11 Anchoring method between reinforced cage and pile end plate in PRC pile

Country Status (1)

Country Link
JP (1) JP3108893B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101241994B1 (en) * 2010-03-11 2013-03-11 송기용 Reinforcing block used in concrete pile and concrete pile using the same
JP5835983B2 (en) * 2011-07-25 2015-12-24 前田製品販売株式会社 Prestressed reinforced concrete pile with knots
JP2015166550A (en) * 2015-05-25 2015-09-24 前田製品販売株式会社 Knotted prestressed reinforced concrete pile
JP2019073907A (en) * 2017-10-16 2019-05-16 日本コンクリート工業株式会社 Reinforced concrete pile and manufacturing method of the same
CN112854773B (en) * 2021-01-06 2024-01-30 中冶南方城市建设工程技术有限公司 Transfer hoisting device and method for long spiral drilling pressure grouting pile reinforcement cage
KR102502549B1 (en) * 2021-02-03 2023-02-23 피에이치씨탑다운(주) Upper PHC Pile for removeable auxiliary pile and construction method of PHC top-down foundation pile using of the same

Also Published As

Publication number Publication date
JPH05339939A (en) 1993-12-21

Similar Documents

Publication Publication Date Title
JPH09512868A (en) Removable ground anchor and ground anchor construction method using the same
JP3108893B2 (en) Anchoring method between reinforced cage and pile end plate in PRC pile
JP3603130B2 (en) Root-wound reinforcement structure for column bases such as steel columns
JPS6122088B2 (en)
JP2000027202A (en) Column base structure of steel pipe column
JPH06108588A (en) Reinforcing bar joining device and joining tool used for it
JP3543229B2 (en) Construction method of ready-made concrete pile and foundation
JPH05230840A (en) How to install the pile head basket muscle
JP2792968B2 (en) Self-supporting soil cement retaining wall and its construction method
JPH08246446A (en) Underground bottom widening pile by existing pile
JPH01125416A (en) Concrete pile
JPH0612038Y2 (en) Lock anchor bolt
JPH1193162A (en) Pile with node and manufacture of the same
JPS6128804Y2 (en)
JPH0714433Y2 (en) Connection structure between concrete pile head and footing
JP3466724B2 (en) Ready-made pile with knots
JP3015499U (en) Concrete pole and connecting structure of concrete pole and steel pipe
JP3119117B2 (en) PC version driving formwork and formwork method
JPH11172670A (en) Steel pipes, steel pipe piles and method of forming steel pipe piles
JPH0643219Y2 (en) Core body attached to the inner circumference of the head of a concrete pile
JPS63289145A (en) How to fix anchor bolts
JPS6140812B2 (en)
JPH06330522A (en) Pile head joint construction
JPH0617867Y2 (en) Reflex anchor
JPH05140954A (en) Structure of part near head of pc pile

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080914

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090914

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100914

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110914

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120914

Year of fee payment: 12

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120914

Year of fee payment: 12