[go: up one dir, main page]

JP2024075028A - Suspended ceiling structure - Google Patents

Suspended ceiling structure Download PDF

Info

Publication number
JP2024075028A
JP2024075028A JP2022186137A JP2022186137A JP2024075028A JP 2024075028 A JP2024075028 A JP 2024075028A JP 2022186137 A JP2022186137 A JP 2022186137A JP 2022186137 A JP2022186137 A JP 2022186137A JP 2024075028 A JP2024075028 A JP 2024075028A
Authority
JP
Japan
Prior art keywords
surface material
suspended ceiling
attached
floor
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022186137A
Other languages
Japanese (ja)
Inventor
隆 中島
Takashi Nakajima
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2022186137A priority Critical patent/JP2024075028A/en
Publication of JP2024075028A publication Critical patent/JP2024075028A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

【課題】軸組工法の建物において、天井を吊り下げた状態で支持する吊梁を躯体に対して強固に固定できるようにし、上下階間での振動や音の伝達を抑制しつつ、天井裏の耐火性を向上させる。【解決手段】建物1における躯体のうち屋内側面には耐火面材6が貼り付けられており、吊天井10が、天井本体11と、下端部に天井本体11が取り付けられて天井本体11を上方から吊り支える複数の吊木12と、複数の吊木12における上端部が取り付けられた木質の吊梁13と、吊梁13の端部を受けて当該吊梁13と連結された受け金物14と、を備えており、耐火面材6は、天井本体11よりも下方の位置から受け金物14の高さ位置よりも上方に延出し、受け金物14は、耐火面材6を介して、耐火面材6が貼り付けられた躯体の一部に対して固定材で固定されている。【選択図】図1[Problem] In a building constructed using a framework construction method, the suspension beams that support the suspended ceiling can be firmly fixed to the framework, suppressing the transmission of vibrations and sound between upper and lower floors while improving the fire resistance of the ceiling space. [Solution] A fire-resistant surface material 6 is attached to the indoor side of the framework of a building 1, and a suspended ceiling 10 includes a ceiling body 11, a plurality of hanging poles 12 to which the ceiling body 11 is attached at its lower end and which support the ceiling body 11 from above, wooden hanging beams 13 to which the upper ends of the plurality of hanging poles 12 are attached, and a support metal 14 that receives the end of the hanging beam 13 and connects it to the hanging beam 13, and the fire-resistant surface material 6 extends from a position below the ceiling body 11 to a position above the height of the support metal 14, and the support metal 14 is fixed to a part of the framework to which the fire-resistant surface material 6 is attached with a fixing material via the fire-resistant surface material 6. [Selected Figure] Figure 1

Description

本発明は、吊天井構造に関する。 The present invention relates to a suspended ceiling structure.

従来、上下階間で振動や音が伝わりにくくするための天井構造として、特許文献1に記載のような吊天井構造が知られている。このような吊天井構造は、梁の側面に固定された受け金物によって吊木受けの端部を受け、吊木受けに吊木が固定され、吊木の下端部に野縁受け及び野縁からなる枠体が取り付けられ、そして、野縁の下面に天井材が取り付けられた構成となっている。吊木受けは、上階の床を受ける根太との間に隙間を空けて配置されるため、上下階間で振動や音が伝わりにくくなっている。 A suspended ceiling structure as described in Patent Document 1 has been known as a ceiling structure that prevents the transmission of vibrations and sound between upper and lower floors. This type of suspended ceiling structure is configured so that the ends of the hanging beam holders are supported by receiving hardware fixed to the sides of the beams, the hanging beams are fixed to the hanging beam holders, a frame consisting of a joist support and a joist is attached to the lower ends of the hanging beams, and the ceiling material is attached to the underside of the joist. The hanging beam holders are positioned with a gap between them and the joists that support the floor of the upper floor, making it difficult for vibrations and sound to be transmitted between upper and lower floors.

また、特許文献2には、木質パネル工法からなる建物において、内壁面材として壁体の表面に設けられる石膏ボードを、天井を支持するための鋼製吊梁の高さ位置よりも上方に延出させた状態にした天井構造が開示されている。石膏ボードは耐火面材として機能するものであるため、鋼製吊梁の高さ位置よりも上方に延出した状態とすることで、天井裏における耐火性を向上させることができる。なお、鋼製吊梁を受ける受け金物は、石膏ボード表面に設けられた補強合板を固定下地の一部として、木質パネルからなる壁体に固定されている。 Patent Document 2 discloses a ceiling structure in a building constructed using wood panel construction, in which gypsum board, which is installed on the surface of the wall as an interior wall surface material, extends above the height of the steel suspension beams that support the ceiling. Since gypsum board functions as a fire-resistant surface material, by extending it above the height of the steel suspension beams, the fire resistance of the ceiling space can be improved. The support metal fittings that receive the steel suspension beams are fixed to the wall body made of wood panels, with the reinforcing plywood installed on the surface of the gypsum board as part of the fixing base.

特開平08-082035号公報Japanese Patent Application Laid-Open No. 08-082035 特開2000-054545号公報JP 2000-054545 A

ところで、軸組工法で建てられる建物においても吊天井構造を採用し、上下階間での振動や音の伝達を抑制しつつ、石膏ボード等からなる耐火面材を天井裏まで延出させて天井裏の耐火性を向上させたいという要望がある。
ところが、軸組工法で建てられる建物は、木質パネル工法の建物とは異なり、柱等の縦材同士の間や梁等の横材同士の間には大きな隙間があるし、躯体表面に合板が貼り付けられているわけでもない。そのため、軸組工法で建てられる建物においては、吊梁を受ける受け金物を固定材で固定するのに十分な固定強度を発揮する固定下地を必ずしも確保できない場合がある。仮に、石膏ボード表面に補強合板を設けて、それを固定下地とするにしても、石膏ボードの裏側に空間しかない場合(固定下地となる材が無い場合)は、受け金物を固定材で固定するのに十分な固定強度を発揮することは難しい。
Incidentally, there is a demand to adopt a suspended ceiling structure even in buildings constructed using the post-and-beam construction method, in order to suppress the transmission of vibrations and sound between upper and lower floors, while extending fire-resistant surface materials made of gypsum boards or the like into the attic to improve the fire resistance of the attic.
However, unlike buildings constructed using wood panel construction, buildings constructed using the frame construction method have large gaps between vertical members such as columns and between horizontal members such as beams, and plywood is not attached to the surface of the framework. Therefore, in buildings constructed using the frame construction method, it is not always possible to secure a fixing base that provides sufficient fixing strength to fix the support metal that receives the hanging beam with a fixing material. Even if reinforcing plywood is provided on the surface of the gypsum board and used as the fixing base, if there is only space behind the gypsum board (if there is no material that can serve as a fixing base), it is difficult to provide sufficient fixing strength to fix the support metal with a fixing material.

本発明は上記事情に鑑みてなされたものであり、その課題は、軸組工法の建物において、天井を吊り下げた状態で支持する吊梁を躯体に対して強固に固定できるようにし、上下階間での振動や音の伝達を抑制しつつ、天井裏の耐火性を向上させることである。 The present invention was made in consideration of the above circumstances, and its objective is to make it possible to firmly fix the suspension beams that support the suspended ceiling to the framework of buildings constructed using the post-and-beam method, thereby improving the fire resistance of the ceiling space while suppressing the transmission of vibrations and sound between upper and lower floors.

請求項1に記載の発明は、例えば図1~図6に示すように、軸組工法で建てられる建物1において上部構造の下方に間隔を空けて配置された吊天井10の構造であって、
前記建物1における躯体のうち屋内側面には耐火面材6が貼り付けられており、
前記吊天井10は、
天井本体11と、
下端部に前記天井本体11が取り付けられて前記天井本体11を上方から吊り支える複数の吊木12と、
前記複数の吊木12における上端部が取り付けられた木質の吊梁13と、
前記吊梁13の端部を受けて当該吊梁13と連結された受け金物14と、を備えており、
前記耐火面材6は、前記天井本体11よりも下方の位置から前記受け金物14の高さ位置よりも上方に延出し、前記受け金物14は、前記耐火面材6を介して、前記耐火面材6が貼り付けられた前記躯体の一部(胴差4、梁5、吊束7)に対して固定材で固定されていることを特徴とする。
The invention described in claim 1 is a structure of a suspended ceiling 10 arranged at a distance below a superstructure in a building 1 constructed by a framework construction method, as shown in, for example, FIGS. 1 to 6,
A fireproof surface material 6 is attached to the indoor side of the skeleton of the building 1,
The suspended ceiling 10 is
A ceiling body 11,
A plurality of hanging bars 12 having lower ends to which the ceiling body 11 is attached and which suspend and support the ceiling body 11 from above;
A wooden suspension beam 13 to which the upper ends of the plurality of suspension beams 12 are attached;
and a receiving metal fitting 14 that receives an end of the suspension beam 13 and is connected to the suspension beam 13.
The fire-resistant surface material 6 extends from a position below the ceiling body 11 to a position above the height position of the receiving metal fitting 14, and the receiving metal fitting 14 is fixed by a fixing material to a part of the structure to which the fire-resistant surface material 6 is attached (girth 4, beam 5, hanging beam 7) via the fire-resistant surface material 6.

請求項1に記載の発明によれば、耐火面材6は、天井本体11よりも下方の位置から受け金物14の高さ位置よりも上方に延出し、受け金物14は、耐火面材6を介して、耐火面材6が貼り付けられた躯体の一部(胴差4、梁5、吊束7)に対して固定材で固定されているので、耐火面材6によって、躯体と吊梁13との間を離隔できるとともに、天井裏における吊梁13よりも上方の位置まで耐火被覆を行うことができる。さらに、躯体の一部に対して固定材で固定された受け金物14によって吊梁13の端部を受け、吊梁13を連結することができる。そのため、軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定でき、これにより、上下階間での振動や音の伝達を抑制しつつ、天井裏の耐火性を向上させることができる。 According to the invention described in claim 1, the fireproof surface material 6 extends from a position below the ceiling body 11 to a position above the height of the receiving metal fittings 14, and the receiving metal fittings 14 are fixed with a fixing material to a part of the frame (the girth 4, the beam 5, the hanging beam 7) to which the fireproof surface material 6 is attached via the fireproof surface material 6. Therefore, the fireproof surface material 6 can separate the frame and the hanging beam 13, and the fireproof coating can be performed up to a position above the hanging beam 13 in the ceiling space. Furthermore, the end of the hanging beam 13 can be supported by the receiving metal fittings 14 fixed with a fixing material to a part of the frame, and the hanging beam 13 can be connected. Therefore, in the building 1 using the frame construction method, the hanging beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the frame, thereby suppressing the transmission of vibration and sound between the upper and lower floors and improving the fire resistance of the ceiling space.

請求項2に記載の発明は、例えば図1,図2等に示すように、請求項1に記載の吊天井構造において、
前記躯体は、
前記耐火面材6が貼り付けられた横材4と、
前記耐火面材6が貼り付けられ、前記横材4の下面に吊り下げられた状態に設けられた吊束7と、を備えており、
前記受け金物14は、前記吊束7に対して前記固定材で固定されていることを特徴とする。
The invention described in claim 2 is, for example, as shown in Figures 1 and 2, in the suspended ceiling structure described in claim 1,
The body is
A cross member 4 to which the fireproof surface material 6 is attached;
The fire-resistant surface material 6 is attached to the lower surface of the cross member 4, and a hanging bundle 7 is provided in a suspended state.
The receiving metal fitting 14 is characterized in that it is fixed to the hanging bundle 7 by the fixing material.

請求項2に記載の発明によれば、軸組工法によって建てられた建物1の躯体が、横材4と、その横材4の下面に吊り下げられた状態に設けられた吊束7と、を備えており、受け金物14は、この吊束7に対して固定材で固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に、固定下地となるものが無い場合であっても、吊束7によって固定材用の固定下地を確保することができる。そのため、軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 According to the invention described in claim 2, the framework of the building 1 constructed by the framework method includes a cross member 4 and a hanging beam 7 suspended from the underside of the cross member 4, and the receiving metal fittings 14 are fixed to the hanging beam 7 with a fixing material. Therefore, even if there is no fixing base on the back side of the fireproof surface material 6 at the installation position of the hanging beam 13, the hanging beam 7 can secure a fixing base for the fixing material. Therefore, in the framework building 1, the hanging beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

請求項3に記載の発明は、例えば図1,図3等に示すように、請求項1に記載の吊天井構造において、
前記躯体は、
前記耐火面材6が貼り付けられた横材4と、
前記耐火面材6が貼り付けられ、前記横材4と直交して前記横材4を下方から支持する柱2eと、を備えており、
前記受け金物14は、前記柱2eに対して前記固定材で固定されていることを特徴とする。
The invention described in claim 3 is, for example, as shown in Figures 1 and 3, in the suspended ceiling structure described in claim 1,
The body is
A cross member 4 to which the fireproof surface material 6 is attached;
The fireproof surface material 6 is attached to a column 2e that is perpendicular to the cross member 4 and supports the cross member 4 from below.
The receiving metal fitting 14 is characterized in that it is fixed to the column 2e by the fixing material.

請求項3に記載の発明によれば、軸組工法によって建てられた建物1の躯体が、横材4と、横材4と直交して横材4を下方から支持する柱2eと、を備えており、受け金物14は、この柱2eに対して固定材で固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に柱2eが設けられていれば、その柱2eを固定材用の固定下地として確保することができる。そのため、軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 According to the invention described in claim 3, the framework of the building 1 constructed by the framework method includes a cross member 4 and a column 2e that intersects with the cross member 4 and supports the cross member 4 from below. The support metal fittings 14 are fixed to the column 2e with a fixing material. Therefore, if the column 2e is provided on the back side of the fireproof surface material 6 at the location where the suspension beam 13 is to be installed, the column 2e can be secured as a fixing base for the fixing material. Therefore, in the framework building 1, the suspension beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

請求項4に記載の発明は、例えば図1,図4等に示すように、請求項1に記載の吊天井構造において、
前記躯体は、前記耐火面材6が貼り付けられた横材5を備えており、
前記受け金物14は、前記横材5に対して前記固定材で固定されていることを特徴とする。
The invention described in claim 4 is, for example, as shown in Figures 1 and 4, in the suspended ceiling structure described in claim 1,
The structure includes a cross member 5 to which the fireproof surface material 6 is attached,
The support metal fitting 14 is characterized in that it is fixed to the cross member 5 by the fixing material.

請求項4に記載の発明によれば、軸組工法によって建てられた建物1の躯体が、横材5を備えており、受け金物14は、この横材5に対して固定材で固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に横材5が設けられていれば、その横材5を固定材用の固定下地として確保することができる。そのため、軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 According to the invention described in claim 4, the framework of the building 1 constructed by the framework method includes a cross member 5, and the receiving metal fittings 14 are fixed to the cross member 5 with a fixing material. Therefore, if the cross member 5 is provided on the back side of the fireproof surface material 6 at the location where the suspension beam 13 is to be installed, the cross member 5 can be secured as a fixing base for the fixing material. Therefore, in the framework building 1, the suspension beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

請求項5に記載の発明は、例えば図2~図5に示すように、請求項1に記載の吊天井構造において、
前記受け金物14は、
前記耐火面材6を介して前記躯体の一部に対して前記固定材で固定される固定板部15と、
前記固定板部15の両側縁部から突出する一方及び他方の側板部16と、を備え、
前記吊梁13の端部は、前記一方及び他方の側板部16間に配置され、これら側板部16に固定されていることを特徴とする。
The invention described in claim 5 is, for example, as shown in Figures 2 to 5, in the suspended ceiling structure described in claim 1,
The receiving metal fitting 14 is
A fixing plate portion 15 fixed to a part of the frame by the fixing material via the fireproof surface material 6;
and one and the other side plate portions 16 protruding from both side edges of the fixing plate portion 15,
The end of the suspension beam 13 is characterized in that it is disposed between the one and the other side plate portions 16 and fixed to these side plate portions 16.

請求項5に記載の発明によれば、固定板部15を、耐火面材6を介して躯体の一部に対して固定材で固定しておき、吊梁13の端部を、固定板部15の両側縁部から突出する一方及び他方の側板部16間に配置することで、吊梁13の横方向の位置決めを行うことができる。これにより、吊梁13を正確な位置に設置しやすくなる。 According to the invention described in claim 5, the fixing plate portion 15 is fixed to a part of the frame with a fixing material via the fireproof surface material 6, and the end portion of the suspension beam 13 is placed between one and the other side plate portions 16 protruding from both side edges of the fixing plate portion 15, so that the suspension beam 13 can be positioned laterally. This makes it easier to install the suspension beam 13 in an accurate position.

請求項6に記載の発明は、例えば図1,図6に示すように、請求項1に記載の吊天井構造において、
前記上部構造は、複数の梁3a,3b、複数の根太3c、床面材3dを少なくとも備えた上階3の床であり、
前記複数の梁3a,3bには、複数の大梁3aが含まれており、
前記吊梁13は、前記複数の大梁3aと平行して水平に配置されていることを特徴とする。
The invention described in claim 6 is, for example, as shown in Figs. 1 and 6, in the suspended ceiling structure described in claim 1,
The superstructure is a floor of the upper floor 3 including at least a plurality of beams 3a, 3b, a plurality of joists 3c, and a floor surface material 3d,
The plurality of beams 3a, 3b includes a plurality of main beams 3a,
The suspension beam 13 is characterized in that it is arranged horizontally in parallel with the multiple girders 3a.

請求項6に記載の発明によれば、吊梁13は、上階3の床を構成する複数の大梁3aと平行して水平に配置されているので、吊梁13と大梁3aとが直交して配置されることによって互いに干渉し合うことを防ぐことができる。これにより、吊梁13の上面を、大梁3aの下面よりも低く配置する必要がなくなるので、吊梁13によって支持される天井本体11の高さ位置が低くなることを抑制できる。そのため、例えば吊梁13が、複数の大梁3aの下面よりも下方に配置される場合に比して、天井本体11の下方に位置する下階2の部屋の天井高を高くすることができる。 According to the invention described in claim 6, the suspension beams 13 are arranged horizontally in parallel with the multiple girders 3a that make up the floor of the upper floor 3, so that the suspension beams 13 and the girders 3a can be prevented from interfering with each other by being arranged perpendicular to each other. This eliminates the need to arrange the upper surface of the suspension beams 13 lower than the lower surface of the girders 3a, so that the height position of the ceiling body 11 supported by the suspension beams 13 can be prevented from becoming lower. Therefore, for example, the ceiling height of the room on the lower floor 2 located below the ceiling body 11 can be made higher compared to when the suspension beams 13 are arranged lower than the lower surfaces of the multiple girders 3a.

請求項7に記載の発明は、例えば図1,図6に示すように、請求項1から6のいずれか一項に記載の吊天井構造において、
前記天井本体11の上面には遮音材17が敷設され、
前記遮音材17は、前記天井本体11の上面と前記吊梁13の下面との間を通過するように配置されていることを特徴とする。
The invention described in claim 7 is, for example, as shown in Figs. 1 and 6, in the suspended ceiling structure described in any one of claims 1 to 6,
A sound-proofing material 17 is laid on the upper surface of the ceiling body 11.
The sound-proofing material 17 is characterized in that it is arranged so as to pass between the upper surface of the ceiling main body 11 and the lower surface of the suspension beam 13.

請求項7に記載の発明によれば、遮音材17は、天井本体11の上面と吊梁13の下面との間を通過するように配置されているので、例えば遮音材17が吊梁13の上部を跨いだり、途中で途切れたりする場合に比して、高い遮音効果を発揮することができる。 According to the invention described in claim 7, the sound insulation material 17 is arranged so as to pass between the upper surface of the ceiling body 11 and the lower surface of the suspension beam 13, so that a high sound insulation effect can be achieved compared to, for example, a case in which the sound insulation material 17 crosses the upper part of the suspension beam 13 or is interrupted midway.

本発明によれば、軸組工法の建物において、天井を吊り下げた状態で支持する吊梁を躯体に対して強固に固定でき、これにより、上下階間での振動や音の伝達を抑制しつつ、天井裏の耐火性を向上させることができる。 According to the present invention, in a building constructed using a framework construction method, the suspension beams that support the suspended ceiling can be firmly fixed to the framework, thereby improving the fire resistance of the ceiling space while suppressing the transmission of vibrations and sound between upper and lower floors.

吊天井構造が採用された建物を示しており、(a)は、A-A線断面図であり、(b)はB-B線断面図である。The figures show a building that employs a suspended ceiling structure, where (a) is a cross-sectional view taken along line AA, and (b) is a cross-sectional view taken along line BB. 固定下地として吊束を利用した場合の吊天井構造を示しており、(a)は側断面図であり、(b)は受け金物の周囲の正面図である。1 shows a suspended ceiling structure when a suspension beam is used as a fixing base, where (a) is a side cross-sectional view and (b) is a front view of the surrounding area of the receiving metal fittings. 固定下地として柱を利用した場合の吊天井構造を示す図である。This is a diagram showing a suspended ceiling structure when columns are used as a fixing base. 固定下地として梁を利用した場合の吊天井構造を示す図である。This is a diagram showing a suspended ceiling structure when beams are used as a fixing base. 受け金物の構成を示す図である。A diagram showing the configuration of a receiving metal fitting. 遮音材の敷設例を示しており、(a)はOK例であり、(b)及び(c)はNG例である。The figures show examples of sound-proofing material installation, with (a) being an OK example and (b) and (c) being unacceptable examples.

以下、図面を参照して本発明の実施の形態について説明する。ただし、以下に述べる実施形態には、本発明を実施するために技術的に好ましい種々の限定が付されているが、本発明の技術的範囲を以下の実施形態及び図示例に限定するものではない。 The following describes the embodiments of the present invention with reference to the drawings. However, the embodiments described below have various limitations that are technically preferable for implementing the present invention, but the technical scope of the present invention is not limited to the following embodiments and illustrated examples.

図1において符号1は、建物を示す。この建物1は、木造軸組工法によって建てられた建物であり、本実施形態においては複数階建ての住宅とされている。
建物1の躯体は、複数の軸組材によって構成されており、これら複数の軸組材には、柱等の縦材や梁等の横材(横架材)が含まれている。
なお、本実施形態においては、建物1は木造であるとしたが、これに限られるものではなく、鉄骨造(重量鉄骨、軽量鉄骨)であってもよい。
In Fig. 1, reference numeral 1 denotes a building. This building 1 is a building constructed by a wooden framework construction method, and in this embodiment, is a multi-story residence.
The framework of the building 1 is made up of a plurality of framework members, which include vertical members such as columns and horizontal members (cross members) such as beams.
In this embodiment, the building 1 is made of wood, but this is not limited to this and may be made of steel (heavy steel or light steel).

より具体的に説明すると、建物1は、図1~図4に示すように、下階2と上階3とを備えている。そして、下階2の床上には下階2の壁が立設され、下階2の壁上には上階3の床が設けられ、上階3の床上には上階3の壁が立設されている。さらに、下階2と上階3との間には、下階2の天井10(すなわち、吊天井10)が設けられ、当該天井10の上部構造として、上階3の床が設けられている。
なお、本実施形態においては、下階2と上階3は、同一住戸の上下階とされていてもよいし、別々の住戸とされていてもよい。
More specifically, as shown in Figures 1 to 4, the building 1 comprises a lower floor 2 and an upper floor 3. The walls of the lower floor 2 are erected on the floor of the lower floor 2, the floor of the upper floor 3 is erected on the walls of the lower floor 2, and the walls of the upper floor 3 are erected on the floor of the upper floor 3. Furthermore, a ceiling 10 of the lower floor 2 (i.e., a suspended ceiling 10) is provided between the lower floor 2 and the upper floor 3, and the floor of the upper floor 3 is provided as a structure above the ceiling 10.
In this embodiment, the lower floor 2 and the upper floor 3 may be upper and lower floors of the same dwelling unit, or may be separate dwelling units.

下階2は、本実施形態においては一階とされている。そのため、下階2の床は、基礎上に設けられた土台2aや、土台2a間に架け渡された大引2b、図示しない根太、下階床面材2d等を備えて構成されている。 The lower floor 2 is the first floor in this embodiment. Therefore, the floor of the lower floor 2 is composed of a base 2a provided on the foundation, joists 2b spanned between the bases 2a, joists (not shown), a lower floor surface material 2d, etc.

土台2aや大引2bの上には下階柱2eが立設されており、下階床面材2dは、下階柱2eを避けて配置されている。下階2の外周に立設された複数の下階柱2eの上端部間には胴差4(又は後述する梁5)が架け渡されて設けられている。 Lower floor columns 2e are erected on the foundations 2a and joists 2b, and the lower floor floor surface material 2d is positioned to avoid the lower floor columns 2e. Girths 4 (or beams 5, described later) are installed between the upper ends of the multiple lower floor columns 2e erected on the periphery of the lower floor 2.

下階柱2eの屋内側面には、下階床面材2dから胴差4に達する高さまで耐火面材6が貼り付けられて、下階2の内壁面が構成されている。耐火面材6は、後述する受け金物14の高さ位置よりも上方に延出している。なお、このような耐火面材6としては、耐火性能や断熱性能、遮音性能等を有する石膏ボード(強化石膏ボードでもよい。)が採用されている。
下階柱2eの屋外側面には、透湿防水シートや胴縁9、外装材が設けられて上階3の外壁面が構成されている。
A fire-resistant surface material 6 is attached to the indoor side of the lower floor column 2e from the lower floor floor surface material 2d to a height reaching the girth 4, forming the inner wall surface of the lower floor 2. The fire-resistant surface material 6 extends above the height position of the receiving metal fittings 14 described below. As the fire-resistant surface material 6, a gypsum board (reinforced gypsum board may be used) having fire resistance, heat insulation, sound insulation, etc. is used.
A moisture-permeable waterproof sheet, furring strips 9, and exterior materials are provided on the outdoor side of the lower floor pillar 2e to form the exterior wall surface of the upper floor 3.

上階3は、本実施形態においては二階とされている。上階3の床は、胴差4間に架け渡されて設けられた複数の大梁3aや、必要箇所において大梁3a間に架け渡されて設けられた小梁3b、複数の根太3c、上階床面材3d等を備えて構成されている。
なお、大梁3aは、小梁3bや根太3cよりも構造的な強度が必要とされるため、これら小梁3bや根太3cに比して梁成が大きく設定されている。大梁3aの上面、小梁3bの上面、根太3cの上面には上階床面材3dが設けられるため高さ位置が等しく設定されている。したがって、大梁3aの下端部は、小梁3bや根太3cの下端部よりも下方に突出した状態となっている。
In this embodiment, the upper floor 3 is the second floor. The floor of the upper floor 3 is configured with a plurality of girders 3a arranged between the girder beams 4, small beams 3b arranged between the girders 3a at necessary locations, a plurality of joists 3c, and an upper floor surface material 3d.
In addition, the main beam 3a requires more structural strength than the minor beams 3b and the floor joists 3c, so the beam depth is set to be larger than those of the minor beams 3b and the floor joists 3c. The upper floor floor surface material 3d is provided on the top surfaces of the main beam 3a, the minor beams 3b, and the floor joists 3c, so the height positions are set to be equal. Therefore, the lower end of the main beam 3a protrudes downward more than the lower ends of the minor beams 3b and the floor joists 3c.

大梁3aや小梁3bの上には上階柱3eが立設されており、上階床面材3dは、上階柱3eを避けて配置されている。また、必要箇所に立設された複数の上階柱3e間には筋交い3fが設けられて補強されている。筋交い3fが設けられた位置には、床下に小梁3bが設けられている。そのため、当該位置は、他の位置よりも強化されて、耐力壁として機能することとなる。 Upper floor columns 3e are erected on the main beams 3a and small beams 3b, and the upper floor surface material 3d is positioned to avoid the upper floor columns 3e. In addition, braces 3f are provided between the upper floor columns 3e erected in necessary locations for reinforcement. Small beams 3b are provided under the floor at the locations where the braces 3f are provided. Therefore, these locations are stronger than other locations and function as load-bearing walls.

上階柱3eの屋内側面には、下階2の場合と同様に耐火面材が適宜貼り付けられて、上階3の内壁面が構成されている。
屋外側面にも、下階2の場合と同様に、透湿防水シートや胴縁9、外装材が設けられて上階3の外壁面が構成されている。
As with the lower floor 2, fire-resistant surface material is appropriately attached to the indoor side of the upper floor column 3e to form the inner wall surface of the upper floor 3.
As with the lower floor 2, the exterior side is also provided with a moisture-permeable waterproof sheet, furring strips 9, and exterior materials to form the exterior wall surface of the upper floor 3.

なお、下階2の場合も上階3の場合も、壁や床の中空部には断熱材が適宜充填されているものとする。特に、上階3の床に充填される断熱材として、耐火性能を有する断熱材が充填されていると、吊天井10の天井裏における耐火性を向上させる上で好ましい。躯体の屋内側面に貼り付けられた耐火面材6の上端部が、上階3の床の中空部に充填された耐火性能を有する断熱材と接していると耐火構造が連続するので、吊天井10の天井裏における耐火性を向上させる上で好ましい。 In addition, in both the lower floor 2 and the upper floor 3, the hollow spaces in the walls and floors are assumed to be appropriately filled with insulating material. In particular, if the insulating material filled in the floor of the upper floor 3 is a fire-resistant insulating material, this is preferable in terms of improving the fire resistance of the space above the suspended ceiling 10. If the upper end of the fire-resistant facing material 6 attached to the indoor side of the building structure is in contact with the fire-resistant insulating material filled in the hollow spaces in the floor of the upper floor 3, the fire-resistant structure will be continuous, which is preferable in terms of improving the fire resistance of the space above the suspended ceiling 10.

また、下階2の場合も上階3の場合も、耐火面材6の表面には、壁クロス等の壁仕上げ材が設けられ、床面にも床仕上げ材が設けられているものとする。このような各仕上げ材にも耐火性能が備わっていると好ましい。 In addition, in both the lower floor 2 and the upper floor 3, a wall finishing material such as wall cloth is provided on the surface of the fire-resistant surface material 6, and a floor finishing material is provided on the floor surface. It is preferable that each of these finishing materials also has fire resistance.

以上のように構成された建物1に設けられた吊天井10は、天井本体11と、下端部に天井本体11が取り付けられて天井本体11を上方から吊り支える複数の吊木12と、複数の吊木12における上端部が取り付けられた木質の吊梁13と、吊梁13の端部を受けて当該吊梁13と連結された受け金物14と、を備える。
また、天井本体11の上面には、上下階間での音の伝達を抑制する遮音材17が敷設されている。
The suspended ceiling 10 installed in the building 1 configured as described above comprises a ceiling body 11, a plurality of hanging poles 12 to whose lower ends the ceiling body 11 is attached and which suspend and support the ceiling body 11 from above, a wooden hanging beam 13 to which the upper ends of the plurality of hanging poles 12 are attached, and a support metal fitting 14 that receives the end of the hanging beam 13 and connects to the hanging beam 13.
In addition, a soundproofing material 17 is laid on the upper surface of the ceiling body 11 to suppress the transmission of sound between upper and lower floors.

天井本体11は、下階2に面する天井面材11aと、複数の野縁材が格子状に組まれて形成され、下面に天井面材11aが取り付けられた野縁11bと、野縁11bの上面に取り付けられ、複数の吊木12における下端部が取り付けられた複数の野縁受け11cと、を備える。
ここで、吊天井10の天井裏(天井懐とも言う。)とは、この天井本体11における天井面材11aよりも上方であって、かつ、上階3の床(本実施形態においては上階床面材3dを指すものとするが、小梁3bや根太3cを指してもよい。)よりも下方に形成される空間を指している。
また、天井面材11aの下面には、天井クロス等の天井仕上げ材が設けられているものとする。このような天井仕上げ材に耐火性能が備わっていると好ましい。
The ceiling main body 11 comprises a ceiling surface material 11a facing the lower floor 2, a rafter 11b formed by arranging a plurality of rafters in a lattice pattern and having the ceiling surface material 11a attached to its underside, and a plurality of rafter supports 11c attached to the upper surface of the rafter 11b and having the lower ends of a plurality of hanging beams 12 attached thereto.
Here, the space above the ceiling 10 (also called the ceiling pocket) refers to the space formed above the ceiling surface material 11a of the ceiling main body 11 and below the floor of the upper floor 3 (in this embodiment, this refers to the upper floor floor surface material 3d, but it may also refer to the joists 3b and floor joists 3c).
In addition, a ceiling finishing material such as a ceiling cloth is provided on the underside of the ceiling surface material 11a. It is preferable that such a ceiling finishing material has fire resistance.

野縁材は角材であり、複数の野縁材からなる格子状の野縁11bは、下階2の部屋における四周の壁(耐火面材6)に亘って設けられている。さらに、野縁11bの下面に取り付けられる天井面材11aも、野縁11bと同様に、下階2の部屋における四周の壁に亘って設けられている。すなわち、天井本体11、ひいては吊天井10自体が、下階2の部屋における四周の壁に亘って設けられている。
また、野縁受け11cも角材であり、野縁材の上面に沿って取り付けられるか、複数の野縁材に架け渡されて取り付けられている。
The furring strips are square timbers, and a lattice-shaped furring strip 11b made up of a plurality of furring strips is provided around the four walls (fire-resistant surface material 6) of the room on the lower floor 2. Furthermore, the ceiling surface material 11a attached to the underside of the furring strip 11b is also provided around the four walls of the room on the lower floor 2, similar to the furring strip 11b. In other words, the ceiling body 11, and in turn the suspended ceiling 10 itself, is provided around the four walls of the room on the lower floor 2.
The furring strip support 11c is also a square timber and is attached along the top surface of the furring strip material or is attached by bridging multiple furring strip materials.

複数の吊木12は角材であり、下端部が、複数の野縁受け11cの側面に取り付けられている。野縁受け11cがない箇所においては、野縁11bに取り付けられてもよい。また、吊木12の上端部は、吊梁13の側面に取り付けられている。
なお、吊木12は、釘やビス等の固定具によって野縁受け11c(野縁11b)及び吊梁13に取り付けられ、その際に接着剤を併用してもよい。
The hanging beams 12 are square timbers, and their lower ends are attached to the sides of the joist supports 11c. In places where there are no joist supports 11c, they may be attached to the joists 11b. The upper ends of the hanging beams 12 are attached to the sides of the hanging beams 13.
The hanging beam 12 is attached to the siding support 11c (siding 11b) and the hanging beam 13 by fasteners such as nails or screws, and adhesive may also be used in combination.

吊梁13は、二つの木材(木質の板材)を接着して一本の梁材としたものであり、吊天井10の天井裏内に複数配置されている。また、複数の吊梁13は、長手方向側端部のみが躯体との接点となっている。
このような吊梁13は、吊天井10の天井裏において、複数の大梁3aと平行して水平に配置されている。すなわち、吊梁13と大梁3aは互いに交差しないように配置されている。これにより、吊梁13が、小梁3bや根太3cよりも下方に突出する大梁3aと干渉し合うことを防ぐことができるため、下階2の部屋の天井高を高くすることができる。
The suspension beams 13 are formed by gluing two pieces of wood (wooden boards) together to form a single beam, and a plurality of suspension beams 13 are arranged within the ceiling space of the suspended ceiling 10. Furthermore, the suspension beams 13 are connected to the building frame only at their longitudinal side ends.
Such suspension beams 13 are arranged horizontally in parallel with the multiple girders 3a above the ceiling of the suspended ceiling 10. In other words, the suspension beams 13 and the girders 3a are arranged so as not to cross each other. This makes it possible to prevent the suspension beams 13 from interfering with the girders 3a that protrude downward beyond the small girders 3b and floor joists 3c, thereby making it possible to increase the ceiling height of the rooms on the lower floor 2.

受け金物14は、図5に示すように、固定板部15と、一方及び他方の側板部16と、を備えて断面略コ字型に形成されている。
固定板部15は、耐火面材6を介して躯体の一部に対して固定材で固定される板状の部位である。本実施形態においては、固定材としてビスが用いられている。そして、この固定板部15には、複数のビス孔15a(固定材が通される通孔)が形成されている。複数のビス孔15aには、固定板部15の四隅と、これら四隅のビス孔15aよりも中央側に寄った位置に形成された複数のビス孔15aと、が含まれている。中央側に形成された複数のビス孔15aは、後述する接合金物8とビスとが接触しないようにしつつ、当該接合金物8になるべく近接した位置にビスを通すことができるような配置となっている。
また、この固定板部15における左右方向中央部の上下端部には、芯墨の位置を確認するのに用いられる孔15bが形成されている。
一方及び他方の側板部16は、固定板部15の両側縁部から同一方向(吊梁13側)に突出する板状の部位であり、複数のビス孔16aが形成されている。
なお、鉄骨の軸組工法によって建物1が建てられる場合は、固定材として、ボルトやドリフトピン等の固定具が適宜用いられるものとする。ボルトを固定材として用いる場合は、必要に応じてナットが用いられる。
As shown in FIG. 5, the receiving metal fitting 14 includes a fixed plate portion 15 and one and the other side plate portions 16, and is formed into a substantially U-shaped cross section.
The fixing plate portion 15 is a plate-shaped portion fixed to a part of the frame by a fixing material via the fireproof surface material 6. In this embodiment, screws are used as the fixing material. The fixing plate portion 15 has a plurality of screw holes 15a (through holes through which the fixing material is passed). The plurality of screw holes 15a include the four corners of the fixing plate portion 15 and a plurality of screw holes 15a formed at positions closer to the center than the screw holes 15a at the four corners. The plurality of screw holes 15a formed at the center are arranged so that the screws can be passed as close as possible to the joint metal 8 described later while preventing the screws from coming into contact with the joint metal 8.
In addition, holes 15b used to confirm the position of the center mark are formed at the top and bottom ends of the left-right center of the fixed plate portion 15.
The one and other side plate portions 16 are plate-shaped portions that protrude in the same direction (towards the suspension beam 13) from both side edges of the fixed plate portion 15, and are formed with a plurality of screw holes 16a.
In addition, when the building 1 is constructed by a steel frame construction method, fasteners such as bolts and drift pins are used as appropriate as fastening materials. When bolts are used as fastening materials, nuts are used as necessary.

受け金物14は、固定板部15が複数のビスによって躯体の一部にビス固定される。そして、吊梁13の端部が、一方及び他方の側板部16間に配置され、これら側板部16に固定されている。つまり、一方及び他方の側板部16における複数のビス孔16aから吊梁13にビスが打ち込まれることで、吊梁13と受け金物14とが連結されている。 The receiving metal fitting 14 has a fixing plate portion 15 which is fixed to a part of the frame by a number of screws. The end of the suspension beam 13 is disposed between one and the other side plate portion 16 and fixed to these side plate portions 16. In other words, the suspension beam 13 and the receiving metal fitting 14 are connected by driving screws into the suspension beam 13 through the multiple screw holes 16a in the one and the other side plate portions 16.

なお、吊梁13の梁成がどのような寸法であっても、吊梁13は、当該吊梁13の上面と受け金物14における一方及び他方の側板部16の上端面とが面一となるように配置されている。すなわち、吊梁13の梁成が大きく、下端部が受け金物14の下端部よりも下方に突出する場合も、梁成が小さく、下端部が受け金物14の下端部よりも下方に突出しない場合も、吊梁13の上面と受け金物14の上端面は揃った状態となっている。
また、吊梁13と受け金物14との連結は、ビス固定によるものだけでなく、一方及び他方の側板部16と吊梁13とを貫通するドリフトピンやボルトによる固定を採用してもよい。
Regardless of the dimensions of the beam depth of the suspension beam 13, the suspension beam 13 is disposed so that the upper surface of the suspension beam 13 is flush with the upper end surfaces of the one and other side plate portions 16 of the receiving hardware 14. In other words, whether the beam depth of the suspension beam 13 is large and the lower end protrudes downward beyond the lower end of the receiving hardware 14, or whether the beam depth is small and the lower end does not protrude downward beyond the lower end of the receiving hardware 14, the upper surface of the suspension beam 13 and the upper end surface of the receiving hardware 14 are flush with each other.
In addition, the connection between the suspension beam 13 and the support metal fitting 14 may not only be made by screw fixing, but also by fixing using drift pins or bolts that pass through the one and other side plate portions 16 and the suspension beam 13.

なお、天井本体11の上面に敷設された遮音材17は、図6(a)に示すように、天井本体11の上面と吊梁13の下面との間を通過するように配置されている。このような遮音材17は、下階2の部屋における四周の壁(耐火面材6)に亘って設けられている。
また、遮音材17は、良好な遮音効果を発揮するために、図6(b)に示すように吊梁13を跨いだり、図6(c)に示すように吊梁13の位置で途切れたりしないように敷設する。換言すれば、図6(a)に示すような状態で遮音材17が配置されれば、遮音材17の使用量の増加や、吊梁13の位置での遮音効果の低減を防ぐことができる。
As shown in Fig. 6(a), the sound insulation material 17 laid on the upper surface of the ceiling main body 11 is arranged so as to pass between the upper surface of the ceiling main body 11 and the lower surface of the suspension beam 13. Such sound insulation material 17 is provided around the four walls (fireproof surface material 6) of the room on the lower floor 2.
In order to achieve a good sound insulation effect, the sound insulation material 17 is laid so as not to straddle the suspension beams 13 as shown in Fig. 6(b) or to be interrupted at the position of the suspension beams 13 as shown in Fig. 6(c). In other words, if the sound insulation material 17 is arranged in the state shown in Fig. 6(a), it is possible to prevent an increase in the amount of sound insulation material 17 used and a decrease in the sound insulation effect at the position of the suspension beams 13.

次に、受け金物14を用いた躯体の一部に対する吊梁13の取付態様について詳細に説明する。 Next, we will explain in detail how the suspension beam 13 is attached to a part of the structure using the support metal fittings 14.

(吊束に対する吊梁の取付態様)
図2に示す例において、建物1の躯体は、横材4と、吊束7と、を備えている。
ここで、横材4は、上記の胴差4である。胴差4は、少なくとも大梁3aよりも梁成が小さく設定されており、場合によっては、小梁3bよりも梁成が小さく設定されている。そのため、吊梁13は、その上面の高さ位置が、胴差4における下面の高さ位置に達しないか、達していても僅かに高い程度に設定される場合がある。そのため、胴差4は、受け金物14を、ビスによる十分な固定強度を確保できるような固定下地としては機能しない場合がある。つまり、梁成(下方への突出量)が足りない胴差4によって、受け金物14を介して吊梁13を支持することは困難となっている。
(Attachment of the suspension beam to the suspension bundle)
In the example shown in FIG. 2 , the framework of the building 1 includes a cross member 4 and a hanging beam 7 .
Here, the cross member 4 is the girth 4 described above. The girth 4 is set to have a smaller beam depth than at least the main girder 3a, and in some cases, the beam depth is set to be smaller than the sub-girder 3b. Therefore, the height position of the upper surface of the hanging beam 13 may be set to be slightly higher than the height position of the lower surface of the girth 4, or may reach the height position. Therefore, the girth 4 may not function as a fixing base that can ensure sufficient fixing strength of the receiving metal 14 by the screw. In other words, it is difficult to support the hanging beam 13 through the receiving metal 14 by the girth 4 that has insufficient beam depth (downward protrusion).

そこで、図2に示す例においては、受け金物14の固定下地として機能する吊束7が、横材である胴差4の下面に吊り下げられた状態に設けられている。
吊束7は、例えば柱に比して上下寸法の短い角材であり、その上下寸法は、胴差4の下面から天井本体11よりも下方に突出しない程度の長さに設定されている。換言すれば、吊束7の上下寸法は、天井本体11における天井面材11aの下面よりも上方の位置から胴差4の下面までの長さに設定されている。
Therefore, in the example shown in Figure 2, the suspension bundle 7 which functions as a fixing base for the receiving metal fitting 14 is provided in a suspended state from the underside of the girth 4 which is a cross member.
The hanging bundle 7 is, for example, a square timber with a vertical dimension shorter than that of a pillar, and its vertical dimension is set to a length such that it does not protrude below the bottom surface of the girth 4 below the ceiling main body 11. In other words, the vertical dimension of the hanging bundle 7 is set to the length from a position above the bottom surface of the ceiling surface material 11a of the ceiling main body 11 to the bottom surface of the girth 4.

また、吊束7は、胴差4に対して接合金物8を介して接合固定されている。
接合金物8は、本実施形態においては、ドリフトピンやボルト等の軸材が差し込まれる貫通孔が上下端部に形成された円筒状の接合部材が採用されている。
より詳細に説明すると、胴差4の下面のうち吊束7が接合される位置には、接合金物8の上端部が差し込まれる差込穴が形成され、吊束7の上端部には、接合金物8の下端部が差し込まれる差込穴が形成されている。さらに、胴差4には、厚さ方向に貫通してドリフトピンが差し込まれる差込孔が形成され、吊束7にも、ドリフトピンが差し込まれる差込孔が形成されている。胴差4におけるドリフトピン用の差込孔と吊束7におけるドリフトピン用の差込孔は、平面視において直交する方向に形成されている。
In addition, the suspension bundle 7 is joined and fixed to the girth 4 via a joint metal fitting 8.
In this embodiment, the joint metal 8 is a cylindrical joint member having through holes at the top and bottom ends into which shaft members such as drift pins and bolts are inserted.
More specifically, an insertion hole into which the upper end of the joining metal fitting 8 is inserted is formed at the position on the underside of the girth 4 where the hanging bundle 7 is joined, and an insertion hole into which the lower end of the joining metal fitting 8 is inserted is formed at the upper end of the hanging bundle 7. Furthermore, an insertion hole into which a drift pin is inserted that penetrates through the girth 4 in the thickness direction is formed, and an insertion hole into which a drift pin is inserted is also formed in the hanging bundle 7. The insertion hole for the drift pin in the girth 4 and the insertion hole for the drift pin in the hanging bundle 7 are formed in directions that are perpendicular to each other in a plan view.

接合金物8は、上端部が胴差4の差込穴に差し込まれ、ドリフトピンが、胴差4に形成されたドリフトピン用の差込孔と接合金物8の上端部に形成された貫通孔を貫通するように差し込まれることで胴差4に固定される。
また、接合金物8は、下端部が吊束7の差込穴に差し込まれ、ドリフトピンが、吊束7に形成されたドリフトピン用の差込孔と接合金物8の上端部に形成された貫通孔を貫通するように差し込まれることで吊束7に固定される。
これにより、胴差4と吊束7とを接合金物8によって接合することができる。
The upper end of the connecting metal fitting 8 is inserted into the insertion hole of the girth 4, and the drift pin is inserted so that it passes through the insertion hole for the drift pin formed in the girth 4 and the through hole formed in the upper end of the connecting metal fitting 8, thereby fixing it to the girth 4.
In addition, the connecting metal 8 is fixed to the hanging bundle 7 by inserting its lower end into the insertion hole of the hanging bundle 7 and inserting the drift pin so that it passes through the insertion hole for the drift pin formed in the hanging bundle 7 and the through hole formed in the upper end of the connecting metal 8.
This allows the girth 4 and the suspension bundle 7 to be joined by the connecting metal fittings 8.

胴差4の屋内側面と吊束7の屋内側面には、耐火面材6が貼り付けられている。耐火面材6は、上記のように、下階床面材2dから胴差4に達する高さまでの範囲で設けられている。耐火面材6の上端部は、胴差4の下面よりも上方に延出している。 A fire-resistant surface material 6 is attached to the indoor side of the girth 4 and the indoor side of the hanging beam 7. As described above, the fire-resistant surface material 6 is provided in a range from the lower floor surface material 2d to a height reaching the girth 4. The upper end of the fire-resistant surface material 6 extends above the lower surface of the girth 4.

図2に示す例において、受け金物14は、耐火面材6を介して、胴差4の下端部と吊束7に向かってビスが打ち込まれて固定されている。つまり、受け金物14における固定板部15の複数のビス孔15aからビスが打ち込まれている。
なお、図2に示す例においては、受け金物14が、胴差4の下端部と吊束7に跨って配置されてビス固定されているが、これに限られるものではない。すなわち、吊梁13における上面の高さ位置(受け金物14における上端部の高さ位置)が、胴差4における下面の高さ位置に達していない場合、受け金物14は、胴差4には跨らずに吊梁13にのみビス固定される。
In the example shown in Figure 2, the receiving metal fitting 14 is fixed by driving screws through the fireproof surface material 6 toward the lower end of the girth 4 and the hanging bundle 7. In other words, the screws are driven into a plurality of screw holes 15a in the fixing plate portion 15 of the receiving metal fitting 14.
In the example shown in Fig. 2, the receiving hardware 14 is disposed across the lower end of the girth 4 and the hanging bundle 7 and fixed with screws, but this is not limited to this. In other words, if the height position of the upper surface of the hanging beam 13 (the height position of the upper end of the receiving hardware 14) does not reach the height position of the lower surface of the girth 4, the receiving hardware 14 is fixed only to the hanging beam 13 with screws without spanning the girth 4.

吊梁13は、以上のようにして躯体の一部に固定された受け金物14によって長さ方向側端部が受けられ、受け金物14における一方及び他方の側板部16からビスが打ち込まれている。これにより、吊梁13と受け金物14とが連結されている。
受け金物14は、図2に示す一方の胴差4と平行する他方の胴差4(他方の胴差4に代えて大梁3aでもよい。)側の吊束7にも固定されているものとする。これにより、吊梁13の長さ方向両端部を、平行する胴差4間と、これら平行する胴差4の下面に設けられた吊束7間に架け渡して設けることができる。
吊天井10は、以上のように設けられた吊梁13に複数の吊木12が設けられ、複数の吊木12に天井本体11が設けられて構成されている。
The suspension beam 13 has its longitudinal side ends supported by the receiving metal fittings 14 fixed to a part of the frame as described above, and screws are driven into one and the other side plate parts 16 of the receiving metal fittings 14. In this way, the suspension beam 13 and the receiving metal fittings 14 are connected.
The receiving metal fittings 14 are also fixed to the suspension bundles 7 on the side of the other girth 4 (the girder 3a may be substituted for the other girth 4) that is parallel to one of the girths 4 shown in Figure 2. This allows both ends of the suspension beam 13 in the longitudinal direction to be installed between the parallel girths 4 and the suspension bundles 7 installed on the undersides of these parallel girths 4.
The suspended ceiling 10 is constructed by attaching a plurality of hanging poles 12 to the suspension beams 13 installed as described above, and attaching the ceiling body 11 to the plurality of hanging poles 12.

(柱に対する吊梁の取付態様)
図3に示す例において、建物1の躯体は、横材4と、柱2eと、を備えている。
ここで、横材4は、上記の胴差4であり、柱2eは、上記の下階柱2eである。下階柱2eは、胴差4と直交して当該胴差4を下方から支持している。
胴差4の屋内側面と下階柱2eの屋内側面には、耐火面材6が貼り付けられている。耐火面材6は、上記のように、下階床面材2dから胴差4に達する高さまでの範囲で設けられている。耐火面材6の上端部は、胴差4の下面よりも上方に延出している。
(Attachment of the suspension beam to the column)
In the example shown in FIG. 3, the skeleton of the building 1 includes a cross member 4 and a column 2e.
Here, the cross member 4 is the girth 4, and the column 2e is the lower floor column 2e. The lower floor column 2e is perpendicular to the girth 4 and supports the girth 4 from below.
A fire-resistant surface material 6 is attached to the indoor side of the girth 4 and the indoor side of the lower floor column 2e. As described above, the fire-resistant surface material 6 is provided in a range from the lower floor floor surface material 2d to a height reaching the girth 4. The upper end of the fire-resistant surface material 6 extends above the lower surface of the girth 4.

図3に示す例において、受け金物14は、耐火面材6を介して、胴差4の下端部と下階柱2eに向かってビスが打ち込まれて固定されている。つまり、受け金物14における固定板部15の複数のビス孔15aからビスが打ち込まれている。
なお、図3に示す例においては、受け金物14が、胴差4の下端部と下階柱2eに跨って配置されてビス固定されているが、これに限られるものではない。すなわち、吊梁13における上面の高さ位置(受け金物14における上端部の高さ位置)が、胴差4における下面の高さ位置に達していない場合、受け金物14は、胴差4には跨らずに下階柱2eにのみビス固定される。
In the example shown in Fig. 3, the receiving metal fitting 14 is fixed by driving screws toward the lower end of the girth 4 and the lower floor column 2e through the fireproof surface material 6. In other words, the screws are driven into the multiple screw holes 15a of the fixing plate portion 15 of the receiving metal fitting 14.
In the example shown in Fig. 3, the receiving metal fitting 14 is arranged across the lower end of the girth 4 and the lower floor column 2e and fixed with a screw, but this is not limited to this. In other words, if the height position of the upper surface of the suspension beam 13 (the height position of the upper end of the receiving metal fitting 14) does not reach the height position of the lower surface of the girth 4, the receiving metal fitting 14 is fixed only to the lower floor column 2e with a screw without spanning the girth 4.

吊梁13は、以上のようにして躯体の一部に固定された受け金物14によって長さ方向側端部が受けられ、受け金物14における一方及び他方の側板部16からビスが打ち込まれている。これにより、吊梁13と受け金物14とが連結されている。
受け金物14は、図3に示す一方の胴差4と平行する他方の胴差4(他方の胴差4に代えて大梁3aでもよい。)側の下階柱2eにも固定されているものとする。これにより、吊梁13の長さ方向両端部を、平行する胴差4間と、これら平行する胴差4の下面に設けられた下階柱2e間に架け渡して設けることができる。
吊天井10は、以上のように設けられた吊梁13に複数の吊木12が設けられ、複数の吊木12に天井本体11が設けられて構成されている。
The suspension beam 13 has its longitudinal side ends supported by the receiving metal fittings 14 fixed to a part of the frame as described above, and screws are driven into one and the other side plate parts 16 of the receiving metal fittings 14. In this way, the suspension beam 13 and the receiving metal fittings 14 are connected.
The receiving metal fittings 14 are also fixed to the lower floor columns 2e on the side of the other girth 4 (the girder 3a may be substituted for the other girth 4) that is parallel to one of the girths 4 shown in Figure 3. This allows both ends of the suspension beam 13 in the longitudinal direction to be installed between the parallel girths 4 and the lower floor columns 2e installed on the undersides of these parallel girths 4.
The suspended ceiling 10 is constructed by attaching a plurality of hanging poles 12 to the suspension beams 13 installed as described above, and attaching the ceiling body 11 to the plurality of hanging poles 12.

(梁に対する吊梁の取付態様)
図4に示す例において、建物1の躯体は、横材5を備えている。
ここで、横材4は、下階柱2eによって下方から支持される梁5である。梁5は、梁成の小さい胴差4に代えて設けられた、梁成の大きい横架材(梁5)であり、その下端面の高さ位置は、受け金物14の下端部よりも下方に位置している。
梁5の屋内側面と下階柱2eの屋内側面には、耐火面材6が貼り付けられている。耐火面材6は、下階床面材2dから梁5の上下方向中央部に達する高さまでの範囲で設けられている。耐火面材6の上端部は、受け金物14の上端部よりも上方に延出している。
(Attachment of the suspension beam to the beam)
In the example shown in FIG. 4 , the skeleton of the building 1 includes a cross member 5 .
Here, the cross member 4 is a beam 5 supported from below by the lower floor column 2e. The beam 5 is a cross member (beam 5) with a large beam depth that is provided in place of the girth 4 with a small beam depth, and the height position of the lower end surface of the beam 5 is located below the lower end of the receiving metal fitting 14.
A fire-resistant surface material 6 is attached to the indoor side of the beam 5 and the indoor side of the lower floor column 2e. The fire-resistant surface material 6 is provided in a range from the lower floor floor surface material 2d to a height reaching the vertical center of the beam 5. The upper end of the fire-resistant surface material 6 extends above the upper end of the receiving metal fitting 14.

図4に示す例において、受け金物14は、耐火面材6を介して、梁5に向かってビスが打ち込まれて固定されている。つまり、受け金物14における固定板部15の複数のビス孔15aからビスが打ち込まれている。
また、受け金物14における下端部の高さ位置は、梁5における下端面の高さ位置と略等しいか、梁5における下端面の高さ位置よりも上方に位置しているものとする。換言すれば、梁5の下端部は、受け金物14の下端部よりも下方に突出している。
In the example shown in Fig. 4, the receiving metal fitting 14 is fixed to the beam 5 by driving screws through the fireproof surface material 6. In other words, the screws are driven into a plurality of screw holes 15a in the fixing plate portion 15 of the receiving metal fitting 14.
The height position of the lower end of the receiving metal 14 is approximately equal to the height position of the lower end face of the beam 5, or is located higher than the height position of the lower end face of the beam 5. In other words, the lower end of the beam 5 protrudes downward from the lower end of the receiving metal 14.

吊梁13は、以上のようにして躯体の一部に固定された受け金物14によって長さ方向側端部が受けられ、受け金物14における一方及び他方の側板部16からビスが打ち込まれている。これにより、吊梁13と受け金物14とが連結されている。
受け金物14は、図4に示す一方の梁5と平行する他方の梁5(他方の梁5に代えて大梁3aでもよい。)にも固定されているものとする。これにより、吊梁13の長さ方向両端部を、平行する梁5間に架け渡して設けることができる。
吊天井10は、以上のように設けられた吊梁13に複数の吊木12が設けられ、複数の吊木12に天井本体11が設けられて構成されている。
The suspension beam 13 has its longitudinal side ends supported by the receiving metal fittings 14 fixed to a part of the frame as described above, and screws are driven into one and the other side plate parts 16 of the receiving metal fittings 14. In this way, the suspension beam 13 and the receiving metal fittings 14 are connected.
The receiving metal fittings 14 are also fixed to the other beam 5 (the main beam 3a may be substituted for the other beam 5) that is parallel to the one beam 5 shown in Fig. 4. This allows both ends of the suspension beam 13 in the longitudinal direction to be installed between the parallel beams 5.
The suspended ceiling 10 is constructed by attaching a plurality of hanging poles 12 to the suspension beams 13 installed as described above, and attaching the ceiling body 11 to the plurality of hanging poles 12.

受け金物14を用いた躯体の一部に対する吊梁13の取付態様については、以上のように、建物1の躯体が、図4に示すような梁成の大きい梁5を備えている場合は、当該梁5を固定下地として受け金物14をビス固定することができる。
このような梁成の大きい梁5を備えておらず、梁成の小さい胴差4の下側に下階柱2eがある場合は、下階柱2eを固定下地として受け金物14をビス固定することができる。
一方、梁成の大きい梁5を備えておらず、梁成の小さい胴差4の下側に下階柱2eがあるものの、吊梁13の設置位置に下階柱2eが配置されない場合には、胴差4の下側に吊束7を設けて、当該吊束7を固定下地として受け金物14をビス固定することができる。
図2,図3,図4に示す吊梁13の取付態様は、一つの建物1において併用されてもよいし、併用されなくてもよい。
Regarding the manner in which the suspension beam 13 is attached to a part of the structure using the support metal fittings 14, as described above, when the structure of the building 1 has a beam 5 with a large beam depth as shown in Figure 4, the support metal fittings 14 can be fixed with screws using the beam 5 as a fixing base.
In the case where a beam 5 with such a large beam depth is not provided and a lower floor column 2e is located below a girder 4 with a smaller beam depth, the support metal fitting 14 can be fixed with screws using the lower floor column 2e as a fixing base.
On the other hand, if the building does not have a beam 5 with a large beam depth, and a lower floor column 2e is located below the girder 4 with a small beam depth, but the lower floor column 2e is not positioned at the installation position of the suspension beam 13, a suspension bundle 7 can be provided below the girth 4, and the support hardware 14 can be fixed with screws using the suspension bundle 7 as a fixing base.
The mounting modes of the suspension beams 13 shown in Figures 2, 3, and 4 may or may not be used together in one building 1.

(吊天井の施工手順)
なお、吊天井10の施工は、建物1の躯体が建てられて躯体の屋内側面に耐火面材6が貼り付けられた後に行われる。すなわち、躯体の屋内側面に耐火面材6が貼り付けられた後に、受け金物14が、耐火面材6を介して、躯体の一部にビス固定される手順となっている。そして、受け金物14がビス固定された後に、吊梁13が設置され、吊木12、天井本体11の施工が行われる。
ただし、吊天井10における天井本体11の上面には遮音材17が敷設されるため、建物1の躯体のうち、上階3の床における上階床面材3dの施工は、遮音材17の敷設が済んだ後に完了させるようにする(途中までは進めてもよい)。
(Suspended ceiling installation procedure)
The suspended ceiling 10 is constructed after the framework of the building 1 is erected and the fire-resistant facing material 6 is attached to the indoor side of the framework. In other words, after the fire-resistant facing material 6 is attached to the indoor side of the framework, the support metal fittings 14 are fixed with screws to a part of the framework via the fire-resistant facing material 6. Then, after the support metal fittings 14 are fixed with screws, the suspension beams 13 are installed, and the hanging beams 12 and ceiling body 11 are constructed.
However, since sound-proofing material 17 is laid on the upper surface of the ceiling body 11 in the suspended ceiling 10, the construction of the upper floor floor surface material 3d on the floor of the upper floor 3 of the building 1's structure should be completed after the sound-proofing material 17 has been laid (although construction may be completed partway).

(本実施形態の効果)
本実施形態によれば、以下のような優れた効果を奏する。
すなわち、耐火面材6は、天井本体11よりも下方の位置から受け金物14の高さ位置よりも上方に延出し、受け金物14は、耐火面材6を介して、耐火面材6が貼り付けられた躯体の一部に向かってビス固定されているので、耐火面材6によって、躯体と吊梁13との間を離隔できるとともに、天井裏における吊梁13よりも上方の位置まで耐火被覆を行うことができる。さらに、躯体の一部にビス固定された受け金物14によって吊梁13の端部を受け、吊梁13を連結することができる。そのため、木造軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定でき、これにより、上下階間での振動や音の伝達を抑制しつつ、天井裏の耐火性を向上させることができる。
(Effects of this embodiment)
According to this embodiment, the following excellent effects are obtained.
That is, the fireproof surface material 6 extends from a position below the ceiling body 11 to a position above the height of the receiving metal fittings 14, and the receiving metal fittings 14 are fixed with screws through the fireproof surface material 6 toward a part of the frame to which the fireproof surface material 6 is attached, so that the fireproof surface material 6 can separate the frame and the suspension beam 13, and can provide fireproof covering up to a position above the suspension beam 13 in the ceiling space. Furthermore, the end of the suspension beam 13 can be supported by the receiving metal fittings 14 fixed with screws to a part of the frame, and the suspension beam 13 can be connected. Therefore, in the wooden frame building 1, the suspension beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the frame, and this can improve the fire resistance of the ceiling space while suppressing the transmission of vibrations and sounds between upper and lower floors.

また、木造軸組工法によって建てられた建物1の躯体が、胴差4と、その胴差4の下面に吊り下げられた状態に設けられた吊束7と、を備えており、受け金物14は、この吊束7に向かってビス固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に、固定下地となるものが無い場合であっても、吊束7によってビス固定用の固定下地を確保することができる。そのため、木造軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 The framework of the building 1 constructed using the wooden frame construction method includes the girth 4 and the hanging beam 7 suspended from the underside of the girth 4, and the receiving metal fittings 14 are fixed with screws toward the hanging beam 7. Therefore, even if there is no base for fixing on the back side of the fireproof surface material 6 at the location where the hanging beam 13 is to be installed, the hanging beam 7 can provide a base for fixing with screws. Therefore, in the wooden frame construction building 1, the hanging beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

また、木造軸組工法によって建てられた建物1の躯体が、胴差4と、胴差4と直交して胴差4を下方から支持する柱2eと、を備えており、受け金物14は、この柱2eに向かってビス固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に柱2eが設けられていれば、その柱2eをビス固定用の固定下地として確保することができる。そのため、木造軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 The framework of the building 1 constructed using the wooden framework method includes the girth 4 and the pillar 2e that intersects perpendicularly with the girth 4 and supports the girth 4 from below, and the support metal fittings 14 are fixed with screws toward the pillar 2e. Therefore, if the pillar 2e is provided on the back side of the fireproof surface material 6 at the location where the suspension beam 13 is to be installed, the pillar 2e can be secured as a fixing base for the screws. Therefore, in the wooden framework building 1, the suspension beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

また、木造軸組工法によって建てられた建物1の躯体が、胴差4よりも梁成の大きい梁5を備えており、受け金物14は、この梁5に向かってビス固定されているので、吊梁13の設置位置に当たる箇所の耐火面材6の裏側に梁5が設けられていれば、その梁5をビス固定用の固定下地として確保することができる。そのため、木造軸組工法の建物1において、天井本体11を吊り下げた状態で支持する吊梁13を躯体に対して強固に固定できる。 The framework of the building 1 constructed using the wooden frame construction method includes a beam 5 with a greater beam depth than the girder 4, and the receiving metal fittings 14 are fixed with screws toward this beam 5. Therefore, if the beam 5 is provided on the back side of the fireproof surface material 6 at the location where the suspension beam 13 is to be installed, the beam 5 can be secured as a fixing base for fixing with screws. Therefore, in the building 1 constructed using the wooden frame construction method, the suspension beam 13 that supports the ceiling body 11 in a suspended state can be firmly fixed to the framework.

また、固定板部15を、耐火面材6を介して躯体の一部にビス固定しておき、吊梁13の端部を、固定板部15の両側縁部から突出する一方及び他方の側板部16間に配置することで、吊梁13の横方向の位置決めを行うことができる。これにより、吊梁13を正確な位置に設置しやすくなる。 The fixing plate 15 is fixed to a part of the frame with screws via the fireproof surface material 6, and the end of the suspension beam 13 is placed between the side plate parts 16 protruding from both side edges of the fixing plate 15, allowing the suspension beam 13 to be positioned laterally. This makes it easier to install the suspension beam 13 in an accurate position.

また、吊梁13は、上階3の床を構成する複数の大梁3aと平行して水平に配置されているので、吊梁13と大梁3aとが直交して配置されることによって互いに干渉し合うことを防ぐことができる。これにより、吊梁13の上面を、大梁3aの下面よりも低く配置する必要がなくなるので、吊梁13によって支持される天井本体11の高さ位置が低くなることを抑制できる。そのため、例えば吊梁13が、複数の大梁3aの下面よりも下方に配置される場合に比して、天井本体11の下方に位置する下階2の部屋の天井高を高くすることができる。 In addition, the suspension beams 13 are arranged horizontally in parallel with the multiple girders 3a that make up the floor of the upper floor 3, so the suspension beams 13 and the girders 3a are arranged perpendicular to each other, preventing them from interfering with each other. This eliminates the need to arrange the upper surface of the suspension beams 13 lower than the lower surface of the girders 3a, preventing the height position of the ceiling body 11 supported by the suspension beams 13 from becoming lower. Therefore, for example, the ceiling height of the room on the lower floor 2 located below the ceiling body 11 can be made higher compared to when the suspension beams 13 are arranged lower than the lower surfaces of the multiple girders 3a.

また、遮音材17は、天井本体11の上面と吊梁13の下面との間を通過するように配置されているので、例えば遮音材17が吊梁13の上部を跨いだり、途中で途切れたりする場合に比して、高い遮音効果を発揮することができる。 In addition, the sound insulation material 17 is arranged so that it passes between the upper surface of the ceiling body 11 and the lower surface of the suspension beam 13, so that it can provide a high level of sound insulation compared to, for example, a case in which the sound insulation material 17 crosses over the top of the suspension beam 13 or is interrupted midway.

また、近年、二酸化炭素の排出量を実質ゼロにするカーボンニュートラルの推進による脱炭素社会の実現や、SDGs(Sustainable Development Goals)の目標達成が求められており、建築業界においても、建物を二酸化炭素排出量の少ない木造とする取り組みが進められている。本実施形態の吊天井構造及び当該吊天井構造が適用された建物1は、木造軸組工法によって建築されているので、カーボンニュートラルの推進による脱炭素社会の実現や、SDGsの目標達成に貢献できる。 In recent years, there has been a demand for the realization of a decarbonized society through the promotion of carbon neutrality, which reduces carbon dioxide emissions to virtually zero, and for the achievement of the SDGs (Sustainable Development Goals). In the construction industry, too, efforts are being made to build buildings using wood, which has low carbon dioxide emissions. The suspended ceiling structure of this embodiment and the building 1 to which this suspended ceiling structure is applied are built using the wooden frame construction method, and therefore can contribute to the realization of a decarbonized society through the promotion of carbon neutrality and the achievement of the SDGs.

〔変形例〕
なお、本発明を適用可能な実施形態は、上述した実施形態に限定されることなく、本発明の趣旨を逸脱しない範囲で適宜変更可能である。
[Modifications]
The embodiments to which the present invention can be applied are not limited to the above-described embodiments, and can be modified as appropriate without departing from the spirit of the present invention.

上記の実施形態においては、吊天井10の上部構造として、上階3の床が設けられているものとしたが、上部構造は、屋根であってもよい。屋根は、勾配屋根でもよいし、陸屋根でもよい。また、陸屋根の場合は、ルーフバルコニーも含まれるものとする。
上部構造として屋根が採用される場合、吊天井10における吊梁13は、例えば桁材や小屋梁等の横材に受け金物14がビス固定されたり、横材と直交する屋根の直下階の柱や吊束7に対して受け金物14がビス固定されたりすることで、屋根の小屋組に極力干渉しないように設けられる。また、耐火面材6も、屋根裏まで延出し、桁材や小屋梁等の横材や柱、吊束7に貼り付けられるものとする。
なお、上記の実施形態において説明した天井裏と同様、小屋裏にも断熱材や遮音材17が適宜設けられていて耐火性の向上に貢献している。
In the above embodiment, the floor of the upper floor 3 is provided as the upper structure of the suspended ceiling 10, but the upper structure may be a roof. The roof may be a sloped roof or a flat roof. In the case of a flat roof, a roof balcony is also included.
When a roof is used as the superstructure, the suspension beams 13 in the suspended ceiling 10 are installed so as to interfere as little as possible with the roof truss by, for example, fastening metal supports 14 with screws to cross members such as girders and rafters, or fastening metal supports 14 with screws to columns and hanging beams 7 on the floor directly below the roof that are perpendicular to the cross members. The fireproof surface material 6 also extends up to the attic and is attached to the cross members such as girders and rafters, columns, and hanging beams 7.
As with the attic space described in the above embodiment, heat insulation and soundproofing materials 17 are appropriately provided in the attic space, which contributes to improving fire resistance.

1 建物
2 下階
2e 下階柱
3 上階
3a 大梁
3d 上階床面材
4 胴差
5 梁
6 耐火面材
7 吊束
8 接合金物
10 吊天井
11 天井本体
11a 天井面材
11b 野縁
11c 野縁受け
12 吊木
13 吊梁
14 受け金物
Reference Signs List 1 Building 2 Lower floor 2e Lower floor column 3 Upper floor 3a Beam 3d Upper floor floor surface material 4 Girth 5 Beam 6 Fireproof surface material 7 Suspension beam 8 Joint metal 10 Suspended ceiling 11 Ceiling body 11a Ceiling surface material 11b Rafter 11c Rafter support 12 Suspension beam 13 Suspension beam 14 Support metal

Claims (7)

軸組工法で建てられる建物において上部構造の下方に間隔を空けて配置された吊天井の構造であって、
前記建物における躯体のうち屋内側面には耐火面材が貼り付けられており、
前記吊天井は、
天井本体と、
下端部に前記天井本体が取り付けられて前記天井本体を上方から吊り支える複数の吊木と、
前記複数の吊木における上端部が取り付けられた木質の吊梁と、
前記吊梁の端部を受けて当該吊梁と連結された受け金物と、を備えており、
前記耐火面材は、前記天井本体よりも下方の位置から前記受け金物の高さ位置よりも上方に延出し、前記受け金物は、前記耐火面材を介して、前記耐火面材が貼り付けられた前記躯体の一部に対して固定材で固定されていることを特徴とする吊天井構造。
A suspended ceiling structure arranged at intervals below the superstructure in a building constructed by a framework construction method,
A fireproof surface material is attached to the interior side of the building's structure,
The suspended ceiling is
The ceiling body and
A plurality of hanging bars having lower ends to which the ceiling body is attached and which suspend and support the ceiling body from above;
A wooden suspension beam to which the upper ends of the plurality of suspension beams are attached;
A receiving metal fitting is provided which receives an end of the suspension beam and is connected to the suspension beam,
A suspended ceiling structure characterized in that the fire-resistant surface material extends from a position below the ceiling body to a position above the height position of the receiving metal fitting, and the receiving metal fitting is fixed by a fixing material to a part of the structure to which the fire-resistant surface material is affixed, via the fire-resistant surface material.
請求項1に記載の吊天井構造において、
前記躯体は、
前記耐火面材が貼り付けられた横材と、
前記耐火面材が貼り付けられ、前記横材の下面に吊り下げられた状態に設けられた吊束と、を備えており、
前記受け金物は、前記吊束に対して前記固定材で固定されていることを特徴とする吊天井構造。
The suspended ceiling structure according to claim 1,
The body is
A cross member to which the fireproof surface material is attached;
The fire-resistant surface material is attached to the lower surface of the cross member, and a hanging bundle is provided in a suspended state.
A suspended ceiling structure characterized in that the support metal fitting is fixed to the suspension beam by the fixing material.
請求項1に記載の吊天井構造において、
前記躯体は、
前記耐火面材が貼り付けられた横材と、
前記耐火面材が貼り付けられ、前記横材と直交して前記横材を下方から支持する柱と、を備えており、
前記受け金物は、前記柱に対して前記固定材で固定されていることを特徴とする吊天井構造。
The suspended ceiling structure according to claim 1,
The body is
A cross member to which the fireproof surface material is attached;
The fireproof surface material is attached to a column that is perpendicular to the cross member and supports the cross member from below.
A suspended ceiling structure, characterized in that the support metal fitting is fixed to the column by the fixing material.
請求項1に記載の吊天井構造において、
前記躯体は、前記耐火面材が貼り付けられた横材を備えており、
前記受け金物は、前記横材に対して前記固定材で固定されていることを特徴とする吊天井構造。
The suspended ceiling structure according to claim 1,
The structure includes a cross member to which the fireproof surface material is attached,
A suspended ceiling structure characterized in that the support metal fitting is fixed to the cross member by the fixing material.
請求項1に記載の吊天井構造において、
前記受け金物は、
前記耐火面材を介して前記躯体の一部に対して前記固定材で固定される固定板部と、
前記固定板部の両側縁部から突出する一方及び他方の側板部と、を備え、
前記吊梁の端部は、前記一方及び他方の側板部間に配置され、これら側板部に固定されていることを特徴とする吊天井構造。
The suspended ceiling structure according to claim 1,
The receiving hardware is
A fixing plate portion fixed to a part of the frame by the fixing material via the fireproof surface material;
one and the other side plate portions protruding from both side edges of the fixing plate portion,
A suspended ceiling structure characterized in that the end of the suspension beam is positioned between the one and the other side plate portions and fixed to these side plate portions.
請求項1に記載の吊天井構造において、
前記上部構造は、複数の梁、複数の根太、床面材を少なくとも備えた上階の床であり、
前記複数の梁には、複数の大梁が含まれており、
前記吊梁は、前記複数の大梁と平行して水平に配置されていることを特徴とする吊天井構造。
The suspended ceiling structure according to claim 1,
The superstructure is an upper floor having at least a plurality of beams, a plurality of floor joists, and a floor surface material;
The plurality of beams includes a plurality of girders;
A suspended ceiling structure characterized in that the suspension beam is arranged horizontally in parallel with the plurality of main beams.
請求項1から6のいずれか一項に記載の吊天井構造において、
前記天井本体の上面には遮音材が敷設され、
前記遮音材は、前記天井本体の上面と前記吊梁の下面との間を通過するように配置されていることを特徴とする吊天井構造。
The suspended ceiling structure according to any one of claims 1 to 6,
A sound-proofing material is laid on the upper surface of the ceiling body,
A suspended ceiling structure characterized in that the sound-proofing material is arranged so as to pass between the upper surface of the ceiling body and the lower surface of the suspension beam.
JP2022186137A 2022-11-22 2022-11-22 Suspended ceiling structure Pending JP2024075028A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022186137A JP2024075028A (en) 2022-11-22 2022-11-22 Suspended ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022186137A JP2024075028A (en) 2022-11-22 2022-11-22 Suspended ceiling structure

Publications (1)

Publication Number Publication Date
JP2024075028A true JP2024075028A (en) 2024-06-03

Family

ID=91321749

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022186137A Pending JP2024075028A (en) 2022-11-22 2022-11-22 Suspended ceiling structure

Country Status (1)

Country Link
JP (1) JP2024075028A (en)

Similar Documents

Publication Publication Date Title
US7856786B2 (en) Wall and floor construction arrangements and methods
GB2440803A (en) Insulating structure
US20040250482A1 (en) Construction method and appartaus
JP2024075028A (en) Suspended ceiling structure
JP2002097730A (en) Fixing structure for partition wall
JP2007224586A (en) Composite structural building and method of constructing composite structural building
JP2999102B2 (en) Fire-resistant building units
JP6860354B2 (en) Building structure
JPH06136833A (en) Floor panel with ceiling, and room unit equipped with the panel
JP7431615B2 (en) Parting wall structure
JP7584950B2 (en) Soundproofing structures and buildings
RU2766109C2 (en) Prefabricated load-bearing structure of flooring and method for its formation
JP3967824B2 (en) Building floor sound insulation
EP1953300B1 (en) Arrangement for joining wood-based construction elements
JP3492091B2 (en) Unit building hut back
JP4018000B2 (en) Construction method of unit type building
RU1499U1 (en) BALCONY
JP2025012079A (en) Timber-clad steel structure and construction method thereof
JP3526333B2 (en) Building structure with long base
JP2024083154A (en) Bearing wall structure and building
JP2774059B2 (en) Three-storey unit building
JP2024131936A (en) Wiring unit, wiring structure and building
JP2024010904A (en) wall structure
JP2025019414A (en) Building construction method and building structure
JP2022157575A (en) Fire resistant building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250627

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20250627