JP2005282353A - Steel tower assembly method and work jig by helicopter - Google Patents
Steel tower assembly method and work jig by helicopter Download PDFInfo
- Publication number
- JP2005282353A JP2005282353A JP2005142623A JP2005142623A JP2005282353A JP 2005282353 A JP2005282353 A JP 2005282353A JP 2005142623 A JP2005142623 A JP 2005142623A JP 2005142623 A JP2005142623 A JP 2005142623A JP 2005282353 A JP2005282353 A JP 2005282353A
- Authority
- JP
- Japan
- Prior art keywords
- steel tower
- helicopter
- tower
- assembled
- guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
【課題】 短期間に効率よく、しかも安全に鉄塔の組立作業を行うことができるようにしたヘリコプタによる鉄塔組立工法及び作業用治具を提供する。
【解決手段】 地上において既設の鉄塔または所定部分組み立てられた鉄塔10の上部に取り付けられ、予め所定の枠組みに組み立てられ、ヘリコプタ20により搬送される鉄塔枠部材55を受ける荷受け用ガイド部58を備える。荷受け用ガイド部58は、既存の鉄塔構成部材26の四方にその長手方向に対して各々塔心方向に傾斜して延出して設けられている。組み上げられた鉄塔構成部材26の主柱材27の端部には、枠組みされて組み付けられる鉄塔枠部材26の下端部を受ける受け部材62が固定されている。受け部材62の外側には、ガイドリング66が取り付けられ、ガイドリング66に、枠組みされた鉄塔枠部材55の下端部に連結されたガイドロープ68が挿通される。
【選択図】図1PROBLEM TO BE SOLVED: To provide a steel tower assembling method using a helicopter and a work jig capable of efficiently and safely performing a steel tower assembling work in a short period of time.
SOLUTION: A load receiving guide portion 58 that is attached to an upper portion of an existing steel tower or a predetermined partially assembled steel tower 10 on the ground, is assembled in advance to a predetermined frame, and receives a steel tower frame member 55 conveyed by a helicopter 20 is provided. . The load receiving guide portions 58 are provided on the four sides of the existing steel tower component 26 so as to extend inclining in the tower center direction with respect to the longitudinal direction thereof. A receiving member 62 that receives the lower end portion of the steel tower frame member 26 that is assembled in a frame is fixed to the end portion of the main pillar member 27 of the assembled steel tower constituting member 26. A guide ring 66 is attached to the outside of the receiving member 62, and a guide rope 68 connected to the lower end portion of the framed steel tower frame member 55 is inserted into the guide ring 66.
[Selection] Figure 1
Description
本発明は、送電線が架設される鉄塔を新たに組み立てる場合や、既設の鉄塔を嵩上げする場合のヘリコプタを利用した鉄塔組立工法及び作業用治具に関する。 The present invention relates to a steel tower assembling method using a helicopter and a work jig when a steel tower on which a transmission line is installed is newly assembled or when an existing steel tower is raised.
従来、送電線の鉄塔の組み立てや嵩上げにおいては、設置場所の周辺に作業スペースを確保し、さらに山間地においては近隣の道路までの仮設の作業用道路を設営して工事を行っている。鉄塔の新設による組立作業は、設置個所に基礎を設け、下から順に鉄塔の構成部材をクレーンにより吊り上げてボルトとナットにより組み立てて行くものである。また嵩上げ作業は、新設の場合と同様にクレーンで鉄塔構成部材を吊り下げて、既設鉄塔の所定部位から鉄塔構成部材を側面に固定して、順に組み立てて行くものである。
従来の鉄塔組立工法においては、鉄塔の周辺及び近くの道路までの作業スペースを広く必要とし、作業のための準備期間やクレーン等の大型の重機を長期間必要とし、さらに用地の確保にも多くのコストがかかり、全体として膨大な費用を要する上、組み立て作業自体も工数のかかるものであった。 The conventional steel tower assembly method requires a large work space around the steel tower and nearby roads, requires a large period of preparation for work and large heavy machinery such as cranes, and also secures land. In addition, it requires a huge amount of money as a whole, and the assembly work itself takes time.
この発明は上記従来の問題点に鑑みて成されたものであり、短期間に効率よく、しかも安全に鉄塔の組立作業を行うことができるようにしたヘリコプタによる鉄塔組立工法及び作業用治具を提供することを目的とする。 The present invention has been made in view of the above-described conventional problems, and includes a tower assembly method using a helicopter and a work jig that can efficiently and safely perform the tower assembly work in a short period of time. The purpose is to provide.
この発明は、地上から組み上げられた鉄塔構成部材の上部に、互いに対向して長手方向に対して各々塔心方向に傾斜して延びた複数の荷受け用ガイド部を設置し、予め所定の枠組みに組み立てられた鉄塔枠部材をヘリコプタにより搬送し、ヘリコプタにより搬送された鉄塔枠部材の下端部を上記ガイド部に沿って上記鉄塔構成部材上に降ろし、この後、このガイド部により位置決めされた上記鉄塔枠部材を、既に組み立てられた鉄塔構成部材に組み付けるヘリコプタによる鉄塔組立工法である。 In this invention, a plurality of guides for receiving cargo are installed on the upper part of a steel tower component assembled from the ground so as to be opposed to each other and inclined in the direction of the tower center with respect to the longitudinal direction. The assembled steel tower frame member is transported by a helicopter, the lower end portion of the steel tower frame member transported by the helicopter is lowered onto the steel tower component member along the guide section, and then the steel tower positioned by the guide section This is a steel tower assembly method using a helicopter for assembling a frame member to a steel tower component already assembled.
またこの発明は、地上において既設の鉄塔または所定部分組み立てられた鉄塔の上部に取り付けられ、予め所定の枠組みに組み立てられヘリコプタにより搬送される鉄塔枠部材を受ける荷受け用ガイド部を備え、この荷受け用ガイド部は、既存の鉄塔構成部材の四方にその長手方向に対して各々塔心方向に傾斜して延出して設けられているヘリコプタによる鉄塔組立作業用治具である。 The present invention also includes a load receiving guide portion that is attached to an upper portion of an existing steel tower or a predetermined partially assembled steel tower on the ground and receives a steel tower frame member that is assembled in advance to a predetermined frame and conveyed by a helicopter. The guide portion is a steel tower assembling jig using a helicopter provided to be inclined and extend in the direction of the tower center with respect to the longitudinal direction of each of the existing steel tower constituent members.
組み上げられた鉄塔構成部材の主柱材の端部には、枠組みされて組み付けられる鉄塔枠部材の下端部を受ける受け部材が固定され、この受け部材の外側にはガイドリングが取り付けられ、このガイドリングには、枠組みされた前記鉄塔枠部材の下端部に連結されたガイドロープが挿通されるものである。 A receiving member for receiving the lower end portion of the steel tower frame member assembled in a frame is fixed to the end of the main pillar member of the assembled steel tower component, and a guide ring is attached to the outside of the receiving member. A guide rope connected to a lower end portion of the framed steel tower frame member is inserted through the ring.
本発明のヘリコプタによる鉄塔組立工法及び作業用治具は、鉄塔設置場所における作業スペースを最小限にして作業可能であり、大型のクレーン等の重機を必要とせず、鉄塔の組立作業も迅速に行うことができる。従って、従来のように作業スペースの確保ための費用や準備期間を必要とせず、コストも安価に作業を行うことができる。また、この発明のヘリコプタによる鉄塔組立工法に用いる作業用治具は、作業を確実且つ迅速に行うことができるとともに、安全に遂行可能とするものである。 The steel tower assembling method and work jig by the helicopter of the present invention can be operated while minimizing the work space at the steel tower installation place, does not require heavy machinery such as a large crane, and quickly performs the steel tower assembly work. be able to. Therefore, it is possible to work at a low cost without requiring a cost and a preparation period for securing a work space as in the prior art. Moreover, the working jig used in the steel tower assembling method using the helicopter according to the present invention can perform the work reliably and quickly and can be performed safely.
以下、この発明の一実施形態のヘリコプタによる鉄塔組立工法と作業治具について、図面を基にして説明する。この実施形態は、既設の鉄塔10を嵩上げする場合にのものである。まず、図2に示すように、鉄塔10に架設された地線12を鉄塔10の頂部10aに設けられた金車14を介して頂部10aの僅かに下方の位置に移線する。このとき、鉄塔10の頂部10aの、前後の地線12に3個ずつの目標物16を吊り下げる。吊り下げ位置は、例えば鉄塔頂部10aから68m、12m、及び鉄塔10の近隣部の3箇所ずつ対称に設ける。目標物16は、例えばピンク色のパイロンに、黄色の縞が形成されたもので、自然界になく目立つものとする。目標物16は、ガイドローラ18により地線12に沿って容易に移動可能に設けられている。目標物16は、ヘリコプタ20が鉄塔10の上空で、一定の位置に正確にホバリング可能とするためのものである。
Hereinafter, a steel tower assembling method using a helicopter and a working jig according to an embodiment of the present invention will be described with reference to the drawings. This embodiment is for raising an existing
ヘリコプタ20には、吊り下げ用の一定長さのワイヤ22が垂下され、ワイヤ22の先端には、吊り下げ対象に係合させる係合部材24が連結されている。係合部材24ヘリコプタ20側から係合及び係合解除が可能なものである。
The
鉄塔10には、電力線31,32,33の邪魔にならない位置に、荷受け台40を設ける。荷受け台40は、ヘリコプタ20により搬送される鉄塔構成部材26を一時的に係止するもので、搬送される鉄塔構成部材26の一端部には、フック28が予めボルト等により固定されている。フック28には吊り下げ用のワイヤ23を通す孔29が形成され、ワイヤ23がヘリコプタ20から吊り下げられた係合部材24に掛けられる。フック28が係合する荷受け台40は、鉄塔10の上部の対向する主柱材11に各々固定されたブラケット材42と、ブラケット材42間に架け渡して設けられた棒状の荷受け部材44からなる。ブラケット材42は、主柱材11にボルトとナットにより固定される。
The
既設の鉄塔10の電力線31,32,33は、2本ずつが、互いに対称の位置で、鉄塔10の側方に延びた3対の腕金34,35,36の先端部に係止され、架設されている。
Two
鉄塔10には、搬送された鉄塔構成部材26を吊り下げて降ろすための滑車46が、ブラケット48により主柱材11に取り付けられて設けられている。滑車46及びブラケット48の位置は、荷受け台40に係合された鉄塔構成部材26を吊り下げ可能な位置であれば良く、図1に示すように、鉄塔10の頂部10a近傍や図3に示すように、鉄塔10最上部の腕金36の位置でも良い。ブラケット48は、水平方向に90°揺動可能に設けられている。
On the
鉄塔10の嵩上げに際しては、図4に示すように、既設の鉄塔10の4本の主柱材11の所定部位に、ボルト挿通孔を空けて、嵩上げを始める基端部材50をボルトにより固定する。この基端部材50の先端部の取付孔52に、各鉄塔構成部材26をボルトにより固定し、さらに鉄塔構成部材26同士をボルトにより固定して順に嵩上げを行う。鉄塔構成部材26を荷受け台40から降ろすには、図5に示すように、荷受け台40に係合した鉄塔構成部材26に、そのままワイヤ23と滑車46に掛けられたワイヤ54を連結し、鉄塔構成部材26の下端部にも安定用のガイドロープ56を取り付けて、基端部材50の位置又はその上方の組立中の鉄塔構成部材26の先端部まで降ろす。
When raising the
また、既設の鉄塔10の頂部10aの近くまで、嵩上げした鉄塔構成部材26ができあがると、嵩上げした鉄塔構成部材26の先端部に、予め枠組みした鉄塔枠部材55を組み付けることができる。先ず、嵩上げした鉄塔構成部材26の4本の主柱材27となる部材の最先端部56に、く字状に屈曲したガイド部58をボルトにより固定する。ガイド部58は、断面がL字状の鋼材であり、主柱材27の内側に固定され、ガイド部58の屈曲した端部58aは、各々嵩上げした主柱材27の塔心側に向いて傾斜している。
Further, when the raised
さらに、主柱材27の端部の外側には、スペーサ60を介して枠組みされた鉄塔枠部材55の下端部を受ける受け部材62が固定される。受け部材62は、断面がL字状の鋼材であり、外側に角部の孔64にはガイドリング66が取り付けられている。ガイドリング66には、枠組みされた鉄塔枠部材55の下端部に連結された安定用のガイドロープ68が挿通される。これにより主柱材27と枠組みされた鉄塔枠部材55の下端部とがスペーサ60、受け部材62を挟んで対向するように連結される。
Further, a receiving
ヘリコプタ20により搬送されてきた鉄塔枠部材55は、ガイド部58が設けられた位置に待機した作業員により、受け部材62のガイドリング66に挿通されたガイドロープ68が下端部に取り付けられ、ヘリコプタ20の降下とともに鉄塔枠部材55がガイド部58に当接しながら主柱材27の端部に位置決めされる。このとき、ガイド部58は各々塔心側を向いて端部58aが傾斜しているので、鉄塔枠部材55の多少の位置ズレを矯正しながら主柱部材27の端部へ導く。また、このときガイドロープ68により、鉄塔枠部材55を引くことにより、より安定に降下させることができる。
The steel
この実施形態の鉄塔組立工法によれば、既設の鉄塔10の周囲に多くの場所を取らなくても嵩上げ作業を容易に行うことができ、施工期間も短いものである。また、専用の治具を用いることにより、容易にヘリコプタ20により搬送した鉄塔構成部材26を既設の鉄塔10に係合させることができ、その後の作業を容易なものとする。嵩上げされた新鉄塔70は、既設の鉄塔10の外側に強固に固定され、使用した治具等の部材も、容易に撤去可能であり、またはそのまま設置しておいても良く、極めて作業性がよい。
According to the steel tower assembly method of this embodiment, the raising work can be easily performed without taking up many places around the existing
10 鉄塔
16 目標物
20 ヘリコプタ
22 ワイヤ
24 フック部
26 鉄塔構成部材
40 荷受け台
46 滑車
55 鉄塔枠部材
58 ガイド部
DESCRIPTION OF
Claims (3)
A receiving member for receiving the lower end portion of the steel tower frame member assembled in a frame is fixed to the end of the main pillar member of the assembled steel tower component, and a guide ring is attached to the outside of the receiving member. The steel tower assembling jig according to claim 2, wherein a guide rope connected to a lower end portion of the steel tower frame member is inserted into the ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005142623A JP4099491B2 (en) | 2005-05-16 | 2005-05-16 | Steel tower assembly method and work jig by helicopter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005142623A JP4099491B2 (en) | 2005-05-16 | 2005-05-16 | Steel tower assembly method and work jig by helicopter |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003373895A Division JP3717910B2 (en) | 2003-11-04 | 2003-11-04 | Steel tower assembly method by helicopter |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2005282353A true JP2005282353A (en) | 2005-10-13 |
JP4099491B2 JP4099491B2 (en) | 2008-06-11 |
Family
ID=35181043
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005142623A Expired - Lifetime JP4099491B2 (en) | 2005-05-16 | 2005-05-16 | Steel tower assembly method and work jig by helicopter |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4099491B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967902A (en) * | 2010-09-25 | 2011-02-09 | 中国电力科学研究院 | Basic guide rail for helicopter assembly transmission line iron tower leg section |
CN103031978A (en) * | 2012-12-12 | 2013-04-10 | 中国电力科学研究院 | Installation assisting system for erection of power transmission line iron tower and erection method for iron tower |
CN103485572A (en) * | 2013-09-27 | 2014-01-01 | 国家电网公司 | Method for suspending steel frame and steel frame for DC filter of converter station with suspension cable |
WO2015049520A1 (en) * | 2013-10-04 | 2015-04-09 | Babcock Networks Limited | Tower construction |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967903A (en) * | 2010-09-25 | 2011-02-09 | 中国电力科学研究院 | Basic guide rail for helicopter assembly transmission line iron tower leg section |
CN105464456B (en) * | 2015-12-30 | 2017-09-01 | 国家电网公司 | Method and spreader for erecting UHV transmission towers by helicopter |
JP6675536B1 (en) * | 2019-06-19 | 2020-04-01 | 株式会社ノーム | Eaves type protector, building, construction construction transportation moving installation method |
-
2005
- 2005-05-16 JP JP2005142623A patent/JP4099491B2/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967902A (en) * | 2010-09-25 | 2011-02-09 | 中国电力科学研究院 | Basic guide rail for helicopter assembly transmission line iron tower leg section |
CN101967902B (en) * | 2010-09-25 | 2013-11-27 | 中国电力科学研究院 | A basic guide rail for the tower leg section of a transmission line erected by a helicopter |
CN103031978A (en) * | 2012-12-12 | 2013-04-10 | 中国电力科学研究院 | Installation assisting system for erection of power transmission line iron tower and erection method for iron tower |
CN103485572A (en) * | 2013-09-27 | 2014-01-01 | 国家电网公司 | Method for suspending steel frame and steel frame for DC filter of converter station with suspension cable |
WO2015049520A1 (en) * | 2013-10-04 | 2015-04-09 | Babcock Networks Limited | Tower construction |
GB2519663A (en) * | 2013-10-04 | 2015-04-29 | Babcock Networks Ltd | Tower construction |
Also Published As
Publication number | Publication date |
---|---|
JP4099491B2 (en) | 2008-06-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109335949A (en) | The method of scale beam type counter-jib suspender and its hoisting steel beam component | |
EP3498655B1 (en) | Crane assembling method | |
CN102674136A (en) | Lifting method for large-scale tower equipment | |
CN104695752A (en) | Rapid repairing tower system and erection method thereof | |
JP2003184730A (en) | Climbing device for constructing wind generator and method for constructing wind generator | |
JP6309400B2 (en) | Pile removal method | |
JP4099491B2 (en) | Steel tower assembly method and work jig by helicopter | |
CN103741964B (en) | The method for dismounting of rake mast-up and armored concrete channel roof slab | |
CN104797766B (en) | Assembly type chimney demolition scaffold device and used the device assembly type chimney method for dismounting | |
CN104989111B (en) | Steel construction high level construction method for hanging | |
JP3717910B2 (en) | Steel tower assembly method by helicopter | |
CN105971654A (en) | Process for rapidly assembling shield-type hydraulic support underground | |
CN205114843U (en) | Prefabricated post hoist device with unhook function | |
JP5421143B2 (en) | Overhead crane installation equipment | |
JP5356091B2 (en) | Crane girder exchanging method and crane girder exchanging apparatus | |
JP3988937B2 (en) | Steel tower raising method | |
CN101973491B (en) | Construction method for hoisting by using double-tower low-pylon self-balanced elevating device | |
JP2010047995A (en) | Leader changing method of pile driver | |
JP3947542B2 (en) | Steel tower lifting and dismantling method and tower receiving bracket for the method | |
JP2014084199A (en) | Method for installing overhead crane | |
JP2018178633A (en) | Rotor installation method and rotor installation apparatus | |
JP3053296B2 (en) | Pillar hanging jig | |
JP5948828B2 (en) | Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof | |
CN210763953U (en) | Auxiliary frame for hoisting travelling beam and upright column in underground mine chamber | |
CN204959605U (en) | Knotted rope hookup |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060126 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071010 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071017 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071213 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080214 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080317 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 4099491 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110321 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110321 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130321 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130321 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140321 Year of fee payment: 6 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |