JP2763430B2
JP2763430B2 JP27781591A JP27781591A JP2763430B2 JP 2763430 B2 JP2763430 B2 JP 2763430B2 JP 27781591 A JP27781591 A JP 27781591A JP 27781591 A JP27781591 A JP 27781591A JP 2763430 B2 JP2763430 B2 JP 2763430B2
Authority
JP
Japan
Prior art keywords
ground
pressure
jet
injection pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27781591A
Other languages
Japanese (ja)
Other versions
JPH05112927A (en
Inventor
紘治 中山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SOGO BOSUI KK
Original Assignee
NIPPON SOGO BOSUI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SOGO BOSUI KK filed Critical NIPPON SOGO BOSUI KK
Priority to JP27781591A priority Critical patent/JP2763430B2/en
Publication of JPH05112927A publication Critical patent/JPH05112927A/en
Application granted granted Critical
Publication of JP2763430B2 publication Critical patent/JP2763430B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は地下水位が高く、ある
いは被圧下における、例えば大深度の地盤を対象とし
て、グラウト、あるいは水、空気等の高圧噴射力を利用
して地盤を切削し、固結体を形成する地盤の改良工法、
およびこの工法で用いる注入管のパッカー装置に関す
る。
BACKGROUND OF THE INVENTION The present invention relates to a method for cutting ground by using high-pressure jetting force of grout or water, air, etc., for a ground having a high groundwater level or under pressure, for example, a deep ground. Improvement method of ground to form unity,
And a packer device for an injection pipe used in this method.

【0002】[0002]

【従来の技術】近年、セメントミルク等のグラウトを注
入管先端付近から高圧で噴射し、あるいは高圧グラウト
に圧縮空気を沿わせたり、圧縮空気に沿わせ高圧水を噴
射して、地盤を切削し、同時に切削土砂とグラウトとを
撹拌混合して地盤中に固結体を形成するジェット噴流に
よる地盤改良工法(ジェットグラウト工法)が実用化さ
れている。
2. Description of the Related Art In recent years, the ground has been cut by injecting grout such as cement milk at high pressure from near the tip of an injection pipe, or by injecting compressed air along the high-pressure grout or by injecting high-pressure water along with the compressed air. At the same time, a ground improvement method (jet grout method) using a jet jet that forms a consolidated body in the ground by stirring and mixing the cut soil and grout has been put to practical use.

【0003】また近年、比較的深度の大きな立坑の築造
等に伴ない、ボイリングやヒービングの防止等を目的と
する底盤部の改良を行う必要性が高まっているが、従来
のジェットグラウト工法を地下水位以下の、特に高い被
圧水を有する地盤に地上から施工しようとすると次の様
な問題点があった。
In recent years, along with the construction of shafts having a relatively large depth, it has become necessary to improve the bottom portion for the purpose of preventing boiling and heaving. The following problems have been encountered when attempting to construct from the ground on a ground having a high level of pressurized water below the ground level.

【0004】 切削位置と排出口までの距離が長く切
削土砂の排出が困難になる。
[0004] The distance between the cutting position and the discharge port is long, and it becomes difficult to discharge the cutting earth and sand.

【0005】 ケーシングによる穿孔時において、あ
るいは注入管による直接穿孔するに当って、管周囲よ
り、泥土を含む地下水が噴出し穿孔作業が困難になる。
[0005] At the time of piercing with a casing or directly piercing with an injection pipe, groundwater containing mud is spouted from around the pipe, making it difficult to perform the piercing operation.

【0006】 グラウトの噴射あるいは注入時におい
て、被圧水と共にグラウトが地上に噴出し、造成径が確
保できない。
[0006] When grout is injected or injected, grout is ejected to the ground together with the water to be pressurized, and the formed diameter cannot be secured.

【0007】 ケーシングまたは注入管の穿孔精度の
確保が困難となる。
[0007] It is difficult to ensure the accuracy of drilling the casing or the injection pipe.

【0008】 注入管等の穿孔機に大トルクが必要と
なり、大型機種や広い作業面積が必要となる。
A large torque is required for a drilling machine such as an injection pipe, and a large model and a large work area are required.

【0009】 注入管、先端ノズル等の装置類の強度
を大幅に高める必要がある。
It is necessary to greatly increase the strength of devices such as an injection pipe and a tip nozzle.

【0010】 コアサンプリングの精度が低下し、改
良効果の確認がむずかしい。
[0010] The accuracy of core sampling is reduced, and it is difficult to confirm the improvement effect.

【0011】 改良長に対する穿孔長の割合が大きく
なり、著しくコストアップとなる。
[0011] The ratio of the perforated length to the improved length is increased, which significantly increases the cost.

【0012】等多くの問題点があり、実用化が遅れてい
た。
There are a number of problems, and practical application has been delayed.

【0013】この発明は、上記問題点に着目しなされた
ものである。その目的は、浅深度地盤を対象とした従来
の技術、装置を基本として用い、これを改善することに
より、地下水の被圧下における地盤の改良工法、殊に大
深度の地盤の改良工法およびこの工法で地下水位以下に
ある施工基盤から施工する際に改良地盤に挿入させた注
入管の口元からの地下水、掘削土砂、グラウト等の噴出
を制御しつつ、ケーシングや注入管等による穿孔および
引抜きを行なうことができるパッカー装置を提案するに
ある。
The present invention has been made in view of the above problems. The purpose is to improve the ground under the pressure of groundwater by using the conventional technology and equipment for the shallow depth ground as a basis, and to improve the ground, especially the deep ground ground improvement method and this method. Performing drilling and pulling with casing and injection pipe etc. while controlling the injection of groundwater, excavated earth and sand, grout etc. from the mouth of the injection pipe inserted into the improved ground when constructing from the construction base below the groundwater level with It is to propose a packer device that can be.

【0014】(1項)の発明になる地下水の被圧下にお
ける地盤改良工法は地盤を高圧水により削孔しつつ、グ
ラウトを充填しあるいは、高圧グラウトの噴射によって
直接グラウトを地盤と撹拌混合して固結体を形成するジ
ェット噴流による地下水の被圧下における地盤の改良工
法において、改良地盤に注入管を挿入してジェット噴流
を噴射し、注入管周囲から上昇する排泥の排出圧を圧力
調整装置を用いて適正となし、それによって排泥量を制
御することを特徴とする。(2項)の発明になる改良工
法は地盤を高圧水により削孔しつつ、グラウトを充填あ
るいは、高圧グラウトの噴射によって直接グラウトを地
盤と攪拌混合して固結体を形成するジェット噴流による
地下水の被圧下における改良工法において、所定深度ま
で掘下げた立坑内に施工基盤を設けて、施工基盤から改
良地盤までの深度を浅くなし、施工基盤から改良地盤に
注入管を挿入してジェット噴流を噴射し、注入管周囲か
ら上昇する排泥の排出圧を圧力調整装置を用いて適正と
なし、それによって排泥量を制御することを特徴とす
る。(3項)の発明になる注入管のパッカー装置は、ジ
ェット噴流による地下水の被圧下における地盤改良を、
地下水圧が作用する施工基盤からケーシングパイプおよ
び注入管を用いてジェット噴流を噴射し施工する際の注
入管の口元パツカー装置であって、ケーシングパイプお
よび注入管を挿通できる円筒形空間を有し、下端部は施
工基盤に嵌込む嵌着部をなし、上端部には上下2段にケ
ーシングパイプ用パッカーリングおよび注入管用パッカ
ーリングを備え、中間部から排泥管が分岐し、円筒形空
間に連通し圧力調整装置が付帯していることを特徴とす
る。
The ground improvement method under pressure of ground water according to the invention of the above (1) is a method of drilling the ground with high-pressure water, filling the grout, or directly mixing the grout with the ground by injection of the high-pressure grout. In the improvement method of the ground under the pressure of the groundwater by the jet jet forming the solidified body, the injection pipe is inserted into the improved ground, the jet jet is injected, and the discharge pressure of the mud rising from around the injection pipe is controlled by the pressure regulator. And the amount of sludge is controlled accordingly. The improved construction method according to the invention of (2) is a method in which a ground is filled with grout while the ground is drilled with high-pressure water or ground water is jet-mixed directly with the ground by jetting high-pressure grout to form a consolidated body. In the improvement method under pressure, a construction base is installed in a shaft excavated to a predetermined depth, the depth from the construction base to the improved ground is made shallow, and a jet jet is injected by inserting an injection pipe from the construction base to the improved ground Then, the discharge pressure of the sludge rising from the periphery of the injection pipe is made appropriate by using a pressure adjusting device, and thereby the amount of the sludge is controlled. The packer device of the injection pipe according to the invention of (3) improves the ground under the pressure of the groundwater by the jet jet,
It is a mouth-packer device of the injection pipe at the time of spraying and constructing a jet jet using the casing pipe and the injection pipe from the construction base on which the groundwater pressure acts, and has a cylindrical space through which the casing pipe and the injection pipe can be inserted, The lower end has a fitting part that fits into the construction base, and the upper end has a packer ring for casing pipe and a packer ring for injection pipe at the upper and lower two stages, and the sludge pipe branches from the middle part and communicates with the cylindrical space And a pressure adjusting device is provided.

【0015】[0015]

【作用】(1項)の発明になる地盤改良工法は、圧力調
整装置により排泥圧を検出し、予め地下水圧、ジェット
水、グラウトの充填量を勘案し設定した調整圧を基準に
して排泥量を制御するので、地盤内が著しく高圧となっ
たり、過剰の排泥やグラウトが排出されることがなく、
所望量のグラウトを地盤内に充填し、またはこれを混合
して地盤の改良を図ることが可能となる。(2項)の発
明になる改良工法は、地盤を掘削して立坑内に施工基盤
を設け、改良すべき地盤までの深度を浅くするので、例
えば50m以上の大深度地盤であっても施工基盤からの
深さを50m以下とすることができる。従って長い穿孔
距離、穿孔精度、穿孔機の能力、強度、切削土砂の排出
等の大深度に伴なう問題点は従来の技術、装置を基盤に
して解決できる。また大深度地盤は多くの場合、地下水
圧が高く、被圧水に起因する造成径の確保、変化に対す
るコトロールがむずかしくなるが、この工法は、(1
項)の改良工法と同様に調整圧を基準にして排泥量を制
御することにより、所望量のグラウトを地盤内に充填
し、地盤の改良を図ることができる。
In the ground improvement method according to the invention of the item (1), the drainage pressure is detected by a pressure adjusting device, and drainage is performed based on an adjusted pressure set in advance in consideration of a groundwater pressure, a jet water, and a filling amount of grout. Because the amount of mud is controlled, the inside of the ground does not have a remarkably high pressure, and excess mud and grout are not discharged.
The ground can be improved by filling the ground with a desired amount of grout or mixing it. According to the improved construction method of the invention of (2), the ground is excavated, a construction base is provided in the shaft, and the depth to the ground to be improved is reduced. Can be set to 50 m or less. Therefore, problems associated with a large depth, such as a long drilling distance, drilling accuracy, drilling machine capacity, strength, and discharge of cutting earth and sand, can be solved based on conventional techniques and equipment. In addition, deep ground often has high groundwater pressure, which makes it difficult to secure the formation diameter due to the confined water and to control the change.
By controlling the amount of sludge discharged on the basis of the adjustment pressure in the same manner as in the improvement method of item (1), a desired amount of grout can be filled in the ground to improve the ground.

【0016】地盤を掘下げた立坑内の施工基盤は多くの
場合に地下水水位より低位置にあって地下水圧が作用
し、ケーシングパイプや注入管の挿入時にはそれらの周
囲から地下水やグラウトが噴出するが、(3項)の発明
になる注入管のパッカー装置は、ケーシングパイプ用パ
ッカーリングと注入管用パッカーリングとを上下2段に
備えているので、ケーシングパイプおよび注入管による
削孔時、ケーシングパイプを挿通した注入管の設置時あ
るいはケーシングパイプおよび注入管の引抜時におい
て、地下水、切削土砂あるいはグラウト等の口元からの
噴出を防止できる。また、圧力調整装置が付帯してい
て、注入管周囲から上昇する排泥の圧力を検出し、排泥
量を制御するので、大深度で高い地下水圧がかかる地盤
でも、グラウトの充填、混合を適確に行なうことができ
る。
In many cases, the construction base in the shaft where the ground has been dug is located at a position lower than the groundwater level, and the groundwater pressure acts. When a casing pipe or an injection pipe is inserted, groundwater or grout spouts from around the pipe. The packer apparatus for an injection pipe according to the invention of (3) includes a casing pipe packer ring and an injection pipe packer ring in two upper and lower stages. During installation of the inserted injection pipe or withdrawal of the casing pipe and the injection pipe, it is possible to prevent the spouting of groundwater, cut sand, grout, etc. from the mouth. In addition, a pressure regulator is attached to detect the pressure of the sludge rising from around the injection pipe and control the amount of sludge, so that grout can be filled and mixed even on ground where deep groundwater pressure is high. It can be performed accurately.

【0017】[0017]

【実施例】本工法の基本的概念をケーシングパイプを用
いない方式の場合で説明する。図1は大深度の立坑の底
盤部の地盤改良の施工例を示す。この立坑の底盤部の改
良対象地盤1は深度50m以上であり、地盤改良の施工
に先だち周囲を地中連続壁2で囲み、その内部を掘削し
て施工基盤3を構築する。施工基盤3は対象地盤1まで
の深さDが50m以下となる深さ位置に設定するのが好
ましい。地下水位は施工基盤3位より高い位置となって
いる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The basic concept of the present construction method will be described in the case of a system not using a casing pipe. FIG. 1 shows a construction example of ground improvement at the bottom of a shaft at a large depth. The ground 1 to be improved at the bottom of the shaft has a depth of 50 m or more. Prior to the ground improvement, the ground is surrounded by a continuous underground wall 2 and the inside thereof is excavated to construct a construction base 3. The construction base 3 is preferably set at a depth position where the depth D to the target ground 1 is 50 m or less. The groundwater level is higher than the third place of the construction base.

【0018】この施工基盤3面に下床コンクリート4を
布設し、この下床コンクリート4を貫通して、高圧グラ
ウト、圧縮空気を送る注入管5として二重管ロッドを対
象地盤1まで挿入する。注入管5の下床コンクリート4
を貫通する位置の周りは口元パッカー6で気密に閉塞す
る。注入管5は、上端部にロッドの回転を駆動するボー
リング機7を取付け、地盤表面に設置したコンプレッサ
ー8、送水ポンプ9、高圧ポンプ10と送給管11を介
し連結する。また口元パッカー6に連通して圧力調整装
置12、流量計13、沈澱槽14を排泥管15を介し直
列に連結する。注入管5は一定の深さまで穿孔した後、
回転させ、その先端から高圧グラウトと圧縮空気を噴射
し、地山を切削しながら、グラウトと地盤との攪拌混合
を行なう。
A lower-floor concrete 4 is laid on the surface of the construction base 3, and a double-pipe rod is inserted through the lower-floor concrete 4 to the target ground 1 as an injection pipe 5 for sending high-pressure grout and compressed air. Injection pipe 5 Lower floor concrete 4
Is closed airtightly by the mouth packer 6. The injection pipe 5 is provided with a boring machine 7 for driving rotation of a rod at an upper end thereof, and is connected to a compressor 8, a water pump 9, and a high-pressure pump 10 installed on the ground surface via a feed pipe 11. Further, the pressure adjusting device 12, the flow meter 13, and the sedimentation tank 14 are connected in series through a drainage pipe 15 in communication with the mouth packer 6. After piercing the injection tube 5 to a certain depth,
The grout and the ground are agitated and mixed while cutting the ground by injecting high-pressure grout and compressed air from the tip.

【0019】この施工作業に伴ない生じる切削土砂は注
入管5の周囲に沿い圧縮空気に同伴して上昇し口元パッ
カー6に連通する排泥管15を通り排泥として排出され
る。排泥管15の口元パッカー6近傍に取付けた圧力調
整装置12は注入管5の周囲を通り排泥管に入る排泥圧
を検出し、予め設定してある調整圧を基準にして排泥管
の弁を開閉し、排出する。排泥は流量計13で計測した
後、沈澱槽14に集められる。
The cutting sand produced during the construction work rises along the periphery of the injection pipe 5 with the compressed air, and is discharged as sludge through the drainage pipe 15 communicating with the mouth packer 6. The pressure adjusting device 12 attached to the vicinity of the mouth packer 6 of the exhaust pipe 15 detects the exhaust pressure passing through the periphery of the injection pipe 5 and entering the exhaust pipe, and based on the preset adjustment pressure, the exhaust pipe is used as a reference. Open and close the valve and discharge. The sludge is measured by a flow meter 13 and then collected in a sedimentation tank 14.

【0020】圧力調整装置に設定する調整圧は、地盤内
の間隙水圧、ジェット水、グラウトの充填量等を総合的
に勘案して適正値を選定する。また必要に応じ弁圧を逐
一制御して開閉し、土砂やグラウトあるいは地下水が必
要以上に排出されるのを防止することもできる。
An appropriate value is selected as the adjustment pressure set in the pressure adjustment device, taking into account the pore water pressure in the ground, the amount of jet water, the filling amount of grout, and the like. In addition, the valve pressure can be controlled and opened and closed as needed to prevent the earth and sand, grout or groundwater from being discharged more than necessary.

【0021】所定の立坑の底盤部対象地盤1に固結体1
6をつくり、地盤改良を行った後、ジェット噴射を停止
し、注入管5を引抜きながらグラウトにより穴埋を行な
う。注入管5引抜後、口元パッカー6に取付けてある開
閉バルブを閉め閉塞する。
A solid body 1 is attached to the target ground 1 at the bottom of a predetermined shaft.
After making the ground 6 and improving the ground, the jet injection is stopped, and the filling is performed by grouting while the injection pipe 5 is pulled out. After pulling out the injection pipe 5, the open / close valve attached to the mouth packer 6 is closed and closed.

【0022】本発明は被圧水が作用する地盤を対象とす
る地盤改良工法であり、大深度の場合は施工基盤を立坑
内に設けるのが原則である。しかし、地上から穿孔した
だけでも地下水が噴出するような極めて高被圧の条件下
においては、施工基盤を立坑内に設けずに地上より施工
せざるを得ない場合が多い。何れの場合も、施工基盤で
は、被圧水の噴出を防ぎ、また切削土砂の排出を適正に
制御しつつ、グラウトの充填、混合を行ない改良固結体
の形成が図られる。
The present invention relates to a ground improvement method for a ground on which pressurized water acts, and in principle, a construction base is provided in a shaft when the ground is deep. However, under extremely high pressure conditions, such as when groundwater spouts out from the ground, it is often necessary to construct from the ground without providing a construction base in the shaft. In each case, the construction base is filled with grout and mixed to form an improved consolidated body while preventing the pressurized water from being blown out and appropriately controlling the discharge of the cutting sand.

【0023】そして、この工法ではケーシングパイプを
用いないで注入管を穿孔に兼用する方式よりは、穿孔に
はケーシングパイプを用いる方式が一般的である。
In this method, a casing pipe is generally used for drilling, rather than a case where an injection pipe is used for drilling without using a casing pipe.

【0024】このために、本発明では、図2に示す口元
パッカー6を用いた。口元パッカー本体部17は円筒形
をなし、下端部は下床コンクリート4に嵌込む嵌部1
8をなし、上端部には上下2段にケーシングパイプ用パ
ッカーリング19、および注入管用パッカーリング2
0、その下側には開閉バルブ21が取付けてあり、さら
にその下方位置に排泥管15が分岐し、圧力調整装置1
2および開閉バルブ22が取付けてある。以下、この口
元パッカー6を用いた施工の実施例を、高圧水、圧縮空
気、グラウトを送るための三重管ロッドを注入管とし、
穿孔にケーシングパイプを用いる方式の場合について図
面を用い詳述する。
For this purpose, in the present invention, a mouth packer 6 shown in FIG. 2 is used. Mouth packer body portion 17 has a cylindrical shape, wear part 1 fitting the lower end portion Komu fitted under the floor concrete 4
8 and two upper and lower stages of a casing pipe packing ring 19 and an injection pipe packing ring
0, an opening / closing valve 21 is attached to the lower side thereof, and a mud pipe 15 branches below the opening / closing valve 21.
2 and the opening / closing valve 22 are attached. Hereinafter, an embodiment of the construction using the mouth packer 6 will be described in which a triple pipe rod for sending high-pressure water, compressed air, and grout is used as an injection pipe,
The case of using a casing pipe for drilling will be described in detail with reference to the drawings.

【0025】図3において、先ず、注入管を挿入するケ
ーシングパイプ23を用いて穿孔する。ケーシングパイ
プ23は先端に削孔ビット24、逆止弁25、離脱装置
26を備え、上端部口元をケーシングパイプ用パッカー
リング19で気密にシールして回転させ、先端の削孔ビ
ット24で穿孔して地盤内に貫入させる。先端部には逆
止弁25があり、ケーシングパイプ23内を通り地下水
が上部に噴出することはない。穿孔作業に伴ない発生す
る掘削土砂、穿孔水等は圧力調整装置12により排出圧
を調整し、開閉バルブ22を開閉して排泥管15から排
出する。
In FIG. 3, first, a perforation is made using a casing pipe 23 into which an injection pipe is inserted. The casing pipe 23 is provided with a drill bit 24, a check valve 25, and a release device 26 at the tip. The mouth of the upper end is hermetically sealed with a casing pipe packing ring 19 and rotated. To penetrate the ground. A check valve 25 is provided at the distal end, and groundwater does not flow upward through the casing pipe 23. Excavated earth and sand, drilling water, and the like generated during the drilling operation are discharged from the drainage pipe 15 by adjusting the discharge pressure by the pressure adjusting device 12 and opening and closing the open / close valve 22.

【0026】ケーシングパイプ23で所定深度まで穿孔
した後、図4のごとく、ケーシングパイプ23内に注入
管5として三重管ロッド(φ900mm)を挿入する。ケ
ーシングパイプ23と注入管5との間隙は、注入管5上
端部に取付けたエントランスパッキング27で密閉し、
ロッド5の先端で離脱装置26を押し、ケーシングパイ
プ先端の逆止弁25、削孔ビット24を離脱させる。
After piercing the casing pipe 23 to a predetermined depth, a triple pipe rod (φ900 mm) is inserted into the casing pipe 23 as the injection pipe 5 as shown in FIG. The gap between the casing pipe 23 and the injection pipe 5 is sealed by an entrance packing 27 attached to the upper end of the injection pipe 5,
The release device 26 is pushed by the tip of the rod 5 to release the check valve 25 and the drill bit 24 at the tip of the casing pipe.

【0027】続いて、ケーシングパイプ23の引抜きを
開始する。ケーシングパイプ23の下端が注入管用パッ
カーリング20の位置を通過した直後に、パッカーリン
グ20で注入管5の周囲を密閉して、注入管5の口元か
らの土砂等の噴出を防止し、ケーシングパイプ23を撤
去する(図5)。
Subsequently, the drawing of the casing pipe 23 is started. Immediately after the lower end of the casing pipe 23 has passed the position of the injection pipe packer ring 20, the periphery of the injection pipe 5 is sealed by the packer ring 20 to prevent spout of soil and the like from the mouth of the injection pipe 5, 23 is removed (FIG. 5).

【0028】注入管5は図6のごとく、地盤改良すべき
底盤部の対象地盤1において、注入管5を回転させなが
ら、ジェット水および圧縮空気28を噴射して地盤の切
削と、グラウト29の充填を行なった後、注入管5を引
抜きながら撹拌混合して固結体16をつくり(図7)、
注入管5を引抜き、口元パッカー6に取付けてある開閉
バルブ21および排泥管15の開閉バルブ22を閉め、
削孔を閉塞する。
As shown in FIG. 6, the injection pipe 5 jets jet water and compressed air 28 while rotating the injection pipe 5 on the target ground 1 at the bottom to be ground-removed, and cuts the ground and grouts the grout 29. After the filling, the solidified body 16 is formed by stirring and mixing while pulling out the injection tube 5 (FIG. 7).
The injection pipe 5 is pulled out, and the opening and closing valve 21 attached to the mouth packer 6 and the opening and closing valve 22 of the mud pipe 15 are closed.
Close the drill hole.

【0029】[0029]

【発明の効果】(1項)の発明になる大深度地盤の改良
工法は地下水の被圧下にある地盤を対象とするが、排泥
圧の調整により排泥量を制御して排出することにより、
高い地下水圧が作用する地盤であっても、所望のグラウ
トを充填して地盤の改良ができる。(2項)の改良工法
は掘下げた立坑内の施工基盤から施工するので従来の技
術、装置を基本にして作業ができ一層好適である。
The method for improving the deep ground according to the invention of the item (1) is intended for the ground under the pressure of the groundwater. ,
Even if the ground is subjected to a high groundwater pressure, the ground can be improved by filling a desired grout. The improvement method (2) is more preferable because the work is carried out based on the conventional technology and equipment since the work is carried out from the construction base in the shaft that is dug down.

【0030】(3項)の発明になる注入管のパッカー装
置は地下水水位より低い施工基盤からの施工に際し、注
入管、ケーシングパイプの周囲口元からの地下水、土砂
あるいはグラウトの噴出を防止し、同時に排泥圧の調整
により排泥量を制御し、大深度地盤の改良を可能とす
る。
The injection pipe packing apparatus according to the third aspect of the present invention prevents the injection of groundwater, earth and sand, or grout from the surrounding mouth of the injection pipe and the casing pipe during construction from a construction base lower than the groundwater level. By controlling the mud pressure, the amount of mud is controlled to enable improvement of deep ground.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施例の大深度地盤の改良工法の全体断面図で
ある。
FIG. 1 is an overall sectional view of a method for improving deep ground in an embodiment.

【図2】口元パッカー装置の断面図である。FIG. 2 is a sectional view of a mouth packer device.

【図3】口元パッカー装置を挿通してケーシングパイプ
を地盤内に貫入した状態の断面図である。
FIG. 3 is a cross-sectional view showing a state where a casing pipe has penetrated into the ground through a mouth packer device.

【図4】ケーシングパイプを挿通して注入管を地盤内に
貫入した状態の断面図である。
FIG. 4 is a cross-sectional view showing a state where an injection pipe has penetrated into the ground through a casing pipe.

【図5】地盤内に貫入した注入管の断面図である。FIG. 5 is a sectional view of an injection pipe penetrating into the ground.

【図6】地盤内でジェット水および圧縮空気とグラウト
を噴射している注入管の断面図である。
FIG. 6 is a cross-sectional view of an injection pipe for jetting jet water, compressed air, and grout in the ground.

【図7】地盤内から引抜いている注入管の断面図であ
る。
FIG. 7 is a cross-sectional view of an injection pipe withdrawn from the ground.

【図8】地盤改良施工後の改良地盤の断面図である。FIG. 8 is a cross-sectional view of the improved ground after the ground improvement work.

【符号の説明】[Explanation of symbols]

1…改良の対象地盤、2…地中連続壁、3…施工基盤、
4…下床コンクリート、5…注入管、6…口元パッカ
ー、7…ボーリング機、8…コンプレッサー、9…送水
ポンプ、10…高圧ポンプ、11…送給管、12…圧力
調整装置、13…流量計、14…沈澱槽、15…排泥
管、16…固結体、17…口元パッカー本体部、18…
嵌着部、19…ケーシングパイプ用パッカーリング、2
0…注入管用パッカーリング、21,22…開閉バル
ブ、23…ケーシングパイプ、24…削孔ビット、25
…逆止弁、26…離脱装置、27…エントラスパッキン
グ、28…ジェット水および圧縮空気、29…グラウ
ト。
1 ... ground to be improved, 2 ... underground continuous wall, 3 ... construction base,
4 ... lower floor concrete, 5 ... injection pipe, 6 ... mouth packer, 7 ... boring machine, 8 ... compressor, 9 ... water pump, 10 ... high pressure pump, 11 ... feed pipe, 12 ... pressure regulator, 13 ... flow rate Total: 14: sedimentation tank, 15: sludge pipe, 16: solidified body, 17: mouth packer body, 18 ...
Fitting part, 19 ... Packer ring for casing pipe, 2
0: Packer ring for injection pipe, 21, 22: open / close valve, 23: casing pipe, 24: drill bit, 25
... check valve, 26 ... release device, 27 ... entra packing, 28 ... jet water and compressed air, 29 ... grout.

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地盤を高圧水により削孔しつつ、グラウ
トを充填あるいは、高圧グラウトの噴射によって直接グ
ラウトを地盤と撹拌混合して固結体を形成するジェット
噴流による地下水の被圧下における地盤改良工法におい
て、改良地盤に注入管を挿入してジェット噴流を噴射
し、注入管周囲から上昇する排泥の排出圧を圧力調整装
置を用いて適正となし、それによって排泥量を制御する
ことを特徴とする地下水の被圧下における地盤改良工
法。
1. Ground improvement under pressure of groundwater by a jet jet that forms a consolidated body by filling grout or directly mixing grout with the ground by injection of high-pressure grout while drilling the ground with high-pressure water. In the construction method, the injection pipe is inserted into the improved ground to jet the jet jet, and the discharge pressure of the sludge rising from the periphery of the injection pipe is made appropriate using a pressure adjusting device, thereby controlling the amount of the sludge. Characteristic soil improvement method under pressure of groundwater.
【請求項2】 地盤を高圧水により削孔しつつ、グラウ
トを充填あるいは、高圧グラウトの噴射によって直接グ
ラウトを地盤と攪拌混合して固結体を形成するジェット
噴流による地下水の被圧下における地盤改良工法におい
て、所定深度まで掘下げた立坑内に施工基盤を設けて、
施工基盤から改良地盤までの深度を浅くなし、施工基盤
から改良地盤に注入管を挿入してジェット噴流を噴射
し、注入管周囲から上昇する排泥の排出圧を圧力調整装
置を用いて適正となし、それよって排泥量を制御するこ
とを特徴とする地下水の被圧下における地盤改良工法。
2. Ground improvement under pressure of groundwater by a jet jet that fills grout or directly mixes grout with the ground by injection of high-pressure grout while drilling the ground with high-pressure water to form a consolidated body. In the construction method, a construction base is installed in a shaft that has been dug down to a predetermined depth,
Reduce the depth from the construction base to the improved ground, insert an injection pipe from the construction base into the improved ground, jet a jet jet, and adjust the discharge pressure of the mud rising from around the injection pipe using a pressure adjustment device to be appropriate. A ground improvement method under pressure of groundwater, characterized in that the amount of sludge is controlled accordingly.
【請求項3】 ジェット噴流による地下水の被圧下にお
ける地盤改良を、地下水圧が作用する施工基盤からケー
シングパイプおよび注入管を用いてジェット噴流を噴射
し施工する際の注入管の口元パツカー装置であって、ケ
ーシングパイプおよび注入管を挿通できる円筒形空間を
有し、下端部は施工基盤に嵌込む嵌着部をなし、上端部
には上下2段にケーシングパイプ用パッカーリングおよ
び注入管用パッカーリングを備え、中間部から排泥管が
分岐し、円筒形空間に連通し圧力調整装置が付帯してい
ることを特徴とする注入管のパッカー装置。
3. A packing machine at the mouth of an injection pipe when jetting a jet jet from a construction base on which the groundwater pressure acts using a casing pipe and an injection pipe to perform the ground improvement under the pressure of the groundwater caused by the jet jet. A cylindrical space through which the casing pipe and the injection pipe can be inserted, a lower end part of which forms a fitting part to be fitted into the construction base, and an upper end part provided with a casing pipe packer ring and an injection pipe packer ring in upper and lower two stages. A packer device for an injection pipe, characterized in that a drainage pipe is branched from an intermediate part, and is connected to a cylindrical space and is provided with a pressure regulator.
JP27781591A 1991-10-24 1991-10-24 Soil improvement method under injection of groundwater and packer for injection pipe Expired - Fee Related JP2763430B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27781591A JP2763430B2 (en) 1991-10-24 1991-10-24 Soil improvement method under injection of groundwater and packer for injection pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27781591A JP2763430B2 (en) 1991-10-24 1991-10-24 Soil improvement method under injection of groundwater and packer for injection pipe

Publications (2)

Publication Number Publication Date
JPH05112927A JPH05112927A (en) 1993-05-07
JP2763430B2 true JP2763430B2 (en) 1998-06-11

Family

ID=17588656

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27781591A Expired - Fee Related JP2763430B2 (en) 1991-10-24 1991-10-24 Soil improvement method under injection of groundwater and packer for injection pipe

Country Status (1)

Country Link
JP (1) JP2763430B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4060720B2 (en) * 2003-01-24 2008-03-12 株式会社錢高組 Ground improvement method for contaminated soil by high pressure jet.
JP5301917B2 (en) * 2008-08-11 2013-09-25 東日本旅客鉄道株式会社 Ground improvement method and drilling machine
JP6320850B2 (en) * 2014-06-06 2018-05-09 公益財団法人鉄道総合技術研究所 Reinforcement construction and quality control method of earth structure using injection type natural ground reinforcement
JP6763678B2 (en) * 2015-03-27 2020-09-30 ユーロフィン日本環境株式会社 Soil sampling method and groundwater outlet pipe
JP6506076B2 (en) * 2015-03-31 2019-04-24 前田建設工業株式会社 Mud tank
JP6795874B2 (en) * 2017-03-13 2020-12-02 株式会社奥村組 Mud treatment equipment used in the high-pressure injection stirring method
JP7060402B2 (en) * 2018-02-20 2022-04-26 大成建設株式会社 Mud collection device and ground improvement method

Also Published As

Publication number Publication date
JPH05112927A (en) 1993-05-07

Similar Documents

Publication Publication Date Title
JPH0791930B2 (en) Underground drilling machine cement soil equipment
CN105256795B (en) Hold type thread core built pile and its construction equipment and construction method in a kind of end
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN107489158A (en) A kind of spiral-digging pore stirs the construction method of water spray soil occlusion curtain pile
CN106522213A (en) Rotary jet grouting bar inserting type mini pile construction method
CN106906840A (en) The method of offshore wind farm rock-socketed steel pipe piles and the outer grouting construction of stake
JP2763430B2 (en) Soil improvement method under injection of groundwater and packer for injection pipe
EP1277887A2 (en) Displacement drilling tool and equipment using said tool
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN107587502B (en) Construction method for rotary drilling hole-forming pressure-grouting cement soil occlusion curtain pile
JP2647572B2 (en) Ground improvement method
US6079906A (en) Method for making foundation piling with drilling machines
JP3703633B2 (en) Head for digging and expanding roots
US4701078A (en) Pile construction method for improving bearing power
JP3264349B2 (en) Consolidated pile forming equipment
GB2356659A (en) Pile formation
JPH073054B2 (en) Foundation pile construction method
JPH0127207B2 (en)
JPH0114380B2 (en)
JPH10183599A (en) Ground improvement method
CN114575883B (en) Decompression guide grouting method suitable for airtight stratum
JPH02492B2 (en)
EP0989241B1 (en) Method for forming concrete piles in the ground
JP2787548B2 (en) Underground anchoring method and equipment
WO2023218396A1 (en) Method of installation of a drill pile and the drill pill

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees